swd landscape and athletic field · synthetic turf installations: j•drain swd-12 for lateral...

4
[email protected] [email protected] www.j-drain.com BRO-LD-SWD-0416 REMOVING STANDING WATER IN YARDS AND LANDSCAPE THE EASY WAY! JDRAIN SWD is an effective method for removing standing water in many landscape applications without disrupting the surrounding areas by placing SWD in narrow trenches and backfilling with sand. APPLICATIONS: LAWNS, GARDENS, PLAYGROUNDS, ATHLETIC FIELDS, GOLF COURSES, SYNTHETIC TURFS, HORSE FARMS, AND LANDSCAPE. Site Water Drainage SWD 292 S. Main St., Suite 200 Alpharetta, GA 30009 (800) 843-7569 (770) 442-1461 Enterprises, Inc.

Upload: votuong

Post on 07-Mar-2019

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SWD landscape and athletic field · synthetic turf installations: j•drain swd-12 for lateral drainage drainage laterals into sideline trench finished playing field very cost effective:

[email protected]@j-drain.com www.j-drain.com

BRO-LD-SWD-0416

REMOVING STANDING WATER IN YARDS AND LANDSCAPE THE EASY WAY!

J•DRAIN SWD is an effective method for removing standing water in manylandscape applications without disrupting the surrounding areas by placing SWD in narrow trenches and backfilling with sand.

APPLICATIONS: LAWNS, GARDENS, PLAYGROUNDS, ATHLETIC FIELDS,GOLF COURSES, SYNTHETIC TURFS, HORSE FARMS, AND LANDSCAPE.

Site Water Drainage

SWD

292 S. Main St., Suite 200 Alpharetta, GA 30009

(800) 843-7569 (770) 442-1461Enterprises, Inc.

Page 2: SWD landscape and athletic field · synthetic turf installations: j•drain swd-12 for lateral drainage drainage laterals into sideline trench finished playing field very cost effective:

2 - 3 INCH MIN. WIDTH

J•DRAIN SWD-6

SAND BACKFILL PROVIDESRAPID DRAINAGE OFSURFACE FLOW, FLOWTHROUGH TURF AND FLOWTHROUGH ROOT ZONE

SURFACE FLOW

FLOW THROUGH TURF

FLOW THROUGH ROOT ZONEPROMOTES HEALTHY TURF

TRENCH DEPTH MIN. 12" TO PROVIDEDRAINAGE OF ROOT ZONE

LOCATE AND DIG TRENCHES

T-CONNECTOR DETAIL END CONVERSION TO PIPE

SPLICING DETAIL END CAP FITTING INSTALLING INTO TRENCH

TEMP. STAKES FOR CENTERING INSTALLING SAND BACKFILL

INSTALL AND TAPE FITTINGS

ENDOUT T CONNECTOR

SPLICE END CAP (6” only)

Site Water Drainage

SWD

Page 3: SWD landscape and athletic field · synthetic turf installations: j•drain swd-12 for lateral drainage drainage laterals into sideline trench finished playing field very cost effective:

SYNTHETIC TURFINSTALLATIONS:

J•DRAIN SWD-12 FOR LATERAL DRAINAGE DRAINAGE LATERALS INTO SIDELINE TRENCH FINISHED PLAYING FIELD

VERY COST EFFECTIVE: ELIMINATES ALL TRENCHES ACROSS FIELD WHILE SPEEDING UP CONSTRUCTION TIME AND REDUCING INSTALLATION COST.

PLAYGROUNDINSTALLATIONS:

VERY COST EFFECTIVE: ELIMINATES ALL TRENCHES UNDER PLAYGROUND AND PROVIDES RAPID DRAINAGE, SAVING CONSTRUCTION TIME AND MONEY.

GOLF COURSEINSTALLATIONS:

INSTALLING J•DRAIN / FITTINGS BACK FILLING WITH SANDTRENCHING ACROSS FAIRWAY

NATURAL TURFINSTALLATIONS:

VERY COST EFFECTIVE: NARROW, SHALLOW TRENCHES CAN BE LAID FOR A FRACTION OF THE COST OF PIPE AND GRAVEL FILLED TRENCHES. LESS INTRUSIVE TO PLAYING AREA.

TRENCHING ACROSS FIELD

HORSE FARMINSTALLATIONS:

VERY COST EFFECTIVE: NARROW, SHALLOW TRENCHES CAN BE LAID FOR A FRACTION OF THE COST OF PIPE AND GRAVEL FILLED TRENCHES. SURFACE DRYING TIME GREATLY REDUCED.

TRENCHING AND INSTALLING J•DRAIN

J•DRAIN SWD-6 IN TRENCH / SAND BACK FILL J•DRAIN SWD-6 WITH ACCESSORIES

INSTALLING J•DRAIN SWD ACROSS PLAYGROUND FREE DRAINAGE PLAYGROUND

VERY COST EFFECTIVE: NARROW, SHALLOW TRENCHES CAN BE LAID FOR A FRACTION OF THE COST OF PIPE AND GRAVEL FILLED TRENCHES. CAN BE INSTALLED QUICKLY WITH LESS DAMAGE TO AREA.

Page 4: SWD landscape and athletic field · synthetic turf installations: j•drain swd-12 for lateral drainage drainage laterals into sideline trench finished playing field very cost effective:

[email protected]@j-drain.com www.j-drain.com

292 S. Main St., Suite 200 Alpharetta, GA 30009

(800) 843-7569 (770) 442-1461Enterprises, Inc.

INSTALLATION PROCEDURE:1. Determine drainage layout. Mark field or drainage area with a chalk line at trench locations.

2. Excavate trenches 2” - 3” (33 - 105 mm.) wide and to a depth so that the top of the J•DRAIN SWD is 6” below the turf surface.

3. Unroll and place J•DRAIN SWD into trench centering with temporary wood stakes. Install proper fittings and tape fittings in place. Use a select backfill such as washed concrete sand.4. Remove temporary stakes and flood trench with water to promote proper compaction.5. Top off trench with sand and replace sod.

TYPICAL GRIDIRON PATTERN FOR TEE BOXES, FAIRWAYS, LAWNS AND GREENS

RANDOM PATTERN FOR SAND TRAPS, FAIRWAYS AND LAWNS

TYPICAL HERRINGBONE PATTERN FOR GREENS, FAIRWAYS AND LAWNS

TO OUTLET

TO OUTLET

TO OUTLET

SL

OP

E SAND TRAPSFAIRWAYSLAWNS

SLOPE

SLOPE

TYPICAL DRAINAGE LAYOUTS FOR J•DRAIN SWD

EN

DZ

ON

E6 IN. COLLECTOR PIPE

1 %

SLO

PE

45°

J•DRAIN SWD-6 or SWD-12

CROWN

1 % SLOPE TO DISCHARGE

EN

DZ

ON

E

6 IN.

SLO

PE

SLO

PE

COLLECTOR PIPE

1 % SLOPE TO DISCHARGE

TYPICAL ATHLETIC FIELD DRAINAGE LAYOUT

1 % SLO

PE

J•DRAIN SWD-6

12”MIN.

2”-3”WIDTH

SAND BACK FILL

TYPICAL NATURAL TURF DETAIL

TYPICAL SYNTHETIC TURF DETAIL

J•DRAIN SWD-12

GRAVEL

TURF AND PAD

NOTE: J•DRAIN SWD-6is placed verticallyin narrow trenchesand sloped to sidelines. Narrowtrenches are lessintrusive to playingfield.

NOTE: J•DRAIN SWD-12is placed horizontallyacross playing fieldand sloped to sidelinetrenches thuseliminating crossfieldtrenching.

The information contained herein is believed by JDR Enterprises, Inc. to be accurate and is offered solely for the customer’s consideration, investigation and verification. Determination of suitability for use is the responsibility of the user. JDR’s Limitiations, Limited Warranty, & Disclaimer along with Standard Terms & Conditions apply. See www.j-drain.com for more info. Limitations: J-DRain is resistant to chemicals in normal soil environments. However, some reagents may affect the performance of J-DRain. A JDR representative should be contacted for further information to determine the suitability of use of J-DRain in unusual soil environments. J-DRain should be limited to its exposure to ultra-violet sunlight. J-DRain should be backfilled or covered within seven days of installation. Disclaimer: All information, drawings and specifications are based on the latest published information at the time of printing. JDR reserves the right to make changes due to manufacturing improvements and engineering at any time. All physical properties are minimum average roll values (MARV). Standard variations of 10% in mechanical properties and 15% in hydraulic properties are normal.

BRO-LD-SWD-0416

Fabric2 2Flow (ASTM D-4491) 140 gpm/ft (5704 lpm/m )

CBR Puncture (ASTM D-6241) 250 lbs. (1.11 kN)

AOS (ASTM D-4751) 70 U.S. Sieve (.212 mm)

Grab Tensile (ASTM D-4632) 100 lbs. (.45 kN)-1Permittivity (ASTM D-4491) 2.0 sec

U.V. Resistance (ASTM D-4355) 70% @500 hrs.

Core

Roll Weight: 38, 68, 83, 98, & 128 lbs. (17, 30, 37, 44, & 57 kgs.)Roll Width: 6”, 12”, 18”, 24”, & 36” (15, 30, 38, 45, & 60 cm.) Roll Length: 165 ft. / 300 ft. (50.29 / 91.44 meters)

2Compressive Strength (ASTMD-1621) 9,500 psf (455 kN/m )

Thickness (ASTM-1777) 1 In. (2.54 cm.)In-Plane Flow (ASTMD-4716) 30 gpm/ft width (372 lpm/m) (Q&518 psf & Hydraulic gradient = .1)

Rol

l

Physical Properties

Site Water DrainageSWD