table of contents - mdl 2179 trial docs...the drilling engineering and drilling fluids laboratory...

130

Upload: others

Post on 06-Mar-2021

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well
Page 2: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 2

T A B L E O F C O N T E N T S INTRODUCTION AND STATEMENT OF PURPOSE 6

INTRODUCTION 6 STATEMENT OF PURPOSE 6

SUMMARY OF EDUCATIONAL BACKGROUND AND WORK EXPERIENCE 6

EDUCATION 6 WORK EXPERIENCE 7

EXECUTIVE SUMMARY 9

SUMMARY OF OPINIONS 11

DEEPWATER DRILLING AND BP PRESSURE INTEGRITY TESTS 11

HISTORICAL PERSPECTIVE 12 EVOLUTION OF ROLES AND RESPONSIBILITIES 13 OVERBURDEN STRESS 20 FRACTURE GRADIENT 21 PRESSURE INTEGRITY TESTS 23 DRILLING MARGINS 28 SAFE DRILLING MARGIN 33 BP’S PRESSURE INTEGRITY TEST OF THE 9-7/8 INCH LINER SHOE 42

EFFECT OF SPACER ON NEGATIVE PRESSURE TEST INTERPRETATION 48

NEGATIVE TEST NOMENCLATURE 49 FLUID DISPLACEMENT 54 MI-SWACO SPACER 54 NEGATIVE PRESSURE TEST 59 WELL MONITORING FAILURE 64

APPENDIX A 69

Page 3: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 3

APPENDIX B 70

APPENDIX C 71

APPENDIX D 90

Page 4: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 4

L I S T O F F I G U R E S

Figure 1: Deepwater Drilling Units and Production Facilities 13 Figure 2a: Pore pressure in hydrostatic equilibrium with surface water 18 Figure 2b: Pore Pressure is controlled by Mud Pressure 18 Figure 2: What is Pore Pressure? 18 Figure 3: What is Mud Weight? 19 Figure 4: Overburden Stress calculated from Macondo Well Logs 21 Figure 5: What is Fracture Gradient 22 Figure 6: Comparison of Calculated and Observed Leak-off Test Results 23 Figure 7: Typical Leak-Off Test Plot 26 Figure 8: Typical Pressure Integrity Test Plot 27 Figure 9: Approximate effect of Water Depth on Fracture Gradient at 3500 feet 28 Figure 10: What is a Kick? 29 Figure 11: Shoe Strength protects Weaker Sediments Above 31 Figure 12: What is an Underground Blowout? 32 Figure 13: Pressure Integrity Test at 13-5/8 inch Liner Shoe 41 Figure 14: Pressure Integrity Test at 9-7/8 inch Liner Shoe 45 Figure 15: Common Assumptions in Fracture Modeling 48 Figure 16: Schematic of Macondo Well after Circulating Cement 50 Figure 17: Planned Configuration of Macondo Well with Temporary Cap 51 Figure 18: Use of Equivalent Mud Weights in Negative Test Nomenclature 53 Figure 19: Displacement Planned by MI-Swaco Drilling Fluid Specialist 55 Figure 20: Plot of Real Time Data Recorded during Negative Pressure Test 61 Figure 21: U-tube analogy for Negative Test being conducted (pressures equal) 64 Figure 22: Real Time Data Showing Kick Indications that were not detected 66

Page 5: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 5

L I S T O F TA B L E S

Table 1 –Summary of Events during the Initial Displacement 58

Table 2 – Summary of Actions Taken during the First Negative Pressure Test 60

Table 3 – Summary of Actions Taken during the Second Negative Pressure Test 62

Page 6: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 6

INTRODUCTION AND STATEMENT OF PURPOSE

INTRODUCTION

The BP Exploration & Production Inc. Macondo Well (OCSG 32306-001) located offshore Louisiana in Mississippi Canyon Block 252 was in the process of being temporarily capped when a tragic accident occurred in which eleven people lost their lives and 17 others were injured. The rig “Deepwater Horizon,” sank, and the well continued to flow oil into the Gulf of Mexico for 87 days before it was successfully plugged.

The well had been successfully drilled, the production casing had been run, and cement circulated at the time of the blowout. However, an event of this magnitude invariably raises questions about the drilling operations as well as the temporary capping operations.

STATEMENT OF PURPOSE

Upon the request of counsel representing BP, I have reviewed the daily operational summaries and reports, reports of other experts, and other materials provided. The list of those materials is included in Appendix D. I was asked to review various aspects of the drilling operations for the Macondo well.

This report summarizes my opinions reached based on my reviews and analysis. It also provides schematics illustrating well conditions during various operations. These opinions are based on the information I have reviewed at this time. My work is ongoing and I reserve the right to adjust my opinion as new information is obtained.

SUMMARY OF EDUCATIONAL BACKGROUND AND WORK EXPERIENCE

EDUCATION

B. S. in Petroleum Engineering, Cum Laude, May 28, 1966 Louisiana State University

M. S. in Petroleum Engineering, January 23, 1968 Louisiana State University

Ph.D. in Petroleum Engineering, January 24, 1970 University of Texas at Austin

Page 7: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 7

WORK EXPERIENCE

I have more than 45 years of experience in the oil and gas industry, particularly in Louisiana and the Gulf of Mexico. My work experience in the oil and gas industry began through participation in summer/co-op programs while in college. I worked for Mobil Oil Company three months as an onshore roustabout and three months as an offshore roustabout. After reaching senior status at Louisiana State University (LSU), I worked three months as an Engineering Assistant involved with offshore drilling and well work-over planning. After receiving my B.S. Degree and prior to entering graduate school, I worked three months for Texaco as an Assistant Drilling Engineer involved with offshore field operations, well planning, and drilling optimization. My training for this position included working as a floor hand on the first semi-submersible rig, the “Ocean Driller.” After entering graduate school, I worked three months for Chevron at their research laboratory in La Habra, California and three months for Conoco at their research laboratory in Ponca City, Oklahoma.

In 1969, after completion of my course work at the University of Texas at Austin (UT-Austin), I joined Conoco in Houston as a Senior Systems Engineer in their Production Engineering Services Group. There, I participated in several drilling and production projects including an offshore drilling project involving real-time drilling data acquisition and estimation of formation pore pressure.

In 1971, I joined LSU as an Assistant Professor. For the next 29 years, I worked in the undergraduate, graduate, and continuing education programs of the LSU Petroleum Engineering Department and in administration of the College of Engineering. I had primary responsibility for the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well. I served as Chairman of the Petroleum Engineering Department from 1977 to 1983. At the time of my retirement in December of 1999, I was the Campanile Charities Professor of Offshore Mining and Petroleum Engineering and Dean of the College of Engineering.

I have been especially active in the area of blowout prevention. Soon after joining LSU in 1971, I began assisting Professor Bill Hise, one of the more senior LSU faculty members, in teaching industry short-courses on well control for onshore and bottom-supported offshore drilling rigs. Under the sponsorship of the International Association of Drilling Contractors (IADC), Professor Hise had reworked an abandoned well on the LSU Campus for use in “hands on” well control training including the safe circulation of a threatened gas blowout. Building on this foundation, LSU founded the first blowout prevention training program with open enrollment. The program was enthusiastically received by the industry and several hundred industry participants per year attended the program during the 1970s. Discussions held with a

Page 8: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 8

wide cross-section of industry participants provided me valuable insight into the complications that can arise during well control operations. I became particularly interested in complications associated with deepwater drilling operations with the blowout preventer at the seafloor. A list of publications, training courses and other relevant items is included in Appendix C.

Starting in 1979, I guided the development of a multi-million dollar research and training well facility at LSU to support work on deepwater well control and to complement the older training well. The newer facility was funded through the combined support of 13 major oil companies, 40 service companies, and the Minerals Management Service (MMS) (now the Bureau of Ocean Energy Management, Regulation and Enforcement or BOEMRE), and became operational in 1981. The facility was initially centered around a 6000-foot well specially configured to model the full-scale well control flow geometry of a floating drilling rig in 3000 feet of water. Extensive surface equipment provided for “hands on” training as well as highly-instrumented well control experiments. Gas could be injected into the bottom of the well to initiate the conditions of a threatened blowout. The goal of the research was the development of improved well control procedures and training for deepwater drilling operations.

The facility, which still operates today, was later expanded to include additional wells and model diverter components for experimental study of flow erosion and pressures seen during diverter operations. This research was aimed at reducing the incidence of failures in diverters used to handle a shallow gas flow that could not be safely shut-in. Under sponsorship of Amoco (now BP) and the Drilling Engineers Association (DEA), the facility was further expanded to include an additional 6000-foot well to study kick detection and other potential well control complications associated with gas solubility in oil base muds.

Between 1981 and my retirement in 1999, I supervised the graduate research of 19 MS theses and 12 PhD dissertations on various well control topics of interest to industry and the MMS (now BOEMRE). Numerous Well Control Research Workshops were held at LSU during this period and were well attended by both MMS and industry personnel. The research has resulted in more than 50 publications related to well control and including formation pore pressure estimation, fracture gradient correlations, Leak-off test data, modeling well control and relief well operations, and improved procedures for safe removal of a gas influx. During this period I also organized and helped to teach specialized deepwater well control schools for Amoco, Exxon, Shell, Conoco, Phillips, and Zapata as well as numerous open enrollment schools.

I am the lead author of the Society of Petroleum Engineers (SPE) Drilling Engineering Textbook, entitled “Applied Drilling Engineering” which was developed for petroleum engineering college curriculums. This textbook is widely accepted and has been a “top seller” for SPE since it was first published in 1986. I have also written “Drilling Practices,” a chapter in

Page 9: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 9

the Encyclopedia of Chemical Processing and Design and “Shallow Gas Blowouts,” a chapter in Firefighting and Blowout Control. I have also written several chapters in a well control manual used in LSU’s well control schools. I have served as chairman of the SPE reprint series on “Pore pressure and Fracture Gradient Determination” and also for another reprint series on “Well Control.” I am a past recipient of the SPE Distinguished Achievement Award for Petroleum Engineering Educators and have received the SPE Drilling Engineering Award “for distinguished contributions to petroleum engineering in the area of drilling technology.”

In 1990, I was selected as a Distinguished Member of SPE. In 1997-98, I was selected as a Distinguished Lecturer by the SPE and gave lectures at about 30 locations in the U.S., Europe, and Middle East. During 1998 I also served on a steering committee of the International Association of Drilling Contractors (IADC) that coordinated the development of a manual on well control practices for deepwater drilling operations. I have also served on an ad hoc committee of SPE to review the exam leading to professional registration of Petroleum Engineers. Upon my retirement from LSU, I was recognized by the House of Representatives of the State of Louisiana in House Concurrent Resolution No. 33 of the First Extraordinary Session, 2000, commending me for “achievements in scholarly research and writing in the field of petroleum engineering and for highly significant contributions to higher education in Louisiana.” In December of 2001, I was recognized as a Distinguished Graduate of the College of Engineering at the University of Texas at Austin. In 2006, I was inducted into the LSU Engineering Hall of Distinction.

I am currently President of Bourgoyne Enterprises, Inc., which offers Petroleum Engineering consulting services to the Oil and Gas Industry. I have consulted extensively with Pennington Oil and Gas, LLC in their drilling and completion of deep, high-temperature, high-pressure wells in the Tuscaloosa Trend Area of Louisiana. I have also served as an expert witness on blowout and well control matters.

EXECUTIVE SUMMARY

The blowout prevention practices and equipment used in the oil and gas industry are designed to maintain redundant and verifiable barriers to an uncontrolled release of formation fluids. For a blowout to occur there generally must be a “perfect storm” series of both equipment failures and human failures (mistakes) to circumvent all of the intended barriers. The Deepwater Horizon tragedy was not an exception to this rule. As many of the publicly available reports have concluded, the equipment failures required for the blowout to occur included (1) the failure of the cement to seal the annular space through the oil and gas zone, (2) the failure of the cement to seal the shoe track of the production casing, and (3) the failure of the blowout

Page 10: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 10

preventers to stop the flow at the seafloor. The human failures (mistakes) required for the blowout to occur included (1) the failure to correctly interpret a critical negative pressure test of the cement seals, (2) the failure to detect the influx of formation fluids into the casing, and (3) the failure to use the diverter system to vent overboard the oil and gas that reached the surface.

The human failures are especially hard to understand because there are multiple groups on the rig tasked with constantly monitoring the well during all operations, including the Transocean rig crew and the Sperry-Sun mud loggers. The ability to detect an influx of formation fluid of less than 30 barrels is an expected normal response, and numerous drills are generally conducted while drilling to test this response. An influx of over 600 barrels was required for the formation fluids to reach the seafloor undetected and begin entering the marine riser. It is unknown why standard well control training concepts were not followed that night. If the situation was such that rig pumps were shut down at 9:30, standard well control would dictate that the well be checked for flow, and shut in if flowing, before taking any other steps. Both a driller and a toolpusher were evaluating the well at that time. Yet, on that night, the next action taken was to bleed the drill pipe. Additionally, negative pressure tests involve simple hydrostatic pressure concepts that form the basis of many rig site calculations and the needed hydrostatic pressure concepts are always included in well control training. The parties interpreting the negative pressure test made a mistake in determining that the negative pressure tests run by Transocean’s rig crew were successful.

I reviewed the BP Daily Operational Summaries for the Macondo Well, real time data collected during drilling and other rig operations, deposition transcripts, discovery materials, expert reports issued by other parties and the reports of investigative bodies issued in regard to the tragic accident that occurred. See Appendix D. I saw no evidence that BP drilled this well in a careless or reckless manner with disregard for safety in order to save money and drill fast. There are always advantages and disadvantages to various design options considered when drilling and completing a well. On any given issue, it is normal for members of a drilling team in a large organization to have differences of opinion as to which option is better. In my opinion, all of the final choices made in regard to planning fell within the range of normal drilling and completion practices. A critical review of the planning decisions must recognize that the well was successfully drilled, the production casing was successfully run to bottom, and cement was circulated into the well as planned.

Page 11: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 11

SUMMARY OF OPINIONS

I have reached the following opinions to a reasonable engineering certainty in this matter:

First, this well was drilled to total depth safely and successfully and consistent with industry practices. The Deepwater Horizon crew and BP’s team followed industry practices in conducting formation integrity tests, interpreting those tests and properly managing their mud weights to safely drill each interval.

Second, the use of the Loss Circulation Material (LCM) spacer during the temporary abandonment procedures on April 20, 2010 likely resulted in fluids being displaced in a manner that the rig crew did not fully understand.

Third, the negative pressure test was not properly understood, but the parties involved allowed the displacement to continue. While everyone involved had every incentive to get it right and had no incentive to cut corners, they did not properly interpret the test.

Fourth, the rig crew failed to properly monitor the well on April 20, 2010 and allowed a kick to go unnoticed until it turned into a blowout. Even after recognizing that signs of a kick were present, the Transocean rig crew failed to shut in the well immediately.

DEEPWATER DRILLING AND BP PRESSURE INTEGRITY TESTS

Several issues related to normal drilling practice have arisen in this litigation. These issues are best understood after a discussion of how the practice evolved as the industry moved from land and shallow water operations offshore to floating drilling operations in deep water. A background discussion of my perspective on these issues is provided regarding:

� Historical Perspective � Evolution of Roles and Responsibilities � Pore Pressure � Overburden Stress � Fracture Gradients � Pressure Integrity Test � Drilling Margins � Safe Drilling Margins � Negative Pressure Test

Page 12: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 12

HISTORICAL PERSPECTIVE1

Offshore drilling began in California in 1887 in an area where wells drilled nearest to the ocean tended to be better producers. Wharfs were constructed that served as the first platforms for offshore drilling, the longest extending almost a quarter mile offshore. In the early 1930s along the Louisiana and Texas inland waters, rigs built on steel barges were constructed that could be towed to a well’s location and sunk to rest on bottom with the top of the barge still above water. At the end of the job, the derrick was lowered, the barge pumped out to a floating position, and the rig towed to another location.

The use of barge rigs was gradually extended from inland waters in the coastal areas to shallow waters offshore. To extent the water depth ranged to about 40 feet, shell mats were deposited at the well location and the barge was sunk onto the shell mat. The barge rigs evolved into submersible rigs and jackups to further extend the water depth. The first submersible rig was basically an upper and lower barge type structure connected by steel columns. The jackup design was a barge with long legs that could be raised when moving the rig and lowered to jack the barge up to a safe height above the waves. For development wells, offshore platforms were designed to allow a rig to be put on the platform and used to drill multiple directional wells.

The submersible rig evolved into the semisubmersible rig, which could be anchored over the well location and the well drilled from a floating position. The semisubmersible “Ocean Driller,” launched in 1963, was the first drilling vessel designed to drill in a floating position. Since that time, a variety of mobile offshore drilling units and production facilities have been designed (Figure 1). These designs have allowed the search for oil and gas to extend beyond the continental shelf into the deep water of the continental slope.

Anchoring becomes more difficult as water depth increases. Dynamically positioned drillships and semisubmersibles were developed capable of keeping the drilling vessel on location over the well without the use of anchors. Tension Leg Platforms, Compliant Towers, and Spars are used for field development with multiple wells drilled directionally through a template at the seafloor.

Deepwater wells are generally capable of producing at very high flow rates because of the characteristics of the turbidite sands found in deepwater. Deepwater drilling in the Gulf of Mexico offers one of the best opportunities for increasing domestic oil production.

1 This background section is based on my professional experience as summarized in Appendix C, my drilling book, (footnote continued)

Page 13: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 13

Figure 1: Deepwater Drilling Units and Production Facilities

EVOLUTION OF ROLES AND RESPONSIBILITIES

I have seen the roles and responsibilities for companies involved in drilling operations change during my 46 years of association with the oil and gas industry. In the earlier portion of my career, the oil and gas operators did most of the engineering work. The oil companies were in the final stages of shifting from owning the drilling rigs and manning the rigs with their employees to contracting for rigs and drilling services with drilling contractors. Some oil companies still maintained a few rigs but had sold most of their equipment during the bust of the 1950s that followed the boom after World War II.

Petroleum engineering enrollments had dwindled to a trickle as jobs were scarce during this period of contraction. Petroleum engineering enrollments hit bottom in 1963 and began growing again over the next decade. During this period, almost all of the petroleum engineering graduates went to work for major oil companies. Oil company employees did almost all of the engineering work associated with drilling, completing, producing, and managing the oil and gas reservoirs. Most of the major oil companies had active research and development organizations and my papers on petroleum engineering manpower supply and demand.

Page 14: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 14

and almost all of the technical papers written and presentations on new technology made at technical conferences and meetings of the Society of Petroleum Engineers (SPE) were by employees of oil companies and a few large service companies. Work done by service companies was primarily at the field technician level. Procedures used in the field were developed largely by the well operators and both engineering and operational supervision was provided almost exclusively by the oil company.

The Arab oil embargo created a domestic oil crisis and oil and gas activities quickly ramped up during the 1970s in response to increasing oil prices. During the boom period that followed, national petroleum engineering enrollment grew from about 2,000 in 1975 to over 10,000 in 1982 in response to high demand and starting salaries. However, the boom ended with another bust before many of these students could graduate. The enrollment fell just as fast as it went up as major changes again took place in the way the oil companies did business. Oil companies became more international and began contracting out more of their engineering work to service companies. While I was serving on the board of directors of SPE in the mid 1980’s, the society made major changes towards becoming a truly international technical society in response to these changes in the industry.

During the 1990s, service companies grew, conducted more research and development, and achieved leadership positions in many technical fields associated with oil and gas drilling. Gradually, the number of technical papers and presentations on new developments at SPE conferences and meetings that were made by engineers employed by service companies increased and became dominant. Service companies increased their training programs and began hiring new graduates as well as experienced engineers. The number of major domestic oil companies decreased and the independent oil companies began to play a major role in domestic operations. This trend has continued through the 2000s with mergers and acquisitions of both major oil companies and service companies as they positioned themselves for competition in a more global economy. The latest boom in oil prices began in 2003.

Drilling for oil and gas in deep water requires teamwork from many specialists. Service company personnel have offices in oil company facilities and work together with oil company personnel in planning and coordinating field operations. The well operator has overall responsibility for drilling, completion, production, and reservoir management. However, the operator transfers some of these responsibilities to service companies when they hire them to use highly specialized procedures and equipment on their behalf. The shared responsibility is controlled by contracts, work agreements and applicable law. The operator’s representative on the rig generally does not have the specialized knowledge to supervise all of the work. The operator’s representative coordinates the implementation of the procedures provided to him,

Page 15: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 15

helps to coordinate logistics, sees that company policy is followed, and reports on the progress being made.

BP’s representatives on the rig are called Well Site Leaders. They are trained in company safety policies, well control policy and approved operational procedures. General planning documents are generally discussed in meetings (Spud Meetings) held prior to the well starting. Training is provided so that procedures given the Well Site Leaders in outline or abbreviated form can be implemented according to BP’s Drilling and Well Operations Practice (DWOP) manual, Well Control manuals, and other safety policies. This is a common industry practice.

The drilling contractor is responsible for the operation of the drilling vessel and the work done by the rig crew. They have a responsibility for the safety of those aboard their vessel. They too are trained in well control and safety procedures appropriate for their level of job responsibility.2 The driller and his rig crew are highly trained in recognizing the signs of a kick and closing the blowout preventers to stop the flow with the influx still near the well bottom. They are also trained in the use of a diverter to divert flow overboard and away from the rig when hydrocarbons enter the marine riser above the blowout preventer at the seafloor.3 Two diverter lines are available to always allow downwind diversion. The chain of command from the Well Site Leader to the rig crew is through the drilling contractor’s Offshore Installation Manager and Senior Toolpusher.4 The Offshore Installation Manager and Senior Toolpusher have the responsibility to stop work when asked to perform an unsafe operation.5 Any member of the crew can call for work to be stopped if an unsafe condition is seen.

2 Transocean’s policies and procedures are consistent with this general industry standard. Examples include MDL Ex. 1454, Transocean’s Well Control Handbook §1.3 at p. 2; MDL Ex. 1452, Transocean’s Field Operations Handbook §3, 1.3 at pgs. 1-3; MDL Ex. 1453 Transocean Deepwater Horizon Emergency Response Manual, Vol. 1 §7.2. Many Transocean witnesses testified to these responsibilities as well, including Mr. Newman (S. Newman 9/30/11 Dep. Tr. at 177-78. I am also familiar with the IADC Well Cap training that Transocean uses as part of its training program. MDL Ex. 1454, Transocean Well Control Handbook, §1.4. TRN-MDL-0028687-88. 3 Examples of Transocean’s policy on this point include: (i) TRN-INV-01131807-813. On page 811, it provides that “Currently accredited IADC Well Control programs are taught in Transocean, Introductory, Fundamental, and Supervisory. All three provide instruction on how to use these [MGS and Diverter] systems for well control,” (ii) MDL Ex. 1454, Transocean Well Control Handbook at 1.4, and (iii) the Driller and Assistant Driller On the Job Training Module there are tasks (Driller Task 45,46 & Assistant Driller Task 35, 36, 37) covering the diverter that must be completed and signed by a supervisor to be deemed competent. TRN-MDL-00576075-114 (Driller Module) and TRN-MDL-00398653-398722 (Assistant Driller Module). Additionally, the Well Control Handbook states “At any time, if there is a rapid expansion of gas in the riser, the diverter must be closed, if not already and the flow diverted overboard.” MDL Ex. 1454 at 8.4.9.2, TRN-MDL-0286973. 4 MDL Ex. 1453, Transocean’s Deepwater Horizon Emergency Response Manual at TRN-MDL-00048168; MDL Ex. 5644 Transocean Management System - HSE Management at TRN-MDL-02865361. 5 Stop the Job authority is something that is common among rig personnel – they should know that if something is unsafe, they stop the job and correct it. See MDL Ex. 1449, Transocean’s HSE Policies and Procedures Manual at (footnote continued)

Page 16: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 16

Mud logging services are generally provided by a service company specializing in rig monitoring and drilling data acquisition and transmission. Mud loggers monitor the entrained gas and rock cuttings that are circulated in the drilling mud to the surface as well as monitoring real time data.6 Mud loggers are responsible for monitoring the well at all times, for being aware of the status of the well at all times, for recognizing the signs that formation fluids are entering the well and alerting the crew to shut-in the well. They provide a redundant level of eyes and ears for watching the well in addition to the driller and rig crew.

Cementing services and equipment are generally provided by a service company specializing in oil and gas well cementing. This is a complex and highly technical service that requires a large organization to carry out. Cementing companies have a research group to develop improved proprietary cement compositions and placement techniques, highly trained engineers to properly design the cement job, trained technicians for performing the needed testing and quality control function, and trained field technicians for carrying out the cement placement into the well using their specialized equipment.

Numerous other service companies provide specialty services regarding well logging, downhole equipment and subsea equipment. All of the service companies can have some responsibility in accidents caused by failure of their equipment.

It is now common industry practice for oil companies, such as BP, to work together with specialized, expert contractors in order to successfully drill deepwater wells in the Gulf of Mexico.

PORE PRESSURE

Well design and casing depth placement is largely controlled by how formation pore pressure and fracture pressure vary with increasing depth. The depths of casing strings are initially established based on predicted pore pressure and fracture gradient values, which then are re-evaluated as drilling operations are conducted and actual pore pressure measurements are established. If pre-drilling pore pressure predictions are off (which is common in the Gulf of Mexico), then the casing strings may be set deeper or shallower than originally planned and additional casing strings may be added to the well design.

TRN-MDL-00046468. Steve Newman also noted the stop the job authority for all personnel on the rig in his deposition. S. Newman 9/30/11 Dep. Tr. at 160-61. 6 I conducted independent review and analysis of much of the real time data from the rig, including the data monitored by the Sperry-Sun mudloggers.

Page 17: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 17

The term pore pressure is used to refer to the pressure in the pore space of a rock. The sediments that we drill into in the Gulf of Mexico have been eroded from the North American Continent, carried to the sea by ancient rivers like the present Mississippi river, and laid down in the ancient gulf waters over geologic time. Pore pressure is easier to visualize if we think in terms of a sand bottom offshore from a sand beach (Figure 2a). The pore space is the space between the sand grains and the pore pressure is the pressure of the sea water in the pore space. Since water can flow freely between the grains in this situation, the magnitude of the pore pressure is controlled by the depth of the water column above the point of interest and the density of the seawater. The pressure gradient in a fluid in psi per foot can be obtained by multiplying the density in pounds per gallon by 0.052. Seawater has a density of 8.5 pounds per gallon so that the pressure increases by 0.44 psi for each foot of depth. Note in Figure 2a that the pore pressure at points A, B, and C are all equal to 4.4 psi since all three points are at a depth of 10 feet. If we removed the sediments by drilling a hole at point B, pore fluid would fill the hole. If we refilled the hole with sand, the pressure in the pore space at the bottom of the hole would remain unchanged. This is because the pore fluid can move through the pore space and be in hydrostatic equilibrium with the ocean.

The pore pressure is said to be “normal” when it is in hydrostatic equilibrium with the surface. The average pore water density in the Gulf of Mexico area is a little higher than the density of today’s seawater because of additional dissolved minerals so that the normal formation pore pressure increases by 0.465 psi per foot of depth. In south Louisiana, the prevalent formation type is sandstone down to a depth of approximately 10,000 feet and the sediments are nearly in hydrostatic equilibrium with the surface. Thus, the normal formation pore pressure gradient is 0.465 psi/ft and the pore pressure expected in this area at 10,000 feet is 4,650 psi.

The porosity of rock is the fraction of the total rock volume that is pore space. Permeability is a measure of how easily pore fluid can flow through the rock. A sandstone formation made from the deep burial of sand grains such that one would find on a beach would have a high porosity, typically on the order of 25%, and a high permeability. Such a rock would be an excellent reservoir rock if it contained oil and gas because it could contain a large oil volume that could flow easily into a well. Porosity decreases with depth of burial in normal pressure formations as pore water is squeezed out towards the surface.

Page 18: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 18

Figure 2a: Pore pressure in hydrostatic equilibrium with surface water

Figure 2b: Pore Pressure is controlled by Mud Pressure

Figure 2: What is Pore Pressure?

Page 19: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 19

When very fine grained clay is converted into shale rock by the elevated temperature and pressure of deep burial, it has an extremely low permeability such that pore fluid can flow only with extreme difficulty. Water is bound up in the crystalline structure of the clays as well as being present as free pore water. Shale can form a good seal so that when thick layers of shale are present, the hydrostatic equilibrium with the surface is interrupted. It becomes more difficult for pore water to escape as sediments are buried more deeply. In addition, more free water is released from the conversion of clay mineral structures from one form to another, e.g., conversion of montmorillonite clay to illites, chlorites, and kaolinite clays. The pore pressure increases and is said to be abnormal pore pressure. As one moves farther offshore into deep water, the top of abnormal pressure is encountered at more shallow depths.

Figure 3: What is Mud Weight?

Page 20: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 20

Pore pressure at any given vertical depth is often expressed as a pore pressure gradient by dividing the pore pressure by the depth. The pore pressure gradient is also commonly expressed as an equivalent density. The pore pressure gradient in pounds per gallon is obtained by dividing the pore pressure gradient in psi per foot by 0.052. This tells the rig crew that a mud (Figure 3) having at least this density is needed to prevent pore fluids from flowing into the well.

The mud weight at the surface is measured with a mud balance to the nearest 0.1 pounds per

gallon. The mud weight in the well varies slightly with depth due to the effect of increasing temperature and pressure on the density of the synthetic oil and emulsified water in the mud. The annular mud weight can also be slightly affected by the rock cuttings and pore fluids being carried to the surface by the mud.

OVERBURDEN STRESS

Just as the density of a fluid determines the increase in pressure exerted by the fluid with increasing depth, the density of the sediments controls the vertical pressure or overburden stress within the sediments. This concept is more easily visualized if we go back to the example of beach sand. If one is buried under a foot of slightly submerged beach sand, the pressure that is felt is due to the combined density of the water and the sand grains. This average density, called the bulk density, is weight per unit volume of sediment with the pore water in the sediments. The bulk density of the sediments is not a constant but increases with depth because the grains rearrange and get closer together as they are buried deeper and subject to higher overburden stress. Water is squeezed out towards the surface as the porosity decreases.

Overburden stress cannot be measured directly and must be calculated from sediment density values provided using well logging tools. The well logging tools do not make a direct measurement of sediment density. Density values are computed from measurements such as sonic travel time through the rock and neutron absorption. Figure 4 is a plot of bulk density and overburden stress versus depth estimated from well logs run in the Macondo Well.

Since the rock grains or matrix tend to interlock and resist moving in a direction perpendicular to the overburden stress, the horizontal stress is usually less than the overburden stress in a tectonically relaxed region like the Gulf of Mexico. The horizontal stress can vary with horizontal directions and is expected to have a minimum value in a direction perpendicular to local fault lines. However, near salt domes or other intrusions, the horizontal stress can become higher than the overburden stress.

Page 21: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 21

Drilling a borehole through the sediments can create local stress concentrations near the borehole wall. After the borehole is drilled, the stress in the sediments close to the borehole increases to accommodate load that was previously borne by material removed.

Figure 4: Overburden Stress calculated from Macondo Well Logs

FRACTURE GRADIENT

If the pressure in the borehole is increased significantly above the minimum horizontal stress so that rock tensile strength and local stress concentrations are exceeded, the rock of the borehole wall will crack vertically along the wall parallel to the axis of the hole. The crack will begin to open (Figure 5) and mud will enter the crack. The pressure at which the crack begins to open and take mud is called the fracture pressure. The fracture gradient in units of psi per foot is the fracture pressure in psi divided by the vertical depth of the fracture below the rig floor in feet. The fracture gradient can be expressed in pound per gallon by dividing by 0.052. This tells the drill crew that a static mud having this density or higher could fracture the formation.

Page 22: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 22

Figure 5: What is Fracture Gradient

There are a number of correlations that have been developed for estimating the formation fracture gradient. However, because of the wide variability found in nature, there is often considerable disagreement between the predicted and observed fracture gradients. There is no foolproof way of determining the fracture pressure of a section of hole. The best available method is to intentionally create a small fracture at the top of section and measure the pressure required to do so. This operation is called a Leak-off Test (LOT). Figure 6 is a comparison of predicted fracture pressure and Leak-off test results made by one my students using Leak-off test data and presented at the 1994 LSU/MMS Workshop.7 If the measured Leak-off test value for 7 Rocha, L.A. and Bourgoyne, A.T., Session II, Presentation 8, LSU/MMS Well Control Workshop, March 30-31, 1994.

Page 23: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 23

fracture gradient, shown in Figure 6 as a point, agrees with the calculated value of fracture gradient, shown as a dashed line, the point would fall on the line. Note that the measured values for fracture gradient often disagreed with the calculated value by as much as two pounds per gallon. Three different published methods for calculating the fracture gradient were used in the comparison. The Leak-off test data was from the Green Canyon Area of the Gulf of Mexico.

Figure 6: Comparison of Calculated and Observed Leak-off Test Results

In some cases, the formation fracture pressure is higher than needed to finish the next section of hole and the pressure integrity test is stopped before creating a small fracture. The Pressure integrity test does not always go all the way to Leak-off.

PRESSURE INTEGRITY TESTS

Pressure integrity tests provide information about the effectiveness of the cement seal at the bottom of the casing and about the resistance of the formation just below the casing to hydraulic fracturing. This is generally done after setting each casing string. Leakage past the cement is indicated by a non-linear, slower than expected pressure build-up that does not reach the minimum expected pressure. If leakage past the cement outside of the casing is detected, cement is squeezed into the leak and allowed to harden. The cement is again drilled out and the Pressure Integrity Test is repeated. This sequence is repeated until leakage past the cement is no longer seen. Running multiple pressure integrity tests is common.

These tests involve two steps. First, after the cement has hardened, a casing pressure test is made to insure that there are no leaks in the casing. A recorded plot of pressure versus time is made during the casing pressure test. The blowout preventer is closed and mud is pumped into the well at a low pump rate (typically 0.25 or 0.5 barrels per minute) in order to impose the desired pressure on the casing. After reaching the desired test pressure, the pump is stopped and pressure continues to be recorded for at least 30 minutes. The pressure during the shut-in can change slightly due to temperature changes in the mud. MMS (now BOEMRE) limits the

Page 24: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 24

observed decline in pressure to no more than 10% during a 30 minute period. The onsite operator’s representative signs and dates the casing pressure test as being correct. The driller’s report includes the time, date, and results of the test.

Second, following a successful casing pressure test, the hardened cement is drilled out of the bottom portion of the casing and then a short interval of formation (typically 5 to 10 feet onshore and 10 to 50 feet offshore) is drilled below the casing. After circulating cuttings out of the well, the blowout preventer is closed and mud is pumped into the well at a low pump rate (typically 0.25 or 0.5 barrels per minute). BP’s procedure calls for pumping down both the drill pipe and the casing to minimize the effect of the frictional pressure loss between the surface and the casing seat.8 This also reduces the effect of mud gelation when starting and ending the test. The pump pressure and volume pumped is recorded at even time increments (typically after each minute of pumping). If the cement seal around the bottom of the casing is good, a straight line trend of increasing pressure with volume pumped is seen. If the pressure reaches a value corresponding to the formation strength needed to drill the next section of hole, the test may be terminated prior to creating a small fracture. If the fracture initiation pressure is to be determined, the test is continued until two or three points fall significantly to the right of the straight line trend indicating that mud is beginning to enter a small fracture. BP’s procedure calls for continuing a Leak-off test until the same pressure or a lessor pressure is seen at the previous value recorded. BP’s procedure is consistent with industry practices and my understanding is that BP informed the MMS (now BOEMRE) of their testing procedures in a meeting in February 2009.9

Upon fracture initiation, the rock tends to crack vertically, parallel to the axis of the borehole. The borehole acts as a notch in the rock from which the fracture grows. Fracture resistance is determined by creating a small vertical fracture and then stopping the test. Fracture growth is limited so that it does not extend upward past the casing seat into weaker rock. When the pressure is allowed to bleed off, the small fracture will close. Usually the rock will not be weakened significantly because natural cracks and imperfections are already present and only have to be opened by the mud pressure.

Once it is decided that the pressure integrity test will be terminated, the pump is stopped and pressure readings are then taken at a regular time interval. BP’s procedure calls for recording the

8MDL Ex. 4025 FIT/LOT Worksheet and instructions. 9MDL Ex. 4734; MDL Ex. 4735; MDL Ex. 4736; M. Saucier 7/27/11 Dep. Tr. at 172-78; D. Trocquet 9/23/11 Dep. Tr. at 171-73.

Page 25: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 25

shut-in pressures for a minimum of 10 minutes if performing a Formation Integrity Test (FIT).10 The rate of decline in pump pressure is affected by the permeability of the zone exposed, by the size of the fracture created (if any), and by the rate of increase in mud gel strength. If the test is conducted with only low permeability shale exposed below the casing, the Leak-off rate after the pump is stopped will be much slower that if sand is exposed, and will be negligible if a fracture was not initiated. It is common practice to record the volume of mud bled back at the end of the test when the pressure is released. This volume can then be compared to the volume pumped during the test to estimate the volume leaked-off during the test.

A graph of pump pressure versus volume pumped is generally prepared to assist in the interpretation of a Leak-off test. The casing pressure test is often plotted as a reference for system compressibility expected. This helps in interpreting the test in regard to whether or not the cement seal at the bottom of the casing is leaking. Typical pressure test results to be expected are shown in Figure 7 for a Leak-off test (LOT) and Figure 8 for a Formation Integrity Test (FIT) not taken to Leak-off. Two cases are illustrated in Figure 7. The upper plot is for the case in which a smooth borehole is drilled into impermeable shale that does not have any natural cracks or imperfections and has a significant tensile strength. Rocks are generally weak in tension but previously unbroken rock often has a tensile strength of about 5% of it compressive strength.

When interpreting a Leak-off test, the first few data points after pumping begins can fall off trend and are ignored because any air trapped in the surface piping needs to be compressed sufficiently before it has a negligible effect on the trend line. This can cause the few points to fall to the left of the subsequent straight line trend. After sufficient air compression and before initiation of leakage into a formation fracture or past the cement sheath around the bottom of the casing, the points will fall approximately on a straight line. After the leak begins, the pressure vs. volume pumped plot will begin to depart from a linear relationship, i.e., the points will begin to fall to the right of the straight line trend. The leak may be past the cement sheath around the bottom of the casing or into a fracture that is being initiated. After the fracture begins to grow, the pump pressure will reach a maximum value and in some cases will begin decreasing with increased volume pumped as the fracture is extended away from the borehole.

10 Although nomenclature varies somewhat in industry practice, an FIT in this context is taken to be a Pressure Integrity Test (PIT) that does not go all the way to Leak-off.

Page 26: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 26

Figure 7: Typical Leak-Off Test Plot

The maximum pressure reached is called the breakdown pressure when the shape of the test is similar to upper plot of Figure 7. This is also done by some operators when the shape of the test is similar to the lower plot of Figure 7. Industry practice varies on whether the leak initiation pressure or the breakdown pressure measured at a low pump rate is used to compute the formation integrity expressed as a maximum equivalent mud weight. The maximum pressure seen when the shape of the test is similar to the lower plot of Figure 7 can be sensitive to how fast the mud is being pumped during the test. The leak initiation pressure is not as sensitive to the pump rate used during the test. The computation of fracture gradient using either the fracture initiation pressure or a breakdown pressures measured at a low pump rate clearly falls within normal industry practice. To my knowledge, MMS does not take a position on what constitutes the best available technology for running and interpreting a Pressure Integrity Test and will accept either approach described above.11

11 MDL Ex. 4731; MDL Ex. 4023; M. Saucier 7/27/11 Dep. Tr. at 166-67; F. Patton 7/13/11 Dep. Tr. at 230-31.

Page 27: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 27

.

Figure 8: Typical Pressure Integrity Test Plot

Points in the table are most often obtained every ¼ barrel while pumping at ¼ barrels per minute. However, when the hole-volume is large the test time required becomes unnecessarily large and points are obtained every ½ barrel while pumping at ½ barrels per minute or every barrel while pumping at one barrel per minute. Pump rates higher than one barrel per minute during a Leak-off test are unusual. When the points are too far apart, it becomes more difficult to determine the pressure at which the departure from linearity occurred. A common practice is to draw a straight line through the points on the linear trend and also draw a straight line though the first two or three points that fall to the right of the linear trend. The leak initiation pressure is then determined from the intersection point of these two lines. When pumping is stopped after pumping only a small volume into the fracture, the fracture will close quickly and the Initial Shut-In Pressure (ISIP) will be only slightly higher than the pressure to re-initiate the fracture. This will often yield the same results as the point of departure from the straight-line trend. Also, with the pump off, there is no frictional pressure loss down the drill string.

The interpretation of leak of tests is not an exact science and I have observed significant differences in interpretations among practicing professionals attending my well control class. During the mid-1990’s, my graduate students collected Leak-off test data from a number of offshore operators in an effort to develop improved fracture gradient prediction methods. It was clear that there was variability in the selection of the formation breakdown pressure from the Leak-off test results. Data from softer, less consolidated formations are sometimes more

Page 28: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 28

difficult to interpret. Experience in some areas has shown that small leakage rates can be tolerated or controlled with loss circulation material.

Dr. Alan Huffman has concluded that in drilling the Macondo Well, BP departed from the standards that would be met by any prudent operator. This was in part based on his analysis of the pressure integrity tests conducted at the bottom of each casing or liner. In some cases Dr. Huffman focuses on reporting errors made in submissions to MMS (now BOEMRE) and in other cases he questions the validity of the tests conducted. As discussed below, I disagree with Dr. Huffman’s assertions.

Figure 9: Approximate effect of Water Depth on Fracture Gradient at 3500 feet

DRILLING MARGINS

For conventional drilling in deepwater, there is a narrow margin between the mud weight needed to control pore pressure and the mud weight that would cause an exposed formation to fracture. Figure 9 is a comparison of fracture gradients below casing set with a sediment penetration of 3500 ft. Note the drastic decrease in fracture gradient for a casing string cemented 3500 feet into the sediments as water depths increase. The narrower margin requires the use of more casing strings than for the same well in shallow water. This occurs because the open hole must support a column of mud that is heavier than seawater and that extends far above the sea floor to the floating drilling vessel at the surface.

Page 29: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 29

Every operator in deepwater wells encounters narrow drilling margins. The way to manage narrow drilling margins is to carefully monitor the well at all times and set more casing strings. The Macondo well was not unusual in that regard.

Figure 10: What is a Kick?

As shown previously in Figure 2b, the mud weight should be sufficient to maintain the pressure within a borehole at any given depth above the pore pressure of a permeable formation exposed to the borehole at that depth. If this is not done, fluids from the rock pores can flow into the well. An influx of formation fluid into the well is called a kick (Figure 10) because in an extreme case it can “kick” the mud out of the well onto the rig floor. The rig crews are trained to recognize a kick early when signs are much less obvious and to close the blowout preventer. Formation fluids entering the well cause the mud to flow out of the well faster than it is being

Page 30: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 30

pumped and cause the fluid level in the pits to rise. Pit drills, in which a false indication of a pit level increase is created, are routinely conducted to test the response of the crew.12

Kicks are not desired but happen on many wells drilled in the Gulf of Mexico because of the presence of abnormal pressure. Mud logging service companies such as Sperry-Sun display a number of indicators that show when the pore pressure could be increasing. None of this technology is 100% accurate, so occasionally a well will become underbalanced and formation fluids will enter the well. Normally the influx of fluid is detected quickly from either a pit level increase or an increase in the flow returning from the well and the well is shut-in with only a small pit gain. The required mud weight (kill mud weight) is calculated from the observed shut-in drill pipe pressure. The mud service company prepares the kill mud and it is circulated around with the blowout preventers closed and flow from the well taken through an adjustable choke. Formation fluid is circulated out of the well and kill mud is circulated to the surface. After it is verified that the well is dead, normal operations can be resumed. Redundant well control systems and good training practices have been established for many years. Such an event can be handled in a routine manner.

When pulling the drill pipe out of the well to “trip” for a new bit, the pressure at the bottom of the well decreases slightly below that of a static well. Thus, the mud weight must be maintained slightly above the pore pressure gradient in order to prevent a kick. The additional mud weight maintained over the pore pressure gradient is called the “trip margin.”

The mud weight should also be less than the fracture gradient at the bottom of the casing, which is referred to as the “casing seat” or the “casing shoe” or sometimes just “shoe.” As shown in Figure 11, it is important to prevent the development of a very large fracture that could grow upward outside of casing into weaker sediments previously protected by the casing. This can cause an inability to keep the hole full of mud and lead to an “underground blowout,” (Figure 12). Underground blowouts are very expensive to control and usually require sealing off and losing at least the bottom portion of the well. In some cases, the entire well is lost. If the casing penetration is not very deep (less than about 2500 feet) and there are no shallow sands or shell beds to take the flow, the sediments can be broached all the way to the surface and cause a large crater to develop. This is dangerous for bottom supported rigs, since they are not easily moved.

12 Transocean’s procedures require pit drills to be conducted weekly, along with other well control drills on the rig. See MDL Ex. 1454, Transocean Well Control Handbook at TRN-MDL-00286823-26.

Page 31: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 31

When circulating the mud, or when running drill pipe or casing into the well, the pressure at the bottom of the well increases slightly above that of a static well. Thus the mud weight should be maintained below the fracture gradient to prevent loss of mud to a formation fracture. The rig crew is trained to quickly detect when mud is being lost and to take appropriate measures to stop the loss. There have been numerous advancements in the design and use of loss circulation material to “heal” the fracture so that normal operations can be resumed.

Figure 11: Shoe Strength protects Weaker Sediments Above

Page 32: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 32

Figure 12: What is an Underground Blowout?

When a kick is taken and the blowout preventers are closed, the surface drill pipe pressure increases by the amount that the pore pressure exceeds the mud pressure in the well. The casing pressure increases higher than the drill pipe pressure by an amount equal to the difference in hydrostatic pressure of the mud in the drill pipe and the kick contaminated mud in the annulus. When the kick is detected quickly and the kick volume is small, the casing pressure is only slightly higher than the drill pipe. The shut-in pressure causes the downhole pressures to be higher than static downhole pressure when no kick is present. A higher mud weight must be circulated into the well at a low pump rate and under pressure with the blowout preventers closed before normal operations can be resumed.

Page 33: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 33

SAFE DRILLING MARGIN

The initial drilling plan must be made before starting the well. For the first well drilled in a new prospect area, prediction of how formation pore pressure and fracture gradient will vary with depth is especially difficult and is usually not accurate. This is especially true when the normal trend of increasing pore pressure and fracture gradient with increasing depth is not present. The bottom part of the Macondo well had a reversal of the normal trend in which both formation pore pressure and fracture gradient decreased with increasing depth.13

Changes in the casing program based on information learned while drilling is a common occurrence. The estimation of pore pressure and fracture gradient becomes more accurate after data from previously drilled nearby wells are available. For example, BP was able to use data obtained drilling the original Macondo well to drill a nearby relief well with no delays.14

When planning a section of hole in a well below casing, it is clearly desirable for the operator to plan to use a mud weight below the fracture gradient to allow for circulating, running pipe, or taking an unexpected kick. Since the fracture gradient is known at the casing seat and fracture gradient normally increase with depth, normal practice is to base the planned margin between fracture pressure and mud weight on the Pressure Integrity Test results. The reference to safe drilling margin is in 30 C.F.R. § 250.427 covering the requirements for pressure integrity tests. The fracture gradient included in the Application for Permit to Drill (APD) provided BOEMRE (previously MMS) must be included in a single plot containing estimated pore pressures, formation fracture gradients, proposed drilling fluid weights, and casing setting depths in true vertical measurements. The regulations do not specify how the estimate is made or what safety margins to use. Approval of the plan is at the discretion of the District Manager of MMS based on the information presented. Once the plan is approved, and drilling commences, the plan in the APD defines the approved safety margin. For example, if the planned maximum mud weight is 0.5 pounds per gallon less that the estimated fracture pressure for the hole section, then the approved safety margin is 0.5 pounds per gallon.

It is recognized that the approved APD is based on estimates and that data obtained while drilling must be recorded in the daily drilling reports as the well is being drilled. The regulations state:

13 MDL Ex. 1 BP’s Deepwater Horizon Accident Investigation Report, September 8, 2010 at 16-17; MDL Ex. 986 Chief Counsel’s 2011 National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling Report at 59-61; MWD/LWD real time data recorded on the rig and cited in Appendix D. 14 Daily Drilling Reports for the relief wells are identified in Appendix D.

Page 34: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 34

You must use the pressure integrity test and related hole-behavior observations, such as pore-pressure test results, gas-cut drilling fluid, and well kicks to adjust the drilling fluid program and the setting depth of the next casing string. You must record all test results and hole-behavior observations made during the course of drilling related to formation integrity and pore pressure in the driller's report.15

This recognizes that mud weights must be allowed to deviate from the APD based on what is seen while drilling. MMS does not specify how to interpret the information that you must record, but they want the ability to be able to inspect the available information. In my opinion, it is extremely important for the team on the rig to be able to change mud weights when needed for proper well control and safety without having to wait for approval.

Dr. Alan Huffman expresses the opinion that if mud is lost while drilling, this event is equivalent to an “open-hole pressure integrity test” and requires immediate recalculation of the drilling margin. He states that regulations require that if the mud weight cannot be safely reduced within the approved safe drilling margin (as re-calculated based on loss return incident), then the operator must cease drilling immediately and get approval from BOEMRE to drill ahead with a reduced drilling margin or to set casing immediately. He further indicated that BOEMRE would not allow drilling to continue if the recalculated drilling margin was less than 0.3 pounds per gallon and would require casing to be set immediately. I do not agree with any of this for the following reasons:16

� In deepwater drilling, the margin between pore pressure and fracture gradient is often so small that permeable formations encountered while drilling will initially fracture at mud weights significantly lower than the shoe strength. The fracture resistance of these zones can usually be raised to that of the confining shale by treatment with modern loss circulation material. When the use of loss-circulation-material allows full circulation to be regained, the mud weight that the well will hold can often be gradually increased. There is no way to calculate what the final fracture gradient will be after multiple treatments. Geo-Tap tools can measure pore pressure but do not measure fracture pressure. BP has specialists for calculating fracture gradient from other observations, but these are just estimated and are often inaccurate. The drilling team leader uses this group to provide input, but he must weigh their input against other potential problems and operational risks.

15 30 C.F.R. § 250.427

Page 35: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 35

� In my opinion, normal drilling practice is to drill through a sandstone interval whenever circulation can be established, even if some mud losses continue. Setting casing in the middle of a sandstone formation would be extremely unwise because the weak zone would still be exposed and it would be much more difficult to get a good cement job on the casing. Furthermore, the formation pore pressure gradient within a permeable formation cannot increase with additional penetration to the bottom of the sandstone formation. The mud weight in use will be sufficient to control formation pore pressure. Care will have to be taken when pulling pipe out of the hole, but again, there are standard drilling practices for not allowing the bottom-hole pressure to fall when pulling pipe out of the hole. This is especially true on modern rigs which allow mud to be pumped when pulling pipe.

� Efforts to heal the loss circulation zone would continue while drilling through the permeable zone and there would be no basis for accurate re-determination of the final fracture gradient. When the use of loss-circulation-material allows full circulation to be regained, the mud weight that the well will hold can often be gradually increased.

� I would expect the District Manager of BOEMRE (previously MMS) and experienced field inspectors to recognize normal practice in such situations. If regulation enforcement was a simple enforcement of pre-determined drilling margins as indicated by Dr. Huffman, then this would be written into the regulations. There would be a many more issuances of non-compliance made in the Gulf of Mexico region if every case of drilling ahead with hole-ballooning seen in a field inspection resulted in one being issued. If casing had to be run every time loss circulation or hole-ballooning was experienced, there would be very few wells successfully drilled in the Gulf of Mexico area.

Dr. Huffman found examples of reporting errors made in documents submitted to BOEMRE (previously MMS). In my opinion, the few errors found in the large amount of material submitted to BOEMRE (previously MMS) do not warrant the leap Dr. Huffman makes to a conclusion that BP intentionally hid information so that they could operate in an unsafe and imprudent manner.

16 Transocean recognized many of these aspects of deepwater drilling as well, as reflected in their “Drilling Deepwater Wells” powerpoint presentation. TRN-MDL-00868570.

Page 36: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 36

Dr. Huffman also based his conclusions regarding purported imprudent practices in part on BP not reporting Pressure Integrity Test results to the nearest hundredth of a pound per gallon. In my opinion, normal engineering practice is not to exceed expected accuracy when reporting test results. Mud weights are measured to the nearest tenth of a pound per gallon. BP used a Pressure While Drilling (PWD) tool above the drill bit on the Macondo well. This tool is not required and the use of this tool is an indication of using the best available technology and incurring extra costs to improve safety. The accuracy of a very good pressure gauge seldom is better than one percent and it is difficult to rely on a PWD tool to be accurate to a hundredth of a pound per gallon when measuring downhole conditions. In my opinion, it is normal practice to record mud weights and equivalent mud weights to the nearest tenth of a pound per gallon. Also, it is my understanding that the MMS’s (now BOEMRE) electronic eWells system requires data to be reported in tenths.17

Dr. Huffman expressed an opinion that the pressure integrity tests that were conducted below the 13-5/8 inch liner and the 9-7/8 inch liner were not valid tests. I was asked to do independent analyses of these pressure integrity tests and to provide an opinion as to whether or not these tests were valid. Both tests were valid pressure integrity tests.

BP’S PRESSURE INTEGRITY TEST PROCEDURE

BP’s written procedure for conducting a Pressure Integrity Test is as follows:

PRE-JOB CONSIDERATIONS:

· Graph casing pressure test versus volume pumped and use as a baseline for the PIT test.

· Use cement unit and cement unit gauges. Ensure sufficient mud supply to the cement unit.

· Calculate estimated Leak-off Test (LOT)/Formation Integrity Test (FIT) pressure and test lines to 1000 psi over expected LOT/FIT pressure.

OPERATIONS

� 1. Drill out the cement shoe track, cleanout rat-hole, and drill 10-ft of new formation or as otherwise specified in well specific program

� Technical Note: � MMS regulations require a minimum of 10-ft md and a maximum of 50-ft md of

new formation.

17 F. Patton 7/13/11 Dep. Tr. at 271:2-6 (“Q. Mr. Patton, the eWell submission, the computer submission, you can only submit data in tenths, correct? A. That is correct, yes.”)

Page 37: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 37

� 2. Circulate cuttings out of the well or at least above the BOPs. If minimal cuttings have been drilled, circulate a minimum of 1,000-ft above the Bottom-hole Assembly. Ensure consistent mud weight with surface samples with pressurized scales.

� 3. Pull bit back into shoe and space out to close the appropriate BOPs. � 4. While keeping drill string still, circulate up consistent downhole equivalent

static densities (ESDs) from the pressure while drilling (PWD) tool to achieve < 0.05 pound per gallon consistency.

� 5. Displace the appropriate choke or kill line to fresh mud. � Technical Note: � The test will be performed pumping down the drill pipe and down the annulus

simultaneously via the appropriate choke or kill line to reduce friction pressure. � 6. Rig up to pump down the drill pipe and down choke or kill line with the

cement unit. � 7. Break circulation down the drill pipe and down the choke or kill line. � 8. Close the appropriate surface valve on the drill pipe side, and the appropriate

choke/kill line valve at the BOP stack. Test lines to 1,000 psi over anticipated maximum LOT or FIT surface pressure.

� 9. Bleed off test pressure but do not completely drain lines. Open valves and break circulation down drill pipe and down the choke or kill line.

� 10. Shutdown and re-zero pressure gauge at cement unit to account for hydrostatic between cement unit and rig floor.

� 11. Close appropriate BOP and monitor return line to ensure no returns during PIT.

� 12. Perform LOT/FIT, pumping a maximum of ½ barrel per minute (bpm). � 13. Record volume pumped and surface pressure consistent with pump rate. For

example, if pumping ½ bpm, record data every ½ bbl. If pumping � ¼ bpm, record data every ¼ bbl. � 14. Graph data on a Surface Pressure versus Volume Pumped/Time graph. � Technical Note: � Note 1: If performing an FIT, once desired surface pressure is achieved, shutdown

and monitor pressure for a minimum of 10 minutes. � Note 2: If performing a LOT, continue pumping until the pressure flatten or

decreases (pump until the subsequent pressure is equal or less than the last pressure). This is the shut-down point.

Page 38: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 38

BP’S PRESSURE INTEGRITY TEST OF THE 13-5/8 INCH LINER SHOE

The Pressure Integrity Test on the 13-5/8 inch liner shoe was conducted on March 21, 2010 with R. Sepulvado listed the Well Site Leader supervising the test.18 The measured depth of the hole was 13,150 feet, which corresponded to a True Vertical Depth of 13,140 feet. The bottom of the liner was at a measured depth of 13,145 feet which corresponded to a True Vertical Depth of 13,135 feet. The well was vertical on bottom (inclination angle of zero). The top cement plug was at the float collar at 01:30 hours on March 21, 2010. The casing was pressure tested at about 17:00 hrs. The volume of 12.5 pound per gallon mud pumped during the casing test to achieve a test pressure of 2415 psi was 14.0 barrels and the data recorded during the pressure build-up was as follows:

Casing Test

Volume Pump Pumped Pressure (bbl) (psi)

0 0 0.5 240 1 322

1.5 405 2 500

2.5 575 3 670

3.5 765 4 845

4.5 930 5 1020

5.5 1100 6 1180

6.5 1260 7 1345

7.5 1425 8 1505

8.5 1590 9 1670

9.5 1750 18 The data underlying this discussion comes from Daily Operations Reports for March 20 and 21, 2010 (BP-HZN-MBI00013815-26); IADC Drilling Report for March 20 and 21, 2010 (BP-HZN-2179MDL00060910-12, 916-18); Daily Geological Reports for March 20 and 21, 2010 (BP-HZN-2179MDL00060910-12, 16-18), and MDL Ex. 4025 - FIT/LOT Worksheet and the realtime downhole MWD/PWD data referenced in Appendix D.

Page 39: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 39

10 1830 10.5 1900 11 1980

11.5 2060 12 2140

12.5 2220 13 2310

13.5 2400 14 2490

The pressure after 30 minutes was 2370 psi, which was about a 2% decline in 30 minutes and thus much less than the 10% allowed for a successful test. The volume bled back after the test was 14 barrels.

By 10:30 hours the next day, the drilling assembly had been run to bottom and cement was drilled out from 13,100 feet to 13,150 feet. It was reported that the bit exited the shoe at 13,145 feet and cement was drilled in the rat hole from 13,145 feet to 13,150 feet. Ten feet of new formation was drilled from 13,150 feet to 13,160 feet (measured depth). The cuttings were pumped from bottom to the wellhead. A static bottom bole pressure equivalent to 12.72 pounds per gallon was reported with a surface mud weight of 12.5 pounds per gallon when circulating at a measure depth of 13,140 feet. The Pressure Integrity Test was performed at about 13:00 hours using a pump rate of 0.5 barrels per minute. The midpoint of the new formation drilled was a measured depth of 13,155 feet and a true vertical depth of 13,145 feet. The following data was recorded:

Pressure Integrity Test Shut-in Data Pump

Volume Pump Time (min) Pressure Pumped Pressure (min) (psi) (bbl) (psi) 0.17 1416

1 1322 0 0 2 1217

0.5 140 3 1200 1 205 4 1190

1.5 270 5 1187 2 350 6 1183

2.5 438 7 1180 3 520 8 1178

3.5 600 9 1177 4 680 10 1175

4.5 760

Page 40: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 40

5 840 5.5 930 6 1010

6.5 1090 7 1170

7.5 1250 8 1330

8.5 1420 9 1480

9.5 1480

The volume of mud bled back at the end of the test was 9.25 barrels. Note that 9.5 barrels was pumped into the well when increasing the pressure. This indicates that 0.25 barrels of mud and mud filtrate leaked into the formation during the test.

The results of my analysis are shown graphically in Figure 13. Basing the fracture gradient on the observed fracture initiation pressure of 1480 psi, the fracture gradient is calculated to be equivalent to a surface mud weight of 14.7 pounds per gallon. On this test, the fracture initiation pressure was the breakdown pressure. This is consistent with the 10 feet of formation being exposed consisting of an impermeable smooth borehole with no pre-existing defects or cracks and significant tensile strength and stress concentration near the borehole wall.

The fracture pressure at 13,145 feet calculated using the equivalent mud weight on bottom as measured by the Pressure While Drilling (PWD) tool was 10,175 psi. The overburden stress at a measured depth of 13,155 feet (true vertical depth of 13,145 feet), due to the weight of the sediments above, was calculated from well logs to be 9,632 psi. Thus the Leak-off test gave a value for fracture pressure that was about 543 psi higher than the calculated overburden stress. This is a reasonable value for the tensile strength for impermeable rock that was not previously fractured.

The shut-in pressure versus time plot is indicative of a fracture that closed slowly over a two minute period after pumping was stopped. The fracture closure pressure appears to be about 1,200 psi, which is equivalent to a surface mud weight equivalent to 14.3 pounds per gallon. However, fracture closure pressure generally cannot be accurately measured in mud because the mud starts to gel as soon as pumping is stopped.

Dr. Huffman indicated that Pressure Integrity Test was a bad test because of the following “problems”:

� The slope of the pressure build-up curve for the Pressure Integrity Test was very close to the slope of the casing pressure test build-up curve.

Page 41: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 41

� The leak-off pressure and the propagation pressure was nearly the same. � An initial shut-in pressure that is lower than Dr. Huffman would expect relative to

the apparent leak-off pressure. � An anomalously steep decline in pressure during the shut-in period. � The fracture gradient indicated by the test was higher than expected and higher

than the overburden stress computed from well logs.

Figure 13: Pressure Integrity Test at 13-5/8 inch Liner Shoe

I do not agree that the above observations indicate that the test was bad. I find the test results to be consistent with 10 feet of borehole drilled below casing into low permeability rock that was not previously fractured. A point by point response to Dr. Huffman’s list follows.

� The volume being compressed for the casing and leak-off tests are almost the same. Adding 60 more feet to the 13,100 feet of well depth does not add much to the volume that has to be compressed. The length of drill string in the hole was less for the casing test. Thus, for low permeability rock, the slope would be expected to be nearly the same.

Page 42: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 42

� I do not find it strange for the breakdown and propagation pressure to be the same. Sometimes the breakdown is very sharp and the first point after breakdown is lower than the breakdown pressure as shown in Figure 7. In this case we have only one point and not a continuous curve.

� The Initial Shut in Pressure falls 75 psi below the final pumping pressure on the casing test and 64 psi on the Leak-off test. I find that this is consistent with opening a very small fracture and leaking only 0.25 barrels of mud and mud filtrate into the fracture.19

� I did not find the decline in pressure after shut-in to be anomalous. I find it to be consistent with a small fracture not penetrating all the way through the region of higher stress concentration surrounding a borehole drilled through rock not previously fractured.

� It is true that the test result was higher than expected and was likely not to be representative of the entire hole-section. However, it did indicate that the shoe strength was strong enough to proceed with drilling the next section, which was the main purpose of the test. BP eventually adjusted the fracture gradient curves to calculated values more representative of the hole section.

BP’S PRESSURE INTEGRITY TEST OF THE 9-7/8 INCH LINER SHOE

The Pressure Integrity Test on the 9-7/8 inch liner shoe was conducted on April 2, 2010 with Lee and Price listed as the Well Site Leaders supervising the test.20 The measured depth of the hole was 17,183 feet, which corresponded to a True Vertical Depth of 17,173 feet. The bottom of the liner was at a measured depth of 17,168 feet which corresponded to a True Vertical Depth of 17,158 feet. The well was nearly vertical on bottom (inclination angle of 0.5 degrees). The cement was in place at 11:00 hours on March 31, 2010. The casing was pressure tested at about 13:00 hours on April 1, 2010. The volume of 14.1 pound per gallon mud pumped during the

19 The volume pumped into the well was 9.5 barrels and the volume bleed back after the test was 9.25 barrels. 20 The data for this discussion comes from the Daily Operations Report for April 2, 2010 (BP-HZN-MBI00013890-96), the IADC Drilling Report for April 2, 2010 (BP-HZN-2179MDL00251188-91), Daily Geological Reports for April 2, 2010 (BP-HZN-2179MDL00059370-71), MDL Ex. 4025 - FIT/LOT worksheet, and the real time downhole MWD/PWD data referenced in Appendix D.

Page 43: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 43

casing test to achieve a test pressure of 914 psi was 5.75 barrels and the data recorded during the pressure build-up was as follows:

Casing Test

Volume Pump Pumped Pressure

(bbl) (psi)

0 0 0.5 207 1 257

1.5 365 2 438

2.5 507 3 582

3.5 656 4 731

4.5 795 5 875

5.5 950

The pressure after 30 minutes was 887 psi, which was about a 3% decline in 30 minutes and thus much less than the 10% allowed for a successful test. The volume of mud bled back after the test was 5.5 bbl.

By 05:00 hours on April 2, 2010, the drilling assembly had been run to bottom and cement was drilled out from 17,000 feet to 17,173 feet. Ten feet of new formation was drilled from 17,173 feet to 17,183 feet (measured depth). The cuttings were pumped from bottom to above the blowout preventers. A static bottom bole pressure equivalent to 14.52 pounds per gallon was reported with a surface mud weight of 14.3 pounds per gallon when circulating at a measured depth of 17,183 feet. The Pressure Integrity Test was performed at about 09:00 hours using a pump rate of 0.5 barrels per minute at the liner shoe at 17,168 feet (measured depth). The midpoint of the new formation drilled was a measured depth of 17,178 feet and a true vertical depth of 17,173 feet. The following data was recorded:

Pressure Integrity Test Shut-in Data Pump

Volume Pump Time (min) Pressure Pumped Pressure (min) (psi)

(bbl) (psi) 0.17 1500 1 1500

0 40 2 1500

Page 44: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 44

Pressure Integrity Test Shut-in Data 0.5 146 3 1500 1 215 4 1500

1.5 293 5 1500 2 365 6 1500

2.5 435 7 1500 3 510 8 1500

3.5 587 9 1500 4 660 10 1500

4.5 735 11 1500 5 805 12 1500

5.5 880 13 1500 6 952 14 1500

6.5 1020 15 1500 7 1092 16 1500

7.5 1164 17 1500 8 1235 18 1500

8.5 1306 9 1380

9.5 1450 10 1520

The volume of mud bled back at the end of the test was 10.0 barrels. Note that 10.0 barrels

was pumped into the well when increasing the pressure. This test did not go to Leak-off. The equivalent mud weight on bottom as measured by the Pressure While Drilling (PWD) tool was reported to be equivalent to 16.22 pounds per gallon. The results of my analysis are shown graphically in Figure 14. Using the pressure of 1,520 psi when the test was terminated, the shoe strength is calculated to be equivalent to a surface mud weight of 16.0 pounds per gallon.

The overburden stress at a true vertical depth of 17,173 feet, due to the weight of the sediments above, was calculated from well logs to be 13,772 psi. The pressure measured with the PWD tool was 16.22 pounds per gallon or 14,470 psi. Thus the Formation Integrity Test gave a strength value that was 698 psi above the calculated overburden stress. This is a reasonable number for 10 feet of formation being exposed consisting of an impermeable smooth borehole with no pre-existing defects or cracks and significant tensile strength and stress concentration near the borehole wall.

Dr. Huffman has suggested that this was not a valid test because of its high value and BP was not a prudent operator because they did not continue testing. I saw no evidence that this was true. There is often a wide variation in shoe test results when comparing results obtained on different wells and when comparing observed results to calculated results. Calculation results

Page 45: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 45

also vary depending on the correlation used in the calculation. An example of variations on the order of two pounds per gallon was shown previously in Figure 6.

Figure 14: Pressure Integrity Test at 9-7/8 inch Liner Shoe

Dr. Huffman pointed out that the slope of the buildup curve was nearly the same as the casing test and compared the test to the test at the 16 inch shoe which had more difference in slope. The decrease in slope of the straight line buildup curve (between the casing test and the formation test in a deep well with 10 feet of open borehole) depends primarily on the rate at which mud filtrate is being lost during the test. If the 10 feet of borehole is good shale with a very low permeability, then one would expect the slopes to be nearly the same. The permeability of shale is in the nanodarcy range,21 which is about a million times less permeable than

21 Discussion of shale permeability in “Shale Water as a Pressure Support Mechanism in Gas Reservoirs having Abnormal Formation Pressure,” Journal of Petroleum Science and Engineering, 3 (1990) 305-319.

Page 46: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 46

sandstone, and would be expected to behave much like steel pipe from the standpoint of allowing fluid to enter the borehole wall when no cracks are present.

Dr. Huffman pointed out internal e-mails within the BP organization discussing the high shoe strength. Various reasons were suggested including the possibility that the driller did not know what depth he was at when he drilled out the shoe.22 This issue was brought up in regard to both tests that produced unexpectedly high fracture gradients. BP’s team members that supervised the test recognized that the results were higher than expected and BP even repeated a portion of the test.23 It is not plausible that they would not have checked for possible pipe tally errors and that the driller was off by more than 10 feet. Another speculation is that not all of cement in the five feet of rat hole below the casing had been drilled out. This speculation was partially based on a report of abundant cement mixed with shale cuttings when drilling new formation below the 13-5/8 inch shoe. When cementing with a short rat hole below the casing, the cement is not expected to displace all of the mud out of the rat hole, but sometimes good cement fills the entire rat hole. Good cement in the entire rat hole results in more cement cuttings being circulated to the surface when drilling ahead. I have examined the daily operational reports, cuttings evaluations, penetration rate data, and gamma ray logs and found the speculation about the tests being conducted in casing or cement not being drilled out to be unfounded for both tests. The data is consistent with the depths reported in the operational records and confirmed that both tests were conducted in newly drilled formation below previously drilled larger hole.

It should also be pointed out that cement is often squeezed at the shoe to repair a leaking cement seal. The drilled out cement after a squeeze job is not strong enough in tension to interfere with the Pressure Integrity Test conducted after the squeeze job. Sometimes multiple squeeze jobs must be done to repair the cement seal around the bottom of the casing.

The fact that BP has on its staff a number of scientists that specialize in pore pressure and fracture gradient calculations is an indication to me that it was not trying to cut corners to save money but instead was employing the best available technology to support and advise its experienced team leader. Filings by BP and the number of individuals focused on pore pressure prediction and estimates show a strong emphasis by BP towards obtaining as accurate as possible data related to pore pressure and estimated fracture gradients. The specialists often see only their side of an issue and do not recognize the risk versus benefit of taking additional data. If drilling was stopped to do a Leak-off test in the extended borehole, the risk of getting stuck

22 MDL Ex. 1343, M. Albertin April 2, 2010 email discussing FIT test. 23 MDL Ex. 3734, BP-HZN-2179MDL00247809

Page 47: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 47

would increase. If the test was carried to a high value, the risk of unnecessarily causing a leak at the liner top had to be considered. Even if the test gave a value close to what was calculated by the specialists, this would not necessarily be representative of formations not yet drilled. The test had accomplished its main objective of demonstrating that the shoe was strong enough to proceed with drilling the next section of hole. Additionally, it is my understanding that the author of the email quoted by Dr. Huffman concluded that the test was valid after he sent the email.24

The resistance of a rock to fracture is controlled primarily by the overburden stress in the sediments caused by the weight of sediments above and other local tectonics. The overburden stress always increases with depth so that the weaker sediments exposed by an open borehole will usually be near the top of the open borehole. However, rock fracture resistance is also affected by pore pressure, permeability, mineral composition, and cementation. Mother Nature is not uniform and large variability in fracture resistance is to be expected. Figure 15, taken from one of my old lectures, shows the common assumptions made to do fracture mechanics modeling on a picture of what Mother Nature has to offer. Fortunately, the technology for healing downhole fractures has been improved. When drilling in deep water, care must be taken to keep a good supply of loss circulation material on hand.

24 M. Albertin 7/13/11 Dep. Tr. at 583-85 (discussing FIT test and stating that after discussion, BP believed it was a valid test of rock stronger than they expected); G. Vinson 6/23/11 Dep. Tr. at 274-75 (same).

Page 48: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 48

Figure 15: Common Assumptions in Fracture Modeling (Homogeneous Layers, Isotropic Media, Elastic Behavior)

EFFECT OF SPACER ON NEGATIVE PRESSURE TEST INTERPRETATION

The discussion of the previous section was regarding the Pressure Integrity Test conducted after setting each casing string or liner required to complete the drilling operations. Once the production casing is run and cement is circulated as planned, additional pressure tests are conducted before completing the well to put it on production or to temporarily cap the well. A temporary cap allows the drilling rig to be released to drill other wells and a smaller rig moved on the well to complete the well and make it ready for production.

An overarching principle of well control that industry follows in drilling and completing wells is to always maintain two independently verified barriers to an uncontrolled release of formation fluids from the well.25 When drilling ahead in deep water, the two barriers are the hydrostatic pressure of the mud and the blowout preventer stack at the seafloor. The blowout preventer stack has redundant blowout preventers so that it can be closed on any size or shape of pipe in the hole or when nothing is in the hole. Provisions are also made for multiple blowout preventers for the same size range of pipe and for pipe to be stripped into the well under pressure. The hydrostatic pressure of the mud is verified to be a barrier simply by keeping the well filled with mud and observing that it does not flow. The blowout preventers are pressure tested on a routine schedule to verify their ability to function as a barrier.

After cementing casing, the casing and cement work together and isolate the rock formations from the inside of the well. However, the casing/cement system must be pressure tested to verify that it serves as a barrier. A positive pressure test of the production casing is conducted in the same manner that the other casing strings and liners are tested. The positive pressure test verifies that the casing is intact and does not leak from the inside of the casing to the outside of the casing from the wellhead to the Top Plug landed on the float collar at the bottom of the casing. However, before the hydrostatic head of the mud in the well can be reduced below formation pressure, a Negative Pressure Test is conducted in which the hydrostatic head is temporarily removed in a controlled manner to observe whether or not fluid can leak past the cement around the outside of the casing and the cement remaining in the bottom portion of the casing. The casing joints below the float collar are called the shoe joints. The purpose of the

25 Transocean’s well control handbook includes a discussion of multiple barriers, consistent with industry practice. See Ex. 1454, Transocean Well Control Handbook at TRN-MDL00286776.

Page 49: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 49

negative test is to verify that formation fluids cannot enter the well from the outside at the negative pressure difference that was imposed in the test.

Once the negative test is passed, the mud that was in the marine riser and in the top part of the well can be replaced with seawater. At this time the two verified barriers would be the tested casing/cement system and the blowout preventer stack. A cement plug could then be set in the top part of the casing.26 The cement plug would have no pressure differential across it and could be verified by tagging it with pipe to insure the cement had hardened and was in place. BP was planning to test the top plug in the Macondo well to 1000 psi, although there was no regulatory requirement to do so. Once the upper plug was in place, the Marine Riser could be pulled back and laid down on the drilling vessel and the temporary well cap put in place. There would be three barriers in place after the temporary cap was installed.

Figure 16 is a schematic showing the Macondo well after circulating cement. The left side of the schematic shows an overview of the well and various casing strings and liners. The right side of the schematic is an enlargement of the bottom part of the production casing and the sediments penetrated below the 9-7/8 inch liner. Figure 17 is a schematic of how the well would have been configured at the end of the temporary capping operation. Note that the change in fluid density occurs only above the depth of the plug (8,367 feet), where the 14 pound per gallon mud is replaced by seawater having a density of about 8.5 pounds per gallon. Everything else remains the same.

NEGATIVE TEST NOMENCLATURE

It is customary to reference a negative pressure test in terms of the depth to which the hydrostatic pressure will change or the depth of the equipment being tested. For the negative pressure test needed for the temporary capping operation, the negative test had to be conducted to an equivalent mud weight of 8.5 pounds per gallon at the plug depth of 8,367 feet. As shown in Figure 18, this is also equivalent to an 11.5 pound per gallon mud at the top of the shoe track at a vertical depth of approximately 18,100 feet.

26 Regulations require that the plug be at least 100 feet in length and be set no more than 1000 feet below the seafloor. However, BP had sought and received permission to set the plug about 3,400 feet below the seafloor, but would use a 300 foot plug. MDL Ex. 2236 (BP-HZN-2179MDL00048427-531). Setting the plug deeper would facilitate using more weight of pipe to set the casing lockdown device in the subsea wellhead at the seafloor.

Page 50: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 50

Figure 16: Schematic of Macondo Well after Circulating Cement

Page 51: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 51

Figure 17: Planned Configuration of Macondo Well with Temporary Cap

I know of no industry standard regarding Negative Pressure Tests. The most common way to conduct a negative pressure test is to pump water down the drill pipe to a depth sufficient to cause the desired reduction in well hydrostatic pressure. To do this, the needed depth and volume required to fill the drill pipe to that depth is first calculated. The rig crew then pumps the calculated water volume down the drill pipe. When pumping is stopped, the surface drill pipe

Page 52: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 52

pressure will be equal to the desired reduction in hydrostatic pressure. The blowout preventers are then closed and the surface drill pipe pressure is bled down to zero while the volume of water bled back is measured. When the drill pipe pressure reaches zero, the volume bled back should be the expansion volume of the fluids in the well corresponding to the pressure decrease. The system is then left static for the duration of the test. For a 30 minute negative test, this period would be 30 minutes. If no fluid flows from the drill pipe, the negative test is passed and reported as a good test. If the drill pipe pressure cannot be bled to zero or bleeds down and then increases, or water continues to flow from the drill pipe, the negative test is said to have failed. As shown in Figure 21 and as will be discussed in more detail later in this report, the system is easily understood using a U-tube analogy with the drill pipe being the high pressure side of the U-tube and the annulus being the low pressure side of the U-tube.

The rig crew should know not to let a significant influx of fluid into the well. The test is terminated quickly if the well is flowing. At the end of the test, the pump is started and the drill pipe pressure is increased back to the initial value seen when the blowout preventer was closed. The pressure on the drill pipe is slowly bled through a choke while the annulus kept full of mud by filling through a choke of kill line. This removes the water or synthetic base oil from the drill pipe and returns the well to its initial condition before the test.

On a deepwater rig with the blowout preventer at the seafloor, the luxury of additional piping (the choke and kill lines) down to the seafloor is present. Water or some other low density fluid such as synthetic oil can be pumped down the choke line instead of the drill pipe. This option is often preferred because it simplifies the bleed back part of the test. However, the depth of the choke line is fixed, so the hydrostatic pressure reduction achieved during the test is limited by the lowest density fluid available for pumping down the choke line.

The rig crew does not have to be told how to run a negative test. This should be a routine operation that fits within their training. A typical procedure sent to the rig would say simply to conduct a negative test to an equivalent density of so many pounds per gallon at a depth of so many feet. The procedure could also say to conduct a negative pressure test at a depth of so many feet to a pressure differential of so many psi. The operator’s representative and the rig crew would be expected to know the proper procedure for running the test.

I have reviewed several of Transocean’s written procedures for Performing Negative Flow Tests. These included tests conducted by pumping a low density fluid down the drill string27 and

27 The procedure labeled TRN-INV-00760141 is basically the general procedure described above in which low density fluid is pumped down the drill pipe to create the desired differential.

Page 53: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 53

tests conducted by pumping a low density fluid down the choke line. They also included a negative test run in conjunction with displacing the top part of the well from mud to seawater (separated by a spacer) as was being done on the Macondo Well at the time of the blowout.28

I reviewed several written Transocean procedures for conducting a Negative Pressure Test after pumping synthetic oil down the choke line and/or kill line.29 Transocean’s Task Specific THINK procedure for the Deepwater Horizon for performing a Negative Flow Test using the choke and kill lines is a variation of this procedure that uses both the choke line and kill line as the high pressure side of the U-Tube.30 One of the hazards warned about in the THINK procedure is that a closed flow path can give a false indication of no flow.

Figure 18: Use of Equivalent Mud Weights in Negative Test Nomenclature

28 The procedure labeled TRN-MDL-01323432 uses a spacer between the seawater and mud and pumps the spacer above the BOP stack before closing the Blowout Preventer and performing a Negative Test. 29 The procedure labeled TRN-INV-00760143 does not use the drill pipe and annulus as the two sides of the U-tube, but instead uses the choke line and kill line. The procedure labeled TRN-INV-00760142 is a slight variation of this procedure that uses the annular Blowout Preventer instead of the blind/shear rams. The procedure labeled BP-HZN-2179MDL03287798 used the choke line and the marine riser as the two sides of the U-tube. 30 TRN-MDL-01995569

Page 54: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 54

FLUID DISPLACEMENT

The removal of the mud from the top part of the well and from the marine riser requires what is called a fluid displacement. This is accomplished by placing the drill string at the depth to be displaced. The replacement fluid is pumped from mud tanks on the rig into the drill pipe while taking return flow of existing well fluid to different mud tanks on the rig.

The displacement of a heavy oil base mud by sea water is complicated by the fact that mixing between the two fluids will take place during the displacement and contamination of the mud by sea water can cause the mud to become unstable. If this happens, the mud solids dispersed in the oil phase can start clumping together in the seawater. In order to avoid this mud chemistry problem, the drilling fluid specialist must design a spacer fluid to pump between the mud being removed from the well and the seawater being pumped into the well. The spacer must be compatible with the mud on the leading edge and the seawater on the trailing edge. The drilling fluid specialist is generally in charge of the displacement.31 He is trained in this operation and the operator depends on him to make sure that the displacement goes well.32 The displacement of oil base fluids by water base fluids or vice versa have been known to go bad and create a highly contaminated well that is hard to clean.

MI-SWACO SPACER

MI-Swaco provided drilling fluid and drilling fluid waste management services on the rig for BP. The MI-Swaco drilling fluid specialist wrote procedures and supervised displacement of various fluids into the well.33 At the end of drilling operations, there was a significant volume of loss circulation material that had been mixed as a contingency in case there was another event of loss circulation. The spacer for the fluid displacement was composed of a blend of two lost circulation material (LCM) pills left over from the drilling operations plus some additional 31 B. Billon 6/23/11 B. Billon Dep. Tr. at 109:11-21 (MI-Swaco personnel “in most cases, always prepare a [displacement] procedure”); B. Billon 6/24/11 Dep. Tr. at 471-482 (discussing M-I Swaco responsibilities); L. Lindner 9/14/11 Dep. Tr. at 231-33 (discussing development of M-I Swaco displacement procedure). 32 MDL Dep. Ex. 567; B. Billon 6/23/11 Dep. Tr. at 109:11-21; L. Lindner 9/15/11 Dep. Tr. at 549:12-17. In addition to the M-I Swaco personnel preparing the displacement procedure and calculating the pumps necessary, the Transocean rig crew would also have evaluated the displacement procedure. Wyman Wheeler’s interview notes reflect the collaborative process involved in displacement when he answered the question about displacement figures and said that displacement figures are evaluated by the Transocean rig crew and that the Assistant Driller, the Driller and the Toolpusher all have to agree before the procedure goes forward. W. Wheeler interview notes, TRN-INV-00004991-97. Leo Lindner also testified that he provided the displacement procedure to the mudloggers, Transocean crew, MI-Swaco personnel on shore and BP’s company man to review. L. Linder 9/14/11 Dep. Tr. at 268-69. 33 L. Lindner 9/14/11 Dep. Tr. at 564-65 (discussing M-I Swaco internal discussions regarding the spacer and Lindner testifying that he “got the idea from Doyle [Maxie of M-I Swaco]”); L. Lindner 9/14/11 Dep. Tr. at 231-33 (discussing development of M-I Swaco displacement procedure); MDL Ex. 2810.

Page 55: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 55

weight material and viscosity enhancer.34 MI-Swaco had not previously used LCM pills for this purpose but believed the mixture could be used effectively and at the same time better manage waste by providing a beneficial re-use of material.35 The mixture chemistry was adjusted by not adding the cross linking chemical so that it would not function in the same manner that it would if used to stop loss circulation. Without the cross linking chemical, the polymers present could not link and make the spacer too thick. The fibers and ground limestone that were in the mixture were inert materials that are routinely circulated in the mud without problems. MI-Swaco personnel has circulated this idea within their organization and also told BP that this was their plan.36

Figure 19: Displacement Planned by MI-Swaco Drilling Fluid Specialist

The basic displacement that was planned is shown in Figure 19. Note how the spacer separates the seawater from the 14 pound per gallon mud. In the drill pipe, the thick 16 pound 34 MDL Ex. 1, BP Deepwater Horizon Accident Investigation Report at Appendices P and Q. 35 MDL Dep. Ex. 567; L. Lindner 9/15/11 Dep. Tr. at 583:22-25; B. Billon 6/24/11 Dep. Tr. at 522:6-12. 36 B. Billon 6/24/11 Dep. Tr. at 510-512 (discussing M-I Swaco internal emails regarding displacement); MDL Ex. 2810 (internal M-I Swaco emails regarding the spacer); L. Lindner 9/15/11 Dep. Tr. at 554-561.

Page 56: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 56

per gallon spacer displaces the mud below it. The spacer is about 14% heavier than the mud, but little mixing would take place at the interface because the spacer is so thick. The water displaces the spacer from the drill pipe and since water is only half as dense as the spacer, there would be little mixing between the water and the spacer in the drill pipe. In the annular space outside of the drill pipe, the spacer efficiently displaces the mud upward because it is heavier than the mud and more viscous. Note that the spacer gets shorter when it enters the large-diameter Marine Riser. When the water pushes the spacer up the Marine Riser, a less efficient displacement takes place and there is some mixing of the water and the spacer. However, the spacer contains only non-toxic material that could be released to the environment along with the seawater.

The final instructions sent to the rig regarding the temporary capping procedure included the following steps:37

1. Test Casing per Application for Permit to Drill to a low pressure test of 250 psi and a high pressure test of 2500 psi.

2. Run in the hole to 8,367 feet. 3. Displace to seawater from there to above the wellhead. 4. With seawater in the kill line, close the annular blowout preventer and do a

negative test to a pressure differential of approximately 2350 psi. 5. Open annular blowout preventer and continue displacement. 6. Set a 300 foot balanced cement plug with 5 barrels in the drill pipe. 7. Pull out of hole about 100 to 200 feet above the top of cement and drop a nerf

ball. Then circulate a drill string38 volume. 8. Spot corrosion inhibitor in the open hole. 9. Pull out of the hole to just below the wellhead or above with the 3-1/2 inch

stinger39. (If desired, wash with the 3-1/2 inch stinger but do not rotate. A separate run will not be made to wash since the displacement will clean up the wellhead.

10. Pull out of the hole and make Lead Impression Tool/Lock-Down Sleeve runs.40

37 MDL Ex. 545. 38 The term drill string is used to refer to all of the drill pipe sections and bottom-hole assembly (if any) as a whole. In this case it was composed of a section of 6-5/8” drill pipe on top, 5-1/2” drill pipe in the middle and 3-1/2” pipe in the bottom section. 39 A section of small diameter pipe on bottom is called a stinger. It is best to set a balanced cement plug using a small diameter pipe to reduce disturbing the slurry when pulling the stinger out of the cement after it is placed. 40 A Lead Impression Tool is used to provide an imprint of the area in the wellhead where the top of the production casing has been landed and the seals installed. The impression made into the soft lead block can confirm that the wellhead at the seafloor is properly configured to accept the lock down sleeve that will lock the top of the casing so that upward movement is prevented.

Page 57: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 57

11. Test casing and surface plug to 1000 psi with seawater as required by BP’s Drilling and Well Operations Practice (DWOP).

a. Confirm volume in barrels needed to pressure up on original casing test versus volume in barrels to test the surface plug. Less volume should be required to test the surface plug because of differences in well fluid volume and compressibility. (seawater versus synthetic oil bas mud).

b. Plot on chart and send to Houston for confirmation. The negative test procedures included in this plan appear very similar to what was used

previously by Transocean on the Kodiak Well in Mississippi Canyon 727 #2.41 After cementing, the drill pipe was pulled to the planned depth of the displacement. The Boost line, Choke Line, and Kill Line were displaced to seawater. They then pumped water base spacer down the drillpipe and displaced the drill pipe and hole with seawater to the top of the BOP Stack to perform the negative test. The differential pressure was put back using the Halliburton Pump, the annular preventer was opened, and the displacement to seawater was completed. This negative test, which was run on January 28, 2010, used essentially the same procedure as used on the Macondo Well.

MI-Swaco’s drilling fluid specialist included the negative test of Step 4 in the displacement procedure that he prepared. This procedure is given as Appendix P in BP’s Deepwater Horizon Accident Investigation Report issued September 8, 2010.42 The procedure called for first displacing the boost line,43 choke line, and kill line44 to seawater and then closing the lower valve where these lines enter the Marine Riser. The MI-Swaco Procedure called for pumping:

� 73 barrels of seawater or 579 strokes to displace the Boost Line, � 8 barrels of seawater or 63 strokes to displace surface lines plus 100 barrels or

794 strokes to displace the choke line (total of 857 strokes), � 100 barrels of seawater or 794 strokes to displace the kill line, � 425 barrels of 16 pound per gallon spacer or 3373 strokes into the drill pipe, � Follow spacer with seawater until 775 barrels or 6150 strokes were pumped.

41 TRN-MDL-00600984. 42 MDL Ex. 1 at Appendix P; MDL Ex. 567. 43 The boost line is attached to the outside of the Marine Riser and enters the Marine Riser above the Blowout Preventer Stack. By pumping down the boost line with the boost pump, the upward fluid velocity in the Marine Riser can be increased. Boosting the fluid velocity in the Marine Riser can help carry the cuttings to the surface in this large diameter pipe. 44 The choke line and kill line are attached to the outside of the Marine riser and provide two high pressure fluid paths to or from the well when the blowout preventers are closed.

Page 58: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 58

At this point in the displacement, the spacer was intended to be above the upper annular in the blowout preventer with only seawater below the blowout preventer down to the planned cement plug depth of 8,367 feet. 45 The blowout preventer would then be closed to run the Negative Pressure Test.

Implementation of the procedure by the Transocean Rig Crew began at about 3:00 pm on April 20, 2010. An overview of the first part of the displacement is shown in Table 1.

ActivityEvent

No.Action Description Time

1Displaced boost line

mud to seawaterPump 1 used to displace boost line from 14-ppg mud to seawater. 15:03 - 15:15

2 Tested surface lines Pump 2 used to test the surface lines. 15:15 - 15:21

3Displaced choke line

mud to seawaterPump 2 used to displace choke line from 14-ppg mud to seawater. 15:21 - 15:38

4Displaced kill line mud to seawater

Pump 2 pumped used to displace kill line from 14-ppg mud to seawater. 15:38 - 15:55

5Pumped spacer

through drillpipe into well

Pumps 3 and 4 used to pump about 454 bbls of 16-ppg spacer from Pit 5 into the well displacing 14-ppg mud.

15:55 - 16:27

6Pumped seawater through drillpipe

into well

Pumps 3 and 4 used to pump 353 bbl of seawater behind the spacer to place the theoretical spacer/water interface above the BOP. Pumps are shut down.

16:27 - 16:53

Displaced mud from Booster,

Choke, and Kill lines

Displaced mud from

Drill pipe and Riser

Table 1 –Summary of Events during the Initial Displacement

Sperry-Sun Real Time Data indicated the following:

� 616 strokes of seawater was pumped (Boost Line), � 872 strokes of seawater was pumped (Surface line and Choke Line), � 845 strokes of seawater was pumped (Kill Line), � 3607 strokes were pumped down drill pipe from the tank containing the

spacer, � Pumping continued with seawater down drill pipe until total stroke count of

6408 (807 barrels) were pumped.

At this point, the pumps were stopped and the blowout preventer was closed to conduct the negative test.

45 Leo Lindner, a MI-Swaco Drilling Fluid Specialist testified that he had calculated that the spacer would be 17 feet above the Blowout Preventer. L. Lindner 9/14/11 Dep. Tr. at 271-72. See also MDL Ex. 1 at page 84, BP Deepwater Horizon Accident Investigation Report at 84 and Appendix Q (spacer calculated to be 12 feet above BOP).

Page 59: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 59

The intent of the procedure was to place the entire spacer above the upper annular in the blowout preventer. The actual position of the bottom of the spacer at the time pumping was stopped to do the negative pressure test cannot be accurately determined. If the spacer tank contained 454 barrels of spacer,46 the interface would be below the bottom of the blowout preventer. In addition, the pump pressure observed when pumping was stopped indicated that the effective height of the spacer was greater than expected for all of the spacer to be above the blowout preventer. I would expect mixing at the spacer seawater interface during the displacement because the spacer was almost twice the density of the water. Once pumping stopped, the rate of settling of solids from the spacer into the seawater below would have increased. Spacers are designed to separate fluids for circulating conditions and not for static conditions. In my opinion, the procedure followed did not place all of the spacer above the blowout preventer and spacer material was in and below the blowout preventer.

NEGATIVE PRESSURE TEST

A summary of the actions taken by the rig crew during the first Negative Pressure Test is shown in Table 2. A plot of data recorded in real time and transmitted to shore bases by the Sperry-Sun well monitors is shown in Figure 20.

The first action was to close the blowout preventer and bleed fluid from the drill pipe. The Transocean Rig crew conducting the negative pressure test should have expected the drill pipe pressure and choke line pressure to both bleed to zero after bleeding about 4 barrels of water from the drill pipe. Estimates of the initial amount of fluid bled back were in the range of 15 to 25 barrels and the pressure did not bleed to zero. This was an indication that the Negative Pressure Test had failed, but it also could be explained by fluid leaking past the closed blowout preventer. With some additional checking and bleeding, it was seen that the annular preventer was leaking and allowing fluid from above the blowout preventer to leak into the casing that was intended to contain only seawater. The leak was stopped by increasing the closing pressure to the annular in the blowout preventer. An estimate of the amount of fluid that was required to refill the casing was in the range of 50-65 barrels.47 This is an indication that the 50-65 barrels of seawater had been bled from the well before the leak was found. This would have moved additional spacer material down into the area where the choke line and kill line connect with the

46 The MI-Swaco Drilling Fluid Specialist testified that the volume of spacer in the tank was measured to be 454 bbl. L. Lindner 9/14/11 Dep. Tr. at 151, 268. 47 MDL Ex. 1 BP Deepwater Horizon Accident Investigation Report at 84; Macondo Well Incident Transocean Investigation Report, Vol. 1 at 96.

Page 60: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 60

well and substantially further down into the drill pipe casing annulus inside the narrower diameter production casing.

ActivityEvent

No.Action Description Time

7 Closed BOP The annular BOP is closed. 16:53 - 16:54

8 Bled drill pipeThe drill pipe is opened and an estimated 25 bbl of fluid are bled from the drill pipe, and the drill pipe pressure decreases to 1,250 psig. The drill pipe is then

closed. 16:54 - 16:57

9Opened subsea kill

valveThe subsea kill valve is opened. The drill pipe pressure increases to 1400 psig

and the kill line pressure decreases to 680 psig. 16:57 -16:58

10Bled drill pipe and

kill lineResume bleeding drill pipe and bleed kill line. The kill line pressure bleeds to 0

psig while the drill pipe pressure decreases to approximately 340 psig.16:58 - 16:59

11

Bled drill pipe; Fluid leaked through BOP;

Spacer moved downward

Continue bleeding drill pipe. The drill pipe pressure decreases to approximately 240 psig before increasing. Discovered fluid level in riser has fallen indicating

leak of annular BOP and downward movement of the spacer.16:59 - 17:05

12Closed drill pipe;

Annular BOP sealed

The drill pipe is closed and the drill pipe pressure increases rapidly to 830 psig, more slowly to 1,250 psig, and then decreases to 1,200 psig. Early in this period

the annular preventer is sealed preventing any further movement of 16 ppg spacer into BOP. Based on the volume used to refill the riser, approximately 50

bbl of spacer passed the BOP during the leak.

17:05 - 17:26

13 Bled drill pipe

The drill pipe is opened and approximately 15 bbl bled. Compressibility calculations indicate that only 3.5 bbl of the fluid bled can be attributed to liquid

expansion, suggesting an cement seal is leaking. The drill pipe pressure decreases to approximately 0 psig.

17:26 - 17:32

14 ~17:30

Crew conducts NPT on Drill pipe

Well becomes underbalanced to formation; hydrocarbons leak into well until pressure builds up to equalize with formation pore pressure.

Table 2 – Summary of Actions Taken during the First Negative Pressure Test

The Transocean rig crew was responsible for placing the fluids in the correct position and for maintenance of the blowout preventer. After refilling the well, it should have been obvious that the spacer was not correctly positioned for the planned negative test using the Kill Line. I would have expected that the situation would have been discussed with the MI-Swaco mud specialist and that allowance would have been made for mixing of seawater and spacer to have taken place while the leaking blowout preventer was being diagnosed and the well refilled. The well had been static so long, it is questionable that a valid 8.5 pound per gallon negative test at 8,367 feet could have been run using the Kill line without first displacing the well back to mud and starting over. Unfortunately, nothing to rectify the situation was done; there was no attempt to circulate the 65 barrels that was known to have leaked below the blowout preventer back to the correct position above it.

Page 61: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 61

Figure 20: Plot of Real Time Data Recorded during Negative Pressure Test

After stopping the leakage past the annular blowout preventer, the rig crew bled an additional approximately 15 barrels from the drill pipe to bring the pressure to zero. This was three times the volume that should have been required and should have caused the test to be interpreted as a failed test. The Well Site Leader decided to re-test using the kill line since the kill line was specified in the procedure approved by MMS (now BOEMRE).48

Table 3 shows a summary of the actions taken during the second Negative Pressure Test. After making the appropriate valve changes to line up for testing using the kill line, the kill line was bled to zero. Estimates of the volume bled were in the range of 3-15 barrels. The surface kill line valve was closed and the drill pipe pressure slowly increased to 1400 psi. This was a direct indication that the second negative test had also failed and that formation fluid was leaking past the cement seals into the well. The leak stopped after the pressure in the well became in balance with the formation pore pressure and the observed drill pipe pressure. This is indicated by the stabilized drill pipe pressure readings.

48 MDL Ex. 2236 (outlining temporary abandonment plan).

Page 62: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 62

ActivityEvent

No.Action Description Time

15Lined up to monitor

test with kill lineSystem lined up to perform negative pressure test on kill line. Pressure likely

had built-up on the drill pipe due to leakage past cement seals.17:32 - 17:52

16Bled drill pipe and

kill line

A valve is opened exposing a gauge to the drill pipe pressure. After rapidly increasing to 770 psig, the pressure is again bled off. Kill line is opened and

witnesses report that between 3 and 15 bbls of seawater flowed from the well, and that the flow spurted before being shut in.

17:52 - 18:00

17 ~18:00

18Closed drill pipe;

Opened kill subsea valve

The drill pipe is closed and the drill pipe pressure gradually increases to 1,200 psig. A slight pressure increase is recorded on the the kill line, suggesting the

subsea kill valve was opened. 18:00 - 18:35

19

Well potentially brought into

balance; Drill pipe pressure stabilizes

The drill pipe pressure increases to 1,400 psig and the kill line pressure increases to 140 psig, suggesting the well is in communication with the formation. The

drillpipe pressure becomes relatively stable at this value throughout the duration of the negative pressure test. This drillpipe pressure conicides with the

well near balance with the formations.

18:35 - 18:40

20Pumped down kill line; Bled kill line

Fluid is pumped into the kill line and the pressure spikes to 490 psig, suggesting the kill line was full. The kill line pressure is then bled off. A slight reduction in

the drill pipe pressure is noted on two occasions with no corresponding response on the kill line pressure. The kill line pressure increases while drill pipe pressure

decreases suggesting the columns of fluid in drill pipe and kill line equalized.

18:40 - 19:07

21 Bled Kill lineThe kill line valves at BOP and surface are opened and the pressure is bled off,

returning a small volume of liquid (0.2 bbl). At least 3 bbl of spacer in BOP is potentially drawn into 150 ft of kill line.

19:07 - 19:15

22 19:15 - 19:54 The negative test is conducted by monitoring the kill line for flow. The drill pipe is stable at 1,400 psig

and the kill line is open with no flow.

Crew conducts NPT

on Kill Line

Crew change time for certain individuals.

Table 3 – Summary of Actions Taken during the Second Negative Pressure Test

The Transocean Toolpushers and BP Well Site Leaders had considerable discussions in an effort to resolve the conflicting information. They appeared to be working together to reach a consensus as to the reason for the conflicting test data. Witness testimony49 indicated that the Toolpusher proposed that the drill pipe pressure was caused by a “bladder effect” that he had seen before. This explanation was accepted by everyone and a conclusion was reached that the Negative Pressure Test had passed, when in actuality it was not.

I find this misinterpretation by experienced people trained in well control extremely hard to understand. Figure 21 is a U-tube analogy that is always taught to be used to understand differences in surface pressures and how surface pressure is related to downhole pressure.50 In this case, if the well was configured as intended with seawater everywhere in the hydraulic path

49 See MDL Ex. 1 at pgs. 25 and 86; L. Lambert 5/9/11 Dep. Tr. at 245-46 (testifying regarding discussions about negative test); L. Lambert 5/10/11 Dep. Tr. at 444 (same). 50 Rig workers are taught in Well Control training to use a U-tube analogy where the drill pipe is one side of the U-Tube or manometer and the annular fluid path is the other side of the U-tube.

Page 63: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 63

between the surface drill pipe pressure and the surface kill line pressure, both the drill pipe pressure and the kill line pressure would have to be zero for the negative test pressure to be good.

As shown in Figure 18, the hydrostatic pressure computed at the top of the shoe joint using a surface mud weight of 14 pounds per gallon is 10,784 psi. Adding a stabilized surface drill pipe pressure of 1,400 psi to the hydrostatic pressure gives a pressure of 12,184 psi at the top of the shoe joint. This is equivalent to a 12.95 pressure gradient, which is close to the measured formation pore pressure. This calculation does not account for low density oil that may have occupied an unknown height above the Shoe Track. The effect of the oil would be to slightly lower the equivalent density calculated and make it even closer to the measured formation pore pressure. This calculation also does not account for the potential effect of the fluid column height of spacer below the blowout preventer, which could also impact the pressure reading.

The reason that the kill line did not flow during the 30 minute test cannot be completely resolved. It could have been caused by a sufficient effective height of spacer material51 on the kill line side of the U-tube, by a plugged kill line due to settling of barite and loss of circulation material, or a closed valve. We know that a pressure relief valve actuated later when trying to start pumping down the kill line. This could have been caused by a plugged kill line or a closed valve. There were other instances of pressure relief valve actuations reported in the drilling records.

If plugging did occur due to spacer, in my opinion, the plugging would be related more to the placement of the spacer than to the inclusion of loss circulation material in the spacer. Barite was by far the predominant solid in the spacer. A 16 pound per gallon spacer with no loss circulation material will contain about 30% barite by volume. The barite is about twice as dense as loss circulation material and would settle readily from a 16 pound per gallon mud that is mixing freely with seawater in a static condition. Barite is a good plugging agent and is sometimes intentionally used to plug off an underground blowout. If a 16 pound per gallon spacer had been used that had no loss circulation material included, placement of the spacer opposite the kill line prior to a negative test would have still been undesirable.

51 Some spacer material would have to be in the kill line and below the closed blowout preventer to have sufficient hydrostatic head.

Page 64: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 64

Figure 21: U-tube analogy for Negative Test being conducted (pressures equal)

WELL MONITORING FAILURE

The blowout preventer upper annular was opened after the negative test and the hydrostatic head of the mud and spacer above the preventer returned the well to an overbalanced condition in which the well could not flow. However, by proceeding with the displacement of mud from the riser, it was just a matter of time until the well began flowing again. Once the barrier of mud weight was removed, normal kick detection practices became extremely important. It was clearly the responsibility of the Transocean Rig Crew and the Sperry-Sun mud loggers to do so.

The Deepwater Horizon was a top of the line rig with approximately 20 mud tanks that could have been configured to properly monitor the well. This would have required organizing the active system52 so that the volume of mud returning from the well could always be compared to

52 Well monitoring systems allow the total volume in the mud tanks designated as included in the circulation system to be constantly monitored. The active system includes the tanks from which fluid is being pumped into the well and the tanks to which fluid is being returned from the well.

Page 65: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 65

the volume of the spacer or seawater being pumped into the well. Regulations, BP Policy, and Transocean policy require that the well be continually monitored. The well must be continually monitored even if you have a tested downhole barrier in addition to the hydrostatic pressure of the mud and especially when the hydrostatic pressure barrier is being intentionally removed.53

Mud to be offloaded to a boat should have been pumped from tanks that were isolated from the active system while offloading from those tanks. If this was not practical, then offloading should have been done through a flow meter so that off-loaded volumes could be tracked and included in the pit gain/pit loss determination.54 When pumping from the sea chest, the total pump strokes times the pump volume factor is an accurate measure of the volume pumped into the well and could have easily been included in the effective pit gain/pit loss calculation. The accuracy of volumes measured from pump strokes is second only to volumes measured in a metering tank.55

In addition to constantly monitoring the total volume removed from the well, the total rate of flow out of the well, less the total rate of flow into the well, should have been monitored. This is generally done by monitoring the total pump strokes per minute for flow into the well and flow meter readings for flow out of the well. When pumping overboard, the Sperry-Sun flow-out meter was bypassed. However, flow was passing through a second flow meter that was part of the rig sensor package.56 This meter should have been maintained in working order and flow should have been monitored at all times through this sensor. It is clear from the size of the kick taken that the overboard flow was not being monitored. If flow overboard could not be accurately monitored, the seawater should have been returned to tanks included in the active system. A full tank could be removed from the active system before dumping overboard.

Changes in pump pressure can also be used to detect an influx into the well, but normally the well is shut-in long before trends of changing pump pressure would be seen. Figure 22 is a plot

53 MDL Ex. 1761 (Sedco 711 Investigation Report) (TRN-MDL-00607583-621); MDL Ex. 2197 (email and report discussing Sedco 711 incident) (TRN-MDL-01288237-284); and TRN-INV-01128907-909 at ¶ 13 (discussing need to monitor well during displacement). 54 The pit gain/pit loss value is the total volume of fluid removed from the well minus the total volume of fluid pumped into the well. If this volume difference is positive, it is equal to the total volume of formation fluids that have entered the well. If it is negative, it is equal to the total loss of mud from the well into an underground or subsea leak. Alarms are generally set to alarm if the pit gain/pit loss is greater than 10 to 30 barrels. 55 A trip tank is a metering tank. Metering tanks are also included with cementing pumps. 56 Transocean’s report confirms that the second flow meter was capable of monitoring flow at this time. Macondo Well Incident, Transocean Investigation Report, Vol. 2, App. G. at pg. 106 (“data from the Hi-Tec flow sensor was still available to all personnel on the rig.”)

Page 66: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 66

of real time data taken when the first sign of a kick became evident on pump pressure. Several clear sign that the well was flowing are shown in this plot of the real time data.

Figure 22: Real Time Data Showing Kick Indications that were not detected

The failure of so many people to detect the flow of oil into the well until after it had passed through the blowout preventer stack at the seafloor is a human failure that is hard to understand. Big kicks are taken very seriously in industry practice. A failure to detect a pit gain of more than 50 barrels would be considered a major error that could require an internal investigation and a

Page 67: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 67

report to management.57 The pit gain was more than 600 barrels and the flow rate was very high on the Deepwater Horizon when the oil flow passed through the blowout preventers and began displacing the Marine Riser. When anomalous pressures were noticed, the rig crew began trying to diagnose the meaning of the kick indicators instead of immediately closing the blowout preventers. The failure to shut-in the well and investigate, as opposed to investigating before shut-in, is inconsistent with well control training and guidance.

Wyman Wheeler, a Transocean Toolpusher who was injured in the accident, indicated in answering questions about kick detection that the location of the line may have precluded visual observation of flow. He reportedly said, “you use to be able to visually see flow, but you couldn’t see it in this rig ... you had to trust the gauges.” He also indicated that the position of the return valve on the trip tank cannot be observed visually and that you can only see it on the computer.58

The diverter was closed but flow was not directed overboard away from the rig.59 Two diverter lines were available to always allow downwind diversion. The system should have been set-up for automatic routing to the overboard lines. In the early days of diverter design for bottom supported rigs, failures occurred because the diverter would sometimes be closed before the side valve was opened. This possibility was eliminated by designing systems that would automatically open the valve before closing the diverter. Concern for pollution was the likely cause for having the diverter lined up to flow to a mud gas separator. However, it would be relatively easy to have the overboard lines open up automatically above an appropriately low threshold pressure. When displacing mud with seawater from the top part of the well, I would have expected that the diverter would be lined up to go overboard before starting the displacement.

Answers to questions60 about the mud gas separator and diverter and Transocean Well Control Training manuals clearly showed that their policy was to divert overboard if a kick is taken that goes undetected and a significant gas volume enters the riser. It was also recognized in Transocean presentation material that I reviewed that the Marine Riser could unload quickly

57 I have served as an external reviewer for Diamond Offshore to review an event on one of their rigs when a 98 barrel kick was taken. This review was presented to upper management. 58 W. Wheeler interview notes, TRN-INV-00004991-97 at 95-97. 59 The Transocean Investigation Report (page 31) indicates that flow went to the mud gas separator at 9:45 p.m. The BP Investigation Report (pages 103-04,113) indicates this occurred at 9:41 p.m. 60 TRN-INV-01131807

Page 68: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 68

when gas begins breaking out of solution.61 The training material that I reviewed was appropriate and of a high quality. What may have been lacking were adequate emergency drills simulating high flow rate conditions. Training intensity for dangerous but very rare events is always hard to maintain. When an event does happen, the response has to be automatic. There might not be time to think about it.

61 See also MDL Ex. 2188 (Transocean Major Accident Hazard Risk Assessment for the Deepwater Horizon discussing gas in the riser) (TRN-MDL-01184580 at 588 and 777).

Page 69: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 69

APPENDIX A

STATEMENT OF COMPENSATION

� Adam T. Bourgoyne, Jr., Ph.D. P.E. $300 per hour

� Engineering support $108 per hour

� Computer Graphics Support $60 per hour

� Travel Reimbursed at cost

Page 70: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 70

APPENDIX B

LIST OF EXPERT DEPOSITION AND TRIAL TESTIMONY SINCE 2000

Petroleum Engineering Testimony before the Commissioner of Conservation, Office of Conservation, Louisiana Department of Natural Resources, Docket No. 04-102, January 27, 2004 regarding BolMex 3 Sand, Reservoir D, Broussard Field in Lafayette Parish.

Chevron Texaco vs. INTCO, Inc.; In the Matter of INTCO, Inc., as owner of the C-4 for Exoneration or Limitation of Liability; U.S.D.C. E.D.La. CA No. 00-2566; Retained by Michael Golemi of of Liskow and Lewis; Deposition Only

Marathon and Texaco vs. Transocean Offshore (U.K.) Inc., et al; U.S.D.C. E.D.La. CA No. 00-0760 c/w No. 00-2154, Sec. J, Mag. 2; Review of Claim of Lost Production from Platform due to rupture of Pipeline; Retained by Mr. Dan Picou and Ms Mary K. Denard of Larzelere, Picou, and Wells, L.L.C.; Deposition only.

Denbury Management, Inc. vs. Certain Underwriters; Retained by Charles Talley of Lemle Kelleher, LLP, New Orleans, Louisiana. Deposition only.

Basin Exploration, Inc. vs. BJ Services Company, USA, et al; Retained by Ken Klemm of Lemle Kelleher, LLP, New Orleans, Louisiana. Deposition only.

Mobil Exploration and Producing U. S. Inc. vs. Certain Underwriters; Retained by George H. Robinson with Liskow and Lewis of Lafayette, Louisiana and Mark Brosseau with Kerr Friedrich Brosseau Bartlett, LLC in Denver, Colorado regarding underground blowout and associated lost production; (Deposition in Lafayette, LA. in November, 1999 and trial testimony in Franklin, LA. during January, 2000).

NONE IN LAST FIVE YEARS

Page 71: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 71

APPENDIX C

RESUME OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. (LA # 15776)

President

Bourgoyne Enterprises, Inc.

Professor Emeritus of Petroleum Engineering

Louisiana State University (since 1999)

Member of Faculty of Petroleum Engineering

Louisiana State University (since 1971)

Registered Professional Engineer (Petroleum)

in Louisiana, No. 15776.

6006 Boone Drive

Baton Rouge, LA 70808-5005

Voice: 225 766 6536

Fax: 225 766 3779

Email: [email protected]

EDUCATION

Louisiana State University B. S. in Petroleum Engineering, Cum Laude, 1966 M. S. in Petroleum Engineering, 1967 Inducted into Engineering Hall of Distinction, 2006

University of Texas at Austin Ph.D. in Petroleum Engineering, 1969 Recognized as Distinguished Engineering Graduate, 2001

Page 72: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 72

ACADEMIC EXPERIENCE

Current Title: Professor Emeritus of Petroleum Engineering (Retired December, 1999)

Administrative Assignments:

Dean of the College of Engineering January, 1997 to January, 2000 Director of Petroleum Engineering Research and Technology Transfer Laboratory May 1987 – June 1990 Acting Dean of the College of Engineering December 1985 – May 1987 Chairman of Petroleum Engineering Department May 1977 – July 1983

INDUSTRIAL EXPERIENCE PRIOR TO ACADEMIC SERVICE

Continental Oil Company – Houston, TX (1969–70)

Senior Systems Engineer in Production Engineering Services Group working on computer applications in drilling and production. Work included drilling data acquisition, abnormal pressure detection, optimization of drilling hydraulics, optimization of bit weight and rotary speed, multiphase pipeline networks, design of submersible electric pump installations.

Continental Oil Research Laboratory – Ponca City, OK (Summer, 1968)

Performed experimental laboratory evaluation of new surfactant system for enhanced oil recovery

Chevron Oil Research Laboratory – La Habra, CA (Summer, 1967)

Reservoir Engineer assisting with reservoir simulation of fields in Saudi Arabia and development of new computer programs for analysis of drill-stem tests and well interference tests.

Texaco, Inc. – Morgan City, LA (Summer, 1966)

Assistant Drilling Engineer involved with well planning and drilling optimization for offshore area.

Mobil Oil Company – Morgan City, LA (Summer, 1965)

Page 73: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 73

Assistant Production Engineer involved with planning and economic justification of well workover operations on offshore platforms.

Mobil Oil Company – Cameron, LA (Summer, 1964)

Roustabout involved with installation of automation equipment on offshore production platforms.

Mobil Oil Company – Opelousas, LA (Summer, 1963)

Roustabout in field produced by gas cycling method.

RECENT CONSULTING ACTIVITIES

Pennington Oil and Gas Company Co. – 2001-present

Consultation on drilling, production, and reservoir engineering matters. Diamond Offshore Drilling, Incorporated - 2000-2003

Well Control training activities. Shell Offshore/DeepStar - 1997-1999

Computer simulations of deepwater well control operations. Wild Well Control, Inc. – 1993-2000

Computer simulations of alternative well control operations. Weatherford – 1993-2001

Research and development advisor for rotating control head applications

PROFESSIONAL SOCIETIES AND ACTIVITIES

Society of Petroleum Engineers (SPE) Chairman, Twenty-Five Year/Century Club Committee, 1996 Chairman, Drilling Engineering Award Selection Committee, 1996–98 Chairman, Reprint Series Committee, 1996-98 Board of Directors, 1984–87 Chairman, Manpower Committee, 1981–82 Education and Accreditation Committee, 1980–83 Pass Point Evaluation Committee for Professional Engineering Exam, 1996 Distinguished Lecturer, 1997

American Petroleum Institute Committee concerning the determination of formation pore pressures and fracture gradients

American Association of Drilling Engineers Charter Member, Houston Chapter

Page 74: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 74

Accreditation Board for Engineering and Technology (ABET) Adhoc committee, ABET, 1983-1990 Advisory committee, AIME Engineering Accreditation Commission Member, 1983–86

Minerals Management Service Conducted Annual Well Control Research Workshops, 1983-1999 Three U.S. Patents related to Well Drilling Sigma Xi Scientific Research Society, LSU Chapter OTA-US Congress (Advisor on Technology for Deep Water Oil and Gas Development, 1984–85)

National Bureau of Standards Chaired Workshop Panel on Use of Risk Analysis in Offshore Oil and Gas Operation, Gaithersburg, Maryland, March 1984

National Institute of Standards and Technology Chaired Workshop Session on Reliability of Offshore Operations, Gaithersburg, Maryland, March 20–22, 1991

International Association of Drilling Contractors (IADC) Chairman, Committee for Well Control Instructor Certification Standards Member of Steering Committee for development of IADC Deepwater Well Control Guidelines, 1998

International Well Control Symposium Chairman, Symposium co-sponsored by US Minerals Management Service, UK Department of Energy, American Association of Drilling Engineers, and International Association of Drilling Contractors, Baton Rouge, LA, Nov. 27–29, 1989.

American Association of Drilling Engineers Session Chairman, Deepwater Drilling Forum, Lafayette, LA, Feb. 15, 1990. Chairman, Technical Panel, Advanced Well Control Forum, New Orleans, LA, April 3, 1991.

The Oilman’s Editorial Advisory Board member, 1993-95

Elsevier Science Publishing Associate Editor, Journal of Petroleum Science and Engineering, 1989–1995.

LSU Workshop on Horizontal Drilling in Louisiana Chairman, New Orleans, LA, June 4–5, 1991.

American Filtration Society Session Chairman, Fall Meeting, Baton Rouge, October 29–30, 1990

Petroleum Engineer International

Page 75: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 75

Advisory Board, 1995-96 Technical Advice Working Group to Integrated Ocean Drilling Program

Chairman, 2000-2001

HONORARY SOCIETIES AND AWARDS

Distinguished Lecturer selected 1997 topic -- Well Control Aspects of Underbalanced Drilling

Foreign Member of the Russian Academy of Natural Sciences

elected 1996 Kapitsa Gold Medal of Honor (Russian)

citation - “For outstanding contributions to the field of drilling engineering” Society of Petroleum Engineers Distinguished Member

selected 1990 Charter Member of American Association of Drilling Engineers

selected 1989, No. 0159 Society of Petroleum Engineers Drilling Engineering Award

selected for 1988 citation – “For distinguished contributions to petroleum engineering in the area of drilling technology”

Pi Epsilon Tau National Petroleum Engineering Honor Society Diploma of Honor Selected 1988, citation – “For outstanding contributions to the petroleum industry”

Society of Petroleum Engineers Distinguished Achievement Award for Petroleum Engineering Faculty, selected 1981

Tau Beta Pi, member Pi Epsilon Tau, member Outstanding Alumnus of Redemptorist High School, selected 1989

Citation for Distinguished Service Louisiana House of Representatives, passed 2000

Distinguished Engineering Graduate of University of Texas at Austin, selected 2001

Albert Einstein Gold Medal of Honor US Section of Russian Academy of Natural Sciences, awarded 2002

Page 76: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 76

PUBLICATIONS

REFEREED ARTICLES

“Numerical Simulation of Drillstem Tests as an Interpretation Technique,” J.P. Brill, A.T. Bourgoyne, and T.N. Dixon, Journal of Petroleum Technology, (November 1969).

“The Effect of Interfacial Films on the Displacement Efficiency of a Waterflood,” Transactions, AIME (1971).

“A Multiple Regression Approach to Optimal Drilling and Abnormal Pressure Detection,” A.T. Bourgoyne and F.S. Young, Transactions, AIME (1974).

“Factors Affecting Bubble Rise Velocity of Gas Kicks,” D.W. Rader, A.T. Bourgoyne and R.E. Ward, Journal of Petroleum Technology (May 1975).

“A Feasibility Study on the Use of Subsea Chokes in Well Control Operations on Floating Drilling Vessels,” J.L. Mathews and A.T. Bourgoyne, Journal of Petroleum Technology (May 1982) and Transactions, Society of Petroleum Engineers, (1982).

“Frictional Pressure Losses for Single Phase and Two-Phase Flow of Drilling Muds,” F.A. Elfaghi, J.P. Langlinais, A.T. Bourgoyne, and W.R. Holden, Transactions of the ASME, (September 1983) Vol. 105, pp. 372–78.

“Petroleum Engineering Manpower Supply,” Journal of Petroleum Technology (March 1984) pp. 407–11.

“An Experimental Study of Well Control Procedures for Deepwater Drilling Operations,” A.T. Bourgoyne and W.R. Holden, Journal of Petroleum Technology, (July 1985) and Transactions, Society of Petroleum Engineers, (1985) pp. 1239–1250, also SPE Reprint Series, Vol. 42, March 1996, pp. 110–121.

“Frictional Pressure Losses for Annular Flow of Drilling Mud and Mud Gas Mixtures,” J.P. Langlinais, A.T. Bourgoyne and W.R. Holden, Transactions of the ASME (March 1985) Vol. 107, pp. 142–51.

“Manpower Supply - Analysis of Survey Data,” Journal of Petroleum Technology (March 1986) pp. 303–305.

“An Experimental Study of Gas Solubility in Oil-Based Drilling Fluids,” P.L. O’Bryan, A.T. Bourgoyne, T.G. Monger, and D.P. Kopsco, SPE Drilling Engineering (March 1988) pp. 33–42.

Page 77: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 77

“PDC Applications in the Gulf of Mexico with Water-Based Drilling Fluids,” A.D. Gault, H. Knowlton, H.E. Goodman and A.T. Bourgoyne, Jr., SPE Drilling Engineering, (June 1988) pp. 117–24.

“Fracture Gradient Prediction for Offshore Wells,” W.D. Constant and A.T. Bourgoyne, SPE Drilling Engineering, (June 1988) pp. 136–40.

“Methods for Handling Drilled Gas in Oil-Based Drilling Fluids,” P.L. O’Bryan and A.T. Bourgoyne, SPE Drilling Engineering, (September 1989), pp. 237–246.

“Shale Water as a Pressure Support Mechanism in Gas Reservoirs Having Abnormal Formation Pressure,” A.T. Bourgoyne, Journal of Petroleum Science and Engineering, Vol. 3, No. 4, (January 1990), pp. 305–319.

“Experimental Study of Gas Slip Velocity and Liquid Holdup in an Inclined Eccentric Annulus,” E.Y. Nakagawa and A.T. Bourgoyne, FED–Vol. 144, ASME, (November 1992), pp. 71–80.

“How to Handle a Gas Kick Moving Up a Shut-In Well,” J.E. Mathews and A.T. Bourgoyne, Jr., SPE Reprint Series, Vol. 42, (March 1996), pp. 22–28.

“Method for Determining the Feasibility of Dynamic Kill of Shallow Gas Flows,” W. L. Koederitz, F. E. Beck, J. P. Langlinais, and A.T. Bourgoyne, Jr., SPE Reprint Series, Vol. 42, (March 1996), pp. 66–77.

“Recognizing Downhole Casing Failure During Well Control Operations,” A.T. Bourgoyne, Jr., SPE Reprint Series, Vol. 42, (March 1996), pp. 202–206.

“A New Simple Method to Estimate Fracture Pressure Gradient,” L.A. Rocha and A.T. Bourgoyne, Jr., SPE Drilling and Completion, (September 1996), pp. 153–159.

“Use of Soil Borings Data for Estimating Break-down Pressure of Shallow Marine Sediments,” C.V. Bender, A.T. Bourgoyne, Jr. and J.N. Suhayda, Journal of Petroleum Engineering, Vol. 14, (1996), pp. 101–114.

“Failure of Wellbores During Well Control Operations,” M. E. Chenevert, A. T. Bourgoyne, Jr. and C. F. H. Fonseca, Turkish Journal of Oil and Gas, Vol. 3 (June 1997) p 22.

“A Computer Assisted Well Control Safety System for Deep Ocean Well Control,” O. A. Kelly, W. R. Holden, and A. T. Bourgoyne, Jr., Turkish Journal of Oil and Gas, Vol. 3 (June 1997) p 30.

Page 78: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 78

“Experimental Study of Gas Slip Velocity and Liquid Holdup in an Inclined Eccentric Annulus,” Nagakawa, E. Y. and A. T. Bourgoyne, Jr., Turkish Journal of Oil and Gas, Vol. 3 (October 1997) p 22.

“An Analysis of the Design Loads placed on a Well by a Diverter System,” Beck, F. E. and J. P. Langlinais and A. T. Bourgoyne, Jr., Trans. ASME, Vol. 120 (March 1998).

“An Analysis of the Design Loads placed on a Well by a Diverter System,” Beck, F. E. and J. P. Langlinais and A. T. Bourgoyne, Jr., Journal of Energy Resource Technology (June 1998).

“Co-current and Countercurrent Migration of Gas Kicks in ‘Horizontal’ Wells,” Baca, H., Nikitopoulos, J. Smith, and A.T. Bourgoyne, Jr., Trans. ASME, Vol. 121 (June 1999) p 96.

“New Model to Analyze Non-Linear Leak-off Test Behavior,” Altun, G. and E. Shirman, J. P. Langlinais, and A. T. Bourgoyne, Jr., accepted for publication by JERC.

BOOKS AND CHAPTERS

“Drilling Practices,” A Chapter in Encyclopedia of Chemical Processing and Design, Vol. 16, Edited by John J. Mcketta and William A. Cunningham, Marcel Dekker, Inc. New York 10016 (1982), pp 359– 394.

Applied Drilling Engineering, A.T. Bourgoyne, K.H. Milheim, M.E. Chenevert, and F.S. Young, Society of Petroleum Engineers of AIME, Dallas, TX (SPE Textbook Series Vol. 2) (1986), 502 pages.

“Shallow Abnormal Pressure Hazards,” Chapter 10 in Studies in Abnormal Pressure, Edited by W.H. Fertl, Richard Chapman, and Rod F. Hotz, Elsevier Scientific Publishing Co., New York, (1994), pp. 281– 317.

“Shallow Gas Blowouts”, Bourgoyne, A. T. Zwald, E. A., and Abel, L. W., Chapter 4 in Firefighting and Blowout Control, by L. William Abel, Joe R. Bowden, Sr., and Patrick J. Campbell, Wild Well Control, Inc., Houston, TX (1994), pp 83–121.

TRADE JOURNALS

“Graphs Simplify Drilling Hydraulics,” World Oil, (January 1969).

Page 79: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 79

“Computer Graphics Improve Drilling Hydraulics,” A.T. Bourgoyne and R.E. McKee, Petroleum Engineer, (September 1970).

“Porosity and Pore Pressure Logs,” A.T. Bourgoyne, J.A. Rizer and G.M. Myers, The Drilling Contractor, (June 1971).

“A Graphic Approach to Overpressure Detection While Drilling,” Petroleum Engineer, (September 1971).

“Graphic Approach to Kick Severity Calculations,” Petroleum Engineer, (September 1976).

“Well Control Procedures for Deepwater Drilling - Part 1,” A.T. Bourgoyne, W.R. Holden, B.R. Hise and R.S. Sullins, Ocean Resources Engineering (April 1978).

“Well Control Procedures for Deepwater Drilling - Part 2: Control of Shallow Kicks,” A.T. Bourgoyne, W.R. Holden, B.R. Hise, and R.S. Sullins, Ocean Resources Engineering, (October 1978).

“Well Control Procedures for Deepwater Drilling - Part 3: Initiation of Well Control Operations,” A.T. Bourgoyne, W.R. Holden, B.R. Hise and R.S. Sullins, Ocean Resources Engineering, (December 1978).

“University Uses On-Campus Abandoned Well to Simulate Deep Water Well Control Operations,” Oil& Gas Journal, (May 31,1982), pp. 138–141.

“Bubble Chopping— A New Way to Control Large, Deep Gas Kicks,” World Oil, (December 1984) pp. 75–82.

“Changing Drilling Technology— What Three Experts Say,” J. Smith, D. Hammet, and A.T. Bourgoyne, Petroleum Engineer International (September 1985).

“Integration of MWD & Well Control Technologies,” A.T. Bourgoyne and R. Desbrandes, Offshore (September 1986) pp. 49–52.

“MWD Transmission Data Rates Can Be Optimized,” R. Desbrandes, A.T. Bourgoyne, and J.A. Carter, Petroleum Engineer International (June 1987) pp. 46–52.

“Identifying Crater Potential Improves Shallow Gas Kick Control,” L.A. Rocha and A.T. Bourgoyne, Oil & Gas Journal, (December 27, 1993) pp 93–98.

“Rotating Control Head Applications Increasing,” A.T. Bourgoyne, Oil & Gas Journal, (October 9, 1995), pp. 72–77.

“Annual Editorial Advisor’s Section: Current Issues in Well Control,” A.T. Bourgoyne, Petroleum Engineer International, (February 1996), pp. 27–28.

Page 80: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 80

“New Ideas for Shallow Gas Well Control,” A.T. Bourgoyne, O.A. Kelly, and C.L. Sandoz, World Oil, (June 1996), pp. 50–51.

“New Model Rotating Control Head Tested,” A.T. Bourgoyne, Jr., The Brief, Murphy Publishing, Inc., (October 1996), pp. 25–27.

“Applications and Limitations of Underbalanced Drilling and Completion Technology”, Oil and Gas Reporter (April, 2000).

“Case Histories bring Reality to Well Control Training,” J.R. Smith, A. T. Bourgoyne, Jr., S. M. Waly, and E.B. Hoff, World Oil, (June 2000), Vol. 221 No. 8, p 39-46.

CONFERENCE PROCEEDINGS

“A Critical Examination of Rotary Drilling Hydraulics,” Proceedings of Second SPE Conference on Drilling and Rock Mechanics; Austin, TX (January 1968).

“The Determination of Porosity and Pore Pressure Logs from Drilling Data,” A.T. Bourgoyne, J.A. Rizer, and G.M. Myers, Transactions of the Ninth Annual AAODC Rotary Drilling Conference, Houston, TX (February 1971) pp. 15–22.

“The Use of Drillability Logs for Formation Evaluation and Abnormal Pressure Detection,” A.T. Bourgoyne and F.S. Young, Proceedings of SPWLA Fourteenth Annual Logging Symposium; Lafayette, LA (May 1973).

“A University View of the Status and Future of Petroleum Engineering Education,” Proceedings of the First Annual Engineering Manpower Conference of SPE; Houston, TX (June 1978).

“The Dynamics of Well Control,” Proceedings of the Second Research and Development Conference for OCS Oil and Gas Operations; Reston, VA (April 1980).

“Development of Improved Blowout Prevention Procedures for Deepwater Drilling Operations,” Proceedings of the Third Research and Development Conference for OCS Oil and Gas Operations: Reston, VA (November 1981).

“Risk Analysis in Design, Operation, and Maintenance of Offshore Oil and Gas Facilities,” International Workshop on the Application of Risk Analysis to Offshore Oil and Gas Operations, National Bureau of Standards, Gaithersburg, Maryland (March 1984).

Page 81: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 81

“Development of Improved Blowout Prevention Procedures for Deepwater Drilling Operations,” Proceedings of the Fourth Research and Development Conference for OCS Oil and Gas Operations, Reston, VA (March 1984) pp. 275–86.

“Improved Gas Diverter Systems,” Proceedings of the Fifth Annual Gulf of Mexico Information Transfer Meeting, US Department of Interior, New Orleans, LA (October 1985) pp. 29–30.

“Experimental Study of Diverters,” Proceedings of the Fifth Research and Development Conference for OCS Oil and Gas Operations, Reston, VA (1986) pp. 175–82.

“An Experimental Study of Fluidic Mud Pulser,” Proceedings of the Fifth Research and Development Conference for Oil and Gas Operations, Reston, VA (1986) pp. 183–191.

“Technological Developments for Improved Well-Control Procedures,” Proceedings for the Fifth Research and Development Conference for Oil and Gas Operations, Reston, VA (1986) pp. 192–199.

“Petroleum Engineering Manpower Supply - Results of the 1986 Survey,” Proceedings of the Annual Fall Meeting of SPE, New Orleans, LA (October 1986) SPE 15459.

“Experimental and Theoretical Considerations for Diverter Evaluation and Design,” F.E. Beck, J.P. Langlinais, and A.T. Bourgoyne, Proceedings of the 56th California Regional Meeting of SPE, Oakland, CA (April 1986) SPE 15111.

“An Analysis of the Design Loads Placed on a Well by a Diverter System,” F.E. Beck, J.P. Langlinais, and A.T. Bourgoyne, Proceedings of the 1987 SPE/IADC Rotary Drilling Conference, New Orleans, LA (March 1987) SPE/IADC 16129.

“Petroleum Engineering Manpower Supply - Results of the 1987 Survey,” Proceedings of the Annual Fall Meeting of SPE, Dallas, TX (September 1987) SPE 16834.

“Joint Industry/Government/University Programs of Research and Development,” Proceedings of the Annual Fall Meeting of SPE, Dallas, TX (September 1987) SPE 16825.

“Petroleum Engineering Manpower Supply - Results of the 1988 Survey,” A.T. Bourgoyne, Proceedings of the Annual Fall Meeting of SPE, Houston, TX (October 2–5, 1988) SPE 18336.

“Generation, Migration, and Transportation of Gas Contaminated Regions of Drilling Fluid,” A.T. Bourgoyne and V. Casariego, Proceedings of the Annual Fall Meeting of SPE, Houston, TX (October 2–5, 1988) SPE 18020.

Page 82: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 82

“Experimental Study of Erosion of Diverter Systems Due to Sand Production,” A.T. Bourgoyne, Proceedings of the 1989 SPE/IADC Rotary Drilling Conference, New Orleans, LA (February 28–March 3, 1989) SPE/IADC 18716, pp. 807-816.

“Experimental Study of Diverter Systems Used in Offshore Drilling Operations,” A.T. Bourgoyne, Proceedings of the 1988 Technology Assessment and Research Program for Offshore Minerals Operations, OCS Study MMS 88-0057, U.S. Department of Interior (April 6–7, 1989) pp. 6-10.

“A Microcomputer Aided Experimental Gas Reservoir Simulator for Well-Control Operations,” A.T. Bourgoyne, SPE Petroleum Computer Conference: Technology for the 90’s Efficiency, Productivity, Applications, (June 26, 1989).

“Experimental Bench Mark Data for Testing Well Control Computer Models,” V. Casariego and A.T. Bourgoyne, Jr., International Well Control Symposium, (November 27–29, 1989).

“Blowout Prevention in Deepwater Drilling,” A.T. Bourgoyne, Jr., Proceedings of the 11th Annual Information Transfer Meeting, Gulf of Mexico (OCS) Region, (November 13–15, 1990), New Orleans, LA.

“General Computerized Well Control Kill Sheet for Drilling Operations with Graphic Display Capabilities,” H.C. Leitao, E.E. Maidla, and A.T. Bourgoyne, Proceedings of SPE Computer Conference, Denver, CO (June 25–26, 1990), SPE 20327.

“Reliability of Offshore Drilling Operations,” A.T. Bourgoyne, G.L. Lever, and B. Berry, Proceedings of the International Workshop on Reliability of Offshore Operations, National Bureau of Standards and Technology, Gaithersburg, Maryland (March 20–22, 1991).

“Computerized Kill Sheet for Most Drilling Operations,” H.C. Leitao, E.E. Maidla, O.A. Santos, F.A. Notto, and A.T. Bourgoyne, Proceedings of the 1992 IADC/SPE Drilling Conference, New Orleans, LA (February 18–21, 1992) (IADC/SPE 23933).

“Improved Method of Predicting Wellhead Pressure During Diverter Operations,” A.T. Bourgoyne, Proceedings of IADC's Third Annual European Well Control Conference, Noordwijkerhout, The Netherlands (June 2–4, 1992).

“A Spreadsheet Approach to Diverter Design Calculations,” A.T. Bourgoyne, Proceedings of the IADC Well Control Conference of the Americas, Houston, TX (November 17–19, 1992).

Page 83: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 83

“General Access Well Information Database,” A.T. Bourgoyne, V.K. Sinha and L.A. Rocha, Proceedings of the SPE Petroleum Computer Conference, Dallas, TX, (July 31-August 3, 1994) (SPE 28232).

“Advanced Control System Developed for Well Control Operations,” O.A. Kelly and A.T. Bourgoyne, Proceedings of the IADC Well Control Conference of the Americas, Houston, TX (November 16–17, 1994).

“Integration of MWD and Process Control Technology Into an Advanced Well Control System,” O.A. Kelly and A.T. Bourgoyne, Proceedings of the IADC Well Control Conference of the Americas, Houston, TX, (November 16–17, 1994).

“Experimental Study of Erosion Resistant Materials for Use in Diverter Components,” A. Jain and A.T. Bourgoyne, SPE International Student Paper, Proceedings of the SPE Annual Technical Conference and Exhibition, Dallas, TX, (October 22–25, 1995).

“Well Control Aspects of Underbalanced Drilling,” A.T. Bourgoyne, IADC Well Control Training Roundtable, Plano, TX, (April 2, 1996).

“Manpower Trends in the Petroleum Industry,” presented to the Gulf Coast Section of the Society of Petroleum Engineers, Houston, TX, (May 9, 1996).

“A Method for Planning Well Control Operations Involving an Induced Fracture,” A. F. Negrao and A. T. Bourgoyne, Jr., proceedings of the ASME Petroleum Division Conference, Houston, TX, (1996).

“New Developments in Computer Modeling of Blowout Control Operations,” A. T. Bourgoyne, D. Barnett, and D. Eby, proceedings of the IADC Well Control Conference of the Americas, Rio de Janeiro, Brazil, (July 31-August 2, 1996).

“Feasibility Study of Dual Density Mud System for Deepwater Drilling Operations,” C. A. Lopes and A. T. Bourgoyne, Jr., proceedings of the Offshore Technology Conference, Houston, TX, (May 5-8, 1997).

“Well Control Considerations for Deepwater Drilling Operations,” A. T. Bourgoyne, Jr., proceedings of the IBC Deepwater Technologies Conference, Houston, TX, (July 28-29, 1997).

“Computer-Assisted Well Control System for Deep Ocean Drilling Environments,” O. A. Kelly and A. T. Bourgoyne, Jr., proceedings of the IADC International Deep Water Well Control Conference, (September 15-16, 1997).

Page 84: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 84

“Case History-Based Training for Control and Prevention of Underground Blowouts,” J. R. Smith and A. T. Bourgoyne, Jr., proceedings of the SPE Annual Technical Conference and Exhibition, San Antonio, TX, (October 5 - 8, 1997).

“Well Control Considerations for Underbalanced Drilling,” A. T. Bourgoyne, Jr., proceedings of the SPE Annual Technical Conference and Exhibition, San Antonio, TX, (October 5 - 8, 1997).

“A Relief Well Model for Deep Water Drilling and Production Systems,” Bourgoyne, A. T. Jr. and D. Barnett and D. Eby, proceedings of the IADC Well Control Conference, Houston, August 26-27, 1998.

“A Subsea Rotating Control Head for Riserless Drilling Applications,” Bourgoyne, D. A. and Bourgoyne, A. T. Jr and D. Hannegan, proceedings of the IADC Well Control Conference, Houston, August 26-27, 1998.

“Circulating Kick Tolerance for Deepwater Drilling,” Ohara, S. and A. T. Bourgoyne, Jr., proceedings of the IADC Well Control Conference of the Americas, Caracas, October 29-30, 1998.

“Sustained Casing Pressure in Offshore Producing Wells,” OTC 11029, Bourgoyne, Adam T., Jr., Stuart L. Scott, and James B. Regg, presented at the Offshore Technology Conference, Houston, 3–6 May 1999.

“Case Histories Bring Reality to Well Control Training,” Smith, J.R., Bourgoyne, A. T., Waly, S.M., and Hoff, E.B., IADC Well Control Conference of the Americas ,Houston, TX, August 25-26, 1999.

“Deepwater Drilling with Lightweight Fluids: Essential Equipment Required,” D.M. Hannegan and A. T. Bourgoyne, Jr., World Oil, March 2001.

“Counter-current and Co-current Gas Kicks in Horizontal Wells: Non-Newtonian Rheology Effects,” H. Baca, D.E. Nikitopoulos, J.R. Smith, and A.T. Bourgoyne, Proceedings of ETCE/OMAE2000 Joint Conference, (February 14-17, 2000), New Orleans, LA. Paper No. ETCE2000/DRIL-10117.

COURSES TAUGHT

UNDERGRADUATE COURSES

CS 1241 FORTRAN Programming PETE 2020 Introduction to Petroleum Engineering

Page 85: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 85

PETE 3025 Petroleum Economics PETE 3031 Reservoir Fluid Flow PETE 3032 Phase Behavior of Hydrocarbon Systems PETE 3033 Petrophysics Laboratory PETE 3034 Phase Behavior Laboratory PETE 3990 Undergraduate Special Projects PETE 4045 Drilling Engineering PETE 4046 Well Design—Production PETE 4051 Reservoir Engineering PETE 4059 Drilling Fluids Laboratory PETE 4060 Prevention of Oil and Gas Well Blowouts PETE 4086 Advanced Drilling Engineering

GRADUATE COURSES

PETE 7201 Advanced Reservoir Engineering PETE 7241 Horizontal Well Technology PETE 7242 Risk Analysis in making Economic Decisions in the Petroleum Industry PETE 7256 Special Problems in Petroleum Engineering PETE 7280 Reservoir Simulation

EXTENSION COURSES

PETE 4045 Drilling Engineering, USGS Office, Metairie, LA 1979–80 PETE 7241 Horizontal Drilling, UNO Downtown Center, New Orleans, LA 1996

SHORT COURSES

Well Control Training leading to MMS Certification, 1971-1998 Well Completion Short Courses and Drilling Engineering Practicum, 1978-1980 Hydraulic Fracturing School, Rock Mechanics Section, 1996

RESEARCH DIRECTED

GRANTS AND CONTRACTS

“A Multiple Regression Approach to Optimal Drilling and Abnormal Pressure Detection,” Bariod Division of N.L. Industries, Inc., $11,649, 1972–73.

“The Determination of Abnormal Formation Pressure Using a Computerized Mathematical Model of the Rotary Drilling Process,” Bariod Division of N.L. Industries, Inc., $9,200, 1973–74.

Page 86: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 86

“Experimental Research on New Surfactant Placement Techniques for Enhanced Recovery of Petroleum by Water Displacement,” O.K. Kimbler, A.T. Bourgoyne, Jr., and W.R. Whitehead, $28,000, 1976–77.

“Development of Improved Laboratory and Field Procedures for Determining the Carrying Capacity of Drilling Fluids,” Milchem, Inc., $12,072.

“Investigation of Enhanced Oil Recovery Through Use of Carbon Dioxide,” W.R. Whitehead, O.K. Kimbler, W.R. Holden, and A.T. Bourgoyne, Jr., U.S. Department of Energy, $161,120, 1978–79.

“Technical Support for Geopressured Well Activities in Louisiana,” Z. Bassiouni, W.J. Bernard, and A.T. Bourgoyne, $85,500, 1978–79.

“Development of Improved Blowout Prevention Procedures to be Used in Deepwater Drilling Operations,” A.T. Bourgoyne, Jr., W.R. Holden, and B.R. Hise, U.S. Department of the Interior, $822,962, 1978–82.

“A Proposal for the Expansion of the LSU-IADC Blowout Prevention Training Center,” Various companies in petroleum industry, $2,000,000, 1980–82.

“A Feasibility Study of the Integration of Measurements While Drilling (MWD) Technology and Well Control Technology,” A.T. Bourgoyne, Jr., and W.R. Holden, U.S. Minerals Management Service, $90,000, 1983.

“The Development of Improved Blowout Prevention Systems for Offshore Drilling Operations,” A.T. Bourgoyne, Jr., W.R. Holden, and J.P. Langlinais, U.S. Minerals Management Service, $1,800,000, 1983–88.

“Well Control Problems Associated with Gas Solubility in Oil-Base Muds,” Drilling Engineering Association Project 4, $160,000, 1984–87.

“Field Analysis of Well Control,” Drilling Engineering Association, Project 7, $1,061,505, 1986–88.

“Fluid Dynamics of Oil Storage and Production Cycles in the Weeks Island Strategic Petroleum Reserve,” A.T. Bourgoyne, Jr., S. Acharya and A. Wojtanowicz, Sandia Laboratories, $50,000, 1988–89.

“Improved Contingency Procedures for Complications Arising During Offshore Blowout Prevention Operations,” Minerals Management Service, $950,000, 1988–94.

“Use of Vector Processor for Locating Large Area of Bypassed Oil,” with Moore and Tyler, Louisiana Education Quality Support Fund, $322,000, 1988–90.

Page 87: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 87

“Memorandum of Understanding - Annex I (Bypassed Oil Study),” A.T. Bourgoyne, Jr., C.A. Groat, R. Sassen, and B. Baumann, U.S. DOE, $750,000, 1989–90.

“Improved Procedures for Handling Underground Blowouts in a Marine Environment,” Minerals Management Service, A.T. Bourgoyne, Jr., A. Wojtanowicz, and O.A. Kelly, $1,600,000, 1994–99.

“Improved Methods for Selecting Kick Tolerance During Deepwater Drilling Operations,” A.T. Bourgoyne, Jr. and O.A. Kelly, Petrobras, $99,215, 1994–96.

“Improved Recovery from Gulf of Mexico Reservoirs,” Z. Bassiouni, A.T. Bourgoyne, Jr. and C. Kimbrell, DOE, $950,000, 1995–96.

THESES DIRECTED

Mannarino, Remo: “The Effects of Sealing and Non-Sealing Faults on Pressure Build-Up and Pressure Draw-down Analysis” (August, 1971).

Lavaquial, Fernando P.: “Water Influx Into Petroleum Reservoirs from Adjacent Shales” (August, 1971).

Rader, David W.: “Movement of Gas Slugs Through Newtonian and Non-Newtonian Liquids in Vertical Annuli” (May, 1973).

Simmons, Richard D.: “A Comparison of Horizontal Multiphase Flow Pressure Loss Correlations” (May, 1973).

McKenzie, Michael F.: “Factors Affecting Surface Casing Pressure During Well Control Operations,” (August, 1974).

Ward, Robert H.: “Movement of Gas Slugs Through Static Liquids in Large Diameter Annuli,” (August, 1974).

Koederitz, W.L.: “The Mechanics of Large Bubbles Rising in an Annulus,” (May, 1976).

Mathews, Gerald L.: “A Microscopic Investigation of the Use of Preferentially Oil Soluble Surface Active Agents to Enhance Oil Recovery,” (May, 1977).

Ofoh, EberePaulinus: “The Effect of Flood Rate on Displacement Efficiency When Using Oil Soluble Surface Active Agents to Enhance Oil Recovery,” (May, 1978).

Sample, Kenneth John: “Development of Improved Procedures for Determining the Carrying Capacity of Drilling Fluids,” (August, 1978).

Bizanti, Mohamed: “New Bit Designs for Reducing Bottom Hole Pressure While Drilling,” (December, 1978).

Page 88: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 88

Mathews, Jeffrey L.: “Upward Migration of Gas Kicks in a Shut-in Well,” (May, 1980).

Casariego, Vicente G.: “Experimental Study of Two Phase Flow Patterns Occurring in a Well During Pressure Control Operations,” (May, 1981).

Redmann, Kerry P.: “Flow Characteristics of Commercially Available Drilling Chokes Used in Well Control Operations,” (May, 1982).

McFadden, Peter G.: “The Pressure Behavior of a Shut-in Well Due to the Upward Migration of a Gas Kick,” (December, 1984).

O’Bryan, Patrick L.: “Experimental and Theoretical Study of Methane Solubility in an Oil-Base Drilling Fluid,” (December, 1985).

Johnson, Paul: “Experimental Study of Erosion in a Model Diverter System" (December, 1987).

Bourgeois, Steve, "The Evaluation of a Horizontal Well Completion for Recovery of Bypassed Oil in a South Louisiana Bottom Water Drive Reservoir,” (May, 1989).

Cooke, M. Scott, “Reservoir Study of the Lafitte Field in South Louisiana,” (December, 1990).

Hebert, Lance, “An Experimental Study of Water Coning in Horizontal Wellbores,” (May, 1990).

Rocha, Luiz Alberto Santos, “A Critical Analysis of Petrobras Data System,” (December, 1991).

Ghosh, Biswajit, “Experimental Study of Erosion in a Fluidic Vortex Valve,” (January 1992).

Mendes, Pedro Paulo Melo, “Two Phase Flow in a Vertical and Inclined Eccentric Annulus,” (January, 1992).

Gautam, Anurag, “Effect of Cell Geometry on Pulser Performance for MWD Applications,” (December, 1992).

Franklin, Bernard, “Effect of Produced Gas-Water Ratio on Erosion Rate in a Diverter,” (August, 1993).

Wang, Y.: “Gas Slip Velocity through Water and Non-Newtonian Liquids in Vertical and Inclined Eccentric Annuli.” M.S. Thesis, LSU, Baton Rouge, LA. (Dec. 1993).

Jain, Alok, “Experimental Study of Erosion Resistant Materials for Use in Diverter Components,” (May, 1995).

Page 89: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 89

Smith, John Rogers, “Drilling Overpressured Shales with PDC Bits,” (December, 1995).

DISSERTATIONS DIRECTED

Almedia, Mauricio de A.: “Computer-Aided Analysis of Formation Pressure Integrity Tests Used in Oil Well Drilling” (December, 1986).

Casariego, Vicente G.: “Generation, Migration, and Transportation of Gas Contaminated Regions of Drilling Fluid” (December, 1987).

Santos, Otto Luiz A., “A Dynamic Model of Diverter Operations for Handling Shallow Gas Hazards in Oil and Gas Exploratory Drilling,” (May, 1989).

Nakagawa, Edson, “Gas Kick Behavior During Well Control Operations in Vertical and Slanted Wells,” (November 1990).

Rocha, Luiz, “Mechanisms leading to Crater formation while Drilling for Oil and Gas,” (December 1993).

Negrao, Alvero “Relief Well Requirements for Dynamic Kill of Underground Blowouts,” (May 1995).

Koederitz, W.: “Gas Kick Behavior during Bullheading Operations in Vertical Wells,” (May 1995).

Ohara, Shiniti, “Experimental Study of Plugging Techniques for Underground Blowouts,” (May 1996).

Kelly, O. Allen, “Development of a Prototype Computer-Assisted Well Control System for Deep Ocean Drilling Environments,” (May 1997).

Lopes, Clovis, “Feasibility Study on the Reduction of Hydrostatic Pressure in a Deep Water Riser Using a Gas-Lift Method,” (May 1997).

Smith, John Rogers, “Diagnosis of Poor PDC Bit Performance in Deep Shales,” (August 1998).

Gursat, Altun, “Methods for Determining Fracture Resistance of Upper Marine Sediments,” (May, 1999).

Page 90: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

EXPERT REPORT OF ADAM T. (TED) BOURGOYNE, JR., PH.D., P.E. PAGE 90

APPENDIX D

MATERIALS CONSIDERED AS OF OCTOBER 17, 2011 IN SUPPORT OF EXPERT REPORT AND OPINIONS

Page 91: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nB

P-H

ZN-2

179M

DL0

0079

413

BP-

HZN

-217

9MD

L000

7941

3M

acon

do S

hallo

w H

azar

d A

sses

smen

t - C

D o

f dat

a an

d fil

esB

P-H

ZN-S

NR

0000

0001

BP-

HZN

-BLY

0004

5778

BP-

HZN

-BLY

0004

5778

Mac

ondo

BP

Surf

ace

Para

met

ers R

T (4

.22.

2010

)B

P-H

ZN-B

LY00

0438

62B

P-H

ZN-B

LY00

0438

62M

acon

do B

P Su

rfac

e Pa

ram

eter

s Tim

e R

T Lo

gB

P-H

ZN-B

LY00

0438

68B

P-H

ZN-B

LY00

0438

68M

acon

do B

P Pi

ts (4

/21/

2010

)B

P-H

ZN-2

179M

DL0

0079

414

BP-

HZN

-217

9MD

L000

7941

4H

allib

urto

n W

ell a

nd M

udlo

ggin

g D

ata

- CD

of d

ata

and

files

BP-

HZN

-SN

R00

0000

02B

P-H

ZN-2

179M

DL0

0079

415

BP-

HZN

-217

9MD

L000

7941

5H

allib

urto

n M

WD

/LW

D D

ata

- CD

of d

ata

and

files

BP-

HZN

-SN

R00

0000

03B

P-H

ZN-2

179M

DL0

0079

416

BP-

HZN

-217

9MD

L000

7941

6H

allib

urto

n W

ell a

nd M

udlo

ggin

g D

ata

- CD

of d

ata

and

files

BP-

HZN

-SN

R00

0000

04B

P-H

ZN-2

179M

DL0

0079

417

BP-

HZN

-217

9MD

L000

7941

7H

allib

urto

n M

WD

/LW

D D

ata

- CD

of d

ata

and

files

BP-

HZN

-SN

R00

0000

05B

P-H

ZN-2

179M

DL0

0079

418

BP-

HZN

-217

9MD

L000

7941

8H

allib

urto

n W

ell a

nd M

udlo

ggin

g D

ata

- CD

of d

ata

and

files

BP-

HZN

-SN

R00

0000

06B

P-H

ZN-2

179M

DL0

0079

419

BP-

HZN

-217

9MD

L000

7941

9Sc

hlum

berg

er -

MD

T R

epor

t - C

D o

f dat

a an

d fil

esB

P-H

ZN-S

NR

0000

0007

BP-

HZN

-217

9MD

L000

7942

0B

P-H

ZN-2

179M

DL0

0079

420

Schl

umbe

rger

- D

LIS,

LIS

Dep

th/T

ime

LAS,

PD

S R

epor

ts -

CD

of d

ata

and

files

BP-

HZN

-SN

R00

0000

08B

P-H

ZN-2

179M

DL0

0075

243

BP-

HZN

-217

9MD

L000

7524

3Sc

hlum

berg

er -

DLI

S/LA

S/PD

S w

/ MD

T/M

MS

& P

roce

ssed

Dat

a B

P-H

ZN-

SNR

0000

0009

- C

D o

f dat

a an

d fil

esB

P-H

ZN-2

179M

DL0

0075

244

BP-

HZN

-217

9MD

L000

7524

4Sc

hlum

berg

er -

Dua

l MB

MI P

DS,

LA

S &

Wel

lEye

File

s - C

D o

f dat

a an

d fil

esB

P-H

ZN-S

NR

0000

0010

BP-

HZN

-BLY

0024

2955

BP-

HZN

-BLY

0024

879

BP

- TO

1100

0827

(BP-

HZN

-BLY

0024

2955

-487

9).p

dfB

P-H

ZN-2

179M

DL0

0063

085

BP-

HZN

-217

9MD

L000

6308

5M

C25

2_00

1_ST

00B

P01_

APR

15

- Apr

20_

ASC

II (B

P-H

ZN-2

179M

DL0

0063

085)

.txt

BP-

HZN

-BLY

0019

0158

BP-

HZN

-BLY

0019

0158

MC

252_

001_

ST00

BP0

1_A

PR 1

5 - A

pr 2

0_A

SCII

(BP-

HZN

-BLY

0019

0158

).txt

BP-

HZN

-BLY

0017

6372

BP-

HZN

-BLY

0017

6372

Tim

eSD

LSta

ts 0

5Apr

il 20

Apr

il201

0 (B

P-H

ZN-B

LY00

1763

72).l

asB

P-H

ZN-2

179M

DL0

0269

030

BP-

HZN

-217

9MD

L002

6903

0W

ellS

pace

Doc

umen

ts, C

opy

of B

P-00

1318

- C

D o

f dat

a an

d fil

esH

AL_

0123

040

HA

L_01

2304

0M

C25

2_32

306_

3_Ti

me

AD

T V

ib_1

0 Ju

ly 1

0_A

M.e

mf

HA

L_01

9788

3H

AL_

0197

883

MC

252

BP0

1 Pr

essu

re L

og T

VD

.em

fH

AL_

0205

627

HA

L_02

0562

7M

C25

2 B

P01

Pres

sure

Log

TV

D.e

mf

HA

L_02

3419

4H

AL_

0234

194

MC

252_

001_

ST00

BP0

0_R

UN

_600

.EM

FH

AL_

0234

245

HA

L_02

3424

570

2693

9bp1

GT.

emf

HA

L_02

3444

7H

AL_

0234

447

MC

252

BP0

1_ G

EOTA

P TE

ST #

4_17

722M

D_1

7711

TVD

.em

fH

AL_

0243

170

HA

L_02

4317

0M

acon

do B

P1_P

its_T

ime_

RT.

emf

Page 92: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nH

AL_

0251

624

HA

L_02

5162

4M

C25

2#1_

1in

MD

_Com

posi

te_5

067_

1235

0_PM

_2_2

4_10

.em

fH

AL_

0252

072

HA

L_02

5207

2M

acon

do B

P1_P

its_T

ime_

RT.

emf

HA

L_02

5596

0H

AL_

0255

960

Rec

orde

d M

C25

2 B

P01

PWD

Eng

Log

MD

.em

fH

AL_

0257

929

HA

L_02

5792

9M

acon

do 5

in C

ombo

MD

Fin

al.e

mf

HA

L_02

6532

5H

AL_

0265

325

Rec

orde

d M

C25

2 B

P01

Pres

sure

Log

TV

D.e

mf

HA

L_02

7267

7H

AL_

0272

677

Rec

orde

d M

C25

2 B

P01

Pres

sure

Log

TV

D.e

mf

HA

L_02

8500

3H

AL_

0285

003

Rec

orde

d M

C25

2 B

P01

PWD

Eng

Log

MD

.em

fH

AL_

0292

765

HA

L_02

9276

5M

C 2

52 B

P01_

GEO

TAP

TEST

#6_

1772

3MD

_177

12TV

D.e

mf

HA

L_03

1308

8H

AL_

0313

088

MC

252

BP0

1_ G

EOTA

P TE

ST #

2_16

512M

D_1

6501

TVD

.em

fH

AL_

0321

414

HA

L_03

2141

470

2693

9bp1

com

p.em

fH

AL_

0328

767

HA

L_03

2876

7M

C25

2 B

P01

PWD

Eng

Log

MD

.em

fH

AL_

0330

878

HA

L_03

3087

8M

C25

2#1_

5in

MD

_Com

posi

te_5

067_

1235

0_PM

_2_2

4_10

.em

fH

AL_

0342

497

HA

L_03

4249

7M

acon

do 5

in C

ombo

TV

D F

inal

.em

fH

AL_

0349

596

HA

L_03

4959

6M

acon

do 1

in C

ombo

MD

Fin

al.e

mf

HA

L_03

5845

3H

AL_

0358

453

MC

252#

1_M

WD

_Sur

vey_

RT_

2_18

_10.

emf

HA

L_03

6998

9H

AL_

0369

989

MC

252

BP0

1_ G

EOTA

P TE

ST #

3_17

723M

D_1

7712

TVD

.em

fH

AL_

0373

388

HA

L_03

7338

8M

acon

do P

WD

Eng

inee

ring

Log

Fina

l.em

fH

AL_

0386

159

HA

L_03

8615

9M

C 2

52 B

P01_

GEO

TAP

TEST

#8_

1808

9MD

_180

78TV

D.e

mf

HA

L_03

8848

2H

AL_

0388

483

0000

0444

2746

.pdf

HA

L_03

9133

3H

AL_

0391

333

MC

252

BP0

1_ G

EOTA

P TE

ST #

5_17

724M

D_1

7713

TVD

.em

fH

AL_

0439

200

HA

L_04

3920

0M

C 2

52 B

P01_

GEO

TAP

TEST

#1_

1651

3MD

_165

02TV

D.e

mf

HA

L_04

5312

7H

AL_

0453

127

MC

252

BP0

1 PW

D E

ng L

og M

D.e

mf

HA

L_04

6622

3H

AL_

0466

223

MC

252

BP0

1_ G

EOTA

P TE

ST #

7_18

090M

D_1

8079

TVD

.em

fH

AL_

0467

694

HA

L_04

6769

4M

acon

do P

ress

ure

Log

Fina

l.em

fH

AL_

0498

853

HA

L_04

9885

3M

acon

do 1

in C

ombo

TV

D F

inal

.em

fB

P-H

ZN-2

179M

DL0

0434

280

BP-

HZN

-217

9MD

L004

3787

4M

acon

do B

P_Ti

me

SDL_

4-21

-201

0.tx

tB

P-H

ZN-2

179M

DL0

0437

876

BP-

HZN

-217

9MD

L004

3860

0M

acon

do B

P_C

emen

ting_

4-21

-201

0.tx

tB

P-H

ZN-2

179M

DL0

0438

601

BP-

HZN

-217

9MD

L004

3860

1M

acon

do B

P_M

udlo

g.em

fB

P-H

ZN-2

179M

DL0

0434

278

BP-

HZN

-217

9MD

L004

3427

8M

acon

do B

P1_S

urfa

cePa

ram

eter

s_R

T_4-

22-1

0.em

fB

P-H

ZN-2

179M

DL0

0434

275

BP-

HZN

-217

9MD

L004

3427

7Em

fVie

w3.

123

BP-

HZN

-217

9MD

L004

3860

2B

P-H

ZN-2

179M

DL0

0438

602

Mac

ondo

BP_

MW

D B

AT.

emf

BP-

HZN

-217

9MD

L004

3427

9B

P-H

ZN-2

179M

DL0

0434

279

Mac

ondo

BP1

_Sur

face

Para

met

ers_

Tim

e_R

T.em

fB

P-H

ZN-2

179M

DL0

0437

875

BP-

HZN

-217

9MD

L004

3787

5M

acon

do B

P1_P

its_T

ime_

RT.

emf

Page 93: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nB

P-H

ZN-2

179M

DL0

0438

603

BP-

HZN

-217

9MD

L004

4051

1M

acon

do B

P_Pi

ts_4

-21-

2010

.txt

TBD

BP-

Mud

logg

ing

Dat

a.xl

sx -

Bou

rgoy

ne c

reat

ed fi

leTB

DM

acon

do D

ispl

acem

ent V

olum

es.x

lsx

- Bou

rgoy

ne c

reat

ed fi

leTB

DM

acon

do O

verb

urde

n vs

. Dep

th.x

lsx

- Bou

rgoy

ne c

reat

ed fi

leTB

DN

egat

ive

Test

Ana

lysi

s.xls

x - B

ourg

oyne

cre

ated

file

TBD

Pres

sure

Inte

grity

Tes

t Ana

lysi

s.xls

x - B

ourg

oyne

cre

ated

file

Page 94: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expert Report of Adam T. (Ted) Bourgoyne, Jr., Ph.D., P.E. Appendix D

Appendix D-3: Materials From The 2179MDL Litigation

In addition to the materials cited in my report, Appendix D-3 lists the materials from the 2179MDL litigation provided to me for my consideration. These materials include deposition transcripts, reports from various experts or investigative bodies, materials produced in the litigation and materials used as deposition exhibits, among other items.

Page 95: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nB

P-H

ZN-2

179M

DL0

0000

001

BP-

HZN

-217

9MD

L000

0076

0B

P D

eepw

ater

Hor

izon

Acc

iden

t Inv

estig

atio

n R

epor

t and

app

endi

ces

N/A

BP

Dee

pwat

er H

oriz

on A

ccid

ent I

nves

tigat

ion

Rep

ort V

ideo

- av

aila

ble

at w

ww

.bp.

com

BP-

HZN

-217

9MD

L001

6108

4B

P-H

ZN-2

179M

DL0

0161

085

Emai

l fro

m S

. Dou

glas

to H

. Pow

ell r

e M

W in

crea

se re

ques

tB

P-H

ZN-2

179M

DL0

0211

407

BP-

HZN

-217

9MD

L002

1140

7Em

ail f

rom

B. M

orel

to S

. Dou

glas

re P

PFG

MW

Cha

rtsB

P-H

ZN-2

179M

DL0

0239

630

BP-

HZN

-217

9MD

L002

3963

1Em

ail f

rom

S. D

ougl

as to

M. H

afle

re M

W in

crea

se re

ques

tB

P-H

ZN-2

179M

DL0

2470

626

BP-

HZN

-217

9MD

L024

7062

6Em

ail f

rom

S. D

ougl

as to

J. H

afle

et a

l re

Ver

bal A

ppro

val

BP-

HZN

-217

9MD

L027

4748

2B

P-H

ZN-2

179M

DL0

2747

483

Emai

l fro

m S

. Dou

glas

to L

. Car

ter r

e M

W C

hang

e R

eque

stB

P-H

ZN-2

179M

DL0

2859

913

BP-

HZN

-217

9MD

L028

5991

3Em

ail f

rom

L. C

arte

r to

S. D

ougl

as re

MW

cha

nge

Req

uest

BP-

HZN

-217

9MD

L028

5991

8B

P-H

ZN-2

179M

DL0

2859

918

Emai

l fro

m S

. Dou

glas

to B

. Mor

el e

t al r

e F.

Pat

ton

appr

oval

for M

W in

crea

seB

P-H

ZN-B

LY00

2459

45B

P-H

ZN-B

LY00

2459

47Em

ail f

rom

D. T

rocq

uet t

o S.

Dou

glas

re M

C 2

52 P

lugb

ack

App

rova

l Req

uest

edIM

S023

-014

842

IMS0

23-0

1484

3Em

ail f

rom

J. L

evin

e to

F. P

atto

n et

al r

e Te

st P

rogr

am P

roto

cols

IMS0

26-0

1082

3IM

S026

-010

825

Emai

l fro

m D

. Tro

cque

t to

G. W

oltm

an e

t al r

e qu

estio

n ab

out p

ress

ure

for L

OT

BP-

HZN

-217

9MD

L000

5785

8B

P-H

ZN-2

179M

DL0

0057

859

Geo

Rep

ort_

10-2

5-09

_Mac

ondo

.doc

BP-

HZN

-217

9MD

L000

5786

2B

P-H

ZN-2

179M

DL0

0057

863

Geo

Rep

ort_

10-2

7-09

_Mac

ondo

.doc

BP-

HZN

-217

9MD

L000

5796

3B

P-H

ZN-2

179M

DL0

0057

964

Geo

Rep

ort_

03-0

8-10

_Mac

ondo

.doc

BP-

HZN

-217

9MD

L000

5800

5B

P-H

ZN-2

179M

DL0

0058

006

Geo

Rep

ort_

03-2

2-10

_Mac

ondo

.doc

BP-

HZN

-217

9MD

L000

5803

5B

P-H

ZN-2

179M

DL0

0058

036

Geo

Rep

ort_

10-3

0-09

_Mac

ondo

.doc

BP-

HZN

-217

9MD

L000

5805

0B

P-H

ZN-2

179M

DL0

0058

051

Geo

Rep

ort_

03-1

5-10

_Mac

ondo

.doc

BP-

HZN

-217

9MD

L000

5805

5B

P-H

ZN-2

179M

DL0

0058

058

Geo

Rep

ort_

02-1

7-10

_Mac

ondo

.doc

BP-

HZN

-217

9MD

L000

5808

6B

P-H

ZN-2

179M

DL0

0058

087

Geo

Rep

ort_

02-1

2-10

_Mac

ondo

.doc

BP-

HZN

-217

9MD

L000

5810

7B

P-H

ZN-2

179M

DL0

0058

108

Geo

Rep

ort_

03-2

0-10

_Mac

ondo

.doc

BP-

HZN

-217

9MD

L000

5825

1B

P-H

ZN-2

179M

DL0

0058

253

Geo

Rep

ort_

03-3

0-10

_Mac

ondo

.doc

BP-

HZN

-217

9MD

L000

5826

5B

P-H

ZN-2

179M

DL0

0058

266

Geo

Rep

ort_

03-1

8-10

_Mac

ondo

.doc

BP-

HZN

-217

9MD

L000

5828

5B

P-H

ZN-2

179M

DL0

0058

286

Geo

Rep

ort_

03-1

4-10

_Mac

ondo

.doc

BP-

HZN

-217

9MD

L000

5832

1B

P-H

ZN-2

179M

DL0

0058

322

Geo

Rep

ort_

02-2

2-10

_Mac

ondo

.doc

BP-

HZN

-217

9MD

L000

5832

6B

P-H

ZN-2

179M

DL0

0058

328

Geo

Rep

ort_

04-0

5-10

_Mac

ondo

.doc

BP-

HZN

-217

9MD

L000

5833

3B

P-H

ZN-2

179M

DL0

0058

334

Geo

Rep

ort_

03-2

1-10

_Mac

ondo

.doc

BP-

HZN

-217

9MD

L000

5834

2B

P-H

ZN-2

179M

DL0

0058

343

Geo

Rep

ort_

10-2

3-09

_Mac

ondo

.doc

BP-

HZN

-217

9MD

L000

5834

5B

P-H

ZN-2

179M

DL0

0058

346

Geo

Rep

ort_

04-1

4-10

_Mac

ondo

.doc

BP-

HZN

-217

9MD

L000

5834

8B

P-H

ZN-2

179M

DL0

0058

350

Geo

Rep

ort_

10-2

6-09

_Mac

ondo

.doc

BP-

HZN

-217

9MD

L000

5836

5B

P-H

ZN-2

179M

DL0

0058

366

Geo

Rep

ort_

03-1

7-10

_Mac

ondo

.doc

BP-

HZN

-217

9MD

L000

5845

0B

P-H

ZN-2

179M

DL0

0058

451

Geo

Rep

ort_

04-1

3-10

_Mac

ondo

.doc

BP-

HZN

-217

9MD

L000

5845

8B

P-H

ZN-2

179M

DL0

0058

459

Geo

Rep

ort_

03-1

3-10

_Mac

ondo

.doc

Page 96: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nB

P-H

ZN-2

179M

DL0

0058

467

BP-

HZN

-217

9MD

L000

5846

8G

eoR

epor

t_04

-06-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0058

504

BP-

HZN

-217

9MD

L000

5850

7G

eoR

epor

t_04

-03-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0058

509

BP-

HZN

-217

9MD

L000

5851

1G

eoR

epor

t_03

-29-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0058

521

BP-

HZN

-217

9MD

L000

5852

2G

eoR

epor

t_03

-03-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0058

532

BP-

HZN

-217

9MD

L000

5853

3G

eoR

epor

t_03

-11-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0058

539

BP-

HZN

-217

9MD

L000

5854

0G

eoR

epor

t_04

-09-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0058

600

BP-

HZN

-217

9MD

L000

5860

1G

eoR

epor

t_03

-12-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0058

604

BP-

HZN

-217

9MD

L000

5860

5G

eoR

epor

t_03

-23-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0058

613

BP-

HZN

-217

9MD

L000

5861

4G

eoR

epor

t_03

-09-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0058

634

BP-

HZN

-217

9MD

L000

5863

6G

eoR

epor

t_04

-04-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0058

665

BP-

HZN

-217

9MD

L000

5866

6G

eoR

epor

t_04

-11-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0058

684

BP-

HZN

-217

9MD

L000

5868

5G

eoR

epor

t_03

-10-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0058

733

BP-

HZN

-217

9MD

L000

5873

4G

eoR

epor

t_04

-08-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0058

769

BP-

HZN

-217

9MD

L000

5877

0G

eoR

epor

t_02

-24-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0058

833

BP-

HZN

-217

9MD

L000

5883

4G

eoR

epor

t_02

-28-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0058

841

BP-

HZN

-217

9MD

L000

5884

2G

eoR

epor

t_02

-19-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0058

912

BP-

HZN

-217

9MD

L000

5891

3G

eoR

epor

t_10

-31-

09_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0058

918

BP-

HZN

-217

9MD

L000

5891

9G

eoR

epor

t_04

-07-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0058

954

BP-

HZN

-217

9MD

L000

5895

5G

eoR

epor

t_04

-12-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0058

959

BP-

HZN

-217

9MD

L000

5896

0G

eoR

epor

t_02

-15-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

018

BP-

HZN

-217

9MD

L000

5901

9G

eoR

epor

t_03

-04-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

052

BP-

HZN

-217

9MD

L000

5905

3G

eoR

epor

t_02

-20-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

126

BP-

HZN

-217

9MD

L000

5912

7G

eoR

epor

t_03

-25-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

135

BP-

HZN

-217

9MD

L000

5913

6G

eoR

epor

t_02

-11-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

142

BP-

HZN

-217

9MD

L000

5914

3G

eoR

epor

t_02

-23-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

177

BP-

HZN

-217

9MD

L000

5917

8G

eoR

epor

t_02

-13-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

182

BP-

HZN

-217

9MD

L000

5918

3G

eoR

epor

t_03

-05-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

185

BP-

HZN

-217

9MD

L000

5918

6G

eoR

epor

t_04

-15-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

209

BP-

HZN

-217

9MD

L000

5921

0G

eoR

epor

t_03

-26-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

220

BP-

HZN

-217

9MD

L000

5922

2G

eoR

epor

t_03

-19-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

291

BP-

HZN

-217

9MD

L000

5929

2G

eoR

epor

t_10

-29-

09_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

321

BP-

HZN

-217

9MD

L000

5932

3G

eoR

epor

t_02

-18-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

367

BP-

HZN

-217

9MD

L000

5936

8G

eoR

epor

t_10

-24-

09_M

acon

do.d

oc

Page 97: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nB

P-H

ZN-2

179M

DL0

0059

370

BP-

HZN

-217

9MD

L000

5937

1G

eoR

epor

t_04

-02-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

378

BP-

HZN

-217

9MD

L000

5937

9G

eoR

epor

t_02

-10-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

404

BP-

HZN

-217

9MD

L000

5940

5G

eoR

epor

t_03

-01-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

427

BP-

HZN

-217

9MD

L000

5942

8G

eoR

epor

t_02

-21-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

483

BP-

HZN

-217

9MD

L000

5948

4G

eoR

epor

t_04

-01-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

527

BP-

HZN

-217

9MD

L000

5952

8G

eoR

epor

t_02

-26-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

573

BP-

HZN

-217

9MD

L000

5957

4G

eoR

epor

t_03

-07-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

626

BP-

HZN

-217

9MD

L000

5962

9G

eoR

epor

t_03

-24-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

678

BP-

HZN

-217

9MD

L000

5967

9G

eoR

epor

t_03

-16-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

710

BP-

HZN

-217

9MD

L000

5971

1G

eoR

epor

t_03

-28-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

721

BP-

HZN

-217

9MD

L000

5972

3G

eoR

epor

t_10

-28-

09_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

772

BP-

HZN

-217

9MD

L000

5977

3G

eoR

epor

t_03

-31-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

797

BP-

HZN

-217

9MD

L000

5979

8G

eoR

epor

t_03

-06-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

805

BP-

HZN

-217

9MD

L000

5980

6G

eoR

epor

t_02

-25-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

852

BP-

HZN

-217

9MD

L000

5985

3G

eoR

epor

t_04

-10-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

866

BP-

HZN

-217

9MD

L000

5986

7G

eoR

epor

t_03

-02-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

869

BP-

HZN

-217

9MD

L000

5987

0G

eoR

epor

t_02

-27-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

892

BP-

HZN

-217

9MD

L000

5989

3G

eoR

epor

t_03

-27-

10_M

acon

do.d

ocB

P-H

ZN-2

179M

DL0

0059

895

BP-

HZN

-217

9MD

L000

5989

6G

eoR

epor

t_02

-14-

10_M

acon

do.d

ocB

P-H

ZN-M

BI0

0014

039

BP-

HZN

-MB

I000

1404

020

09.0

5.03

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 0

1) (P

rinte

d 10

0514

AM

) B

P-H

ZN-M

BI0

0014

045

BP-

HZN

-MB

I000

1404

620

09.0

5.04

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 0

2) (P

rinte

d 10

0622

AM

) B

P-H

ZN-M

BI0

0014

041

BP-

HZN

-MB

I000

1404

220

09.0

5.05

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 0

3) (P

rinte

d 10

0614

AM

) B

P-H

ZN-M

BI0

0014

033

BP-

HZN

-MB

I000

1403

420

09.0

5.06

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 0

4) (P

rinte

d 10

0531

AM

) B

P-H

ZN-M

BI0

0014

035

BP-

HZN

-MB

I000

1403

620

09.0

5.07

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 0

5) (P

rinte

d 10

0539

AM

) B

P-H

ZN-M

BI0

0014

037

BP-

HZN

-MB

I000

1403

820

09.0

5.08

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 0

6) (P

rinte

d 10

0547

AM

) B

P-H

ZN-M

BI0

0014

047

BP-

HZN

-MB

I000

1404

920

09.0

5.09

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 0

7) (P

rinte

d 10

0606

AM

) B

P-H

ZN-M

BI0

0014

050

BP-

HZN

-MB

I000

1405

120

09.0

5.10

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 0

8) (P

rinte

d 10

0557

AM

) B

P-H

ZN-M

BI0

0014

043

BP-

HZN

-MB

I000

1404

420

09.0

5.11

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 0

9) (P

rinte

d 10

0523

AM

) B

P-H

ZN-M

BI0

0014

052

BP-

HZN

-MB

I000

1405

320

09.0

5.16

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 1

0) (P

rinte

d 09

5223

AM

) B

P-H

ZN-M

BI0

0014

054

BP-

HZN

-MB

I000

1405

520

09.0

5.17

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 1

1) (P

rinte

d 09

5231

AM

) B

P-H

ZN-M

BI0

0014

056

BP-

HZN

-MB

I000

1405

720

09.0

5.18

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 1

2) (P

rinte

d 09

5239

AM

) B

P-H

ZN-M

BI0

0014

058

BP-

HZN

-MB

I000

1405

920

09.0

5.19

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 1

3) (P

rinte

d 09

5246

AM

) B

P-H

ZN-M

BI0

0014

060

BP-

HZN

-MB

I000

1406

120

09.0

5.20

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 1

4) (P

rinte

d 09

5254

AM

)

Page 98: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nB

P-H

ZN-M

BI0

0014

062

BP-

HZN

-MB

I000

1406

320

09.0

5.21

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 1

5) (P

rinte

d 09

5303

AM

) B

P-H

ZN-M

BI0

0014

064

BP-

HZN

-MB

I000

1406

520

09.0

6.02

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 1

6) (P

rinte

d 09

5310

AM

) B

P-H

ZN-M

BI0

0014

066

BP-

HZN

-MB

I000

1406

720

09.0

6.03

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 1

7) (P

rinte

d 09

5317

AM

) B

P-H

ZN-M

BI0

0014

068

BP-

HZN

-MB

I000

1406

920

09.0

6.04

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 1

8) (P

rinte

d 09

5325

AM

) B

P-H

ZN-M

BI0

0014

070

BP-

HZN

-MB

I000

1407

120

09.0

6.05

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 1

9) (P

rinte

d 09

5333

AM

) B

P-H

ZN-M

BI0

0014

072

BP-

HZN

-MB

I000

1407

320

09.0

6.06

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 2

0) (P

rinte

d 09

5340

AM

) B

P-H

ZN-M

BI0

0014

074

BP-

HZN

-MB

I000

1407

520

09.0

6.07

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 2

1) (P

rinte

d 09

5348

AM

) B

P-H

ZN-M

BI0

0014

076

BP-

HZN

-MB

I000

1407

720

09.0

6.08

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 2

2) (P

rinte

d 09

5356

AM

) B

P-H

ZN-M

BI0

0014

078

BP-

HZN

-MB

I000

1407

920

09.0

6.09

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 2

3) (P

rinte

d 09

5405

AM

) B

P-H

ZN-M

BI0

0014

031

BP-

HZN

-MB

I000

1403

220

09.0

6.10

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 2

4) (P

rinte

d 09

5414

AM

) B

P-H

ZN-M

BI0

0014

083

BP-

HZN

-MB

I000

1408

520

09.0

9.30

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 0

1) (P

rinte

d 05

2810

AM

) B

P-H

ZN-M

BI0

0014

086

BP-

HZN

-MB

I000

1408

820

09.1

0.01

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 0

2) (P

rinte

d 05

1644

AM

) B

P-H

ZN-M

BI0

0014

089

BP-

HZN

-MB

I000

1409

120

09.1

0.02

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 0

3) (P

rinte

d 05

3028

AM

) B

P-H

ZN-M

BI0

0014

092

BP-

HZN

-MB

I000

1409

520

09.1

0.03

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 0

4) (P

rinte

d 05

2954

AM

) B

P-H

ZN-M

BI0

0014

096

BP-

HZN

-MB

I000

1410

020

09.1

0.04

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 0

5) (P

rinte

d 05

3542

AM

) B

P-H

ZN-M

BI0

0014

101

BP-

HZN

-MB

I000

1410

520

09.1

0.05

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 4

8) (P

rinte

d 06

3107

AM

) B

P-H

ZN-M

BI0

0014

110

BP-

HZN

-MB

I000

1411

220

09.1

0.06

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 0

1) (P

rinte

d 05

3614

AM

) B

P-H

ZN-M

BI0

0014

106

BP-

HZN

-MB

I000

1410

920

09.1

0.06

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 4

9) (P

rinte

d 05

3602

AM

) B

P-H

ZN-M

BI0

0014

113

BP-

HZN

-MB

I000

1411

620

09.1

0.07

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 0

2) (P

rinte

d 04

5026

AM

) B

P-H

ZN-M

BI0

0014

117

BP-

HZN

-MB

I000

1412

220

09.1

0.08

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 0

3) (P

rinte

d 05

1742

AM

) B

P-H

ZN-M

BI0

0014

123

BP-

HZN

-MB

I000

1412

620

09.1

0.09

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 0

4) (P

rinte

d 05

1936

AM

) B

P-H

ZN-M

BI0

0014

127

BP-

HZN

-MB

I000

1413

020

09.1

0.10

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 0

5) (P

rinte

d 04

5723

AM

) B

P-H

ZN-M

BI0

0014

131

BP-

HZN

-MB

I000

1413

420

09.1

0.11

Dai

ly O

pera

tions

Rep

ort (

Rep

ort 0

6) (P

rinte

d 05

2618

AM

) B

P-H

ZN-M

BI0

0014

191

BP-

HZN

-MB

I000

1419

520

09.1

0.12

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 07)

(Prin

ted

0724

34

BP-

HZN

-MB

I001

8381

9B

P-H

ZN-M

BI0

0183

822

2009

.10.

12 D

aily

Ope

ratio

ns R

epor

t (R

epor

t 07)

(Prin

ted

0525

38 A

M)

BP-

HZN

-MB

I000

1418

8B

P-H

ZN-M

BI0

0014

190

2009

.10.

13 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 0

8) (P

rinte

d 07

2348

B

P-H

ZN-M

BI0

0182

328

BP-

HZN

-MB

I001

8233

020

09.1

0.13

Dai

ly O

pera

tions

Rep

ort (

Dril

ling)

(Rep

ort 0

8) (P

rinte

d 05

3750

AM

) B

P-H

ZN-M

BI0

0181

059

BP-

HZN

-MB

I001

8106

120

09.1

0.13

Dai

ly O

pera

tions

Rep

ort (

Dril

ling)

(Rep

ort 0

8) (P

rinte

d 07

4313

AM

) B

P-H

ZN-M

BI0

0179

040

BP-

HZN

-MB

I001

7904

220

09.1

0.14

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 09)

(Prin

ted

0719

09

BP-

HZN

-MB

I000

1418

5B

P-H

ZN-M

BI0

0014

187

2009

.10.

14 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 0

9) (P

rinte

d 07

2255

B

P-H

ZN-M

BI0

0073

003

BP-

HZN

-MB

I000

7300

520

09.1

0.14

Dai

ly O

pera

tions

Rep

ort (

Dril

ling)

(Rep

ort 0

9) (P

rinte

d 07

5346

AM

) B

P-H

ZN-M

BI0

0014

182

BP-

HZN

-MB

I000

1418

420

09.1

0.15

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 10)

(Prin

ted

0722

06

BP-

HZN

-MB

I000

1417

8B

P-H

ZN-M

BI0

0014

181

2009

.10.

16 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

1) (P

rinte

d 07

2109

Page 99: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nB

P-H

ZN-M

BI0

0183

835

BP-

HZN

-MB

I001

8383

720

09.1

0.17

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 12)

(Prin

ted

0506

17

BP-

HZN

-MB

I000

1417

5B

P-H

ZN-M

BI0

0014

177

2009

.10.

17 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

2) (P

rinte

d 07

2008

B

P-H

ZN-M

BI0

0014

171

BP-

HZN

-MB

I000

1417

420

09.1

0.18

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 13)

(Prin

ted

0719

07

BP-

HZN

-MB

I000

1416

6B

P-H

ZN-M

BI0

0014

170

2009

.10.

19 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

4) (P

rinte

d 07

1807

B

P-H

ZN-M

BI0

0014

161

BP-

HZN

-MB

I000

1416

520

09.1

0.20

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 15)

(Prin

ted

0716

53

BP-

HZN

-MB

I000

1413

5B

P-H

ZN-M

BI0

0014

139

2009

.10.

21 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

6) (P

rinte

d 05

5113

B

P-H

ZN-M

BI0

0014

140

BP-

HZN

-MB

I000

1414

420

09.1

0.22

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 17)

(Prin

ted

0543

27

BP-

HZN

-MB

I000

1414

5B

P-H

ZN-M

BI0

0014

150

2009

.10.

23 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

8) (P

rinte

d 05

1345

B

P-H

ZN-M

BI0

0014

151

BP-

HZN

-MB

I000

1415

520

09.1

0.24

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 19)

(Prin

ted

0552

05

BP-

HZN

-MB

I000

1415

6B

P-H

ZN-M

BI0

0014

160

2009

.10.

25 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 2

0) (P

rinte

d 05

4622

B

P-H

ZN-M

BI0

0014

196

BP-

HZN

-MB

I000

1420

020

09.1

0.26

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 21)

(Prin

ted

0859

23

BP-

HZN

-MB

I001

8612

9B

P-H

ZN-M

BI0

0186

133

2009

.10.

26 D

aily

Ope

ratio

ns R

epor

t (D

rillin

g) (R

epor

t 21)

(Prin

ted

0700

34 A

M)

BP-

HZN

-MB

I001

8388

2B

P-H

ZN-M

BI0

0183

886

2009

.10.

27 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 2

2) (P

rinte

d 05

4408

B

P-H

ZN-M

BI0

0183

887

BP-

HZN

-MB

I001

8389

120

09.1

0.28

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 23)

(Prin

ted

0707

07

BP-

HZN

-MB

I000

1420

1B

P-H

ZN-M

BI0

0014

205

2009

.10.

29 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 2

4) (P

rinte

d 04

5642

B

P-H

ZN-M

BI0

0014

206

BP-

HZN

-MB

I000

1420

920

09.1

0.30

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 25)

(Prin

ted

0510

25

BP-

HZN

-MB

I000

1421

0B

P-H

ZN-M

BI0

0014

213

2009

.10.

31 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 2

6) (P

rinte

d 05

0026

B

P-H

ZN-M

BI0

0014

214

BP-

HZN

-MB

I000

1421

620

09.1

1.01

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 27)

(Prin

ted

0724

42

BP-

HZN

-MB

I000

1421

7B

P-H

ZN-M

BI0

0014

219

2009

.11.

02 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 2

8) (P

rinte

d 07

1049

B

P-H

ZN-M

BI0

0014

220

BP-

HZN

-MB

I000

1422

220

09.1

1.03

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 29)

(Prin

ted

0456

35

BP-

HZN

-MB

I000

1422

3B

P-H

ZN-M

BI0

0014

225

2009

.11.

04 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 3

0) (P

rinte

d 05

0511

B

P-H

ZN-M

BI0

0014

226

BP-

HZN

-MB

I000

1422

820

09.1

1.05

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 31)

(Prin

ted

0547

45

BP-

HZN

-MB

I000

1422

9B

P-H

ZN-M

BI0

0014

231

2009

.11.

06 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 3

2) (P

rinte

d 06

5355

B

P-H

ZN-M

BI0

0014

232

BP-

HZN

-MB

I000

1423

420

09.1

1.07

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 33)

(Prin

ted

0558

30

BP-

HZN

-MB

I000

1423

8B

P-H

ZN-M

BI0

0014

240

2009

.11.

08 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 3

4) (P

rinte

d 08

1755

B

P-H

ZN-M

BI0

0178

940

BP-

HZN

-MB

I001

7894

220

09.1

1.08

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 34)

(Prin

ted

0950

38

BP-

HZN

-MB

I000

1423

5B

P-H

ZN-M

BI0

0014

237

2009

.11.

09 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 3

5) (P

rinte

d 04

0054

B

P-H

ZN-M

BI0

0014

241

BP-

HZN

-MB

I000

1424

320

09.1

1.10

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 36)

(Prin

ted

0538

47

BP-

HZN

-MB

I000

1424

4B

P-H

ZN-M

BI0

0014

246

2009

.11.

11 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 3

7) (P

rinte

d 05

0919

B

P-H

ZN-M

BI0

0014

247

BP-

HZN

-MB

I000

1424

920

09.1

1.12

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 38)

(Prin

ted

0516

25

BP-

HZN

-MB

I000

1425

0B

P-H

ZN-M

BI0

0014

252

2009

.11.

13 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 3

9) (P

rinte

d 05

0502

B

P-H

ZN-M

BI0

0014

253

BP-

HZN

-MB

I000

1425

520

09.1

1.14

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 40)

(Prin

ted

0507

54

BP-

HZN

-MB

I000

1425

6B

P-H

ZN-M

BI0

0014

258

2009

.11.

15 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 4

1) (P

rinte

d 05

1438

Page 100: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nB

P-H

ZN-M

BI0

0014

259

BP-

HZN

-MB

I000

1426

120

09.1

1.16

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 42)

(Prin

ted

0548

39

BP-

HZN

-MB

I001

8395

4B

P-H

ZN-M

BI0

0183

956

2009

.11.

16 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 4

2) (P

rinte

d 07

2314

B

P-H

ZN-M

BI0

0014

262

BP-

HZN

-MB

I000

1426

420

09.1

1.17

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 43)

(Prin

ted

0511

25

BP-

HZN

-MB

I000

1426

5B

P-H

ZN-M

BI0

0014

267

2009

.11.

18 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 4

4) (P

rinte

d 04

3343

B

P-H

ZN-M

BI0

0014

268

BP-

HZN

-MB

I000

1427

020

09.1

1.19

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 45)

(Prin

ted

0501

13

BP-

HZN

-MB

I000

1427

1B

P-H

ZN-M

BI0

0014

273

2009

.11.

20 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 4

6) (P

rinte

d 05

0704

B

P-H

ZN-M

BI0

0014

274

BP-

HZN

-MB

I000

1427

620

09.1

1.21

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 47)

(Prin

ted

0457

41

BP-

HZN

-MB

I000

1427

7B

P-H

ZN-M

BI0

0014

279

2009

.11.

22 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 4

8) (P

rinte

d 05

0602

B

P-H

ZN-M

BI0

0014

280

BP-

HZN

-MB

I000

1428

620

09.1

1.23

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 49)

(Prin

ted

0520

26

BP-

HZN

-MB

I000

1428

7B

P-H

ZN-M

BI0

0014

293

2009

.11.

24 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 5

0) (P

rinte

d 05

1723

B

P-H

ZN-M

BI0

0014

294

BP-

HZN

-MB

I000

1430

120

09.1

1.25

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 51)

(Prin

ted

0446

56

BP-

HZN

-MB

I000

1430

2B

P-H

ZN-M

BI0

0014

306

2009

.11.

26 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 5

2) (P

rinte

d 04

4843

B

P-H

ZN-M

BI0

0014

307

BP-

HZN

-MB

I000

1431

120

09.1

1.27

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 53)

(Prin

ted

0450

38

BP-

HZN

-MB

I000

1431

2B

P-H

ZN-M

BI0

0014

314

2009

.11.

28 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 5

4) (P

rinte

d 04

4435

B

P-H

ZN-M

BI0

0014

315

BP-

HZN

-MB

I000

1431

720

09.1

1.29

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 55)

(Prin

ted

0458

41

BP-

HZN

-MB

I000

1431

8B

P-H

ZN-M

BI0

0014

320

2009

.11.

30 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 5

6) (P

rinte

d 09

4324

B

P-H

ZN-M

BI0

0014

321

BP-

HZN

-MB

I000

1432

320

09.1

2.01

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 57)

(Prin

ted

0643

08

BP-

HZN

-MB

I000

1432

4B

P-H

ZN-M

BI0

0014

326

2009

.12.

02 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 5

8) (P

rinte

d 05

4227

B

P-H

ZN-M

BI0

0014

327

BP-

HZN

-MB

I000

1432

920

09.1

2.03

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 59)

(Prin

ted

0515

12

BP-

HZN

-MB

I000

1433

0B

P-H

ZN-M

BI0

0014

332

2009

.12.

04 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 6

0) (P

rinte

d 05

1323

B

P-H

ZN-M

BI0

0014

333

BP-

HZN

-MB

I000

1433

520

09.1

2.05

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 61)

(Prin

ted

0521

15

BP-

HZN

-MB

I000

1433

6B

P-H

ZN-M

BI0

0014

338

2009

.12.

06 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 6

2) (P

rinte

d 05

0319

B

P-H

ZN-M

BI0

0014

339

BP-

HZN

-MB

I000

1434

220

09.1

2.07

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 63)

(Prin

ted

0532

40

BP-

HZN

-MB

I000

1434

3B

P-H

ZN-M

BI0

0014

345

2009

.12.

08 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 6

4) (P

rinte

d 05

0805

B

P-H

ZN-M

BI0

0014

346

BP-

HZN

-MB

I000

1434

920

09.1

2.09

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 65)

(Prin

ted

0514

13

BP-

HZN

-MB

I000

1435

0B

P-H

ZN-M

BI0

0014

352

2009

.12.

10 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 6

6) (P

rinte

d 05

1608

B

P-H

ZN-M

BI0

0014

353

BP-

HZN

-MB

I000

1435

520

09.1

2.11

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 67)

(Prin

ted

0513

02

BP-

HZN

-MB

I000

1435

6B

P-H

ZN-M

BI0

0014

358

2009

.12.

12 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 6

8) (P

rinte

d 05

1619

B

P-H

ZN-M

BI0

0014

359

BP-

HZN

-MB

I000

1436

220

09.1

2.13

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 69)

(Prin

ted

0523

20

BP-

HZN

-MB

I000

1436

3B

P-H

ZN-M

BI0

0014

365

2009

.12.

14 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 7

0) (P

rinte

d 05

0655

B

P-H

ZN-M

BI0

0014

366

BP-

HZN

-MB

I000

1436

820

09.1

2.15

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 71)

(Prin

ted

0529

21

BP-

HZN

-MB

I000

1436

9B

P-H

ZN-M

BI0

0014

372

2009

.12.

16 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 7

2) (P

rinte

d 05

2726

B

P-H

ZN-M

BI0

0014

373

BP-

HZN

-MB

I000

1437

520

09.1

2.17

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 73)

(Prin

ted

0506

56

Page 101: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nB

P-H

ZN-M

BI0

0014

376

BP-

HZN

-MB

I000

1437

820

09.1

2.18

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 74)

(Prin

ted

0502

38

BP-

HZN

-MB

I000

1437

9B

P-H

ZN-M

BI0

0014

381

2009

.12.

19 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 7

5) (P

rinte

d 05

2029

B

P-H

ZN-M

BI0

0014

080

BP-

HZN

-MB

I000

1408

220

09.1

2.20

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 76)

(Prin

ted

0538

45

BP-

HZN

-MB

I000

1359

2B

P-H

ZN-M

BI0

0013

595

2010

.01.

31 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

MO

BIL

IZA

TIO

N) (

Rep

ort 0

1) (P

rinte

d B

P-H

ZN-M

BI0

0013

596

BP-

HZN

-MB

I000

1359

820

10.0

2.01

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (M

OB

ILIZ

ATI

ON

) (R

epor

t 02)

(Prin

ted

BP-

HZN

-MB

I000

1362

1B

P-H

ZN-M

BI0

0013

624

2010

.02.

02 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

MO

BIL

IZA

TIO

N) (

Rep

ort 0

3) (P

rinte

d B

P-H

ZN-M

BI0

0013

599

BP-

HZN

-MB

I000

1360

220

10.0

2.03

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (M

OB

ILIZ

ATI

ON

) (R

epor

t 04)

(Prin

ted

BP-

HZN

-MB

I000

1361

7B

P-H

ZN-M

BI0

0013

620

2010

.02.

04 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

MO

BIL

IZA

TIO

N) (

Rep

ort 0

5) (P

rinte

d B

P-H

ZN-M

BI0

0100

992

BP-

HZN

-MB

I001

0099

420

10.0

2.05

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (M

OB

ILIZ

ATI

ON

) (R

epor

t 06)

(Prin

ted

BP-

HZN

-MB

I000

2088

5B

P-H

ZN-M

BI0

0020

887

2010

.02.

06 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 0

7) (P

rinte

d 06

1828

B

P-H

ZN-M

BI0

0013

991

BP-

HZN

-MB

I000

1399

420

10.0

2.06

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 77)

(Prin

ted

0504

32

BP-

HZN

-MB

I000

2088

1B

P-H

ZN-M

BI0

0020

884

2010

.02.

06 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

MO

BIL

IZA

TIO

N) (

Rep

ort 0

7) (P

rinte

d B

P-H

ZN-M

BI0

0178

838

BP-

HZN

-MB

I001

7884

120

10.0

2.07

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 08)

(Prin

ted

0540

25

BP-

HZN

-MB

I000

1360

7B

P-H

ZN-M

BI0

0013

610

2010

.02.

07 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 7

8) (P

rinte

d 06

5834

B

P-H

ZN-M

BI0

0013

603

BP-

HZN

-MB

I000

1360

620

10.0

2.08

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 79)

(Prin

ted

0615

00

BP-

HZN

-MB

I000

1361

1B

P-H

ZN-M

BI0

0013

616

2010

.02.

09 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 8

0) (P

rinte

d 05

4913

B

P-H

ZN-M

BI0

0013

625

BP-

HZN

-MB

I000

1362

920

10.0

2.10

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 81)

(Prin

ted

0543

11

BP-

HZN

-MB

I000

1363

0B

P-H

ZN-M

BI0

0013

635

2010

.02.

11 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 8

2) (P

rinte

d 06

1549

B

P-H

ZN-M

BI0

0013

636

BP-

HZN

-MB

I000

1364

220

10.0

2.12

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 83)

(Prin

ted

0558

40

BP-

HZN

-MB

I000

1364

3B

P-H

ZN-M

BI0

0013

648

2010

.02.

13 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 8

4) (P

rinte

d 05

5916

B

P-H

ZN-M

BI0

0013

649

BP-

HZN

-MB

I000

1365

420

10.0

2.14

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 85)

(Prin

ted

0609

54

BP-

HZN

-MB

I000

1365

5B

P-H

ZN-M

BI0

0013

660

2010

.02.

15 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 8

6) (P

rinte

d 06

0226

B

P-H

ZN-M

BI0

0013

661

BP-

HZN

-MB

I000

1366

520

10.0

2.16

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 87)

(Prin

ted

0532

09

BP-

HZN

-MB

I000

1366

6B

P-H

ZN-M

BI0

0013

672

2010

.02.

17 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 8

8) (P

rinte

d 06

2102

B

P-H

ZN-M

BI0

0013

673

BP-

HZN

-MB

I000

1367

920

10.0

2.18

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 89)

(Prin

ted

0545

59

BP-

HZN

-MB

I000

1368

0B

P-H

ZN-M

BI0

0013

686

2010

.02.

19 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 9

0) (P

rinte

d 05

4416

B

P-H

ZN-M

BI0

0013

687

BP-

HZN

-MB

I000

1369

320

10.0

2.20

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 91)

(Prin

ted

0529

28

BP-

HZN

-MB

I000

1369

4B

P-H

ZN-M

BI0

0013

699

2010

.02.

21 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 9

2) (P

rinte

d 05

5323

B

P-H

ZN-M

BI0

0013

700

BP-

HZN

-MB

I000

1370

620

10.0

2.22

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 93)

(Prin

ted

0646

22

BP-

HZN

-MB

I000

1399

5B

P-H

ZN-M

BI0

0014

001

2010

.02.

23 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 9

4) (P

rinte

d 05

1128

B

P-H

ZN-M

BI0

0013

707

BP-

HZN

-MB

I000

1371

320

10.0

2.24

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 95)

(Prin

ted

0539

12

BP-

HZN

-MB

I000

1371

4B

P-H

ZN-M

BI0

0013

720

2010

.02.

25 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 9

6) (P

rinte

d 05

5210

B

P-H

ZN-M

BI0

0014

002

BP-

HZN

-MB

I000

1400

620

10.0

2.26

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 97)

(Prin

ted

0513

45

Page 102: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nB

P-H

ZN-M

BI0

0178

719

BP-

HZN

-MB

I001

7872

320

10.0

2.26

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 97)

(Prin

ted

0544

00

BP-

HZN

-MB

I000

1400

7B

P-H

ZN-M

BI0

0014

012

2010

.02.

27 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 9

8) (P

rinte

d 05

1505

B

P-H

ZN-M

BI0

0178

713

BP-

HZN

-MB

I001

7871

820

10.0

2.27

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 98)

(Prin

ted

0539

14

BP-

HZN

-MB

I000

1401

3B

P-H

ZN-M

BI0

0014

018

2010

.02.

28 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 9

9) (P

rinte

d 05

1638

B

P-H

ZN-M

BI0

0178

708

BP-

HZN

-MB

I001

7871

220

10.0

2.28

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 99)

(Prin

ted

0534

30

BP-

HZN

-MB

I001

7869

9B

P-H

ZN-M

BI0

0178

707

2010

.03.

01 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

00) (

Prin

ted

0532

15

BP-

HZN

-MB

I000

1372

1B

P-H

ZN-M

BI0

0013

727

2010

.03.

02 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

01) (

Prin

ted

0604

33

BP-

HZN

-MB

I000

1401

9B

P-H

ZN-M

BI0

0014

024

2010

.03.

03 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

02) (

Prin

ted

0518

27

BP-

HZN

-MB

I001

7868

6B

P-H

ZN-M

BI0

0178

691

2010

.03.

03 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

02) (

Prin

ted

0555

26

BP-

HZN

-MB

I000

1372

8B

P-H

ZN-M

BI0

0013

734

2010

.03.

04 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

03) (

Prin

ted

0559

21

BP-

HZN

-MB

I000

1373

5B

P-H

ZN-M

BI0

0013

740

2010

.03.

05 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

04) (

Prin

ted

0555

18

BP-

HZN

-MB

I000

1374

1B

P-H

ZN-M

BI0

0013

746

2010

.03.

06 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

05) (

Prin

ted

0548

36

BP-

HZN

-MB

I000

1374

7B

P-H

ZN-M

BI0

0013

752

2010

.03.

07 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

06) (

Prin

ted

0531

30

BP-

HZN

-MB

I000

1375

3B

P-H

ZN-M

BI0

0013

758

2010

.03.

08 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

07) (

Prin

ted

0540

09

BP-

HZN

-MB

I000

1375

9B

P-H

ZN-M

BI0

0013

763

2010

.03.

09 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

08) (

Prin

ted

0544

31

BP-

HZN

-MB

I000

1376

4B

P-H

ZN-M

BI0

0013

769

2010

.03.

10 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

09) (

Prin

ted

0548

12

BP-

HZN

-MB

I000

1402

5B

P-H

ZN-M

BI0

0014

030

2010

.03.

11 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

10) (

Prin

ted

0519

51

BP-

HZN

-MB

I000

1377

0B

P-H

ZN-M

BI0

0013

776

2010

.03.

12 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

11) (

Prin

ted

0618

15

BP-

HZN

-MB

I000

1377

7B

P-H

ZN-M

BI0

0013

781

2010

.03.

13 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

12) (

Prin

ted

0620

51

BP-

HZN

-MB

I000

1378

2B

P-H

ZN-M

BI0

0013

786

2010

.03.

14 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

13) (

Prin

ted

0550

42

BP-

HZN

-MB

I000

1378

7B

P-H

ZN-M

BI0

0013

792

2010

.03.

15 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

14) (

Prin

ted

0554

26

BP-

HZN

-MB

I000

1379

3B

P-H

ZN-M

BI0

0013

795

2010

.03.

16 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

15) (

Prin

ted

0401

43

BP-

HZN

-MB

I001

7860

9B

P-H

ZN-M

BI0

0178

614

2010

.03.

16 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

15) (

Prin

ted

0545

02

BP-

HZN

-MB

I000

1379

6B

P-H

ZN-M

BI0

0013

802

2010

.03.

17 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

16) (

Prin

ted

0556

58

BP-

HZN

-MB

I000

1380

3B

P-H

ZN-M

BI0

0013

808

2010

.03.

18 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

17) (

Prin

ted

0535

07

BP-

HZN

-MB

I000

1380

9B

P-H

ZN-M

BI0

0013

814

2010

.03.

19 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

18) (

Prin

ted

0515

16

BP-

HZN

-MB

I000

1381

5B

P-H

ZN-M

BI0

0013

820

2010

.03.

20 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

19) (

Prin

ted

0605

20

BP-

HZN

-MB

I000

1382

1B

P-H

ZN-M

BI0

0013

826

2010

.03.

21 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

20) (

Prin

ted

0551

29

BP-

HZN

-MB

I000

1382

7B

P-H

ZN-M

BI0

0013

833

2010

.03.

22 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

21) (

Prin

ted

0605

12

BP-

HZN

-MB

I000

1383

4B

P-H

ZN-M

BI0

0013

838

2010

.03.

23 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

22) (

Prin

ted

0548

12

BP-

HZN

-MB

I000

1383

9B

P-H

ZN-M

BI0

0013

843

2010

.03.

24 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

23) (

Prin

ted

0524

17

BP-

HZN

-MB

I000

1384

4B

P-H

ZN-M

BI0

0013

849

2010

.03.

25 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

24) (

Prin

ted

0549

51

BP-

HZN

-MB

I000

1385

0B

P-H

ZN-M

BI0

0013

855

2010

.03.

26 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

25) (

Prin

ted

0712

33

Page 103: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nB

P-H

ZN-M

BI0

0013

856

BP-

HZN

-MB

I000

1386

220

10.0

3.27

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 126

) (Pr

inte

d 05

4858

B

P-H

ZN-M

BI0

0013

863

BP-

HZN

-MB

I000

1386

720

10.0

3.28

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 127

) (Pr

inte

d 05

3340

B

P-H

ZN-M

BI0

0013

868

BP-

HZN

-MB

I000

1387

320

10.0

3.29

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 128

) (Pr

inte

d 05

1614

B

P-H

ZN-M

BI0

0013

874

BP-

HZN

-MB

I000

1387

820

10.0

3.30

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 129

) (Pr

inte

d 05

0658

B

P-H

ZN-M

BI0

0013

879

BP-

HZN

-MB

I000

1388

320

10.0

3.31

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 130

) (Pr

inte

d 06

1554

B

P-H

ZN-M

BI0

0178

515

BP-

HZN

-MB

I001

7852

020

10.0

4.01

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 131

) (Pr

inte

d 06

0659

B

P-H

ZN-M

BI0

0013

884

BP-

HZN

-MB

I000

1388

920

10.0

4.01

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 131

) (Pr

inte

d 08

3006

B

P-H

ZN-M

BI0

0013

890

BP-

HZN

-MB

I000

1389

620

10.0

4.02

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 132

) (Pr

inte

d 06

1314

B

P-H

ZN-M

BI0

0013

897

BP-

HZN

-MB

I000

1390

420

10.0

4.03

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 133

) (Pr

inte

d 05

5103

B

P-H

ZN-M

BI0

0013

905

BP-

HZN

-MB

I000

1391

020

10.0

4.04

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 134

) (Pr

inte

d 06

1228

B

P-H

ZN-M

BI0

0013

911

BP-

HZN

-MB

I000

1391

520

10.0

4.05

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 135

) (Pr

inte

d 06

5442

B

P-H

ZN-M

BI0

0013

916

BP-

HZN

-MB

I000

1392

020

10.0

4.06

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 136

) (Pr

inte

d 05

5107

B

P-H

ZN-M

BI0

0013

921

BP-

HZN

-MB

I000

1392

520

10.0

4.07

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 137

) (Pr

inte

d 05

4418

B

P-H

ZN-M

BI0

0013

926

BP-

HZN

-MB

I000

1393

420

10.0

4.08

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 138

) (Pr

inte

d 06

3816

B

P-H

ZN-M

BI0

0013

935

BP-

HZN

-MB

I000

1394

020

10.0

4.09

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 139

) (Pr

inte

d 05

5857

B

P-H

ZN-M

BI0

0013

941

BP-

HZN

-MB

I000

1394

620

10.0

4.10

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 140

) (Pr

inte

d 06

0623

B

P-H

ZN-M

BI0

0013

947

BP-

HZN

-MB

I000

1395

020

10.0

4.11

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 141

) (Pr

inte

d 05

5615

B

P-H

ZN-M

BI0

0013

951

BP-

HZN

-MB

I000

1395

420

10.0

4.12

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 142

) (Pr

inte

d 05

5419

B

P-H

ZN-M

BI0

0013

955

BP-

HZN

-MB

I000

1395

920

10.0

4.13

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 143

) (Pr

inte

d 05

3325

B

P-H

ZN-M

BI0

0013

960

BP-

HZN

-MB

I000

1396

420

10.0

4.14

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 144

) (Pr

inte

d 05

3749

B

P-H

ZN-M

BI0

0013

557

BP-

HZN

-MB

I000

1356

120

10.0

4.15

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (C

ompl

etio

n) (R

epor

t 01)

(Prin

ted

BP-

HZN

-MB

I000

1397

0B

P-H

ZN-M

BI0

0013

974

2010

.04.

15 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

45) (

Prin

ted

0552

28

BP-

HZN

-MB

I000

1356

2B

P-H

ZN-M

BI0

0013

566

2010

.04.

16 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Com

plet

ion)

(Rep

ort 0

2) (P

rinte

d B

P-H

ZN-M

BI0

0013

567

BP-

HZN

-MB

I000

1357

220

10.0

4.17

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (C

ompl

etio

n) (R

epor

t 03)

(Prin

ted

BP-

HZN

-MB

I000

1357

3B

P-H

ZN-M

BI0

0013

577

2010

.04.

18 D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Com

plet

ion)

(Rep

ort 0

4) (P

rinte

d B

P-H

ZN-M

BI0

0013

578

BP-

HZN

-MB

I000

1358

420

10.0

4.19

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (C

ompl

etio

n) (R

epor

t 05)

(Prin

ted

BP-

HZN

-217

9MD

L000

5807

4B

P-H

ZN-2

179M

DL0

0058

075

PP R

epor

t Mac

ondo

801

1MD

.doc

BP-

HZN

-217

9MD

L000

5814

7B

P-H

ZN-2

179M

DL0

0058

149

PP R

epor

t Mac

ondo

110

10M

D.p

dfB

P-H

ZN-2

179M

DL0

0058

175

BP-

HZN

-217

9MD

L000

5817

7PP

Rep

ort M

acon

do 1

3305

.pdf

BP-

HZN

-217

9MD

L000

5847

0B

P-H

ZN-2

179M

DL0

0058

473

PP R

epor

t Mac

ondo

123

50.p

dfB

P-H

ZN-2

179M

DL0

0058

851

BP-

HZN

-217

9MD

L000

5885

3PP

Rep

ort M

acon

do B

P01

1808

8MD

.pdf

BP-

HZN

-217

9MD

L000

5885

8B

P-H

ZN-2

179M

DL0

0058

859

PP R

epor

t Mac

ondo

BP0

1 17

761M

D.p

dfB

P-H

ZN-2

179M

DL0

0058

921

BP-

HZN

-217

9MD

L000

5892

2PP

Rep

ort M

acon

do 8

878M

D.d

oc

Page 104: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nB

P-H

ZN-2

179M

DL0

0058

967

BP-

HZN

-217

9MD

L000

5896

9PP

Rep

ort M

acon

do 8

050M

D.d

ocB

P-H

ZN-2

179M

DL0

0059

079

BP-

HZN

-217

9MD

L000

5908

0PP

Rep

ort M

acon

do B

P01

1517

5.pd

fB

P-H

ZN-2

179M

DL0

0059

091

BP-

HZN

-217

9MD

L000

5909

2PP

Rep

ort M

acon

do 8

500M

D.d

ocB

P-H

ZN-2

179M

DL0

0059

237

BP-

HZN

-217

9MD

L000

5923

9PP

Rep

ort M

acon

do B

P01

1511

3.pd

fB

P-H

ZN-2

179M

DL0

0059

401

BP-

HZN

-217

9MD

L000

5940

3PP

Rep

ort M

acon

do 1

1887

MD

.pdf

BP-

HZN

-217

9MD

L000

5944

0B

P-H

ZN-2

179M

DL0

0059

443

PP R

epor

t Mac

ondo

BP0

1 13

780.

pdf

BP-

HZN

-217

9MD

L000

5945

7B

P-H

ZN-2

179M

DL0

0059

459

PP R

epor

t Mac

ondo

123

50.p

dfB

P-H

ZN-2

179M

DL0

0059

474

BP-

HZN

-217

9MD

L000

5947

5PP

Rep

ort M

acon

do 8

970M

D.d

ocB

P-H

ZN-2

179M

DL0

0059

488

BP-

HZN

-217

9MD

L000

5948

9PP

Rep

ort M

acon

do 8

000M

D.d

ocB

P-H

ZN-2

179M

DL0

0059

546

BP-

HZN

-217

9MD

L000

5954

7PP

Rep

ort M

acon

do B

P01

1183

8.pd

fB

P-H

ZN-2

179M

DL0

0059

558

BP-

HZN

-217

9MD

L000

5956

0PP

Rep

ort M

acon

do B

P01

1646

0.pd

fB

P-H

ZN-2

179M

DL0

0059

632

BP-

HZN

-217

9MD

L000

5963

3PP

Rep

ort M

acon

do B

P01

1826

0MD

.pdf

BP-

HZN

-217

9MD

L000

5969

2B

P-H

ZN-2

179M

DL0

0059

694

PP R

epor

t Mac

ondo

909

0MD

.doc

BP-

HZN

-217

9MD

L000

5978

3B

P-H

ZN-2

179M

DL0

0059

785

PP R

epor

t Mac

ondo

BP0

1 13

150.

pdf

N/A

Dep

ositi

on T

rans

crip

ts &

Exh

ibits

of A

lber

tin, M

artin

N/A

Dep

ositi

on T

rans

crip

ts &

Exh

ibits

of A

lber

ty, M

ark

N/A

Dep

ositi

on T

rans

crip

ts &

Exh

ibits

of L

acy,

Stu

art

N/A

Dep

ositi

on T

rans

crip

ts &

Exh

ibits

of P

aine

, Kat

eN

/AD

epos

ition

Tra

nscr

ipts

& E

xhib

its o

f Pat

ton,

Fra

nkN

/AD

epos

ition

Tra

nscr

ipts

& E

xhib

its o

f Tro

cque

t, D

avid

N/A

Dep

ositi

on T

rans

crip

ts &

Exh

ibits

of V

inso

n, G

raha

mN

/A20

11-0

9-23

Exp

ert R

epor

t of C

alvi

n B

arnh

ill (T

rans

ocea

n)N

/A20

11-0

8-26

Exp

ert R

epor

t of D

avid

Prit

char

d (P

SC)

N/A

2011

-08-

26 E

xper

t Rep

ort o

f Alla

n H

uffm

an (U

S)N

/AM

acon

do W

ell I

ncid

ent -

Tra

nsoc

ean

Inve

stig

atio

n R

epor

t Vol

umes

1 a

nd 2

and

N

/AC

hief

Cou

nsel

's 20

11 N

atio

nal C

omm

issi

on o

n th

e B

P D

eepw

ater

Hor

izon

Oil

Spill

and

N

/AD

epos

ition

Tra

nscr

ipt &

Exh

ibits

of O

'Bry

an, P

atric

kN

/AD

epos

ition

Tra

nscr

ipts

& E

xhib

its o

f Spr

ague

, Joh

nN

/AD

epos

ition

Tra

nscr

ipts

& E

xhib

its o

f Bill

on, B

rad

N/A

Dep

ositi

on T

rans

crip

t & E

xhib

its o

f Lin

dner

, Leo

BP-

HZN

-CEC

0204

94B

P-H

ZN-C

EC02

0510

2010

-03

Dril

ling

Piec

esB

P-H

ZN-C

EC02

8826

BP-

HZN

-CEC

0288

4020

10-0

4 D

rillin

g Pi

eces

BP-

HZN

-MB

I000

9908

8B

P-H

ZN-M

BI0

0099

102

2010

-01

Dril

ling

Plan

Pie

ces

Page 105: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nB

P-H

ZN-M

BI0

0116

697

BP-

HZN

-MB

I001

1670

620

10-0

3 D

rillin

g Pi

eces

BP-

HZN

-MB

I001

2618

1B

P-H

ZN-M

BI0

0126

200

2010

-04

Dril

ling

Piec

esB

P-H

ZN-M

BI0

0140

193

BP-

HZN

-MB

I001

4020

120

09-0

9 D

rillin

g Pl

an P

iece

sB

P-H

ZN-M

BI0

0140

211

BP-

HZN

-MB

I001

4021

320

09-0

9 D

rillin

g Pl

an P

iece

sB

P-H

ZN-M

BI0

0140

216

BP-

HZN

-MB

I001

4023

320

09-0

9 D

rillin

g Pl

an P

iece

sB

P-H

ZN-M

BI0

0140

234

BP-

HZN

-MB

I001

4025

020

09-0

9 D

rillin

g Pl

an P

iece

sB

P-H

ZN-M

BI0

0140

251

BP-

HZN

-MB

I001

4027

020

09-0

9 D

rillin

g Pl

an P

iece

sB

P-H

ZN-M

BI0

0140

300

BP-

HZN

-MB

I001

4031

720

09-0

9 D

rillin

g Pl

an P

iece

sB

P-H

ZN-M

BI0

0140

318

BP-

HZN

-MB

I001

4033

520

09-0

9 D

rillin

g Pl

an P

iece

sB

P-H

ZN-M

BI0

0140

336

BP-

HZN

-MB

I001

4035

320

09-0

9 D

rillin

g Pl

an P

iece

sB

P-H

ZN-M

BI0

0140

354

BP-

HZN

-MB

I001

4037

920

09-0

9 D

rillin

g Pl

an P

iece

sB

P-H

ZN-M

BI0

0140

447

BP-

HZN

-MB

I001

4046

020

09-0

9 D

rillin

g Pl

an P

iece

sB

P-H

ZN-M

BI0

0140

461

BP-

HZN

-MB

I001

4047

320

10-0

1 D

rillin

g Pl

an P

iece

sB

P-H

ZN-M

BI0

0140

475

BP-

HZN

-MB

I001

4049

220

09-0

9 D

rillin

g Pl

an P

iece

sB

P-H

ZN-M

BI0

0140

493

BP-

HZN

-MB

I001

4050

920

10-0

1 D

rillin

g Pl

an P

iece

sB

P-H

ZN-M

BI0

0140

522

BP-

HZN

-MB

I001

4053

020

10-0

1 D

rillin

g Pl

an P

iece

sB

P-H

ZN-M

BI0

0140

564

BP-

HZN

-MB

I001

4059

820

10-0

1 D

rillin

g Pl

an P

iece

sB

P-H

ZN-M

BI0

0140

599

BP-

HZN

-MB

I001

4060

020

10-0

1 D

rillin

g Pl

an P

iece

sB

P-H

ZN-M

BI0

0140

601

BP-

HZN

-MB

I001

4061

720

10-0

1 D

rillin

g Pl

an P

iece

sB

P-H

ZN-M

BI0

0141

096

BP-

HZN

-MB

I001

4111

820

10-0

3 D

rillin

g Pi

eces

BP-

HZN

-MB

I001

4111

9B

P-H

ZN-M

BI0

0141

137

2010

-03

Dril

ling

Piec

esB

P-H

ZN-M

BI0

0141

205

BP-

HZN

-MB

I001

4122

120

10-0

3 D

rillin

g Pi

eces

BP-

HZN

-MB

I001

4125

7B

P-H

ZN-M

BI0

0141

276

2010

-03

Dril

ling

Piec

esB

P-H

ZN-M

BI0

0141

297

BP-

HZN

-MB

I001

4131

620

10-0

3 D

rillin

g Pi

eces

BP-

HZN

-MB

I001

4131

7B

P-H

ZN-M

BI0

0141

336

2010

-03

Dril

ling

Piec

esB

P-H

ZN-M

BI0

0141

400

BP-

HZN

-MB

I001

4141

120

10-0

3 D

rillin

g Pi

eces

BP-

HZN

-MB

I001

4149

3B

P-H

ZN-M

BI0

0141

512

2010

-03

Dril

ling

Piec

esB

P-H

ZN-M

BI0

0141

737

BP-

HZN

-MB

I001

4174

620

10-0

3 D

rillin

g Pi

eces

BP-

HZN

-MB

I001

4201

4B

P-H

ZN-M

BI0

0142

034

2010

-04

Dril

ling

Piec

esB

P-H

ZN-2

179M

DL0

0031

758

BP-

HZN

-217

9MD

L000

3176

6D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

(Rep

ort 1

00) (

Prin

ted

0556

33 A

M)

BP-

HZN

-217

9MD

L019

1779

3B

P-H

ZN-2

179M

DL0

1917

797

Dai

ly O

pera

tions

Rep

ort

BP-

HZN

-MB

I000

1432

1B

P-H

ZN-M

BI0

0014

323

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) (R

epor

t 57)

(Prin

ted

0643

08 A

M)

Nat

ive

prod

uctio

nM

DL

Ex. 4

025

- MC

252

For

mat

ion

PIT

Rep

ortin

g W

orks

heet

Page 106: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nB

P-H

ZN-2

179M

DL0

0060

898

BP-

HZN

-217

9MD

L000

6090

0IA

DC

Dai

ly D

rillin

g R

epor

t for

Feb

ruar

y 14

, 201

0B

P-H

ZN-B

LY00

2425

20B

P-H

ZN-B

LY00

2425

23IA

DC

Dai

ly D

rillin

g R

epor

t for

Mar

ch 1

5, 2

010

BP-

HZN

-217

9MD

L003

2711

6B

P-H

ZN-2

179M

DL0

0327

511

BP

EX00

83 -

Tran

soce

an W

ell C

ontro

l Han

dboo

k (0

3.31

.200

9)_M

DL

Bat

es.P

DF

BP-

HZN

-217

9MD

L003

3594

8B

P-H

ZN-2

179M

DL0

0336

409

BP

Wel

l Con

trol M

anua

l Vol

. 1_M

DL

Bat

es.P

DF

BP-

HZN

-217

9MD

L003

3641

0B

P-H

ZN-2

179M

DL0

0336

757

BP

Wel

l Con

trol M

anua

l Vol

. 2_M

DL

Bat

es.P

DF

BP-

HZN

-217

9MD

L003

3676

2B

P-H

ZN-2

179M

DL0

0336

889

BP

Wel

l Con

trol M

anua

l Vol

. 3_M

DL

Bat

es.P

DF

BP-

HZN

-217

9MD

L000

5726

1B

P-H

ZN-2

179M

DL0

0057

372

Dril

ling

and

Wel

l Ope

ratio

ns P

ract

ice,

E&

P D

efin

ed O

pera

ting

Prac

tice

BP-

HZN

-SN

R00

0000

18B

P-H

ZN-S

NR

0000

0018

Form

MM

S 14

4 - R

ig M

ovem

ent N

otifi

catio

n R

epor

tB

P-H

ZN-S

NR

0000

0024

BP-

HZN

-SN

R00

0000

51Fo

rm M

MS

123A

/123

S - A

pplic

atio

n fo

r Per

mit

to D

rill N

ew W

ell

BP-

HZN

-SN

R00

0004

06B

P-H

ZN-S

NR

0000

0408

Form

MM

S 12

5 - E

nd o

f Ope

ratio

ns R

epor

tB

P-H

ZN-S

NR

0000

0409

BP-

HZN

-SN

R00

0004

09Lt

r fro

m W

. Bra

ntle

y to

M. G

riffit

t re

Initi

al E

xplo

ratio

n Pl

an fo

r MC

252

BP-

HZN

-SN

R00

0004

25B

P-H

ZN-S

NR

0000

0425

Ltr f

rom

M. T

olbe

rt to

S. D

ougl

as re

Rev

ised

Exp

lora

tion

Plan

for M

C 2

52B

p-H

ZN-S

NR

0000

0426

BP-

HZN

-SN

R00

0004

40Fo

rm M

MS

123A

/123

S - A

pplic

atio

n fo

r Byp

ass

BP-

HZN

-SN

R00

0004

41B

P-H

ZN-S

NR

0000

0450

Form

MM

S 12

3A/1

23S

- App

licat

ion

for R

evis

ed B

ypas

sB

P-H

ZN-S

NR

0000

0493

BP-

HZN

-SN

R00

0005

00Fo

rm M

MS

123A

/123

S - A

pplic

atio

n fo

r Rev

ised

New

Wel

lB

P-H

ZN-S

NR

0000

0509

BP-

HZN

-SN

R00

0005

12Fo

rm M

MS

124

BP-

HZN

-SN

R00

0005

13B

P-H

ZN-S

NR

0000

0520

Form

MM

S 12

3A/1

23S

- App

licat

ion

for R

evis

ed N

ew W

ell

BP-

HZN

-SN

R00

0005

75B

P-H

ZN-S

NR

0000

0585

Form

MM

S 12

3A/1

23S

- App

licat

ion

for R

evis

ed N

ew W

ell

Bp-

HZN

-SN

R00

0005

86B

P-H

ZN-S

NR

0000

0593

Form

MM

S 12

3A/1

23S

- App

licat

ion

for R

evis

ed N

ew W

ell

BP-

HZN

-SN

R00

0006

16B

P-H

ZN-S

NR

0000

0624

Form

MM

S 12

3A/1

23S

- App

licat

ion

for R

evis

ed B

ypas

sB

P-H

ZN-S

NR

0000

0625

BP-

HZN

-SN

R00

0006

32Fo

rm M

MS

123A

/123

S - A

pplic

atio

n fo

r Rev

ised

New

Wel

lB

p-H

ZN-S

NR

0000

0651

BP-

HZN

-SN

R00

0006

63Fo

rm M

MS

124

BP-

HZN

-SN

R00

0007

13B

P-H

ZN-S

NR

0000

0716

Form

MM

S 12

4 B

P-H

ZN-S

NR

0000

0727

BP-

HZN

-SN

R00

0007

27Fo

rm 1

44 -

Rig

Mov

emen

t Not

ifica

tion

Rep

ort

BP-

HZN

-SN

R00

0007

70B

P-H

ZN-S

NR

0000

0782

Form

MM

S 12

3A/1

23S

- App

licat

ion

for R

evis

ed N

ew W

ell

BP-

HZN

-SN

R00

0007

86B

P-H

ZN-S

NR

0000

0788

Form

MM

S 13

3B

P-H

ZN-S

NR

0000

0944

BP-

HZN

-SN

R00

0009

47Fo

rm M

MS

124

BP-

HZN

-SN

R00

0009

48B

P-H

ZN-S

NR

0000

0956

Form

MM

S 12

3A/1

23S

- App

licat

ion

for R

evis

ed N

ew W

ell

BP-

HZN

-SN

R00

0009

57B

P-H

ZN-S

NR

0000

0958

Form

MM

S 12

5 - E

nd o

f Ope

ratio

ns R

epor

tB

P-H

ZN-S

NR

0000

0959

BP-

HZN

-SN

R00

0009

74Fo

rm M

MS

123A

/123

S - A

pplic

atio

n fo

r Rev

ised

Byp

ass

BP-

HZN

-SN

R00

0009

78B

P-H

ZN-S

NR

0000

0990

Form

MM

S 12

3A/1

23S

- App

licat

ion

for R

evis

ed B

ypas

sB

P-H

ZN-S

NR

0000

122

BP-

HZN

-SN

R00

0001

50Fo

rm M

MS

123A

/123

S - A

pplic

atio

n fo

r Per

mit

to D

rill N

ew W

ell (

MM

S A

ppro

val)

BP-

HZN

-SN

R-0

0002

71B

P-H

ZN-S

NR

-000

0003

91In

itial

Exp

lora

tion

Plan

- M

issi

ssip

pi C

anyo

n B

lock

252

Page 107: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nB

P-H

ZN-S

NR

-000

0392

BP-

HZN

-SN

R-0

0000

394

Initi

al E

xplo

ratio

n Pl

an -

Mis

siss

ippi

Can

yon

Blo

ck 2

52 (S

ectio

n 14

.0)

BP-

HZN

-217

9MD

L025

6744

4B

P-H

ZN-2

179M

DL0

2567

557

NA

E Tr

ansc

ript f

or H

allib

urto

n (T

rans

crip

t 3 o

f 4)

BP-

HZN

-217

9MD

L010

4530

7B

P-H

ZN-2

179M

DL0

1045

323

9-26

-201

0 H

allib

urto

n Pr

esen

tatio

n to

NA

EB

P-H

ZN-2

179M

DL0

0004

060

BP-

HZN

-217

9MD

L000

0406

0Em

ail f

rom

G. B

enne

tt to

M. A

lber

tin e

t al r

e M

acon

do U

pdat

e 3p

mB

P-H

ZN-2

179M

DL0

0005

009

BP-

HZN

-217

9MD

L000

0501

0Em

ail f

rom

F. P

atto

n to

S. D

ougl

as re

BO

P ex

tens

ion

BP-

HZN

-217

9MD

L000

0512

9B

P-H

ZN-2

179M

DL0

0005

129

Emai

l fro

m B

. Mor

el to

D. V

idrin

e re

Mod

ifica

tion

of P

erm

it to

Byp

ass

BP-

HZN

-217

9MD

L000

0707

6B

P-H

ZN-2

179M

DL0

0007

077

Emai

l fro

m F

. pat

ton

to S

. Dou

glas

re M

C 2

52 L

OT

BP-

HZN

-217

9MD

L000

0711

1B

P-H

ZN-2

179M

DL0

0007

111

Emai

l fro

m S

. Dou

glas

to F

. Pat

ton

re 1

6" C

asin

g Te

st P

ress

ure

BP-

HZN

-217

9MD

L002

1016

3B

P-H

ZN-2

179M

DL0

0210

280

Fina

l Rep

ort -

Blo

w-o

ut P

reve

ntio

n Eq

uipm

ent R

elia

bilit

y Jo

int I

ndus

try P

roje

ctB

P-H

ZN-2

179M

DL0

0211

240

BP-

HZN

-217

9MD

L002

1124

1Em

ail f

rom

S. D

ougl

as to

T. F

leec

e et

al r

e B

OP

Stac

k C

hang

e R

eque

stB

P-H

ZN-2

179M

DL0

0213

246

BP-

HZN

-217

9MD

L002

1324

6Em

ail f

rom

S. D

ougl

as to

D. V

idrin

e et

al r

e M

MS

appr

oval

to se

t plu

g an

d pu

ll st

ack

BP-

HZN

-217

9MD

L002

9002

5B

P-H

ZN-2

179M

DL0

0290

026

Emai

l fro

m L

. Her

bst t

o J.

Gra

nt re

MM

S D

irect

or T

ripB

P-H

ZN-2

179M

DL0

0302

808

BP-

HZN

-217

9MD

L003

0281

0Em

ail f

rom

J. G

rant

to J.

Gra

nt e

t al r

e B

P N

atio

nal M

MS

SAFE

Aw

ard

Fina

list

BP-

HZN

-217

9MD

L003

0281

1B

P-H

ZN-2

179M

DL0

0302

812

MM

S SA

FE A

war

d Pr

ogra

mB

P-H

ZN-2

179M

DL0

0302

813

BP-

HZN

-217

9MD

L003

0281

3M

MS

Dis

trict

SA

FE A

war

d R

ecip

ient

sB

P-H

ZN-2

179M

DL0

1906

814

BP-

HZN

-217

9MD

L019

0681

5Em

ail f

rom

S. D

ougl

as to

H. P

owel

l re

BO

P St

ack

Cha

nge

Req

uest

BP-

HZN

-217

9MD

L019

0682

7B

P-H

ZN-2

179M

DL0

1906

828

Emai

l fro

m S

. Dou

glas

to J.

Gui

de e

t al r

e Pl

ugnb

ack

appr

oval

requ

este

dB

P-H

ZN-2

179M

DL0

1952

111

BP-

HZN

-217

9MD

L019

5211

2Le

tter f

rom

D. T

rocq

uet t

o G

. Gra

y re

Not

ifica

tion

of In

cide

nt o

f Non

com

plia

nce

BP-

HZN

-217

9MD

L019

9337

2B

P-H

ZN-2

179M

DL0

1993

374

Emai

l fro

m F

. Pat

ton

to S

. Dou

glas

re S

EPLA

no

2 fa

iled

reco

very

BP-

HZN

-217

9MD

L019

9529

6B

P-H

ZN-2

179M

DL0

1995

296

MC

252

Pro

spec

t Ove

rvie

wB

P-H

ZN-2

179M

DL0

2709

676

BP-

HZN

-217

9MD

L027

0968

3M

MS

Inci

dent

Rep

ort

BP-

HZN

-217

9MD

L029

6214

3B

P-H

ZN-2

179M

DL0

2962

175

Emer

genc

y Ev

acua

tion

Plan

- M

C 2

52 -

Dee

pwat

er H

oriz

onB

P-H

ZN-B

LY00

2412

59B

P-H

ZN-B

LY00

2412

61Em

ail f

rom

S. D

ougl

as to

B. M

orel

et a

l re

Test

Pre

ssur

eB

P-H

ZN-M

BI0

0170

673

BP-

HZN

-MB

I001

7067

3Lt

r fro

m S

. Dou

glas

re In

itial

Exp

lora

tion

Plan

for M

C 2

52B

P-H

ZN-M

BI0

0170

742

BP-

HZN

-MB

I001

7074

2Em

ail f

rom

F. P

atto

n to

S. D

ougl

as re

Cem

ent V

olum

e C

hang

eB

P-H

ZN-2

179M

DL0

0247

809

BP-

HZN

-217

9MD

L002

4780

9Em

ail f

rom

Mor

el to

Bur

ns re

FIT

/LO

T te

stII

G01

3-03

7711

IIG

013-

0377

15M

MS

Test

C K

ey -

Dril

ling

IMS0

17-0

0033

8IM

S017

-000

341

Min

utes

of F

ield

Ope

ratio

ns D

rillin

g En

gine

ers'

Mee

ting

IMS0

17-0

2503

0IM

S017

-025

031

Min

utes

of D

rillin

g En

gine

ers M

eetin

gIM

S019

-008

027

IMS0

19-0

0803

0Em

ail f

rom

D. T

rocq

uet t

o M

. Sau

cier

re M

MS

Que

sito

nsIM

S020

-011

185

IMS0

20-0

1123

7St

anda

rd O

pera

ting

Proc

edur

es -

Dril

ling

Ope

ratio

ns F

ield

Ope

ratio

ns G

OM

IMS0

22-0

3055

8IM

S022

-030

558

Emai

l fro

m F

. Pat

ton

to A

. Lap

lant

e re

MC

776

Perm

it D

etai

lIM

S023

-016

635

IMS0

23-0

1663

6Em

ail f

rom

J. L

evin

e to

F. P

atto

n et

al r

e M

MS

Dril

l Tes

t B (A

ttach

men

ts a

re a

t Tab

53

Page 108: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nIM

S023

-016

637

IMS0

23-0

1664

3M

MS

Test

B K

ey -

Dril

ling

IMS0

23-0

1664

4IM

S023

-016

650

MM

S Te

st B

- D

rillin

gIM

S023

-045

399

IMS0

23-0

4540

0Em

ail f

rom

F. P

atto

n to

J. C

hady

(She

ll) re

MM

S A

ppro

val t

o Se

t Con

tinge

ncy

7-5/

8"

IMS-

0260

0079

9IM

S-02

6000

800

Emai

l fro

m F

. Pat

ton

to G

. Cra

ne re

MC

782

IMS0

26-0

0377

4IM

S026

-003

775

Emai

l fro

m F

. Pat

ton

to J.

Cam

p re

MC

956

IM

S026

-009

754

IMS0

26-0

0975

4Em

ail f

rom

D. T

rocq

uet t

o G

. Cra

ne re

MC

782

IMS0

26-0

1383

0IM

S026

-013

830

Emai

l fro

m D

. Tro

cque

t to

G. C

rane

re M

C 7

82IM

S026

-047

062

IMS0

26-0

4706

3Em

ail f

rom

G. W

iltz

to F

. Pat

ton

re M

C 5

20 D

ispe

nsat

ions

IMS0

26-0

4905

98IM

S026

-049

598

Emai

l fro

m C

. Lyn

ard

to F

. Pat

ton

et a

l re

MC

250

requ

est t

o de

epen

cas

ing

setti

ng

IMS1

81-0

0000

1IM

S181

-000

001

MM

S N

ew O

rlean

s Dis

trict

Rec

ord

of C

onve

rsat

ion

Publ

icly

Ava

ilabl

eM

DL

Ex. 4

019

- BO

EMR

E - N

atio

nal O

ffic

e Po

tent

ial I

ncid

ent o

f Non

com

plia

nce

Publ

icly

Ava

ilabl

e30

CFR

250

.427

HA

L_05

3996

0H

AL_

0539

979

BP

Am

eric

a Pr

oduc

tion

Com

pany

Mac

ondo

#1,

9 7

/8"

X 7

" Pr

oduc

tion

Cas

ing

Des

ign

HA

L_01

1733

0H

AL_

0117

330

BP

Am

eric

a Pr

oduc

tion

Com

pany

Mac

ondo

#1,

9 7

/8"

X 7

" Pr

oduc

tion

Cas

ing

Des

ign

HA

L_01

1735

2H

AL_

0117

384

BP

Am

eric

a Pr

oduc

tion

Com

pany

Mac

ondo

#1,

9 7

/8"

X 7

" Pr

oduc

tion

Cas

ing

Des

ign

BP-

HZN

-217

9MD

L005

3968

5B

P-H

ZN-2

179M

DL0

0539

696

EPT

Dril

ling,

Eva

luat

ion

of C

asin

g D

esig

n B

asis

for M

acon

do P

rosp

ect,

Mis

sipp

i B

P-H

ZN-2

179M

DL0

0470

489

BP-

HZN

-217

9MD

L004

7050

1EP

T D

rillin

g, E

valu

atio

n of

Cas

ing

Des

ign

Bas

is fo

r Mac

ondo

Pro

spec

t, M

issi

ppi

BP-

HZN

-217

9MD

L030

7432

9B

P-H

ZN-2

179M

DL0

3074

252

EPT

Dril

ling,

Eva

luat

ion

of C

asin

g D

esig

n B

asis

for M

acon

do P

rosp

ect,

Mis

sipp

i B

P-H

ZN-2

179M

DL0

1578

858

BP-

HZN

-217

9MD

L015

7886

2EP

T D

rillin

g, E

valu

atio

n of

Cas

ing

Des

ign

Bas

is fo

r Mac

ondo

Pro

spec

t, M

issi

ppi

BP-

HZN

-217

9MD

L013

2814

BP-

HZN

-217

9MD

L013

2782

8EP

T D

rillin

g, E

valu

atio

n of

Cas

ing

Des

ign

Bas

is fo

r Mac

ondo

Pro

spec

t, M

issi

ppi

BP-

HZN

-SN

R00

0000

11B

P-H

ZN-S

NR

0000

0014

Wee

kly

Act

ivity

Rep

ort

BP-

HZN

-SN

R00

0000

15B

P-H

ZN-S

NR

0000

0017

Wee

kly

Act

ivity

Rep

ort

BP-

HZN

-SN

R00

0000

19B

P-H

ZN-S

NR

0000

0023

Wee

kly

Act

ivity

Rep

ort

BP-

HZN

-SN

R00

0001

11B

P-H

ZN-S

NR

0000

0113

Wee

kly

Act

ivity

Rep

ort

BP-

HZN

-SN

R00

0001

51B

P-H

ZN-S

NR

0000

0153

Wee

kly

Act

ivity

Rep

ort

BP-

HZN

-SN

R00

0001

54B

P-H

ZN-S

NR

0000

0156

Wee

kly

Act

ivity

Rep

ort

BP-

HZN

-SN

R00

0002

40B

P-H

ZN-S

NR

0000

0241

Wee

kly

Act

ivity

Rep

ort

BP-

HZN

-SN

R00

0003

95B

P-H

ZN-S

NR

0000

0398

Wee

kly

Act

ivity

Rep

ort

BP-

HZN

-SN

R00

0004

00B

P-H

ZN-S

NR

0000

0402

Wee

kly

Act

ivity

Rep

ort

BP-

HZN

-SN

R00

0004

10B

P-H

ZN-S

NR

0000

0412

Wee

kly

Act

ivity

Rep

ort

BP-

HZN

-SN

R00

0004

13B

P-H

ZN-S

NR

0000

0416

Wee

kly

Act

ivity

Rep

ort

BP-

HZN

-SN

R00

0004

88B

P-H

ZN-S

NR

0000

0490

Wee

kly

Act

ivity

Rep

ort

BP-

HZN

-SN

R00

0004

91B

P-H

ZN-S

NR

0000

0492

Wee

kly

Act

ivity

Rep

ort

Page 109: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nB

P-H

ZN-S

NR

0000

0594

BP-

HZN

-SN

R00

0005

95W

eekl

y A

ctiv

ity R

epor

tB

P-H

ZN-S

NR

0000

0710

BP-

HZN

-SN

R00

0007

12W

eekl

y A

ctiv

ity R

epor

tB

P-H

ZN-S

NR

0000

0717

BP-

HZN

-SN

R00

0007

19W

eekl

y A

ctiv

ity R

epor

tB

P-H

ZN-S

NR

0000

0720

BP-

HZN

-SN

R00

0007

22W

eekl

y A

ctiv

ity R

epor

tB

P-H

ZN-S

NR

0000

0723

BP-

HZN

-SN

R00

0007

26Fo

rm M

MS

124

BP-

HZN

-SN

R00

0009

13B

P-H

ZN-S

NR

0000

0917

Wee

kly

Act

ivity

Rep

ort

BP-

HZN

-SN

R00

0009

75B

P-H

ZN-S

NR

0000

0977

Wee

kly

Act

ivity

Rep

ort

BP-

HZN

-SN

R00

0009

92B

P-H

ZN-S

NR

0000

0994

Wee

kly

Act

ivity

Rep

ort

BP-

HZN

-BLY

0009

6490

BP-

HZN

-BLY

0009

6527

Proj

ect S

pace

r rep

ort

TRN

-MD

L-02

1307

70TR

N-M

DL-

0213

0871

2005

DW

H T

HIN

K P

lans

TRN

-IN

V-0

1131

807

TRN

-IN

V-0

1131

807

Oct

ober

5, 2

010

Farr

to A

mbr

ose

emai

l re

Mud

Gas

Div

erte

r que

stio

nsTR

N-I

NV

-011

3180

8TR

N-I

NV

-011

3181

3A

ttach

men

t to

Oct

ober

5, 2

010

Farr

to A

mbr

ose

emai

lH

AL_

0468

825

HA

L_04

6884

6M

DL

Dep

. Ex.

609

: Sp

erry

Sun

mat

eria

lsTR

N-H

CEC

-000

0540

2TR

N-H

CEC

-000

0579

7M

DL

Dep

. Ex.

674

: TO

Wel

l Con

trol H

andb

ook

BP-

HZN

-MB

I001

6753

4B

P-H

ZN-M

BI0

0167

575

MD

L D

ep. E

x. 5

71:

TO S

afet

y D

rills

TRN

-HC

EC00

0004

727

TRN

-HC

EC00

0052

36M

DL

Dep

. Ex.

144

9: T

O H

SE M

anua

lTR

N-H

CEC

-000

1157

4TR

N-H

CEC

-000

1200

1M

DL

Dep

. Ex.

145

2: T

O F

ield

Ops

Han

dboo

kTR

N-H

CEC

-000

0642

3TR

N-H

CEC

-000

0678

3M

DL

Dep

. Ex.

145

3: T

O E

RM

Vol

. 1TR

N-M

DL-

0028

6767

TRN

-MD

L-00

2871

62M

DL

Dep

. Ex.

145

4: T

O E

RM

Vol

. 1TR

N-M

DL-

0004

7535

TRN

-MD

L-00

0477

54M

DL

Dep

. Ex.

218

7: T

O M

AR

on

DW

HTR

N-M

DL-

0114

6603

TRN

-MD

L-01

1466

07M

DL

Dep

. Ex.

219

4: T

O E

mai

lsTR

N-I

NV

-006

9028

8TR

N-I

NV

-006

9029

0M

DL

Dep

. Ex.

490

2: T

O E

mai

l re

kick

tole

ranc

eTR

N-I

NV

-000

0000

1TR

N-I

NV

-000

0000

7TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

008

TRN

-IN

V-0

0000

028

TO In

terv

iew

Not

esTR

N-I

NV

-000

0002

9TR

N-I

NV

-000

0003

3TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

034

TRN

-IN

V-0

0000

046

TO In

terv

iew

Not

esTR

N-I

NV

-000

0004

7TR

N-I

NV

-000

0005

1TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

052

TRN

-IN

V-0

0000

083

TO In

terv

iew

Not

esTR

N-I

NV

-000

0008

4TR

N-I

NV

-000

0009

0TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

091

TRN

-IN

V-0

0000

096

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0009

7TR

N-I

NV

-000

0011

5TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0000

116

TRN

-IN

V-0

0000

121

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0012

2TR

N-I

NV

-000

0013

8TO

Inte

rvie

w N

otes

Page 110: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nTR

N-I

NV

-000

0013

9TR

N-I

NV

-000

0014

3TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

144

TRN

-IN

V-0

0000

160

TO In

terv

iew

Not

esTR

N-I

NV

-000

0016

1TR

N-I

NV

-000

0016

5TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

166

TRN

-IN

V-0

0000

177

TO In

terv

iew

Not

esTR

N-I

NV

-000

0017

8TR

N-I

NV

-000

0018

1TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

182

TRN

-IN

V-0

0000

188

TO In

terv

iew

Not

esTR

N-I

NV

-000

0018

9TR

N-I

NV

-000

0019

8TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0000

199

TRN

-IN

V-0

0000

201

TO In

terv

iew

Not

esTR

N-I

NV

-000

0020

2TR

N-I

NV

-000

0020

7TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

208

TRN

-IN

V-0

0000

227

TO In

terv

iew

Not

esTR

N-I

NV

-000

0022

8TR

N-I

NV

-000

0023

2TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

233

TRN

-IN

V-0

0000

247

TO In

terv

iew

Not

esTR

N-I

NV

-000

0024

8TR

N-I

NV

-000

0025

3TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

254

TRN

-IN

V-0

0000

266

TO In

terv

iew

Not

esTR

N-I

NV

-000

0026

7TR

N-I

NV

-000

0027

1TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

272

TRN

-IN

V-0

0000

283

TO In

terv

iew

Not

esTR

N-I

NV

-000

0028

4TR

N-I

NV

-000

0028

7TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

288

TRN

-IN

V-0

0000

295

TO In

terv

iew

Not

esTR

N-I

NV

-000

0029

6TR

N-I

NV

-000

0030

6TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

307

TRN

-IN

V-0

0000

350

TO In

terv

iew

Not

esTR

N-I

NV

-000

0035

1TR

N-I

NV

-000

0035

4TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

355

TRN

-IN

V-0

0000

360

TO In

terv

iew

Not

esTR

N-I

NV

-000

0036

1TR

N-I

NV

-000

0036

9TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

370

TRN

-IN

V-0

0000

394

TO In

terv

iew

Not

esTR

N-I

NV

-000

0039

5TR

N-I

NV

-000

0039

9TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

400

TRN

-IN

V-0

0000

417

TO In

terv

iew

Not

esTR

N-I

NV

-000

0041

8TR

N-I

NV

-000

0042

3TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

424

TRN

-IN

V-0

0000

442

TO In

terv

iew

Not

esTR

N-I

NV

-000

0044

3TR

N-I

NV

-000

0044

8TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

449

TRN

-IN

V-0

0000

462

TO In

terv

iew

Not

esTR

N-I

NV

-000

0046

3TR

N-I

NV

-000

0046

8TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

469

TRN

-IN

V-0

0000

480

TO In

terv

iew

Not

esTR

N-I

NV

-000

0048

1TR

N-I

NV

-000

0048

6TO

Inte

rvie

w M

emo

Page 111: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nTR

N-I

NV

-000

0048

7TR

N-I

NV

-000

0051

3TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0000

514

TRN

-IN

V-0

0000

518

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0051

9TR

N-I

NV

-000

0052

7TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0000

528

TRN

-IN

V-0

0000

531

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0053

2TR

N-I

NV

-000

0054

7TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0000

548

TRN

-IN

V-0

0000

550

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0055

1TR

N-I

NV

-000

0055

6TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0000

557

TRN

-IN

V-0

0000

560

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0056

1TR

N-I

NV

-000

0057

2TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0000

573

TRN

-IN

V-0

0000

578

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0057

9TR

N-I

NV

-000

0059

3TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0000

594

TRN

-IN

V-0

0000

598

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0059

9TR

N-I

NV

-000

0062

1TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0000

622

TRN

-IN

V-0

0000

625

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0062

6TR

N-I

NV

-000

0063

5TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0000

636

TRN

-IN

V-0

0000

639

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0064

0TR

N-I

NV

-000

0065

7TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0000

658

TRN

-IN

V-0

0000

663

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0066

4TR

N-I

NV

-000

0069

5TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0000

696

TRN

-IN

V-0

0000

699

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0070

0TR

N-I

NV

-000

0071

9TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0000

720

TRN

-IN

V-0

0000

724

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0072

5TR

N-I

NV

-000

0073

9TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0000

740

TRN

-IN

V-0

0000

746

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0074

7TR

N-I

NV

-000

0076

6TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0000

767

TRN

-IN

V-0

0000

771

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0077

2TR

N-I

NV

-000

0078

0TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0000

781

TRN

-IN

V-0

0000

784

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0078

5TR

N-I

NV

-000

0079

1TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0000

792

TRN

-IN

V-0

0000

797

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0079

8TR

N-I

NV

-000

0081

0TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0000

811

TRN

-IN

V-0

0000

815

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0081

6TR

N-I

NV

-000

0083

1TO

Inte

rvie

w N

otes

Page 112: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nTR

N-I

NV

-000

0083

2TR

N-I

NV

-000

0083

5TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

836

TRN

-IN

V-0

0000

842

TO In

terv

iew

Not

esTR

N-I

NV

-000

0084

3TR

N-I

NV

-000

0084

7TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

848

TRN

-IN

V-0

0000

862

TO In

terv

iew

Not

esTR

N-I

NV

-000

0086

3TR

N-I

NV

-000

0086

8TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

869

TRN

-IN

V-0

0000

886

TO In

terv

iew

Not

esTR

N-I

NV

-000

0088

7TR

N-I

NV

-000

0089

1TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

892

TRN

-IN

V-0

0000

897

TO In

terv

iew

Not

esTR

N-I

NV

-000

0089

8TR

N-I

NV

-000

0090

4TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

905

TRN

-IN

V-0

0000

924

TO In

terv

iew

Not

esTR

N-I

NV

-000

0092

5TR

N-I

NV

-000

0093

6TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

937

TRN

-IN

V-0

0000

973

TO In

terv

iew

Not

esTR

N-I

NV

-000

0097

4TR

N-I

NV

-000

0097

7TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

978

TRN

-IN

V-0

0000

991

TO In

terv

iew

Not

esTR

N-I

NV

-000

0099

2TR

N-I

NV

-000

0099

7TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0000

998

TRN

-IN

V-0

0001

015

TO In

terv

iew

Not

esTR

N-I

NV

-000

0101

6TR

N-I

NV

-000

0102

2TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0001

023

TRN

-IN

V-0

0001

040

TO In

terv

iew

Not

esTR

N-I

NV

-000

0104

1TR

N-I

NV

-000

0104

4TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0001

045

TRN

-IN

V-0

0001

061

TO In

terv

iew

Not

esTR

N-I

NV

-000

0106

2TR

N-I

NV

-000

0106

6TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0001

067

TRN

-IN

V-0

0001

093

TO In

terv

iew

Not

esTR

N-I

NV

-000

0109

4TR

N-I

NV

-000

0109

8TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0001

099

TRN

-IN

V-0

0001

116

TO In

terv

iew

Not

esTR

N-I

NV

-000

0111

7TR

N-I

NV

-000

0112

1TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0001

122

TRN

-IN

V-0

0001

139

TO In

terv

iew

Not

esTR

N-I

NV

-000

0114

0TR

N-I

NV

-000

0114

4TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0001

145

TRN

-IN

V-0

0001

162

TO In

terv

iew

Not

esTR

N-I

NV

-000

0116

3TR

N-I

NV

-000

0116

7TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0001

168

TRN

-IN

V-0

0001

182

TO In

terv

iew

Not

esTR

N-I

NV

-000

0118

3TR

N-I

NV

-000

0118

8TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0001

189

TRN

-IN

V-0

0001

204

TO In

terv

iew

Not

esTR

N-I

NV

-000

0120

5TR

N-I

NV

-000

0121

0TO

Inte

rvie

w M

emo

Page 113: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nTR

N-I

NV

-000

0121

1TR

N-I

NV

-000

0123

0TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

231

TRN

-IN

V-0

0001

234

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0123

5TR

N-I

NV

-000

0124

5TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

246

TRN

-IN

V-0

0001

252

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0125

3TR

N-I

NV

-000

0126

5TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

266

TRN

-IN

V-0

0001

272

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0127

3TR

N-I

NV

-000

0129

2TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

293

TRN

-IN

V-0

0001

298

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0129

9TR

N-I

NV

-000

0131

8TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

319

TRN

-IN

V-0

0001

323

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0132

4TR

N-I

NV

-000

0133

8TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

339

TRN

-IN

V-0

0001

342

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0134

3TR

N-I

NV

-000

0135

4TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

355

TRN

-IN

V-0

0001

360

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0136

1TR

N-I

NV

-000

0138

6TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

387

TRN

-IN

V-0

0001

391

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0139

2TR

N-I

NV

-000

0140

6TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

407

TRN

-IN

V-0

0001

410

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0141

1TR

N-I

NV

-000

0142

1TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

422

TRN

-IN

V-0

0001

428

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0142

9TR

N-I

NV

-000

0146

3TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

464

TRN

-IN

V-0

0001

464

TO W

itnes

s sta

tem

ent

TRN

-IN

V-0

0001

465

TRN

-IN

V-0

0001

474

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0147

5TR

N-I

NV

-000

0150

7TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

508

TRN

-IN

V-0

0001

511

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0151

2TR

N-I

NV

-000

0152

0TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

521

TRN

-IN

V-0

0001

524

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0152

5TR

N-I

NV

-000

0153

3TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

534

TRN

-IN

V-0

0001

538

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0153

9TR

N-I

NV

-000

0155

0TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

551

TRN

-IN

V-0

0001

557

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0155

8TR

N-I

NV

-000

0157

8TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

579

TRN

-IN

V-0

0001

585

TO In

terv

iew

Mem

o

Page 114: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nTR

N-I

NV

-000

0158

6TR

N-I

NV

-000

0160

8TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

609

TRN

-IN

V-0

0001

616

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0161

7TR

N-I

NV

-000

0164

0TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

642

TRN

-IN

V-0

0001

647

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0164

8TR

N-I

NV

-000

0167

2TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

673

TRN

-IN

V-0

0001

677

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0167

8TR

N-I

NV

-000

0168

8TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

689

TRN

-IN

V-0

0001

693

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0169

4TR

N-I

NV

-000

0170

2TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

703

TRN

-IN

V-0

0001

707

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0170

8TR

N-I

NV

-000

0174

7TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

748

TRN

-IN

V-0

0001

752

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0175

3TR

N-I

NV

-000

0176

6TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

767

TRN

-IN

V-0

0001

774

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0177

5TR

N-I

NV

-000

0179

7TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

798

TRN

-IN

V-0

0001

801

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0180

2TR

N-I

NV

-000

0181

2TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

813

TRN

-IN

V-0

0001

818

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0181

9TR

N-I

NV

-000

0183

8TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

839

TRN

-IN

V-0

0001

842

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0184

3TR

N-I

NV

-000

0185

5TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0001

856

TRN

-IN

V-0

0001

860

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0186

1TR

N-I

NV

-000

0186

4TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0001

865

TRN

-IN

V-0

0001

876

TO In

terv

iew

Not

esTR

N-I

NV

-000

0187

7TR

N-I

NV

-000

0188

6TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0001

887

TRN

-IN

V-0

0001

912

TO In

terv

iew

Not

esTR

N-I

NV

-000

0191

5TR

N-I

NV

-000

0191

8TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0001

919

TRN

-IN

V-0

0001

929

TO In

terv

iew

Not

esTR

N-I

NV

-000

0193

0TR

N-I

NV

-000

0193

5TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0001

936

TRN

-IN

V-0

0001

970

TO In

terv

iew

Not

esTR

N-I

NV

-000

0197

1TR

N-I

NV

-000

0197

4TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0001

975

TRN

-IN

V-0

0001

981

TO In

terv

iew

Not

esTR

N-I

NV

-000

0198

2TR

N-I

NV

-000

0198

6TO

Inte

rvie

w M

emo

Page 115: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nTR

N-I

NV

-000

0198

7TR

N-I

NV

-000

0200

9TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0002

010

TRN

-IN

V-0

0002

016

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0201

7TR

N-I

NV

-000

0204

5TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0002

046

TRN

-IN

V-0

0002

048

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0204

9TR

N-I

NV

-000

0205

3TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0002

054

TRN

-IN

V-0

0002

059

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0206

0TR

N-I

NV

-000

0208

0TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0002

081

TRN

-IN

V-0

0002

086

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0208

7TR

N-I

NV

-000

0209

9TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0002

100

TRN

-IN

V-0

0002

103

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0210

4TR

N-I

NV

-000

0211

3TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0002

114

TRN

-IN

V-0

0002

123

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0212

4TR

N-I

NV

-000

0216

2TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0002

163

TRN

-IN

V-0

0002

167

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0216

8TR

N-I

NV

-000

0219

1TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0002

192

TRN

-IN

V-0

0002

196

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0219

7TR

N-I

NV

-000

0221

7TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0002

218

TRN

-IN

V-0

0002

222

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0222

3TR

N-I

NV

-000

0223

7TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0002

238

TRN

-IN

V-0

0002

244

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0224

5TR

N-I

NV

-000

0227

4TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0002

275

TRN

-IN

V-0

0002

281

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0228

2TR

N-I

NV

-000

0230

2TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0002

303

TRN

-IN

V-0

0002

316

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0231

7TR

N-I

NV

-000

0241

9TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0002

420

TRN

-IN

V-0

0002

423

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0242

4TR

N-I

NV

-000

0243

3TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0002

434

TRN

-IN

V-0

0002

437

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0243

8TR

N-I

NV

-000

0245

4TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0002

455

TRN

-IN

V-0

0002

460

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0246

1TR

N-I

NV

-000

0248

6TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0002

487

TRN

-IN

V-0

0002

491

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0249

2TR

N-I

NV

-000

0250

7TO

Inte

rvie

w N

otes

Page 116: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nTR

N-I

NV

-000

0250

8TR

N-I

NV

-000

0251

3TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0002

514

TRN

-IN

V-0

0002

532

TO In

terv

iew

Not

esTR

N-I

NV

-000

0253

3TR

N-I

NV

-000

0253

8TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0002

539

TRN

-IN

V-0

0002

554

TO In

terv

iew

Not

esTR

N-I

NV

-000

0255

5TR

N-I

NV

-000

0256

0TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0002

561

TRN

-IN

V-0

0002

575

TO In

terv

iew

Not

esTR

N-I

NV

-000

0257

6TR

N-I

NV

-000

0257

9TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0002

580

TRN

-IN

V-0

0002

605

TO In

terv

iew

Not

esTR

N-I

NV

-000

0260

6TR

N-I

NV

-000

0261

2TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0002

613

TRN

-IN

V-0

0002

627

TO In

terv

iew

Not

esTR

N-I

NV

-000

0262

8TR

N-I

NV

-000

0263

0TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0002

631

TRN

-IN

V-0

0002

644

TO In

terv

iew

Not

esTR

N-I

NV

-000

0264

5TR

N-I

NV

-000

0265

2TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0002

653

TRN

-IN

V-0

0002

692

TO In

terv

iew

Not

esTR

N-I

NV

-000

0269

3TR

N-I

NV

-000

0269

8TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0002

699

TRN

-IN

V-0

0002

724

TO In

terv

iew

Not

esTR

N-I

NV

-000

0272

5TR

N-I

NV

-000

0272

9TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0002

730

TRN

-IN

V-0

0002

739

TO In

terv

iew

Not

esTR

N-I

NV

-000

0274

0TR

N-I

NV

-000

0274

2TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0002

743

TRN

-IN

V-0

0002

757

TO In

terv

iew

Not

esTR

N-I

NV

-000

0275

8TR

N-I

NV

-000

0276

2TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0002

763

TRN

-IN

V-0

0002

777

TO In

terv

iew

Not

esTR

N-I

NV

-000

0277

8TR

N-I

NV

-000

0278

2TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0002

783

TRN

-IN

V-0

0002

788

TO In

terv

iew

Not

esTR

N-I

NV

-000

0278

9TR

N-I

NV

-000

0279

2TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0002

793

TRN

-IN

V-0

0002

830

TO In

terv

iew

Not

esTR

N-I

NV

-000

0283

1TR

N-I

NV

-000

0283

4TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0002

835

TRN

-IN

V-0

0002

857

TO In

terv

iew

Not

esTR

N-I

NV

-000

0285

8TR

N-I

NV

-000

0286

1TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0002

862

TRN

-IN

V-0

0002

872

TO In

terv

iew

Not

esTR

N-I

NV

-000

0287

3TR

N-I

NV

-000

0287

8TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0002

879

TRN

-IN

V-0

0002

893

TO In

terv

iew

Not

esTR

N-I

NV

-000

0289

4TR

N-I

NV

-000

0289

9TO

Inte

rvie

w M

emo

Page 117: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nTR

N-I

NV

-000

0290

0TR

N-I

NV

-000

0292

3TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0002

924

TRN

-IN

V-0

0002

927

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0292

8TR

N-I

NV

-000

0293

3TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0002

934

TRN

-IN

V-0

0002

938

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0293

9TR

N-I

NV

-000

0295

4TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0002

955

TRN

-IN

V-0

0002

955

TO W

itnes

s sta

tem

ent

TRN

-IN

V-0

0002

956

TRN

-IN

V-0

0002

961

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0296

2TR

N-I

NV

-000

0297

2TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0002

973

TRN

-IN

V-0

0002

977

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0297

8TR

N-I

NV

-000

0298

7TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0002

988

TRN

-IN

V-0

0002

995

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0299

6TR

N-I

NV

-000

0307

1TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0003

072

TRN

-IN

V-0

0003

075

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0307

6TR

N-I

NV

-000

0308

6TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0003

087

TRN

-IN

V-0

0003

093

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0309

4TR

N-I

NV

-000

0311

3TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0003

114

TRN

-IN

V-0

0003

117

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0311

8TR

N-I

NV

-000

0319

0TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0003

191

TRN

-IN

V-0

0003

199

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0320

0TR

N-I

NV

-000

0324

3TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0003

244

TRN

-IN

V-0

0003

249

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0325

0TR

N-I

NV

-000

0326

9TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0003

270

TRN

-IN

V-0

0003

275

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0327

6TR

N-I

NV

-000

0329

7TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0003

298

TRN

-IN

V-0

0003

305

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0330

6TR

N-I

NV

-000

0334

1TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0003

344

TRN

-IN

V-0

0003

348

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0334

9TR

N-I

NV

-000

0335

6TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0003

357

TRN

-IN

V-0

0003

359

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0336

0TR

N-I

NV

-000

0336

4TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0003

365

TRN

-IN

V-0

0003

367

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0336

8TR

N-I

NV

-000

0337

7TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0003

378

TRN

-IN

V-0

0003

382

TO In

terv

iew

Mem

o

Page 118: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nTR

N-I

NV

-000

0338

3TR

N-I

NV

-000

0340

5TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0003

406

TRN

-IN

V-0

0003

412

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0341

3TR

N-I

NV

-000

0341

7TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0003

418

TRN

-IN

V-0

0003

446

TO In

terv

iew

Not

esTR

N-I

NV

-000

0344

7TR

N-I

NV

-000

0345

0TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0003

451

TRN

-IN

V-0

0003

472

TO In

terv

iew

Not

esTR

N-I

NV

-000

0347

3TR

N-I

NV

-000

0347

6TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0003

477

TRN

-IN

V-0

0003

482

TO In

terv

iew

Not

esTR

N-I

NV

-000

0348

3TR

N-I

NV

-000

0349

6TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0003

497

TRN

-IN

V-0

0003

542

TO In

terv

iew

Not

esTR

N-I

NV

-000

0354

3TR

N-I

NV

-000

0354

8TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0003

549

TRN

-IN

V-0

0003

562

TO In

terv

iew

Not

esTR

N-I

NV

-000

0356

3TR

N-I

NV

-000

0356

6TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0003

567

TRN

-IN

V-0

0003

585

TO In

terv

iew

Not

esTR

N-I

NV

-000

0358

6TR

N-I

NV

-000

0359

5TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0003

596

TRN

-IN

V-0

0003

626

TO In

terv

iew

Not

esTR

N-I

NV

-000

0362

7TR

N-I

NV

-000

0362

7TO

Witn

ess s

tate

men

tTR

N-I

NV

-000

0362

8TR

N-I

NV

-000

0363

2TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0003

633

TRN

-IN

V-0

0003

653

TO In

terv

iew

Not

esTR

N-I

NV

-000

0365

4TR

N-I

NV

-000

0366

3TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0003

664

TRN

-IN

V-0

0003

691

TO In

terv

iew

Not

esTR

N-I

NV

-000

0369

2TR

N-I

NV

-000

0369

5TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0003

696

TRN

-IN

V-0

0003

705

TO In

terv

iew

Not

esTR

N-I

NV

-000

0370

6TR

N-I

NV

-000

0370

9TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0003

710

TRN

-IN

V-0

0003

714

TO In

terv

iew

Not

esTR

N-I

NV

-000

0371

5TR

N-I

NV

-000

0371

8TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0003

719

TRN

-IN

V-0

0003

729

TO In

terv

iew

Not

esTR

N-I

NV

-000

0373

0TR

N-I

NV

-000

0373

3TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0003

734

TRN

-IN

V-0

0003

745

TO In

terv

iew

Not

esTR

N-I

NV

-000

0374

6TR

N-I

NV

-000

0375

0TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0003

751

TRN

-IN

V-0

0003

762

TO In

terv

iew

Not

esTR

N-I

NV

-000

0376

3TR

N-I

NV

-000

0376

6TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0003

767

TRN

-IN

V-0

0003

773

TO In

terv

iew

Not

es

Page 119: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nTR

N-I

NV

-000

0377

4TR

N-I

NV

-000

0378

0TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0003

781

TRN

-IN

V-0

0003

791

TO In

terv

iew

Not

esTR

N-I

NV

-000

0379

2TR

N-I

NV

-000

0379

5TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0003

796

TRN

-IN

V-0

0003

806

TO In

terv

iew

Not

esTR

N-I

NV

-000

0380

7TR

N-I

NV

-000

0381

1TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0003

812

TRN

-IN

V-0

0003

827

TO In

terv

iew

Not

esTR

N-I

NV

-000

0382

8TR

N-I

NV

-000

0383

1TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0003

832

TRN

-IN

V-0

0003

845

TO In

terv

iew

Not

esTR

N-I

NV

-000

0384

6TR

N-I

NV

-000

0385

2TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0003

853

TRN

-IN

V-0

0003

874

TO In

terv

iew

Not

esTR

N-I

NV

-000

0387

5TR

N-I

NV

-000

0388

7TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0003

888

TRN

-IN

V-0

0003

936

TO In

terv

iew

Not

esTR

N-I

NV

-000

0393

7TR

N-I

NV

-000

0394

0TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0003

941

TRN

-IN

V-0

0003

946

TO In

terv

iew

Not

esTR

N-I

NV

-000

0394

7TR

N-I

NV

-000

0394

9TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0003

950

TRN

-IN

V-0

0003

960

TO In

terv

iew

Not

esTR

N-I

NV

-000

0396

1TR

N-I

NV

-000

0396

4TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0003

965

TRN

-IN

V-0

0003

985

TO In

terv

iew

Not

esTR

N-I

NV

-000

0398

8TR

N-I

NV

-000

0399

2TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0003

993

TRN

-IN

V-0

0004

007

TO In

terv

iew

Not

esTR

N-I

NV

-000

0400

8TR

N-I

NV

-000

0401

1TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0004

012

TRN

-IN

V-0

0004

018

TO In

terv

iew

Not

esTR

N-I

NV

-000

0401

9TR

N-I

NV

-000

0402

2TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0004

023

TRN

-IN

V-0

0004

033

TO In

terv

iew

Not

esTR

N-I

NV

-000

0403

4TR

N-I

NV

-000

0403

9TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0004

040

TRN

-IN

V-0

0004

059

TO In

terv

iew

Not

esTR

N-I

NV

-000

0406

0TR

N-I

NV

-000

0406

5TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0004

066

TRN

-IN

V-0

0004

090

TO In

terv

iew

Not

esTR

N-I

NV

-000

0409

1TR

N-I

NV

-000

0409

7TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0004

098

TRN

-IN

V-0

0004

117

TO In

terv

iew

Not

esTR

N-I

NV

-000

0411

8TR

N-I

NV

-000

0412

0TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0004

121

TRN

-IN

V-0

0004

125

TO In

terv

iew

Not

esTR

N-I

NV

-000

0412

6TR

N-I

NV

-000

0413

0TO

Inte

rvie

w M

emo

Page 120: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nTR

N-I

NV

-000

0413

1TR

N-I

NV

-000

0414

4TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0004

145

TRN

-IN

V-0

0004

153

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0415

4TR

N-I

NV

-000

0419

9TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0004

200

TRN

-IN

V-0

0004

208

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0420

9TR

N-I

NV

-000

0423

8TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0004

239

TRN

-IN

V-0

0004

243

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0424

4TR

N-I

NV

-000

0426

1TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0004

262

TRN

-IN

V-0

0004

265

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0426

6TR

N-I

NV

-000

0428

2TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0004

283

TRN

-IN

V-0

0004

287

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0428

8TR

N-I

NV

-000

0430

2TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0004

303

TRN

-IN

V-0

0004

308

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0430

9TR

N-I

NV

-000

0432

3TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0004

324

TRN

-IN

V-0

0004

329

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0433

0TR

N-I

NV

-000

0434

8TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0004

349

TRN

-IN

V-0

0004

353

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0435

4TR

N-I

NV

-000

0437

3TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0004

374

TRN

-IN

V-0

0004

378

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0437

9TR

N-I

NV

-000

0438

7TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0004

388

TRN

-IN

V-0

0004

390

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0439

1TR

N-I

NV

-000

0439

5TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0004

396

TRN

-IN

V-0

0004

400

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0440

1TR

N-I

NV

-000

0441

7TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0004

418

TRN

-IN

V-0

0004

421

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0442

2TR

N-I

NV

-000

0442

7TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0004

428

TRN

-IN

V-0

0004

433

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0443

4TR

N-I

NV

-000

0444

7TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0004

448

TRN

-IN

V-0

0004

453

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0445

4TR

N-I

NV

-000

0447

5TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0004

476

TRN

-IN

V-0

0004

479

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0448

0TR

N-I

NV

-000

0448

4TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0004

485

TRN

-IN

V-0

0004

489

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0449

0TR

N-I

NV

-000

0449

9TO

Inte

rvie

w N

otes

Page 121: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nTR

N-I

NV

-000

0450

0TR

N-I

NV

-000

0450

7TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0004

508

TRN

-IN

V-0

0004

528

TO In

terv

iew

Not

esTR

N-I

NV

-000

0452

9TR

N-I

NV

-000

0453

4TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0004

535

TRN

-IN

V-0

0004

551

TO In

terv

iew

Not

esTR

N-I

NV

-000

0455

2TR

N-I

NV

-000

0455

5TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0004

556

TRN

-IN

V-0

0004

561

TO In

terv

iew

Not

esTR

N-I

NV

-000

0456

2TR

N-I

NV

-000

0456

5TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0004

566

TRN

-IN

V-0

0004

572

TO In

terv

iew

Not

esTR

N-I

NV

-000

0457

3TR

N-I

NV

-000

0457

7TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0004

578

TRN

-IN

V-0

0004

586

TO In

terv

iew

Not

esTR

N-I

NV

-000

0458

7TR

N-I

NV

-000

0459

0TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0004

591

TRN

-IN

V-0

0004

600

TO In

terv

iew

Not

esTR

N-I

NV

-000

0460

1TR

N-I

NV

-000

0461

3TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0004

614

TRN

-IN

V-0

0004

673

TO In

terv

iew

Not

esTR

N-I

NV

-000

0467

4TR

N-I

NV

-000

0468

2TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0004

683

TRN

-IN

V-0

0004

715

TO In

terv

iew

Not

esTR

N-I

NV

-000

0471

6TR

N-I

NV

-000

0471

9TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0004

720

TRN

-IN

V-0

0004

734

TO In

terv

iew

Not

esTR

N-I

NV

-000

0473

5TR

N-I

NV

-000

0474

0TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0004

741

TRN

-IN

V-0

0004

756

TO In

terv

iew

Not

esTR

N-I

NV

-000

0475

7TR

N-I

NV

-000

0476

3TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0004

764

TRN

-IN

V-0

0004

788

TO In

terv

iew

Not

esTR

N-I

NV

-000

0478

9TR

N-I

NV

-000

0479

5TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0004

796

TRN

-IN

V-0

0004

832

TO In

terv

iew

Not

esTR

N-I

NV

-000

0483

4TR

N-I

NV

-000

0483

5TO

Witn

ess s

tate

men

tTR

N-I

NV

-000

0483

6TR

N-I

NV

-000

0483

9TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0004

840

TRN

-IN

V-0

0004

851

TO In

terv

iew

Not

esTR

N-I

NV

-000

0485

2TR

N-I

NV

-000

0485

7TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0004

858

TRN

-IN

V-0

0004

872

TO In

terv

iew

Not

esTR

N-I

NV

-000

0487

3TR

N-I

NV

-000

0487

6TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0004

877

TRN

-IN

V-0

0004

885

TO In

terv

iew

Not

esTR

N-I

NV

-000

0488

6TR

N-I

NV

-000

0489

0TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0004

891

TRN

-IN

V-0

0004

904

TO In

terv

iew

Not

es

Page 122: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nTR

N-I

NV

-000

0490

5TR

N-I

NV

-000

0491

0TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0004

911

TRN

-IN

V-0

0004

929

TO In

terv

iew

Not

esTR

N-I

NV

-000

0493

0TR

N-I

NV

-000

0493

4TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0004

935

TRN

-IN

V-0

0004

952

TO In

terv

iew

Not

esTR

N-I

NV

-000

0495

3TR

N-I

NV

-000

0495

8TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0004

959

TRN

-IN

V-0

0004

990

TO In

terv

iew

Not

esTR

N-I

NV

-000

0499

1TR

N-I

NV

-000

0499

7TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0004

998

TRN

-IN

V-0

0005

018

TO In

terv

iew

Not

esTR

N-I

NV

-000

0501

9TR

N-I

NV

-000

0502

3TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0005

024

TRN

-IN

V-0

0005

042

TO In

terv

iew

Not

esTR

N-I

NV

-000

0504

3TR

N-I

NV

-000

0504

8TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0005

049

TRN

-IN

V-0

0005

065

TO In

terv

iew

Not

esTR

N-I

NV

-000

0506

6TR

N-I

NV

-000

0506

9TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0005

070

TRN

-IN

V-0

0005

081

TO In

terv

iew

Not

esTR

N-I

NV

-000

0508

2TR

N-I

NV

-000

0508

5TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0005

086

TRN

-IN

V-0

0005

094

TO In

terv

iew

Not

esTR

N-I

NV

-000

0509

5TR

N-I

NV

-000

0510

2TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0005

103

TRN

-IN

V-0

0005

142

TO In

terv

iew

Not

esTR

N-I

NV

-000

0514

3TR

N-I

NV

-000

0514

7TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0005

148

TRN

-IN

V-0

0005

161

TO In

terv

iew

Not

esTR

N-I

NV

-000

0516

2TR

N-I

NV

-000

0516

8TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0005

169

TRN

-IN

V-0

0005

184

TO In

terv

iew

Not

esTR

N-I

NV

-000

0518

5TR

N-I

NV

-000

0518

8TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0005

189

TRN

-IN

V-0

0005

210

TO In

terv

iew

Not

esTR

N-I

NV

-000

0521

1TR

N-I

NV

-000

0521

3TO

Witn

ess s

tate

men

tTR

N-I

NV

-000

0521

4TR

N-I

NV

-000

0521

7TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0005

218

TRN

-IN

V-0

0005

229

TO In

terv

iew

Not

esTR

N-I

NV

-000

0523

0TR

N-I

NV

-000

0523

2TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0005

233

TRN

-IN

V-0

0005

238

TO In

terv

iew

Not

esTR

N-I

NV

-000

0523

9TR

N-I

NV

-000

0524

5TO

Inte

rvie

w M

emo

TRN

-IN

V-0

0005

246

TRN

-IN

V-0

0005

251

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0525

2TR

N-I

NV

-000

0528

1TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0005

282

TRN

-IN

V-0

0005

285

TO In

terv

iew

Mem

o

Page 123: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nTR

N-I

NV

-000

0528

6TR

N-I

NV

-000

0529

3TO

Inte

rvie

w N

otes

TRN

-IN

V-0

0005

294

TRN

-IN

V-0

0005

298

TO In

terv

iew

Mem

oTR

N-I

NV

-000

0529

9TR

N-I

NV

-000

0531

1TO

Inte

rvie

w N

otes

TRN

-MD

L-00

8685

70TR

N-M

DL-

0086

8612

Dril

ling

Dee

pwat

er W

ells

BP-

HZN

-MB

I001

3644

7B

P-H

ZN-M

BI0

0136

567

May

12,

201

0 O

ptic

em m

odel

TRN

-MD

L-00

6009

84TR

N-M

DL-

0060

0989

Dai

ly D

rillin

g R

epor

t #14

3TR

N-M

DL-

0060

0990

TRN

-MD

L-00

6009

95M

DL

Dep

. Ex.

346

5: D

aily

Dril

ling

Rep

ort #

142

TRN

-IN

V-0

0760

143

TRN

-IN

V-0

0760

143

Neg

ativ

e Te

st p

roce

dure

sTR

N-I

NV

-007

6014

2TR

N-I

NV

-007

6014

2N

egat

ive

Test

pro

cedu

res

TRN

-IN

V-0

0760

141

TRN

-IN

V-0

0760

141

Neg

ativ

e Te

st p

roce

dure

sTR

N-M

DL-

0132

3431

TRN

-MD

L-01

3234

32N

egat

ive

Test

pro

cedu

res

BP-

HZN

-217

9MD

L032

8779

8B

P-H

ZN-2

179M

DL0

3287

798

Neg

ativ

e Te

st p

roce

dure

sTR

N-M

DL-

0199

5569

TRN

-MD

L-01

9955

70D

eepw

ater

Hor

izon

Tas

k Sp

ecifi

c Th

ink

Proc

edur

en/

aD

epos

ition

tran

scrip

ts &

exh

ibits

of R

obin

son,

Ste

veB

P-H

ZN-2

179M

DL0

0010

720

BP-

HZN

-217

9MD

L000

1072

2Em

ail f

rom

J. H

ogga

n to

L. L

indn

erB

P-H

ZN-2

179M

DL0

0015

195

BP-

HZN

-217

9MD

L000

1519

5R

helia

nt D

ispl

acem

ent P

roce

dure

s Mac

ondo

OC

S-G

323

06B

P-H

ZN-2

179M

DL0

0056

402

BP-

HZN

-217

9MD

L000

5655

7C

ontra

ct F

or G

ulf O

f Mex

ico

Stra

tegi

c Pe

rfor

man

ce U

nit O

ffsh

ore

Wel

l Ser

vice

s B

P-H

ZN-2

179M

DL0

0161

670

BP-

HZN

-217

9MD

L001

6171

4In

terv

iew

not

esB

P-H

ZN-2

179M

DL0

0251

013

BP-

HZN

-217

9MD

L002

5101

3Em

ail f

rom

D. M

axie

to J.

LeB

leu

re F

AS

and

FAS

AK

BP-

HZN

-217

9MD

L002

5103

8B

P-H

ZN-2

179M

DL0

0251

038

Emai

l fro

m D

. Max

ie to

J. L

eBle

u re

Wat

erba

sed

FAS

pills

BP-

HZN

-217

9MD

L002

6294

0B

P-H

ZN-2

179M

DL0

0262

944

Dai

ly D

rillin

g R

epor

tB

P-H

ZN-2

179M

DL0

0262

945

BP-

HZN

-217

9MD

L002

6295

0D

aily

Ope

raio

ns R

epor

t - P

artn

ers (

Dril

ling)

BP-

HZN

-217

9MD

L002

6772

6B

P-H

ZN-2

179M

DL0

0267

790

Dril

ling

Flui

ds P

rogr

amB

P-H

ZN-2

179M

DL0

0312

988

BP-

HZN

-217

9MD

L003

1298

8Em

ail f

rom

T. D

yer t

o D

. Max

ie, e

t al.

re D

ispo

sal

BP-

HZN

-BLY

0007

1636

BP-

HZN

-BLY

0007

1636

Emai

l fro

m L

. Lin

dner

to R

. Kal

uza

re M

acon

do D

ispl

acem

ent P

roce

dure

BP-

HZN

-217

9MD

L000

1519

5B

P-H

ZN-2

179M

DL0

0015

195

BP/

Dee

pwat

er H

oriz

on R

helia

nt D

ispl

acem

ent P

roce

dure

BP-

HZN

-BLY

0014

1575

BP-

HZN

-BLY

0014

1599

Inte

rtek

Pote

ntia

l for

Set

tlem

ent F

orm

-A-S

quee

ze &

For

m-A

-Set

Ble

nds

BP-

HZN

-MB

I001

3508

5B

P-H

ZN-M

BI0

0135

090

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g)B

P-H

ZN-M

BI0

0135

365

BP-

HZN

-MB

I001

3537

0D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

BP-

HZN

-217

9MD

L000

0331

0B

P-H

ZN-2

179M

DL0

0003

313

MD

L D

ep. E

x. 6

97:

Emai

l fro

m J.

LeB

leu

to B

. Mor

el, e

t al.

re P

ropo

sed

Proc

edur

e fo

rB

P-H

ZN-2

179M

DL0

0007

230

BP-

HZN

-217

9MD

L000

0723

0M

DL

Dep

. Ex.

100

4: E

mai

l fro

m J.

LeB

leu

to J.

Gui

de, e

t al r

e C

ritic

al n

eed

for

BP-

HZN

-217

9MD

L000

0803

5B

P-H

ZN-2

179M

DL0

0008

036

MD

L D

ep. E

x. 1

008:

Em

ail f

rom

J. L

eBle

u to

J. M

cFad

din,

et a

l. re

MI S

wac

o N

CR

B

P-H

ZN-B

LY00

0988

75B

P-H

ZN-B

LY00

0989

02M

DL

Dep

. Ex.

101

9: D

raft

BP

Proj

ect S

pace

r Pow

erPo

int

Page 124: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nB

P-H

ZN-2

179M

DL0

0016

162

BP-

HZN

-217

9MD

L000

1622

6M

DL

Dep

. Ex.

102

6: D

rillin

g Fl

uids

Pro

gram

M-I

000

0318

0M

-I 0

0003

185

MD

L D

ep. E

x. 1

030:

Em

ail f

rom

T. A

rman

d to

D. M

axie

re L

esso

n Le

arne

d Fo

rm A

B

P-H

ZN-M

BI0

0129

240

BP-

HZN

-MB

I001

2924

1Em

ail f

rom

J. L

eBle

u to

A. P

ere,

et a

l. re

Ris

er D

ispl

acem

ent S

pace

rM

-I 0

0002

310

M-I

000

0231

2Em

ail f

rom

D. M

axie

to A

. Wild

e re

Wat

erba

sed

FAS

pills

M-I

000

0318

6M

-I 0

0003

189

Emai

l fro

m T

. Arm

and

to D

. Max

ie re

Wat

erba

sed

FAS

pills

M-I

000

0368

5M

-I 0

0003

687

Emai

l fro

m J.

Hog

gan

to L

. Lid

ner,

et a

l. re

Que

stio

n ab

out s

eaw

ater

dis

char

geM

-I 0

0003

727

M-I

000

0373

0Em

ail f

rom

J. M

anue

l to

D. M

axie

, et a

l. re

Wat

erba

sed

FAS

pills

M-I

000

0676

9M

-I 0

0006

769

8-1/

2" x

9-7

/8"

Tand

em P

illM

-I 0

0007

029

M-I

000

0702

9Em

ail f

rom

T. A

rman

d to

E. D

avid

, et a

l. re

PFM

Hig

h le

vel

M-I

000

0703

1M

-I 0

0007

034

Emai

l fro

m L

. Lin

dner

to C

. Det

ivea

ux re

Que

stio

n ab

out s

eaw

ater

dis

char

geM

-I 0

0007

180

M-I

000

0718

0Em

ail f

rom

C. D

etiv

eaux

to D

. Pat

ters

on re

Ris

er C

lean

-Out

M-I

000

0767

7M

-I 0

0007

677

Com

plia

nce

Che

ck S

heet

M-I

000

0775

3M

-I 0

0007

753

MI S

wac

o B

P Ex

plor

atio

n R

epor

tM

-I 0

0007

995

M-I

000

0799

5Em

ail f

rom

W. B

ush

to C

. Boq

uet r

e H

oriz

onM

-I 0

0008

631

M-I

000

0863

1B

P H

oriz

on L

CM

Loa

d ou

ts b

y Pr

oduc

t and

dat

e fo

r cur

rent

wel

lM

-I 0

0009

782

M-I

000

0978

2M

I Sw

aco

Equi

pmen

t Per

form

ance

Rep

ort

M-I

000

0991

2M

-I 0

0009

912

MI S

wac

o R

epor

t Num

ber 7

8M

-I 0

0010

848

M-I

000

1084

9Em

ail f

rom

D. M

axie

to J.

Sm

ith re

Not

esM

-I 0

0010

853

M-I

000

1085

6Ta

mde

m F

orm

-A-S

quee

ze/F

orm

-A-S

et A

K M

ixin

g an

d Sp

ottin

g Pr

oced

ures

M-I

000

1089

1M

-I 0

0010

891

Emai

l fro

m L

. Lin

dner

to J.

Sm

ith re

Not

So

Goo

dM

-I 0

0011

507

M-I

000

1150

7M

ixin

g Ti

mes

Rep

ort

M-I

000

1165

3M

-I 0

0011

653

Emai

l fro

m B

. Tou

ps to

T. A

rman

d re

Hor

izon

LC

MM

-I 0

0011

674

M-I

000

1167

4Em

ail f

rom

A. W

ilde

to T

. Arm

and,

et a

l. re

For

m-A

-Squ

eeze

/For

m-A

-Set

AK

Tan

dem

M

-I 0

0011

765

M-I

000

1176

8Em

ail f

rom

T. A

rman

d to

J. B

arry

re E

MI 1

820

M-I

000

1176

9M

-I 0

0011

770

Emai

l fro

m T

. Arm

and

to A

. Pop

ples

tone

re E

MI 1

820

M-I

000

1178

4M

-I00

0117

85Em

ail f

rom

T. A

rman

d to

D. M

axie

re F

AS

Dra

ft 2

M-I

000

1179

8M

-I 0

0011

799

Emai

l fro

m T

. Arm

and

to D

. Max

ie re

SPM

M-I

000

1185

2M

-I 0

0011

853

Emai

l fro

m T

. Arm

and

to J.

Bac

ho, e

t al.

re H

oriz

on u

pdat

eM

-I 0

0012

598

M-I

000

1260

0Em

ail f

rom

D. M

axie

to F

. Enr

ique

z re

FA

S A

KM

-I 0

0012

623

M-I

000

1262

4O

il-B

ase

Mud

Rep

ort

M-I

000

1337

2M

-I 0

0013

372

Emai

l fro

m V

. Vis

ines

cu to

M. F

reem

an, e

t al.

re F

orm

-A-S

et A

K p

ills f

or H

oriz

onM

-I 0

0013

373

M-I

000

1337

3Em

ail f

rom

D. M

axie

to T

. Que

bode

aux,

et a

l. re

fina

l dra

ftM

-I 0

0013

374

M-I

000

1337

6Ta

ndem

For

m-A

-Squ

eeze

/For

m-A

-Set

AK

Mix

ing

and

Spot

ting

Proc

edur

es

Page 125: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nM

-I 0

0013

548

M-I

000

1354

8Em

ail f

rom

D. M

axie

to J.

Bro

wn

re F

AS

M-I

000

1354

9M

-I 0

0013

551

Tand

em F

orm

-A-S

quee

ze/F

orm

-A-S

et A

K M

ixin

g an

d Sp

ottin

g Pr

oced

ures

M-I

000

1355

2M

-I 0

0013

554

Tand

em F

orm

-A-S

quee

ze/F

orm

-A-S

et A

K M

ixin

g an

d Sp

ottin

g Pr

oced

ures

M-I

000

1355

5M

-I 0

0013

555

Form

-A-S

et A

K M

ixin

g Fo

rmul

atio

nM

-I 0

0013

571

M-I

000

1357

4PF

M R

ecap

Exe

cutiv

e Su

mm

ary

M-I

000

1357

5M

-I 0

0013

575

Emai

l fro

m D

. Max

ie to

J. Y

earw

ood,

et a

l. re

Dis

plac

emen

tM

-I 0

0013

576

M-I

000

1357

6R

helia

nt D

ispl

acem

ent P

roce

dure

s Mac

ondo

OC

S-G

323

06M

-I 0

0013

705

M-I

000

1370

7Em

ail f

rom

T. A

rman

d to

V. V

isin

escu

, et a

l. re

For

m-A

-Set

AK

pill

s for

Hor

izon

M-I

000

1373

0M

-I 0

0013

733

Emai

l fro

m D

. Max

ie to

B. B

illon

re Q

uest

ion

abou

t sea

wat

er d

isch

arge

M-I

000

1423

6M

-I 0

0014

236

M-I

000

1423

7Em

ail f

rom

B. C

art t

o A

. Hec

k re

Kw

ik se

alM

-I 0

0014

249

M-I

000

1425

0B

P N

CR

LC

M M

ater

ial

M-I

000

1425

2M

-I 0

0014

252

MI S

WA

CO

Inci

dent

Inve

stig

atio

nM

-I 0

0015

330

M-I

000

1533

3Ta

ndem

For

m-A

-Squ

eeze

/For

m-A

-Set

AK

Mix

ing

and

Spot

ting

Proc

edur

esM

-I 0

0015

686

M-I

000

1568

8Em

ail f

rom

J. S

mith

to D

. Cul

lum

re "

Tand

em"

pill

proc

edur

e fo

r inc

lusi

on in

Bar

oid

M-I

000

1596

2M

-I 0

0016

047

MI S

WA

CO

Res

pons

e to

Que

stio

nsM

-I 0

0018

779

M-I

000

1878

0Em

ail f

rom

A. W

ilde

to A

. McL

ean,

et a

l. re

Leo

Lin

der T

estim

ony

- Coa

st G

uard

M

-I 0

0022

768

M-I

000

2277

1Ta

ndem

For

m-A

-Squ

eeze

/For

m-A

-Set

AK

Mix

ing

and

Spot

ting

Proc

edur

esM

-I 0

0031

942

M-I

000

3194

6Em

ail f

rom

D. M

axie

to A

. Wild

e re

Wat

erba

sed

FAS

pills

M-I

000

3195

7M

-I 0

0031

960

Emai

l fro

m A

. Wild

e to

D. M

axie

re W

ater

base

d FA

S pi

llsM

-I 0

0031

984

M-I

000

3198

6Em

ail f

rom

L. L

indn

er to

D. M

axie

re W

ater

base

d FA

S pi

llsM

-I 0

0031

987

M-I

000

3198

8Em

ail f

rom

B. M

orel

to D

. Max

ie, e

t al.

re F

AS

and

FAS

AK

M-I

000

3199

0M

-I 0

0031

991

Emai

l fro

m D

. Max

ie to

B. B

illon

re F

AS

and

FAS

AK

M-I

000

3250

8M

-I 0

0032

510

Emai

l fro

m J.

Bac

ho to

P. H

anso

n, e

t al.

re D

W H

oriz

on In

vest

igat

ion

Flui

ds

M-I

000

3418

3M

-I 0

0034

185

Emai

l fro

m D

. Max

ie to

T. A

rman

d re

Les

sons

cap

ture

dM

-I 0

0034

340

Emai

l fro

m D

. Max

ie to

J. L

eBle

u re

FA

S FA

S A

KM

-I 0

0079

488

M-I

000

7948

9B

radl

ey B

illon

CV

M-I

000

1162

8M

-I 0

0011

631

Emai

l fro

m J.

Man

uel t

o D

. Max

ie, e

t al.

re W

ater

base

d FA

S pi

llsB

P-H

ZN-B

LY00

0384

24B

P-H

ZN-B

LY00

0384

61M

DL

Dep

. Ex.

101

8: P

roje

ct S

pace

r rep

ort

M-I

000

3251

6M

-I 0

0032

516

Form

-A-S

et A

K a

nd F

orm

-A-S

quee

ze re

port

M-I

000

3251

7M

-I 0

0032

517

Form

-A-S

quee

ze P

rodu

ct B

ulle

tinB

P-H

ZN-S

EC00

7930

10B

P-H

ZN-S

EC00

7930

13D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#02

BP-

HZN

-217

9MD

L044

7701

2B

P-H

ZN-2

179M

DL0

4477

015

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

02B

P-H

ZN-2

179M

DL0

4477

021

BP-

HZN

-217

9MD

L044

7702

4D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#02

Page 126: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nB

P-H

ZN-2

179M

DL0

4477

025

BP-

HZN

-217

9MD

L044

7702

8D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#02

BP-

HZN

-217

9MD

L044

7702

9B

P-H

ZN-2

178M

DL0

4476

989

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

02B

P-H

ZN-S

EC00

7947

30B

P-H

ZN-S

EC00

7947

35D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#02

BP-

HZN

-217

9MD

L044

7704

0B

P-H

ZN-2

179M

DL0

4477

044

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

02B

P-H

ZN-2

179M

DL0

4477

052

BP-

HZN

-217

9MD

L044

7705

9D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#02

BP-

HZN

-217

9MD

L044

7469

9B

P-H

ZN-2

179M

DL0

4474

705

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

02B

P-H

ZN-2

179M

DL0

0602

441

BP-

HZN

-217

9MD

L006

0244

5D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#02

BP-

HZN

-217

9MD

L006

0024

1B

P-H

ZN-2

179M

DL0

0600

245

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

02B

P-H

ZN-S

EC00

5814

25B

P-H

ZN-S

EC00

5814

30D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#02

BP-

HZN

-217

9MD

L012

0023

0B

P-H

ZN-2

179M

DL0

1200

236

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

02B

P-H

ZN-S

EC00

6008

02B

P-H

ZN-S

EC00

6008

07D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#02

BP-

HZN

-217

9MD

L012

1565

7B

P-H

ZN-2

179M

DL0

1215

662

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

02B

P-H

ZN-S

EC00

7714

34B

P-H

ZN-S

EC00

7714

39D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#02

BP-

HZN

-217

9MD

L014

0716

9B

P-H

ZN-2

179M

DL0

1407

174

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

02B

P-H

ZN-2

179M

DL0

1341

283

BP-

HZN

-217

9MD

L013

4128

6D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#02

BP-

HZN

-SEC

0060

4663

BP-

HZN

-SEC

0060

4670

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

02B

P-H

ZN-2

179M

DL0

3701

169

BP-

HZN

-217

9MD

L037

0117

5D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#02

BP-

HZN

-217

9MD

L036

9398

8B

P-H

ZN-2

179M

DL0

3693

994

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

02B

P-H

ZN-2

179M

DL0

3695

607

BP-

HZN

-217

9MD

L036

9561

2D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#02

BP-

HZN

-217

9MD

L012

1549

4B

P-H

ZN-2

179M

DL0

1215

499

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

02B

P-H

ZN-2

179M

DL0

9637

493

BP-

HZN

-217

9MD

L036

9749

7D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#02

BP-

HZN

-217

9MD

L037

0528

9B

P-H

ZN-2

179M

DL0

3705

293

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

02B

P-H

ZN-2

179M

DL0

4419

758

BP-

HZN

-217

9MD

L044

1976

3D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L044

2705

2B

P-H

ZN-2

179M

DL0

4427

058

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

4418

905

BP-

HZN

-217

9MD

L044

1891

2D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L044

1205

0B

P-H

ZN-2

179M

DL0

4412

055

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

2365

705

BP-

HZN

-217

9MD

L023

6570

9D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L044

1908

5B

P-H

ZN-2

179M

DL0

4419

089

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

4429

259

BP-

HZN

-217

9MD

L044

2926

3D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L044

1901

4B

P-H

ZN-2

179M

DL0

4419

020

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-S

EC00

8517

89B

P-H

ZN-S

EC00

8517

94D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L023

6809

0B

P-H

ZN-2

179M

DL0

2368

096

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-S

EC00

8526

18B

P-H

ZN-S

EC00

8526

21D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

Page 127: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nB

P-H

ZN-S

EC00

8527

97B

P-H

ZN-S

EC00

8528

03D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L023

4977

3B

P-H

ZN-2

179M

DL0

2349

779

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

2351

752

BP-

HZN

-217

9MD

L023

5175

7D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L023

5978

1B

P-H

ZN-2

179M

DL0

2359

787

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

1215

572

BP-

HZN

-217

9MD

L012

1557

7D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L023

5608

5B

P-H

ZN-2

179M

DL0

2356

091

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

2360

716

BP-

HZN

-217

9MD

L023

6072

3D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L023

4468

8B

P-H

ZN-2

179M

DL0

2344

694

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

2340

822

BP-

HZN

-217

9MD

L023

4083

0D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L023

4955

0B

P-H

ZN-2

179M

DL0

2349

557

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

2374

906

BP-

HZN

-217

9MD

L023

7491

1D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L023

7909

8B

P-H

ZN-2

179M

DL0

2379

104

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

1214

956

BP-

HZN

-217

9MD

L012

1496

3D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L023

4100

6B

P-H

ZN-2

179M

DL0

2341

012

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

0882

008

BP-

HZN

-217

9MD

L008

8201

5D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L023

4428

6B

P-H

ZN-2

179M

DL0

2344

293

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

2343

097

BP-

HZN

-217

9MD

L023

4310

5D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9666

4B

P-H

ZN-2

179M

DL0

3296

672

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

2357

318

BP-

HZN

-217

9MD

L023

5732

4D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L023

6448

2B

P-H

ZN-2

179M

DL0

2364

488

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

2350

638

BP-

HZN

-217

9MD

L023

5064

3D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L005

8208

5B

P-H

ZN-2

179M

DL0

0582

089

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3296

944

BP-

HZN

-217

9MD

L032

9695

1D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9472

1B

P-H

ZN-2

179M

DL0

3294

727

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3295

041

BP-

HZN

-217

9MD

L032

9504

7D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9592

5B

P-H

ZN-2

179M

DL0

3295

927

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3296

849

BP-

HZN

-217

9MD

L032

9685

4D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

AE-

HZN

-217

9MD

L000

4982

6A

E-H

ZN-2

179M

DL0

0049

830

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3293

901

BP-

HZN

-217

9MD

L032

9390

6D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L005

8135

0B

P-H

ZN-2

179M

DL0

0581

355

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3294

106

BP-

HZN

-217

9MD

L032

9411

2D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9524

8B

P-H

ZN-2

179M

DL0

3295

253

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3294

131

BP-

HZN

-217

9MD

L032

9413

6D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

Page 128: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nB

P-H

ZN-2

179M

DL0

3292

617

BP-

HZN

-217

9MD

L032

9262

3D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9665

7B

P-H

ZN-2

179M

DL0

3296

662

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3296

801

BP-

HZN

-217

9MD

L032

9680

7D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9638

6B

P-H

ZN-2

179M

DL0

3296

392

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3292

915

BP-

HZN

-217

9MD

L032

9292

2D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9519

6B

P-H

ZN-2

179M

DL0

3295

202

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3292

789

BP-

HZN

-217

9MD

L032

9279

6D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9372

5B

P-H

ZN-2

179M

DL0

3293

732

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3293

049

BP-

HZN

-217

9MD

L032

9305

5D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9532

2B

P-H

ZN-2

179M

DL0

3295

329

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3296

457

BP-

HZN

-217

9MD

L032

9646

4D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9463

1B

P-H

ZN-2

179M

DL0

3294

637

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3294

190

BP-

HZN

-217

9MD

L032

9419

6D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9683

6B

P-H

ZN-2

179M

DL0

3296

843

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3294

302

BP-

HZN

-217

9MD

L032

9430

9D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9699

2B

P-H

ZN-2

179M

DL0

3296

998

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3293

518

BP-

HZN

-217

9MD

L032

9352

7D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9648

3B

P-H

ZN-2

179M

DL0

3296

491

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3294

785

BP-

HZN

-217

9MD

L032

9479

4D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9366

3B

P-H

ZN-2

179M

DL0

3293

671

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

1591

285

BP-

HZN

-217

9MD

L015

9129

2D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9311

1B

P-H

ZN-2

179M

DL0

3293

117

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3293

197

BP-

HZN

-217

9MD

L032

9320

4D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9698

3B

P-H

ZN-2

179M

DL0

3296

990

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3294

080

BP-

HZN

-217

9MD

L032

9408

7D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9309

8B

P-H

ZN-2

179M

DL0

3293

104

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3296

906

BP-

HZN

-217

9MD

L032

9691

1D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9564

5B

P-H

ZN-2

179M

DL0

3295

645

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3296

442

BP-

HZN

-217

9MD

L032

9644

7D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9671

8B

P-H

ZN-2

179M

DL0

3296

723

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3293

167

BP-

HZN

-217

9MD

L032

9317

2D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9399

8B

P-H

ZN-2

179M

DL0

3294

003

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3294

573

BP-

HZN

-217

9MD

L032

9457

9D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

Page 129: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nB

P-H

ZN-2

179M

DL0

3294

639

BP-

HZN

-217

9MD

L032

9464

5D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9566

9B

P-H

ZN-2

179M

DL0

3295

675

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3293

529

BP-

HZN

-217

9MD

L032

9353

4D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9290

7B

P-H

ZN-2

179M

DL0

3292

913

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3292

635

BP-

HZN

-217

9MD

L032

9264

0D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9231

7B

P-H

ZN-2

179M

DL0

3292

324

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3296

507

BP-

HZN

-217

9MD

L032

9651

2D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9622

8B

P-H

ZN-2

179M

DL0

3296

228

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3293

480

BP-

HZN

-217

9MD

L032

9348

6D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9351

1B

P-H

ZN-2

179M

DL0

3293

516

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3292

523

BP-

HZN

-217

9MD

L032

9252

8D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9569

6B

P-H

ZN-2

179M

DL0

3295

702

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3296

417

BP-

HZN

-217

9MD

L032

9642

3D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9520

4B

P-H

ZN-2

179M

DL0

3295

209

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3296

475

BP-

HZN

-217

9MD

L032

9648

1D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9427

1B

P-H

ZN-2

179M

DL0

3294

276

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3293

698

BP-

HZN

-217

9MD

L032

9370

4D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9603

7B

P-H

ZN-2

179M

DL0

3296

041

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3296

600

BP-

HZN

-217

9MD

L032

9660

5D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9657

6B

P-H

ZN-2

179M

DL0

3296

581

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3296

543

BP-

HZN

-217

9MD

L032

9654

8D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9314

8B

P-H

ZN-2

179M

DL0

3293

151

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3292

664

BP-

HZN

-217

9MD

L032

9266

9D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9596

0B

P-H

ZN-2

179M

DL0

3295

965

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZH-2

179M

DL0

3296

953

BP-

HZN

-217

9MD

L032

9695

8D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L005

9953

1B

P-H

ZN-2

179M

DL0

0599

536

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3294

448

BP-

HZN

-217

9MD

L032

9445

3D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9242

2B

P-H

ZN-2

179M

DL0

3292

427

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3293

778

BP-

HZN

-217

9MD

L032

9378

5D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9580

3B

P-H

ZN-2

179M

DL0

3295

808

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3296

171

BP-

HZN

-217

9MD

L032

9617

6D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9614

7B

P-H

ZN-2

179M

DL0

3296

153

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3296

592

BP-

HZN

-217

9MD

L032

9659

8D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

Page 130: TABLE OF CONTENTS - MDL 2179 Trial Docs...the drilling engineering and drilling fluids laboratory courses, but taught production engineering and reservoir engineering courses as well

Expe

rt R

epor

t of A

dam

T. (

Ted)

Bou

rgoy

ne, J

r., P

h.D

., P.

E.A

ppen

dix

D

Beg

Bat

esE

nd B

ates

File

nam

e O

r D

escr

iptio

nB

P-H

ZN-2

179M

DL0

3292

876

BP-

HZN

-217

9MD

L032

9288

2D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9528

8B

P-H

ZN-2

179M

DL0

3295

294

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3293

126

BP-

HZN

-217

9MD

L032

9313

3D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9529

6B

P-H

ZN-2

179M

DL0

3295

302

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3292

250

BP-

HZN

-217

9MD

L032

9225

4D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9334

7B

P-H

ZN-2

179M

DL0

3293

352

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3295

632

BP-

HZN

-217

9MD

L032

9563

7D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9471

4B

P-H

ZN-2

179M

DL0

3294

719

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3293

460

BP-

HZN

-217

9MD

L032

9346

5D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9373

8B

P-H

ZN-2

179M

DL0

3293

745

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3295

892

BP-

HZN

-217

9MD

L032

9589

7D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9604

3B

P-H

ZN-2

179M

DL0

3296

048

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3292

536

BP-

HZN

-217

9MD

L032

9254

1D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9600

0B

P-H

ZN-2

179M

DL0

3296

001

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3296

030

BP-

HZN

-217

9MD

L032

9603

5D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9367

8B

P-H

ZN-2

179M

DL0

3293

684

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3297

006

BP-

HZN

-217

9MD

L032

9701

2D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9558

4B

P-H

ZN-2

179M

DL0

3295

590

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3295

499

BP-

HZN

-217

9MD

L032

9550

5D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03

BP-

HZN

-217

9MD

L032

9242

9B

P-H

ZN-2

179M

DL0

3292

434

Dai

ly O

pera

tions

Rep

ort -

Par

tner

s (D

rillin

g) M

C 2

52 #

03B

P-H

ZN-2

179M

DL0

3293

706

BP-

HZN

-217

9MD

L032

9371

3D

aily

Ope

ratio

ns R

epor

t - P

artn

ers (

Dril

ling)

MC

252

#03