Sustainability Management Plan for 423-425 Smith Street Fitzroy Stage 2 Issued: 28 November 2017 Final prepared by Co-Perform p Sustainable Building Consultancy Level 2, 696 Bourke Street, Melbourne PLANNING & ENVIRONMENT ACT 1987 YARRA PLANNING SCHEME Report referred to in Permit No. P 4 - 1 4 1 (6/ 099 3 relating to Condition No et 4 1 4 47 For and on behalf of the Responsible Authority DATE 7 / 3 / ( 8 PAGES This is NOT a Building Permit

Upload: others

Post on 08-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Sustainability Management Plan

for

423-425 Smith Street Fitzroy Stage 2

Issued: 28 November 2017

Final

prepared by

Co-Perform p Sustainable Building Consultancy

Level 2, 696 Bourke Street, Melbourne

PLANNING & ENVIRONMENT ACT 1987 YARRA PLANNING SCHEME

Report referred to in Permit No. P4-141(6/0993

relating to Condition No

et41447 For and on behalf of the Responsible Authority

DATE 7 / 3 / ( 8 PAGES This is NOT a Building Permit

Page 2: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

ASMAY •ovl ni of b9.n9191 tiociE.61

• •00 noifibno0 o± prlitwoi

.!oGruA ,...ddier;ocianS1 r1l lo tl6ded no bni. liJ'R 3A3A9 i 1 3TA0

• TOO ei erti-

Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2

Contents

1. EXECUTIVE SUMMARY 1 1.1 Sustainability Management Plan Purpose 1 1.2 Key ESD attributes of the development 2 1.3 Best practice assessment against specific tools 3

2. INTRODUCTION 4 2.1 Description of the site and building 4 2.2 Assessment tools 4

3. 10 KEY SUSTAINABLE DESIGN CRITERIA 5 3.1 Management 5 3.2 Water 5 3.3 Energy 6 3.4 Stormwater 7 3.5 Indoor environment quality 8 3.6 Transport 9 3.7 Waste 10 3.8 Urban ecology 10 3.9 Innovation 10 3.10 Materials 11

APPENDIX A — BESS ASSESSMENT (BUILT ENVIRONMENT SUSTAINABILITY SCORECARD)

APPENDIX B — INDOOR ENVIRONMENT QUALITY CALCUATIONS — DAYLIGHT ASSESSMENT

APPENDIX C — BEST PRACTICE WSUD APPENDIX D — WATER EFFICIENT LANDSCAPING

APPENDIX E — LOW VOC CRITERIA APPENDIX F — GLOSSARY & NOMENCLATURE

Issue and change log

Current issue

Date Purpose of issue and changes Status Issued: 28 November 2017 Issued for planning approval

(incorporated VCAT conditions) Final

Prior issues

Date Purpose of issue and changes Status Issued 29 September 2016 Issued for planning approval Final Issued 19 September 2016 Issued for comment

General updates. Draft

Issued 29 April 2016 Issued for comment Amended to Stage 2 SMP rather than Stage 1

Draft

Issued 21 March 2016 Issuecifor comment i ic) ,. ., I I/I A/A , {Draft

Co -Perform Pty Ltd Issued 28 November 2017 (Final)

Page 3: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2

1. Executive summary

1.1 Sustainability Management Plan Purpose

This Sustainability Management Plan provides a detailed sustainability assessment of the project at the planning stage. It addresses 10 sustainable design criteria and demonstrates that a holistic ESD (ecologically sustainable development) review has been undertaken. This document also identifies responsibilities for the implementation of the various ESD aspects through the life of the project (design through construction to operation and maintenance).

This SMP relates to Stage 2 of the development, that is: Level 3 and above only.

This Sustainability Management Plan is in accordance with: • The Yarra Planning Scheme — primarily:

o Clause 21.07 Environmental Sustainability. o Clause 22.16 Stormwater Management (Water Sensitive Urban Design). ■ Refer to 3.4 Stormwater and Appendix C.

o Clause 22.17 Environmentally Sustainable Development. ■ Best practice ESD: refer to BESS results in Appendix A including detailed responses for

individual ESD categories as noted in Appendix A and as further detailed in Section 3. o 52.34 Bicycle Facilities. ■ Refer to 3.6 Transport.

o 56.07 Integrated Water Management. ■ Drinking water supply objectives: refer to Section 3.2 Water, 3.4 Stormwater and

Appendix C. • Reused and recycled water objective : Refer to 3.4 and Appendix C. • Waste water management objective: to comply with the relevant standards and to be

addressed at the design phase. ■ Urban run-off management objectives: Refer to 3.4 Stormwater and Appendix C.

• The City of Yarra SDAPP (Sustainable Design Assessment in the Planning Process) framework. • VCAT conditions dated 10 October 2017:

5a Glass facade to have a minimum light transmittance of 32%. • Refer to Section 3.5 which specifically nominates this requirement.

5b Operable elements in the façade and mixed mode HVAC or consider mechanical ventilation with heat recovery and outdoor air rates 100 per cent increase on AS1668 rates.

• Refer to Section 3.3 and 3.5 which nominate the mechanical ventilation with heat recovery and increased outdoor rates.

5c A minimum of 130 bicycle parking spaces. • Refer to Section 3.6 (transport) and 3.9 (innovation) and to the Architectural drawings

that indicate the 130 bicycle spaces. 5d The inconsistencies between the WELS water efficiency standard of fittings and fixtures in the

BESS report that vary from the body of the sustainable management plan rectified. • Refer to Section 3.2; note that water efficiency commitments are generally improved

from the previous version of the SMP. 5e All stormwater management features (e.g. rain tank volume and location, toilet flush

connections, etc) to be shown on the plans when finalised. • Refer to the Architectural documents.

5f Indicate on plans which toilets are in 'stage 2' and connected to rainwater tanks for flushing. • For the purposes of this SMP, Stage 2 is defined as Levels 3 and above. Refer to

Appendix C for confirmation of toilet connections and to the Architectural documents. 5g Details of the water efficient landscaping mentioned in the sustainable management plan.

• Refer to the Landscape documents. 5h A recycling system at least as convenient as the general waste system.

• Refer to Section 3.7 which nominates a Waste Management Plan to be approved by the Authority and to in accordance with guidelines that require recycling to at least as convenient as the general waste system.

5i Indicate the approximate size of the solar PV array. • Refer to Section 3.3 and the Architectural plans that show a 12kW solar PV array.

Co-Perform Pty Ltd

Issued: 28 November 2017 (Final) Page 1

Page 4: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2

The following key sustainable building categories have been addressed: 1. Management 6. Transport 2. Water 7. Waste 3. Energy 8. Urban ecology 4. Stormwater 9. Innovation 5. Indoor environment quality 10. Materials

1.2 Key ESD attributes of the development

The development will meet the planning requirements of the City of Yarra with enhanced ESD attributes as outlined in this SMP. This will ensure an appropriate level of sustainability for the development; and, in doing so, will: provide community benefits; manage environmental impact; improve the indoor environment; and facilitate the efficient use of existing energy, water and transportation infrastructure.

A key sustainability attribute of the development is its location that is highly "walkable" and has excellent proximity to public transport links and a wide array of retail and social infrastructure such as supermarkets, restaurants, and specialty stores along Smith St, Officeworks, and schools, groceries, etc. The development location achieves a "walkers paradise" 97 points out of 100 on walkscore.com.

97 Walker's Paradise Travel Time Map

Explore hoe far you can travel by car, bus Dike artO DWI Dorn 425 5,,1e1 Street.

Additional significant sustainability benefits of the development include: • The development builds upon an existing heritage building, this provides many benefits:

o Retaining the heritage building in Stage 1 had environmental sustainability benefits. Conserving heritage buildings reduces energy usage associated with demolition, waste disposal and new construction, and promotes sustainable development by conserving the embodied energy in the existing buildings.

o The heritage of the local area is retained while increasing density on an existing site with excellent transportation acess and walkability.

• Innovative approach to consider that the existing building could be retained and the inherent structural capacity utilised in increase the site yield.

• Energy reduction from the minimum regulatory requirements through various strategies such as glazing thermal performance, efficient lighting, efficient hot water heating and efficient airconditioning systems.

• Water efficient showers and a high efficiency instantaneous gas hot water system are proposed. • Best practice water sensitive urban design (WSUD) evidenced by a 100 STORM rating. • Water efficient fixtures and fittings generally plus rain water collection and re-use for toilet flushing

for Levels 3 to 7. • Cyclist provisions for the employees and visitors that are 100% in excess of planning scheme

requirements. • Provisions to properly manage recyclables and waste from the site. • Low VOC paints, adhesives, sealants and floor coatings/coverings to improve indoor air quality. • Building Users Guide.

Co-Perform Pty Ltd

Issued 28 November 2017 (Final) Page 2

Page 5: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Fitzroy Plaza Stage 2 0

+56% Project Details

Management 37% 0

Water 75% • Energy 55% 0

Stormwater 100% • IEQ 33% 0

Transport 37% 0

Waste 66% 0

Urban Ecology 25% 0

Innovation 60% 0

Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2

1.3 Best practice assessment against specific tools

Best practice assessments have been performed in accordance with the "example tools" nominated in the Yarra Planning Scheme clause 22.17-4 (application requirements).

BESS assessment of the development

A BESS (Built Environment Sustainability Scorecard) assessment has been performed and the scorecard is provided in Appendix A. The scorecard assesses the development proposal as follows:

• 56% = best practice.

It is noted that the full IEQ score is not reflected in the BESS tool and therefore the score summary adjacent does not show a score for IEQ equal to or above 50% as required. Refer to Section 3.5 for additional IEQ items that are not scored in BESS and an explanation of why, when all items are taken into account, best practice IEQ is achieved.

STORM

A STORM assessment has been performed and the results included in Appendix B.

• 100 STORM rating = best practice water sensitive urban design

Co-Perform Pty Ltd

Issued: 28 November 2017 (Final) Page 3

Page 6: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2

2. Introduction

2.1 Description of the site and building

The proposed development is located on an approximately 2.730m2 site at 423-425 Smith Street Fitzroy and comprises the addition of office floors above the existing heritage building. This SMP relates to Stage 2 of the development, that is: Level 3 and above only. Stage 2 of the development comprises approximately 7,350sqm of base building office space (excluding circulation and amenities) with an assumed base building population of 735 people (based on AS1668.2-2012 Table Al tabulated rates for office areas).

This SMP relates to Stage 2 of the development, that is: Level 3 and above only. Notwithstanding, there were some elements of Stage 1 of the development that were provided to service Stage 2, namely: bicycle parking, rain water tank and associated rain water reticulation; these items are included in this report where they are applicable to Stage 2.

2.2 Assessment tools

The appropriate ESD assessment tool for this development is defined in the Yarra Planning Scheme Clause 22.17 Environmentally Sustainable Development.

BESS (Built Environment Sustainability Scorecard)

BESS assesses water and energy efficiency, stormwater quality, indoor environment quality and overall environmental sustainability performance of new buildings and alterations. It was created to assist builders and developers to demonstrate that they meet sustainability information requirements as part of a planning permit applications. BESS supports the 'Sustainable Design Assessment in the Planning Process' framework.

The BESS tool assesses projects against a benchmark in nine environmental categories (refer to Appendix A for the list of categories). Within each category, points are available for various design strategies relevant to that category. There are four mandatory categories with minimum pass rates: • Indoor Environment Quality (IEQ). • Energy. • Water. • Stormwater.

The overall BESS score is shown as a percentage figure. This figure represents a percentage improvement over a benchmark project.

• A score of 50% and higher equates to 'best practice' and is an effective pass of the BESS tool.

• A score of 70% and higher equates to BESS 'excellence' and exists as a higher benchmark in the tool.

Co-Perform Pty Ltd

Issued: 28 November 2017 (Final) Page 4

Page 7: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Collect and use rain Use of alternate water on site. water sources

Refer to the stormwater management section for further details.

Achieve a 100 STORM rating (refer also to section 3.4).

Design: • Arch • Hyd-Des Construction: • Bldr • Hyd-lnst Operation: • Bld-Mgr • Hyd-Maint

Rainwater harvesting will be integrated into the development. The rain water will be utilised for toilet flushing on Levels 3 to 7. Refer to Appendix C and the stormwater management section (Section 3,4) for further details.

Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2

3. 10 key sustainable design criteria

3.1 Management Objective: Sustainability is integrated from concept design through the construction process ensuring good decisions made early in a way that balances maximum benefit appropriate cost. Best practice building management also means giving future occupants the information they need to be able to run their buildings in an efficient way.

Performance Project Response: Maintenance Responsibility: standard:

No specific maintenance impact.

Design: • PM Construction: • Builder Operation: • - Design: • Mech-Des • Elec-Des • Hyd-Des Construction: • Mech-lnst • Elec-lnst • Hyd-lnst Operation: • -

ESD Professional

Metering

Building Users Guide

Ensure professional ESD advice is provided to the project at key stages.

Provide accessible electricity metering to all major energy uses and for water common area uses.

Clear and simple information that enables building users to optimise the buildings environmental performance.

An ESD professional has been engaged and provided advice regarding best practice ESD from the early design stage.

Individual electricity meters shall be provided to individual commercial tenants.

Metering should be provided for major common area services:

• Airconditioning plant. • Artificial lighting. • Appliance power. • Central hot water supply. • Lifts. Ensure that meters are located in areas which are easy to access to facilitate regular monitoring. For example, plant rooms, main distribution room or control room etc. Building Users Guides should be prepared and provided to occupants.

No specific maintenance impact.

This initiative Design: does not have • PM an ongoing Construction: maintenance • - impact. Operation:

• -

3.2 Water Objective: To ensure the efficient use of water, to reduce total operating potable water consumption and to encourage the appropriate use of alternative water sources.

Performance standard

Project Response

Maintenance

Responsibility

Fire test water reclaim

Landscaping Water efficient landscaping

Significant reduction in potable water consumption for fire testing.

Design: • L'scape-Des • Arch Construction: • Builder Operation: • Bldg-Mgr Design: • Fire-Des • Arch Construction: • Fire-Inst Operation: • Fire-Maint

Planting should include water efficient varieties.

Refer to the landscape documents and Appendix D for further information.

The fire systems should reduce typical testing water consumption by up to 75% through the incorporation of bell check valves on the sprinkler control valves, specific valving arrangements and an increased period between testing a typical single pass arrangement).

Plant areas must be maintained

The Fire system Operating and Maintenance Manual is to include procedures that reduce fire test water consumption.

Co-Perform Pty Ltd

Issued: 28 November 2017 (Final) Page 5

Page 8: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2

Performance standard

Project Response

Maintenance Responsibility

Water efficient fixtures and appliances

Use fittings and fixtures with a high water rating (WELS).

Through the use of water efficient fittings as nominated in Appendix A, plus rain water harvesting and reuse for toilet flushing on Levels 3 to 7, the development proposes to incorporate a high degree of water efficiency.

Minimum WELS star rating of fixtures: • Showerhead:

3 star WELS (>6.0 but <= 7.5 Ipm).

• Kitchen taps: >4 star WELS rating.

• Bathroom taps: >5 star WELS rating.

• Toilet: >4 star WELS rating.

• Urinals: >5 star WELS rating.

All airconditioning systems in the building will be air-cooled. No water-based heat rejection systems will be installed. The water efficiency benefit is that air-cooled systems have no water consumption in operation whereas water-cooled systems are large water consumers.

Water efficient fixtures and appliances are not expected to create an adverse maintenance impact.

Design: • Arch • Mech-Eng Construction: • Bldr Operation: • -

3.3 Energy Objective: To ensure the efficient use of energy to reduce total operating greenhouse gas emissions and to reduce energy peak demand.

Performance standard

Project Response

Maintenance

Responsibility

Building envelope, layout and orientation

Comply with the regulatory requirements for the building fabric and exceed these requirements where reasonable.

Comply with or exceed the minimum building regulatory requirements for the building fabric. Energy reduction of 20 to 30% from the minimum regulatory requirements is proposed to be incorporated through various strategies such as glazing thermal performance, efficient lighting, efficient hot water heating and efficient airconditioning systems. The 20 to 30% reduction is notionally a 4 star NABERS target, this will be assessed further in the design phase.

Improved thermal comfort by passive strategies means reduced reliance on mechanical heating and cooling.

Design: • Arch • ESD Construction: • Bldr Operation. • -

Renewable energy

Provide renewable energy to reduce the operational greenhouse gas emissions of the development.

A 12W photovoltaic array is proposed. This is sized to approximate the lighting energy of the circulation and amenites spaces in Stage2. The PV sysem will reduce the reliance on Authority power in the common areas.

The photovoltaic array and inverter will require annual maintenance.

Design • Elec-Des Construction: • Elec-Inst Operation: • Bld-Mgr Elec-Maint

Peak electrical load reduction

Reduce peak demand load on the electricity network infrastructure.

The combination of the initiatives noted above (e.g. efficient glazing, HVAC, lighting, domestic hot water and vertical transport) and photovoltaic panels will all have a significant impact on reducing the peak demand for electricity.

Initiatives are not expected to have a maintenance impact.

Refer to various initiatives above.

Co-Perform Pty Ltd

Issued: 28 November 2017 (Final) Page 6

Page 9: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

SuStainability Management Plan 423-425 Smith Street Fitzroy Stage 2

Performance standard

Project Response

Maintenance Responsibility

Heating and cooling systems

Select high efficiency air conditioning systems.

Heating and cooling systems are to be within one Star of the best available, or Coefficient of Performance (COP) & Energy Efficiency Ratios (EER) 85% or better than the most efficient equivalent unit / capacity.

Mechanical ventilation with heat recovery as nominated in the VCAT conditions.

Air-conditioning systems should be selected from well established brands that have a proven low maintenance requirement.

Design: • Arch • Mech-Des Construction: • Mech-Inst Operation: • Bld-Mgr Mech-Maint

Lighting Meet or exceed BCA minimum requirements for energy density.

Select energy efficient light fittings and lamps.

Install energy efficient control systems to external areas and common areas.

The project will target a 20% reduction on BCA energy density requirements by the correct design of lighting levels and the selection of energy efficient lamps such as LED lighting (i.e. to commercial tenancies, car park, etc.).

Occupants should have the ability to control the lighting in their immediate environment.

Common areas such as service areas and corridors will be provided with motion sensors and/or time clock controls.

Control external lighting by daylight sensor, timeclock and motion detection.

Light fitting locations and selections should ensure that the system is readily maintainable. Lamp cleaning is important to ensure good quality lighting and changing of lamps is to be safe and reasonably easy.

Design: • Elec-Des Construction: • Elec-lnst Operation: • Bld-Mgr Elec-Maint

• Gas fired continuous flow hot water systems will be selected from amongst the most efficient units available (>90% efficiency). This will reduce greenhouse emissions by 15% when compared to typical gas storage systems.

Continuous flow hot water systems are an established technology with a proven maintenance record.

Design: • Hyd-Des • Elec-Des Construction: • Hyd-lnst • Elec-lnst Operation: • Bld-Mgr • Hyd-Maint Elec-Maint

Water

A high efficiency hot water heating system.

3.4 Stormwater

Objective: To reduce the impact of stormwater runoff, to improve the water quality of stormwater runoff, to achieve best practice stormwater quality outcomes and to incorporate the use of water sensitive urban design.

Performance standard Project Response

Maintenance Responsibility

Urban Stormwater Best Practice Environ'l Management Guidelines (BPEG)

Achieve best practice by meeting the guidelines set out in the BPEG. Melbourne Water deem best practice to be met if a rating of 100 or more is achieved on Melbourne Water's "STORM" tool.

A STORM rating of 100 is achieved through the following:

• Connect a minimum of 1,875m2 of roof and balcony/terrace area to a 30,000 litre rain water tank.

• Connect harvested rainwater from the tank to all toilets throughout Stage 2 (Levels 3 to 7) for flushing purposes. Flushing systems are to incorporate mains backup.

Refer to Appendix C. for the details of the STORM assessment.

The stormwater management initiatives identified create added management responsibilities during operation.

The rain water system will incorporate a filter and pumps that require maintenance.

Design: • Arch • Hyd-Des Construction' • Bldr • Hyd-lnst Operation: • Bld-Mgr • Hyd-Maint

Co-Perform Pty Ltd

Issued: 28 November 2017 (Final) Page 7

Page 10: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2

3.5 Indoor environment quality

Objective: Improving the indoor environment quality at home and in the workplace will generally enhance well-being and reduce the likelihood of ill-health. Through the implementation of passive design principles, good indoor environment quality can also lead to energy savings due to reduced energy demands for heating, cooling and artificial lighting.

Performance

Project Response

Maintenance Responsibility standard

Daylight A minimum of 30% of the area of Stage 2 base building office spaces to have natural daylight.'

The design for levels 3 to 7 has been assessed using a cumputerised simulation model as submitted as part of the VCAT evidence; the related Daylight Assessment Report is provided in Appendix B. The Daylight Report was prepared on a previous scheme and shows 40% of the L3 to L7 floor area achieving a daylight factor (DF) of 2% so long as the visible light transmission (VLT) for all primary glazing is not less than 32%. The proposed (revised) design is similar to that modelled but increases the window to floor area ratio; this means that the percentage of floor area achieving a DF of 2% will be increased (improved) in the proposed (revised) design. Revised modelling on the proposed (revised) design therefore has not been performed and a (conservative) daylighting achievement of 40% of the floor area achieving a DF of 2% is used in this SMP for Levels 3 to 7.

Enable glare control by the provision for internal blinds that have a visual light transmittance of less than 10% and which are controllable by all affected occupants.

Glass facade to have a minimum visible light transmittance (VLT) of 32%.

There is no maintenance requirement generally, however, if blinds are installed then they will require ongoing maintence.

Design: • Arch Construction: • Bldr Operation:

Low volatile organic compound (VOC) content

Achieve at least 2 out of 2 credits available in Green Star for indoor pollutants (low VOC and low formaldehyde products).

Office areas should meet the Total Volatile Organic Compound (TVOC) content limits for internal painted surfaces, adhesives, sealants, floor coatings/coverings and engineered wood products and Appendix D.

MDF, plywood and particleboard should be specified as E0 or equivalent.

The project aims to achieve 2 out of 2 credits available in Green Star for indoor pollutants.2

Low TVOC products have similar life spans to traditional products and do not have an adverse maintenance impact.

Design: • Arch Construction: • Bldr Operation: • -

Indoor air quality

Improve outdoor air rates to the space in excess of the regulatory minimum.

Outdoor airflow rates 100 per cent increased on AS1668 rates as nominated in the VCAT conditions. 2

Increased outdoor air rates are not expected to significantly change minatenance requirements

Design: • Mech-Des Construction: • Mech-Const Operation: • -

1 BESS does not include appropriate coverage of IEQ for this building type. There is only one question for IEQ and, despite the BESS tool notes stating that 30% of the nominated area achieving a 2% daylight factor (DE) is adequate to score credits, BESS requires 60% floor coverage at 2% DF in order to achieve the required 50% IEQ category score. 30% was noted as acceptable for best practice in the VCAT evidence (Appendix C page 3) and the additional improvement to 40% coverage to 2% DF for Levels 3 to 7 was agreed in the VCAT decision. 2 Refer to footnote 1 regarding the inadequacy of BESS scoring for this building type. It is noted that I EQ is improved through the outdoor air and low VOC provisions as noted in this SMP, but this is not scored in BESS. It is considered that the overall IEQ response as noted in this section of the project achieves best practice.

Co-Perform Pty Ltd

Issued. 28 November 2017 (Final) Page 8

Page 11: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2

3.6 Transport

Objective: To reduce car dependency and to ensure that the built environment is designed to promote the use of public transport, walking and cycling.

Performance standard Project Response

Maintenance Responsibility

Reduced car dependency

Developments should be in locations that facilitate local living such as retail, community infrastructure, recreation and work opportunities. Public transport should be easily accessible.

The development is in a location The initiative Design: that is highly "walkable" and has does not have • - excellent proximity to public an adverse Construction: transport links and a wide array of maintenance - retail and social infrastructure impact. Operation: such as supermarkets, • - restaurants, and specialty stores along Smith St, Officeworks, and schools, groceries, etc. The development location achieves a 'Walkers paradise" 97 points out of 100 on walkscore.com.

Bicycle

Meet or exceed the minimum

Cyclist provisions for the The initiative Design: facilities planning requirements. commercial tenancies (including does not have • Arch

visitors) have been incorporated at an adverse Construction: Ground Floor and Level 2. These maintenance • Builder exceed the planning requirements impact. Operation: by at least 100%: • - • Commercial office area of

approximately 11,680 sqm (including Stage 2 plus Ground and L1) requires 39 employee parks (1 per 300sqm) and 12 visitor parks (1 per 1,000sqm) = 51 parks.

• Cafe (Ground Floor) of 250sqm total requires from 0 to 10 employee parks and between 0 to 2 visitor parks depending on the specific use and layout.

• Therefore, the total number of bicycle parks required by the Yarra Planning Scheme is from 39 to 49 employee parks and from 12 to 14 visitor parks. This is a total of 51 to 63 parks depending on the use and layout of the cafe. (This is for the entire building, not just Stage 2).

• 130 parks are proposed and this exceeds the planning scheme by at least 100%.

Green Travel Establish a Green Travel Plan

A Green Travel Plan has been The initiative Design: Plan

for the development in prepared which describes ways in does not have • Traffic

accordance with the Yarra which the use of sustainable an adverse Construction: Planning Scheme clause

transport may be encouraged. maintenance • Traffic

22.17. impact. Operation: • Bld-Mgr

Co-Perform Pty Ltd

Issued: 28 November 2017 (Final) Page 9

Page 12: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Commercial tenancy recycle and landfill collection will be integrated into the tenancy fitout and is transferred manually by occupants/cleaners to a convenient location on the Ground Floor.

A Waste Management Plan (WMP) will be prepared for Authority approval and shall be in accordance with the the applicable guidelines required by the Authorities.

It is a requirement of waste management guidelines that the recycling system be at least as convenient as the general waste system (e.g. refer to the "Guide for Best Practise for Waste Management in Multi-Unit Developments, Sustainability Victoria, 2010" page 13 as referenced by the Yarra Planning Scheme: other guidelines that may be required by the Authorities have similar references). Refer to the WMP for further information.

Operational waste

Develop a Waste Management Plan for the convenient transfer of sorted waste from within residence and commercial tenancies to dedicated waste storage spaces.

Regular cleaning of the common waste facilities will be the responsibility of building management.

Design. • Arch • Waste-Des Construction: • Bldr Operation: • Bld-Mgr • Occupants. • Waste-Collect

Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2

3.7

Waste

Objective: To ensure waste avoidance, reuse and recycling during the construction and operation stages of the development.

Performance standard

Project Response

Maintenance

Responsibility

Construction waste management plan

Target a minimum recycling rate of 80% of demolition and construction waste.

Specifications will include a target minimum recycling rate of 80% of demolition and construction waste.

This initiative Design: does not have . Arch an ongoing • Waste-Des maintenance Construction: impact. • Bldr

Operation: • -

3.8 Urban ecology Objective: Improve the urban ecosystem through the incorporation of vegetation through landscaping.

Performance standard Project Response

Maintenance Responsibility

The nature of the development (existing heritage facade for the entire site area plus intermediate car parking on the original roof top) does not allow a significant response to this category.

Light pollution Minimise light pollution arising from external lighting.

It is proposed that no external luminaire on the project has a ULOR that exceeds 5%, relative to its actual mounted orientation

There are no maintenance implications

Design: • Elec-Des Construction: • Elec-Inst Operation: • -

3.9 Innovation Objective: Improve sustainable building performance (e.g. reduced energy and water consumption: reduced pollution and waste; improved and more resilient communities and economies) through innovative design solutions such as: exceeding best practice standards; passive, site and climate responsive design; and identifying synergies.

Identifying synergies

Performance standard

Capitalise on synergies whereby building attributes provide multiple benefits in unique ways. Create more by using less.

Project Response

The overall development provides a There are no significant increase in commercial maintenance office floor space into a site that is implications. provided with excellent transportation and community infrastructure.

Responsibility

Design: • Developer • Arch Construction: • - Operation: • -

Maintenance

Co-Perform Pty Ltd Issued 28 November 2017 (Final) Page 10

Page 13: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2

Utilisation of inherent structural capacity

An innovative approach of the development is to consider that the existing building could be retained and the inherent structural capacity utilised (built over) to increase the site yield.

This process will have a positive impact on the maintainability of the building

Bicycle parking 100% more than Planning Scheme

The bicycle parking allowance is over 100% more than the planning scheme requirement.

BESS credits 3 points overall for a 50% improvement, therefore 2 points are claimed for the extension to a 100% improvement.

Whilst this is not an "innovation" as such, the innovation point(s) are claimed in BESS because the project response extends well beyond the BESS benchmarks.

3.10 Materials

Objective: To reduce the environmental impacts of materials used by encouraging the use of materials with a favourable lifecycle assessment.

Performance

Project Response

Maintenance Responsibility standard

The project aims to be environmentally responsible in the selection of materials. Particular items of note include: • Insitu concrete will have a minimum of

20% replacement cementitious material such as fly ash or blast furnace slag. These replacement materials are waste products and reduce the embodied energy and CO2 emissions of conventional concrete that uses only Portland cement. This commitment is subject to availability of the replacement material, structural requirements and project management constraints.

• All timber to be certified through an accredited certification scheme such as the Forrest Stewardship Council (FSC) or the Australian Forest Certification Scheme (AFCS).

• Low VOC paints, adhesives, sealants, floor coverings and engineered timbers to improve indoor air quality.

Responsible Ensure healthy and selection of

environmentally materials preferable material

selections.

Material selections should be durable and the selection of environmentally preferable materials is not expected to create an adverse maintenance impact.

Design: • Arch • Str-Eng • PM Construction: • Bldr Operation: • -

Issued: 28 November 2017 (Final) Page 11 Co-Perform Pty Ltd

Page 14: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2

APPENDIX A — BESS assessment (built environment sustainability scorecard)

Co-Perform Pty Ltd Issued: 28 November 2017 (Final)

Page 15: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

BESS Report kbe 8100Ps M A M/

This BESS report outlines the sustainable design commitments of the proposed development at 423-425 Smith St Fitzroy VIC 3065. The BESS report and accompanying documents and evidence are submitted in response to the requirement for a Sustainable Design Assessment or Sustainability Management Plan at Yarra City Council.

Note that where a Sustainability Management Plan is required, the BESS report must be accompanied by a report that further demonstrates the development's potential to achieve the relevant environmental performance outcomes and documents the means by which the performance outcomes can be achieved.

423-425 Smith St, Fitzroy 3065 Fitzroy Project number

Site area: 2730 m2 • Site type: Non-residential development m2 • Building Floor Area: 7350 m2

Date of Assessment: 28 Nov 2017 Version: V3, 1.5.0-B150 Applicant: admin©co-perform.com.au

Your BESS score is

56%

4398 Draft

http://bess.net.au/projects/4398

% of Total Category Score Pass

1 % Management37 %

6 % Water 75 %

15 % Energy 55 %

13 % Stormwater 100

5 % IEQ 33 %

3 % Transport 37

3 % Waste

Urban 1 % 25 %

Ecology

5 % Innovati n 60 %

0% 10% 209 30% 40% 50% 60% 70% 80% 90% 100%

50% + 70% +

Best Practice Excellence

• How did this Development Perform in each Environmental Category?

Maximum vailabla El Your Building

40%

IEQ best practice is achieved via additional building attributes to those scored within BESS. Refer to detailed notes in the IEQ Section (3.5) of the SMP and the IEQ Section of this BESS Report below. Accordingly the "x" from the BESS report score has been removed manually.

10%

0% Management Water Energy Stormwaier 1E0 Transport Waste Urban Ecology Innovation

Sustainable design commitments by category

30%

20%

Page 16: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

The sustainable design commitments for this project are listed below. These are to be incorporated into the design documentation and subsequently implemented.

Management

37% - contributing 1% to overall score

Credit Disabled Scoped out Score

Management 2.3 Thermal Performance Modelling - Non-Residential 0 %

Management 3.2 Metering 100 %

Management 3.3 Metering 100 %

Management 4.1 Building Users Guide 100 %

Management 2.3 Thermal Performance Modelling - Non-Residential 0%

Score Contribution This credit contributes 28% towards this section's score.

To encourage and recognise developments that have used modelling to inform passive design at the early design stage

Preliminary thermal insulation requirements communicated to the architect. Building regulatory compliance is readily achievable.

Questions

Has preliminary modelling been undertaken in accordance with either BCA Section J (Energy Efficiency), NABERS or Green Star?

No

Management 3.2 Metering 100%

Score Contribution This credit contributes 14% towards this section's score.

Aim To provide building users with information that allows monitoring of energy and

water consumption

Questions

Have utility meters been provided for all individual commercial tenants?

Yes

Management 3.3 Metering 100%

Score Contribution This credit contributes 14% towards this section's score.

Aim To provide building users with information that allows monitoring of energy and

water consumption

Questions

Have all major common area services been separately submetered?

Yes

Management 4,1 Building Users Guide 100%

Score Contribution This credit contributes 14% towards this section's score.

Aim To encourage and recognise initiatives that will help building users to use the

building efficiently

Aim

Notes

Page 17: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Questions

Will a building users guide be produced and issued to occupants?

Yes

Water

75% - contributing 6% to overall score

Credit Disabled Scoped out Score

Water 1.1 Potable Water Use Reduction (Interior Uses) 50 %

Water 2.1 Rainwater Collection & Reuse (Additional Uses) 100 %

Water 3.1 Water Efficient Landscaping 100 %

Water 4.1 Building Systems Water Use Reduction 100 %

Water Approachs

What approach do you want to use Water? Use the built in calculation tools

Project Water Profile Questions

Do you have a reticulated third pipe or an on-site water No

recycling system?

Are you installing a swimming pool? No

Are you installing a rainwater tank? Yes

Water fixtures, fittings and connections

Office Building

Showerhead 3 Star WELS (> 6.0 but <= 7.5)

Bath Scope out

Kitchen Taps > 4 Star WELS rating

Bathroom Taps > 5 Star WELS rating

Dishwashers Default or unrated

WC > 4 Star WELS rating

Urinals > 5 Star WELS rating

Washing Machine Water Efficiency Scope out

Connected to which Tank Tank 1

Rainwater connected to: Toilets Yes

Rainwater connected to: Laundry (washing machine) No

Rainwater connected to: Hot Water System No

Rainwater Tanks

Tank 1

What is the total roof area connected to the rainwater tank? 1875.0

Square Metres

Tank Size Litres

30000.0

Irrigation area connected to tank square Metres 0.0

Is connected irrigation area a water efficient garden?

Yes

Other external water demand connected to tank? Litres/Day

Water 1.1 Potable Water Use Reduction (Interior Uses) 50%

Score Contribution This credit contributes 50% towards this section's score.

Page 18: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Water 1.1 Potable water use reduction (interior uses) What is the reduction in total water use due to efficient fixtures, appliances, and rainwater use? To achieve

Aim

points in this credit there must be >25% potable water reduction. You are using the built in calculation tools. This credit is calculated from information you have entered above.

Criteria Percentage reduction in potable water use

Questions

Percentage Achieved ? percentage no

Calculations

Annual Water Consumption (kL) (Reference)

20228

Annual Water Consumption (kL) (Proposed)

14709

% Reduction in Potable Water Consumption percentage %

27 %

Water 2.1 Rainwater Collection & Reuse (Additional Uses) 100%

Score Contribution

Aim

Criteria

This credit contributes 25% towards this section's score.

What is the additional reduction in potable (mains) water use due to rainwater harvesting? Additional water uses for rainwater include non-potable demands such as irrigation, pools, commercial process uses and taps for washdown. Note: tank water will only be available for additional uses if it not required for internal uses. If the property uses an alternative water source, the alternative water source is deemed to meet 90% of additional non-potable water use requirements. You are using the built in calculation tools. This credit is calculated from information you have entered above in the rainwater tanks section.

What is the additional reduction in potable (mains) water use due to using rainwater or an alternative water source?

Questions

Percentage Achieved ? porcentaga %

Calculations

Rainwater collection & reuse (additional uses) Percentage %

100 %

Water 3.1 Water Efficient Landscaping 100%

Score Contribution This credit contributes 12% towards this section's score.

Are water efficiency principles used for landscaped areas? This includes low water use plant selection (e.g. xeriscaping) and specifying water efficient irrigation (e.g.

Aim

drip irrigation with timers and rain sensors). Note: food producing landscape areas and irrigation areas connected to rainwater or an alternative water source are excluded from this section.

Questions

Will water efficient landscaping be installed?

Page 19: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Yes

Water 4.1 Building Systems Water Use Reduction 100%

Score Contribution This credit contributes 12% towards this section's score.

Aim Will the project minimise water use for building systems such as evaporative

cooling and fire testing systems?

Questions

Where applicable, nave measures been taken to reduce potable water consumption by >80% in the buildings air-

conditioning chillers and when testing fire safety systems?

Yes

Energy

Credit

Energy 1.1 Thermal Performance Rating - Non-Residential

55% - contributing 15% to overall score

Disabled Scoped out Score

25 %

Energy 2.1 Greenhouse Gas Emissions 100 %

Energy 2.3 Electricity Consumption 100 %

Energy 3.1 Carpark Ventilation N/A

Energy 3.2 Hot Water 100 %

Energy 3.7 Internal Lighting - Non-Residential 100 %

Energy 4.1 Combined Heat and Power (cogeneration / trigeneration) N/A

Project Energy Profile Questions

Are you installing a solar photovoltaic (PV) system? Yes

Are you installing any other renewable energy system(s)? No

Gas Supply Natural Gas

Are you installing a cogeneration or trigeneration system? No

Non-Residential Spaces Energy Profiles

Office Building

Heating, Cooling & Comfort Ventilation - Electricity - baseline 1257000.0

kWh

Heating, Cooling & Comfort Ventilation - Electricity - proposed 985000.0

kWh

Heating - Gas - baseline MJ 0.0

Heating - Gas - proposed MJ

Heating - Wood - baseline MJ

Heating - Wood - proposed MJ

Hot Water - Electricity - baseline kWh 2000.0

Hot Water - Electricity - proposed kWh 2000.0

I lot Water - Gas - baseline MJ 425000.0

Hot Water - Gas - proposed MJ 360000.0

Peak Thermal Cooling Load - Baseline kW 470.0

Peak Thermal Cooling Load - Proposed kW 370.0

Solar Photovoltaic systems

PV 1

Page 20: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

PV 1

System Size (lesser of inverter and panel capacity) kW peak 12.0

Orientation (which way is the system facing)? North

Inclination (angle from horizontal) Angle (degrees) 0.0

Energy 1.1 Thermal Performance Rating - Non-Residential 25%

Score Contribution This credit contributes 40% towards this section's score.

Reduce reliance on mechanical systems to achieve thermal comfort in summer and winter - improving comfort, reducing greenhouse gas emissions, energy consumption, and maintenance costs.

What is the % reduction in heating and cooling energy consumption against the reference case (NCC 2016 BCA Volume 1 Section J)

An energy model has not been prepared at the planning stage. The reference case is taken as being equivalent to typical energy consumption of Melbourne office properties and the proposed case was calculated as an average 20% energy reduction (i.e. improved efficiency) of glazing, plant, light fittings, hot water, appliances, etc compared to regulatory requirements.

Questions

Criteria Achieved ?

Calculations

Total Improvement Percentage

21 %

Energy 2.1 Greenhouse Gas Emissions 100%

Score Contribution This credit contributes 10% towards this section's score.

Aim Reduce the building's greenhouse gas emissions

Criteria Are greenhouse gas emissions >10% below the benchmark

Questions

Criteria Achieved ?

Calculations

Reference Building with Reference Services (BCA only) kg CO2

1520025.2

Proposed Building with Proposed Services (Actual Building) kg CO2

1193008.8

% Reduction in GHG Emissions Percentage %

21 %

Energy 2.3 Electricity Consumption 100%

Score Contribution This credit contributes 10% towards this section's score.

Aim Reduce consumption of electricity

Aim

Criteria

Notes

Page 21: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Criteria Is the annual electricity consumption >10% below the benchmark

Questions

Criteria Achieved ?

Calculations

Reference win

1259000.0

Proposed kin

987000.0

Improvement Percentage °.

21 %

Energy 3.1 Carpark Ventilation N/A

This credit was scoped out: There is no basement car park.

Energy 3.2 Hot Water 100%

Score Contribution This credit contributes 5% towards this section's score.

Does the hot water system use >10% less energy (gas and electricity) than the reference case?

Questions

Criteria Achieved ?

Calculations

Reference MJ

120055.6

Proposed MJ

102000.0

Improvement percentage

15%

Energy 3.7 Internal Lighting - Non-Residential 100%

Score Contribution This credit contributes 10% towards this section's score.

Aim Reduce energy consumption associated with internal lighting

Notes Comments refer to base building lighting provided by the developer.

Questions

Is the maximum illumination power density (W/m2) in at least 90% of the relevant building class at least 20% lower than required by Table J6.2a of the NCC 2016 BCA Volume 1 Section J (Class 2 to 9)

Criteria

Yes

Page 22: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Energy 4.1 Combined Heat and Power (cogeneration / trigeneration)

N/A

This credit was scoped out: No reason provided

This credit was disabled: No cogeneration or trigeneration system in use.

Aim Reduce energy consumption

Does the CHP system reduce the class of buildings GHG emissions by more than 25%?

Stormwater

100% - contributing 13% to overall score

Credit Disabled Scoped out Score

Stormwater 1.1 Stormwater Treatment 100 %

Which stormwater modelling are you using? Melbourne Water STORM tool

Stormwater 1.1 Stormwater Treatment 100%

Score Contribution

Aim

Criteria

Questions

STORM score achieved

100

Flow (MUyear) % Reduction

This credit contributes 100% towards this section's score.

To achieve best practice stormwater quality objectives through reduction of pollutant load (suspended solids, nitrogen and phosphorus)

Has best practice stormwater management been demonstrated?

Total Suspended Solids (kg/year) % Reduction

Total Phosphorus (kg/year) % Reduction

Total Nitrogen (kg/year) % Reduction

Calculations

Min STORM Score

100

IEQ

33% - contributing 5% to overall score

Credit Disabled Scoped out Score

IEQ 1.4 Daylight Access - Non-Residential 33 %

Criteria

IEQ 1.4 Daylight Access - Non-Residential 33%

Page 23: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Score Contribution

Aim

Criteria

Notes

This credit contributes 100% towards this section's score.

To provide a high level of amenity and energy efficiency through design for natural light.

What % of the nominated floor area has at least 2% daylight factor?

BESS does not include appropriate coverage of IEQ for this building type. There is only one question for IEQ and, despite the BESS tool notes stating that 30% of the nominated area achieving a 2% daylight factor (DF) is adequate to score credits, BESS requires 60% floor coverage at 2% DF in order to achieve the required 50% IEQ category score. 30% was noted as acceptable for best practice in the VCAT evidence (refer to SMP Appendix C page 3) and the additional improvement to 40% coverage to 2% DF for Levels 3-7 was agreed in the VCAT decision. It is noted that 1E0 is improved through the outdoor air and low VOC provisions as noted in this SMP, but this is not scored in BESS. It is therefore considered that the overall 1E0 response of the project achieves best practice.

Questions

% Achieved ?

30 %

Transport

37% - contributing 3% to overall score

Credit Disabled Scoped out Score

Transport 1.4 Bicycle Parking - Non-Residential 100 %

Transport 1.5 Bicycle Parking - Non-Residential Visitor 100 %

Transport 1.4 Bicycle Parking - Non-Residential t00%

Score Contribution This credit contributes 25% towards this section's score,

Aim To encourage and recognise initiatives that facilitate cycling

Questions

Have the planning scheme requirements for employee bicycle parking been exceeded by at least 50%?

Yes

Transport 1.5 Bicycle Parking - Non-Residential Visitor 100%

Score Contribution

This credit contributes 12% towards this section's score.

Aim

To encourage and recognise initiatives that facilitate cycling

Questions

Have the planning scheme requirements for visitor bicycle parking been exceeded by at least 50%?

Yes

Waste

66% - contributing 3% to overall score

Credit Disabled Scoped out Score

Waste 1,1 - Construction Waste - Building Re-Use 100 %

Waste 2.2 - Operational Waste - Convenience of Recycling 100 %

Page 24: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Waste 1.1 - Construction Waste - Building Re-Use 100%

Score Contribution This credit contributes 33% towards this section's score.

Aim To recognise developments that re-use materials or-s to

Questions

If the development is on a site that has been previously developed, has at least 30% of the existing building been

re-used?

Yes

Waste 2.2 - Operational Waste - Convenience of Recycling 100%

Score Contribution This credit contributes 33% towards this section's score.

Aim To minimise recyclable material going to landfill

Questions

Are the recycling facilities at least as convenient for occupants as fac lities for general waste?

Yes

Urban Ecology

25% - contributing 1% to overall score

Credit Disableo Scoped out Score

Urban Ecology 2.1 Vegetation 25 %

Urbar Ecology 2.3 Green Walls and Facades 100 %

Urban Ecology 3.2 Food Production - Non-Residential 0 %

Urban Ecology 2.1 Vegetation 25%

Score Contrioution This credit contributes 50% towards this section's score.

To encourage and recognise the use of vegetation and landscaping within and

around developments

How much of the site is covered with vegetation, expressed as a percentage of the

total site area.

Questions

Percentage Achieved ? percentage co

5%

Urban Ecology 2.3 Green Walls and Facades 100%

Score Contrioution This credit contributes 12% towards this section's score.

To encourage the appropriate use of green roofs. walls and facades to mit gate the

impact of the urban heat island effect.

Questions

Does the development incorporate a green wall or facade?

Aim

Criteria

Aim

Yes

Page 25: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Urban Ecology 3.2 Food Production - Non-Residential 0%

Score Contribution

Aim

Criteria

Notes

This credit contributes 12% towards this section's score.

To encourage the production of fresh food on-site

Is there at least 0.25m2 of space per occupant dedicated to food production?

The existing building occupies 100% of the site area. The roof top is used for the

required car parking space and there is no opportunity for significant vegetation.

Questions

Food Production Area Metres

Calculations

Min Food Production Area Square Metres

242

Innovation

60% - contributing 5% to overall score

Credit

Disabled Scoped out Score

Innovation 1.1 Innovation

60 %

Innovations

Heritage building structural investigation and use of inherent structural capacity

Integration of a mix of commercial uses into an existing site that is provided with excellent transportation and community infrastructure.

Bicycle parking 100% more than Planning Scheme

Dcscr ption

The bicycle parking

The following credits The development

alowance is are claimed for the provides the clever

over 100%

innovative approach integration of a mix of more than the to consider that the commercial uses into an planning existing budding could existing site that is scheme be retained and the provided with excellent requirement. inherent structural transportation and BESS credits 3 capacity utilised in community points overall for increase the site yield. infrastructure. A key a 50% As part of the points sustainability attribute of improvement, claimed is the overall the development is its therefore 2 building reuse location that is highly points are because it is 'walkable" and has claimed for the considered that BESS excelent proximity to extension to a does not adequately public transport links 100% credit the and a wide array of retail improvement. sustainability benefits and social infrastructure Whilst this is not of building over the such as supermarkets, an Innovation" existing heritage

restaurants, and as such, the building (e.g. reduced specialty stores along following energy in demolition, Smith St, Officeworks, point(s) is (are) reduced waste and schools, groceries, targeted

disposal, etc. The development because the conservation of

location achieves a projecgt embodied energy, "walkers paradise" 97 response culture and heritage points out of 100 on extends wed preservation). walkscore.com. beyond the

BESS benchmarks.

Points Targeted 2 2 2

Page 26: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Design phase documentation

Design phase documentation

Refer App C and Arch documents

Incomplete

Incomplete

Incomplete

Refer App D and L'scape documents Incomplete

Refer App C and Incomplete Arch documents

Refer to Arch documents

Refer to Arch documents

Refer to Arch documents

Incomplete

Incomplete

Incomplete

Refer Arch and .ncomplete L'scape documents

Refer to Arch documents Incomplete

Innovation 1.1 Innovation 60%

Score Contribution This credit contributes 100% towards this section's score.

Criteria What percentage of the Innovation points have been claimed (10 points maximum)?

Questions

Criteria Achieved ?

Items to be marked on floorplans 0/10 floorplans & elevation notes complete.

Management 3.2: Individual utility meters annotated

Management 3.3: Common area submeters annotated

Water 2.1: Location of rainwater tanks as described

Water 3.1: Water efficient garden annotated

Stormwater 1.1: Location of any stormwater management systems used in STORM or MUSIC modelling (e.g. Rainwater tanks, raingarden, buffer strips)

Transport 1.4: All nominated non-residential bicycle parking spaces

Transport 1.5: All nominated non-residential visitor bicycle parking spaces

Waste 2.2: Location of recycling facilities

Urban Ecology 2.1: Vegetated areas

Urban Ecology 2.3: Green facade

Documents and evidence 0 5 supporting evidence documentation complete.

Design phase Energy 1.1: Energy Report showing calculations of reference case and proposed buildings documentation Incomplete

Energy 3.7: Provide a written description of the average lighting power density to be Design phase Incomplete installed in the development and specify the lighting type(s) to be used. documentation

Stormwater 1.1: STORM report or MUSIC model Refer App C Incomplete

IEQ 1.4: A short report detailing assumptions used and results achieved. Refer App B Incomplete

Waste 1.1: Report detailing how the existing building is being reused on-site Refer to Arch Incomplete documents

The Built Environment Sustainability Scorecard (BESS) has been provided for the purpose of information and communication. While we make every effort to ensure that material is accurate and up to date (except where denoted as 'archival), this material does in no way constitute the provision of professional or specific advice. You should seek appropriate, independent, professional advice before acting on any of the areas covered by BESS.

The Municipal Association of Victoria (MAV) and CASBE (Council Alliance for a Sustainable Built Environment) member councils do not guarantee, and accept no legal liability whatsoever arising from or connected to, the accuracy, reliability, currency or completeness of BESS, any material contained on this website or any linked sites.

Page 27: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2

APPENDIX B — Indoor environment quality calcuations — daylight assessment

Note: • The Daylight Report was prepared on a previous scheme and shows 40% of the L3 to L7 floor

area achieving a daylight factor (DF) of 2% so long as the visible light transmission (VLT) for all primary glazing is no less than 32%.

• The proposed (revised) design is similar to that modelled but increases the window to floor area ratio:

o This means that the percentage of floor area achieving a DF of 2% will be increased (improved) in the proposed (revised) design.

o Revised modelling on the proposed (revised) design therefore has not been performed and a (conservative) daylighting achievement of 40% of the floor area achieving a DF of 2% is used in this SMP for Levels 3 to 7.

Co-Perform Pty Ltd Issued: 28 November 2017 (Final)

Page 28: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

423-425 Smith Street, Fitzroy

Summary

This report provides a daylight assessment for the 423-425 Smith Street project in Fitzroy and is based on planning documentation (refer to Table 3 in Appendix A) and includes significant external influences such as nearby future developments and build-ing features such as facade fins. The purpose of this assessment is to benchmark the proposed building against available daylight performance standards used in Australia, including the Built Environment Sustainability Scorecard (BESS) and Green Star. The scope of this assessment is limited to the office space of the new tower development and excludes the refurbishment of the existing building and all retail spaces.

The best practice standard set by CASBE (Council Alliance for the Sustainable Built Environment) through the BESS tool is 30% of the floor area to achieve a daylight factor of 2%, The Green Building Council of Australia (GBCA) sets a higher benchmark of 40% of the floor area to achieve a daylight factor of 2%.

The assessment indicates that the proposed building meets the relevant BESS and Green Star daylight benchmarks. This is achieved so long as the visible light transmission (VLT) for all primary glazing is no less than 32%. The daylighting aspects of the design achieve best practice when compared to the relevant industry benchmarks, the proposal is therefore consistent with the objectives of the Yarra Planning Scheme, for exam-ple:

• 22.10 Built Form and Design Policy: minimise the need for artificial lighting during daylight hours.

• 22.17 Environmentally Sustainable Development: achieve best practice in envi-ronmentally sustainable development and achieve a healthy indoor environment quality including the provision of natural daylight.

Contents

1 Introduction 2

2 Performance metrics 3

3 Simulation model 4

4 Results 4

Appendices 6

A Simulation model 7

B Daylight contours 10

C Curricula Vitae 16

Co-Perform (p 16 June 2017 Page 1

Sustainable Building Consultancy

Page 29: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

423-425 Smith Street, Fitzroy

1 Introduction

The proposed building at 423-425 Smith Street is an 8-storey, mixed-use development comprising office, retail space and car-parking. Level G and Level 1 include office and retail space and will be developed as a refurbishment of the existing building. Level 2 is car-parking only and the next 5 floors, from Level 3 to Level 7, are all new office space to be developed as the new tower. Figure 1 shows a perspective view of the building from the south-east corner, indicating the general form of the new tower and the facade recesses that extend from Level 3 to Level 6. The floor-plates are set-back above Level 3, which can be seen in the floor plans and model images provided in Appendix A. The image also shows the massing of surrounding buildings that have been assumed in the model with further details provided in Figure 4.

Figure 1: Perspective view of model

The proposed office tower has full-height vision glazing to all facade orientations. Ex-ternal shading comprises vertical fin elements with irregular spacing; fin spacing is on average 1000mm and reducing to approximately 500mm on the north-west corner of the building where the floor-plates are set-back. There proposal includes two types of facade glazing; primary glazing making up most of the vision glass with secondary glaz-ing filling in the facade recesses and also being used for all glazing on Level 7.

The method of assessment for this project includes a detailed analysis of the proposed building using computer simulation. The analysis is used to predict the depth of daylight penetration into the office spaces, which is then compared to the relevant benchmarks. The benchmarks used in this assessment are based on the calculation of Daylight Factor (DF), which is defined as the ratio of indoor to outdoor illuminance and expressed as a percentage. It is calculated in the absence of direct sunlight and consequently captures information relating to the quantity of diffuse daylight.

16 June 2017 Page 2 Co-Perform pSustainable Building Consultancy

Page 30: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

(4;) Sustainable Building Consultancy

16 June 2017 Page 3 Co-Perform

423-425 Smith Street, Fitzroy

2 Performance metrics

This assessment is based on two relevant benchmarks currently used for the assessment of office daylight in Victoria. The first of these frameworks, BESS, incorporates a day- light metric by CASBE (Council Alliance for a Sustainable Built Environment; an association of Victorian councils, of which the City of Yarra are a member). The second framework, Green Star, is a sustainability rating tool commonly used by design-ers to demonstrate the achievement of a high level of environmental performance. In both of these tools, points are awarded for designs that improve beyond normal prac-tice.

2.1 BESS

Daylight performance in BESS comes under the sub-category of Indoor Environment Quality (IEQ). Credits are awarded in BESS when it is demonstrated that more than 30% of the nominated area achieves a daylight factor of at least 2% under uniform sky conditions. Achieving this level of daylight performance would be consistent with a development that achieved the overall best-practice benchmark.

The BESS benchmark is achieved when it is demonstrated that more than 30% of the nominated area achieves a daylight factor of at least 2%.

2.2 Green Star

Daylight performance in Green Star comes under the sub-category of Visual Comfort. Daylight performance can be demonstrated using a number of different approaches, all of which require demonstration of a minimum level of glare control in addition to ad-equate daylight reaching the working plane. The approach to glare control chosen for this assessment is the provision of internal blinds that have a visual light transmittance of less than 10% and which are controllable by all affected occupants. The approach to meeting the daylight criterion is to use the Daylight Factor calculation and to demon-strate that more than 40% of the nominated area achieves a daylight factor of at least 2%. Green Star allows the use of either a uniform or overcast sky condition for the calculation; the uniform sky condition has been selected for consistency with the BESS assessment.

The Green Star benchmark is achieved when it is demonstrated that an effective glare control strategy has been implemented and more than 40% of the nominated area achieves a daylight factor of at least 2%.

Page 31: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

423-425 Smith Street, Fitzroy

3 Simulation model

The simulation model has been constructed using Sketch-Up modelling software and simulations completed using the Radiance synthetic imaging system, which is the in-dustry standard simulation engine for this type of work. Complete details relating to the model configuration are provided in Appendix A including a list of design documents used to construct the model in Table 3.

Material properties

A key input to the daylight assessment includes the proposed material properties, includ-ing surface reflectance for opaque elements and visible light transmittance for glazing elements. Table 1 provides a summary of the material properties that have been used in the assessment. Wherever possible, material properties are based on information pro-vided by the architectural team, however, some assumptions have been made where this information is not available.

Model element

Characteristic

Description

Floor Ceiling Internal wall Ground Surrounding building Primary glazing Secondary glazing

30% reflectance 75% reflectance 65% reflectance 20% reflectance 30% reflectance 32% transmittance 34% transmittance

Specified light grey Specified white Assumed value Assumed value Assumed value Assumed value Specified by Architect

Table 1: Summary of material properties

The visible light transmittance of the primary glazing is assumed to be 32% which sets the lower limit and minimum value to be specified in order for the assessment benchmarks to be achieved.

4 Results

4.1 Glare

The glare requirements for Green Star will be met via the specification of an appropriate internal blind system. This project will commit to glare control that meets the Green Star criteria such as specifying internal blinds with a maximum visible light transmission of 10% in addition to a manual control mechanism that enables the office occupants to raise an lower the blinds as required.

Co-Perform 16 June 2017 Page 4 (F) Sustainable Building Consultancy

Page 32: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

423-425 Smith Street, Fitzroy

4.2 Daylight factor

Table 2 provides a summary of the results achieved for the office space on each level. Additional information, including contour plots of daylight factor are provided in Ap-pendix B.

Space NLA (m2) NLA meeting target (m2) % of NLA

Level 3 1751 528 30 Level 4 1711 545 32 Level 5 1657 576 35 Level 6 1601 614 38 Level? 1112 876 79

Total 7832 3149 40

Table 2: Floor area achieving a DF of at least 2% (NLA values are approximate)

The assessment indicates that the proposed building meets the relevant BESS and Green Star daylight benchmarks. This is achieved so long as the visible light transmission (VLT) for all primary glazing is no less than 32%.

Co-Perform (p Sustainable Building Consultancy

16 June 2017 Page 5

Page 33: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

423-425 Smith Street, Fitzroy

Daylight Assessment Appendices

Co-Perform p Sustainable Building Consultancy

16 June 2017 Page 6

Page 34: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

)-Perform

ti

Figure 2: View from south-east corner

16 June 2017

423-425 Smith Street, Fitzroy

A Simulation model

General

The simulation model shown in Figure 2 and Figure 3 is based on design documents prepared by Davey Architecture Studio listed in Table 3. Some minor geometric sim-plifications have been made where necessary although these will have no significant impact on the outcome of the simulations. Primary glazing is shown in grey, secondary glazing is shown as a bronze colour, and all fixed external shading devices are included as shown.

Document

Description

Date

Sketch-Up Model ICF-SD1.2 KF-SD1.3 ICF-SD1.4 KF-SD1.5 ICF-SD1.6 KF-SD1 .7 KF-SD1.8 KF-SD1.13 ICF-SD1.14

Sketch-Up Model LEVEL 2 PLAN LEVEL 3 PLAN LEVEL 4 PLAN LEVEL 5 PLAN LEVEL 6 PLAN LEVEL 7 PLAN ROOF PLAN SECTION B-B STAGE 2 SECTION E-E STAGE 2

Received 31 May 2017 Date Stamped May 22, 2017 Date Stamped May 22, 2017 Date Stamped May 22, 2017 Date Stamped May 22, 2017 Date Stamped May 22, 2017 Date Stamped May 22, 2017 Date Stamped May 22, 2017 Date Stamped May 22, 2017 Date Stamped May 22, 2017

Table 3: Design documents

Sustainable Building Consultancy

Page 7

Page 35: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

rtr NW

ioululi II 1 r . 1 " 1 11,

lIII1III I 1,„ 11

111111 1:10,

423-425 Smith Street, Fitzroy

Figure 3: View from north-west corner

Surrounding buildings

Figure 4 shows the development site (pink dotted line) within the context of Smith Street and the surrounding buildings. All modeling is based on the assumption that the surrounding sites could be developed as indicated by the blue and green mark-up.

Interior configuration

The proposed design includes exposed services beneath the soffit and structural beams. The impact of mechanical services on daylight penetration has been simulated using an equivalent ceiling located at the height of the underside of the proposed services. The effective ceiling height for Levels 3 to 6 is at 2400mm above finished floor level (FFL) throughout the core area and increasing to 2950mm within 1.3m of the perimeter. Level 7 does not have exposed services and the proposed ceiling is located at 3500mm above FFL.

Simulation parameters

The analysis has been completed using the Radiance synthetic imaging system. The model has been configured to calculate diffuse daylight penetration into the building.

16 June 2017 Page 8 Co-Perform ( 11) Sustainable Building Consultancy

Page 36: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Ambient bounces 5 Ambient divisions 512 Ambient accuracy 0.08 Grid size 1.0m Grid location 720mm above FFL Sky condition Uniform brightness

< > -> NRZ1: Neighbourhood 1 MUZ: Mixed I CZ1: Commercial Zone 1 Residential Zone - Schedule 1 :Use Zone I

6.0 m •

E • c`i is ;I

WESTC;Ring gThEET

6.0 m ► •

6.toTER STREET ► 4

BP • E

o A•

'42

LJ $___ ct

w cr)

0 C7 1

1111

LEICESTER STREET 4 E •

4On" t:'cl Ai - I

► • 4.0 m

MUZ: Mixed Use Zone

• 6.0 m 4

Figure 4: Site map NRZ1:

CZ1: Commercial Zone 1 Neighbourhood Residential Zone - Schedule 1

Parameter Value

• E 0.1 ♦ro

423-425 Smith Street, Fitzroy

Podium to 12m (notionally G plus 2)

MI Tower to 30m (notionally G plus 6)

Table 4: Summary of Radiance simulation parameters

Co-Perform

16 June 2017 Page 9

Sustainable Building Consultancy

Page 37: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

423-425 Smith Street, Fitzroy

B Daylight contours

Contour plots of daylight factor, colour range is from 0 (red) to 5 (blue) as shown in the legend below. The solid black line on each figure shows the 2% daylight factor contour.

Daylight Factor

0.5 1 15 2 2.5 3 35 4 4.5

Co-Perform (p Sustainable Building Consultancy

16 June 2017 Page 10

Page 38: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

II Iil

t h IMt151: t I ri

cc .tr -

C

423-425 Smith Street, Fitzroy

133d1S1-111VYS

e ,

'AD 4

4 , 44. co .41.11

I ;

Daylight contours - level 3

3NVI S.

S.

Co-Perform (p Sustainable Building Consultancy

16 June 2017 Page 11

Page 39: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

423-425 Smith Street, Fitzroy

1 1S 1-1111/11S

c.1 . 1 f ............,

c12 1. a,co a 3J pet 2

i a g ■4' 1 .13

1 -

4 1 4 1

Daylight contours - level 4

Co-Perform Sustainable Building Consultancy

16 June 2017 Page 12

Page 40: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

.1.332:11S

LON

< '1 Ii

.„ 3Ntrl

I'S 8 C

3.1 In

Daylight contours - level 5

423-425 Smith Street, Fitzroy

Co-Perform (p Sustainable Building Consultancy

16 June 2017 Page 13

Page 41: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

1332:11S HJJVIS

S

Ow.

...WM...4 1

CO • 1; ■ 4,

;3 1g co I 1m In

1 •-•, .4)

I • • r

3 N V1

a 1

kila°

• 1

II

423-425 Smith Street, Fitzroy

Daylight contours - level 6

Co-Perform cf), Sustainable Building Consultancy

16 June 2017 Page 14

Page 42: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

423-425 Smith Street, Fitzroy

iiii !Nilo , I 1 - L A ., .4

- g i hiffli0 i

133a15 HlIWS

‘.• v

jai

/ON

1

,,..._„ —; 3NV1 ,. ..%

N :, •8---- 1 1 t A I

Ai 03 v- a 1. •ch

In q

Daylight contours - level 7

co p co 8 •t-

Co-Perform (p Sustainable Building Consultancy

16 June 2017 Page 15

Page 43: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

423-425 Smith Street, Fitzroy

C Curricula Vitae

Co-Perform Team:

Paul Graham - Paul's role in the report is as "Principal" at Co-Perform. Paul has performed an overall direction and checking role with regard to the Report. Paul's expertise is in Sustainable Building Design with a sound engineering basis from planning approval stage through design to construction.

Jon Morgan - Jon is a specialist Subconsultant to Co-Perform and has performed the physical modelling and prepared the report under Paul Graham's direction. Jon has significant knowledge and experience in building physics and performing daylighting simulations.

Co-Perform (i) Sustainable Building Consultancy

16 June 2017 Page 16

Page 44: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Paul Graham

Profession • Sustainable Buildings

Position • Principal

Years of Experience • 31

Qualifications • Green Star Accredited

Professional • NABERS Assessor • Registered Building

Practitioner EM 1190 • Bachelor of Engineering

(Aero) • Grad. Cert. Business Admin • BESS Trained Professional • MUSIC (water sensitive

urban design) trained

Professional Associations M.AIRAH Member: BDAV Member: Alternative Technology Association

Committees • AIRAH

Prior Employment • Arup • GHD • Irwin Consult

Publications & Papers • HVAC Hybrid or Natural,

AIRAH 2003 • Building Services in Heritage

Buildings, RAIA 1999

Co-Perform pSustainable Building Consultancy

Paul's career has focused on the successful, timely, cost effective and quality completion of building development projects across most industry sectors. Paul's experience also extends to sustainable development master planning at a precinct, city and regional scale.

Paul has held senior positions in major international consultancy firms such as Arup and GHD, successfully leading building services and sustainability related commissions around Australia and internationally.

Successful projects include an award winning 6 star Green Star office, award winning energy show case facility, sustainability advice to 101 Collins Street, regional scale energy utility strategies, complex military installations, community facilities, multi-residential buildings and many more.

Relevant Projects

2012 to 2017 - Carlton Housing Redevelopment Stages 4. 6, 7a, 7b. 8 & 9 - ESD consultancy. The project is part of the Victorian Government's plan to provide more and better quality public and private housing. The overall development is the largest public and private housing redevelopment in Victoria's history.

2007 to 2017 - 101 Collins Street Melbourne Sustainability Consultancy. Melbourne CBD, Vic - Led the sustainability consultancy for an existing Melbourne CBD premium office building. Liaised with investors and building management to understand and develop the business case to improve sustainability performance. This led to investor funding toward an improved NABERS base building rating from a low level to 4.0 star through the establishment of an ongoing works program.

2013 to 2017 - 101 Collins Street Melbourne NABERS base building yearly assessments for 2013 to 2016 plus preparation of a tracking report and system toward an improved 2014 rating.

2016 to 2017 - Fitzroy Plaza

New office building of approximately 8,000sqm over an existing heritage building in Fitzroy. Prepared the Sustainability Management Plan (SMP) for planning approval. Preparation of daylight modelling and energy modelling to support the planning submissions. Advice on the appropriate NABERS energy rating and preparation of energy modelling and associated design brief to achieve the proposed NABERS rating.

16 June 2017

Page 45: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Co-Perform Sustainable Building Consultancy

2016 to 2017 - Oak Park Sports & Aquatic Precinct - ESD consultancy for the City of Moreland for redevelopment of an aquatic centre and adjacent sports pavilion. All facilities are renewed including: gymnasium, multi-use rooms, administration, change facilities, etc; 50dm pool, children's pool, water slide, etc. The project incorporates a 40kW photovoltaic panel system, significant rain water collection and reuse systems and comply with the progressive ESD policy of the City of Moreland.

2016 to 2017 - Parkville Gardens Stages 10, 11, and 12 -Following the successful energy rating consultancy on earlier stages (4, 7 and 8), ESD consultancy responsibilities were increased to include the overall ESD Management Plan and Water Conservation Management Plan as well as residential energy rating consultancy from design concepts through to construction phase services for this major residential development.

2014 to 2016 - Parkville Gardens Stages 4, 7, and 8 - Residential energy rating consultancy from design concepts through to tender documentation for this major residential development.

2008 - SA Water Headquarters, Adelaide CBD, SA — Multi-award winning 6 Green Star office and laboratory headquarters building. Developed and led the sustainability and engineering strategy for a new office and laboratory headquarters building. Ongoing strategic consultancy during the bidding process and through design and construction. The approach led to excellent bid submissions and subsequent commitment by the SA Government to a 6 Green Star (world leadership) standard on excellent commercial terms. The project has won many awards, e.g: 2010 PCA "Development of the Year Award" (South Aust).

2007 - K2 Apartments Windsor — Led the construction stage engineering consultancy for this $32M project; hailed as the most environmentally sustainable public housing development in Australia (2007). Attended site meetings (Hansen Yuncken), prepared/managed snagging lists, commissioning overview, etc. Third party evaluation has shown that the constructed and operating project performs to the design expectations for energy and water performance. The project has won many awards, e.g: 2007 AIB National Professional Excellence in Building Award.

2007 - Westfield Doncaster - Sustainability Management Plan (SMP) for this major shopping centre extension covering site management, public / private realm, IEQ, Energy, Water, etc. Liaised with Westfield's on-site construction team to put policies in place to manage the design and construction to meet the SMP objectives. Subsequently during construction, Westfield registered the project for a Green Star Retail Pilot rating; I managed this process with the site team and ultimately achieved a 4 star accredited rating.

16 June 2017

Page 46: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Co-Perform (F) Sustainable Building Consultancy

2003 - CSIRO Energy Centre. Newcastle. NSW - World class Energy Technology Complex for CSIRO (multi-storey laboratories and office spaces) featuring: thermal mass; labyrinth cooling, natural ventilation, light shelves; underfloor HVAC; on-site generation plant (micro-turbines wind and solar energy).

Engineering Leader for the new Energy Technology Complex for CSIRO (multi-storey laboratories and office spaces). Development features included: thermal mass; light shelves; underfloor HVAC; 0.5 MW on-site generation plant including fuel cells (future provision), micro-turbine generators and renewable energy features (wind turbines and solar energy). The project received the 2003 Gold Medal Award for sustainable green buildings (RAIA), the 2004 NSW Urban Design Taskforce Development Excellence Award for Sustainable Development and was national finalist in the 2004 Australian Engineering Excellence Awards.

Other

Successful projects range from feasibility through design and construction phases into operations; projects have spanned a wide range of industry sectors including:

• Corporate Fitout • Retail • Military

• Building Reports • Industrial • Education

• Commercial Office • Hospitality • Laboratories

• Transportation & Logistics • Heritage • Healthcare

• City Master Planning • Cable tunnels • Residential

• Regional Master Planning • Commercial • Stadia

• Regulatory impact assess't • Data Centres

16 June 2017

Page 47: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Jon Morgan Curriculum vitae

Extensive experience in performance-based design -specialising in high-performance buildings, urban precincts

and renewable energy systems.

Education

2009-2014 Master's Degree, Urban Planning and Environment, RM1T, Melbourne,

Distinction.

1991-1995 Bachelor of Engineering (B.Eng.), Aerospace, RMIT, Melbourne, Honours .

Experience

Vocational

2014-2017 Senior Consultant, Moreland Energy Foundation, Melbourne.

Consulting engineer working on passive building design, energy efficient building technologies, renewable energy including rooftop solar and energy storage solutions. o Building-related performance assessment, organizational data management and analytics. 0 Analysis of utility data to identify sectorial trends in greenhouse gas emissions. o Development of real-time and web-based reporting of spatial data with temporal analysis. o Strategic advice to the Dol (federal) on the evaluation of the 6 Star Homes. o Design advice to the DHHS (Victorian) on heatwave-resilient housing. o Analysis and evaluation of comfort and energy monitoring systems for existing houses. o Feasibility assessments for solar installations including system sizing and economics. o Third-party review of Sustainability Management Plans for Melbourne councils. o Delivery of training for BESS (local government sustainability scorecard).

2014-2017 Consultant/Analyst, Visergy, Woodend.

Sole trader specialising in performance-based design analysis for building energy and daylight. o Documentation for town planning and building approvals. o Performance assessments for daylight benchmarking. o Performance solutions for BCA Energy Efficiency (JV3 assessment). o Development of bespoke thermal and daylight simulation models.

2005-2014 Senior Consulting Engineer, Arup, Melbourne.

Regional leader for Environmental and Building Physics. o Building envelope analysis and design for high-quality thermal and visual environments. o Development and maintenance of analytical capabilities. o Design, build and maintenance of Linux clusters (simulation hardware). o Software and hardware systems, communications, training and quality management.

47 East Street — Woodend — Victoria, 3442

? i 61 429 357 751 • 121 [email protected] • 't www.visergy.com.au 1/4

Page 48: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

2004-2005 Consulting Engineer, Arup, London.

Environmental and Building Physics engineering specialising in energy, daylight and thermal

comfort.

2002-2004 Consulting Engineer, BMT Fluid Mechanics, Teddington, UK.

Desktop simulation and experimental (wind-tunnel) analysis for built environment and

offshore industry sectors.

2000-2002 Consulting Engineer, Scott Wilson Irwin Johnston Pty Ltd, Melbourne.

Sustainability consultant across building energy simulation, daylight and glare and natural

ventilation.

1996-2000 Engineer, Defence Science and Technology Organisation, Melbourne.

Research and development into engine performance simulation, aerodynamics and

hydrodynamic characteristics of defence platforms and weapons systems.

Miscellaneous

2015—Present Advisory Board Member, BDAV, Melbourne.

Energy and Sustainability Hub Advisory Board Member for the Building Designers Association

of Victoria.

2014—Present Committee Member, Macedon Ranges Sustainability Group, Woodend.

Co-director of the 2016 Sustainable Living Festival. Planning and implementation of a 40kW

rooftop solar installation in Woodend.

2012-2016 Chartered Engineer, Engineers Australia.

Core Skills

Building Daylight, thermal comfort, en- Simulation Radiance, EnergyPlus, ANSYS-

physics ergy, natural ventilation, re- tools CFX, Window/Therm, Rhino,

flected glare & environmental Sketch-Up, TAPM, Ausplume,

wind. AutoReaGas, CONTAM

Coding Python, Ruby, Perl, MATLAB Operating Linux, Windows

systems

Project Experience

Daylight

17-23 Wills The design of this high-profile residential development in Melbourne was strongly

Street, influenced by planning considerations concerning the impact of the tower on daylight

Melbourne amenity to the residents on the adjacent site. Jon undertook a detailed assessment

of sunlight and daylight to review the impact of different building setbacks and this

information was presented as part of an expert witness statement at VCAT. This

work led to an on-going engagement with the City of Melbourne and discussions

relating to the impact of high-rise development on daylight amenity in residential

buildings.

47 East Street — Woodend — Victoria, 3442

61 429 357 751 • [-] [email protected] • 8 www.visergvcom au 2 4

Page 49: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

600 Glenferrie The proposed 6-storey residential apartment block in Melbourne aimed to maximise

Road, the development potential of the site whilst still achieving good ESD outcomes.

Melbourne The high density of development presented challenges with respect to solar access

and daylight access. Jon worked with the developer and architect to assess building

massing and the internal layout of apartments to meet SDAPP guidelines and

maximise residential amenity.

452-456 The architectural intent of this residential development was to reflect the surrounding

Bridge Road, buildings and sky so as to blend into the landscape and allow the heritage facade

Melbourne to remain prominent in the streetscape. Jon's role was to assess the scheme with

respect to solar reflections towards road vehicles and pedestrians, preparing an

expert statement for VCAT and advising the architect on material selection and

facade articulation.

AAMI Park, A critical requirement for the design of sporting arenas is to ensure adequate solar

Melbourne radiation to maintain healthy grass growth. Jon completed a detailed analytical

study to predict solar radiation for the new AAMI stadium. He combined local

climatic data with a 3D simulation model to predict hourly radiation levels, taking

into account the effects of overshadowing, cloud cover and the spectrum of radiation

that is essential for plant growth.

Williams A glare analysis was undertaken to assess the potential for disabling solar reflections

Landing to interfere with train driver control and ability to read signalling on approach

Railway to Williams Landing railway station in Melbourne's outer growth suburbs. Jon

Station, completed the analysis, which comprised a range of simulation methods including

Melbourne solar visualisations, reflection maps and luminance calculations using the industry

standard Hassall methodology.

ANZ This Docklands building is the corporate headquarters for ANZ and an exemplar in

Docklands, sustainable building design, achieving 6 stars under the Green Star rating system.

Melbourne The facade design was performance-driven and optimised to reduce peak solar

loads and maximise indoor environment quality. Jon completed an analysis of the

perimeter daylighting performance and glare potential, as well an analysis of the

roof-mounted, sun-control devices for each of the atria spaces.

171 Collins This development proposal for this office building in Melbourne required careful

Street, facade design to avoid any aesthetic conflicts with the adjacent St Paul's Cathedral.

Melbourne Jon undertook advanced lighting simulation to create physically accurate predictions

of the buildings appearance for a range of glass options and various natural lighting

conditions. Robust technical analysis was central to the success of this planning

application.

Let There Be Arup worked with international architecture firm, Woods Bagot, to develop a

Light, daylighting pattern guide to streamline the process of daylight assessment for

Melbourne new buildings. Jon was integral to developing the analysis methodology and

the assessment criterion, which applies the Useful Daylight Illuminance (UDI)

methodology. The pattern guide is used instead of detailed daylight calculations at

the early design stage.

47 East Street — Woodend — Victoria, 3442

+61 429 357 751 • [2] [email protected] • 13 www.visergycom.au 3/4

Page 50: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

One One One This iconic building on the Brisbane River has a high performance facade with

Eagle Street, daylight redirection achieved through the use of custom-designed, internal sun-

Brisbane louvres. Jon designed a custom louvre profile that was tailored to the building

orientation and local climate and wrote a bespoke analysis tool for this purpose. The

final design maximised the potential for glare-free daylighting and made a significant

contribution to the high quality of the indoor office environment.

Reserve Bank Direct sun glare at the RBA building in Sydney was causing discomfort for building

of Australia, occupants located at the main reception desk and interfering with their ability

Sydney to work. Jon's glare analysis identified low angle sun entering the building on

winter mornings and then analysed this information to identify possible mitigation

strategies. The analysis used complex ray-tracing and a full 3D model of the RBA

and surrounding buildings in the Sydney CBD.

48 Martin The aim of this refurbishment was to improve visual amenity for building occupants

Place, Sydney during winter when no direct sunlight reaches the lower levels of the atrium. Jon

competed detailed daylighting analysis to inform the glass specification for new roof

glazing and to predict the potential benefit of a roof-mounted daylight redirection

system.

47 East Street — Woodend — Victoria, 3442

4-61 429 357 751 • jonOvisergy.com.au • ' www.visergy.com.au 4.4

Page 51: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2

APPENDIX C — Best practice WSUD

Co-Perform Pty Ltd Issued: 28 November 2017 (Final)

Page 52: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

n Melbourne mi Water TransactionID:

Municipality:

Rainfall Station:

Address:

STORM Rating Report

542512

YARRA

YARRA

423-425 Smith Street

Assessor:

Development Type:

Allotment Site (m2):

STORM Rating %:

Fitzroy

VIC

3065

Paul Graham

Commercial/Retail

2,730.00

100

Description Impervious Area Treatment Type Treatment Occupants / Treatment % Tank Water (m2) Area/Volume Number Of Supply

(m2 or L) Bedrooms Reliability (%)

Impervious area to drain 855.00 None 0.00 0 0.00 0.00

Impervious area to tank 1,875.00 Rainwater Tank 30,000.00 100 146.00 72.00

Date Generated: 22-Nov-2017 Program Version: 1.0.0

Page 53: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

▪ 11.7 Submismor POI emlorarnen1 • 11.111, VCAT oneren detbbe. ear.1.1ex 11 21117 VCAt Subonagn • .117 .11. - 111111 PINIMIASubrn.pan

oeveLopren BurRNr Eason GROUND FLOOR AREA LEVEL I AREA LEVEL 2 AREA

TOTAL AREA

CARS BIKES

2563 rn2 2583 m2 2563 m2

7669 /n2

POOPOIED (Including service mess)

GROUND FLOOR AREA 2563 rn2 LEVEL 1 AREA 2563 m2 LEVEL 2 AREA 256302 LEVEL 3 AREA 1914 m2 LEVEL 4 AREA 1837 m2 LEVEL 5 AREA 174901 LEVEL 6 AREA 1559 m2 LEVEL 7 AREA 112501 (abslcooy 55102)

TOTAL AREA 15,173

is 74 BIKES 130 Ec.,004414

ou hoops

UB-STATION

vent

FEMALE

fire

MALE

end of hip

shw/wc

level above

anted doo

RAMP UP

.1kL

roller door

[1

• • ■ ■ ■ • ■

r

roller door

LOADING DOCK 46,112

CAFE refer PT113

cafe plan ima appros 250m2

■ on

OFFICE

• • ' magnet,/

meter

11/11E.EaWLIIIM__.L3gEF:_E

abov

roller • oor end of

tnp shwAvc evel

-

SM

ITH

ST

RE

ET

IIIIIIIPMIUIIIIIIV allii1:111111111M

GROUND FLOOR AREA: 2563SQM

AHD 22.16 (AHD 22.161

■ _ VII I

.fiffirzFEffit -r

12

sli

reception

above

bike on ask

(f) WSUD Concept Prepared by Co-Perform Pty Ltd 27 November 2017

■ ■

30,000 litre rain water storage.

Connect harvested rainwater from the tank to toilets and urinals in Stage 2 (Levels 3 to 7) for flushing purposes. Flushing systems are to incorporate mains backup.

■ • ■

glaas Tondo. Nen tnansmillame 321011.12140. X0440 d 161

O I 2 3 4 5 10

111.1 ANCIIITECTURF

• 1•/10

426.126 South Slow FITZROY

dlINNIkle GROUND ROOS PLAN PROPOSED • STAGE

• •

_ra erara

L.•• _L

■ ■

ramp to roof I solo /sage/. sooPAT COPY

8431011102■00

KF -SD1.0 c -aldlIndent Val*L

A. _A. /1,ta 41091ovea—s.

Page 54: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

SM

ITH

ST

RE

ET

8511

5050

(c )

CORM GROUND FLOOR AREA LEVEL 1 AREA LEVEL 2 AREA

TOTAL AREA 7689 rn,

2563 rnd 2563 m, 2563 mr

07 CARS BIKES

2563 m, 2563 en, 2563 01, 1914 m, 1837 m, 1749 m, 1559 rn, 1125 in,

GROUND FLOOR AREA LEVEL I AREA LEVEL 2 AREA LEVEL 3 AREA LEVEL 4 AREA LEVEL 5 AREA LEVEL 6 AREA LEVEL 7 AREA (*balcony 561m9

.0104,0 ole 11001.1 t12000103

1/40 r.dro KF - SO1.8

SYTAIT' SIM"' 13 9 IS Plann, Subn

mmapoom (including service areas/

TOTAL AREA 15.873 ne

BIKES 13 20% ground loyal hoop

LEGEND

(1) WSUD Concept Prepared by Co-Perform Pty Ltd 27 November 2017

0 I 2 3 4 5 10 I I■1

a. C 'E %Ia E

0tudIO

4124. Smt. 5.1 EITZPOY

pa

C

90D0

1

gimme,

7

12570

— 0)5,1

458

464

462

(34) 460 POS

-t I 03

(03

3070

Roof terrace / balcony catchment for the rain water tank (approximately 775 sqm minimum to achieve an overall catchment of 1,875 sqm minimum)

Roof catchment for the rain water tank (approximately 1,100 Sqm)

7500

Page 55: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

APPENDIX D — Water efficient landscaping

Water efficient landscaping is part of the development proposal as confirmed in the following letter from Memla Landscape Architects.

Co-Perform Pty Ltd Issued: 28 November 2017 (Final)

Page 56: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

28/11/17

onto landscape architects

ABN: 70401242344 ACN 126121006 TRADING AS MEMLA Pty Ltd as trustee for M S. S McFall Trust

Simon Fulcrum Urban Planning Pty Ltd

Dear Simon

Re: Water efficient landscaping, 423-425 Smith St Fitzroy. VCAT Conditions item 5(g)

Further to discussion with Paul Graham, the following points below should address this issue:

• All plants are hardy species and suited to Melbourne's climate.

All plants, except for the Wisteria vine, are local Port Phillip, font line coastal species. They grow in very poor, well drained beach sand soils and are therefore adapted to tough, drought situations. Growing as they do, on the front line of coastal exposure, they can withstand severe winds which is something they will encounter on levels three and four. Wisteria is a proven tough plant in Melbourne and survived the Millennium drought in Melbourne.

• All raised planters are lm deep

Specifying planters this Deep, allows the soils to retain moisture and feed the plants in the event of an irrigation malfunction. As noted above, the plants grow naturally in beach sand so are adapted to dry situations.

• Drip irrigation

All garden beds are fed by drip irrigation.This will only need to be on in the summer months and even then only for an hour twice a week as a maximum. In the cooler months it will be turned off.

Attached with this letter is the amended plan and elevation with the above changes all included. If you require any further information please do not hesitate to call.

Yours Faithfully

Matthew. E. MCFa II. B.App.SCi Plg. M.L.Arch. Registered Landscape Architect

Office 1/655 Nepean Highway, Brighton East 3187. p. (03)8060 6813 www memla.net e. matthewiamemla.net M: 0414 346117

Page 57: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2

APPENDIX E — Low VOC criteria

Low-VOC Materials

The maximum TVOC content and emissions limits shall be followed when selecting paints, sealants, adhesives, wall and ceiling coverings.

Product Type Max TVOC Conte of read -to-use •roduc

Walls and ceilings — interior gloss 75 Walls and ceilings — interior semi gloss 16

Walls and ceilings — interior low sheen 16

Walls and ceilings- interior flat washable 16

Ceilings — interior flat 14

Trim — gloss, semi gloss, satin, varnishes and woodstains 75

Timber and binding primers 30

Latex primer for galvanized iron and zincalume 60

Interior latex undercoat 65

Interior sealer 65 One and two pack performance coatings for floors 140 Any solvent-based coatings whose purpose is not covered in this table 200

Table 1: Maximum TVOC content limits for paints and varnishes

IIMIKimmiiiP=ct Type Max TVOC Content (WI „ . of paiduct)

Indoor carpet adhesive 50 Carpet pad adhesive 50 Wood flooring and Laminate adhesive 100

Rubber flooring adhesive 60

Sub-floor adhesive 50

Ceramic tile adhesive 65

Cove base adhesive 50

Dry wall and panel adhesive 50 Multipurpose construction adhesive 70

Structural glazing adhesive 100

Architectural sealants 250

Table 2: Maximum TVOC content limits for adhesives and sealants

Product Type W' 'TVOC Emission Limit

(mg/m2 per

TVOC at 3 days 5

TVOC at 28 days 0.5

Table 3: Wall and ceiling covering TVOC emissions limits

Co-Perform Pty Ltd Issued 28 November 2017 (Final)

Page 58: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2

Engineered Wood Products The term "engineered wood products" includes composite wood products and includes raw/ unfinished as well as finished products. Items not covered by these limits include products used in exterior applications, formwork, internal car park applications, re-used products, and raw timber. All emission levels must be established by a NATA or ISO/IEC 17025 registered laboratory as per the testing methodologies in the table above.

Emission Limit / -Test Protocol

Unit of

Additional Notes Measurement

AS/NZS 2269:2004, testing procedure AS/NZS 2098.11:2005 method 10 for Plywood AS/NZS 1859.1:2004 - Particle Board, with use of testing procedure AS/NZS 4266.16:2004 method 16 AS/NZS 1859.2:2004 - MDF, with use of testing procedure AS/NZS 4266.16:2004 method 16 JIS A 5908:2003- Particle Board and Plywood, with use of testing procedure JIS A 1460 JIS A 5905:2003 - MDF, with use of testing procedure JIS A 1460 JIS A1901 (not applicable to Plywood)

< 1.0 mg/L

< 1 5 mg/L

< 1.0 mg/L

< 1.0 mg/L

< 1.0 mg/L

< 1.0 mg/L

ASTM D5116 <0.1 (+/- 0.0005)

mg/m2hr

(may also be represented as

mg/m2/hr) (may also be

represented as mg/m2/hr)

ISO 16000 part 9, 10 and 11 (also known as EN 13419)

<0.1 (+/- 0.0005) mg/m2hr

ASTM D6007 ASTM E1333 EN 717-1 (also known as DIN EN 717-1)

0.12mg/m3* 0.12mg/m3— 0.12 mg/m3

(may also be EN 717-2 (also known as DIN EN 717-2) 3.5 mg/m2hr represented as

mg/m2/hr). *The test report must confirm that the conditions of Table 1 comply for the particular wood product type, the final results must be presented in EN 717-1 equivalent (as presented in the table) using the correlation ratio of 0.98. — The final results must be presented in EN 717-1 equivalent (as presented in the table), using the correlation ratio of 0.98.

Table 4; Formaldehyde emission limit values for engineered wood products

Co-Perform Pty Ltd Issued: 28 November 2017 (Final)

Page 59: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2

APPENDIX F — Glossary & Nomenclature

Glossary

Alternative water sources

Alternative sources of use other than high quality potable water deliver delivered to site by the respective water authority. Examples include: rain water harvesting, stormwater harvesting and grey water re-use.

AS 1668.2-2012 Australian Standard AS 1668.2-2012 The use of ventilation and airconditioning in buildings Mechanical ventilation in buildings

Base building The building's primary structure; the building envelope; circulation and fire egress; and primary (pre tenancy fitout) electricity, HVAC, communications, water supply, drainage, gas, etc. of typical standard capacity up to the point of contact with tenancy spaces.

BCA Building Code of Australia.

BESS Built Environment Sustainability Scorecard.

BPEG Urban Stormwater Best Practice Environmental Management Guidelines published by the Victorian Stormwater Committee.

CoP Coefficient of Performance. An efficiency measure for heating based on the ratio of output (heating) to electrical power input.

DF Daylight factor. Is defined as the ratio of indoor to outdoor illuminance and expressed as a percentage.

EER Energy Efficiency Ratio. An efficiency measure for cooling based on the ratio of output (cooling) to electrical power input.

ESD Ecologically Sustainable Development.

Green Star Green Star is a national, voluntary environmental rating system that evaluates the environmental design and construction of buildings and communities. For buildings, the Green Star rating tools assess against a number of categories to determine the environmental impact of a project's site selection, design, construction, maintenance, etc. The nine categories included: management, indoor environment quality, energy, transport, water, materials, land use & ecology, emissions, and innovation. In this report, "Green Star" refers to the Design & As Built v1.1 tool.

Ipd Litres per day.

Ipm Litres per minute.

Potable water Suitable for human consumption, whether used as drinking water or in the preparation of food.

SDAPP Sustainable Design Assessment in the Planning Process.

SMP Sustainability Management Plan.

STORM Melbourne Water has developed the STORM Calculator as a method of simplifying the analysis of stormwater treatment methods to calculate the amount of treatment that is required to meet best practice targets, using WSUD treatment measures.

Co-Perform Pty Ltd

Issued: 28 November 2017 (Final)

Page 60: Sustainability Management Plan for 423-425 Smith Street Fitzroy … · 2018-04-20 · Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2 2. Introduction 2.1 Description

Sustainability Management Plan 423-425 Smith Street Fitzroy Stage 2

Water sensitive urban design (WSUD)

The integration of urban planning with the management. protection and conservation of the urban water cycle, that ensures urban water management is sensitive to natural hydrological and ecological processes.

• 0 ■ > Bullet points.

Nomenclature

Arch Architect

Bldr Builder

Bld-Mgr Building Manager

Elec-Des Electrical Designer / Engineer

Elec-Inst Electrical Installation Contractor

Elec-Maint Electrical Maintenance Contractor

ESD ESD Consultant

Fire-Des Fire Protection Designer / Engineer

Fire-Inst Fire Protection Installation Contractor

Fire-Maint Fire Protection Maintenance Contractor

Hyd-Des Hydraulic Designer / Engineer

Hyd-Inst Hydraulic Installation Contractor

Hyd-Maint Hydraulic Maintenance Contractor

L'scape-Des Landscape Designer / Consultant

L'scape-Inst Landscape Installation Contractor

L'scape-Maint Landscape Maintenance Contractor

Mech-Des Mechanical Designer / Engineer

Mech-lnst Mechanical Installation Contractor

Mech-Maint Mechanical Maintenance Contractor

Occupants Building occupants

PM Project Manager

Str-Eng Structural Engineer

Traffic Traffic Consultant

Waste-Des Waste Designer / Consultant

Waste-Collect Waste Collection Contractor

Co-Perform Pty Ltd Issued 28 November 2017 (Final)