Mayfield Industries Pty Limited
Switch onto Mayfield Capability Profile
Design, manufacturing, installation and commissioning of transportable switchroom and switchboard solutions.
Mayfield
Core Proposition
Mayfield is a specialist engineering company with a trusted name in
the design, manufacturing, installation, and commissioning of
Transportable Switchrooms, LV Main Switchboards, LV Motor
Control Centres and other products to clients locally and overseas.
Mayfield has operated continually since 1936 and our reputation
was founded on our switchboard manufacturing capability. This
understanding has allowed us to develop and manufacture
transportable buildings suited for the operation and long life
expectancy of the electrical equipment housed inside.
We deliver switchrooms, switchboards, motor control centres and
other products to clients locally and overseas. Our reputation has
been founded on our switchboard manufacturing capability, however
our offering extends beyond this.
Our approach to winning and delivering each project is flexible, in
that we can offer our clients a range of partnering models, including
alliancing or a consortium arrangement.
Manufacturing Operation
Our modern manufacturing facility, situated on 26,000m2, provides
the foundation for guaranteed project delivery, on time and to the
highest possible standards.
We pride ourselves on the quality and longevity of our client
relationships established over many years, which include a
considerable number of long-term clients and repeat business,
earned by providing the best solutions.
Experience has shown us that maintenance can be a costly
component throughout a product’s life cycle. Accordingly, our
approach ensures we focus on delivering the lowest ‘total life cost’.
Our Target Markets
Market Focus
• Water & Wastewater treatment plants
• Pumping stations
• Power generation
• Co-generation facilities
• Renewable energy
• Mining and mineral
• Oil and gas
• Process industries
Sample of Completed Projects
• Olympic Dam Expansion (SA)
• Newman Power Station (WA)
• Quarantine Power Station (SA)
• Mt Stuart Power Station (QLD)
• Badu Island Power Station (QLD)
• BMA Broadmeadows Coal Handling Substations (QLD)
• Metronode Datacentre Plantrooms (VIC)
• Port Adelaide and Bolivar High Salinity Project (SA)
• Snapper Mineral Sands (NSW)
• Shell Aust. Blast Rated Switchroom (VIC)
• APLNG Upstream Electrification (QLD)
• Simberi Gold (Papua New Guinea)
BMA Broadmeadows SS108
Substation, 2011-2012
Clients
• BHP Billiton
• Electranet
• Tenix
• SA Water
• United Water
• Santos
• GRD Minproc
• Ausenco
• Siemens
• Rolls Royce
• Ergon Energy
• HWE / Rio Tinto
Switchrooms
Transportable Switchrooms
We design and manufacture fully transportable switchrooms, control
rooms and process skid assemblies. Our switchrooms are custom
designed and built to withstand the most arduous climate and
transport routes Australia has to offer.
Mayfield is recognised as an industry leader in transportable
switchrooms. Its history in switchboards provides Mayfield with a
unique understanding of the connection between switchboard and
switchroom. These 2 elements are not exclusive, but need to be
considered as a whole in order to develop the solution. Mayfield has
the capability to install and intercable all types of Medium Voltage
and Low Voltage switchgear into their switchrooms.
Our buildings are manufactured entirely in-house and designs are
based on all steel construction for the base, wall and roof sections
incorporating:
• Colourbond steel sheeting to walls and ceiling – internal/external
• Fire rated construction
• Fire alarm systems
• Fire suppression (FM200, Novec, Inergen, Argonite)
• Point and VESDA detection systems
• Air conditioning systems
• Room pressurisation systems/Dust ingress prevention
• Support platforms and stairs
• Complete electrical and HV/LV switchgear fitout
• Communication systems
• Cyclone, ballistic and blast rated construction
Switchboard Capabilities
Switchboard Capabilities
We provide the option of a custom-built switchboard, tailored to
specification, or a modular ‘off the shelf’ switchboard.
Our switchboards are type tested to AS 3439, in accordance with the
following:
• continuous ratings up to 5,000A
• short-circuit ratings up to 100kA
• Forms 1, 2, 3, 3A, 3B or 4 segregation
• Appendix E arc fault containment
• Based on our client’s requirements, cubicles can be manufactured
• from marine grade aluminium, mild, galvanized or stainless steel.
Custom Switchboards
Main switchboards are manufactured entirely in-house, in accordance
with independently certified quality assurance procedures. This ensures
total control throughout all phases of design and production.
As part of our customised solution, configuration options include:
• Up to IP66 degrees of protection
• front or back connection
• top and/or bottom cable entry
• double sided or back-to-back
• shipping breaks
• external/internal paint colour to specification
To support our ability to manufacture custom built switchboard
enclosures and switchrooms in-house, we have a state-of-the-art
manufacturing facility, which is fully equipped with large fixed
machinery, including NC brake presses, guillotine and the latest in NC
turret punch technology, enabling general steel fabrication to high
tolerances.
In addition, we have a fully equipped wet spray painting and baking
system to facilitate a variety of paint finishes.
Our capabilities in this area include the following:
• acoustic enclosures
• access platforms
• canopies
• stairs
• walkways
• general equipment supports
Modular Switchboards and MCCs
Modular Switchboards
We offer our clients a modular switchboard, designed for main
switchboard and motor control centre applications.
We are well versed in applying a variety of proprietary modular
switchboard building systems, such as B&R, Elsteel, Rittal and
Mayfield’s own modular system.
Modular construction systems enable products to be built to various
sizes and configurations, resulting in shortened lead times and design
flexibility, to produce type-tested solutions.
Modular switchboards offer our clients a cost effective, simple to
construct solution, which maximises design flexibility, particularly in fast
track project time frames.
Motor Control Centres
We offer our clients motor control centres with the option of fixed, plug-
in or withdrawable modules. They are designed and manufactured in-
house and can be configured in a number of ways, for example, front or
back connection, top and/or bottom cable entry and doublesided
arrangement.
The plug-in and withdrawable motor control centres offer our clients a
completely flexible design. Modules can be rearranged in the future
without the need to cut, drill or weld and they also offer easy extension
from both ends. The draw-out nature of modules simplifies maintenance
and minimises downtime.
Features of our motor control centres include:
• Fault level of 50kA for 3 secs, 100kA for 1 sec
• Forms 1, 2, 3, 3A, 3B or 4 segregation
• Form 3B, Appendix E (arc fault containment)
• Up to IP65 degrees of protection
• Horizontal busbar system rated from 1000A to 5000A
• Vertical busbar system rated up to 1000A
• Full-length Neutral and Earth bars
• Cable entry from top and bottom
• Switched fuse units and circuit breakers are door interlocked,
ensuring operator safety.
Experience - Relevant Industry Expertise
Labour force tailored for Project size
• In House expertise
• Long history of Industrial experience
• Olympic Dam, Shell, APLNG, Rio Tinto, IHI, ECM,
SA Water
• Strong in house electrical capability - 25+
Electricians
• Use of industry recognised electrical subcontractors
• ie. Broadspectrum, IES
• Strong Subcontract Management
Structural Engineering and Third Party RPEQ certification
• CPR
• Form 15 and 16
History based on Switchboard Design and Manufacturing
• Understanding the importance interface between
switchgear and switchroom as a total solution
• Ownership by AMEC, Leighton Contractors
Strong Project Management Experience
• Independence - full contract management capability
• Established Siemens project team at Mayfield
• Project Management
• Document Control
• Testing Controllers
Integrated Management System
AS/NZS ISO 9001
AS/NZS 4801
AS/NZS ISO 14001
Australian Standards
WHS Regulations &
Environmental
Legislation
Government
Management Systems
Guidelines
MAYFIELD INTEGRATED
MANAGEMENT SYSTEMS MANUAL
Policies
Standard Procedures
System forms
ISO 9001:2008 - Quality Assurance
ISO 14001.2004 - Environment
AS NZS 4801.2001 - OHS
Systems - Web Based Business Systems
Managing our Business Systems securely, whilst gaining unprecedented access across
multiples sites
Full ISO audit
capability
Document
management and
version control
Recording, analysing
and reporting data
metrics
Supplier, Client,
Contractor
management,
including remote
Induction capability
WiFi access via servers,
ipad and iphone for
access anywhere,
anytime
Detailed Project Management
Relevant Industry Experience
Safety Conscious Culture
• Safety systems built on the history of Tier 1
Contracting ownership (AMEC, Leighton
Contractors)
• Inductions across the board
• Visitors, Clients, Workers
• Now achieved over 225,000hrs on APLNG
without Lost Time or Medical Treatment
ISO 9001:2008
Quality Assurance
ISO 14001.2004
Environment
AS/NZS 4801.2001
OHS
Surveillance Audit conducted in
June 2013
98% Score on the Achilles Audit
October 2013
Quality Assurance
Process – Pre-Contract Order Receipt
Pre Contracts Process
Pre-contractsBDM Estimators Review/Approval Team Client
All opportunities directed to the BDM
Conduct Opportunity Assessment
Yes/No/Negotiate
Reject opportunity
Conduct Go/ No Go Assessment
Yes/No/Review
Reject Opportunity
Client review
Review Business
Risk
Complete OA record
Complete Go/ No Go
Record
Conduct Tender Process
(Refer Tender Process )
Financial & Green sheet Review
Yes/No
Create Tender Docs
Present to Client,Notify BDM
Review Feed Back Form
Book Greensheet
review
Client reviews tender
Parent Process
Sub Process
Document
Decision
No
No
Yes
Yes
Yes
Prepare Client Submission Tender
Documents
Accept
No
Tender Strategy Review
Pre Tender Assessment
Checklist
Tender Review
Checklist
Tender Review
Checklist
Process – Project Development
Development Phase, Specifications, calculations
Client Design & Engineering SuppliersCompliance Sub-contractorsTender/QA/
Manufacturing
Phas
e
Client documentation
ScopeDrawings
Supplier
RegulationsStandards
Codes
design team
Client review for approval
Receipt confirmation
Issued for Construction
To IFC
Sub-contractors
From Client alteration
IFC
TQ issued to
Client
Document Controller,
QDMS system
Mayfield Knowledge Base
External Technical resources
Sub-contractor external process
Release to Mayfield
Project controlled documents are managed through QDMS.Any qualifications/amendments are managed through a ‘TQ’ process
To MOR process
IMS-SP09-F04
Planning Xfunctional Team
ResourcesITP
PQMP
Receipt confirmation
Process - Manufacturing
Manufacturing overview
Design and Development
Manufacturing QA Sub-Function
Phas
e
Manufacturing Pack released
Manufacture to specification
Manufacturing Query
Design team(query review)
Progress inspections
Progress gates
ITC
Colate incoming documentation
ITPMDR
Release Note
TQ issued to
Client
Goods receipt
Punch List
Suppliers
Inspection
NCR
OK
N/OK
Inspection
N/OKOK
outcome
IMS-SP09-F04
OK
N/OK
Process – IFC and Issue Resolution
Release to Manufacturing, issue resolution
Client Sub-ContractorsMayfield Engineering Mayfield Manufacturing Suppliers Function
Phas
e
From Development
QDMS
Control copy issued through QDMS
Control copy issued through QDMS
Control copy issued through QDMS
IFC document(Registered in)
QDMS
Change to scope or
design brief by Client
Advise Mayfield
Engineering
Manufacture to specification
Manufacture to specification
Manufacturing Query
Manufacturing query
Design team
Resolve or escalate
Continue manufacture
Continue manufacture
Supply through Procurement
Obtain release certificate
Obtain release certificate
Raise TQ
TQ issued to
Client
Manage inhouse
Design team
MOR
From Development
(supplier)
IMS-SP09-F04
Process – Inwards Goods Control
Title; Incoming Goods
Goods Receipt Quality InspectionFree Issue Inspection
Ph
ase
Goods arrive.
Visual inspection of condition of goods and
verify against paperwork
Return or receipt “as is”(NCR required)
Sub-process ANon conforming goods procedure
1. General item,2. Free Issue,
3. QA inspect required
Receipt item
Accept deliveryComplete Mayfield
receipt docket
1.
2
Label items for usePut away items
Enter final disposition into Job Pac
File all documents as per procedure
2&3
Raise QA inspect request,Inform QA
Complete free issue receipt for,
Inform Store receivables
Uncrate items,Inspect as per QA
inspection requirements
OK/Not OK
Identify items as Not OKRaise NCR
Inform Site Supervisor
Identify items as OK for production
Move to storage if required
Sub-Process BNon-conforming free issue goods
procedure
Label items and transfer to QA or free issue
storage
Complete QA release and inform Store receivables
Uncrate items,Inspect as per QA
inspection requirements
OK/Not OK
Identify items as Not OKRaise NCR
Inform Site Supervisor
Identify items as OK for production
Move to storage if required
Sub-Process CNon-conforming goods procedure
3
Standard Project Documentation Deliverables
Mayfield Handover Documentation
Project Quality Management Plan
o Project Details
o Project Description
o Risk Identification
o Project champion details
o Communication Plan
Equipment specifications & Installation and Operation
Manuals
Material Data Records (MDR’s)
o Equipment test reports & Certificate of compliance
o Material details & Specifications
o Test equipment Calibration certificates
o Inspection & Test Plan
o Inspection & Test checklist
o Electrical Certificate of Compliance
o Spare Parts list
o As Builts
• A professional and ethical approach
to all aspects of the projects.
• Willingness to work co-operatively
and creatively in solving problems.
• A total focus on achieving all targets
for price, delivery and quality.
• The willingness to go the ‘extra mile’
when required.
• A highly skilled and motivated
workforce.
• Manufacturing facilities that are
ideally suited to the application.
Its not just what we do, but
how we do it that matters.”
Project Endorsements
Project Endorsements
Recent Project Snapshot
Project Client Year Scope Leadtime Value
APLNG Upstream Gas process and
Water Treatment Facility
Switchrooms
Siemens 2012-2013 Design, Engineer and the Manufacture of 64 transportable
switchrooms complete with platforms, support columns, L&P DBs,
Fire and Gas Suppression and HVAC system. Installation and
testing of LV and MV switchboards, LV and MV Drives and
Compressor cooling units. Buildings were up to 25m x 5.5m and a
maximum of 50tonne.
20 months $32mil
Macarthur River Power Station ECM 2013 Design, Engineer, Manufacture and Install 2 substations complete
with platforms, support columns, L&P DBs, Fire and Gas
Suppression and HVAC system consisting of a 4 module and 2
module switchrooms. Design and manufacture of LV switchboards.
Installation and testing of LV and MV switchboards, drives and
Compressor cooling units. This project required the development of
a process to provide the safe and cost effective system of re-
assembling the 6 modules at site. Buildings were LV and Control at
38m x 10m and MV at 34m x 5m.
4 months $3.4mil
Hamersley Iron - Yaralyi Maya Power
Station
IHI 2012-2013 Design, Engineer, Manufacture and Supply 22mm x 6m
transportable switchroom. The switchroom was designed suitable
for 2hr fire rating and Region D Cyclone rating. Installation and
intercabling of LV Switchboards, Battery systems and Control
Cabinets. Building weight was 58tonne.
3.5 months $950k
Nyrstar Silver Plant – Precious Metals
Refinery Switch-room
Nyrstar 2012 Design, Engineer, Manufacture and install transportable switchroom
complete with L&P DB, LV MCC, F&G System, HVAC and
intercabling between equipment. This switchroom incorporated a
computer floor to contain the intercabling.
3.5 months $680k
Simberi Gold (Papua New Guinea) Schneider Electric 2012 The design, engineering and manufacture of 4 LV and HV
transportable switchrooms for the Simberi Gold mine in Papua New
Guinea. Project included the design and manufacture of LV MCCs
for installation and connection to free issued VSDs, PLCs and UPSs.
3 months $3mil
Recent Project Snapshot
Project Client Year Scope Leadtime Value
BMA Broadmeadows Siemens 2011-12 Design, Engineer and Manufacture 3 transportable substations
consisting a total of 6 transportable switchrooms and approximately
200m2 of platforms and stairs. Main MV VSD room consisted of
280kw of heat cooled by a 320KW HVAC system. Installation of LV
and MV switchboards, VSDs, control panels UPSs, DBs etc. The
heaviest of the buildings was 75tonne.
7 months $3mil
Metronode Datacentre Plantroom Metronode 2011 The design, engineering and manufacture of a modular data facility
plantroom. The plantroom consisted of 15 tranportable modules
arranged 3 storeys high and 5 bays wide. The design, manufacture,
installation and testing of 21 LV switchboards that controlled the
power reticulation across the Datacentre site.
8 months $6mil
Blast Resilient Switchroom Shell Refinery 2010/2011 Design, Engineer, Manufacture and deliver and Medium Voltage
switchroom capable of withstanding a blast of 11kPa with peak
overpressure of 23kPa @ 44ms.
Scope Included:
ŸBlast calculations for structure and doors.
ŸInstallation of Siemens Medium voltage switchgear.
16 weeks $400k
Sino Iron Port Facilities Switchrooms United Group 2010 Design, Manufacture and deliver 1 @ 36m x 4.5m transportable
building. Building was designed in 3 sections to be joined on site.
Scope Included:Ÿ
VESDA Detection and FM200 Gas Suppression.Ÿ
A/C design, selection and supply.Ÿ
Design for Region D cyclone rating.
16 weeks $630k
Olympic Dam RB08,RB33, RB34,
RB35 & RB39 Vent Fan Projects Schneider Electric for
BHPB
2010 Design, Manufacture and deliver 10m x 4.5m transportable
buildings.
Scope included:Ÿ
Design and supply of 3 x Packaged HVAC units to handle 150kW of
internal heatload.Ÿ
VESDA Detection and Inergen Gas Suppression.Ÿ
LV MCC design and installation into switchrooms.
Ÿ2hr Fire rated Walls, floor and ceiling.
9 weeks/ project $2.5mil
Snapper Mineral Sands Wet
Concentrator Plant Switchroom and
Accessories
Bemax Resources 2009 Design, Manufacture and deliver 1 @ 19.5m x 5.6m transportable
building.
Scope included:Ÿ
Design and Installation of 5 LV Motor Control Centres.Ÿ
Manufacture of Air cooling and filtering plant custom designed to suit
the highly saline atmosphere and cool the 1.2mW of Variable Speed
Drives installed.
ŸManufacture of Tailings pump skid switchroom and LV MCC.Ÿ
Computer floor installation to act as air plenum for cooling drives and
intercabling zone.
6 months $1.5mil
Switchrooms – Wind Farms
Project: Clare North Wind Farm
Client: Consolidated Power Projects
Date: 2011
Scope: Design, Manufacture and Fitout 2 Switchrooms for a
South Australian wind farm project.
Mayfield has delivered switchrooms into Clare North,
Macarthur River, Woodlawn, Oaklands Hill, North Brown
Hill, Hepburn, Hallet Hill and Clements Gap wind farms.
Value: +$400k
Leadtime: 3 months
Switchrooms
Project: Yuralyi Maya Power Station
Client: IHI, Rio Tinto
Date: 2012-13
Scope: Design, Manufacture and Fitout 2 Switchrooms, Fire
Rated and Region D Cyclone
Value: +$1.5mil
Leadtime: 3 months
Switchrooms
Project: Yuralyi Maya Power Station
Client: IHI, Rio Tinto
Date: 2012-13
Scope: Design, Manufacture and Fitout 2 Switchrooms, Fire
Rated and Region D Cyclone
Value: +$1.5mil
Leadtime: 3 months
Integrated Solutions
Project: Yuralyi Maya Power Station
Client: IHI, Rio Tinto
Date: 2012-13
Scope: Design, Manufacture and Fitout 2 Switchrooms, 2hr Fire
Rated and Region D Cyclone
Value: +$1.5mil
Leadtime: 3 months
Integrated Solutions
Project: Yuralyi Maya Power Station
Client: IHI, Rio Tinto
Date: 2012-13
Scope: Design, Manufacture and Fitout 2 Switchrooms, 2hr Fire
Rated and Region D Cyclone
Value: +$1.5mil
Leadtime: 3 months
Switchrooms
Project: Yuralyi Maya Power Station
Client: IHI, Rio Tinto
Date: 2012-13
Scope: Design, Manufacture and Fitout 2 Switchrooms, 2hr Fire
Rated and Region D Cyclone
Value: +$1.5mil
Leadtime: 3 months
Switchrooms
Project: BMA Broadmeadows Coal Mine
Client: Siemens, BMA
Date: 2011-12
Scope: Design, Manufacture and Fitout 6 Switchrooms, Fire
Rated, F&G system, >200m2 platforms
Value: +$3.5mil
Leadtime: 8 months
Switchrooms
Project: BMA Broadmeadows Coal Mine
Client: Siemens, BMA
Date: 2011-12
Scope: Design, Manufacture and Fitout 6 Switchrooms, Fire
Rated, F&G system, >200m2 platforms
Value: +$3.5mil
Leadtime: 8 months
Switchrooms
Project: Macarthur River
Client: ECM
Date: 2013
Scope: Design, Manufacture and Fitout 5 Switchrooms (4
Pieces to make a single HV, LV and Control building)
Value: +$3mil
Leadtime: 5 months
Integrated Solutions
Project: Snapper Mineral Sands
Client: Ausenco, Bemax
Date: 2009-10
Scope: Design, Manufacture and Fitout 3 switchrooms.
Aluminium Clad to meet the high salinity of the floating
process plant. Computer floor used to intercable and
act as air plenum for cooling of 1.2MW of VSDs.
Value: +$1.6mil
Leadtime: 8 months
Integrated Solutions
Project: Snapper Mineral Sands
Client: Ausenco, Bemax
Date: 2009-10
Scope: Design, Manufacture and Fitout 3 switchrooms.
Aluminium Clad to meet the high salinity of the floating
process plant. Computer floor used to intercable and
act as air plenum for cooling of 1.2MW of VSDs.
Value: +$1.6mil
Leadtime: 8 months
Switchrooms
Project: Newman Powerstation
Client: Leighton Contractors
Date: 2011
Scope: Design, Manufacture and Fitout 1 Switchrooms with
Solar Shield roof.
Value: +$500k
Leadtime: 5months
Switchrooms
Project: Newman Powerstation
Client: Leighton Contractors
Date: 2011
Scope: Design, Manufacture and Fitout 1 Switchrooms with
Solar Shield roof.
Value: +$500k
Leadtime: 5months
Switchrooms
Project: Newman Powerstation
Client: Leighton Contractors
Date: 2011
Scope: Design, Manufacture and Fitout 1 Switchrooms
Value: +$500k
Leadtime: 5months
Switchrooms
Project: APLNG Upstream Electrification
Client: Siemens, Origin-Conoco Philips
Date: 2012-13
Scope: Design, Manufacture and Fitout 63 Switchrooms,
buildings range in length from 18m to 25m.
Value: +$30mil
Leadtime: 18 months
Switchrooms
Project: APLNG Upstream Electrification
Client: Siemens, Origin-Conoco Philips
Date: 2012-13
Scope: Design, Manufacture and Fitout 63 Switchrooms
Value: +$30mil
Leadtime: 18 months
Switchrooms
Project: APLNG Upstream Electrification
Client: Siemens, Origin-Conoco Philips
Date: 2012-13
Scope: Design, Manufacture and Fitout 63 Switchrooms
Value: +$30mil
Leadtime: 18 months
Switchrooms
Project: APLNG Upstream Electrification
Client: Siemens, Origin-Conoco Philips
Date: 2012-13
Scope: Design, Manufacture and Fitout 63 Switchrooms,
buildings range in length from 18m to 25m.
Value: +$30mil
Leadtime: 18 months
Switchrooms – Blast Rated
Project: Shell Geelong - Mogas Blast Rated Switchroom
Client: Shell
Date: 2012
Scope: Design, Manufacture and Fitout 22kV Blast Rated
Switchroom. Building designed to withstand 11kPa
blast.
Value: $400k
Leadtime: 5 months
Oil & Gas – Blast Rated
Project: Shell Geelong - Mogas Blast Rated Switchroom
Client: Shell
Date: 2012
Scope: Design, Manufacture and Fitout 22kV Blast Rated
Switchroom. Building designed to withstand 11kPa
blast.
Value: $400k
Leadtime: 5 months
Integrated Solutions – Blast Rated
Project: Shell Geelong - Mogas Blast Rated Switchroom
Client: Shell
Date: 2012
Scope: Design, Manufacture and Fitout 22kV Blast Rated
Switchroom. Building designed to withstand 11kPa
blast.
Value: $400k
Leadtime: 5 months
Telecommunication Shelters - CEV
Project: Regional Broadband Blackspot Project (RBBP)
Client: Visionstream (Nextgen)
Date: 2011-12
Scope: Design, Manufacture and Fitout 25 Controlled
Environmental Vaults. Walls and Door designed to
withstand ballistic attack to S0 and S1 rating.
Value: +$2m
Leadtime: 12 months
Telecommunication Shelters - CEV
Project: Regional Broadband Blackspot Project (RBBP)
Client: Visionstream (Nextgen)
Date: 2011-12
Scope: Design, Manufacture and Fitout 25 Controlled
Environmental Vaults. Walls and Door designed to
withstand ballistic attack to S0 and S1 rating.
Value: +$2m
Leadtime: 12 months
Switchrooms – Shipping Container Conversion
Project: Bing Bong Creek
Client: Gabriel Electrical
Date: 2013
Scope: Design, Manufacture and Fitout Shipping Container to
2hr Fire and Category D Cyclone ratings.
Design, Manufacture and Install MCC
Value: +$150k
Leadtime: 4 Weeks (inclusive of design and manufacture)
Support Items - Gas Suppression Cabinets
Switchgear Installation - Mining/Process
Switchboards – Outdoor Kiosks
Switchrooms – Multi-level, Multi-Module
Project: Metronode Datacentre Plantroom – Derrimut Vic
Client: Metronode
Date: 2012
Scope: Design, Manufacture and Fitout 5 bay, 3 storey Plantroom
assembled from 15 transportable modules.
Value: +$7m
Leadtime: 12 months
Switchrooms - Telecommunication
Project: Metronode Datacentre Plantroom – Derrimut Vic
Client: Metronode
Date: 2012
Scope: Design, Manufacture and Fitout 5 bay, 3 storey Plantroom
assembled from 15 transportable modules.
Value: +$7m
Leadtime: 12 months
Switchrooms - Telecommunication
Project: Metronode Datacentre Plantroom – Derrimut Vic
Client: Metronode
Date: 2012
Scope: Design, Manufacture and Fitout 5 bay, 3 storey Plantroom
assembled from 15 transportable modules.
Value: +$7m
Leadtime: 12 months
Integrated Solutions
Complex Cable Management Design
• Co-ordinating cable management across 7 layers of cable tray.
• Datacentre Tier 3 consideration.
Integrated Solutions - Telecommunication
Project: Metronode Datacentre Plantroom – Derrimut Vic
Client: Metronode
Date: 2012
Scope: Design, Manufacture and Fitout 5 bay, 3 storey Plantroom
assembled from 15 transportable modules.
Value: +$7m
Leadtime: 12 months
Integrated Solutions - Telecommunication
Project: Metronode Datacentre Plantroom – Derrimut Vic
Client: Metronode
Date: 2012
Scope: Design, Manufacture and Fitout 5 bay, 3 storey Plantroom
assembled from 15 transportable modules.
Value: +$7m
Leadtime: 12 months
Integrated Solutions - Telecommunication
Switchrooms – Multi-level
Project: Metronode Datacentre Plantroom – Derrimut Vic
Client: Metronode
Date: 2012
Scope: Design, Manufacture and Fitout 5 bay, 3 storey Plantroom
assembled from 15 transportable modules.
Value: +$7m
Leadtime: 12 months
Switchrooms – Alternative Cladding Solutions
Project: Metronode Datacentre Plantroom – Derrimut Vic
Client: Metronode
Date: 2012
Scope: Design, Manufacture and Fitout 5 bay, 3 storey Plantroom
assembled from 15 transportable modules.
Value: +$7m
Leadtime: 12 months
Switchboards - Okken
Okken
Mayfield Industries has the sole licence through Schneider
Electric to Manufacture Okken Switchboards within Australia.
Okken is a high arc fault rated, fully type tested withdrawable
switchboard that has been developed over many years of
experience for high safety and process critical applications in
the Oil&Gas, Mining and Nuclear markets.
The systems provides the highest level of safety for operators
and speed of upgrade or maintenance minimising downtime.
Okken – Switchboards
Okken – Switchboards
To find out more visit
Mayfieldindustries.com.au\okken
Okken – Switchboards
Okken – Fully Withdrawable Solutions
Switchboards – Custom Build
Project: BHP Mesa A
Client: HWE Mining, BHP
Date: 2010
Scope: Design, Manufacture 5 x 4000A Outdoor Distribution
Boards
Value: +$600k
Leadtime: 3 months
Switchboards – Custom Build
Project: BHP Mesa A
Client: HWE Mining, BHP
Date: 2010
Scope: Design, Manufacture 5 x 4000A Outdoor Distribution
Boards
Value: +$600k
Leadtime: 3 months
Switchboards – Custom Build
Project: APLNG WTF Ring Main Units
Client: Fredon, Origin-Conoco Philips
Date: 2012-13
Scope: Design, Manufacture and Supply 2 x 22kV Schneider
RMUs and Outdoor enclosures
Value: +$230k
Leadtime: 3 months
Switchboards – Modular Systems
Project: Snapper Mineral Sands
Client: Ausenco, Bemax
Date: 2009-10
Scope: Design and Manufacture of 5 MCCs and 3 Switchrooms
Value: +$1.6mil
Leadtime: 8 months
Mayfield Industries Pty Ltd
3 Gidgie Court Edinburgh Park, SA 280 Cormack Road, Wingfield, SA 5013 t (08) 8169 1000 f (08) 8169 1099 e [email protected]