Sustainable
Construction -
Oman Botanic
Garden Phase 2
Simon Buttery – RMD
Carillion Alawi LLC
Carillion Alawi LLC• As a business we have been present within the Sultanate of Oman for over 45 years and are a wholly owned subsidiary of our UK parent Carillion PLC a £5BN turnover international construction services business
• Today we specialise in:– Civil Engineering
– Building
– High quality joinery (we have Oman’s 1st FSC accredited joinery workshop)
– MEP
Carillion Alawi Values
Sustainability – Our Approach‘meeting the needs of the present generation without
compromising the ability for future generations to meet
their needs’
Project Details
• Client: Muscat Municipality
• Project Value: circa O.R. 19,500,00
• Start Date: 07/04/09
• Completion Date: 31/12/10
• Project Manager: Bovis Lend Lease
• Main Contractor: Carillion Alawi LLC
• 1st LEED Accredited project within the Sultanate of Oman
Mission
“The Oman Botanic Garden, as a new world class
botanic garden, conserves the unique botanical
and ethnobotanical heritage of Oman and ensures
that the flora, heritage and ecosystems of Oman
are valued by all”
Sustainability: Our Key Themes for the Project
• Collaborative working
• Awareness
• Recycling
• Water usage
• Community engagement
• Monitoring
• Adoption of best practices
Collaborative Working
• Partnership
established with
Project Manager
• Learning from wider
Carillion Businesses
Implemented
• Sustainable
Innovations Group
Awareness
• Regular awareness
training and feedback
sessions
• Environmental “Don’t
Walk By’s”
• LEED Training
Recycling• We currently recycle
– Timber
– Paper
– Cardboard
– Plastic PET
– Aluminium
– Steel
– Concrete
– Glass
– Areca leaf plates
Water Usage
• Use of new curing
membranes to reduce
water
• Flow restrictors to
taps
• None potable water
used for dust control
Community Engagement• Construction of new access stair to local school
• Sponsorship of local football team
• Facilitation of school visits to site
• Provision of furniture to local special needs school
Monitoring
• Background environmental monitoring program to establish ambient values for the following:– Noise
– Dust
– Air Quality
• An ongoing monitoring program has been developed to ensure levels during construction meet prescribed limits and do not impact the environment or local community.
Adoption of Best Practice
• On site crushing of
concrete waste mixed
with soil to use as
backfill behind
retaining walls
• Use of filter fences to
protect wadis from
run off and
sedimentation
Adoption of Best Practice
• Use of Areca plates
for serving operatives
food reduces food,
water consumption
and waste
• Protection and
preservation of
existing trees and
vegetation
Adoption of Best Practice
• Vegetation removed
chipped and turned
into compost
• Coir rope used for
walk ways instead of
nylon rope with plastic
tape
It Does Make A Difference!
• 18mm ply wood usage on target against
tight tender allowance
• Back fill material usage against tender
allowance circa 40% cost saving