sy120 mixed-mode operation
DESCRIPTION
SY120 Mixed-mode operation. Mixed-mode operation uses: The same optics in P1 and P2 beamline for stacking and SY120 The same major dipole settings in P1/P2 Different dipole trim settings Modes of operation for slow spill to SY Dedicated slow spill (initial mode) - PowerPoint PPT PresentationTRANSCRIPT
8-26-2004 Run II talk Dave Johnson 1
SY120 Mixed-mode operation
Mixed-mode operation uses: oThe same optics in P1 and P2 beamline for stacking and SY120oThe same major dipole settings in P1/P2o Different dipole trim settings
Modes of operation for slow spill to SYo Dedicated slow spill (initial mode)o Mixed-mode (single batch to pbar, 7/9)o Mixed-mode (2 batch slip-stacking to pbar, 8/19)
All three modes use same MI ramp and timing, but different TLG modules All three modes have been commissionedThe minimum cycle time 2.8 sec The spill length is 655 ms
8-26-2004 Run II talk Dave Johnson 2
Optics ‘n Such
Before After
Stacking
SY120
400m
200m
500mMI
A0
F17
Beams-doc-1243
P1 P2 AP1
P2 P3
Want to start with a matched solution for new SY tuneNew lattice ‘n orbit installed July 9th
Changed P1 & P2 quads
Q703 fixed
AP1 quads fixed
8-26-2004 Run II talk Dave Johnson 3
Simple mixed-mode Slip-stacking mixed-mode
Beam to pbar
Beam to SY
Pbar batchesSY120 batch
RF recapture
Qh
QXR
Two flavors of Mixed-mode (1 or 2 batch to Pbar)
Losses @F18
8-26-2004 Run II talk Dave Johnson 4
Issue: losses during acceleration w/ slip stacking
1st batch
2nd batch
3rd batch
recapture
Need to adjust slip stacking curves to shift recapture time to finish before SY120 batch injected
Data from Kiyomi
8-26-2004 Run II talk Dave Johnson 5
Issue: Orbit through F17 and losses in Tev at F18
F17 AP1 c-magnets
F17B3
T:LMF18
3v
Safe level (1/4 v)
Raise upstream c-magnet interface (~ 1/3 inch) to center lower beam pipe on P2-P3 median plane Install V Trim at F18
SY120AP1
1.75” OD
-8mmP2 line
F17 6-8mm oscillation in P3
8-26-2004 Run II talk Dave Johnson 6
Issue: Mixed-mode Cycle Duty Factor
TLG with 4 sec rep (withother study cycles)
4 sec rep
5 sec rep
Rms current H618
12 a
8a
What to do? >Quad moves (reduce corr. current)
>Cooling plates (as done for NuMI)
Trip limit
8-26-2004 Run II talk Dave Johnson 7
Issue: Spill Duty Factor
100 ma/div
QXR20A FS RFSPILL
MHIERR
Beam
Recall, that the horizontal quad bus produced a measured tune shift of0.0146 /amp => 70 mA will produce a 0.001 tune shift which is the equivalent to 10 amps on QXR (2 magnets).
EE Support implemented feedback to stabilize average level of Qh and Qv due to asymmetric TLG
St
Not been focused on up to this point Starting point –> model system over shutdown and implement feedback using MHIERR as input to kHz bandwidth bucker system.Need beam studies for commission bucker system
From 4/2004 RunII meeting