TUGAS VI
PERMODELAN DAN ESTIMASI CADANGAN
TABEL PERHITUNGAN LUBANG BOR 90-14
1. Puncak
Hole id From To Rock Au (g/t)
kadar
Komposit
(gr/t)Elevasi dari
komposit
90-14 0 15.24 1 -9 - 0.6 1200
2. Bench Kedua90-14 15.24 17.00 1 0.597
0,162 198590-14 17.00 19.00 1 0.927
90-14 19.00 21.00 1 0.906
3. Bench Ketiga90-14 21.00 23.00 5 1.133
2.633 1970
90-14 23.00 25.00 5 1.143
90-14 25.00 27.00 5 1.360
90-14 27.00 29.00 5 1.184
90-14 29.00 31.00 5 0.834
90-14 31.00 33.00 5 1.112
90-14 33.00 35.00 5 1.133
-
5/28/2018 Tabel Perhitungan Bench Composite
2/3
4. Bench Keempat90-14 35.00 37.00 5 0.927
3.313 1955
90-14 37.00 39.00 5 1.133
90-14 39.00 41.00 5 0.927
90-14 41.00 43.00 5 1.13390-14 43.00 45.00 5 1.442
90-14 45.00 47.00 5 1.092
90-14 47.00 49.00 5 1.947
90-14 49.00 51.00 5 1.339
5. Bench Kelima
90-14 51.00 53.00 6 1.638
3.811 1940
90-14 53.00 55.00 6 1.535
90-14 55.00 57.00 6 1.524
90-14 57.00 59.00 6 1.555
90-14 59.00 61.00 6 0.968
90-14 61.00 63.00 6 1.411
90-14 63.00 65.00 6 0.896
6. Bench keenam
90-14 65.00 67.00 6 2.142
3.635 1925
90-14 67.00 69.00 6 1.236
90-14 69.00 71.00 6 0.937
90-14 71.00 73.00 6 1.751
90-14 73.00 75.00 6 0.92790-14 75.00 77.00 6 0.886
90-14 77.00 79.00 6 0.937
90-14 79.00 81.00 6 0.271
-