System AnalysisAdvisory Committee
Futures, Monte Carlo Simulation,and CB “Assumption Cells”
Michael SchilmoellerTuesday, September 27, 2011
![Page 2: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/2.jpg)
2
Overview
–Uncertainties–Their representation–Cells in the RPM
![Page 3: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/3.jpg)
3
Uncertainties• Aluminum Prices• Carbon Penalty• Commercial
Availability• Conservation
Performance• Construction Costs• Electricity Price
• Hydrogeneration• Natural Gas Price• Non-DSI Loads• Production Tax Credit
Life• REC Values• Stochastic FOR
![Page 4: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/4.jpg)
4
The Navigator
–Permits a user to find plants, cost and energy calculations, imbalance estimates, and so forth easily in the RPM
–Uses hyperlinks and windows
![Page 5: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/5.jpg)
5
Aluminum Prices– Aluminum Prices– Carbon Penalty– Commercial Availability– Conservation Performance– Construction Costs– Electricity Price– Hydrogeneration– Natural Gas Price– Non-DSI Loads– Production Tax Credit Life– REC Values– Stochastic FOR
![Page 6: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/6.jpg)
6
Aluminum Prices
t
tt
t
ttttttt
p
b
a
dt
dz
pdp
p
pdzdtpaabdtdzpdtpbapdpp
ofdeviation standard theis
level mequilibriu theis
reversion of rate thecontrolshich constant w is
processes discretefor 1 valuehas which size, step theis
process N(0,1) a fromdrawn a is
step previous thefrom in change theis
questionin variablestochastic is
where
)1()(
80 random variables, one for each period, to generate geometric Brownian motion in aluminum prices
5th Plan, Appn P, page P-83 ff
![Page 7: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/7.jpg)
7
Aluminum Prices
Fifth Power Plan price assumption
Sixth Power Plan price assumption (oops)
![Page 8: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/8.jpg)
8
Carbon Penalty– Aluminum Prices– Carbon Penalty– Commercial Availability– Conservation Performance– Construction Costs– Electricity Price– Hydrogeneration– Natural Gas Price– Non-DSI Loads– Production Tax Credit Life– REC Values– Stochastic FOR
![Page 9: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/9.jpg)
9
Carbon Penalty
2 random variables, determining the timing and size of penalty arrival
![Page 10: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/10.jpg)
10
Carbon Penalty
0
20
40
60
80
100
120
Sep
-09
Sep
-10
Sep
-11
Sep
-12
Sep
-13
Sep
-14
Sep
-15
Sep
-16
Sep
-17
Sep
-18
Sep
-19
Sep
-20
Sep
-21
Sep
-22
Sep
-23
Sep
-24
Sep
-25
Sep
-26
Sep
-27
Sep
-28
$200
6/U
S t
on
CO
2
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
mean
Source: workbook "New CO2 Distribution 090425.xls", chart "Carbon Distribution"
5th Plan, Appn P, page P-133 ff6th Plan, Appn J, page J-4 ff
![Page 11: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/11.jpg)
11
Commercial Availability– Aluminum Prices– Carbon Penalty– Commercial Availability– Conservation Performance– Construction Costs– Electricity Price– Hydrogeneration– Natural Gas Price– Non-DSI Loads– Production Tax Credit Life– REC Values– Stochastic FOR
![Page 12: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/12.jpg)
12
Commercial Availability
6th Plan, Appn J, page J-14, J-15
1 random variable, determining the delay (periods) after construction could begin, absent availability constraints
![Page 13: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/13.jpg)
13
Conservation Performance– Aluminum Prices– Carbon Penalty– Commercial Availability– Conservation Performance– Construction Costs– Electricity Price– Hydrogeneration– Natural Gas Price– Non-DSI Loads– Production Tax Credit Life– REC Values– Stochastic FOR
![Page 14: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/14.jpg)
14
14
Technical Feasibility of Lost Opportunity Conservation
Supply Curves
0
50
100
150
200
250
0 50 100 150 200 250
Lost Opportunity (Q)
real
leve
lized
$/M
Wh
(P
)
2010
2015
2020
source: Q:\MS\Council Presentations and Communication\100511 P4 Portland\graphics\supply curves for illustration.xls
![Page 15: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/15.jpg)
15
15
Effect on the Supply Curve
Supply curves
![Page 16: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/16.jpg)
16
Conservation Performance
6th Plan, Appn J, page J-5;Power Committee Meeting, Tuesday May 11, 2010
1 random variable, determining the scaled shift of all the supply curves in the future
![Page 17: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/17.jpg)
17
Construction Costs– Aluminum Prices– Carbon Penalty– Commercial Availability– Conservation Performance– Construction Costs– Electricity Price– Hydrogeneration– Natural Gas Price– Non-DSI Loads– Production Tax Credit Life– REC Values– Stochastic FOR
![Page 18: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/18.jpg)
18
Construction Costs
6th Plan, Chap 9, page 9-14 ff;
![Page 19: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/19.jpg)
19
Construction Costs
6th Plan, Chap 9, page 9-14 ff;
![Page 20: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/20.jpg)
20
Construction Costs
6th Plan, Appn J, page J-11 ff;Generation Resource Advisory Committee, December 18, 2008 and January 22, 2009
1 random variable, determining the scaled shift of all the supply curves in the future
Complex cost futures are pre-computed , stored in binary form in the workbook, and drawn according to this “seed” value
![Page 21: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/21.jpg)
21
Electricity Prices– Aluminum Prices– Carbon Penalty– Commercial Availability– Conservation Performance– Construction Costs– Electricity Price– Hydrogeneration– Natural Gas Price– Non-DSI Loads– Production Tax Credit Life– REC Values– Stochastic FOR
![Page 22: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/22.jpg)
22
Electricity Prices
6th Plan, Chap 9, page 9-11 ff
![Page 23: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/23.jpg)
23
Casual Regimes
5th Plan, Appn P, page P-65 ff
• Short-term (hourly to monthly)– Positive correlation of electricity price with loads– Hourly correlations to hydro, natural gas price– Quarterly averages correlations to all three
• Long-term (quarterly to yearly)– Negative correlation of electricity price with loads– Supply and demand excursions– Changing technology, regulation
![Page 24: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/24.jpg)
24
Electricity Prices Before Adjustments
5th Plan, Appn P, page P-65 ff
Adjustments for longer-term response include• Hydro year selection• Quarterly loads• Gas price effects• Energy balance (supply vs. demand) effects
The model generates an “independent” electricity price future devoid of these effects; adjustments for these effects are made deterministically during the chronological simulation
![Page 25: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/25.jpg)
25
“Independent” Electricity Price
8 random variables, determining the underlying scenario path of electricity price and the nature of up to two excursions
![Page 26: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/26.jpg)
26
Jumps in Electricity Price
5th Plan, Appn P, page P-65 ff
![Page 27: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/27.jpg)
27
Underlying “Path” of Electricity Price
5th Plan, Appn P, pages P-25 ff and P-65 ff
The underlying path consists of the original benchmark forecast and the combined effects of a random offset and a random change in slope
A more complete description will be provided with the description of natural gas prices
![Page 28: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/28.jpg)
28
Hydrogeneration– Aluminum Prices– Carbon Penalty– Commercial Availability– Conservation Performance– Construction Costs– Electricity Price– Hydrogeneration– Natural Gas Price– Non-DSI Loads– Production Tax Credit Life– REC Values– Stochastic FOR
![Page 29: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/29.jpg)
29
Hydrogeneration• Monthly energies, east and west of the
cascades, are provided by the HYDREG model and are consistent with GENESYS
• Sustained peaking estimates based on these energies enable us to allocate hydrogeneration energy on and off peak
• Hydro years are selected at random from among the 70 years of hydrogeneration available
![Page 30: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/30.jpg)
30
Hydrogeneration
20 random variables determine the hydro year
5th Plan, Appn P, pages P-55 ff
![Page 31: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/31.jpg)
31
Natural Gas Price– Aluminum Prices– Carbon Penalty– Commercial Availability– Conservation Performance– Construction Costs– Electricity Price– Hydrogeneration– Natural Gas Price– Non-DSI Loads– Production Tax Credit Life– REC Values– Stochastic FOR
![Page 32: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/32.jpg)
32
Natural Gas Price
6th Plan, Chap 9, page 9-13 ff
![Page 33: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/33.jpg)
33
Natural Gas Price
47 random variables: three factor multipliers, two for each of two possible jumps, and 40 seasonal specific variances (fall and spring)
![Page 34: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/34.jpg)
34
NGP: Factor Multipliers
5th Plan, Appn P, pages P-26 ff
![Page 35: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/35.jpg)
35
NGP: Factor Multipliers
y = 0.0003x2 + 0.0007x - 0.0019
-0.02
0.00
0.02
0.04
0.06
0.08
0.10
0.12
1 3 5 7 9 11 13 15 17
Quadratic Component
Quadratic Component
Poly. (Quadratic Component)
5th Plan, Appn P, pages P-49 ff
![Page 36: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/36.jpg)
36
NGP: Specific Variances
5th Plan, Appn P, pages P-55 ff
![Page 37: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/37.jpg)
37
Jumps
5th Plan, Appn P, pages P-33 ff
Note: this example is for electricity price
![Page 38: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/38.jpg)
38
NGP: Jumps
5th Plan, Appn P, pages P-49 ff
![Page 39: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/39.jpg)
39
NGP: Distributions
5th Plan, Appn P, pages P-49 ff
![Page 40: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/40.jpg)
40
Non-DSI Frozen Efficiency Load– Aluminum Prices– Carbon Penalty– Commercial Availability– Conservation Performance– Construction Costs– Electricity Price– Hydrogeneration– Natural Gas Price– Non-DSI Loads– Production Tax Credit Life– REC Values– Stochastic FOR
![Page 41: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/41.jpg)
41
Non-DSI Frozen Efficiency Load
6th Plan, Chap 9, page 9-13
![Page 42: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/42.jpg)
42
Non-DSI Frozen Efficiency Load
46 random variables: three factor multipliers, three for a possible jump, and 40 seasonal specific variances (summer and winter)
Note: our “weather corrected” load does not include the specific variance terms
![Page 43: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/43.jpg)
43
Non-DSI Frozen Efficiency Load
5th Plan, Appn P, pages P-37 ff
![Page 44: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/44.jpg)
44
Production Tax Credit Life– Aluminum Prices– Carbon Penalty– Commercial Availability– Conservation Performance– Construction Costs– Electricity Price– Hydrogeneration– Natural Gas Price– Non-DSI Loads– Production Tax Credit Life– REC Values– Stochastic FOR
![Page 45: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/45.jpg)
45
Production Tax Credit Life
1 random variable, representing the likely life of tax credits, assuming no carbon penalty and assuming the purpose of the credit is primarily to make the technology commercially competitive
![Page 46: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/46.jpg)
46
Production Tax Credit Life
5th Plan, Appn P, pages P-90 ff
![Page 47: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/47.jpg)
47
Production Tax Credit Value
5th Plan, Appn P, pages P-90 ff
![Page 48: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/48.jpg)
48
Renewable Energy Credit Value– Aluminum Prices– Carbon Penalty– Commercial Availability– Conservation Performance– Construction Costs– Electricity Price– Hydrogeneration– Natural Gas Price– Non-DSI Loads– Production Tax Credit Life– REC Values– Stochastic FOR
![Page 49: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/49.jpg)
49
Renewable Energy Credit Value
80 random variables, one for each period, to generate geometric Brownian motion in aluminum prices
5th Plan, Appn P, pages P-95 ff, but modified for the 6th Plan (see Chap 9, page 9-19)
![Page 50: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/50.jpg)
50
Stochastic Unit Forced Outages– Aluminum Prices– Carbon Penalty– Commercial Availability– Conservation Performance– Construction Costs– Electricity Price– Hydrogeneration– Natural Gas Price– Non-DSI Loads– Production Tax Credit Life– REC Values– Stochastic FOR
![Page 51: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/51.jpg)
51
Stochastic Unit Forced Outages
1 random variable, representing “seed” value for an endogenous calculation of beta and gamma-distributed random variables
![Page 52: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/52.jpg)
52
Stochastic Unit Forced Outages
In the RPM, real estate is expensive and used intensively. A single row of energy data will represent multiple units added over distinct points in time, each with its own construction cycle modeled.
![Page 53: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/53.jpg)
53
Stochastic Unit Forced OutagesGetting the forced outage calculation right, where each cohort can consist of multiple units, and units are added over time, is solved by making the calculation internally.
6th Plan, Appn J, page J-15 ff
![Page 54: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/54.jpg)
54
Summary
1 Aluminum Prices 802 Carbon Penalty 23 Commercial Availability 14 Conservation Performance 15 Construction Costs 16 Electricity Price 87 Hydrogeneration 208 Natural Gas Price 479 Non-DSI Loads 46
10 Production Tax Credit Life 111 REC Values 8012 Stochastic FOR 1
288
![Page 55: System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011](https://reader036.vdocuments.net/reader036/viewer/2022062417/551659db5503469d698b4ee7/html5/thumbnails/55.jpg)
55
Concluding Remarks
• The values for the 288 random variables are drawn at the beginning of each game, or “future”
• All aspects of the future are calculated in the model before the chronological simulation of the resource portfolio’s performance
• Where decisions are necessary during the chronological simulation, the model references only “past” values of the given future
• You can use the Navigator feature in the RPM to explore these on your own