Sustainable Substation Sustainable Substation Solutions IEEE Substation Conference May 21, 2012 Jim Hogan, VP of Transmission & Distribution Marshall Bird, LEED ® AP www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2012 Burns & McDonnell

Upload: others

Post on 07-May-2020

21 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Sustainable SubstationSustainable Substation Solutionsewh.ieee.org/cmte/substations/scm0/Raleigh Meeting... · Sherwood Substation Overview • 115-kV/13.8- kV Substation in Westport,

Sustainable SubstationSustainable Substation Solutions

IEEE Substation Conference

May 21, 2012

Jim Hogan, VP of Transmission & DistributionMarshall Bird, LEED® AP

www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2012 Burns & McDonnell

,

Page 2: Sustainable SubstationSustainable Substation Solutionsewh.ieee.org/cmte/substations/scm0/Raleigh Meeting... · Sherwood Substation Overview • 115-kV/13.8- kV Substation in Westport,

Why Sustainable Sub?

LEED® - Like for SubstationLEED - Like for Substation• Trendy

B fit• Benefits• The Right SolutionInvestigate Possibilities• Partner with Northeast UtilitiesPartner with Northeast Utilities

www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2012 Burns & McDonnell

Page 3: Sustainable SubstationSustainable Substation Solutionsewh.ieee.org/cmte/substations/scm0/Raleigh Meeting... · Sherwood Substation Overview • 115-kV/13.8- kV Substation in Westport,

Project Introduction

Sherwood Substation Overview• 115-kV/13.8- kV Substation in Westport,

Connecticut• Built on existing residential property• Built on existing residential property• Site drains to existing wetlands• Located adjacent to Metro North commuter rail line j

park-n-ride lot• Study done in parallel with conventional design

and constructionand construction• Sherwood Substation built in 2011 using standard

design criteria

www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2012 Burns & McDonnell

Page 4: Sustainable SubstationSustainable Substation Solutionsewh.ieee.org/cmte/substations/scm0/Raleigh Meeting... · Sherwood Substation Overview • 115-kV/13.8- kV Substation in Westport,

Project Introduction

Sustainable Substation InitiativeSustainable Substation Initiative• Concepts modeled after:

– LEED® Reference Guide– LEED Reference Guide– Sustainable Sites Initiative

• Reasons for the InitiativeReasons for the Initiative– Lack of utility green building standards– Underutilization of sustainable building g

practices in substation design– Demand environmental responsibility

www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2012 Burns & McDonnell

Page 5: Sustainable SubstationSustainable Substation Solutionsewh.ieee.org/cmte/substations/scm0/Raleigh Meeting... · Sherwood Substation Overview • 115-kV/13.8- kV Substation in Westport,

Overview

Sustainable PracticesSustainable Practices• Site Development• Stormwater Management• Stormwater Management• Material Strategies

Control Building Optimization• Control Building Optimization• Electric Vehicle Integration

P bli Ed ti d• Public Education and Awareness

www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2012 Burns & McDonnell

Page 6: Sustainable SubstationSustainable Substation Solutionsewh.ieee.org/cmte/substations/scm0/Raleigh Meeting... · Sherwood Substation Overview • 115-kV/13.8- kV Substation in Westport,

Site Development

Site SelectionSite Selection• Select Brownfield/

Redevelopment SitesRedevelopment Sites• Avoid Sensitive Ecological

AreasAreas– Wetlands– Riparian Buffer ZonesRiparian Buffer Zones– Endangered/Protected Species

Habitat

www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2012 Burns & McDonnell

Page 7: Sustainable SubstationSustainable Substation Solutionsewh.ieee.org/cmte/substations/scm0/Raleigh Meeting... · Sherwood Substation Overview • 115-kV/13.8- kV Substation in Westport,

Site Development

Sustainable Site DevelopmentSustainable Site Development• Minimize Area of Disturbance

– Compact electrical configurations– Compact electrical configurations– Minimize disturbance to surrounding undeveloped

and vegetated areas• Provide Erosion Control BMPs

– Prevent excessive sedimentation• Shield Station Lighting • Minimize Heat Island Effect

www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2012 Burns & McDonnell

Page 8: Sustainable SubstationSustainable Substation Solutionsewh.ieee.org/cmte/substations/scm0/Raleigh Meeting... · Sherwood Substation Overview • 115-kV/13.8- kV Substation in Westport,

Site Development

Water Efficient LandscapingWater Efficient Landscaping• Choose Native Plants• Specify Plant Types that Minimize Erosion• Specify Plant Types that Minimize Erosion

www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2012 Burns & McDonnell

Page 9: Sustainable SubstationSustainable Substation Solutionsewh.ieee.org/cmte/substations/scm0/Raleigh Meeting... · Sherwood Substation Overview • 115-kV/13.8- kV Substation in Westport,

Stormwater Management

Goals• Control stormwater rates• Remove 80% or more of Total Suspended Solids• Minimize erosion of developed areas• Minimize erosion of developed areas• Exceed minimum municipal or state regulations

www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2012 Burns & McDonnell

Pervious Pavement for Driveways Sedimentation Basin

Page 10: Sustainable SubstationSustainable Substation Solutionsewh.ieee.org/cmte/substations/scm0/Raleigh Meeting... · Sherwood Substation Overview • 115-kV/13.8- kV Substation in Westport,

Stormwater Management

Stormwater Management Within Substation Fence• Use Grass Pavers Where Practical• Plant with Low Growing Native Vegetation

www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2012 Burns & McDonnell

Page 11: Sustainable SubstationSustainable Substation Solutionsewh.ieee.org/cmte/substations/scm0/Raleigh Meeting... · Sherwood Substation Overview • 115-kV/13.8- kV Substation in Westport,

Stormwater Management

Grass and Gravel Pavers • Benefits

– Reduce impervious areas– Promote infiltration

• Drawbacks– Increase maintenance

procedures inside substations– Stabilize drive surface– Reduce Heat Island effect– Improve aesthetics

Stormwater Benefits• Meet or Exceed Required Stormwater Design Requirementsq g q• Purchase/Use Smaller Plots of Land• Less Disturbance and Erosion Potential• Simplify Permitting Approval Efforts with Smaller Footprints

www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2012 Burns & McDonnell

• Simplify Permitting Approval Efforts with Smaller Footprints

Page 12: Sustainable SubstationSustainable Substation Solutionsewh.ieee.org/cmte/substations/scm0/Raleigh Meeting... · Sherwood Substation Overview • 115-kV/13.8- kV Substation in Westport,

Material Strategies

Construction Waste Management PlanConstruction Waste Management Plan• Waste Recycling and Landfill Diversion

– Wood– Wood– Metal– Concrete– Masonry– Asphalt

• Source Reduction• Coordination Between All

www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2012 Burns & McDonnell

Contractors

Page 13: Sustainable SubstationSustainable Substation Solutionsewh.ieee.org/cmte/substations/scm0/Raleigh Meeting... · Sherwood Substation Overview • 115-kV/13.8- kV Substation in Westport,

Material Strategies

Recycled Content Building MaterialsRecycled Content Building Materials• Fly Ash in Concrete• Reclaimed Crushed Concrete• Reclaimed Crushed Concrete• High Recycled Content Steel

Recycled Plastics• Recycled Plastics– Block retaining walls

Pi– Pipe– Geogrids and geotextiles

www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2012 Burns & McDonnell

Page 14: Sustainable SubstationSustainable Substation Solutionsewh.ieee.org/cmte/substations/scm0/Raleigh Meeting... · Sherwood Substation Overview • 115-kV/13.8- kV Substation in Westport,

Material Strategies

Regional Materials and Local SuppliersRegional Materials and Local Suppliers• Reduction in environmental impact of

transportation/shippingtransportation/shippingVendor Selection

Sustainable Manufacturing• Sustainable Manufacturing• Responsible Business

PracticesPractices

www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2012 Burns & McDonnell

Page 15: Sustainable SubstationSustainable Substation Solutionsewh.ieee.org/cmte/substations/scm0/Raleigh Meeting... · Sherwood Substation Overview • 115-kV/13.8- kV Substation in Westport,

Control Building OptimizationOptimization

Control Building OpportunitiesControl Building Opportunities• Building Envelope

– Increased InsulationHi h R l– Higher R-value

• HVAC– Geothermal Heat Pump

• Lighting System– High Efficiency Lighting– Led Lighting Fixtures

• Auxiliary Power– Photovoltaic Panels– Small Wind Turbines

www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2012 Burns & McDonnell

Page 16: Sustainable SubstationSustainable Substation Solutionsewh.ieee.org/cmte/substations/scm0/Raleigh Meeting... · Sherwood Substation Overview • 115-kV/13.8- kV Substation in Westport,

Electric Vehicle Integration

Charging StationsCharging Stations• Possible Installation Locations

– Commuter Parking LotsCommuter Parking Lots– Parking Garages– Shopping Centers– Residential Buildings – Office Complexes

Types of Charging Stations• Quick Charge – DC Charging Stations

www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2012 Burns & McDonnell

• Slow Charge – AC Level II

Page 17: Sustainable SubstationSustainable Substation Solutionsewh.ieee.org/cmte/substations/scm0/Raleigh Meeting... · Sherwood Substation Overview • 115-kV/13.8- kV Substation in Westport,

Public Education and AwarenessAwareness

Partnership with Local Schools• Utility Involvement in the Community

Highlighting:– Substation purposes and need– Sustainable practices used in the substation

R bl j t– Renewable energy projects

Display Boards• Locations

– SubstationsCh i t ti l ti

www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2012 Burns & McDonnell

– Charging station locations

Page 18: Sustainable SubstationSustainable Substation Solutionsewh.ieee.org/cmte/substations/scm0/Raleigh Meeting... · Sherwood Substation Overview • 115-kV/13.8- kV Substation in Westport,

Study Site Layout

www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2012 Burns & McDonnell

Page 19: Sustainable SubstationSustainable Substation Solutionsewh.ieee.org/cmte/substations/scm0/Raleigh Meeting... · Sherwood Substation Overview • 115-kV/13.8- kV Substation in Westport,

Cost

• Est. Traditional Substation Cost: $9.2 milEst. Traditional Substation Cost: $9.2 mil• Est. Sustainable Substation Cost: $9.35 mil• Estimated Cost Increase: 1 0%Estimated Cost Increase: 1.0%

www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2012 Burns & McDonnell

Page 20: Sustainable SubstationSustainable Substation Solutionsewh.ieee.org/cmte/substations/scm0/Raleigh Meeting... · Sherwood Substation Overview • 115-kV/13.8- kV Substation in Westport,

Next Steps

• ImplementationImplementation• Performance Review• Cost EvaluationCost Evaluation• Bidding With This Design• Request LEED• Request LEED

Accreditation for Utility ProjectsProjects

www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2012 Burns & McDonnell

Page 21: Sustainable SubstationSustainable Substation Solutionsewh.ieee.org/cmte/substations/scm0/Raleigh Meeting... · Sherwood Substation Overview • 115-kV/13.8- kV Substation in Westport,

Questions?

www.burnsmcd.com Engineering, Architecture, Construction, Environmental and Consulting Solutions © 2012 Burns & McDonnell