t1 - rdso.indianrailways.gov.in

2
'llmi - 't1 '3Tff '111,.'11'" - 226 011 EPBX (0522) 245120{) Fax (0522)2458500 Government ofIndia-Minisfry of RaHway .. Research Designs & Standwrds Organisat i on Luclmow - 226 011 DID (0522) 2450115 01 0(0522)2465310 NO.MC/LHB/Brake Date: 17.12.2019 Principal Chief Mechanical Engineers, 1. Central Railway, Chhatrapati S hivaji Terminus, Mumbai - 2. East Coast Railway, Chandrasekharpur, 400001 Bhubaneswar - 75 1 016 3. Eastern Railway, Fairlie Place, Kolkata - 700001 4. North Central Railway, Allahabad - 211 001 5. Northern Rail way, Baroda House, New Delhi -110 001 6. North Western - 302 006 7. Southern Railw ay, Park Town , Chennai - 600 003 8. W est Central - 482 008 9. South Central Railway, Rail Nilayam, Secunderabad - 1 0. South Western Railway, Hubli - 580 023 500071 11. South East ern Rail wa y, Garden Reach, Kolkata - 700 043 12. South East Central Railway, Bilaspur - 495 004 13. North Eastern Railway, Gorakhpur - 273001 14. Western Mumbai - 400 020 15. Northeast Frontier Railway, Maligaon , Guwahati - 78 1 16. E ast Central Railway, Hajipur - 844101 011 17. Konkan Railway Corp: Ltd. Corporate office, Belapur 18. Rail Coach Factory, Kapurthala, Punjab- 144602. B hawan , Nawi, Mumbai-400 614 19. Modern Coach Factory, Raeb areli, Lalganj - 229206. 20. Integral Coach Factory, Chennai - 600 038. Sub: Modification in air brake pipes & its fittings in LHB Coaches. Ref: i) This office letter of even no. dated 17.12.2019. ii) Minutes of the meeting held in RDSO on 04.12.2019. ii) This office l etters of even no. dated 24.06.20 19 & 23.08.2019. Vide reference (iii) above, drawings of upgraded air brake hoses to ROSO Drg . NO.CG -19036 AIt.1 (Flex ible Hose,.650mm for Bogie) & Drg. No.CG-19037 AIt.1 (Flexible Hose-500mm for Brake Act uator s) were issued by this office and ZRs/PUs w ere advised to carry out the modification in air brake pipes & its fittings in LHB Coaches accordingly. Recently , some Zonal Railways reported regarding quoting of very high price for modified h oses by LHB brake system OEMs a nd also about the slow progress of the implementation of the modification. In connection to this, a meeting with a ll RDSO approved LHB brake system suppliers we re h eld in ROSO on 04.12.2019. Following was discussed & agreed/confi rmed by LHB brake system suppliers (copy of MOM at ref (ii) is also enclosed) : For existing LHB coaches 1. Firms shall carry out h ose modification without any additional cost for coaches cove red under AMC. 2. Firms are advised to start replacement of hoses with modified ones without waiting for the prescribed schedule. They s hall carryout the modification in all the coaches ' covered under AMC in next imme di ate schedule. 3. For the coaches not covered under AMC, firms shall review & quote the reasonable rates to Railways for the modifi ed hoses. For new LHB coaches 1. Mis FTRTlL & Mis Escorts shall cut - in the supply of material with modified hoses from 2()1h De c' 2019. 2. PUs should not accept the new supply of material without modified hoses beyond cut -in da te. Apart from the a bove , a matter for 'Wrong electrical connections in WSP system' was also di scussed and the WSP wi ring layouts of all brake systems OEMs i ssu ed vide this office letter at ref (i), for taki ng fur ther action on the matter by PUs & Zonal Railways. This is for kind information & n ecessary action please. DA: Ala. vek Ach rya ) D irect or/Car iaqe for Director General/Carnage - ---

Upload: others

Post on 01-May-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: t1 - rdso.indianrailways.gov.in

'llmi ~H<nH - 't1 ~ ~ilR' ~ '3Tff ~ ~

'111,.'11'" - 226 011

EPBX (0522) 245120{) Fax (0522)2458500

Government ofIndia-Minisfry of RaHway ..

Research Designs & Standwrds Organisation Luclmow - 226 011

DID (0522) 2450115 0 10(0522)2465310

NO.MC/LHB/Brake Date: 17.12.2019

Principal Chief Mechanical Engineers,

1. Central Railway, Chhatrapati Shivaji Terminus, Mumbai - 2. East Coast Railway, Chandrasekharpur, 400001 Bhubaneswar - 751 016

3. Eastern Railway, Fairlie Place, Kolkata - 700001 4. North Central Railway, Allahabad - 211 001 5. Northern Railway, Baroda House, New Delhi -110 001 6. North Western Railw~ Ja~ur - 302 006 7. Southern Railway, Park Town, Chennai - 600 003 8. West Central Railw~ Jaba~ur - 482 008 9. South Central Railway, Rail Nilayam, Secunderabad - 10. South Western Railway, Hubli - 580 023

500071 11. South Eastern Railway, Garden Reach, Kolkata - 700 043 12. South East Central Railway, Bilaspur - 495 004 13. North Eastern Railway, Gorakhpur - 273001 14. Western Railw~ Churc~ate, Mumbai - 400 020 15. Northeast Frontier Railway, Maligaon, Guwahati - 781 16. East Central Railway, Hajipur - 844101

011 17. Konkan Railway Corp: Ltd. Corporate office, Belapur 18. Rail Coach Factory, Kapurthala, Punjab- 144602.

Bhawan, Nawi, Mumbai-400 614 19. Modern Coach Factory, Raebareli, Lalganj - 229206. 20. Integral Coach Factory, Chennai - 600 038.

Sub: Modification in air brake pipes & its fittings in LHB Coaches.

Ref: i) This office letter of even no. dated 17.12.2019. ii) Minutes of the meeting held in RDSO on 04.12.2019. ii) This office letters of even no. dated 24.06.2019 & 23.08.2019.

Vide reference (iii) above, drawings of upgraded air brake hoses to ROSO Drg. NO.CG-19036 AIt.1 (Flexible Hose,.650mm for Bogie) & Drg. No.CG-19037 AIt.1 (Flexible Hose-500mm for Brake Actuators) were issued by this office and ZRs/PUs were advised to carry out the modification in air brake pipes & its fittings in LHB Coaches accordingly.

Recently, some Zonal Railways reported regarding quoting of very high price for modified hoses by LHB brake system OEMs and also about the slow progress of the implementation of the modification.

In connection to this, a meeting with all RDSO approved LHB brake system suppliers were held in ROSO on 04.12.2019. Following was discussed & agreed/confirmed by LHB brake system suppliers (copy of MOM at ref (ii) is also enclosed):

~ For existing LHB coaches

1. Firms shall carry out hose modification without any additional cost for coaches covered under AMC.

2. Firms are advised to start replacement of hoses with modified ones without waiting for the prescribed schedule. They shall carryout the modification in all the coaches ' covered under AMC in next immediate schedule.

3. For the coaches not covered under AMC, firms shall review & quote the reasonable rates to Railways for the modified hoses.

~ For new LHB coaches

1. Mis FTRTlL & Mis Escorts shall cut-in the supply of material with modified hoses from 2()1h Dec'2019.

2. PUs should not accept the new supply of material without modified hoses beyond cut-in date.

Apart from the above, a matter for 'Wrong electrical connections in WSP system' was also discussed and the WSP wiring layouts of all brake systems OEMs issued vide this office letter at ref (i), for taking further action on the matter by PUs & Zonal Railways.

This is for kind information & necessary action please.

DA: Ala. \'1\\2-\~

vek Ach rya) Director/Car iaqe

for Director General/Carnage

----

Page 2: t1 - rdso.indianrailways.gov.in

MINUTES OF THE MEETING HELD AT RDSO, LUCKNOW ON 04.12.2019 REGARDING VARIOUS ISSUES ON AIR BRAKE SYSTEM OF lHB COACHES

MEMBERS PRESENT

MANUFACTURERS

1. Sh. Vivek Acharya, Director/Carriage 1. Sh. Sridhar P V. Mis Faiveley Transport 2. Sh. Vivek Anand, SSE/Carriage 2. Sh. Milind Basle, Mis Faiveley Transport

3. Sh. Manas Moharana, Mis Knorr-Bremse 4. Sh. Pardeep Sharma, MIs Knorr-Bremse 5. Sh. Amit Srivastava, MIs Knorr-Bremse 6. Sh. Rajendra Raghuvanshi, MIs Escorts Ltd.

At the outset, Director/Carriage welcomed all the participants of the meeting and following issues were discussed in detail:

~ Air Brake Hose modification

In Existing lHB Coaches:

./ In connection to the CRSEICR letter no.M.102.C&W.LHB dated 28.11.2019 regarding quoting of much higher prices of the modified hoses for LHB coach body to bogie connection & for brake actuators compared to existing AMC rates. In this connection, firms were adyised to review and provide the revised minimum rates of the modified hoses .

./ Firms confirmed that as agreed during meeting dated 12.06.2019 at RDSO, modification shall be carried out {without any additional cost} for coaches during AMC. For the coaches not covered under AMC, revised quotation shall be submitted to Railways. In this connection, MIs KBIL informed that they have started implementing the modifICations in AMC Coaches from Nov'19 .

./ Firms are advised to start replacement of hoses with modified ones without waiting for the prescribed schedule date of replacement hoses. They shall carryout the modification in all the coaches covered under AMC in next immediate schedule. In this connection, firms should give detail plan for replacement in AMC Coaches by 12.12.2019 .

./ While making the plan, n is advised that firms should target to complete 100% modifICation in one of the coaching depot where all or most of the coaches are under AMC, to enable better monitoring of the performance after modification. MIs KBIL confirmed that they shall carry out the implementation in LLHIER and MIs FTRTIL in BBQ/SR on 100% basis.

In new lHB Coaches:

./ Mis KBIL Informed that they have taken cut-in supplying modified hoses to PUs fornew supplies from Oct'2019 .

./ MIs FTRTIL & MIs Escorts were advised to cut-in the supply of material with modified hoses from 20th Dec'2019. They were informed that no further extension · in cut-in time would be agreed to. Accordingly PUs should ensure not to accept the material without modified hoses beyond cut-in date. '

~ Failures of Brake Discs

./ MIs FTRTIL is advised to submit its report for the recent Brake Disc failure occurred in SuratIWR. Further, MIs KBIL & MIs FTRTll informed that the meeting in Railway Board as desired by DMElChg. (Rly.Bd. letter no.2017IM(C)/13812 dated 04.11.2019.) may planned to be conducted In first week of Jan.'20 regarding discussion on failures of Brake Discs occurred over Indian Railway, due to year ending & audit.

~ Wrong electrical connections in WSP system

./ Recently, the problem of non-working of WSP is being reported by Railways which is due to wrong electrical wiring connections in WSP system. In this regard, MIs FTRTll has submitted their wiring scheme and MIs KBll & Mis Escorts were advised to submit the layout for wiring scheme for electrical connections of WSP by 15-12-2019 .

./ Firms were also advised to conduct a training program in PUs and also cover the all the ZRs where the same is not imparted, for awareness & implementation of the above. Firms are advised to submit complete detail of training imparted in Rail s (zone wise) regarding WSP system.

(~ MIs Faiveley Transport

I

(Parde p Sharma) MIs Knorr-Bremse

(Rajendra Raghuvanshi) MIs Escorts Ltd.