table of contentsprince india 7, ghogari mansion, 2nd hasnabad lane santacruz (west) mumbai, india...
TRANSCRIPT
TABLE OF CONTENTS
1 INTRODUCTION
2 GENERAL INFORMATION
3 BUSINESS FUNCTIONS
4 LEGAL DOCUMENTS
5 HUMAN amp EQUIPMENT RESOURCES
6 SAFETY amp QAQC PROGRAMS
7 PROJECTS
8 PROJECT PICTURES
INTRODUCTION
We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of
Electro Mechanical amp Instrumentation Engineering
Maintenance amp installation of Power Generators
Turbine overhauling
Pipeline Construction Modification amp Maintenance
New installation amp Overhauling of Process Equipments of Refineries
Civil Construction Modification amp Maintenance
We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc
We also supply industrial support material
Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before
BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations
MISSION STATEMENT
Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele
OUR HEAD OFFICE CONTACTS
AL-JASSIM Building (1st Floor)
Baladiya Street Al-Aziziya District Jeddah
PO Box 18607 Jeddah 21425 KSA
Tel +966 2 663 2382 050 4699 467
Fax +966 2 668 5850
E-mail i n fo bash i rdos t com
URL www bash i rdo st c om
OUR WORK SHOP
KILO- 16 OLD MAKKAH ROAD
PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA
HVACDIVISION
HVAC Engr Purchaser
Store keeper
Forman Forman Forman Forman Forman Forman Helper
Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Cashier
Supv Engineer Supv Engineer
ELECTRICALDIVISION
Computer Operator
DIVISION
Mechanical EngrCivil EngineerElect Engineer
Supv Engineer
Pipeline CP Engr
Supv Engineer
Mechanical Engr
Public Relation Off
ADMIN MANAGER
SERVICES
Personnel Officer
Safety Loss Prev Engr
CONSTRUCTION
Planning amp Control Div Manager
OVERHAULINGPIPELINE amp CP GENERATOR
Civil Engineer
INDUSTRIALCIVIL
Design Draftsman
Mechanical Engineer
PROJECT OPERATIONS
DIVISION DIVISION
PLANNING amp CONTROL
Jeddah - Saudi Arabia
DIVISION
Quantity Engineer
DIVISION
over-all Projects Coord
Technical Support StaffElectrical Engineer
Quality Control Engineer
Supv Engineer Material Planner
BASHIR AHMED DOST MOHAMMAD EST
FINANCE MANAGER
Finance Controller
TECHNICAL amp COOR
PlanningCost Engineer
Supv Engineer
MATERIALMAINTENANCE DIVISION
Exec Secretary
Demo VersionDemo Version
BUSINESS FUNCTION
MAJOR ACTIVITIES
Generators Overhauling
Revamping of Power House Electrical system
Low Medium and High Voltage Switchgear Maintenance
Low Medium and High Voltage Motors Maintenance and overhauling
Electrical Repairing and Refurbishment
Process Plant Installation and Maintenance
Heat Exchanger Maintenance
Refurbishment of Distillation Tower
Boiler Maintenance
New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water
Cooling Tower Maintenance
Pipeline Construction Maintenance amp Modification for Oil Gas and fire water
Cathodic Protection System Installation Commissioning and maintenance
Cold Storage Refrigeration and HVAC System Installation and Maintenance
Supply Installation amp Maintenance of Telecom system-CCTV MATV etc
Supply of Personal Protective Equipment amp Firefighting system
Civil Construction
Generators Overhauling
We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work
Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation
Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine
Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields
Remove bearing caps inner and outer end shields end bearings
Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines
Removing the existing end winding insulation and repair it where it required
Cleaning the stator housing and both end windings painting end winding with anti tracing paint
Cleaning all components properly and reinstall all the components on its original locations
Revamping of Power House Electrical system
Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection
Low Medium and High Voltage Switchgear Maintenance
Switch gear Inspection and trouble shootingPer commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etcMechanical Alignment maintenance of the opening and closing system trouble shooting and Energization testProtection Relay system and CalibrationProtection system upgrading and refurbishment
Low Medium and High Voltage Motors Maintenance and overhauling
Inspection of motors
Dismantling
Carrying out all the required testsDeveloping of test records and their interpretation
Supply of motors
Rewinding of motors
Making the recommendations based on inspection and test
Electrical Repairing and Refurbishment
Electrical distribution maintenance troubleshooting and extensionsInstallation maintenance and extension of lighting distribution and low power systemsInstallation of low voltage distribution as well as control panelsInstallation laying and testing of low voltage cables and cable tray systemDC distribution including batteries and battery chargers and their installation testing and commissioningInstallation of emergency power generating systemProviding around the clock emergency services
Process Plant Installation and Maintenance
We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes
Power PlantsWater Treatment PlantsCement PlantsSugar PlantsFood Industries
Heat Exchanger Maintenance
Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following
Pulling of tube bundlesInternal and external hydro-blast cleaning of tubesRepair and Replacement of tubesRe-facing of tube sheetsFabrication of shellsPressure test
Refurbishment of Distillation Tower
Dismantling of traysCleaning of shell internals by hydro blast and grit blastRepair and replacement of bubble cup traysReplacement of rashing ringsCleaning and replacement of demister padsPressure test
Boiler Maintenance
Services are provided for the maintenance of water tube and fire tube boilers
Repair and replacement of tubes
De-scaling of internal and external boiler tubes including steam drums
Fire box and refractory repairs
New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water
Construction of steel tanks for petroleum chemicals and water
Tank cleaning
Bottom plate replacement
Repair and replacement of heating coils
Epoxy lining
Internal Coating
Replacement of Floating Fixed roof
Maintenance of pressure vacuum relief valve
Cooling Tower Maintenance
Cleaning of cooling tower cells
Replacement of wooden baffle plates
Repair maintenance amp replacement of Exhaust fan amp gearboxes
Pipeline Construction Maintenance amp Modification for Oil Gas and fire water
Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping
Construction Maintenance amp Modification of buried carbon steel pipeline
Construction Maintenance amp Modification of non-metallic pipelines
Construction Maintenance amp Modification of fiberglass pipelines
Hydrostatic testing and commissioning of oil and gas pipelines
De commissioning and vacuum drying of pipelines
Mothballing of pipelines
Pigging and internal cleaning of pipelines
External coating repairs
Cathodic Protection System Installation Commissioning and maintenance
Cathodic protection (CP) system design and installation
Commissioning of Cathodic Protection system
Trouble shooting and maintenance of existing CP system
Up grading of existing CP system
Routine CP data monitoring
Data evaluation and upgrading recommendations
Cold Storage Refrigeration and HVAC System Installation and Maintenance
Installation and commissioning of cold storage systems
Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors
Installation of cooling coils and condensers
Duct work installation Cleaning and Maintenance
Supply Installation amp Maintenance of Telecom system-CCTV MATV etc
Supply of Personal Protective Equipment amp Firefighting system
Civil Construction
Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients
Structure amp Foundation works
New Construction of any kind
Modifications and expansions works
All kind of Finishing and Decoration works
Swimming Pool constructions works
Landscaping Handicapping amp Earth works
Pre-Engineered Steel Structural building works
Concrete repairing works
Water proofing system of any kind suck as pools tanks etc
LEGAL DOCUMENTS
FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST
COMMERCIAL REGISTRATION CERTIFICATE
CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE
SAGIA CERTIFICATE
SOCIAL INSURANCE CERTIFICATE
ZAKAH CERTIFICATE
MUNICIPALTY CERTIFICATE
Human Resources
All personnel are able to understand speak both English and Arabic languages
Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries
Block Visa available in our ESTABLISHMENT - Under Process
Following is the list of our affiliated Recruiting Agents
Agents Address Contacts
AL-AHRAM
Trading amp Manpower Services
Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE
QADER INTERNATIONAL
License 2199
Dira Ghazi khan
Lahore
PAKISTAN
Ph +92-641-4670806
Fax +92-641-460698
BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor
Ali Complex 23-Empress Road Lahore
PAKISTAN
Ph +92-42-6365498
6367869
Fax +92-42-6365290
PRINCE INDIA
7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA
NAZ ASSOCIATES
H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH
ZAHID INTERNATIONAL
109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016
INDIA
Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom
Equipment Resources
The following table provides information of related equipment that is available for the work
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL
YEARMAKE
QTYOWNED
1 MOBILE CRANE 35 TON TADANO 1985 1
2 TANKER TRUCK (WATER)10000 amp
19000 GALNISSAN 1990 2
3 BOOM TRUCK 6 TON HINO 1985 1
4 POWER GENERATOR 35 KVA HONDA 1990 3
5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4
6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8
7 WELDING MACHINE ELECTRIC amp PORTABLE
350 AMP LICON 1998 4
8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO
1991 1
9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1
10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO
1990 1
11 DEWATERING PUMP 600 GPM ROBIN 1990 3
12 PIPE THREADING MACHINE UP TO 16INCH
SET RIGID 1994 2
13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2
14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2
15 OXY-ACETYLENE CYLINDER SET -- 1993 8
16 ARGON-NITROGEN CYLINDER SET -- 5
17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4
18 CREW CAB 1frac12 TON NISSAN 1988 1
19 PASSENGER VAN 15 SEAT NISSAN 2002 2
20 FORKLIFT3 amp 7-12
TONTOYTO 1990 2
21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2
22 SAND BLASTING MACHINE SET GIRACO 1995 3
23 CATHODIC PROTECTION TEST EQUIPMENT
SET -- 1
24 UNDERGROUND PIPE LOCATOR SET -- 2
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMADEMODEL
YEARMAKE
QTYOWNED
25 SOIL COMPACTOR PORTABLE - 1
26 UNDERGROUNG CABEL DETECTOR SET -- 2
27 PIN BRAZING SET -- 3
28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3
29 EXCHANGER BUNDLE PULLER 9 METERS 1
30 BOBCAT 2
31 EXCAVATOR 1
32 MICRO TRENCHER 1
33 VACUUM TRUCK 14 TON NISSAN 1
34 ASPHALT CUTTER 2
35 HIGH PRESSURE HYDRO-JETTING MACHINE
20000 PSI USA 1
36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)
50 KVA 3 way HTU with 3linkable Advantage 3 tempe-
rature programmer cont-rollers and 3 Energy regs
1
SAFETY amp LOSS PREVENTION PROGRAM
Objectives
The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through
Safety meetings and dialoguesdiscussion
Safety Inspection
Enforcement of Establishment safety policies and procedures
Programs Policies and Reports
Weekly Project Manager Safety Meeting
A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences
Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him
Duties and Responsibilities of Safety Inspectors
Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility
Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly
Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents
Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)
QAQC PROGRAM
The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST
Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards
Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients
Quality Procurement Procedure
Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference
A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery
Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage
A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project
Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed
Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications
Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion
As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed
Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement
GOING-ON PROJECTS
CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld
Saudia Ltd MIJAJCO
RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter
Old Makkah Road
JeddahGoing-on
Saudi Electricity Company
ATTS MIJAJCO
Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new
Makkah Power Plant
Going-on
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length
or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-
lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah Going-on
Ministry of Defense
Engineering amp Housing Dept
Jeddah
Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning
Jeddah Going-on
Bashir Ahmed Dost Mohd Used
Lube Oil Re-refining Factory
1) Plot development2)Development of infrastructure for the
factory3)Construction of all underground
concrete tanks of utility4)Fabrication and Installation raw material
storage tanks intermediate storage tanks
Rabigh Going-on
COMPLETED PROJECTS
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Electricity Co Bandariya Intl Co Ltd
MIJAJCO
Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No
Tihama Power Plant
February 2009
Saudi Electricity Co ATTS MIJAJCO
Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant
Najran Power Plant
February 2009
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc
Luberef-1 Jeddah
February 2009
Saudi Bin Laden GroupMIJAJC
O
Construction of Porta-cabin for office unit of the Railway project Haffar Battan
Hafilul Batin
December 2008
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of Existing and Installation of new heat exchanger
Luberef-1 Jeddah
October 2008
SEC Bandariya Intl Co Ltd
MIJAJCO
Re-insertion of rotor and boxing up of everything and run generators Qty 1No
Jazan Power Plant
May 2008
Saudi Electricity Co ATTS MIJAJCO
All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos
Tabuk Power Plant
May 2008
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Mechanical repairing works during emergency shutdown
Removal and reinstallation of 6 nos of fin-fan bundles
Luberef-1 Jeddah
February 2008
Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO
Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah
Jeddah KAIA
November 2007
Saline Water Conversion Corporation
(SWCC)
Dismantling of the structure support and rail of the overhead 30 ton capacity crane
Jeddah October 30 2007
SAFA General Contractors amp Enterprises Co
Ltd MIJAJCO
Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street
Jeddah September 20 2007
Ministry ofDefense Housing amp Planning Dept
Jeddah
Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning
Jeddah August 2007
Saudi Aramco Ashi amp Bushnag Co MIJAJCO
Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco
Saudi Aramco Jeddah Refinery
June 2007
Saudi Electricity Company MIJAJCO
Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment
Al-Qaseem Power Plant
June 2007
Fakieh Poultry Fram
MIJAJCO
Modification and Extension of Hatchery Building
Makkah May 2007
Fakieh Poultry Fram
MIJAJCO
Construction of Labour and staff accommodation Building
Makkah March 2007
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Fakieh Poultry Fram
MIJAJCOExtension of GP Hatchery Makkah April 2007
Fakieh Group MIJAJCO
Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F
Makkah February 2007
SAVOLA Edible oil MIJAJCO
Area Qualification Project (Civil Mechanical and Electrical) at Industrial City
JeddahCompleted December
2006
Ministry of Defense Housing amp Planning Dept
Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work
Jeddah December 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant
2)Tubes modification work on furnace B-3002 during TA of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Electricity CoYusuf Bin A
Kanoo MIJAJCO
Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line
Rabigh Power Plant
October 2006
Saudi Electricity Co Wood
Group MIJAJCO
Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables
Bisha Power Plant
October 2006
SCECOYusuf Bin A Kanoo
MIJAJCO
Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders
Rabigh Power Plant
October 2006
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
ABB Saudi Arabia
MIJAJCO
Servicing amp Site support for 18 MW Generator at Al-Baha
Al-Baha October 2006
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah September 2006
Saudi Electricity Co MIJAJCO
Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)
Bisha Power Plant
December 2005
Saudi Electricity Co MIJAJCO
Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18
Jazan Power Plant
November 2005
Saudi Electricity Co MIJAJCO
Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables
Power Plant -9
November 2005
SCECOAlstom Power
MIJAJCOReplacement of 18 Valve
Shoaiba Power Plant
September 2005
SCECOAlstom Power
MIJAJCO
Hot Tapping of Five Points 2 8 18 20
Shoaiba Power Plant
May 2005
SCECOSAS MIJAJCO
Construction of Site Camp amp Site Office facilities
Shoaiba Power Plant
May 2005
Saudi AramcoAshi Bushnag Co
MIJAJCO
Cable Pulling at Marine Area Jeddah Refinery
Saudi Aramco Jeddah
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Rotted Cables at GT 17
Makkah Power Plant
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Removal of oil and Carbon Heating Stator
Gazlan Power Plant
April 2005
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
SCECOYusuf Bin A Kanoo
MIJAJCO
Repair Cathodic Protection Test Posts PPII amp PPIII
Jeddah Power
Plant II amp III
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Routed Cables at GT 16
Makkah Power Plant
March 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz
Ummlujj Power Plant
February 2005
Redland Industrial
Services Ltd MIJAJCO
Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant
Shuqaiq Desalination Plant
February 2005
Saudi Electricity CoTIG-TESCO
Intl Ltd MIJAJCO
Bolts torquing and life assessment work with flow and retaining rings NDT test
Ghazlan Power Plant
Dammam
February 2005
Alstom GE Shoaiba Power
Plant MIJAJCO
Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant
Shoaiba Power Plant
December 2004
Alstom Shoaiba Power Plant
MIJAJCO
Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants
Shoaiba Power Plant
October 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )
Asir Power Plant
(Abha)
September 2004
Alstom Shoaiba Power Plant
MIJAJCO
Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant
Shoaiba Power Plant
August 2004
Alstom Shoaiba Power Plant MIJAJCO
Replacement of Expansion Joints HFOCO at Shoaiba Power Plant
Shoaiba Power Plant
July 2004
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
INTRODUCTION
We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of
Electro Mechanical amp Instrumentation Engineering
Maintenance amp installation of Power Generators
Turbine overhauling
Pipeline Construction Modification amp Maintenance
New installation amp Overhauling of Process Equipments of Refineries
Civil Construction Modification amp Maintenance
We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc
We also supply industrial support material
Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before
BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations
MISSION STATEMENT
Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele
OUR HEAD OFFICE CONTACTS
AL-JASSIM Building (1st Floor)
Baladiya Street Al-Aziziya District Jeddah
PO Box 18607 Jeddah 21425 KSA
Tel +966 2 663 2382 050 4699 467
Fax +966 2 668 5850
E-mail i n fo bash i rdos t com
URL www bash i rdo st c om
OUR WORK SHOP
KILO- 16 OLD MAKKAH ROAD
PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA
HVACDIVISION
HVAC Engr Purchaser
Store keeper
Forman Forman Forman Forman Forman Forman Helper
Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Cashier
Supv Engineer Supv Engineer
ELECTRICALDIVISION
Computer Operator
DIVISION
Mechanical EngrCivil EngineerElect Engineer
Supv Engineer
Pipeline CP Engr
Supv Engineer
Mechanical Engr
Public Relation Off
ADMIN MANAGER
SERVICES
Personnel Officer
Safety Loss Prev Engr
CONSTRUCTION
Planning amp Control Div Manager
OVERHAULINGPIPELINE amp CP GENERATOR
Civil Engineer
INDUSTRIALCIVIL
Design Draftsman
Mechanical Engineer
PROJECT OPERATIONS
DIVISION DIVISION
PLANNING amp CONTROL
Jeddah - Saudi Arabia
DIVISION
Quantity Engineer
DIVISION
over-all Projects Coord
Technical Support StaffElectrical Engineer
Quality Control Engineer
Supv Engineer Material Planner
BASHIR AHMED DOST MOHAMMAD EST
FINANCE MANAGER
Finance Controller
TECHNICAL amp COOR
PlanningCost Engineer
Supv Engineer
MATERIALMAINTENANCE DIVISION
Exec Secretary
Demo VersionDemo Version
BUSINESS FUNCTION
MAJOR ACTIVITIES
Generators Overhauling
Revamping of Power House Electrical system
Low Medium and High Voltage Switchgear Maintenance
Low Medium and High Voltage Motors Maintenance and overhauling
Electrical Repairing and Refurbishment
Process Plant Installation and Maintenance
Heat Exchanger Maintenance
Refurbishment of Distillation Tower
Boiler Maintenance
New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water
Cooling Tower Maintenance
Pipeline Construction Maintenance amp Modification for Oil Gas and fire water
Cathodic Protection System Installation Commissioning and maintenance
Cold Storage Refrigeration and HVAC System Installation and Maintenance
Supply Installation amp Maintenance of Telecom system-CCTV MATV etc
Supply of Personal Protective Equipment amp Firefighting system
Civil Construction
Generators Overhauling
We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work
Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation
Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine
Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields
Remove bearing caps inner and outer end shields end bearings
Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines
Removing the existing end winding insulation and repair it where it required
Cleaning the stator housing and both end windings painting end winding with anti tracing paint
Cleaning all components properly and reinstall all the components on its original locations
Revamping of Power House Electrical system
Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection
Low Medium and High Voltage Switchgear Maintenance
Switch gear Inspection and trouble shootingPer commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etcMechanical Alignment maintenance of the opening and closing system trouble shooting and Energization testProtection Relay system and CalibrationProtection system upgrading and refurbishment
Low Medium and High Voltage Motors Maintenance and overhauling
Inspection of motors
Dismantling
Carrying out all the required testsDeveloping of test records and their interpretation
Supply of motors
Rewinding of motors
Making the recommendations based on inspection and test
Electrical Repairing and Refurbishment
Electrical distribution maintenance troubleshooting and extensionsInstallation maintenance and extension of lighting distribution and low power systemsInstallation of low voltage distribution as well as control panelsInstallation laying and testing of low voltage cables and cable tray systemDC distribution including batteries and battery chargers and their installation testing and commissioningInstallation of emergency power generating systemProviding around the clock emergency services
Process Plant Installation and Maintenance
We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes
Power PlantsWater Treatment PlantsCement PlantsSugar PlantsFood Industries
Heat Exchanger Maintenance
Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following
Pulling of tube bundlesInternal and external hydro-blast cleaning of tubesRepair and Replacement of tubesRe-facing of tube sheetsFabrication of shellsPressure test
Refurbishment of Distillation Tower
Dismantling of traysCleaning of shell internals by hydro blast and grit blastRepair and replacement of bubble cup traysReplacement of rashing ringsCleaning and replacement of demister padsPressure test
Boiler Maintenance
Services are provided for the maintenance of water tube and fire tube boilers
Repair and replacement of tubes
De-scaling of internal and external boiler tubes including steam drums
Fire box and refractory repairs
New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water
Construction of steel tanks for petroleum chemicals and water
Tank cleaning
Bottom plate replacement
Repair and replacement of heating coils
Epoxy lining
Internal Coating
Replacement of Floating Fixed roof
Maintenance of pressure vacuum relief valve
Cooling Tower Maintenance
Cleaning of cooling tower cells
Replacement of wooden baffle plates
Repair maintenance amp replacement of Exhaust fan amp gearboxes
Pipeline Construction Maintenance amp Modification for Oil Gas and fire water
Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping
Construction Maintenance amp Modification of buried carbon steel pipeline
Construction Maintenance amp Modification of non-metallic pipelines
Construction Maintenance amp Modification of fiberglass pipelines
Hydrostatic testing and commissioning of oil and gas pipelines
De commissioning and vacuum drying of pipelines
Mothballing of pipelines
Pigging and internal cleaning of pipelines
External coating repairs
Cathodic Protection System Installation Commissioning and maintenance
Cathodic protection (CP) system design and installation
Commissioning of Cathodic Protection system
Trouble shooting and maintenance of existing CP system
Up grading of existing CP system
Routine CP data monitoring
Data evaluation and upgrading recommendations
Cold Storage Refrigeration and HVAC System Installation and Maintenance
Installation and commissioning of cold storage systems
Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors
Installation of cooling coils and condensers
Duct work installation Cleaning and Maintenance
Supply Installation amp Maintenance of Telecom system-CCTV MATV etc
Supply of Personal Protective Equipment amp Firefighting system
Civil Construction
Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients
Structure amp Foundation works
New Construction of any kind
Modifications and expansions works
All kind of Finishing and Decoration works
Swimming Pool constructions works
Landscaping Handicapping amp Earth works
Pre-Engineered Steel Structural building works
Concrete repairing works
Water proofing system of any kind suck as pools tanks etc
LEGAL DOCUMENTS
FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST
COMMERCIAL REGISTRATION CERTIFICATE
CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE
SAGIA CERTIFICATE
SOCIAL INSURANCE CERTIFICATE
ZAKAH CERTIFICATE
MUNICIPALTY CERTIFICATE
Human Resources
All personnel are able to understand speak both English and Arabic languages
Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries
Block Visa available in our ESTABLISHMENT - Under Process
Following is the list of our affiliated Recruiting Agents
Agents Address Contacts
AL-AHRAM
Trading amp Manpower Services
Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE
QADER INTERNATIONAL
License 2199
Dira Ghazi khan
Lahore
PAKISTAN
Ph +92-641-4670806
Fax +92-641-460698
BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor
Ali Complex 23-Empress Road Lahore
PAKISTAN
Ph +92-42-6365498
6367869
Fax +92-42-6365290
PRINCE INDIA
7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA
NAZ ASSOCIATES
H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH
ZAHID INTERNATIONAL
109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016
INDIA
Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom
Equipment Resources
The following table provides information of related equipment that is available for the work
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL
YEARMAKE
QTYOWNED
1 MOBILE CRANE 35 TON TADANO 1985 1
2 TANKER TRUCK (WATER)10000 amp
19000 GALNISSAN 1990 2
3 BOOM TRUCK 6 TON HINO 1985 1
4 POWER GENERATOR 35 KVA HONDA 1990 3
5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4
6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8
7 WELDING MACHINE ELECTRIC amp PORTABLE
350 AMP LICON 1998 4
8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO
1991 1
9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1
10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO
1990 1
11 DEWATERING PUMP 600 GPM ROBIN 1990 3
12 PIPE THREADING MACHINE UP TO 16INCH
SET RIGID 1994 2
13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2
14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2
15 OXY-ACETYLENE CYLINDER SET -- 1993 8
16 ARGON-NITROGEN CYLINDER SET -- 5
17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4
18 CREW CAB 1frac12 TON NISSAN 1988 1
19 PASSENGER VAN 15 SEAT NISSAN 2002 2
20 FORKLIFT3 amp 7-12
TONTOYTO 1990 2
21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2
22 SAND BLASTING MACHINE SET GIRACO 1995 3
23 CATHODIC PROTECTION TEST EQUIPMENT
SET -- 1
24 UNDERGROUND PIPE LOCATOR SET -- 2
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMADEMODEL
YEARMAKE
QTYOWNED
25 SOIL COMPACTOR PORTABLE - 1
26 UNDERGROUNG CABEL DETECTOR SET -- 2
27 PIN BRAZING SET -- 3
28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3
29 EXCHANGER BUNDLE PULLER 9 METERS 1
30 BOBCAT 2
31 EXCAVATOR 1
32 MICRO TRENCHER 1
33 VACUUM TRUCK 14 TON NISSAN 1
34 ASPHALT CUTTER 2
35 HIGH PRESSURE HYDRO-JETTING MACHINE
20000 PSI USA 1
36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)
50 KVA 3 way HTU with 3linkable Advantage 3 tempe-
rature programmer cont-rollers and 3 Energy regs
1
SAFETY amp LOSS PREVENTION PROGRAM
Objectives
The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through
Safety meetings and dialoguesdiscussion
Safety Inspection
Enforcement of Establishment safety policies and procedures
Programs Policies and Reports
Weekly Project Manager Safety Meeting
A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences
Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him
Duties and Responsibilities of Safety Inspectors
Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility
Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly
Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents
Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)
QAQC PROGRAM
The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST
Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards
Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients
Quality Procurement Procedure
Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference
A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery
Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage
A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project
Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed
Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications
Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion
As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed
Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement
GOING-ON PROJECTS
CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld
Saudia Ltd MIJAJCO
RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter
Old Makkah Road
JeddahGoing-on
Saudi Electricity Company
ATTS MIJAJCO
Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new
Makkah Power Plant
Going-on
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length
or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-
lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah Going-on
Ministry of Defense
Engineering amp Housing Dept
Jeddah
Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning
Jeddah Going-on
Bashir Ahmed Dost Mohd Used
Lube Oil Re-refining Factory
1) Plot development2)Development of infrastructure for the
factory3)Construction of all underground
concrete tanks of utility4)Fabrication and Installation raw material
storage tanks intermediate storage tanks
Rabigh Going-on
COMPLETED PROJECTS
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Electricity Co Bandariya Intl Co Ltd
MIJAJCO
Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No
Tihama Power Plant
February 2009
Saudi Electricity Co ATTS MIJAJCO
Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant
Najran Power Plant
February 2009
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc
Luberef-1 Jeddah
February 2009
Saudi Bin Laden GroupMIJAJC
O
Construction of Porta-cabin for office unit of the Railway project Haffar Battan
Hafilul Batin
December 2008
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of Existing and Installation of new heat exchanger
Luberef-1 Jeddah
October 2008
SEC Bandariya Intl Co Ltd
MIJAJCO
Re-insertion of rotor and boxing up of everything and run generators Qty 1No
Jazan Power Plant
May 2008
Saudi Electricity Co ATTS MIJAJCO
All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos
Tabuk Power Plant
May 2008
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Mechanical repairing works during emergency shutdown
Removal and reinstallation of 6 nos of fin-fan bundles
Luberef-1 Jeddah
February 2008
Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO
Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah
Jeddah KAIA
November 2007
Saline Water Conversion Corporation
(SWCC)
Dismantling of the structure support and rail of the overhead 30 ton capacity crane
Jeddah October 30 2007
SAFA General Contractors amp Enterprises Co
Ltd MIJAJCO
Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street
Jeddah September 20 2007
Ministry ofDefense Housing amp Planning Dept
Jeddah
Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning
Jeddah August 2007
Saudi Aramco Ashi amp Bushnag Co MIJAJCO
Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco
Saudi Aramco Jeddah Refinery
June 2007
Saudi Electricity Company MIJAJCO
Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment
Al-Qaseem Power Plant
June 2007
Fakieh Poultry Fram
MIJAJCO
Modification and Extension of Hatchery Building
Makkah May 2007
Fakieh Poultry Fram
MIJAJCO
Construction of Labour and staff accommodation Building
Makkah March 2007
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Fakieh Poultry Fram
MIJAJCOExtension of GP Hatchery Makkah April 2007
Fakieh Group MIJAJCO
Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F
Makkah February 2007
SAVOLA Edible oil MIJAJCO
Area Qualification Project (Civil Mechanical and Electrical) at Industrial City
JeddahCompleted December
2006
Ministry of Defense Housing amp Planning Dept
Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work
Jeddah December 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant
2)Tubes modification work on furnace B-3002 during TA of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Electricity CoYusuf Bin A
Kanoo MIJAJCO
Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line
Rabigh Power Plant
October 2006
Saudi Electricity Co Wood
Group MIJAJCO
Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables
Bisha Power Plant
October 2006
SCECOYusuf Bin A Kanoo
MIJAJCO
Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders
Rabigh Power Plant
October 2006
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
ABB Saudi Arabia
MIJAJCO
Servicing amp Site support for 18 MW Generator at Al-Baha
Al-Baha October 2006
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah September 2006
Saudi Electricity Co MIJAJCO
Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)
Bisha Power Plant
December 2005
Saudi Electricity Co MIJAJCO
Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18
Jazan Power Plant
November 2005
Saudi Electricity Co MIJAJCO
Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables
Power Plant -9
November 2005
SCECOAlstom Power
MIJAJCOReplacement of 18 Valve
Shoaiba Power Plant
September 2005
SCECOAlstom Power
MIJAJCO
Hot Tapping of Five Points 2 8 18 20
Shoaiba Power Plant
May 2005
SCECOSAS MIJAJCO
Construction of Site Camp amp Site Office facilities
Shoaiba Power Plant
May 2005
Saudi AramcoAshi Bushnag Co
MIJAJCO
Cable Pulling at Marine Area Jeddah Refinery
Saudi Aramco Jeddah
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Rotted Cables at GT 17
Makkah Power Plant
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Removal of oil and Carbon Heating Stator
Gazlan Power Plant
April 2005
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
SCECOYusuf Bin A Kanoo
MIJAJCO
Repair Cathodic Protection Test Posts PPII amp PPIII
Jeddah Power
Plant II amp III
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Routed Cables at GT 16
Makkah Power Plant
March 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz
Ummlujj Power Plant
February 2005
Redland Industrial
Services Ltd MIJAJCO
Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant
Shuqaiq Desalination Plant
February 2005
Saudi Electricity CoTIG-TESCO
Intl Ltd MIJAJCO
Bolts torquing and life assessment work with flow and retaining rings NDT test
Ghazlan Power Plant
Dammam
February 2005
Alstom GE Shoaiba Power
Plant MIJAJCO
Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant
Shoaiba Power Plant
December 2004
Alstom Shoaiba Power Plant
MIJAJCO
Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants
Shoaiba Power Plant
October 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )
Asir Power Plant
(Abha)
September 2004
Alstom Shoaiba Power Plant
MIJAJCO
Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant
Shoaiba Power Plant
August 2004
Alstom Shoaiba Power Plant MIJAJCO
Replacement of Expansion Joints HFOCO at Shoaiba Power Plant
Shoaiba Power Plant
July 2004
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
MISSION STATEMENT
Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele
OUR HEAD OFFICE CONTACTS
AL-JASSIM Building (1st Floor)
Baladiya Street Al-Aziziya District Jeddah
PO Box 18607 Jeddah 21425 KSA
Tel +966 2 663 2382 050 4699 467
Fax +966 2 668 5850
E-mail i n fo bash i rdos t com
URL www bash i rdo st c om
OUR WORK SHOP
KILO- 16 OLD MAKKAH ROAD
PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA
HVACDIVISION
HVAC Engr Purchaser
Store keeper
Forman Forman Forman Forman Forman Forman Helper
Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Cashier
Supv Engineer Supv Engineer
ELECTRICALDIVISION
Computer Operator
DIVISION
Mechanical EngrCivil EngineerElect Engineer
Supv Engineer
Pipeline CP Engr
Supv Engineer
Mechanical Engr
Public Relation Off
ADMIN MANAGER
SERVICES
Personnel Officer
Safety Loss Prev Engr
CONSTRUCTION
Planning amp Control Div Manager
OVERHAULINGPIPELINE amp CP GENERATOR
Civil Engineer
INDUSTRIALCIVIL
Design Draftsman
Mechanical Engineer
PROJECT OPERATIONS
DIVISION DIVISION
PLANNING amp CONTROL
Jeddah - Saudi Arabia
DIVISION
Quantity Engineer
DIVISION
over-all Projects Coord
Technical Support StaffElectrical Engineer
Quality Control Engineer
Supv Engineer Material Planner
BASHIR AHMED DOST MOHAMMAD EST
FINANCE MANAGER
Finance Controller
TECHNICAL amp COOR
PlanningCost Engineer
Supv Engineer
MATERIALMAINTENANCE DIVISION
Exec Secretary
Demo VersionDemo Version
BUSINESS FUNCTION
MAJOR ACTIVITIES
Generators Overhauling
Revamping of Power House Electrical system
Low Medium and High Voltage Switchgear Maintenance
Low Medium and High Voltage Motors Maintenance and overhauling
Electrical Repairing and Refurbishment
Process Plant Installation and Maintenance
Heat Exchanger Maintenance
Refurbishment of Distillation Tower
Boiler Maintenance
New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water
Cooling Tower Maintenance
Pipeline Construction Maintenance amp Modification for Oil Gas and fire water
Cathodic Protection System Installation Commissioning and maintenance
Cold Storage Refrigeration and HVAC System Installation and Maintenance
Supply Installation amp Maintenance of Telecom system-CCTV MATV etc
Supply of Personal Protective Equipment amp Firefighting system
Civil Construction
Generators Overhauling
We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work
Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation
Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine
Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields
Remove bearing caps inner and outer end shields end bearings
Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines
Removing the existing end winding insulation and repair it where it required
Cleaning the stator housing and both end windings painting end winding with anti tracing paint
Cleaning all components properly and reinstall all the components on its original locations
Revamping of Power House Electrical system
Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection
Low Medium and High Voltage Switchgear Maintenance
Switch gear Inspection and trouble shootingPer commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etcMechanical Alignment maintenance of the opening and closing system trouble shooting and Energization testProtection Relay system and CalibrationProtection system upgrading and refurbishment
Low Medium and High Voltage Motors Maintenance and overhauling
Inspection of motors
Dismantling
Carrying out all the required testsDeveloping of test records and their interpretation
Supply of motors
Rewinding of motors
Making the recommendations based on inspection and test
Electrical Repairing and Refurbishment
Electrical distribution maintenance troubleshooting and extensionsInstallation maintenance and extension of lighting distribution and low power systemsInstallation of low voltage distribution as well as control panelsInstallation laying and testing of low voltage cables and cable tray systemDC distribution including batteries and battery chargers and their installation testing and commissioningInstallation of emergency power generating systemProviding around the clock emergency services
Process Plant Installation and Maintenance
We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes
Power PlantsWater Treatment PlantsCement PlantsSugar PlantsFood Industries
Heat Exchanger Maintenance
Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following
Pulling of tube bundlesInternal and external hydro-blast cleaning of tubesRepair and Replacement of tubesRe-facing of tube sheetsFabrication of shellsPressure test
Refurbishment of Distillation Tower
Dismantling of traysCleaning of shell internals by hydro blast and grit blastRepair and replacement of bubble cup traysReplacement of rashing ringsCleaning and replacement of demister padsPressure test
Boiler Maintenance
Services are provided for the maintenance of water tube and fire tube boilers
Repair and replacement of tubes
De-scaling of internal and external boiler tubes including steam drums
Fire box and refractory repairs
New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water
Construction of steel tanks for petroleum chemicals and water
Tank cleaning
Bottom plate replacement
Repair and replacement of heating coils
Epoxy lining
Internal Coating
Replacement of Floating Fixed roof
Maintenance of pressure vacuum relief valve
Cooling Tower Maintenance
Cleaning of cooling tower cells
Replacement of wooden baffle plates
Repair maintenance amp replacement of Exhaust fan amp gearboxes
Pipeline Construction Maintenance amp Modification for Oil Gas and fire water
Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping
Construction Maintenance amp Modification of buried carbon steel pipeline
Construction Maintenance amp Modification of non-metallic pipelines
Construction Maintenance amp Modification of fiberglass pipelines
Hydrostatic testing and commissioning of oil and gas pipelines
De commissioning and vacuum drying of pipelines
Mothballing of pipelines
Pigging and internal cleaning of pipelines
External coating repairs
Cathodic Protection System Installation Commissioning and maintenance
Cathodic protection (CP) system design and installation
Commissioning of Cathodic Protection system
Trouble shooting and maintenance of existing CP system
Up grading of existing CP system
Routine CP data monitoring
Data evaluation and upgrading recommendations
Cold Storage Refrigeration and HVAC System Installation and Maintenance
Installation and commissioning of cold storage systems
Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors
Installation of cooling coils and condensers
Duct work installation Cleaning and Maintenance
Supply Installation amp Maintenance of Telecom system-CCTV MATV etc
Supply of Personal Protective Equipment amp Firefighting system
Civil Construction
Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients
Structure amp Foundation works
New Construction of any kind
Modifications and expansions works
All kind of Finishing and Decoration works
Swimming Pool constructions works
Landscaping Handicapping amp Earth works
Pre-Engineered Steel Structural building works
Concrete repairing works
Water proofing system of any kind suck as pools tanks etc
LEGAL DOCUMENTS
FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST
COMMERCIAL REGISTRATION CERTIFICATE
CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE
SAGIA CERTIFICATE
SOCIAL INSURANCE CERTIFICATE
ZAKAH CERTIFICATE
MUNICIPALTY CERTIFICATE
Human Resources
All personnel are able to understand speak both English and Arabic languages
Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries
Block Visa available in our ESTABLISHMENT - Under Process
Following is the list of our affiliated Recruiting Agents
Agents Address Contacts
AL-AHRAM
Trading amp Manpower Services
Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE
QADER INTERNATIONAL
License 2199
Dira Ghazi khan
Lahore
PAKISTAN
Ph +92-641-4670806
Fax +92-641-460698
BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor
Ali Complex 23-Empress Road Lahore
PAKISTAN
Ph +92-42-6365498
6367869
Fax +92-42-6365290
PRINCE INDIA
7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA
NAZ ASSOCIATES
H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH
ZAHID INTERNATIONAL
109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016
INDIA
Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom
Equipment Resources
The following table provides information of related equipment that is available for the work
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL
YEARMAKE
QTYOWNED
1 MOBILE CRANE 35 TON TADANO 1985 1
2 TANKER TRUCK (WATER)10000 amp
19000 GALNISSAN 1990 2
3 BOOM TRUCK 6 TON HINO 1985 1
4 POWER GENERATOR 35 KVA HONDA 1990 3
5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4
6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8
7 WELDING MACHINE ELECTRIC amp PORTABLE
350 AMP LICON 1998 4
8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO
1991 1
9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1
10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO
1990 1
11 DEWATERING PUMP 600 GPM ROBIN 1990 3
12 PIPE THREADING MACHINE UP TO 16INCH
SET RIGID 1994 2
13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2
14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2
15 OXY-ACETYLENE CYLINDER SET -- 1993 8
16 ARGON-NITROGEN CYLINDER SET -- 5
17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4
18 CREW CAB 1frac12 TON NISSAN 1988 1
19 PASSENGER VAN 15 SEAT NISSAN 2002 2
20 FORKLIFT3 amp 7-12
TONTOYTO 1990 2
21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2
22 SAND BLASTING MACHINE SET GIRACO 1995 3
23 CATHODIC PROTECTION TEST EQUIPMENT
SET -- 1
24 UNDERGROUND PIPE LOCATOR SET -- 2
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMADEMODEL
YEARMAKE
QTYOWNED
25 SOIL COMPACTOR PORTABLE - 1
26 UNDERGROUNG CABEL DETECTOR SET -- 2
27 PIN BRAZING SET -- 3
28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3
29 EXCHANGER BUNDLE PULLER 9 METERS 1
30 BOBCAT 2
31 EXCAVATOR 1
32 MICRO TRENCHER 1
33 VACUUM TRUCK 14 TON NISSAN 1
34 ASPHALT CUTTER 2
35 HIGH PRESSURE HYDRO-JETTING MACHINE
20000 PSI USA 1
36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)
50 KVA 3 way HTU with 3linkable Advantage 3 tempe-
rature programmer cont-rollers and 3 Energy regs
1
SAFETY amp LOSS PREVENTION PROGRAM
Objectives
The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through
Safety meetings and dialoguesdiscussion
Safety Inspection
Enforcement of Establishment safety policies and procedures
Programs Policies and Reports
Weekly Project Manager Safety Meeting
A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences
Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him
Duties and Responsibilities of Safety Inspectors
Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility
Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly
Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents
Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)
QAQC PROGRAM
The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST
Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards
Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients
Quality Procurement Procedure
Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference
A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery
Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage
A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project
Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed
Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications
Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion
As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed
Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement
GOING-ON PROJECTS
CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld
Saudia Ltd MIJAJCO
RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter
Old Makkah Road
JeddahGoing-on
Saudi Electricity Company
ATTS MIJAJCO
Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new
Makkah Power Plant
Going-on
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length
or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-
lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah Going-on
Ministry of Defense
Engineering amp Housing Dept
Jeddah
Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning
Jeddah Going-on
Bashir Ahmed Dost Mohd Used
Lube Oil Re-refining Factory
1) Plot development2)Development of infrastructure for the
factory3)Construction of all underground
concrete tanks of utility4)Fabrication and Installation raw material
storage tanks intermediate storage tanks
Rabigh Going-on
COMPLETED PROJECTS
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Electricity Co Bandariya Intl Co Ltd
MIJAJCO
Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No
Tihama Power Plant
February 2009
Saudi Electricity Co ATTS MIJAJCO
Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant
Najran Power Plant
February 2009
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc
Luberef-1 Jeddah
February 2009
Saudi Bin Laden GroupMIJAJC
O
Construction of Porta-cabin for office unit of the Railway project Haffar Battan
Hafilul Batin
December 2008
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of Existing and Installation of new heat exchanger
Luberef-1 Jeddah
October 2008
SEC Bandariya Intl Co Ltd
MIJAJCO
Re-insertion of rotor and boxing up of everything and run generators Qty 1No
Jazan Power Plant
May 2008
Saudi Electricity Co ATTS MIJAJCO
All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos
Tabuk Power Plant
May 2008
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Mechanical repairing works during emergency shutdown
Removal and reinstallation of 6 nos of fin-fan bundles
Luberef-1 Jeddah
February 2008
Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO
Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah
Jeddah KAIA
November 2007
Saline Water Conversion Corporation
(SWCC)
Dismantling of the structure support and rail of the overhead 30 ton capacity crane
Jeddah October 30 2007
SAFA General Contractors amp Enterprises Co
Ltd MIJAJCO
Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street
Jeddah September 20 2007
Ministry ofDefense Housing amp Planning Dept
Jeddah
Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning
Jeddah August 2007
Saudi Aramco Ashi amp Bushnag Co MIJAJCO
Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco
Saudi Aramco Jeddah Refinery
June 2007
Saudi Electricity Company MIJAJCO
Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment
Al-Qaseem Power Plant
June 2007
Fakieh Poultry Fram
MIJAJCO
Modification and Extension of Hatchery Building
Makkah May 2007
Fakieh Poultry Fram
MIJAJCO
Construction of Labour and staff accommodation Building
Makkah March 2007
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Fakieh Poultry Fram
MIJAJCOExtension of GP Hatchery Makkah April 2007
Fakieh Group MIJAJCO
Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F
Makkah February 2007
SAVOLA Edible oil MIJAJCO
Area Qualification Project (Civil Mechanical and Electrical) at Industrial City
JeddahCompleted December
2006
Ministry of Defense Housing amp Planning Dept
Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work
Jeddah December 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant
2)Tubes modification work on furnace B-3002 during TA of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Electricity CoYusuf Bin A
Kanoo MIJAJCO
Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line
Rabigh Power Plant
October 2006
Saudi Electricity Co Wood
Group MIJAJCO
Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables
Bisha Power Plant
October 2006
SCECOYusuf Bin A Kanoo
MIJAJCO
Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders
Rabigh Power Plant
October 2006
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
ABB Saudi Arabia
MIJAJCO
Servicing amp Site support for 18 MW Generator at Al-Baha
Al-Baha October 2006
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah September 2006
Saudi Electricity Co MIJAJCO
Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)
Bisha Power Plant
December 2005
Saudi Electricity Co MIJAJCO
Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18
Jazan Power Plant
November 2005
Saudi Electricity Co MIJAJCO
Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables
Power Plant -9
November 2005
SCECOAlstom Power
MIJAJCOReplacement of 18 Valve
Shoaiba Power Plant
September 2005
SCECOAlstom Power
MIJAJCO
Hot Tapping of Five Points 2 8 18 20
Shoaiba Power Plant
May 2005
SCECOSAS MIJAJCO
Construction of Site Camp amp Site Office facilities
Shoaiba Power Plant
May 2005
Saudi AramcoAshi Bushnag Co
MIJAJCO
Cable Pulling at Marine Area Jeddah Refinery
Saudi Aramco Jeddah
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Rotted Cables at GT 17
Makkah Power Plant
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Removal of oil and Carbon Heating Stator
Gazlan Power Plant
April 2005
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
SCECOYusuf Bin A Kanoo
MIJAJCO
Repair Cathodic Protection Test Posts PPII amp PPIII
Jeddah Power
Plant II amp III
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Routed Cables at GT 16
Makkah Power Plant
March 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz
Ummlujj Power Plant
February 2005
Redland Industrial
Services Ltd MIJAJCO
Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant
Shuqaiq Desalination Plant
February 2005
Saudi Electricity CoTIG-TESCO
Intl Ltd MIJAJCO
Bolts torquing and life assessment work with flow and retaining rings NDT test
Ghazlan Power Plant
Dammam
February 2005
Alstom GE Shoaiba Power
Plant MIJAJCO
Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant
Shoaiba Power Plant
December 2004
Alstom Shoaiba Power Plant
MIJAJCO
Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants
Shoaiba Power Plant
October 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )
Asir Power Plant
(Abha)
September 2004
Alstom Shoaiba Power Plant
MIJAJCO
Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant
Shoaiba Power Plant
August 2004
Alstom Shoaiba Power Plant MIJAJCO
Replacement of Expansion Joints HFOCO at Shoaiba Power Plant
Shoaiba Power Plant
July 2004
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
OUR HEAD OFFICE CONTACTS
AL-JASSIM Building (1st Floor)
Baladiya Street Al-Aziziya District Jeddah
PO Box 18607 Jeddah 21425 KSA
Tel +966 2 663 2382 050 4699 467
Fax +966 2 668 5850
E-mail i n fo bash i rdos t com
URL www bash i rdo st c om
OUR WORK SHOP
KILO- 16 OLD MAKKAH ROAD
PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA
HVACDIVISION
HVAC Engr Purchaser
Store keeper
Forman Forman Forman Forman Forman Forman Helper
Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Cashier
Supv Engineer Supv Engineer
ELECTRICALDIVISION
Computer Operator
DIVISION
Mechanical EngrCivil EngineerElect Engineer
Supv Engineer
Pipeline CP Engr
Supv Engineer
Mechanical Engr
Public Relation Off
ADMIN MANAGER
SERVICES
Personnel Officer
Safety Loss Prev Engr
CONSTRUCTION
Planning amp Control Div Manager
OVERHAULINGPIPELINE amp CP GENERATOR
Civil Engineer
INDUSTRIALCIVIL
Design Draftsman
Mechanical Engineer
PROJECT OPERATIONS
DIVISION DIVISION
PLANNING amp CONTROL
Jeddah - Saudi Arabia
DIVISION
Quantity Engineer
DIVISION
over-all Projects Coord
Technical Support StaffElectrical Engineer
Quality Control Engineer
Supv Engineer Material Planner
BASHIR AHMED DOST MOHAMMAD EST
FINANCE MANAGER
Finance Controller
TECHNICAL amp COOR
PlanningCost Engineer
Supv Engineer
MATERIALMAINTENANCE DIVISION
Exec Secretary
Demo VersionDemo Version
BUSINESS FUNCTION
MAJOR ACTIVITIES
Generators Overhauling
Revamping of Power House Electrical system
Low Medium and High Voltage Switchgear Maintenance
Low Medium and High Voltage Motors Maintenance and overhauling
Electrical Repairing and Refurbishment
Process Plant Installation and Maintenance
Heat Exchanger Maintenance
Refurbishment of Distillation Tower
Boiler Maintenance
New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water
Cooling Tower Maintenance
Pipeline Construction Maintenance amp Modification for Oil Gas and fire water
Cathodic Protection System Installation Commissioning and maintenance
Cold Storage Refrigeration and HVAC System Installation and Maintenance
Supply Installation amp Maintenance of Telecom system-CCTV MATV etc
Supply of Personal Protective Equipment amp Firefighting system
Civil Construction
Generators Overhauling
We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work
Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation
Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine
Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields
Remove bearing caps inner and outer end shields end bearings
Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines
Removing the existing end winding insulation and repair it where it required
Cleaning the stator housing and both end windings painting end winding with anti tracing paint
Cleaning all components properly and reinstall all the components on its original locations
Revamping of Power House Electrical system
Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection
Low Medium and High Voltage Switchgear Maintenance
Switch gear Inspection and trouble shootingPer commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etcMechanical Alignment maintenance of the opening and closing system trouble shooting and Energization testProtection Relay system and CalibrationProtection system upgrading and refurbishment
Low Medium and High Voltage Motors Maintenance and overhauling
Inspection of motors
Dismantling
Carrying out all the required testsDeveloping of test records and their interpretation
Supply of motors
Rewinding of motors
Making the recommendations based on inspection and test
Electrical Repairing and Refurbishment
Electrical distribution maintenance troubleshooting and extensionsInstallation maintenance and extension of lighting distribution and low power systemsInstallation of low voltage distribution as well as control panelsInstallation laying and testing of low voltage cables and cable tray systemDC distribution including batteries and battery chargers and their installation testing and commissioningInstallation of emergency power generating systemProviding around the clock emergency services
Process Plant Installation and Maintenance
We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes
Power PlantsWater Treatment PlantsCement PlantsSugar PlantsFood Industries
Heat Exchanger Maintenance
Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following
Pulling of tube bundlesInternal and external hydro-blast cleaning of tubesRepair and Replacement of tubesRe-facing of tube sheetsFabrication of shellsPressure test
Refurbishment of Distillation Tower
Dismantling of traysCleaning of shell internals by hydro blast and grit blastRepair and replacement of bubble cup traysReplacement of rashing ringsCleaning and replacement of demister padsPressure test
Boiler Maintenance
Services are provided for the maintenance of water tube and fire tube boilers
Repair and replacement of tubes
De-scaling of internal and external boiler tubes including steam drums
Fire box and refractory repairs
New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water
Construction of steel tanks for petroleum chemicals and water
Tank cleaning
Bottom plate replacement
Repair and replacement of heating coils
Epoxy lining
Internal Coating
Replacement of Floating Fixed roof
Maintenance of pressure vacuum relief valve
Cooling Tower Maintenance
Cleaning of cooling tower cells
Replacement of wooden baffle plates
Repair maintenance amp replacement of Exhaust fan amp gearboxes
Pipeline Construction Maintenance amp Modification for Oil Gas and fire water
Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping
Construction Maintenance amp Modification of buried carbon steel pipeline
Construction Maintenance amp Modification of non-metallic pipelines
Construction Maintenance amp Modification of fiberglass pipelines
Hydrostatic testing and commissioning of oil and gas pipelines
De commissioning and vacuum drying of pipelines
Mothballing of pipelines
Pigging and internal cleaning of pipelines
External coating repairs
Cathodic Protection System Installation Commissioning and maintenance
Cathodic protection (CP) system design and installation
Commissioning of Cathodic Protection system
Trouble shooting and maintenance of existing CP system
Up grading of existing CP system
Routine CP data monitoring
Data evaluation and upgrading recommendations
Cold Storage Refrigeration and HVAC System Installation and Maintenance
Installation and commissioning of cold storage systems
Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors
Installation of cooling coils and condensers
Duct work installation Cleaning and Maintenance
Supply Installation amp Maintenance of Telecom system-CCTV MATV etc
Supply of Personal Protective Equipment amp Firefighting system
Civil Construction
Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients
Structure amp Foundation works
New Construction of any kind
Modifications and expansions works
All kind of Finishing and Decoration works
Swimming Pool constructions works
Landscaping Handicapping amp Earth works
Pre-Engineered Steel Structural building works
Concrete repairing works
Water proofing system of any kind suck as pools tanks etc
LEGAL DOCUMENTS
FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST
COMMERCIAL REGISTRATION CERTIFICATE
CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE
SAGIA CERTIFICATE
SOCIAL INSURANCE CERTIFICATE
ZAKAH CERTIFICATE
MUNICIPALTY CERTIFICATE
Human Resources
All personnel are able to understand speak both English and Arabic languages
Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries
Block Visa available in our ESTABLISHMENT - Under Process
Following is the list of our affiliated Recruiting Agents
Agents Address Contacts
AL-AHRAM
Trading amp Manpower Services
Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE
QADER INTERNATIONAL
License 2199
Dira Ghazi khan
Lahore
PAKISTAN
Ph +92-641-4670806
Fax +92-641-460698
BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor
Ali Complex 23-Empress Road Lahore
PAKISTAN
Ph +92-42-6365498
6367869
Fax +92-42-6365290
PRINCE INDIA
7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA
NAZ ASSOCIATES
H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH
ZAHID INTERNATIONAL
109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016
INDIA
Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom
Equipment Resources
The following table provides information of related equipment that is available for the work
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL
YEARMAKE
QTYOWNED
1 MOBILE CRANE 35 TON TADANO 1985 1
2 TANKER TRUCK (WATER)10000 amp
19000 GALNISSAN 1990 2
3 BOOM TRUCK 6 TON HINO 1985 1
4 POWER GENERATOR 35 KVA HONDA 1990 3
5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4
6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8
7 WELDING MACHINE ELECTRIC amp PORTABLE
350 AMP LICON 1998 4
8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO
1991 1
9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1
10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO
1990 1
11 DEWATERING PUMP 600 GPM ROBIN 1990 3
12 PIPE THREADING MACHINE UP TO 16INCH
SET RIGID 1994 2
13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2
14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2
15 OXY-ACETYLENE CYLINDER SET -- 1993 8
16 ARGON-NITROGEN CYLINDER SET -- 5
17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4
18 CREW CAB 1frac12 TON NISSAN 1988 1
19 PASSENGER VAN 15 SEAT NISSAN 2002 2
20 FORKLIFT3 amp 7-12
TONTOYTO 1990 2
21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2
22 SAND BLASTING MACHINE SET GIRACO 1995 3
23 CATHODIC PROTECTION TEST EQUIPMENT
SET -- 1
24 UNDERGROUND PIPE LOCATOR SET -- 2
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMADEMODEL
YEARMAKE
QTYOWNED
25 SOIL COMPACTOR PORTABLE - 1
26 UNDERGROUNG CABEL DETECTOR SET -- 2
27 PIN BRAZING SET -- 3
28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3
29 EXCHANGER BUNDLE PULLER 9 METERS 1
30 BOBCAT 2
31 EXCAVATOR 1
32 MICRO TRENCHER 1
33 VACUUM TRUCK 14 TON NISSAN 1
34 ASPHALT CUTTER 2
35 HIGH PRESSURE HYDRO-JETTING MACHINE
20000 PSI USA 1
36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)
50 KVA 3 way HTU with 3linkable Advantage 3 tempe-
rature programmer cont-rollers and 3 Energy regs
1
SAFETY amp LOSS PREVENTION PROGRAM
Objectives
The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through
Safety meetings and dialoguesdiscussion
Safety Inspection
Enforcement of Establishment safety policies and procedures
Programs Policies and Reports
Weekly Project Manager Safety Meeting
A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences
Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him
Duties and Responsibilities of Safety Inspectors
Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility
Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly
Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents
Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)
QAQC PROGRAM
The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST
Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards
Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients
Quality Procurement Procedure
Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference
A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery
Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage
A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project
Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed
Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications
Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion
As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed
Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement
GOING-ON PROJECTS
CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld
Saudia Ltd MIJAJCO
RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter
Old Makkah Road
JeddahGoing-on
Saudi Electricity Company
ATTS MIJAJCO
Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new
Makkah Power Plant
Going-on
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length
or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-
lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah Going-on
Ministry of Defense
Engineering amp Housing Dept
Jeddah
Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning
Jeddah Going-on
Bashir Ahmed Dost Mohd Used
Lube Oil Re-refining Factory
1) Plot development2)Development of infrastructure for the
factory3)Construction of all underground
concrete tanks of utility4)Fabrication and Installation raw material
storage tanks intermediate storage tanks
Rabigh Going-on
COMPLETED PROJECTS
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Electricity Co Bandariya Intl Co Ltd
MIJAJCO
Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No
Tihama Power Plant
February 2009
Saudi Electricity Co ATTS MIJAJCO
Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant
Najran Power Plant
February 2009
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc
Luberef-1 Jeddah
February 2009
Saudi Bin Laden GroupMIJAJC
O
Construction of Porta-cabin for office unit of the Railway project Haffar Battan
Hafilul Batin
December 2008
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of Existing and Installation of new heat exchanger
Luberef-1 Jeddah
October 2008
SEC Bandariya Intl Co Ltd
MIJAJCO
Re-insertion of rotor and boxing up of everything and run generators Qty 1No
Jazan Power Plant
May 2008
Saudi Electricity Co ATTS MIJAJCO
All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos
Tabuk Power Plant
May 2008
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Mechanical repairing works during emergency shutdown
Removal and reinstallation of 6 nos of fin-fan bundles
Luberef-1 Jeddah
February 2008
Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO
Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah
Jeddah KAIA
November 2007
Saline Water Conversion Corporation
(SWCC)
Dismantling of the structure support and rail of the overhead 30 ton capacity crane
Jeddah October 30 2007
SAFA General Contractors amp Enterprises Co
Ltd MIJAJCO
Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street
Jeddah September 20 2007
Ministry ofDefense Housing amp Planning Dept
Jeddah
Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning
Jeddah August 2007
Saudi Aramco Ashi amp Bushnag Co MIJAJCO
Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco
Saudi Aramco Jeddah Refinery
June 2007
Saudi Electricity Company MIJAJCO
Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment
Al-Qaseem Power Plant
June 2007
Fakieh Poultry Fram
MIJAJCO
Modification and Extension of Hatchery Building
Makkah May 2007
Fakieh Poultry Fram
MIJAJCO
Construction of Labour and staff accommodation Building
Makkah March 2007
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Fakieh Poultry Fram
MIJAJCOExtension of GP Hatchery Makkah April 2007
Fakieh Group MIJAJCO
Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F
Makkah February 2007
SAVOLA Edible oil MIJAJCO
Area Qualification Project (Civil Mechanical and Electrical) at Industrial City
JeddahCompleted December
2006
Ministry of Defense Housing amp Planning Dept
Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work
Jeddah December 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant
2)Tubes modification work on furnace B-3002 during TA of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Electricity CoYusuf Bin A
Kanoo MIJAJCO
Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line
Rabigh Power Plant
October 2006
Saudi Electricity Co Wood
Group MIJAJCO
Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables
Bisha Power Plant
October 2006
SCECOYusuf Bin A Kanoo
MIJAJCO
Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders
Rabigh Power Plant
October 2006
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
ABB Saudi Arabia
MIJAJCO
Servicing amp Site support for 18 MW Generator at Al-Baha
Al-Baha October 2006
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah September 2006
Saudi Electricity Co MIJAJCO
Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)
Bisha Power Plant
December 2005
Saudi Electricity Co MIJAJCO
Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18
Jazan Power Plant
November 2005
Saudi Electricity Co MIJAJCO
Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables
Power Plant -9
November 2005
SCECOAlstom Power
MIJAJCOReplacement of 18 Valve
Shoaiba Power Plant
September 2005
SCECOAlstom Power
MIJAJCO
Hot Tapping of Five Points 2 8 18 20
Shoaiba Power Plant
May 2005
SCECOSAS MIJAJCO
Construction of Site Camp amp Site Office facilities
Shoaiba Power Plant
May 2005
Saudi AramcoAshi Bushnag Co
MIJAJCO
Cable Pulling at Marine Area Jeddah Refinery
Saudi Aramco Jeddah
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Rotted Cables at GT 17
Makkah Power Plant
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Removal of oil and Carbon Heating Stator
Gazlan Power Plant
April 2005
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
SCECOYusuf Bin A Kanoo
MIJAJCO
Repair Cathodic Protection Test Posts PPII amp PPIII
Jeddah Power
Plant II amp III
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Routed Cables at GT 16
Makkah Power Plant
March 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz
Ummlujj Power Plant
February 2005
Redland Industrial
Services Ltd MIJAJCO
Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant
Shuqaiq Desalination Plant
February 2005
Saudi Electricity CoTIG-TESCO
Intl Ltd MIJAJCO
Bolts torquing and life assessment work with flow and retaining rings NDT test
Ghazlan Power Plant
Dammam
February 2005
Alstom GE Shoaiba Power
Plant MIJAJCO
Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant
Shoaiba Power Plant
December 2004
Alstom Shoaiba Power Plant
MIJAJCO
Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants
Shoaiba Power Plant
October 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )
Asir Power Plant
(Abha)
September 2004
Alstom Shoaiba Power Plant
MIJAJCO
Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant
Shoaiba Power Plant
August 2004
Alstom Shoaiba Power Plant MIJAJCO
Replacement of Expansion Joints HFOCO at Shoaiba Power Plant
Shoaiba Power Plant
July 2004
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
HVACDIVISION
HVAC Engr Purchaser
Store keeper
Forman Forman Forman Forman Forman Forman Helper
Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Cashier
Supv Engineer Supv Engineer
ELECTRICALDIVISION
Computer Operator
DIVISION
Mechanical EngrCivil EngineerElect Engineer
Supv Engineer
Pipeline CP Engr
Supv Engineer
Mechanical Engr
Public Relation Off
ADMIN MANAGER
SERVICES
Personnel Officer
Safety Loss Prev Engr
CONSTRUCTION
Planning amp Control Div Manager
OVERHAULINGPIPELINE amp CP GENERATOR
Civil Engineer
INDUSTRIALCIVIL
Design Draftsman
Mechanical Engineer
PROJECT OPERATIONS
DIVISION DIVISION
PLANNING amp CONTROL
Jeddah - Saudi Arabia
DIVISION
Quantity Engineer
DIVISION
over-all Projects Coord
Technical Support StaffElectrical Engineer
Quality Control Engineer
Supv Engineer Material Planner
BASHIR AHMED DOST MOHAMMAD EST
FINANCE MANAGER
Finance Controller
TECHNICAL amp COOR
PlanningCost Engineer
Supv Engineer
MATERIALMAINTENANCE DIVISION
Exec Secretary
Demo VersionDemo Version
BUSINESS FUNCTION
MAJOR ACTIVITIES
Generators Overhauling
Revamping of Power House Electrical system
Low Medium and High Voltage Switchgear Maintenance
Low Medium and High Voltage Motors Maintenance and overhauling
Electrical Repairing and Refurbishment
Process Plant Installation and Maintenance
Heat Exchanger Maintenance
Refurbishment of Distillation Tower
Boiler Maintenance
New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water
Cooling Tower Maintenance
Pipeline Construction Maintenance amp Modification for Oil Gas and fire water
Cathodic Protection System Installation Commissioning and maintenance
Cold Storage Refrigeration and HVAC System Installation and Maintenance
Supply Installation amp Maintenance of Telecom system-CCTV MATV etc
Supply of Personal Protective Equipment amp Firefighting system
Civil Construction
Generators Overhauling
We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work
Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation
Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine
Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields
Remove bearing caps inner and outer end shields end bearings
Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines
Removing the existing end winding insulation and repair it where it required
Cleaning the stator housing and both end windings painting end winding with anti tracing paint
Cleaning all components properly and reinstall all the components on its original locations
Revamping of Power House Electrical system
Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection
Low Medium and High Voltage Switchgear Maintenance
Switch gear Inspection and trouble shootingPer commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etcMechanical Alignment maintenance of the opening and closing system trouble shooting and Energization testProtection Relay system and CalibrationProtection system upgrading and refurbishment
Low Medium and High Voltage Motors Maintenance and overhauling
Inspection of motors
Dismantling
Carrying out all the required testsDeveloping of test records and their interpretation
Supply of motors
Rewinding of motors
Making the recommendations based on inspection and test
Electrical Repairing and Refurbishment
Electrical distribution maintenance troubleshooting and extensionsInstallation maintenance and extension of lighting distribution and low power systemsInstallation of low voltage distribution as well as control panelsInstallation laying and testing of low voltage cables and cable tray systemDC distribution including batteries and battery chargers and their installation testing and commissioningInstallation of emergency power generating systemProviding around the clock emergency services
Process Plant Installation and Maintenance
We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes
Power PlantsWater Treatment PlantsCement PlantsSugar PlantsFood Industries
Heat Exchanger Maintenance
Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following
Pulling of tube bundlesInternal and external hydro-blast cleaning of tubesRepair and Replacement of tubesRe-facing of tube sheetsFabrication of shellsPressure test
Refurbishment of Distillation Tower
Dismantling of traysCleaning of shell internals by hydro blast and grit blastRepair and replacement of bubble cup traysReplacement of rashing ringsCleaning and replacement of demister padsPressure test
Boiler Maintenance
Services are provided for the maintenance of water tube and fire tube boilers
Repair and replacement of tubes
De-scaling of internal and external boiler tubes including steam drums
Fire box and refractory repairs
New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water
Construction of steel tanks for petroleum chemicals and water
Tank cleaning
Bottom plate replacement
Repair and replacement of heating coils
Epoxy lining
Internal Coating
Replacement of Floating Fixed roof
Maintenance of pressure vacuum relief valve
Cooling Tower Maintenance
Cleaning of cooling tower cells
Replacement of wooden baffle plates
Repair maintenance amp replacement of Exhaust fan amp gearboxes
Pipeline Construction Maintenance amp Modification for Oil Gas and fire water
Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping
Construction Maintenance amp Modification of buried carbon steel pipeline
Construction Maintenance amp Modification of non-metallic pipelines
Construction Maintenance amp Modification of fiberglass pipelines
Hydrostatic testing and commissioning of oil and gas pipelines
De commissioning and vacuum drying of pipelines
Mothballing of pipelines
Pigging and internal cleaning of pipelines
External coating repairs
Cathodic Protection System Installation Commissioning and maintenance
Cathodic protection (CP) system design and installation
Commissioning of Cathodic Protection system
Trouble shooting and maintenance of existing CP system
Up grading of existing CP system
Routine CP data monitoring
Data evaluation and upgrading recommendations
Cold Storage Refrigeration and HVAC System Installation and Maintenance
Installation and commissioning of cold storage systems
Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors
Installation of cooling coils and condensers
Duct work installation Cleaning and Maintenance
Supply Installation amp Maintenance of Telecom system-CCTV MATV etc
Supply of Personal Protective Equipment amp Firefighting system
Civil Construction
Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients
Structure amp Foundation works
New Construction of any kind
Modifications and expansions works
All kind of Finishing and Decoration works
Swimming Pool constructions works
Landscaping Handicapping amp Earth works
Pre-Engineered Steel Structural building works
Concrete repairing works
Water proofing system of any kind suck as pools tanks etc
LEGAL DOCUMENTS
FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST
COMMERCIAL REGISTRATION CERTIFICATE
CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE
SAGIA CERTIFICATE
SOCIAL INSURANCE CERTIFICATE
ZAKAH CERTIFICATE
MUNICIPALTY CERTIFICATE
Human Resources
All personnel are able to understand speak both English and Arabic languages
Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries
Block Visa available in our ESTABLISHMENT - Under Process
Following is the list of our affiliated Recruiting Agents
Agents Address Contacts
AL-AHRAM
Trading amp Manpower Services
Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE
QADER INTERNATIONAL
License 2199
Dira Ghazi khan
Lahore
PAKISTAN
Ph +92-641-4670806
Fax +92-641-460698
BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor
Ali Complex 23-Empress Road Lahore
PAKISTAN
Ph +92-42-6365498
6367869
Fax +92-42-6365290
PRINCE INDIA
7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA
NAZ ASSOCIATES
H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH
ZAHID INTERNATIONAL
109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016
INDIA
Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom
Equipment Resources
The following table provides information of related equipment that is available for the work
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL
YEARMAKE
QTYOWNED
1 MOBILE CRANE 35 TON TADANO 1985 1
2 TANKER TRUCK (WATER)10000 amp
19000 GALNISSAN 1990 2
3 BOOM TRUCK 6 TON HINO 1985 1
4 POWER GENERATOR 35 KVA HONDA 1990 3
5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4
6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8
7 WELDING MACHINE ELECTRIC amp PORTABLE
350 AMP LICON 1998 4
8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO
1991 1
9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1
10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO
1990 1
11 DEWATERING PUMP 600 GPM ROBIN 1990 3
12 PIPE THREADING MACHINE UP TO 16INCH
SET RIGID 1994 2
13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2
14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2
15 OXY-ACETYLENE CYLINDER SET -- 1993 8
16 ARGON-NITROGEN CYLINDER SET -- 5
17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4
18 CREW CAB 1frac12 TON NISSAN 1988 1
19 PASSENGER VAN 15 SEAT NISSAN 2002 2
20 FORKLIFT3 amp 7-12
TONTOYTO 1990 2
21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2
22 SAND BLASTING MACHINE SET GIRACO 1995 3
23 CATHODIC PROTECTION TEST EQUIPMENT
SET -- 1
24 UNDERGROUND PIPE LOCATOR SET -- 2
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMADEMODEL
YEARMAKE
QTYOWNED
25 SOIL COMPACTOR PORTABLE - 1
26 UNDERGROUNG CABEL DETECTOR SET -- 2
27 PIN BRAZING SET -- 3
28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3
29 EXCHANGER BUNDLE PULLER 9 METERS 1
30 BOBCAT 2
31 EXCAVATOR 1
32 MICRO TRENCHER 1
33 VACUUM TRUCK 14 TON NISSAN 1
34 ASPHALT CUTTER 2
35 HIGH PRESSURE HYDRO-JETTING MACHINE
20000 PSI USA 1
36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)
50 KVA 3 way HTU with 3linkable Advantage 3 tempe-
rature programmer cont-rollers and 3 Energy regs
1
SAFETY amp LOSS PREVENTION PROGRAM
Objectives
The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through
Safety meetings and dialoguesdiscussion
Safety Inspection
Enforcement of Establishment safety policies and procedures
Programs Policies and Reports
Weekly Project Manager Safety Meeting
A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences
Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him
Duties and Responsibilities of Safety Inspectors
Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility
Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly
Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents
Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)
QAQC PROGRAM
The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST
Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards
Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients
Quality Procurement Procedure
Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference
A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery
Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage
A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project
Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed
Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications
Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion
As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed
Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement
GOING-ON PROJECTS
CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld
Saudia Ltd MIJAJCO
RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter
Old Makkah Road
JeddahGoing-on
Saudi Electricity Company
ATTS MIJAJCO
Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new
Makkah Power Plant
Going-on
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length
or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-
lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah Going-on
Ministry of Defense
Engineering amp Housing Dept
Jeddah
Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning
Jeddah Going-on
Bashir Ahmed Dost Mohd Used
Lube Oil Re-refining Factory
1) Plot development2)Development of infrastructure for the
factory3)Construction of all underground
concrete tanks of utility4)Fabrication and Installation raw material
storage tanks intermediate storage tanks
Rabigh Going-on
COMPLETED PROJECTS
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Electricity Co Bandariya Intl Co Ltd
MIJAJCO
Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No
Tihama Power Plant
February 2009
Saudi Electricity Co ATTS MIJAJCO
Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant
Najran Power Plant
February 2009
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc
Luberef-1 Jeddah
February 2009
Saudi Bin Laden GroupMIJAJC
O
Construction of Porta-cabin for office unit of the Railway project Haffar Battan
Hafilul Batin
December 2008
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of Existing and Installation of new heat exchanger
Luberef-1 Jeddah
October 2008
SEC Bandariya Intl Co Ltd
MIJAJCO
Re-insertion of rotor and boxing up of everything and run generators Qty 1No
Jazan Power Plant
May 2008
Saudi Electricity Co ATTS MIJAJCO
All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos
Tabuk Power Plant
May 2008
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Mechanical repairing works during emergency shutdown
Removal and reinstallation of 6 nos of fin-fan bundles
Luberef-1 Jeddah
February 2008
Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO
Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah
Jeddah KAIA
November 2007
Saline Water Conversion Corporation
(SWCC)
Dismantling of the structure support and rail of the overhead 30 ton capacity crane
Jeddah October 30 2007
SAFA General Contractors amp Enterprises Co
Ltd MIJAJCO
Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street
Jeddah September 20 2007
Ministry ofDefense Housing amp Planning Dept
Jeddah
Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning
Jeddah August 2007
Saudi Aramco Ashi amp Bushnag Co MIJAJCO
Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco
Saudi Aramco Jeddah Refinery
June 2007
Saudi Electricity Company MIJAJCO
Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment
Al-Qaseem Power Plant
June 2007
Fakieh Poultry Fram
MIJAJCO
Modification and Extension of Hatchery Building
Makkah May 2007
Fakieh Poultry Fram
MIJAJCO
Construction of Labour and staff accommodation Building
Makkah March 2007
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Fakieh Poultry Fram
MIJAJCOExtension of GP Hatchery Makkah April 2007
Fakieh Group MIJAJCO
Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F
Makkah February 2007
SAVOLA Edible oil MIJAJCO
Area Qualification Project (Civil Mechanical and Electrical) at Industrial City
JeddahCompleted December
2006
Ministry of Defense Housing amp Planning Dept
Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work
Jeddah December 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant
2)Tubes modification work on furnace B-3002 during TA of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Electricity CoYusuf Bin A
Kanoo MIJAJCO
Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line
Rabigh Power Plant
October 2006
Saudi Electricity Co Wood
Group MIJAJCO
Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables
Bisha Power Plant
October 2006
SCECOYusuf Bin A Kanoo
MIJAJCO
Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders
Rabigh Power Plant
October 2006
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
ABB Saudi Arabia
MIJAJCO
Servicing amp Site support for 18 MW Generator at Al-Baha
Al-Baha October 2006
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah September 2006
Saudi Electricity Co MIJAJCO
Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)
Bisha Power Plant
December 2005
Saudi Electricity Co MIJAJCO
Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18
Jazan Power Plant
November 2005
Saudi Electricity Co MIJAJCO
Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables
Power Plant -9
November 2005
SCECOAlstom Power
MIJAJCOReplacement of 18 Valve
Shoaiba Power Plant
September 2005
SCECOAlstom Power
MIJAJCO
Hot Tapping of Five Points 2 8 18 20
Shoaiba Power Plant
May 2005
SCECOSAS MIJAJCO
Construction of Site Camp amp Site Office facilities
Shoaiba Power Plant
May 2005
Saudi AramcoAshi Bushnag Co
MIJAJCO
Cable Pulling at Marine Area Jeddah Refinery
Saudi Aramco Jeddah
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Rotted Cables at GT 17
Makkah Power Plant
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Removal of oil and Carbon Heating Stator
Gazlan Power Plant
April 2005
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
SCECOYusuf Bin A Kanoo
MIJAJCO
Repair Cathodic Protection Test Posts PPII amp PPIII
Jeddah Power
Plant II amp III
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Routed Cables at GT 16
Makkah Power Plant
March 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz
Ummlujj Power Plant
February 2005
Redland Industrial
Services Ltd MIJAJCO
Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant
Shuqaiq Desalination Plant
February 2005
Saudi Electricity CoTIG-TESCO
Intl Ltd MIJAJCO
Bolts torquing and life assessment work with flow and retaining rings NDT test
Ghazlan Power Plant
Dammam
February 2005
Alstom GE Shoaiba Power
Plant MIJAJCO
Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant
Shoaiba Power Plant
December 2004
Alstom Shoaiba Power Plant
MIJAJCO
Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants
Shoaiba Power Plant
October 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )
Asir Power Plant
(Abha)
September 2004
Alstom Shoaiba Power Plant
MIJAJCO
Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant
Shoaiba Power Plant
August 2004
Alstom Shoaiba Power Plant MIJAJCO
Replacement of Expansion Joints HFOCO at Shoaiba Power Plant
Shoaiba Power Plant
July 2004
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
Demo VersionDemo Version
BUSINESS FUNCTION
MAJOR ACTIVITIES
Generators Overhauling
Revamping of Power House Electrical system
Low Medium and High Voltage Switchgear Maintenance
Low Medium and High Voltage Motors Maintenance and overhauling
Electrical Repairing and Refurbishment
Process Plant Installation and Maintenance
Heat Exchanger Maintenance
Refurbishment of Distillation Tower
Boiler Maintenance
New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water
Cooling Tower Maintenance
Pipeline Construction Maintenance amp Modification for Oil Gas and fire water
Cathodic Protection System Installation Commissioning and maintenance
Cold Storage Refrigeration and HVAC System Installation and Maintenance
Supply Installation amp Maintenance of Telecom system-CCTV MATV etc
Supply of Personal Protective Equipment amp Firefighting system
Civil Construction
Generators Overhauling
We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work
Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation
Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine
Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields
Remove bearing caps inner and outer end shields end bearings
Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines
Removing the existing end winding insulation and repair it where it required
Cleaning the stator housing and both end windings painting end winding with anti tracing paint
Cleaning all components properly and reinstall all the components on its original locations
Revamping of Power House Electrical system
Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection
Low Medium and High Voltage Switchgear Maintenance
Switch gear Inspection and trouble shootingPer commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etcMechanical Alignment maintenance of the opening and closing system trouble shooting and Energization testProtection Relay system and CalibrationProtection system upgrading and refurbishment
Low Medium and High Voltage Motors Maintenance and overhauling
Inspection of motors
Dismantling
Carrying out all the required testsDeveloping of test records and their interpretation
Supply of motors
Rewinding of motors
Making the recommendations based on inspection and test
Electrical Repairing and Refurbishment
Electrical distribution maintenance troubleshooting and extensionsInstallation maintenance and extension of lighting distribution and low power systemsInstallation of low voltage distribution as well as control panelsInstallation laying and testing of low voltage cables and cable tray systemDC distribution including batteries and battery chargers and their installation testing and commissioningInstallation of emergency power generating systemProviding around the clock emergency services
Process Plant Installation and Maintenance
We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes
Power PlantsWater Treatment PlantsCement PlantsSugar PlantsFood Industries
Heat Exchanger Maintenance
Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following
Pulling of tube bundlesInternal and external hydro-blast cleaning of tubesRepair and Replacement of tubesRe-facing of tube sheetsFabrication of shellsPressure test
Refurbishment of Distillation Tower
Dismantling of traysCleaning of shell internals by hydro blast and grit blastRepair and replacement of bubble cup traysReplacement of rashing ringsCleaning and replacement of demister padsPressure test
Boiler Maintenance
Services are provided for the maintenance of water tube and fire tube boilers
Repair and replacement of tubes
De-scaling of internal and external boiler tubes including steam drums
Fire box and refractory repairs
New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water
Construction of steel tanks for petroleum chemicals and water
Tank cleaning
Bottom plate replacement
Repair and replacement of heating coils
Epoxy lining
Internal Coating
Replacement of Floating Fixed roof
Maintenance of pressure vacuum relief valve
Cooling Tower Maintenance
Cleaning of cooling tower cells
Replacement of wooden baffle plates
Repair maintenance amp replacement of Exhaust fan amp gearboxes
Pipeline Construction Maintenance amp Modification for Oil Gas and fire water
Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping
Construction Maintenance amp Modification of buried carbon steel pipeline
Construction Maintenance amp Modification of non-metallic pipelines
Construction Maintenance amp Modification of fiberglass pipelines
Hydrostatic testing and commissioning of oil and gas pipelines
De commissioning and vacuum drying of pipelines
Mothballing of pipelines
Pigging and internal cleaning of pipelines
External coating repairs
Cathodic Protection System Installation Commissioning and maintenance
Cathodic protection (CP) system design and installation
Commissioning of Cathodic Protection system
Trouble shooting and maintenance of existing CP system
Up grading of existing CP system
Routine CP data monitoring
Data evaluation and upgrading recommendations
Cold Storage Refrigeration and HVAC System Installation and Maintenance
Installation and commissioning of cold storage systems
Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors
Installation of cooling coils and condensers
Duct work installation Cleaning and Maintenance
Supply Installation amp Maintenance of Telecom system-CCTV MATV etc
Supply of Personal Protective Equipment amp Firefighting system
Civil Construction
Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients
Structure amp Foundation works
New Construction of any kind
Modifications and expansions works
All kind of Finishing and Decoration works
Swimming Pool constructions works
Landscaping Handicapping amp Earth works
Pre-Engineered Steel Structural building works
Concrete repairing works
Water proofing system of any kind suck as pools tanks etc
LEGAL DOCUMENTS
FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST
COMMERCIAL REGISTRATION CERTIFICATE
CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE
SAGIA CERTIFICATE
SOCIAL INSURANCE CERTIFICATE
ZAKAH CERTIFICATE
MUNICIPALTY CERTIFICATE
Human Resources
All personnel are able to understand speak both English and Arabic languages
Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries
Block Visa available in our ESTABLISHMENT - Under Process
Following is the list of our affiliated Recruiting Agents
Agents Address Contacts
AL-AHRAM
Trading amp Manpower Services
Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE
QADER INTERNATIONAL
License 2199
Dira Ghazi khan
Lahore
PAKISTAN
Ph +92-641-4670806
Fax +92-641-460698
BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor
Ali Complex 23-Empress Road Lahore
PAKISTAN
Ph +92-42-6365498
6367869
Fax +92-42-6365290
PRINCE INDIA
7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA
NAZ ASSOCIATES
H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH
ZAHID INTERNATIONAL
109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016
INDIA
Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom
Equipment Resources
The following table provides information of related equipment that is available for the work
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL
YEARMAKE
QTYOWNED
1 MOBILE CRANE 35 TON TADANO 1985 1
2 TANKER TRUCK (WATER)10000 amp
19000 GALNISSAN 1990 2
3 BOOM TRUCK 6 TON HINO 1985 1
4 POWER GENERATOR 35 KVA HONDA 1990 3
5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4
6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8
7 WELDING MACHINE ELECTRIC amp PORTABLE
350 AMP LICON 1998 4
8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO
1991 1
9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1
10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO
1990 1
11 DEWATERING PUMP 600 GPM ROBIN 1990 3
12 PIPE THREADING MACHINE UP TO 16INCH
SET RIGID 1994 2
13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2
14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2
15 OXY-ACETYLENE CYLINDER SET -- 1993 8
16 ARGON-NITROGEN CYLINDER SET -- 5
17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4
18 CREW CAB 1frac12 TON NISSAN 1988 1
19 PASSENGER VAN 15 SEAT NISSAN 2002 2
20 FORKLIFT3 amp 7-12
TONTOYTO 1990 2
21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2
22 SAND BLASTING MACHINE SET GIRACO 1995 3
23 CATHODIC PROTECTION TEST EQUIPMENT
SET -- 1
24 UNDERGROUND PIPE LOCATOR SET -- 2
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMADEMODEL
YEARMAKE
QTYOWNED
25 SOIL COMPACTOR PORTABLE - 1
26 UNDERGROUNG CABEL DETECTOR SET -- 2
27 PIN BRAZING SET -- 3
28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3
29 EXCHANGER BUNDLE PULLER 9 METERS 1
30 BOBCAT 2
31 EXCAVATOR 1
32 MICRO TRENCHER 1
33 VACUUM TRUCK 14 TON NISSAN 1
34 ASPHALT CUTTER 2
35 HIGH PRESSURE HYDRO-JETTING MACHINE
20000 PSI USA 1
36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)
50 KVA 3 way HTU with 3linkable Advantage 3 tempe-
rature programmer cont-rollers and 3 Energy regs
1
SAFETY amp LOSS PREVENTION PROGRAM
Objectives
The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through
Safety meetings and dialoguesdiscussion
Safety Inspection
Enforcement of Establishment safety policies and procedures
Programs Policies and Reports
Weekly Project Manager Safety Meeting
A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences
Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him
Duties and Responsibilities of Safety Inspectors
Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility
Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly
Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents
Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)
QAQC PROGRAM
The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST
Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards
Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients
Quality Procurement Procedure
Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference
A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery
Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage
A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project
Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed
Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications
Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion
As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed
Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement
GOING-ON PROJECTS
CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld
Saudia Ltd MIJAJCO
RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter
Old Makkah Road
JeddahGoing-on
Saudi Electricity Company
ATTS MIJAJCO
Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new
Makkah Power Plant
Going-on
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length
or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-
lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah Going-on
Ministry of Defense
Engineering amp Housing Dept
Jeddah
Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning
Jeddah Going-on
Bashir Ahmed Dost Mohd Used
Lube Oil Re-refining Factory
1) Plot development2)Development of infrastructure for the
factory3)Construction of all underground
concrete tanks of utility4)Fabrication and Installation raw material
storage tanks intermediate storage tanks
Rabigh Going-on
COMPLETED PROJECTS
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Electricity Co Bandariya Intl Co Ltd
MIJAJCO
Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No
Tihama Power Plant
February 2009
Saudi Electricity Co ATTS MIJAJCO
Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant
Najran Power Plant
February 2009
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc
Luberef-1 Jeddah
February 2009
Saudi Bin Laden GroupMIJAJC
O
Construction of Porta-cabin for office unit of the Railway project Haffar Battan
Hafilul Batin
December 2008
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of Existing and Installation of new heat exchanger
Luberef-1 Jeddah
October 2008
SEC Bandariya Intl Co Ltd
MIJAJCO
Re-insertion of rotor and boxing up of everything and run generators Qty 1No
Jazan Power Plant
May 2008
Saudi Electricity Co ATTS MIJAJCO
All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos
Tabuk Power Plant
May 2008
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Mechanical repairing works during emergency shutdown
Removal and reinstallation of 6 nos of fin-fan bundles
Luberef-1 Jeddah
February 2008
Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO
Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah
Jeddah KAIA
November 2007
Saline Water Conversion Corporation
(SWCC)
Dismantling of the structure support and rail of the overhead 30 ton capacity crane
Jeddah October 30 2007
SAFA General Contractors amp Enterprises Co
Ltd MIJAJCO
Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street
Jeddah September 20 2007
Ministry ofDefense Housing amp Planning Dept
Jeddah
Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning
Jeddah August 2007
Saudi Aramco Ashi amp Bushnag Co MIJAJCO
Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco
Saudi Aramco Jeddah Refinery
June 2007
Saudi Electricity Company MIJAJCO
Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment
Al-Qaseem Power Plant
June 2007
Fakieh Poultry Fram
MIJAJCO
Modification and Extension of Hatchery Building
Makkah May 2007
Fakieh Poultry Fram
MIJAJCO
Construction of Labour and staff accommodation Building
Makkah March 2007
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Fakieh Poultry Fram
MIJAJCOExtension of GP Hatchery Makkah April 2007
Fakieh Group MIJAJCO
Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F
Makkah February 2007
SAVOLA Edible oil MIJAJCO
Area Qualification Project (Civil Mechanical and Electrical) at Industrial City
JeddahCompleted December
2006
Ministry of Defense Housing amp Planning Dept
Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work
Jeddah December 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant
2)Tubes modification work on furnace B-3002 during TA of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Electricity CoYusuf Bin A
Kanoo MIJAJCO
Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line
Rabigh Power Plant
October 2006
Saudi Electricity Co Wood
Group MIJAJCO
Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables
Bisha Power Plant
October 2006
SCECOYusuf Bin A Kanoo
MIJAJCO
Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders
Rabigh Power Plant
October 2006
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
ABB Saudi Arabia
MIJAJCO
Servicing amp Site support for 18 MW Generator at Al-Baha
Al-Baha October 2006
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah September 2006
Saudi Electricity Co MIJAJCO
Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)
Bisha Power Plant
December 2005
Saudi Electricity Co MIJAJCO
Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18
Jazan Power Plant
November 2005
Saudi Electricity Co MIJAJCO
Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables
Power Plant -9
November 2005
SCECOAlstom Power
MIJAJCOReplacement of 18 Valve
Shoaiba Power Plant
September 2005
SCECOAlstom Power
MIJAJCO
Hot Tapping of Five Points 2 8 18 20
Shoaiba Power Plant
May 2005
SCECOSAS MIJAJCO
Construction of Site Camp amp Site Office facilities
Shoaiba Power Plant
May 2005
Saudi AramcoAshi Bushnag Co
MIJAJCO
Cable Pulling at Marine Area Jeddah Refinery
Saudi Aramco Jeddah
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Rotted Cables at GT 17
Makkah Power Plant
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Removal of oil and Carbon Heating Stator
Gazlan Power Plant
April 2005
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
SCECOYusuf Bin A Kanoo
MIJAJCO
Repair Cathodic Protection Test Posts PPII amp PPIII
Jeddah Power
Plant II amp III
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Routed Cables at GT 16
Makkah Power Plant
March 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz
Ummlujj Power Plant
February 2005
Redland Industrial
Services Ltd MIJAJCO
Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant
Shuqaiq Desalination Plant
February 2005
Saudi Electricity CoTIG-TESCO
Intl Ltd MIJAJCO
Bolts torquing and life assessment work with flow and retaining rings NDT test
Ghazlan Power Plant
Dammam
February 2005
Alstom GE Shoaiba Power
Plant MIJAJCO
Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant
Shoaiba Power Plant
December 2004
Alstom Shoaiba Power Plant
MIJAJCO
Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants
Shoaiba Power Plant
October 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )
Asir Power Plant
(Abha)
September 2004
Alstom Shoaiba Power Plant
MIJAJCO
Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant
Shoaiba Power Plant
August 2004
Alstom Shoaiba Power Plant MIJAJCO
Replacement of Expansion Joints HFOCO at Shoaiba Power Plant
Shoaiba Power Plant
July 2004
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
BUSINESS FUNCTION
MAJOR ACTIVITIES
Generators Overhauling
Revamping of Power House Electrical system
Low Medium and High Voltage Switchgear Maintenance
Low Medium and High Voltage Motors Maintenance and overhauling
Electrical Repairing and Refurbishment
Process Plant Installation and Maintenance
Heat Exchanger Maintenance
Refurbishment of Distillation Tower
Boiler Maintenance
New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water
Cooling Tower Maintenance
Pipeline Construction Maintenance amp Modification for Oil Gas and fire water
Cathodic Protection System Installation Commissioning and maintenance
Cold Storage Refrigeration and HVAC System Installation and Maintenance
Supply Installation amp Maintenance of Telecom system-CCTV MATV etc
Supply of Personal Protective Equipment amp Firefighting system
Civil Construction
Generators Overhauling
We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work
Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation
Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine
Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields
Remove bearing caps inner and outer end shields end bearings
Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines
Removing the existing end winding insulation and repair it where it required
Cleaning the stator housing and both end windings painting end winding with anti tracing paint
Cleaning all components properly and reinstall all the components on its original locations
Revamping of Power House Electrical system
Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection
Low Medium and High Voltage Switchgear Maintenance
Switch gear Inspection and trouble shootingPer commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etcMechanical Alignment maintenance of the opening and closing system trouble shooting and Energization testProtection Relay system and CalibrationProtection system upgrading and refurbishment
Low Medium and High Voltage Motors Maintenance and overhauling
Inspection of motors
Dismantling
Carrying out all the required testsDeveloping of test records and their interpretation
Supply of motors
Rewinding of motors
Making the recommendations based on inspection and test
Electrical Repairing and Refurbishment
Electrical distribution maintenance troubleshooting and extensionsInstallation maintenance and extension of lighting distribution and low power systemsInstallation of low voltage distribution as well as control panelsInstallation laying and testing of low voltage cables and cable tray systemDC distribution including batteries and battery chargers and their installation testing and commissioningInstallation of emergency power generating systemProviding around the clock emergency services
Process Plant Installation and Maintenance
We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes
Power PlantsWater Treatment PlantsCement PlantsSugar PlantsFood Industries
Heat Exchanger Maintenance
Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following
Pulling of tube bundlesInternal and external hydro-blast cleaning of tubesRepair and Replacement of tubesRe-facing of tube sheetsFabrication of shellsPressure test
Refurbishment of Distillation Tower
Dismantling of traysCleaning of shell internals by hydro blast and grit blastRepair and replacement of bubble cup traysReplacement of rashing ringsCleaning and replacement of demister padsPressure test
Boiler Maintenance
Services are provided for the maintenance of water tube and fire tube boilers
Repair and replacement of tubes
De-scaling of internal and external boiler tubes including steam drums
Fire box and refractory repairs
New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water
Construction of steel tanks for petroleum chemicals and water
Tank cleaning
Bottom plate replacement
Repair and replacement of heating coils
Epoxy lining
Internal Coating
Replacement of Floating Fixed roof
Maintenance of pressure vacuum relief valve
Cooling Tower Maintenance
Cleaning of cooling tower cells
Replacement of wooden baffle plates
Repair maintenance amp replacement of Exhaust fan amp gearboxes
Pipeline Construction Maintenance amp Modification for Oil Gas and fire water
Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping
Construction Maintenance amp Modification of buried carbon steel pipeline
Construction Maintenance amp Modification of non-metallic pipelines
Construction Maintenance amp Modification of fiberglass pipelines
Hydrostatic testing and commissioning of oil and gas pipelines
De commissioning and vacuum drying of pipelines
Mothballing of pipelines
Pigging and internal cleaning of pipelines
External coating repairs
Cathodic Protection System Installation Commissioning and maintenance
Cathodic protection (CP) system design and installation
Commissioning of Cathodic Protection system
Trouble shooting and maintenance of existing CP system
Up grading of existing CP system
Routine CP data monitoring
Data evaluation and upgrading recommendations
Cold Storage Refrigeration and HVAC System Installation and Maintenance
Installation and commissioning of cold storage systems
Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors
Installation of cooling coils and condensers
Duct work installation Cleaning and Maintenance
Supply Installation amp Maintenance of Telecom system-CCTV MATV etc
Supply of Personal Protective Equipment amp Firefighting system
Civil Construction
Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients
Structure amp Foundation works
New Construction of any kind
Modifications and expansions works
All kind of Finishing and Decoration works
Swimming Pool constructions works
Landscaping Handicapping amp Earth works
Pre-Engineered Steel Structural building works
Concrete repairing works
Water proofing system of any kind suck as pools tanks etc
LEGAL DOCUMENTS
FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST
COMMERCIAL REGISTRATION CERTIFICATE
CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE
SAGIA CERTIFICATE
SOCIAL INSURANCE CERTIFICATE
ZAKAH CERTIFICATE
MUNICIPALTY CERTIFICATE
Human Resources
All personnel are able to understand speak both English and Arabic languages
Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries
Block Visa available in our ESTABLISHMENT - Under Process
Following is the list of our affiliated Recruiting Agents
Agents Address Contacts
AL-AHRAM
Trading amp Manpower Services
Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE
QADER INTERNATIONAL
License 2199
Dira Ghazi khan
Lahore
PAKISTAN
Ph +92-641-4670806
Fax +92-641-460698
BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor
Ali Complex 23-Empress Road Lahore
PAKISTAN
Ph +92-42-6365498
6367869
Fax +92-42-6365290
PRINCE INDIA
7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA
NAZ ASSOCIATES
H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH
ZAHID INTERNATIONAL
109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016
INDIA
Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom
Equipment Resources
The following table provides information of related equipment that is available for the work
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL
YEARMAKE
QTYOWNED
1 MOBILE CRANE 35 TON TADANO 1985 1
2 TANKER TRUCK (WATER)10000 amp
19000 GALNISSAN 1990 2
3 BOOM TRUCK 6 TON HINO 1985 1
4 POWER GENERATOR 35 KVA HONDA 1990 3
5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4
6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8
7 WELDING MACHINE ELECTRIC amp PORTABLE
350 AMP LICON 1998 4
8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO
1991 1
9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1
10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO
1990 1
11 DEWATERING PUMP 600 GPM ROBIN 1990 3
12 PIPE THREADING MACHINE UP TO 16INCH
SET RIGID 1994 2
13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2
14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2
15 OXY-ACETYLENE CYLINDER SET -- 1993 8
16 ARGON-NITROGEN CYLINDER SET -- 5
17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4
18 CREW CAB 1frac12 TON NISSAN 1988 1
19 PASSENGER VAN 15 SEAT NISSAN 2002 2
20 FORKLIFT3 amp 7-12
TONTOYTO 1990 2
21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2
22 SAND BLASTING MACHINE SET GIRACO 1995 3
23 CATHODIC PROTECTION TEST EQUIPMENT
SET -- 1
24 UNDERGROUND PIPE LOCATOR SET -- 2
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMADEMODEL
YEARMAKE
QTYOWNED
25 SOIL COMPACTOR PORTABLE - 1
26 UNDERGROUNG CABEL DETECTOR SET -- 2
27 PIN BRAZING SET -- 3
28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3
29 EXCHANGER BUNDLE PULLER 9 METERS 1
30 BOBCAT 2
31 EXCAVATOR 1
32 MICRO TRENCHER 1
33 VACUUM TRUCK 14 TON NISSAN 1
34 ASPHALT CUTTER 2
35 HIGH PRESSURE HYDRO-JETTING MACHINE
20000 PSI USA 1
36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)
50 KVA 3 way HTU with 3linkable Advantage 3 tempe-
rature programmer cont-rollers and 3 Energy regs
1
SAFETY amp LOSS PREVENTION PROGRAM
Objectives
The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through
Safety meetings and dialoguesdiscussion
Safety Inspection
Enforcement of Establishment safety policies and procedures
Programs Policies and Reports
Weekly Project Manager Safety Meeting
A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences
Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him
Duties and Responsibilities of Safety Inspectors
Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility
Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly
Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents
Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)
QAQC PROGRAM
The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST
Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards
Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients
Quality Procurement Procedure
Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference
A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery
Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage
A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project
Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed
Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications
Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion
As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed
Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement
GOING-ON PROJECTS
CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld
Saudia Ltd MIJAJCO
RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter
Old Makkah Road
JeddahGoing-on
Saudi Electricity Company
ATTS MIJAJCO
Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new
Makkah Power Plant
Going-on
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length
or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-
lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah Going-on
Ministry of Defense
Engineering amp Housing Dept
Jeddah
Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning
Jeddah Going-on
Bashir Ahmed Dost Mohd Used
Lube Oil Re-refining Factory
1) Plot development2)Development of infrastructure for the
factory3)Construction of all underground
concrete tanks of utility4)Fabrication and Installation raw material
storage tanks intermediate storage tanks
Rabigh Going-on
COMPLETED PROJECTS
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Electricity Co Bandariya Intl Co Ltd
MIJAJCO
Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No
Tihama Power Plant
February 2009
Saudi Electricity Co ATTS MIJAJCO
Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant
Najran Power Plant
February 2009
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc
Luberef-1 Jeddah
February 2009
Saudi Bin Laden GroupMIJAJC
O
Construction of Porta-cabin for office unit of the Railway project Haffar Battan
Hafilul Batin
December 2008
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of Existing and Installation of new heat exchanger
Luberef-1 Jeddah
October 2008
SEC Bandariya Intl Co Ltd
MIJAJCO
Re-insertion of rotor and boxing up of everything and run generators Qty 1No
Jazan Power Plant
May 2008
Saudi Electricity Co ATTS MIJAJCO
All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos
Tabuk Power Plant
May 2008
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Mechanical repairing works during emergency shutdown
Removal and reinstallation of 6 nos of fin-fan bundles
Luberef-1 Jeddah
February 2008
Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO
Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah
Jeddah KAIA
November 2007
Saline Water Conversion Corporation
(SWCC)
Dismantling of the structure support and rail of the overhead 30 ton capacity crane
Jeddah October 30 2007
SAFA General Contractors amp Enterprises Co
Ltd MIJAJCO
Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street
Jeddah September 20 2007
Ministry ofDefense Housing amp Planning Dept
Jeddah
Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning
Jeddah August 2007
Saudi Aramco Ashi amp Bushnag Co MIJAJCO
Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco
Saudi Aramco Jeddah Refinery
June 2007
Saudi Electricity Company MIJAJCO
Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment
Al-Qaseem Power Plant
June 2007
Fakieh Poultry Fram
MIJAJCO
Modification and Extension of Hatchery Building
Makkah May 2007
Fakieh Poultry Fram
MIJAJCO
Construction of Labour and staff accommodation Building
Makkah March 2007
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Fakieh Poultry Fram
MIJAJCOExtension of GP Hatchery Makkah April 2007
Fakieh Group MIJAJCO
Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F
Makkah February 2007
SAVOLA Edible oil MIJAJCO
Area Qualification Project (Civil Mechanical and Electrical) at Industrial City
JeddahCompleted December
2006
Ministry of Defense Housing amp Planning Dept
Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work
Jeddah December 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant
2)Tubes modification work on furnace B-3002 during TA of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Electricity CoYusuf Bin A
Kanoo MIJAJCO
Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line
Rabigh Power Plant
October 2006
Saudi Electricity Co Wood
Group MIJAJCO
Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables
Bisha Power Plant
October 2006
SCECOYusuf Bin A Kanoo
MIJAJCO
Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders
Rabigh Power Plant
October 2006
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
ABB Saudi Arabia
MIJAJCO
Servicing amp Site support for 18 MW Generator at Al-Baha
Al-Baha October 2006
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah September 2006
Saudi Electricity Co MIJAJCO
Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)
Bisha Power Plant
December 2005
Saudi Electricity Co MIJAJCO
Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18
Jazan Power Plant
November 2005
Saudi Electricity Co MIJAJCO
Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables
Power Plant -9
November 2005
SCECOAlstom Power
MIJAJCOReplacement of 18 Valve
Shoaiba Power Plant
September 2005
SCECOAlstom Power
MIJAJCO
Hot Tapping of Five Points 2 8 18 20
Shoaiba Power Plant
May 2005
SCECOSAS MIJAJCO
Construction of Site Camp amp Site Office facilities
Shoaiba Power Plant
May 2005
Saudi AramcoAshi Bushnag Co
MIJAJCO
Cable Pulling at Marine Area Jeddah Refinery
Saudi Aramco Jeddah
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Rotted Cables at GT 17
Makkah Power Plant
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Removal of oil and Carbon Heating Stator
Gazlan Power Plant
April 2005
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
SCECOYusuf Bin A Kanoo
MIJAJCO
Repair Cathodic Protection Test Posts PPII amp PPIII
Jeddah Power
Plant II amp III
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Routed Cables at GT 16
Makkah Power Plant
March 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz
Ummlujj Power Plant
February 2005
Redland Industrial
Services Ltd MIJAJCO
Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant
Shuqaiq Desalination Plant
February 2005
Saudi Electricity CoTIG-TESCO
Intl Ltd MIJAJCO
Bolts torquing and life assessment work with flow and retaining rings NDT test
Ghazlan Power Plant
Dammam
February 2005
Alstom GE Shoaiba Power
Plant MIJAJCO
Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant
Shoaiba Power Plant
December 2004
Alstom Shoaiba Power Plant
MIJAJCO
Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants
Shoaiba Power Plant
October 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )
Asir Power Plant
(Abha)
September 2004
Alstom Shoaiba Power Plant
MIJAJCO
Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant
Shoaiba Power Plant
August 2004
Alstom Shoaiba Power Plant MIJAJCO
Replacement of Expansion Joints HFOCO at Shoaiba Power Plant
Shoaiba Power Plant
July 2004
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
Generators Overhauling
We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work
Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation
Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine
Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields
Remove bearing caps inner and outer end shields end bearings
Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines
Removing the existing end winding insulation and repair it where it required
Cleaning the stator housing and both end windings painting end winding with anti tracing paint
Cleaning all components properly and reinstall all the components on its original locations
Revamping of Power House Electrical system
Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection
Low Medium and High Voltage Switchgear Maintenance
Switch gear Inspection and trouble shootingPer commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etcMechanical Alignment maintenance of the opening and closing system trouble shooting and Energization testProtection Relay system and CalibrationProtection system upgrading and refurbishment
Low Medium and High Voltage Motors Maintenance and overhauling
Inspection of motors
Dismantling
Carrying out all the required testsDeveloping of test records and their interpretation
Supply of motors
Rewinding of motors
Making the recommendations based on inspection and test
Electrical Repairing and Refurbishment
Electrical distribution maintenance troubleshooting and extensionsInstallation maintenance and extension of lighting distribution and low power systemsInstallation of low voltage distribution as well as control panelsInstallation laying and testing of low voltage cables and cable tray systemDC distribution including batteries and battery chargers and their installation testing and commissioningInstallation of emergency power generating systemProviding around the clock emergency services
Process Plant Installation and Maintenance
We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes
Power PlantsWater Treatment PlantsCement PlantsSugar PlantsFood Industries
Heat Exchanger Maintenance
Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following
Pulling of tube bundlesInternal and external hydro-blast cleaning of tubesRepair and Replacement of tubesRe-facing of tube sheetsFabrication of shellsPressure test
Refurbishment of Distillation Tower
Dismantling of traysCleaning of shell internals by hydro blast and grit blastRepair and replacement of bubble cup traysReplacement of rashing ringsCleaning and replacement of demister padsPressure test
Boiler Maintenance
Services are provided for the maintenance of water tube and fire tube boilers
Repair and replacement of tubes
De-scaling of internal and external boiler tubes including steam drums
Fire box and refractory repairs
New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water
Construction of steel tanks for petroleum chemicals and water
Tank cleaning
Bottom plate replacement
Repair and replacement of heating coils
Epoxy lining
Internal Coating
Replacement of Floating Fixed roof
Maintenance of pressure vacuum relief valve
Cooling Tower Maintenance
Cleaning of cooling tower cells
Replacement of wooden baffle plates
Repair maintenance amp replacement of Exhaust fan amp gearboxes
Pipeline Construction Maintenance amp Modification for Oil Gas and fire water
Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping
Construction Maintenance amp Modification of buried carbon steel pipeline
Construction Maintenance amp Modification of non-metallic pipelines
Construction Maintenance amp Modification of fiberglass pipelines
Hydrostatic testing and commissioning of oil and gas pipelines
De commissioning and vacuum drying of pipelines
Mothballing of pipelines
Pigging and internal cleaning of pipelines
External coating repairs
Cathodic Protection System Installation Commissioning and maintenance
Cathodic protection (CP) system design and installation
Commissioning of Cathodic Protection system
Trouble shooting and maintenance of existing CP system
Up grading of existing CP system
Routine CP data monitoring
Data evaluation and upgrading recommendations
Cold Storage Refrigeration and HVAC System Installation and Maintenance
Installation and commissioning of cold storage systems
Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors
Installation of cooling coils and condensers
Duct work installation Cleaning and Maintenance
Supply Installation amp Maintenance of Telecom system-CCTV MATV etc
Supply of Personal Protective Equipment amp Firefighting system
Civil Construction
Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients
Structure amp Foundation works
New Construction of any kind
Modifications and expansions works
All kind of Finishing and Decoration works
Swimming Pool constructions works
Landscaping Handicapping amp Earth works
Pre-Engineered Steel Structural building works
Concrete repairing works
Water proofing system of any kind suck as pools tanks etc
LEGAL DOCUMENTS
FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST
COMMERCIAL REGISTRATION CERTIFICATE
CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE
SAGIA CERTIFICATE
SOCIAL INSURANCE CERTIFICATE
ZAKAH CERTIFICATE
MUNICIPALTY CERTIFICATE
Human Resources
All personnel are able to understand speak both English and Arabic languages
Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries
Block Visa available in our ESTABLISHMENT - Under Process
Following is the list of our affiliated Recruiting Agents
Agents Address Contacts
AL-AHRAM
Trading amp Manpower Services
Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE
QADER INTERNATIONAL
License 2199
Dira Ghazi khan
Lahore
PAKISTAN
Ph +92-641-4670806
Fax +92-641-460698
BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor
Ali Complex 23-Empress Road Lahore
PAKISTAN
Ph +92-42-6365498
6367869
Fax +92-42-6365290
PRINCE INDIA
7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA
NAZ ASSOCIATES
H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH
ZAHID INTERNATIONAL
109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016
INDIA
Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom
Equipment Resources
The following table provides information of related equipment that is available for the work
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL
YEARMAKE
QTYOWNED
1 MOBILE CRANE 35 TON TADANO 1985 1
2 TANKER TRUCK (WATER)10000 amp
19000 GALNISSAN 1990 2
3 BOOM TRUCK 6 TON HINO 1985 1
4 POWER GENERATOR 35 KVA HONDA 1990 3
5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4
6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8
7 WELDING MACHINE ELECTRIC amp PORTABLE
350 AMP LICON 1998 4
8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO
1991 1
9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1
10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO
1990 1
11 DEWATERING PUMP 600 GPM ROBIN 1990 3
12 PIPE THREADING MACHINE UP TO 16INCH
SET RIGID 1994 2
13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2
14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2
15 OXY-ACETYLENE CYLINDER SET -- 1993 8
16 ARGON-NITROGEN CYLINDER SET -- 5
17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4
18 CREW CAB 1frac12 TON NISSAN 1988 1
19 PASSENGER VAN 15 SEAT NISSAN 2002 2
20 FORKLIFT3 amp 7-12
TONTOYTO 1990 2
21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2
22 SAND BLASTING MACHINE SET GIRACO 1995 3
23 CATHODIC PROTECTION TEST EQUIPMENT
SET -- 1
24 UNDERGROUND PIPE LOCATOR SET -- 2
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMADEMODEL
YEARMAKE
QTYOWNED
25 SOIL COMPACTOR PORTABLE - 1
26 UNDERGROUNG CABEL DETECTOR SET -- 2
27 PIN BRAZING SET -- 3
28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3
29 EXCHANGER BUNDLE PULLER 9 METERS 1
30 BOBCAT 2
31 EXCAVATOR 1
32 MICRO TRENCHER 1
33 VACUUM TRUCK 14 TON NISSAN 1
34 ASPHALT CUTTER 2
35 HIGH PRESSURE HYDRO-JETTING MACHINE
20000 PSI USA 1
36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)
50 KVA 3 way HTU with 3linkable Advantage 3 tempe-
rature programmer cont-rollers and 3 Energy regs
1
SAFETY amp LOSS PREVENTION PROGRAM
Objectives
The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through
Safety meetings and dialoguesdiscussion
Safety Inspection
Enforcement of Establishment safety policies and procedures
Programs Policies and Reports
Weekly Project Manager Safety Meeting
A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences
Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him
Duties and Responsibilities of Safety Inspectors
Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility
Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly
Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents
Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)
QAQC PROGRAM
The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST
Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards
Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients
Quality Procurement Procedure
Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference
A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery
Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage
A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project
Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed
Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications
Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion
As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed
Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement
GOING-ON PROJECTS
CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld
Saudia Ltd MIJAJCO
RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter
Old Makkah Road
JeddahGoing-on
Saudi Electricity Company
ATTS MIJAJCO
Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new
Makkah Power Plant
Going-on
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length
or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-
lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah Going-on
Ministry of Defense
Engineering amp Housing Dept
Jeddah
Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning
Jeddah Going-on
Bashir Ahmed Dost Mohd Used
Lube Oil Re-refining Factory
1) Plot development2)Development of infrastructure for the
factory3)Construction of all underground
concrete tanks of utility4)Fabrication and Installation raw material
storage tanks intermediate storage tanks
Rabigh Going-on
COMPLETED PROJECTS
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Electricity Co Bandariya Intl Co Ltd
MIJAJCO
Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No
Tihama Power Plant
February 2009
Saudi Electricity Co ATTS MIJAJCO
Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant
Najran Power Plant
February 2009
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc
Luberef-1 Jeddah
February 2009
Saudi Bin Laden GroupMIJAJC
O
Construction of Porta-cabin for office unit of the Railway project Haffar Battan
Hafilul Batin
December 2008
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of Existing and Installation of new heat exchanger
Luberef-1 Jeddah
October 2008
SEC Bandariya Intl Co Ltd
MIJAJCO
Re-insertion of rotor and boxing up of everything and run generators Qty 1No
Jazan Power Plant
May 2008
Saudi Electricity Co ATTS MIJAJCO
All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos
Tabuk Power Plant
May 2008
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Mechanical repairing works during emergency shutdown
Removal and reinstallation of 6 nos of fin-fan bundles
Luberef-1 Jeddah
February 2008
Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO
Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah
Jeddah KAIA
November 2007
Saline Water Conversion Corporation
(SWCC)
Dismantling of the structure support and rail of the overhead 30 ton capacity crane
Jeddah October 30 2007
SAFA General Contractors amp Enterprises Co
Ltd MIJAJCO
Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street
Jeddah September 20 2007
Ministry ofDefense Housing amp Planning Dept
Jeddah
Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning
Jeddah August 2007
Saudi Aramco Ashi amp Bushnag Co MIJAJCO
Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco
Saudi Aramco Jeddah Refinery
June 2007
Saudi Electricity Company MIJAJCO
Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment
Al-Qaseem Power Plant
June 2007
Fakieh Poultry Fram
MIJAJCO
Modification and Extension of Hatchery Building
Makkah May 2007
Fakieh Poultry Fram
MIJAJCO
Construction of Labour and staff accommodation Building
Makkah March 2007
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Fakieh Poultry Fram
MIJAJCOExtension of GP Hatchery Makkah April 2007
Fakieh Group MIJAJCO
Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F
Makkah February 2007
SAVOLA Edible oil MIJAJCO
Area Qualification Project (Civil Mechanical and Electrical) at Industrial City
JeddahCompleted December
2006
Ministry of Defense Housing amp Planning Dept
Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work
Jeddah December 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant
2)Tubes modification work on furnace B-3002 during TA of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Electricity CoYusuf Bin A
Kanoo MIJAJCO
Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line
Rabigh Power Plant
October 2006
Saudi Electricity Co Wood
Group MIJAJCO
Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables
Bisha Power Plant
October 2006
SCECOYusuf Bin A Kanoo
MIJAJCO
Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders
Rabigh Power Plant
October 2006
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
ABB Saudi Arabia
MIJAJCO
Servicing amp Site support for 18 MW Generator at Al-Baha
Al-Baha October 2006
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah September 2006
Saudi Electricity Co MIJAJCO
Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)
Bisha Power Plant
December 2005
Saudi Electricity Co MIJAJCO
Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18
Jazan Power Plant
November 2005
Saudi Electricity Co MIJAJCO
Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables
Power Plant -9
November 2005
SCECOAlstom Power
MIJAJCOReplacement of 18 Valve
Shoaiba Power Plant
September 2005
SCECOAlstom Power
MIJAJCO
Hot Tapping of Five Points 2 8 18 20
Shoaiba Power Plant
May 2005
SCECOSAS MIJAJCO
Construction of Site Camp amp Site Office facilities
Shoaiba Power Plant
May 2005
Saudi AramcoAshi Bushnag Co
MIJAJCO
Cable Pulling at Marine Area Jeddah Refinery
Saudi Aramco Jeddah
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Rotted Cables at GT 17
Makkah Power Plant
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Removal of oil and Carbon Heating Stator
Gazlan Power Plant
April 2005
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
SCECOYusuf Bin A Kanoo
MIJAJCO
Repair Cathodic Protection Test Posts PPII amp PPIII
Jeddah Power
Plant II amp III
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Routed Cables at GT 16
Makkah Power Plant
March 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz
Ummlujj Power Plant
February 2005
Redland Industrial
Services Ltd MIJAJCO
Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant
Shuqaiq Desalination Plant
February 2005
Saudi Electricity CoTIG-TESCO
Intl Ltd MIJAJCO
Bolts torquing and life assessment work with flow and retaining rings NDT test
Ghazlan Power Plant
Dammam
February 2005
Alstom GE Shoaiba Power
Plant MIJAJCO
Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant
Shoaiba Power Plant
December 2004
Alstom Shoaiba Power Plant
MIJAJCO
Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants
Shoaiba Power Plant
October 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )
Asir Power Plant
(Abha)
September 2004
Alstom Shoaiba Power Plant
MIJAJCO
Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant
Shoaiba Power Plant
August 2004
Alstom Shoaiba Power Plant MIJAJCO
Replacement of Expansion Joints HFOCO at Shoaiba Power Plant
Shoaiba Power Plant
July 2004
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
Low Medium and High Voltage Switchgear Maintenance
Switch gear Inspection and trouble shootingPer commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etcMechanical Alignment maintenance of the opening and closing system trouble shooting and Energization testProtection Relay system and CalibrationProtection system upgrading and refurbishment
Low Medium and High Voltage Motors Maintenance and overhauling
Inspection of motors
Dismantling
Carrying out all the required testsDeveloping of test records and their interpretation
Supply of motors
Rewinding of motors
Making the recommendations based on inspection and test
Electrical Repairing and Refurbishment
Electrical distribution maintenance troubleshooting and extensionsInstallation maintenance and extension of lighting distribution and low power systemsInstallation of low voltage distribution as well as control panelsInstallation laying and testing of low voltage cables and cable tray systemDC distribution including batteries and battery chargers and their installation testing and commissioningInstallation of emergency power generating systemProviding around the clock emergency services
Process Plant Installation and Maintenance
We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes
Power PlantsWater Treatment PlantsCement PlantsSugar PlantsFood Industries
Heat Exchanger Maintenance
Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following
Pulling of tube bundlesInternal and external hydro-blast cleaning of tubesRepair and Replacement of tubesRe-facing of tube sheetsFabrication of shellsPressure test
Refurbishment of Distillation Tower
Dismantling of traysCleaning of shell internals by hydro blast and grit blastRepair and replacement of bubble cup traysReplacement of rashing ringsCleaning and replacement of demister padsPressure test
Boiler Maintenance
Services are provided for the maintenance of water tube and fire tube boilers
Repair and replacement of tubes
De-scaling of internal and external boiler tubes including steam drums
Fire box and refractory repairs
New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water
Construction of steel tanks for petroleum chemicals and water
Tank cleaning
Bottom plate replacement
Repair and replacement of heating coils
Epoxy lining
Internal Coating
Replacement of Floating Fixed roof
Maintenance of pressure vacuum relief valve
Cooling Tower Maintenance
Cleaning of cooling tower cells
Replacement of wooden baffle plates
Repair maintenance amp replacement of Exhaust fan amp gearboxes
Pipeline Construction Maintenance amp Modification for Oil Gas and fire water
Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping
Construction Maintenance amp Modification of buried carbon steel pipeline
Construction Maintenance amp Modification of non-metallic pipelines
Construction Maintenance amp Modification of fiberglass pipelines
Hydrostatic testing and commissioning of oil and gas pipelines
De commissioning and vacuum drying of pipelines
Mothballing of pipelines
Pigging and internal cleaning of pipelines
External coating repairs
Cathodic Protection System Installation Commissioning and maintenance
Cathodic protection (CP) system design and installation
Commissioning of Cathodic Protection system
Trouble shooting and maintenance of existing CP system
Up grading of existing CP system
Routine CP data monitoring
Data evaluation and upgrading recommendations
Cold Storage Refrigeration and HVAC System Installation and Maintenance
Installation and commissioning of cold storage systems
Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors
Installation of cooling coils and condensers
Duct work installation Cleaning and Maintenance
Supply Installation amp Maintenance of Telecom system-CCTV MATV etc
Supply of Personal Protective Equipment amp Firefighting system
Civil Construction
Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients
Structure amp Foundation works
New Construction of any kind
Modifications and expansions works
All kind of Finishing and Decoration works
Swimming Pool constructions works
Landscaping Handicapping amp Earth works
Pre-Engineered Steel Structural building works
Concrete repairing works
Water proofing system of any kind suck as pools tanks etc
LEGAL DOCUMENTS
FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST
COMMERCIAL REGISTRATION CERTIFICATE
CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE
SAGIA CERTIFICATE
SOCIAL INSURANCE CERTIFICATE
ZAKAH CERTIFICATE
MUNICIPALTY CERTIFICATE
Human Resources
All personnel are able to understand speak both English and Arabic languages
Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries
Block Visa available in our ESTABLISHMENT - Under Process
Following is the list of our affiliated Recruiting Agents
Agents Address Contacts
AL-AHRAM
Trading amp Manpower Services
Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE
QADER INTERNATIONAL
License 2199
Dira Ghazi khan
Lahore
PAKISTAN
Ph +92-641-4670806
Fax +92-641-460698
BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor
Ali Complex 23-Empress Road Lahore
PAKISTAN
Ph +92-42-6365498
6367869
Fax +92-42-6365290
PRINCE INDIA
7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA
NAZ ASSOCIATES
H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH
ZAHID INTERNATIONAL
109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016
INDIA
Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom
Equipment Resources
The following table provides information of related equipment that is available for the work
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL
YEARMAKE
QTYOWNED
1 MOBILE CRANE 35 TON TADANO 1985 1
2 TANKER TRUCK (WATER)10000 amp
19000 GALNISSAN 1990 2
3 BOOM TRUCK 6 TON HINO 1985 1
4 POWER GENERATOR 35 KVA HONDA 1990 3
5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4
6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8
7 WELDING MACHINE ELECTRIC amp PORTABLE
350 AMP LICON 1998 4
8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO
1991 1
9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1
10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO
1990 1
11 DEWATERING PUMP 600 GPM ROBIN 1990 3
12 PIPE THREADING MACHINE UP TO 16INCH
SET RIGID 1994 2
13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2
14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2
15 OXY-ACETYLENE CYLINDER SET -- 1993 8
16 ARGON-NITROGEN CYLINDER SET -- 5
17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4
18 CREW CAB 1frac12 TON NISSAN 1988 1
19 PASSENGER VAN 15 SEAT NISSAN 2002 2
20 FORKLIFT3 amp 7-12
TONTOYTO 1990 2
21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2
22 SAND BLASTING MACHINE SET GIRACO 1995 3
23 CATHODIC PROTECTION TEST EQUIPMENT
SET -- 1
24 UNDERGROUND PIPE LOCATOR SET -- 2
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMADEMODEL
YEARMAKE
QTYOWNED
25 SOIL COMPACTOR PORTABLE - 1
26 UNDERGROUNG CABEL DETECTOR SET -- 2
27 PIN BRAZING SET -- 3
28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3
29 EXCHANGER BUNDLE PULLER 9 METERS 1
30 BOBCAT 2
31 EXCAVATOR 1
32 MICRO TRENCHER 1
33 VACUUM TRUCK 14 TON NISSAN 1
34 ASPHALT CUTTER 2
35 HIGH PRESSURE HYDRO-JETTING MACHINE
20000 PSI USA 1
36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)
50 KVA 3 way HTU with 3linkable Advantage 3 tempe-
rature programmer cont-rollers and 3 Energy regs
1
SAFETY amp LOSS PREVENTION PROGRAM
Objectives
The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through
Safety meetings and dialoguesdiscussion
Safety Inspection
Enforcement of Establishment safety policies and procedures
Programs Policies and Reports
Weekly Project Manager Safety Meeting
A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences
Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him
Duties and Responsibilities of Safety Inspectors
Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility
Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly
Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents
Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)
QAQC PROGRAM
The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST
Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards
Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients
Quality Procurement Procedure
Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference
A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery
Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage
A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project
Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed
Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications
Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion
As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed
Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement
GOING-ON PROJECTS
CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld
Saudia Ltd MIJAJCO
RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter
Old Makkah Road
JeddahGoing-on
Saudi Electricity Company
ATTS MIJAJCO
Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new
Makkah Power Plant
Going-on
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length
or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-
lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah Going-on
Ministry of Defense
Engineering amp Housing Dept
Jeddah
Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning
Jeddah Going-on
Bashir Ahmed Dost Mohd Used
Lube Oil Re-refining Factory
1) Plot development2)Development of infrastructure for the
factory3)Construction of all underground
concrete tanks of utility4)Fabrication and Installation raw material
storage tanks intermediate storage tanks
Rabigh Going-on
COMPLETED PROJECTS
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Electricity Co Bandariya Intl Co Ltd
MIJAJCO
Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No
Tihama Power Plant
February 2009
Saudi Electricity Co ATTS MIJAJCO
Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant
Najran Power Plant
February 2009
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc
Luberef-1 Jeddah
February 2009
Saudi Bin Laden GroupMIJAJC
O
Construction of Porta-cabin for office unit of the Railway project Haffar Battan
Hafilul Batin
December 2008
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of Existing and Installation of new heat exchanger
Luberef-1 Jeddah
October 2008
SEC Bandariya Intl Co Ltd
MIJAJCO
Re-insertion of rotor and boxing up of everything and run generators Qty 1No
Jazan Power Plant
May 2008
Saudi Electricity Co ATTS MIJAJCO
All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos
Tabuk Power Plant
May 2008
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Mechanical repairing works during emergency shutdown
Removal and reinstallation of 6 nos of fin-fan bundles
Luberef-1 Jeddah
February 2008
Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO
Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah
Jeddah KAIA
November 2007
Saline Water Conversion Corporation
(SWCC)
Dismantling of the structure support and rail of the overhead 30 ton capacity crane
Jeddah October 30 2007
SAFA General Contractors amp Enterprises Co
Ltd MIJAJCO
Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street
Jeddah September 20 2007
Ministry ofDefense Housing amp Planning Dept
Jeddah
Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning
Jeddah August 2007
Saudi Aramco Ashi amp Bushnag Co MIJAJCO
Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco
Saudi Aramco Jeddah Refinery
June 2007
Saudi Electricity Company MIJAJCO
Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment
Al-Qaseem Power Plant
June 2007
Fakieh Poultry Fram
MIJAJCO
Modification and Extension of Hatchery Building
Makkah May 2007
Fakieh Poultry Fram
MIJAJCO
Construction of Labour and staff accommodation Building
Makkah March 2007
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Fakieh Poultry Fram
MIJAJCOExtension of GP Hatchery Makkah April 2007
Fakieh Group MIJAJCO
Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F
Makkah February 2007
SAVOLA Edible oil MIJAJCO
Area Qualification Project (Civil Mechanical and Electrical) at Industrial City
JeddahCompleted December
2006
Ministry of Defense Housing amp Planning Dept
Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work
Jeddah December 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant
2)Tubes modification work on furnace B-3002 during TA of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Electricity CoYusuf Bin A
Kanoo MIJAJCO
Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line
Rabigh Power Plant
October 2006
Saudi Electricity Co Wood
Group MIJAJCO
Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables
Bisha Power Plant
October 2006
SCECOYusuf Bin A Kanoo
MIJAJCO
Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders
Rabigh Power Plant
October 2006
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
ABB Saudi Arabia
MIJAJCO
Servicing amp Site support for 18 MW Generator at Al-Baha
Al-Baha October 2006
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah September 2006
Saudi Electricity Co MIJAJCO
Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)
Bisha Power Plant
December 2005
Saudi Electricity Co MIJAJCO
Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18
Jazan Power Plant
November 2005
Saudi Electricity Co MIJAJCO
Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables
Power Plant -9
November 2005
SCECOAlstom Power
MIJAJCOReplacement of 18 Valve
Shoaiba Power Plant
September 2005
SCECOAlstom Power
MIJAJCO
Hot Tapping of Five Points 2 8 18 20
Shoaiba Power Plant
May 2005
SCECOSAS MIJAJCO
Construction of Site Camp amp Site Office facilities
Shoaiba Power Plant
May 2005
Saudi AramcoAshi Bushnag Co
MIJAJCO
Cable Pulling at Marine Area Jeddah Refinery
Saudi Aramco Jeddah
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Rotted Cables at GT 17
Makkah Power Plant
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Removal of oil and Carbon Heating Stator
Gazlan Power Plant
April 2005
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
SCECOYusuf Bin A Kanoo
MIJAJCO
Repair Cathodic Protection Test Posts PPII amp PPIII
Jeddah Power
Plant II amp III
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Routed Cables at GT 16
Makkah Power Plant
March 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz
Ummlujj Power Plant
February 2005
Redland Industrial
Services Ltd MIJAJCO
Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant
Shuqaiq Desalination Plant
February 2005
Saudi Electricity CoTIG-TESCO
Intl Ltd MIJAJCO
Bolts torquing and life assessment work with flow and retaining rings NDT test
Ghazlan Power Plant
Dammam
February 2005
Alstom GE Shoaiba Power
Plant MIJAJCO
Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant
Shoaiba Power Plant
December 2004
Alstom Shoaiba Power Plant
MIJAJCO
Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants
Shoaiba Power Plant
October 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )
Asir Power Plant
(Abha)
September 2004
Alstom Shoaiba Power Plant
MIJAJCO
Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant
Shoaiba Power Plant
August 2004
Alstom Shoaiba Power Plant MIJAJCO
Replacement of Expansion Joints HFOCO at Shoaiba Power Plant
Shoaiba Power Plant
July 2004
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
Process Plant Installation and Maintenance
We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes
Power PlantsWater Treatment PlantsCement PlantsSugar PlantsFood Industries
Heat Exchanger Maintenance
Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following
Pulling of tube bundlesInternal and external hydro-blast cleaning of tubesRepair and Replacement of tubesRe-facing of tube sheetsFabrication of shellsPressure test
Refurbishment of Distillation Tower
Dismantling of traysCleaning of shell internals by hydro blast and grit blastRepair and replacement of bubble cup traysReplacement of rashing ringsCleaning and replacement of demister padsPressure test
Boiler Maintenance
Services are provided for the maintenance of water tube and fire tube boilers
Repair and replacement of tubes
De-scaling of internal and external boiler tubes including steam drums
Fire box and refractory repairs
New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water
Construction of steel tanks for petroleum chemicals and water
Tank cleaning
Bottom plate replacement
Repair and replacement of heating coils
Epoxy lining
Internal Coating
Replacement of Floating Fixed roof
Maintenance of pressure vacuum relief valve
Cooling Tower Maintenance
Cleaning of cooling tower cells
Replacement of wooden baffle plates
Repair maintenance amp replacement of Exhaust fan amp gearboxes
Pipeline Construction Maintenance amp Modification for Oil Gas and fire water
Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping
Construction Maintenance amp Modification of buried carbon steel pipeline
Construction Maintenance amp Modification of non-metallic pipelines
Construction Maintenance amp Modification of fiberglass pipelines
Hydrostatic testing and commissioning of oil and gas pipelines
De commissioning and vacuum drying of pipelines
Mothballing of pipelines
Pigging and internal cleaning of pipelines
External coating repairs
Cathodic Protection System Installation Commissioning and maintenance
Cathodic protection (CP) system design and installation
Commissioning of Cathodic Protection system
Trouble shooting and maintenance of existing CP system
Up grading of existing CP system
Routine CP data monitoring
Data evaluation and upgrading recommendations
Cold Storage Refrigeration and HVAC System Installation and Maintenance
Installation and commissioning of cold storage systems
Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors
Installation of cooling coils and condensers
Duct work installation Cleaning and Maintenance
Supply Installation amp Maintenance of Telecom system-CCTV MATV etc
Supply of Personal Protective Equipment amp Firefighting system
Civil Construction
Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients
Structure amp Foundation works
New Construction of any kind
Modifications and expansions works
All kind of Finishing and Decoration works
Swimming Pool constructions works
Landscaping Handicapping amp Earth works
Pre-Engineered Steel Structural building works
Concrete repairing works
Water proofing system of any kind suck as pools tanks etc
LEGAL DOCUMENTS
FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST
COMMERCIAL REGISTRATION CERTIFICATE
CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE
SAGIA CERTIFICATE
SOCIAL INSURANCE CERTIFICATE
ZAKAH CERTIFICATE
MUNICIPALTY CERTIFICATE
Human Resources
All personnel are able to understand speak both English and Arabic languages
Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries
Block Visa available in our ESTABLISHMENT - Under Process
Following is the list of our affiliated Recruiting Agents
Agents Address Contacts
AL-AHRAM
Trading amp Manpower Services
Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE
QADER INTERNATIONAL
License 2199
Dira Ghazi khan
Lahore
PAKISTAN
Ph +92-641-4670806
Fax +92-641-460698
BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor
Ali Complex 23-Empress Road Lahore
PAKISTAN
Ph +92-42-6365498
6367869
Fax +92-42-6365290
PRINCE INDIA
7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA
NAZ ASSOCIATES
H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH
ZAHID INTERNATIONAL
109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016
INDIA
Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom
Equipment Resources
The following table provides information of related equipment that is available for the work
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL
YEARMAKE
QTYOWNED
1 MOBILE CRANE 35 TON TADANO 1985 1
2 TANKER TRUCK (WATER)10000 amp
19000 GALNISSAN 1990 2
3 BOOM TRUCK 6 TON HINO 1985 1
4 POWER GENERATOR 35 KVA HONDA 1990 3
5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4
6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8
7 WELDING MACHINE ELECTRIC amp PORTABLE
350 AMP LICON 1998 4
8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO
1991 1
9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1
10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO
1990 1
11 DEWATERING PUMP 600 GPM ROBIN 1990 3
12 PIPE THREADING MACHINE UP TO 16INCH
SET RIGID 1994 2
13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2
14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2
15 OXY-ACETYLENE CYLINDER SET -- 1993 8
16 ARGON-NITROGEN CYLINDER SET -- 5
17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4
18 CREW CAB 1frac12 TON NISSAN 1988 1
19 PASSENGER VAN 15 SEAT NISSAN 2002 2
20 FORKLIFT3 amp 7-12
TONTOYTO 1990 2
21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2
22 SAND BLASTING MACHINE SET GIRACO 1995 3
23 CATHODIC PROTECTION TEST EQUIPMENT
SET -- 1
24 UNDERGROUND PIPE LOCATOR SET -- 2
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMADEMODEL
YEARMAKE
QTYOWNED
25 SOIL COMPACTOR PORTABLE - 1
26 UNDERGROUNG CABEL DETECTOR SET -- 2
27 PIN BRAZING SET -- 3
28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3
29 EXCHANGER BUNDLE PULLER 9 METERS 1
30 BOBCAT 2
31 EXCAVATOR 1
32 MICRO TRENCHER 1
33 VACUUM TRUCK 14 TON NISSAN 1
34 ASPHALT CUTTER 2
35 HIGH PRESSURE HYDRO-JETTING MACHINE
20000 PSI USA 1
36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)
50 KVA 3 way HTU with 3linkable Advantage 3 tempe-
rature programmer cont-rollers and 3 Energy regs
1
SAFETY amp LOSS PREVENTION PROGRAM
Objectives
The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through
Safety meetings and dialoguesdiscussion
Safety Inspection
Enforcement of Establishment safety policies and procedures
Programs Policies and Reports
Weekly Project Manager Safety Meeting
A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences
Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him
Duties and Responsibilities of Safety Inspectors
Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility
Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly
Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents
Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)
QAQC PROGRAM
The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST
Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards
Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients
Quality Procurement Procedure
Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference
A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery
Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage
A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project
Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed
Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications
Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion
As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed
Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement
GOING-ON PROJECTS
CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld
Saudia Ltd MIJAJCO
RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter
Old Makkah Road
JeddahGoing-on
Saudi Electricity Company
ATTS MIJAJCO
Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new
Makkah Power Plant
Going-on
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length
or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-
lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah Going-on
Ministry of Defense
Engineering amp Housing Dept
Jeddah
Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning
Jeddah Going-on
Bashir Ahmed Dost Mohd Used
Lube Oil Re-refining Factory
1) Plot development2)Development of infrastructure for the
factory3)Construction of all underground
concrete tanks of utility4)Fabrication and Installation raw material
storage tanks intermediate storage tanks
Rabigh Going-on
COMPLETED PROJECTS
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Electricity Co Bandariya Intl Co Ltd
MIJAJCO
Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No
Tihama Power Plant
February 2009
Saudi Electricity Co ATTS MIJAJCO
Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant
Najran Power Plant
February 2009
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc
Luberef-1 Jeddah
February 2009
Saudi Bin Laden GroupMIJAJC
O
Construction of Porta-cabin for office unit of the Railway project Haffar Battan
Hafilul Batin
December 2008
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of Existing and Installation of new heat exchanger
Luberef-1 Jeddah
October 2008
SEC Bandariya Intl Co Ltd
MIJAJCO
Re-insertion of rotor and boxing up of everything and run generators Qty 1No
Jazan Power Plant
May 2008
Saudi Electricity Co ATTS MIJAJCO
All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos
Tabuk Power Plant
May 2008
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Mechanical repairing works during emergency shutdown
Removal and reinstallation of 6 nos of fin-fan bundles
Luberef-1 Jeddah
February 2008
Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO
Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah
Jeddah KAIA
November 2007
Saline Water Conversion Corporation
(SWCC)
Dismantling of the structure support and rail of the overhead 30 ton capacity crane
Jeddah October 30 2007
SAFA General Contractors amp Enterprises Co
Ltd MIJAJCO
Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street
Jeddah September 20 2007
Ministry ofDefense Housing amp Planning Dept
Jeddah
Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning
Jeddah August 2007
Saudi Aramco Ashi amp Bushnag Co MIJAJCO
Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco
Saudi Aramco Jeddah Refinery
June 2007
Saudi Electricity Company MIJAJCO
Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment
Al-Qaseem Power Plant
June 2007
Fakieh Poultry Fram
MIJAJCO
Modification and Extension of Hatchery Building
Makkah May 2007
Fakieh Poultry Fram
MIJAJCO
Construction of Labour and staff accommodation Building
Makkah March 2007
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Fakieh Poultry Fram
MIJAJCOExtension of GP Hatchery Makkah April 2007
Fakieh Group MIJAJCO
Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F
Makkah February 2007
SAVOLA Edible oil MIJAJCO
Area Qualification Project (Civil Mechanical and Electrical) at Industrial City
JeddahCompleted December
2006
Ministry of Defense Housing amp Planning Dept
Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work
Jeddah December 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant
2)Tubes modification work on furnace B-3002 during TA of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Electricity CoYusuf Bin A
Kanoo MIJAJCO
Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line
Rabigh Power Plant
October 2006
Saudi Electricity Co Wood
Group MIJAJCO
Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables
Bisha Power Plant
October 2006
SCECOYusuf Bin A Kanoo
MIJAJCO
Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders
Rabigh Power Plant
October 2006
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
ABB Saudi Arabia
MIJAJCO
Servicing amp Site support for 18 MW Generator at Al-Baha
Al-Baha October 2006
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah September 2006
Saudi Electricity Co MIJAJCO
Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)
Bisha Power Plant
December 2005
Saudi Electricity Co MIJAJCO
Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18
Jazan Power Plant
November 2005
Saudi Electricity Co MIJAJCO
Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables
Power Plant -9
November 2005
SCECOAlstom Power
MIJAJCOReplacement of 18 Valve
Shoaiba Power Plant
September 2005
SCECOAlstom Power
MIJAJCO
Hot Tapping of Five Points 2 8 18 20
Shoaiba Power Plant
May 2005
SCECOSAS MIJAJCO
Construction of Site Camp amp Site Office facilities
Shoaiba Power Plant
May 2005
Saudi AramcoAshi Bushnag Co
MIJAJCO
Cable Pulling at Marine Area Jeddah Refinery
Saudi Aramco Jeddah
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Rotted Cables at GT 17
Makkah Power Plant
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Removal of oil and Carbon Heating Stator
Gazlan Power Plant
April 2005
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
SCECOYusuf Bin A Kanoo
MIJAJCO
Repair Cathodic Protection Test Posts PPII amp PPIII
Jeddah Power
Plant II amp III
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Routed Cables at GT 16
Makkah Power Plant
March 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz
Ummlujj Power Plant
February 2005
Redland Industrial
Services Ltd MIJAJCO
Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant
Shuqaiq Desalination Plant
February 2005
Saudi Electricity CoTIG-TESCO
Intl Ltd MIJAJCO
Bolts torquing and life assessment work with flow and retaining rings NDT test
Ghazlan Power Plant
Dammam
February 2005
Alstom GE Shoaiba Power
Plant MIJAJCO
Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant
Shoaiba Power Plant
December 2004
Alstom Shoaiba Power Plant
MIJAJCO
Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants
Shoaiba Power Plant
October 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )
Asir Power Plant
(Abha)
September 2004
Alstom Shoaiba Power Plant
MIJAJCO
Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant
Shoaiba Power Plant
August 2004
Alstom Shoaiba Power Plant MIJAJCO
Replacement of Expansion Joints HFOCO at Shoaiba Power Plant
Shoaiba Power Plant
July 2004
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
Boiler Maintenance
Services are provided for the maintenance of water tube and fire tube boilers
Repair and replacement of tubes
De-scaling of internal and external boiler tubes including steam drums
Fire box and refractory repairs
New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water
Construction of steel tanks for petroleum chemicals and water
Tank cleaning
Bottom plate replacement
Repair and replacement of heating coils
Epoxy lining
Internal Coating
Replacement of Floating Fixed roof
Maintenance of pressure vacuum relief valve
Cooling Tower Maintenance
Cleaning of cooling tower cells
Replacement of wooden baffle plates
Repair maintenance amp replacement of Exhaust fan amp gearboxes
Pipeline Construction Maintenance amp Modification for Oil Gas and fire water
Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping
Construction Maintenance amp Modification of buried carbon steel pipeline
Construction Maintenance amp Modification of non-metallic pipelines
Construction Maintenance amp Modification of fiberglass pipelines
Hydrostatic testing and commissioning of oil and gas pipelines
De commissioning and vacuum drying of pipelines
Mothballing of pipelines
Pigging and internal cleaning of pipelines
External coating repairs
Cathodic Protection System Installation Commissioning and maintenance
Cathodic protection (CP) system design and installation
Commissioning of Cathodic Protection system
Trouble shooting and maintenance of existing CP system
Up grading of existing CP system
Routine CP data monitoring
Data evaluation and upgrading recommendations
Cold Storage Refrigeration and HVAC System Installation and Maintenance
Installation and commissioning of cold storage systems
Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors
Installation of cooling coils and condensers
Duct work installation Cleaning and Maintenance
Supply Installation amp Maintenance of Telecom system-CCTV MATV etc
Supply of Personal Protective Equipment amp Firefighting system
Civil Construction
Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients
Structure amp Foundation works
New Construction of any kind
Modifications and expansions works
All kind of Finishing and Decoration works
Swimming Pool constructions works
Landscaping Handicapping amp Earth works
Pre-Engineered Steel Structural building works
Concrete repairing works
Water proofing system of any kind suck as pools tanks etc
LEGAL DOCUMENTS
FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST
COMMERCIAL REGISTRATION CERTIFICATE
CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE
SAGIA CERTIFICATE
SOCIAL INSURANCE CERTIFICATE
ZAKAH CERTIFICATE
MUNICIPALTY CERTIFICATE
Human Resources
All personnel are able to understand speak both English and Arabic languages
Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries
Block Visa available in our ESTABLISHMENT - Under Process
Following is the list of our affiliated Recruiting Agents
Agents Address Contacts
AL-AHRAM
Trading amp Manpower Services
Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE
QADER INTERNATIONAL
License 2199
Dira Ghazi khan
Lahore
PAKISTAN
Ph +92-641-4670806
Fax +92-641-460698
BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor
Ali Complex 23-Empress Road Lahore
PAKISTAN
Ph +92-42-6365498
6367869
Fax +92-42-6365290
PRINCE INDIA
7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA
NAZ ASSOCIATES
H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH
ZAHID INTERNATIONAL
109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016
INDIA
Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom
Equipment Resources
The following table provides information of related equipment that is available for the work
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL
YEARMAKE
QTYOWNED
1 MOBILE CRANE 35 TON TADANO 1985 1
2 TANKER TRUCK (WATER)10000 amp
19000 GALNISSAN 1990 2
3 BOOM TRUCK 6 TON HINO 1985 1
4 POWER GENERATOR 35 KVA HONDA 1990 3
5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4
6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8
7 WELDING MACHINE ELECTRIC amp PORTABLE
350 AMP LICON 1998 4
8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO
1991 1
9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1
10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO
1990 1
11 DEWATERING PUMP 600 GPM ROBIN 1990 3
12 PIPE THREADING MACHINE UP TO 16INCH
SET RIGID 1994 2
13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2
14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2
15 OXY-ACETYLENE CYLINDER SET -- 1993 8
16 ARGON-NITROGEN CYLINDER SET -- 5
17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4
18 CREW CAB 1frac12 TON NISSAN 1988 1
19 PASSENGER VAN 15 SEAT NISSAN 2002 2
20 FORKLIFT3 amp 7-12
TONTOYTO 1990 2
21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2
22 SAND BLASTING MACHINE SET GIRACO 1995 3
23 CATHODIC PROTECTION TEST EQUIPMENT
SET -- 1
24 UNDERGROUND PIPE LOCATOR SET -- 2
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMADEMODEL
YEARMAKE
QTYOWNED
25 SOIL COMPACTOR PORTABLE - 1
26 UNDERGROUNG CABEL DETECTOR SET -- 2
27 PIN BRAZING SET -- 3
28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3
29 EXCHANGER BUNDLE PULLER 9 METERS 1
30 BOBCAT 2
31 EXCAVATOR 1
32 MICRO TRENCHER 1
33 VACUUM TRUCK 14 TON NISSAN 1
34 ASPHALT CUTTER 2
35 HIGH PRESSURE HYDRO-JETTING MACHINE
20000 PSI USA 1
36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)
50 KVA 3 way HTU with 3linkable Advantage 3 tempe-
rature programmer cont-rollers and 3 Energy regs
1
SAFETY amp LOSS PREVENTION PROGRAM
Objectives
The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through
Safety meetings and dialoguesdiscussion
Safety Inspection
Enforcement of Establishment safety policies and procedures
Programs Policies and Reports
Weekly Project Manager Safety Meeting
A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences
Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him
Duties and Responsibilities of Safety Inspectors
Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility
Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly
Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents
Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)
QAQC PROGRAM
The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST
Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards
Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients
Quality Procurement Procedure
Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference
A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery
Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage
A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project
Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed
Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications
Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion
As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed
Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement
GOING-ON PROJECTS
CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld
Saudia Ltd MIJAJCO
RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter
Old Makkah Road
JeddahGoing-on
Saudi Electricity Company
ATTS MIJAJCO
Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new
Makkah Power Plant
Going-on
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length
or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-
lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah Going-on
Ministry of Defense
Engineering amp Housing Dept
Jeddah
Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning
Jeddah Going-on
Bashir Ahmed Dost Mohd Used
Lube Oil Re-refining Factory
1) Plot development2)Development of infrastructure for the
factory3)Construction of all underground
concrete tanks of utility4)Fabrication and Installation raw material
storage tanks intermediate storage tanks
Rabigh Going-on
COMPLETED PROJECTS
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Electricity Co Bandariya Intl Co Ltd
MIJAJCO
Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No
Tihama Power Plant
February 2009
Saudi Electricity Co ATTS MIJAJCO
Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant
Najran Power Plant
February 2009
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc
Luberef-1 Jeddah
February 2009
Saudi Bin Laden GroupMIJAJC
O
Construction of Porta-cabin for office unit of the Railway project Haffar Battan
Hafilul Batin
December 2008
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of Existing and Installation of new heat exchanger
Luberef-1 Jeddah
October 2008
SEC Bandariya Intl Co Ltd
MIJAJCO
Re-insertion of rotor and boxing up of everything and run generators Qty 1No
Jazan Power Plant
May 2008
Saudi Electricity Co ATTS MIJAJCO
All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos
Tabuk Power Plant
May 2008
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Mechanical repairing works during emergency shutdown
Removal and reinstallation of 6 nos of fin-fan bundles
Luberef-1 Jeddah
February 2008
Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO
Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah
Jeddah KAIA
November 2007
Saline Water Conversion Corporation
(SWCC)
Dismantling of the structure support and rail of the overhead 30 ton capacity crane
Jeddah October 30 2007
SAFA General Contractors amp Enterprises Co
Ltd MIJAJCO
Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street
Jeddah September 20 2007
Ministry ofDefense Housing amp Planning Dept
Jeddah
Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning
Jeddah August 2007
Saudi Aramco Ashi amp Bushnag Co MIJAJCO
Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco
Saudi Aramco Jeddah Refinery
June 2007
Saudi Electricity Company MIJAJCO
Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment
Al-Qaseem Power Plant
June 2007
Fakieh Poultry Fram
MIJAJCO
Modification and Extension of Hatchery Building
Makkah May 2007
Fakieh Poultry Fram
MIJAJCO
Construction of Labour and staff accommodation Building
Makkah March 2007
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Fakieh Poultry Fram
MIJAJCOExtension of GP Hatchery Makkah April 2007
Fakieh Group MIJAJCO
Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F
Makkah February 2007
SAVOLA Edible oil MIJAJCO
Area Qualification Project (Civil Mechanical and Electrical) at Industrial City
JeddahCompleted December
2006
Ministry of Defense Housing amp Planning Dept
Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work
Jeddah December 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant
2)Tubes modification work on furnace B-3002 during TA of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Electricity CoYusuf Bin A
Kanoo MIJAJCO
Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line
Rabigh Power Plant
October 2006
Saudi Electricity Co Wood
Group MIJAJCO
Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables
Bisha Power Plant
October 2006
SCECOYusuf Bin A Kanoo
MIJAJCO
Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders
Rabigh Power Plant
October 2006
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
ABB Saudi Arabia
MIJAJCO
Servicing amp Site support for 18 MW Generator at Al-Baha
Al-Baha October 2006
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah September 2006
Saudi Electricity Co MIJAJCO
Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)
Bisha Power Plant
December 2005
Saudi Electricity Co MIJAJCO
Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18
Jazan Power Plant
November 2005
Saudi Electricity Co MIJAJCO
Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables
Power Plant -9
November 2005
SCECOAlstom Power
MIJAJCOReplacement of 18 Valve
Shoaiba Power Plant
September 2005
SCECOAlstom Power
MIJAJCO
Hot Tapping of Five Points 2 8 18 20
Shoaiba Power Plant
May 2005
SCECOSAS MIJAJCO
Construction of Site Camp amp Site Office facilities
Shoaiba Power Plant
May 2005
Saudi AramcoAshi Bushnag Co
MIJAJCO
Cable Pulling at Marine Area Jeddah Refinery
Saudi Aramco Jeddah
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Rotted Cables at GT 17
Makkah Power Plant
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Removal of oil and Carbon Heating Stator
Gazlan Power Plant
April 2005
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
SCECOYusuf Bin A Kanoo
MIJAJCO
Repair Cathodic Protection Test Posts PPII amp PPIII
Jeddah Power
Plant II amp III
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Routed Cables at GT 16
Makkah Power Plant
March 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz
Ummlujj Power Plant
February 2005
Redland Industrial
Services Ltd MIJAJCO
Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant
Shuqaiq Desalination Plant
February 2005
Saudi Electricity CoTIG-TESCO
Intl Ltd MIJAJCO
Bolts torquing and life assessment work with flow and retaining rings NDT test
Ghazlan Power Plant
Dammam
February 2005
Alstom GE Shoaiba Power
Plant MIJAJCO
Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant
Shoaiba Power Plant
December 2004
Alstom Shoaiba Power Plant
MIJAJCO
Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants
Shoaiba Power Plant
October 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )
Asir Power Plant
(Abha)
September 2004
Alstom Shoaiba Power Plant
MIJAJCO
Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant
Shoaiba Power Plant
August 2004
Alstom Shoaiba Power Plant MIJAJCO
Replacement of Expansion Joints HFOCO at Shoaiba Power Plant
Shoaiba Power Plant
July 2004
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
Pipeline Construction Maintenance amp Modification for Oil Gas and fire water
Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping
Construction Maintenance amp Modification of buried carbon steel pipeline
Construction Maintenance amp Modification of non-metallic pipelines
Construction Maintenance amp Modification of fiberglass pipelines
Hydrostatic testing and commissioning of oil and gas pipelines
De commissioning and vacuum drying of pipelines
Mothballing of pipelines
Pigging and internal cleaning of pipelines
External coating repairs
Cathodic Protection System Installation Commissioning and maintenance
Cathodic protection (CP) system design and installation
Commissioning of Cathodic Protection system
Trouble shooting and maintenance of existing CP system
Up grading of existing CP system
Routine CP data monitoring
Data evaluation and upgrading recommendations
Cold Storage Refrigeration and HVAC System Installation and Maintenance
Installation and commissioning of cold storage systems
Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors
Installation of cooling coils and condensers
Duct work installation Cleaning and Maintenance
Supply Installation amp Maintenance of Telecom system-CCTV MATV etc
Supply of Personal Protective Equipment amp Firefighting system
Civil Construction
Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients
Structure amp Foundation works
New Construction of any kind
Modifications and expansions works
All kind of Finishing and Decoration works
Swimming Pool constructions works
Landscaping Handicapping amp Earth works
Pre-Engineered Steel Structural building works
Concrete repairing works
Water proofing system of any kind suck as pools tanks etc
LEGAL DOCUMENTS
FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST
COMMERCIAL REGISTRATION CERTIFICATE
CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE
SAGIA CERTIFICATE
SOCIAL INSURANCE CERTIFICATE
ZAKAH CERTIFICATE
MUNICIPALTY CERTIFICATE
Human Resources
All personnel are able to understand speak both English and Arabic languages
Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries
Block Visa available in our ESTABLISHMENT - Under Process
Following is the list of our affiliated Recruiting Agents
Agents Address Contacts
AL-AHRAM
Trading amp Manpower Services
Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE
QADER INTERNATIONAL
License 2199
Dira Ghazi khan
Lahore
PAKISTAN
Ph +92-641-4670806
Fax +92-641-460698
BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor
Ali Complex 23-Empress Road Lahore
PAKISTAN
Ph +92-42-6365498
6367869
Fax +92-42-6365290
PRINCE INDIA
7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA
NAZ ASSOCIATES
H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH
ZAHID INTERNATIONAL
109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016
INDIA
Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom
Equipment Resources
The following table provides information of related equipment that is available for the work
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL
YEARMAKE
QTYOWNED
1 MOBILE CRANE 35 TON TADANO 1985 1
2 TANKER TRUCK (WATER)10000 amp
19000 GALNISSAN 1990 2
3 BOOM TRUCK 6 TON HINO 1985 1
4 POWER GENERATOR 35 KVA HONDA 1990 3
5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4
6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8
7 WELDING MACHINE ELECTRIC amp PORTABLE
350 AMP LICON 1998 4
8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO
1991 1
9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1
10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO
1990 1
11 DEWATERING PUMP 600 GPM ROBIN 1990 3
12 PIPE THREADING MACHINE UP TO 16INCH
SET RIGID 1994 2
13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2
14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2
15 OXY-ACETYLENE CYLINDER SET -- 1993 8
16 ARGON-NITROGEN CYLINDER SET -- 5
17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4
18 CREW CAB 1frac12 TON NISSAN 1988 1
19 PASSENGER VAN 15 SEAT NISSAN 2002 2
20 FORKLIFT3 amp 7-12
TONTOYTO 1990 2
21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2
22 SAND BLASTING MACHINE SET GIRACO 1995 3
23 CATHODIC PROTECTION TEST EQUIPMENT
SET -- 1
24 UNDERGROUND PIPE LOCATOR SET -- 2
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMADEMODEL
YEARMAKE
QTYOWNED
25 SOIL COMPACTOR PORTABLE - 1
26 UNDERGROUNG CABEL DETECTOR SET -- 2
27 PIN BRAZING SET -- 3
28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3
29 EXCHANGER BUNDLE PULLER 9 METERS 1
30 BOBCAT 2
31 EXCAVATOR 1
32 MICRO TRENCHER 1
33 VACUUM TRUCK 14 TON NISSAN 1
34 ASPHALT CUTTER 2
35 HIGH PRESSURE HYDRO-JETTING MACHINE
20000 PSI USA 1
36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)
50 KVA 3 way HTU with 3linkable Advantage 3 tempe-
rature programmer cont-rollers and 3 Energy regs
1
SAFETY amp LOSS PREVENTION PROGRAM
Objectives
The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through
Safety meetings and dialoguesdiscussion
Safety Inspection
Enforcement of Establishment safety policies and procedures
Programs Policies and Reports
Weekly Project Manager Safety Meeting
A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences
Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him
Duties and Responsibilities of Safety Inspectors
Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility
Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly
Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents
Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)
QAQC PROGRAM
The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST
Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards
Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients
Quality Procurement Procedure
Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference
A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery
Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage
A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project
Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed
Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications
Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion
As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed
Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement
GOING-ON PROJECTS
CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld
Saudia Ltd MIJAJCO
RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter
Old Makkah Road
JeddahGoing-on
Saudi Electricity Company
ATTS MIJAJCO
Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new
Makkah Power Plant
Going-on
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length
or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-
lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah Going-on
Ministry of Defense
Engineering amp Housing Dept
Jeddah
Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning
Jeddah Going-on
Bashir Ahmed Dost Mohd Used
Lube Oil Re-refining Factory
1) Plot development2)Development of infrastructure for the
factory3)Construction of all underground
concrete tanks of utility4)Fabrication and Installation raw material
storage tanks intermediate storage tanks
Rabigh Going-on
COMPLETED PROJECTS
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Electricity Co Bandariya Intl Co Ltd
MIJAJCO
Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No
Tihama Power Plant
February 2009
Saudi Electricity Co ATTS MIJAJCO
Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant
Najran Power Plant
February 2009
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc
Luberef-1 Jeddah
February 2009
Saudi Bin Laden GroupMIJAJC
O
Construction of Porta-cabin for office unit of the Railway project Haffar Battan
Hafilul Batin
December 2008
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of Existing and Installation of new heat exchanger
Luberef-1 Jeddah
October 2008
SEC Bandariya Intl Co Ltd
MIJAJCO
Re-insertion of rotor and boxing up of everything and run generators Qty 1No
Jazan Power Plant
May 2008
Saudi Electricity Co ATTS MIJAJCO
All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos
Tabuk Power Plant
May 2008
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Mechanical repairing works during emergency shutdown
Removal and reinstallation of 6 nos of fin-fan bundles
Luberef-1 Jeddah
February 2008
Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO
Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah
Jeddah KAIA
November 2007
Saline Water Conversion Corporation
(SWCC)
Dismantling of the structure support and rail of the overhead 30 ton capacity crane
Jeddah October 30 2007
SAFA General Contractors amp Enterprises Co
Ltd MIJAJCO
Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street
Jeddah September 20 2007
Ministry ofDefense Housing amp Planning Dept
Jeddah
Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning
Jeddah August 2007
Saudi Aramco Ashi amp Bushnag Co MIJAJCO
Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco
Saudi Aramco Jeddah Refinery
June 2007
Saudi Electricity Company MIJAJCO
Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment
Al-Qaseem Power Plant
June 2007
Fakieh Poultry Fram
MIJAJCO
Modification and Extension of Hatchery Building
Makkah May 2007
Fakieh Poultry Fram
MIJAJCO
Construction of Labour and staff accommodation Building
Makkah March 2007
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Fakieh Poultry Fram
MIJAJCOExtension of GP Hatchery Makkah April 2007
Fakieh Group MIJAJCO
Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F
Makkah February 2007
SAVOLA Edible oil MIJAJCO
Area Qualification Project (Civil Mechanical and Electrical) at Industrial City
JeddahCompleted December
2006
Ministry of Defense Housing amp Planning Dept
Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work
Jeddah December 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant
2)Tubes modification work on furnace B-3002 during TA of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Electricity CoYusuf Bin A
Kanoo MIJAJCO
Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line
Rabigh Power Plant
October 2006
Saudi Electricity Co Wood
Group MIJAJCO
Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables
Bisha Power Plant
October 2006
SCECOYusuf Bin A Kanoo
MIJAJCO
Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders
Rabigh Power Plant
October 2006
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
ABB Saudi Arabia
MIJAJCO
Servicing amp Site support for 18 MW Generator at Al-Baha
Al-Baha October 2006
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah September 2006
Saudi Electricity Co MIJAJCO
Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)
Bisha Power Plant
December 2005
Saudi Electricity Co MIJAJCO
Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18
Jazan Power Plant
November 2005
Saudi Electricity Co MIJAJCO
Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables
Power Plant -9
November 2005
SCECOAlstom Power
MIJAJCOReplacement of 18 Valve
Shoaiba Power Plant
September 2005
SCECOAlstom Power
MIJAJCO
Hot Tapping of Five Points 2 8 18 20
Shoaiba Power Plant
May 2005
SCECOSAS MIJAJCO
Construction of Site Camp amp Site Office facilities
Shoaiba Power Plant
May 2005
Saudi AramcoAshi Bushnag Co
MIJAJCO
Cable Pulling at Marine Area Jeddah Refinery
Saudi Aramco Jeddah
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Rotted Cables at GT 17
Makkah Power Plant
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Removal of oil and Carbon Heating Stator
Gazlan Power Plant
April 2005
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
SCECOYusuf Bin A Kanoo
MIJAJCO
Repair Cathodic Protection Test Posts PPII amp PPIII
Jeddah Power
Plant II amp III
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Routed Cables at GT 16
Makkah Power Plant
March 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz
Ummlujj Power Plant
February 2005
Redland Industrial
Services Ltd MIJAJCO
Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant
Shuqaiq Desalination Plant
February 2005
Saudi Electricity CoTIG-TESCO
Intl Ltd MIJAJCO
Bolts torquing and life assessment work with flow and retaining rings NDT test
Ghazlan Power Plant
Dammam
February 2005
Alstom GE Shoaiba Power
Plant MIJAJCO
Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant
Shoaiba Power Plant
December 2004
Alstom Shoaiba Power Plant
MIJAJCO
Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants
Shoaiba Power Plant
October 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )
Asir Power Plant
(Abha)
September 2004
Alstom Shoaiba Power Plant
MIJAJCO
Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant
Shoaiba Power Plant
August 2004
Alstom Shoaiba Power Plant MIJAJCO
Replacement of Expansion Joints HFOCO at Shoaiba Power Plant
Shoaiba Power Plant
July 2004
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
Supply Installation amp Maintenance of Telecom system-CCTV MATV etc
Supply of Personal Protective Equipment amp Firefighting system
Civil Construction
Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients
Structure amp Foundation works
New Construction of any kind
Modifications and expansions works
All kind of Finishing and Decoration works
Swimming Pool constructions works
Landscaping Handicapping amp Earth works
Pre-Engineered Steel Structural building works
Concrete repairing works
Water proofing system of any kind suck as pools tanks etc
LEGAL DOCUMENTS
FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST
COMMERCIAL REGISTRATION CERTIFICATE
CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE
SAGIA CERTIFICATE
SOCIAL INSURANCE CERTIFICATE
ZAKAH CERTIFICATE
MUNICIPALTY CERTIFICATE
Human Resources
All personnel are able to understand speak both English and Arabic languages
Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries
Block Visa available in our ESTABLISHMENT - Under Process
Following is the list of our affiliated Recruiting Agents
Agents Address Contacts
AL-AHRAM
Trading amp Manpower Services
Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE
QADER INTERNATIONAL
License 2199
Dira Ghazi khan
Lahore
PAKISTAN
Ph +92-641-4670806
Fax +92-641-460698
BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor
Ali Complex 23-Empress Road Lahore
PAKISTAN
Ph +92-42-6365498
6367869
Fax +92-42-6365290
PRINCE INDIA
7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA
NAZ ASSOCIATES
H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH
ZAHID INTERNATIONAL
109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016
INDIA
Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom
Equipment Resources
The following table provides information of related equipment that is available for the work
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL
YEARMAKE
QTYOWNED
1 MOBILE CRANE 35 TON TADANO 1985 1
2 TANKER TRUCK (WATER)10000 amp
19000 GALNISSAN 1990 2
3 BOOM TRUCK 6 TON HINO 1985 1
4 POWER GENERATOR 35 KVA HONDA 1990 3
5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4
6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8
7 WELDING MACHINE ELECTRIC amp PORTABLE
350 AMP LICON 1998 4
8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO
1991 1
9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1
10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO
1990 1
11 DEWATERING PUMP 600 GPM ROBIN 1990 3
12 PIPE THREADING MACHINE UP TO 16INCH
SET RIGID 1994 2
13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2
14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2
15 OXY-ACETYLENE CYLINDER SET -- 1993 8
16 ARGON-NITROGEN CYLINDER SET -- 5
17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4
18 CREW CAB 1frac12 TON NISSAN 1988 1
19 PASSENGER VAN 15 SEAT NISSAN 2002 2
20 FORKLIFT3 amp 7-12
TONTOYTO 1990 2
21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2
22 SAND BLASTING MACHINE SET GIRACO 1995 3
23 CATHODIC PROTECTION TEST EQUIPMENT
SET -- 1
24 UNDERGROUND PIPE LOCATOR SET -- 2
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMADEMODEL
YEARMAKE
QTYOWNED
25 SOIL COMPACTOR PORTABLE - 1
26 UNDERGROUNG CABEL DETECTOR SET -- 2
27 PIN BRAZING SET -- 3
28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3
29 EXCHANGER BUNDLE PULLER 9 METERS 1
30 BOBCAT 2
31 EXCAVATOR 1
32 MICRO TRENCHER 1
33 VACUUM TRUCK 14 TON NISSAN 1
34 ASPHALT CUTTER 2
35 HIGH PRESSURE HYDRO-JETTING MACHINE
20000 PSI USA 1
36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)
50 KVA 3 way HTU with 3linkable Advantage 3 tempe-
rature programmer cont-rollers and 3 Energy regs
1
SAFETY amp LOSS PREVENTION PROGRAM
Objectives
The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through
Safety meetings and dialoguesdiscussion
Safety Inspection
Enforcement of Establishment safety policies and procedures
Programs Policies and Reports
Weekly Project Manager Safety Meeting
A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences
Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him
Duties and Responsibilities of Safety Inspectors
Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility
Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly
Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents
Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)
QAQC PROGRAM
The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST
Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards
Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients
Quality Procurement Procedure
Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference
A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery
Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage
A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project
Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed
Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications
Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion
As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed
Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement
GOING-ON PROJECTS
CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld
Saudia Ltd MIJAJCO
RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter
Old Makkah Road
JeddahGoing-on
Saudi Electricity Company
ATTS MIJAJCO
Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new
Makkah Power Plant
Going-on
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length
or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-
lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah Going-on
Ministry of Defense
Engineering amp Housing Dept
Jeddah
Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning
Jeddah Going-on
Bashir Ahmed Dost Mohd Used
Lube Oil Re-refining Factory
1) Plot development2)Development of infrastructure for the
factory3)Construction of all underground
concrete tanks of utility4)Fabrication and Installation raw material
storage tanks intermediate storage tanks
Rabigh Going-on
COMPLETED PROJECTS
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Electricity Co Bandariya Intl Co Ltd
MIJAJCO
Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No
Tihama Power Plant
February 2009
Saudi Electricity Co ATTS MIJAJCO
Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant
Najran Power Plant
February 2009
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc
Luberef-1 Jeddah
February 2009
Saudi Bin Laden GroupMIJAJC
O
Construction of Porta-cabin for office unit of the Railway project Haffar Battan
Hafilul Batin
December 2008
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of Existing and Installation of new heat exchanger
Luberef-1 Jeddah
October 2008
SEC Bandariya Intl Co Ltd
MIJAJCO
Re-insertion of rotor and boxing up of everything and run generators Qty 1No
Jazan Power Plant
May 2008
Saudi Electricity Co ATTS MIJAJCO
All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos
Tabuk Power Plant
May 2008
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Mechanical repairing works during emergency shutdown
Removal and reinstallation of 6 nos of fin-fan bundles
Luberef-1 Jeddah
February 2008
Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO
Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah
Jeddah KAIA
November 2007
Saline Water Conversion Corporation
(SWCC)
Dismantling of the structure support and rail of the overhead 30 ton capacity crane
Jeddah October 30 2007
SAFA General Contractors amp Enterprises Co
Ltd MIJAJCO
Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street
Jeddah September 20 2007
Ministry ofDefense Housing amp Planning Dept
Jeddah
Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning
Jeddah August 2007
Saudi Aramco Ashi amp Bushnag Co MIJAJCO
Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco
Saudi Aramco Jeddah Refinery
June 2007
Saudi Electricity Company MIJAJCO
Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment
Al-Qaseem Power Plant
June 2007
Fakieh Poultry Fram
MIJAJCO
Modification and Extension of Hatchery Building
Makkah May 2007
Fakieh Poultry Fram
MIJAJCO
Construction of Labour and staff accommodation Building
Makkah March 2007
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Fakieh Poultry Fram
MIJAJCOExtension of GP Hatchery Makkah April 2007
Fakieh Group MIJAJCO
Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F
Makkah February 2007
SAVOLA Edible oil MIJAJCO
Area Qualification Project (Civil Mechanical and Electrical) at Industrial City
JeddahCompleted December
2006
Ministry of Defense Housing amp Planning Dept
Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work
Jeddah December 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant
2)Tubes modification work on furnace B-3002 during TA of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Electricity CoYusuf Bin A
Kanoo MIJAJCO
Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line
Rabigh Power Plant
October 2006
Saudi Electricity Co Wood
Group MIJAJCO
Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables
Bisha Power Plant
October 2006
SCECOYusuf Bin A Kanoo
MIJAJCO
Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders
Rabigh Power Plant
October 2006
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
ABB Saudi Arabia
MIJAJCO
Servicing amp Site support for 18 MW Generator at Al-Baha
Al-Baha October 2006
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah September 2006
Saudi Electricity Co MIJAJCO
Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)
Bisha Power Plant
December 2005
Saudi Electricity Co MIJAJCO
Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18
Jazan Power Plant
November 2005
Saudi Electricity Co MIJAJCO
Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables
Power Plant -9
November 2005
SCECOAlstom Power
MIJAJCOReplacement of 18 Valve
Shoaiba Power Plant
September 2005
SCECOAlstom Power
MIJAJCO
Hot Tapping of Five Points 2 8 18 20
Shoaiba Power Plant
May 2005
SCECOSAS MIJAJCO
Construction of Site Camp amp Site Office facilities
Shoaiba Power Plant
May 2005
Saudi AramcoAshi Bushnag Co
MIJAJCO
Cable Pulling at Marine Area Jeddah Refinery
Saudi Aramco Jeddah
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Rotted Cables at GT 17
Makkah Power Plant
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Removal of oil and Carbon Heating Stator
Gazlan Power Plant
April 2005
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
SCECOYusuf Bin A Kanoo
MIJAJCO
Repair Cathodic Protection Test Posts PPII amp PPIII
Jeddah Power
Plant II amp III
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Routed Cables at GT 16
Makkah Power Plant
March 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz
Ummlujj Power Plant
February 2005
Redland Industrial
Services Ltd MIJAJCO
Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant
Shuqaiq Desalination Plant
February 2005
Saudi Electricity CoTIG-TESCO
Intl Ltd MIJAJCO
Bolts torquing and life assessment work with flow and retaining rings NDT test
Ghazlan Power Plant
Dammam
February 2005
Alstom GE Shoaiba Power
Plant MIJAJCO
Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant
Shoaiba Power Plant
December 2004
Alstom Shoaiba Power Plant
MIJAJCO
Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants
Shoaiba Power Plant
October 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )
Asir Power Plant
(Abha)
September 2004
Alstom Shoaiba Power Plant
MIJAJCO
Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant
Shoaiba Power Plant
August 2004
Alstom Shoaiba Power Plant MIJAJCO
Replacement of Expansion Joints HFOCO at Shoaiba Power Plant
Shoaiba Power Plant
July 2004
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
LEGAL DOCUMENTS
FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST
COMMERCIAL REGISTRATION CERTIFICATE
CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE
SAGIA CERTIFICATE
SOCIAL INSURANCE CERTIFICATE
ZAKAH CERTIFICATE
MUNICIPALTY CERTIFICATE
Human Resources
All personnel are able to understand speak both English and Arabic languages
Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries
Block Visa available in our ESTABLISHMENT - Under Process
Following is the list of our affiliated Recruiting Agents
Agents Address Contacts
AL-AHRAM
Trading amp Manpower Services
Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE
QADER INTERNATIONAL
License 2199
Dira Ghazi khan
Lahore
PAKISTAN
Ph +92-641-4670806
Fax +92-641-460698
BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor
Ali Complex 23-Empress Road Lahore
PAKISTAN
Ph +92-42-6365498
6367869
Fax +92-42-6365290
PRINCE INDIA
7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA
NAZ ASSOCIATES
H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH
ZAHID INTERNATIONAL
109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016
INDIA
Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom
Equipment Resources
The following table provides information of related equipment that is available for the work
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL
YEARMAKE
QTYOWNED
1 MOBILE CRANE 35 TON TADANO 1985 1
2 TANKER TRUCK (WATER)10000 amp
19000 GALNISSAN 1990 2
3 BOOM TRUCK 6 TON HINO 1985 1
4 POWER GENERATOR 35 KVA HONDA 1990 3
5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4
6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8
7 WELDING MACHINE ELECTRIC amp PORTABLE
350 AMP LICON 1998 4
8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO
1991 1
9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1
10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO
1990 1
11 DEWATERING PUMP 600 GPM ROBIN 1990 3
12 PIPE THREADING MACHINE UP TO 16INCH
SET RIGID 1994 2
13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2
14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2
15 OXY-ACETYLENE CYLINDER SET -- 1993 8
16 ARGON-NITROGEN CYLINDER SET -- 5
17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4
18 CREW CAB 1frac12 TON NISSAN 1988 1
19 PASSENGER VAN 15 SEAT NISSAN 2002 2
20 FORKLIFT3 amp 7-12
TONTOYTO 1990 2
21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2
22 SAND BLASTING MACHINE SET GIRACO 1995 3
23 CATHODIC PROTECTION TEST EQUIPMENT
SET -- 1
24 UNDERGROUND PIPE LOCATOR SET -- 2
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMADEMODEL
YEARMAKE
QTYOWNED
25 SOIL COMPACTOR PORTABLE - 1
26 UNDERGROUNG CABEL DETECTOR SET -- 2
27 PIN BRAZING SET -- 3
28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3
29 EXCHANGER BUNDLE PULLER 9 METERS 1
30 BOBCAT 2
31 EXCAVATOR 1
32 MICRO TRENCHER 1
33 VACUUM TRUCK 14 TON NISSAN 1
34 ASPHALT CUTTER 2
35 HIGH PRESSURE HYDRO-JETTING MACHINE
20000 PSI USA 1
36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)
50 KVA 3 way HTU with 3linkable Advantage 3 tempe-
rature programmer cont-rollers and 3 Energy regs
1
SAFETY amp LOSS PREVENTION PROGRAM
Objectives
The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through
Safety meetings and dialoguesdiscussion
Safety Inspection
Enforcement of Establishment safety policies and procedures
Programs Policies and Reports
Weekly Project Manager Safety Meeting
A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences
Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him
Duties and Responsibilities of Safety Inspectors
Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility
Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly
Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents
Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)
QAQC PROGRAM
The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST
Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards
Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients
Quality Procurement Procedure
Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference
A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery
Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage
A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project
Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed
Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications
Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion
As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed
Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement
GOING-ON PROJECTS
CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld
Saudia Ltd MIJAJCO
RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter
Old Makkah Road
JeddahGoing-on
Saudi Electricity Company
ATTS MIJAJCO
Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new
Makkah Power Plant
Going-on
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length
or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-
lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah Going-on
Ministry of Defense
Engineering amp Housing Dept
Jeddah
Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning
Jeddah Going-on
Bashir Ahmed Dost Mohd Used
Lube Oil Re-refining Factory
1) Plot development2)Development of infrastructure for the
factory3)Construction of all underground
concrete tanks of utility4)Fabrication and Installation raw material
storage tanks intermediate storage tanks
Rabigh Going-on
COMPLETED PROJECTS
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Electricity Co Bandariya Intl Co Ltd
MIJAJCO
Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No
Tihama Power Plant
February 2009
Saudi Electricity Co ATTS MIJAJCO
Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant
Najran Power Plant
February 2009
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc
Luberef-1 Jeddah
February 2009
Saudi Bin Laden GroupMIJAJC
O
Construction of Porta-cabin for office unit of the Railway project Haffar Battan
Hafilul Batin
December 2008
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of Existing and Installation of new heat exchanger
Luberef-1 Jeddah
October 2008
SEC Bandariya Intl Co Ltd
MIJAJCO
Re-insertion of rotor and boxing up of everything and run generators Qty 1No
Jazan Power Plant
May 2008
Saudi Electricity Co ATTS MIJAJCO
All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos
Tabuk Power Plant
May 2008
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Mechanical repairing works during emergency shutdown
Removal and reinstallation of 6 nos of fin-fan bundles
Luberef-1 Jeddah
February 2008
Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO
Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah
Jeddah KAIA
November 2007
Saline Water Conversion Corporation
(SWCC)
Dismantling of the structure support and rail of the overhead 30 ton capacity crane
Jeddah October 30 2007
SAFA General Contractors amp Enterprises Co
Ltd MIJAJCO
Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street
Jeddah September 20 2007
Ministry ofDefense Housing amp Planning Dept
Jeddah
Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning
Jeddah August 2007
Saudi Aramco Ashi amp Bushnag Co MIJAJCO
Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco
Saudi Aramco Jeddah Refinery
June 2007
Saudi Electricity Company MIJAJCO
Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment
Al-Qaseem Power Plant
June 2007
Fakieh Poultry Fram
MIJAJCO
Modification and Extension of Hatchery Building
Makkah May 2007
Fakieh Poultry Fram
MIJAJCO
Construction of Labour and staff accommodation Building
Makkah March 2007
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Fakieh Poultry Fram
MIJAJCOExtension of GP Hatchery Makkah April 2007
Fakieh Group MIJAJCO
Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F
Makkah February 2007
SAVOLA Edible oil MIJAJCO
Area Qualification Project (Civil Mechanical and Electrical) at Industrial City
JeddahCompleted December
2006
Ministry of Defense Housing amp Planning Dept
Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work
Jeddah December 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant
2)Tubes modification work on furnace B-3002 during TA of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Electricity CoYusuf Bin A
Kanoo MIJAJCO
Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line
Rabigh Power Plant
October 2006
Saudi Electricity Co Wood
Group MIJAJCO
Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables
Bisha Power Plant
October 2006
SCECOYusuf Bin A Kanoo
MIJAJCO
Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders
Rabigh Power Plant
October 2006
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
ABB Saudi Arabia
MIJAJCO
Servicing amp Site support for 18 MW Generator at Al-Baha
Al-Baha October 2006
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah September 2006
Saudi Electricity Co MIJAJCO
Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)
Bisha Power Plant
December 2005
Saudi Electricity Co MIJAJCO
Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18
Jazan Power Plant
November 2005
Saudi Electricity Co MIJAJCO
Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables
Power Plant -9
November 2005
SCECOAlstom Power
MIJAJCOReplacement of 18 Valve
Shoaiba Power Plant
September 2005
SCECOAlstom Power
MIJAJCO
Hot Tapping of Five Points 2 8 18 20
Shoaiba Power Plant
May 2005
SCECOSAS MIJAJCO
Construction of Site Camp amp Site Office facilities
Shoaiba Power Plant
May 2005
Saudi AramcoAshi Bushnag Co
MIJAJCO
Cable Pulling at Marine Area Jeddah Refinery
Saudi Aramco Jeddah
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Rotted Cables at GT 17
Makkah Power Plant
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Removal of oil and Carbon Heating Stator
Gazlan Power Plant
April 2005
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
SCECOYusuf Bin A Kanoo
MIJAJCO
Repair Cathodic Protection Test Posts PPII amp PPIII
Jeddah Power
Plant II amp III
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Routed Cables at GT 16
Makkah Power Plant
March 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz
Ummlujj Power Plant
February 2005
Redland Industrial
Services Ltd MIJAJCO
Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant
Shuqaiq Desalination Plant
February 2005
Saudi Electricity CoTIG-TESCO
Intl Ltd MIJAJCO
Bolts torquing and life assessment work with flow and retaining rings NDT test
Ghazlan Power Plant
Dammam
February 2005
Alstom GE Shoaiba Power
Plant MIJAJCO
Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant
Shoaiba Power Plant
December 2004
Alstom Shoaiba Power Plant
MIJAJCO
Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants
Shoaiba Power Plant
October 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )
Asir Power Plant
(Abha)
September 2004
Alstom Shoaiba Power Plant
MIJAJCO
Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant
Shoaiba Power Plant
August 2004
Alstom Shoaiba Power Plant MIJAJCO
Replacement of Expansion Joints HFOCO at Shoaiba Power Plant
Shoaiba Power Plant
July 2004
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
Human Resources
All personnel are able to understand speak both English and Arabic languages
Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries
Block Visa available in our ESTABLISHMENT - Under Process
Following is the list of our affiliated Recruiting Agents
Agents Address Contacts
AL-AHRAM
Trading amp Manpower Services
Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE
QADER INTERNATIONAL
License 2199
Dira Ghazi khan
Lahore
PAKISTAN
Ph +92-641-4670806
Fax +92-641-460698
BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor
Ali Complex 23-Empress Road Lahore
PAKISTAN
Ph +92-42-6365498
6367869
Fax +92-42-6365290
PRINCE INDIA
7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA
NAZ ASSOCIATES
H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH
ZAHID INTERNATIONAL
109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016
INDIA
Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom
Equipment Resources
The following table provides information of related equipment that is available for the work
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL
YEARMAKE
QTYOWNED
1 MOBILE CRANE 35 TON TADANO 1985 1
2 TANKER TRUCK (WATER)10000 amp
19000 GALNISSAN 1990 2
3 BOOM TRUCK 6 TON HINO 1985 1
4 POWER GENERATOR 35 KVA HONDA 1990 3
5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4
6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8
7 WELDING MACHINE ELECTRIC amp PORTABLE
350 AMP LICON 1998 4
8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO
1991 1
9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1
10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO
1990 1
11 DEWATERING PUMP 600 GPM ROBIN 1990 3
12 PIPE THREADING MACHINE UP TO 16INCH
SET RIGID 1994 2
13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2
14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2
15 OXY-ACETYLENE CYLINDER SET -- 1993 8
16 ARGON-NITROGEN CYLINDER SET -- 5
17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4
18 CREW CAB 1frac12 TON NISSAN 1988 1
19 PASSENGER VAN 15 SEAT NISSAN 2002 2
20 FORKLIFT3 amp 7-12
TONTOYTO 1990 2
21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2
22 SAND BLASTING MACHINE SET GIRACO 1995 3
23 CATHODIC PROTECTION TEST EQUIPMENT
SET -- 1
24 UNDERGROUND PIPE LOCATOR SET -- 2
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMADEMODEL
YEARMAKE
QTYOWNED
25 SOIL COMPACTOR PORTABLE - 1
26 UNDERGROUNG CABEL DETECTOR SET -- 2
27 PIN BRAZING SET -- 3
28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3
29 EXCHANGER BUNDLE PULLER 9 METERS 1
30 BOBCAT 2
31 EXCAVATOR 1
32 MICRO TRENCHER 1
33 VACUUM TRUCK 14 TON NISSAN 1
34 ASPHALT CUTTER 2
35 HIGH PRESSURE HYDRO-JETTING MACHINE
20000 PSI USA 1
36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)
50 KVA 3 way HTU with 3linkable Advantage 3 tempe-
rature programmer cont-rollers and 3 Energy regs
1
SAFETY amp LOSS PREVENTION PROGRAM
Objectives
The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through
Safety meetings and dialoguesdiscussion
Safety Inspection
Enforcement of Establishment safety policies and procedures
Programs Policies and Reports
Weekly Project Manager Safety Meeting
A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences
Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him
Duties and Responsibilities of Safety Inspectors
Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility
Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly
Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents
Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)
QAQC PROGRAM
The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST
Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards
Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients
Quality Procurement Procedure
Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference
A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery
Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage
A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project
Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed
Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications
Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion
As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed
Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement
GOING-ON PROJECTS
CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld
Saudia Ltd MIJAJCO
RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter
Old Makkah Road
JeddahGoing-on
Saudi Electricity Company
ATTS MIJAJCO
Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new
Makkah Power Plant
Going-on
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length
or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-
lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah Going-on
Ministry of Defense
Engineering amp Housing Dept
Jeddah
Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning
Jeddah Going-on
Bashir Ahmed Dost Mohd Used
Lube Oil Re-refining Factory
1) Plot development2)Development of infrastructure for the
factory3)Construction of all underground
concrete tanks of utility4)Fabrication and Installation raw material
storage tanks intermediate storage tanks
Rabigh Going-on
COMPLETED PROJECTS
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Electricity Co Bandariya Intl Co Ltd
MIJAJCO
Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No
Tihama Power Plant
February 2009
Saudi Electricity Co ATTS MIJAJCO
Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant
Najran Power Plant
February 2009
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc
Luberef-1 Jeddah
February 2009
Saudi Bin Laden GroupMIJAJC
O
Construction of Porta-cabin for office unit of the Railway project Haffar Battan
Hafilul Batin
December 2008
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of Existing and Installation of new heat exchanger
Luberef-1 Jeddah
October 2008
SEC Bandariya Intl Co Ltd
MIJAJCO
Re-insertion of rotor and boxing up of everything and run generators Qty 1No
Jazan Power Plant
May 2008
Saudi Electricity Co ATTS MIJAJCO
All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos
Tabuk Power Plant
May 2008
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Mechanical repairing works during emergency shutdown
Removal and reinstallation of 6 nos of fin-fan bundles
Luberef-1 Jeddah
February 2008
Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO
Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah
Jeddah KAIA
November 2007
Saline Water Conversion Corporation
(SWCC)
Dismantling of the structure support and rail of the overhead 30 ton capacity crane
Jeddah October 30 2007
SAFA General Contractors amp Enterprises Co
Ltd MIJAJCO
Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street
Jeddah September 20 2007
Ministry ofDefense Housing amp Planning Dept
Jeddah
Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning
Jeddah August 2007
Saudi Aramco Ashi amp Bushnag Co MIJAJCO
Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco
Saudi Aramco Jeddah Refinery
June 2007
Saudi Electricity Company MIJAJCO
Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment
Al-Qaseem Power Plant
June 2007
Fakieh Poultry Fram
MIJAJCO
Modification and Extension of Hatchery Building
Makkah May 2007
Fakieh Poultry Fram
MIJAJCO
Construction of Labour and staff accommodation Building
Makkah March 2007
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Fakieh Poultry Fram
MIJAJCOExtension of GP Hatchery Makkah April 2007
Fakieh Group MIJAJCO
Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F
Makkah February 2007
SAVOLA Edible oil MIJAJCO
Area Qualification Project (Civil Mechanical and Electrical) at Industrial City
JeddahCompleted December
2006
Ministry of Defense Housing amp Planning Dept
Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work
Jeddah December 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant
2)Tubes modification work on furnace B-3002 during TA of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Electricity CoYusuf Bin A
Kanoo MIJAJCO
Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line
Rabigh Power Plant
October 2006
Saudi Electricity Co Wood
Group MIJAJCO
Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables
Bisha Power Plant
October 2006
SCECOYusuf Bin A Kanoo
MIJAJCO
Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders
Rabigh Power Plant
October 2006
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
ABB Saudi Arabia
MIJAJCO
Servicing amp Site support for 18 MW Generator at Al-Baha
Al-Baha October 2006
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah September 2006
Saudi Electricity Co MIJAJCO
Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)
Bisha Power Plant
December 2005
Saudi Electricity Co MIJAJCO
Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18
Jazan Power Plant
November 2005
Saudi Electricity Co MIJAJCO
Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables
Power Plant -9
November 2005
SCECOAlstom Power
MIJAJCOReplacement of 18 Valve
Shoaiba Power Plant
September 2005
SCECOAlstom Power
MIJAJCO
Hot Tapping of Five Points 2 8 18 20
Shoaiba Power Plant
May 2005
SCECOSAS MIJAJCO
Construction of Site Camp amp Site Office facilities
Shoaiba Power Plant
May 2005
Saudi AramcoAshi Bushnag Co
MIJAJCO
Cable Pulling at Marine Area Jeddah Refinery
Saudi Aramco Jeddah
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Rotted Cables at GT 17
Makkah Power Plant
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Removal of oil and Carbon Heating Stator
Gazlan Power Plant
April 2005
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
SCECOYusuf Bin A Kanoo
MIJAJCO
Repair Cathodic Protection Test Posts PPII amp PPIII
Jeddah Power
Plant II amp III
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Routed Cables at GT 16
Makkah Power Plant
March 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz
Ummlujj Power Plant
February 2005
Redland Industrial
Services Ltd MIJAJCO
Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant
Shuqaiq Desalination Plant
February 2005
Saudi Electricity CoTIG-TESCO
Intl Ltd MIJAJCO
Bolts torquing and life assessment work with flow and retaining rings NDT test
Ghazlan Power Plant
Dammam
February 2005
Alstom GE Shoaiba Power
Plant MIJAJCO
Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant
Shoaiba Power Plant
December 2004
Alstom Shoaiba Power Plant
MIJAJCO
Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants
Shoaiba Power Plant
October 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )
Asir Power Plant
(Abha)
September 2004
Alstom Shoaiba Power Plant
MIJAJCO
Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant
Shoaiba Power Plant
August 2004
Alstom Shoaiba Power Plant MIJAJCO
Replacement of Expansion Joints HFOCO at Shoaiba Power Plant
Shoaiba Power Plant
July 2004
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
Equipment Resources
The following table provides information of related equipment that is available for the work
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL
YEARMAKE
QTYOWNED
1 MOBILE CRANE 35 TON TADANO 1985 1
2 TANKER TRUCK (WATER)10000 amp
19000 GALNISSAN 1990 2
3 BOOM TRUCK 6 TON HINO 1985 1
4 POWER GENERATOR 35 KVA HONDA 1990 3
5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4
6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8
7 WELDING MACHINE ELECTRIC amp PORTABLE
350 AMP LICON 1998 4
8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO
1991 1
9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1
10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO
1990 1
11 DEWATERING PUMP 600 GPM ROBIN 1990 3
12 PIPE THREADING MACHINE UP TO 16INCH
SET RIGID 1994 2
13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2
14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2
15 OXY-ACETYLENE CYLINDER SET -- 1993 8
16 ARGON-NITROGEN CYLINDER SET -- 5
17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4
18 CREW CAB 1frac12 TON NISSAN 1988 1
19 PASSENGER VAN 15 SEAT NISSAN 2002 2
20 FORKLIFT3 amp 7-12
TONTOYTO 1990 2
21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2
22 SAND BLASTING MACHINE SET GIRACO 1995 3
23 CATHODIC PROTECTION TEST EQUIPMENT
SET -- 1
24 UNDERGROUND PIPE LOCATOR SET -- 2
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMADEMODEL
YEARMAKE
QTYOWNED
25 SOIL COMPACTOR PORTABLE - 1
26 UNDERGROUNG CABEL DETECTOR SET -- 2
27 PIN BRAZING SET -- 3
28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3
29 EXCHANGER BUNDLE PULLER 9 METERS 1
30 BOBCAT 2
31 EXCAVATOR 1
32 MICRO TRENCHER 1
33 VACUUM TRUCK 14 TON NISSAN 1
34 ASPHALT CUTTER 2
35 HIGH PRESSURE HYDRO-JETTING MACHINE
20000 PSI USA 1
36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)
50 KVA 3 way HTU with 3linkable Advantage 3 tempe-
rature programmer cont-rollers and 3 Energy regs
1
SAFETY amp LOSS PREVENTION PROGRAM
Objectives
The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through
Safety meetings and dialoguesdiscussion
Safety Inspection
Enforcement of Establishment safety policies and procedures
Programs Policies and Reports
Weekly Project Manager Safety Meeting
A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences
Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him
Duties and Responsibilities of Safety Inspectors
Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility
Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly
Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents
Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)
QAQC PROGRAM
The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST
Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards
Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients
Quality Procurement Procedure
Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference
A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery
Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage
A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project
Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed
Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications
Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion
As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed
Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement
GOING-ON PROJECTS
CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld
Saudia Ltd MIJAJCO
RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter
Old Makkah Road
JeddahGoing-on
Saudi Electricity Company
ATTS MIJAJCO
Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new
Makkah Power Plant
Going-on
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length
or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-
lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah Going-on
Ministry of Defense
Engineering amp Housing Dept
Jeddah
Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning
Jeddah Going-on
Bashir Ahmed Dost Mohd Used
Lube Oil Re-refining Factory
1) Plot development2)Development of infrastructure for the
factory3)Construction of all underground
concrete tanks of utility4)Fabrication and Installation raw material
storage tanks intermediate storage tanks
Rabigh Going-on
COMPLETED PROJECTS
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Electricity Co Bandariya Intl Co Ltd
MIJAJCO
Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No
Tihama Power Plant
February 2009
Saudi Electricity Co ATTS MIJAJCO
Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant
Najran Power Plant
February 2009
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc
Luberef-1 Jeddah
February 2009
Saudi Bin Laden GroupMIJAJC
O
Construction of Porta-cabin for office unit of the Railway project Haffar Battan
Hafilul Batin
December 2008
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of Existing and Installation of new heat exchanger
Luberef-1 Jeddah
October 2008
SEC Bandariya Intl Co Ltd
MIJAJCO
Re-insertion of rotor and boxing up of everything and run generators Qty 1No
Jazan Power Plant
May 2008
Saudi Electricity Co ATTS MIJAJCO
All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos
Tabuk Power Plant
May 2008
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Mechanical repairing works during emergency shutdown
Removal and reinstallation of 6 nos of fin-fan bundles
Luberef-1 Jeddah
February 2008
Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO
Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah
Jeddah KAIA
November 2007
Saline Water Conversion Corporation
(SWCC)
Dismantling of the structure support and rail of the overhead 30 ton capacity crane
Jeddah October 30 2007
SAFA General Contractors amp Enterprises Co
Ltd MIJAJCO
Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street
Jeddah September 20 2007
Ministry ofDefense Housing amp Planning Dept
Jeddah
Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning
Jeddah August 2007
Saudi Aramco Ashi amp Bushnag Co MIJAJCO
Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco
Saudi Aramco Jeddah Refinery
June 2007
Saudi Electricity Company MIJAJCO
Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment
Al-Qaseem Power Plant
June 2007
Fakieh Poultry Fram
MIJAJCO
Modification and Extension of Hatchery Building
Makkah May 2007
Fakieh Poultry Fram
MIJAJCO
Construction of Labour and staff accommodation Building
Makkah March 2007
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Fakieh Poultry Fram
MIJAJCOExtension of GP Hatchery Makkah April 2007
Fakieh Group MIJAJCO
Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F
Makkah February 2007
SAVOLA Edible oil MIJAJCO
Area Qualification Project (Civil Mechanical and Electrical) at Industrial City
JeddahCompleted December
2006
Ministry of Defense Housing amp Planning Dept
Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work
Jeddah December 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant
2)Tubes modification work on furnace B-3002 during TA of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Electricity CoYusuf Bin A
Kanoo MIJAJCO
Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line
Rabigh Power Plant
October 2006
Saudi Electricity Co Wood
Group MIJAJCO
Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables
Bisha Power Plant
October 2006
SCECOYusuf Bin A Kanoo
MIJAJCO
Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders
Rabigh Power Plant
October 2006
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
ABB Saudi Arabia
MIJAJCO
Servicing amp Site support for 18 MW Generator at Al-Baha
Al-Baha October 2006
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah September 2006
Saudi Electricity Co MIJAJCO
Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)
Bisha Power Plant
December 2005
Saudi Electricity Co MIJAJCO
Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18
Jazan Power Plant
November 2005
Saudi Electricity Co MIJAJCO
Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables
Power Plant -9
November 2005
SCECOAlstom Power
MIJAJCOReplacement of 18 Valve
Shoaiba Power Plant
September 2005
SCECOAlstom Power
MIJAJCO
Hot Tapping of Five Points 2 8 18 20
Shoaiba Power Plant
May 2005
SCECOSAS MIJAJCO
Construction of Site Camp amp Site Office facilities
Shoaiba Power Plant
May 2005
Saudi AramcoAshi Bushnag Co
MIJAJCO
Cable Pulling at Marine Area Jeddah Refinery
Saudi Aramco Jeddah
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Rotted Cables at GT 17
Makkah Power Plant
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Removal of oil and Carbon Heating Stator
Gazlan Power Plant
April 2005
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
SCECOYusuf Bin A Kanoo
MIJAJCO
Repair Cathodic Protection Test Posts PPII amp PPIII
Jeddah Power
Plant II amp III
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Routed Cables at GT 16
Makkah Power Plant
March 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz
Ummlujj Power Plant
February 2005
Redland Industrial
Services Ltd MIJAJCO
Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant
Shuqaiq Desalination Plant
February 2005
Saudi Electricity CoTIG-TESCO
Intl Ltd MIJAJCO
Bolts torquing and life assessment work with flow and retaining rings NDT test
Ghazlan Power Plant
Dammam
February 2005
Alstom GE Shoaiba Power
Plant MIJAJCO
Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant
Shoaiba Power Plant
December 2004
Alstom Shoaiba Power Plant
MIJAJCO
Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants
Shoaiba Power Plant
October 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )
Asir Power Plant
(Abha)
September 2004
Alstom Shoaiba Power Plant
MIJAJCO
Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant
Shoaiba Power Plant
August 2004
Alstom Shoaiba Power Plant MIJAJCO
Replacement of Expansion Joints HFOCO at Shoaiba Power Plant
Shoaiba Power Plant
July 2004
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
ITEMNO
EQUIPMENT DESCRIPTION CAPACITYMADEMODEL
YEARMAKE
QTYOWNED
25 SOIL COMPACTOR PORTABLE - 1
26 UNDERGROUNG CABEL DETECTOR SET -- 2
27 PIN BRAZING SET -- 3
28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3
29 EXCHANGER BUNDLE PULLER 9 METERS 1
30 BOBCAT 2
31 EXCAVATOR 1
32 MICRO TRENCHER 1
33 VACUUM TRUCK 14 TON NISSAN 1
34 ASPHALT CUTTER 2
35 HIGH PRESSURE HYDRO-JETTING MACHINE
20000 PSI USA 1
36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)
50 KVA 3 way HTU with 3linkable Advantage 3 tempe-
rature programmer cont-rollers and 3 Energy regs
1
SAFETY amp LOSS PREVENTION PROGRAM
Objectives
The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through
Safety meetings and dialoguesdiscussion
Safety Inspection
Enforcement of Establishment safety policies and procedures
Programs Policies and Reports
Weekly Project Manager Safety Meeting
A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences
Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him
Duties and Responsibilities of Safety Inspectors
Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility
Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly
Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents
Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)
QAQC PROGRAM
The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST
Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards
Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients
Quality Procurement Procedure
Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference
A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery
Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage
A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project
Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed
Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications
Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion
As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed
Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement
GOING-ON PROJECTS
CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld
Saudia Ltd MIJAJCO
RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter
Old Makkah Road
JeddahGoing-on
Saudi Electricity Company
ATTS MIJAJCO
Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new
Makkah Power Plant
Going-on
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length
or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-
lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah Going-on
Ministry of Defense
Engineering amp Housing Dept
Jeddah
Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning
Jeddah Going-on
Bashir Ahmed Dost Mohd Used
Lube Oil Re-refining Factory
1) Plot development2)Development of infrastructure for the
factory3)Construction of all underground
concrete tanks of utility4)Fabrication and Installation raw material
storage tanks intermediate storage tanks
Rabigh Going-on
COMPLETED PROJECTS
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Electricity Co Bandariya Intl Co Ltd
MIJAJCO
Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No
Tihama Power Plant
February 2009
Saudi Electricity Co ATTS MIJAJCO
Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant
Najran Power Plant
February 2009
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc
Luberef-1 Jeddah
February 2009
Saudi Bin Laden GroupMIJAJC
O
Construction of Porta-cabin for office unit of the Railway project Haffar Battan
Hafilul Batin
December 2008
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of Existing and Installation of new heat exchanger
Luberef-1 Jeddah
October 2008
SEC Bandariya Intl Co Ltd
MIJAJCO
Re-insertion of rotor and boxing up of everything and run generators Qty 1No
Jazan Power Plant
May 2008
Saudi Electricity Co ATTS MIJAJCO
All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos
Tabuk Power Plant
May 2008
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Mechanical repairing works during emergency shutdown
Removal and reinstallation of 6 nos of fin-fan bundles
Luberef-1 Jeddah
February 2008
Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO
Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah
Jeddah KAIA
November 2007
Saline Water Conversion Corporation
(SWCC)
Dismantling of the structure support and rail of the overhead 30 ton capacity crane
Jeddah October 30 2007
SAFA General Contractors amp Enterprises Co
Ltd MIJAJCO
Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street
Jeddah September 20 2007
Ministry ofDefense Housing amp Planning Dept
Jeddah
Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning
Jeddah August 2007
Saudi Aramco Ashi amp Bushnag Co MIJAJCO
Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco
Saudi Aramco Jeddah Refinery
June 2007
Saudi Electricity Company MIJAJCO
Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment
Al-Qaseem Power Plant
June 2007
Fakieh Poultry Fram
MIJAJCO
Modification and Extension of Hatchery Building
Makkah May 2007
Fakieh Poultry Fram
MIJAJCO
Construction of Labour and staff accommodation Building
Makkah March 2007
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Fakieh Poultry Fram
MIJAJCOExtension of GP Hatchery Makkah April 2007
Fakieh Group MIJAJCO
Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F
Makkah February 2007
SAVOLA Edible oil MIJAJCO
Area Qualification Project (Civil Mechanical and Electrical) at Industrial City
JeddahCompleted December
2006
Ministry of Defense Housing amp Planning Dept
Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work
Jeddah December 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant
2)Tubes modification work on furnace B-3002 during TA of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Electricity CoYusuf Bin A
Kanoo MIJAJCO
Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line
Rabigh Power Plant
October 2006
Saudi Electricity Co Wood
Group MIJAJCO
Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables
Bisha Power Plant
October 2006
SCECOYusuf Bin A Kanoo
MIJAJCO
Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders
Rabigh Power Plant
October 2006
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
ABB Saudi Arabia
MIJAJCO
Servicing amp Site support for 18 MW Generator at Al-Baha
Al-Baha October 2006
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah September 2006
Saudi Electricity Co MIJAJCO
Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)
Bisha Power Plant
December 2005
Saudi Electricity Co MIJAJCO
Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18
Jazan Power Plant
November 2005
Saudi Electricity Co MIJAJCO
Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables
Power Plant -9
November 2005
SCECOAlstom Power
MIJAJCOReplacement of 18 Valve
Shoaiba Power Plant
September 2005
SCECOAlstom Power
MIJAJCO
Hot Tapping of Five Points 2 8 18 20
Shoaiba Power Plant
May 2005
SCECOSAS MIJAJCO
Construction of Site Camp amp Site Office facilities
Shoaiba Power Plant
May 2005
Saudi AramcoAshi Bushnag Co
MIJAJCO
Cable Pulling at Marine Area Jeddah Refinery
Saudi Aramco Jeddah
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Rotted Cables at GT 17
Makkah Power Plant
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Removal of oil and Carbon Heating Stator
Gazlan Power Plant
April 2005
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
SCECOYusuf Bin A Kanoo
MIJAJCO
Repair Cathodic Protection Test Posts PPII amp PPIII
Jeddah Power
Plant II amp III
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Routed Cables at GT 16
Makkah Power Plant
March 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz
Ummlujj Power Plant
February 2005
Redland Industrial
Services Ltd MIJAJCO
Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant
Shuqaiq Desalination Plant
February 2005
Saudi Electricity CoTIG-TESCO
Intl Ltd MIJAJCO
Bolts torquing and life assessment work with flow and retaining rings NDT test
Ghazlan Power Plant
Dammam
February 2005
Alstom GE Shoaiba Power
Plant MIJAJCO
Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant
Shoaiba Power Plant
December 2004
Alstom Shoaiba Power Plant
MIJAJCO
Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants
Shoaiba Power Plant
October 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )
Asir Power Plant
(Abha)
September 2004
Alstom Shoaiba Power Plant
MIJAJCO
Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant
Shoaiba Power Plant
August 2004
Alstom Shoaiba Power Plant MIJAJCO
Replacement of Expansion Joints HFOCO at Shoaiba Power Plant
Shoaiba Power Plant
July 2004
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
SAFETY amp LOSS PREVENTION PROGRAM
Objectives
The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through
Safety meetings and dialoguesdiscussion
Safety Inspection
Enforcement of Establishment safety policies and procedures
Programs Policies and Reports
Weekly Project Manager Safety Meeting
A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences
Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him
Duties and Responsibilities of Safety Inspectors
Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility
Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly
Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents
Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)
QAQC PROGRAM
The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST
Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards
Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients
Quality Procurement Procedure
Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference
A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery
Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage
A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project
Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed
Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications
Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion
As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed
Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement
GOING-ON PROJECTS
CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld
Saudia Ltd MIJAJCO
RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter
Old Makkah Road
JeddahGoing-on
Saudi Electricity Company
ATTS MIJAJCO
Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new
Makkah Power Plant
Going-on
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length
or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-
lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah Going-on
Ministry of Defense
Engineering amp Housing Dept
Jeddah
Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning
Jeddah Going-on
Bashir Ahmed Dost Mohd Used
Lube Oil Re-refining Factory
1) Plot development2)Development of infrastructure for the
factory3)Construction of all underground
concrete tanks of utility4)Fabrication and Installation raw material
storage tanks intermediate storage tanks
Rabigh Going-on
COMPLETED PROJECTS
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Electricity Co Bandariya Intl Co Ltd
MIJAJCO
Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No
Tihama Power Plant
February 2009
Saudi Electricity Co ATTS MIJAJCO
Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant
Najran Power Plant
February 2009
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc
Luberef-1 Jeddah
February 2009
Saudi Bin Laden GroupMIJAJC
O
Construction of Porta-cabin for office unit of the Railway project Haffar Battan
Hafilul Batin
December 2008
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of Existing and Installation of new heat exchanger
Luberef-1 Jeddah
October 2008
SEC Bandariya Intl Co Ltd
MIJAJCO
Re-insertion of rotor and boxing up of everything and run generators Qty 1No
Jazan Power Plant
May 2008
Saudi Electricity Co ATTS MIJAJCO
All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos
Tabuk Power Plant
May 2008
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Mechanical repairing works during emergency shutdown
Removal and reinstallation of 6 nos of fin-fan bundles
Luberef-1 Jeddah
February 2008
Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO
Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah
Jeddah KAIA
November 2007
Saline Water Conversion Corporation
(SWCC)
Dismantling of the structure support and rail of the overhead 30 ton capacity crane
Jeddah October 30 2007
SAFA General Contractors amp Enterprises Co
Ltd MIJAJCO
Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street
Jeddah September 20 2007
Ministry ofDefense Housing amp Planning Dept
Jeddah
Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning
Jeddah August 2007
Saudi Aramco Ashi amp Bushnag Co MIJAJCO
Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco
Saudi Aramco Jeddah Refinery
June 2007
Saudi Electricity Company MIJAJCO
Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment
Al-Qaseem Power Plant
June 2007
Fakieh Poultry Fram
MIJAJCO
Modification and Extension of Hatchery Building
Makkah May 2007
Fakieh Poultry Fram
MIJAJCO
Construction of Labour and staff accommodation Building
Makkah March 2007
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Fakieh Poultry Fram
MIJAJCOExtension of GP Hatchery Makkah April 2007
Fakieh Group MIJAJCO
Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F
Makkah February 2007
SAVOLA Edible oil MIJAJCO
Area Qualification Project (Civil Mechanical and Electrical) at Industrial City
JeddahCompleted December
2006
Ministry of Defense Housing amp Planning Dept
Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work
Jeddah December 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant
2)Tubes modification work on furnace B-3002 during TA of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Electricity CoYusuf Bin A
Kanoo MIJAJCO
Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line
Rabigh Power Plant
October 2006
Saudi Electricity Co Wood
Group MIJAJCO
Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables
Bisha Power Plant
October 2006
SCECOYusuf Bin A Kanoo
MIJAJCO
Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders
Rabigh Power Plant
October 2006
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
ABB Saudi Arabia
MIJAJCO
Servicing amp Site support for 18 MW Generator at Al-Baha
Al-Baha October 2006
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah September 2006
Saudi Electricity Co MIJAJCO
Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)
Bisha Power Plant
December 2005
Saudi Electricity Co MIJAJCO
Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18
Jazan Power Plant
November 2005
Saudi Electricity Co MIJAJCO
Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables
Power Plant -9
November 2005
SCECOAlstom Power
MIJAJCOReplacement of 18 Valve
Shoaiba Power Plant
September 2005
SCECOAlstom Power
MIJAJCO
Hot Tapping of Five Points 2 8 18 20
Shoaiba Power Plant
May 2005
SCECOSAS MIJAJCO
Construction of Site Camp amp Site Office facilities
Shoaiba Power Plant
May 2005
Saudi AramcoAshi Bushnag Co
MIJAJCO
Cable Pulling at Marine Area Jeddah Refinery
Saudi Aramco Jeddah
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Rotted Cables at GT 17
Makkah Power Plant
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Removal of oil and Carbon Heating Stator
Gazlan Power Plant
April 2005
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
SCECOYusuf Bin A Kanoo
MIJAJCO
Repair Cathodic Protection Test Posts PPII amp PPIII
Jeddah Power
Plant II amp III
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Routed Cables at GT 16
Makkah Power Plant
March 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz
Ummlujj Power Plant
February 2005
Redland Industrial
Services Ltd MIJAJCO
Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant
Shuqaiq Desalination Plant
February 2005
Saudi Electricity CoTIG-TESCO
Intl Ltd MIJAJCO
Bolts torquing and life assessment work with flow and retaining rings NDT test
Ghazlan Power Plant
Dammam
February 2005
Alstom GE Shoaiba Power
Plant MIJAJCO
Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant
Shoaiba Power Plant
December 2004
Alstom Shoaiba Power Plant
MIJAJCO
Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants
Shoaiba Power Plant
October 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )
Asir Power Plant
(Abha)
September 2004
Alstom Shoaiba Power Plant
MIJAJCO
Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant
Shoaiba Power Plant
August 2004
Alstom Shoaiba Power Plant MIJAJCO
Replacement of Expansion Joints HFOCO at Shoaiba Power Plant
Shoaiba Power Plant
July 2004
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
Duties and Responsibilities of Safety Inspectors
Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility
Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly
Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents
Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)
QAQC PROGRAM
The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST
Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards
Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients
Quality Procurement Procedure
Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference
A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery
Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage
A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project
Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed
Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications
Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion
As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed
Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement
GOING-ON PROJECTS
CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld
Saudia Ltd MIJAJCO
RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter
Old Makkah Road
JeddahGoing-on
Saudi Electricity Company
ATTS MIJAJCO
Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new
Makkah Power Plant
Going-on
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length
or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-
lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah Going-on
Ministry of Defense
Engineering amp Housing Dept
Jeddah
Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning
Jeddah Going-on
Bashir Ahmed Dost Mohd Used
Lube Oil Re-refining Factory
1) Plot development2)Development of infrastructure for the
factory3)Construction of all underground
concrete tanks of utility4)Fabrication and Installation raw material
storage tanks intermediate storage tanks
Rabigh Going-on
COMPLETED PROJECTS
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Electricity Co Bandariya Intl Co Ltd
MIJAJCO
Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No
Tihama Power Plant
February 2009
Saudi Electricity Co ATTS MIJAJCO
Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant
Najran Power Plant
February 2009
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc
Luberef-1 Jeddah
February 2009
Saudi Bin Laden GroupMIJAJC
O
Construction of Porta-cabin for office unit of the Railway project Haffar Battan
Hafilul Batin
December 2008
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of Existing and Installation of new heat exchanger
Luberef-1 Jeddah
October 2008
SEC Bandariya Intl Co Ltd
MIJAJCO
Re-insertion of rotor and boxing up of everything and run generators Qty 1No
Jazan Power Plant
May 2008
Saudi Electricity Co ATTS MIJAJCO
All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos
Tabuk Power Plant
May 2008
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Mechanical repairing works during emergency shutdown
Removal and reinstallation of 6 nos of fin-fan bundles
Luberef-1 Jeddah
February 2008
Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO
Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah
Jeddah KAIA
November 2007
Saline Water Conversion Corporation
(SWCC)
Dismantling of the structure support and rail of the overhead 30 ton capacity crane
Jeddah October 30 2007
SAFA General Contractors amp Enterprises Co
Ltd MIJAJCO
Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street
Jeddah September 20 2007
Ministry ofDefense Housing amp Planning Dept
Jeddah
Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning
Jeddah August 2007
Saudi Aramco Ashi amp Bushnag Co MIJAJCO
Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco
Saudi Aramco Jeddah Refinery
June 2007
Saudi Electricity Company MIJAJCO
Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment
Al-Qaseem Power Plant
June 2007
Fakieh Poultry Fram
MIJAJCO
Modification and Extension of Hatchery Building
Makkah May 2007
Fakieh Poultry Fram
MIJAJCO
Construction of Labour and staff accommodation Building
Makkah March 2007
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Fakieh Poultry Fram
MIJAJCOExtension of GP Hatchery Makkah April 2007
Fakieh Group MIJAJCO
Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F
Makkah February 2007
SAVOLA Edible oil MIJAJCO
Area Qualification Project (Civil Mechanical and Electrical) at Industrial City
JeddahCompleted December
2006
Ministry of Defense Housing amp Planning Dept
Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work
Jeddah December 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant
2)Tubes modification work on furnace B-3002 during TA of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Electricity CoYusuf Bin A
Kanoo MIJAJCO
Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line
Rabigh Power Plant
October 2006
Saudi Electricity Co Wood
Group MIJAJCO
Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables
Bisha Power Plant
October 2006
SCECOYusuf Bin A Kanoo
MIJAJCO
Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders
Rabigh Power Plant
October 2006
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
ABB Saudi Arabia
MIJAJCO
Servicing amp Site support for 18 MW Generator at Al-Baha
Al-Baha October 2006
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah September 2006
Saudi Electricity Co MIJAJCO
Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)
Bisha Power Plant
December 2005
Saudi Electricity Co MIJAJCO
Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18
Jazan Power Plant
November 2005
Saudi Electricity Co MIJAJCO
Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables
Power Plant -9
November 2005
SCECOAlstom Power
MIJAJCOReplacement of 18 Valve
Shoaiba Power Plant
September 2005
SCECOAlstom Power
MIJAJCO
Hot Tapping of Five Points 2 8 18 20
Shoaiba Power Plant
May 2005
SCECOSAS MIJAJCO
Construction of Site Camp amp Site Office facilities
Shoaiba Power Plant
May 2005
Saudi AramcoAshi Bushnag Co
MIJAJCO
Cable Pulling at Marine Area Jeddah Refinery
Saudi Aramco Jeddah
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Rotted Cables at GT 17
Makkah Power Plant
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Removal of oil and Carbon Heating Stator
Gazlan Power Plant
April 2005
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
SCECOYusuf Bin A Kanoo
MIJAJCO
Repair Cathodic Protection Test Posts PPII amp PPIII
Jeddah Power
Plant II amp III
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Routed Cables at GT 16
Makkah Power Plant
March 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz
Ummlujj Power Plant
February 2005
Redland Industrial
Services Ltd MIJAJCO
Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant
Shuqaiq Desalination Plant
February 2005
Saudi Electricity CoTIG-TESCO
Intl Ltd MIJAJCO
Bolts torquing and life assessment work with flow and retaining rings NDT test
Ghazlan Power Plant
Dammam
February 2005
Alstom GE Shoaiba Power
Plant MIJAJCO
Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant
Shoaiba Power Plant
December 2004
Alstom Shoaiba Power Plant
MIJAJCO
Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants
Shoaiba Power Plant
October 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )
Asir Power Plant
(Abha)
September 2004
Alstom Shoaiba Power Plant
MIJAJCO
Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant
Shoaiba Power Plant
August 2004
Alstom Shoaiba Power Plant MIJAJCO
Replacement of Expansion Joints HFOCO at Shoaiba Power Plant
Shoaiba Power Plant
July 2004
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage
A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project
Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed
Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications
Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion
As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed
Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement
GOING-ON PROJECTS
CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld
Saudia Ltd MIJAJCO
RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter
Old Makkah Road
JeddahGoing-on
Saudi Electricity Company
ATTS MIJAJCO
Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new
Makkah Power Plant
Going-on
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length
or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-
lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah Going-on
Ministry of Defense
Engineering amp Housing Dept
Jeddah
Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning
Jeddah Going-on
Bashir Ahmed Dost Mohd Used
Lube Oil Re-refining Factory
1) Plot development2)Development of infrastructure for the
factory3)Construction of all underground
concrete tanks of utility4)Fabrication and Installation raw material
storage tanks intermediate storage tanks
Rabigh Going-on
COMPLETED PROJECTS
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Electricity Co Bandariya Intl Co Ltd
MIJAJCO
Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No
Tihama Power Plant
February 2009
Saudi Electricity Co ATTS MIJAJCO
Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant
Najran Power Plant
February 2009
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc
Luberef-1 Jeddah
February 2009
Saudi Bin Laden GroupMIJAJC
O
Construction of Porta-cabin for office unit of the Railway project Haffar Battan
Hafilul Batin
December 2008
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of Existing and Installation of new heat exchanger
Luberef-1 Jeddah
October 2008
SEC Bandariya Intl Co Ltd
MIJAJCO
Re-insertion of rotor and boxing up of everything and run generators Qty 1No
Jazan Power Plant
May 2008
Saudi Electricity Co ATTS MIJAJCO
All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos
Tabuk Power Plant
May 2008
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Mechanical repairing works during emergency shutdown
Removal and reinstallation of 6 nos of fin-fan bundles
Luberef-1 Jeddah
February 2008
Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO
Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah
Jeddah KAIA
November 2007
Saline Water Conversion Corporation
(SWCC)
Dismantling of the structure support and rail of the overhead 30 ton capacity crane
Jeddah October 30 2007
SAFA General Contractors amp Enterprises Co
Ltd MIJAJCO
Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street
Jeddah September 20 2007
Ministry ofDefense Housing amp Planning Dept
Jeddah
Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning
Jeddah August 2007
Saudi Aramco Ashi amp Bushnag Co MIJAJCO
Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco
Saudi Aramco Jeddah Refinery
June 2007
Saudi Electricity Company MIJAJCO
Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment
Al-Qaseem Power Plant
June 2007
Fakieh Poultry Fram
MIJAJCO
Modification and Extension of Hatchery Building
Makkah May 2007
Fakieh Poultry Fram
MIJAJCO
Construction of Labour and staff accommodation Building
Makkah March 2007
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Fakieh Poultry Fram
MIJAJCOExtension of GP Hatchery Makkah April 2007
Fakieh Group MIJAJCO
Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F
Makkah February 2007
SAVOLA Edible oil MIJAJCO
Area Qualification Project (Civil Mechanical and Electrical) at Industrial City
JeddahCompleted December
2006
Ministry of Defense Housing amp Planning Dept
Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work
Jeddah December 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant
2)Tubes modification work on furnace B-3002 during TA of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Electricity CoYusuf Bin A
Kanoo MIJAJCO
Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line
Rabigh Power Plant
October 2006
Saudi Electricity Co Wood
Group MIJAJCO
Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables
Bisha Power Plant
October 2006
SCECOYusuf Bin A Kanoo
MIJAJCO
Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders
Rabigh Power Plant
October 2006
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
ABB Saudi Arabia
MIJAJCO
Servicing amp Site support for 18 MW Generator at Al-Baha
Al-Baha October 2006
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah September 2006
Saudi Electricity Co MIJAJCO
Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)
Bisha Power Plant
December 2005
Saudi Electricity Co MIJAJCO
Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18
Jazan Power Plant
November 2005
Saudi Electricity Co MIJAJCO
Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables
Power Plant -9
November 2005
SCECOAlstom Power
MIJAJCOReplacement of 18 Valve
Shoaiba Power Plant
September 2005
SCECOAlstom Power
MIJAJCO
Hot Tapping of Five Points 2 8 18 20
Shoaiba Power Plant
May 2005
SCECOSAS MIJAJCO
Construction of Site Camp amp Site Office facilities
Shoaiba Power Plant
May 2005
Saudi AramcoAshi Bushnag Co
MIJAJCO
Cable Pulling at Marine Area Jeddah Refinery
Saudi Aramco Jeddah
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Rotted Cables at GT 17
Makkah Power Plant
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Removal of oil and Carbon Heating Stator
Gazlan Power Plant
April 2005
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
SCECOYusuf Bin A Kanoo
MIJAJCO
Repair Cathodic Protection Test Posts PPII amp PPIII
Jeddah Power
Plant II amp III
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Routed Cables at GT 16
Makkah Power Plant
March 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz
Ummlujj Power Plant
February 2005
Redland Industrial
Services Ltd MIJAJCO
Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant
Shuqaiq Desalination Plant
February 2005
Saudi Electricity CoTIG-TESCO
Intl Ltd MIJAJCO
Bolts torquing and life assessment work with flow and retaining rings NDT test
Ghazlan Power Plant
Dammam
February 2005
Alstom GE Shoaiba Power
Plant MIJAJCO
Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant
Shoaiba Power Plant
December 2004
Alstom Shoaiba Power Plant
MIJAJCO
Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants
Shoaiba Power Plant
October 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )
Asir Power Plant
(Abha)
September 2004
Alstom Shoaiba Power Plant
MIJAJCO
Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant
Shoaiba Power Plant
August 2004
Alstom Shoaiba Power Plant MIJAJCO
Replacement of Expansion Joints HFOCO at Shoaiba Power Plant
Shoaiba Power Plant
July 2004
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
GOING-ON PROJECTS
CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld
Saudia Ltd MIJAJCO
RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter
Old Makkah Road
JeddahGoing-on
Saudi Electricity Company
ATTS MIJAJCO
Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new
Makkah Power Plant
Going-on
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length
or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-
lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah Going-on
Ministry of Defense
Engineering amp Housing Dept
Jeddah
Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning
Jeddah Going-on
Bashir Ahmed Dost Mohd Used
Lube Oil Re-refining Factory
1) Plot development2)Development of infrastructure for the
factory3)Construction of all underground
concrete tanks of utility4)Fabrication and Installation raw material
storage tanks intermediate storage tanks
Rabigh Going-on
COMPLETED PROJECTS
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Electricity Co Bandariya Intl Co Ltd
MIJAJCO
Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No
Tihama Power Plant
February 2009
Saudi Electricity Co ATTS MIJAJCO
Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant
Najran Power Plant
February 2009
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc
Luberef-1 Jeddah
February 2009
Saudi Bin Laden GroupMIJAJC
O
Construction of Porta-cabin for office unit of the Railway project Haffar Battan
Hafilul Batin
December 2008
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of Existing and Installation of new heat exchanger
Luberef-1 Jeddah
October 2008
SEC Bandariya Intl Co Ltd
MIJAJCO
Re-insertion of rotor and boxing up of everything and run generators Qty 1No
Jazan Power Plant
May 2008
Saudi Electricity Co ATTS MIJAJCO
All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos
Tabuk Power Plant
May 2008
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Mechanical repairing works during emergency shutdown
Removal and reinstallation of 6 nos of fin-fan bundles
Luberef-1 Jeddah
February 2008
Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO
Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah
Jeddah KAIA
November 2007
Saline Water Conversion Corporation
(SWCC)
Dismantling of the structure support and rail of the overhead 30 ton capacity crane
Jeddah October 30 2007
SAFA General Contractors amp Enterprises Co
Ltd MIJAJCO
Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street
Jeddah September 20 2007
Ministry ofDefense Housing amp Planning Dept
Jeddah
Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning
Jeddah August 2007
Saudi Aramco Ashi amp Bushnag Co MIJAJCO
Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco
Saudi Aramco Jeddah Refinery
June 2007
Saudi Electricity Company MIJAJCO
Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment
Al-Qaseem Power Plant
June 2007
Fakieh Poultry Fram
MIJAJCO
Modification and Extension of Hatchery Building
Makkah May 2007
Fakieh Poultry Fram
MIJAJCO
Construction of Labour and staff accommodation Building
Makkah March 2007
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Fakieh Poultry Fram
MIJAJCOExtension of GP Hatchery Makkah April 2007
Fakieh Group MIJAJCO
Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F
Makkah February 2007
SAVOLA Edible oil MIJAJCO
Area Qualification Project (Civil Mechanical and Electrical) at Industrial City
JeddahCompleted December
2006
Ministry of Defense Housing amp Planning Dept
Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work
Jeddah December 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant
2)Tubes modification work on furnace B-3002 during TA of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Electricity CoYusuf Bin A
Kanoo MIJAJCO
Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line
Rabigh Power Plant
October 2006
Saudi Electricity Co Wood
Group MIJAJCO
Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables
Bisha Power Plant
October 2006
SCECOYusuf Bin A Kanoo
MIJAJCO
Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders
Rabigh Power Plant
October 2006
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
ABB Saudi Arabia
MIJAJCO
Servicing amp Site support for 18 MW Generator at Al-Baha
Al-Baha October 2006
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah September 2006
Saudi Electricity Co MIJAJCO
Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)
Bisha Power Plant
December 2005
Saudi Electricity Co MIJAJCO
Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18
Jazan Power Plant
November 2005
Saudi Electricity Co MIJAJCO
Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables
Power Plant -9
November 2005
SCECOAlstom Power
MIJAJCOReplacement of 18 Valve
Shoaiba Power Plant
September 2005
SCECOAlstom Power
MIJAJCO
Hot Tapping of Five Points 2 8 18 20
Shoaiba Power Plant
May 2005
SCECOSAS MIJAJCO
Construction of Site Camp amp Site Office facilities
Shoaiba Power Plant
May 2005
Saudi AramcoAshi Bushnag Co
MIJAJCO
Cable Pulling at Marine Area Jeddah Refinery
Saudi Aramco Jeddah
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Rotted Cables at GT 17
Makkah Power Plant
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Removal of oil and Carbon Heating Stator
Gazlan Power Plant
April 2005
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
SCECOYusuf Bin A Kanoo
MIJAJCO
Repair Cathodic Protection Test Posts PPII amp PPIII
Jeddah Power
Plant II amp III
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Routed Cables at GT 16
Makkah Power Plant
March 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz
Ummlujj Power Plant
February 2005
Redland Industrial
Services Ltd MIJAJCO
Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant
Shuqaiq Desalination Plant
February 2005
Saudi Electricity CoTIG-TESCO
Intl Ltd MIJAJCO
Bolts torquing and life assessment work with flow and retaining rings NDT test
Ghazlan Power Plant
Dammam
February 2005
Alstom GE Shoaiba Power
Plant MIJAJCO
Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant
Shoaiba Power Plant
December 2004
Alstom Shoaiba Power Plant
MIJAJCO
Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants
Shoaiba Power Plant
October 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )
Asir Power Plant
(Abha)
September 2004
Alstom Shoaiba Power Plant
MIJAJCO
Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant
Shoaiba Power Plant
August 2004
Alstom Shoaiba Power Plant MIJAJCO
Replacement of Expansion Joints HFOCO at Shoaiba Power Plant
Shoaiba Power Plant
July 2004
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
COMPLETED PROJECTS
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Electricity Co Bandariya Intl Co Ltd
MIJAJCO
Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No
Tihama Power Plant
February 2009
Saudi Electricity Co ATTS MIJAJCO
Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant
Najran Power Plant
February 2009
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc
Luberef-1 Jeddah
February 2009
Saudi Bin Laden GroupMIJAJC
O
Construction of Porta-cabin for office unit of the Railway project Haffar Battan
Hafilul Batin
December 2008
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of Existing and Installation of new heat exchanger
Luberef-1 Jeddah
October 2008
SEC Bandariya Intl Co Ltd
MIJAJCO
Re-insertion of rotor and boxing up of everything and run generators Qty 1No
Jazan Power Plant
May 2008
Saudi Electricity Co ATTS MIJAJCO
All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos
Tabuk Power Plant
May 2008
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Mechanical repairing works during emergency shutdown
Removal and reinstallation of 6 nos of fin-fan bundles
Luberef-1 Jeddah
February 2008
Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO
Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah
Jeddah KAIA
November 2007
Saline Water Conversion Corporation
(SWCC)
Dismantling of the structure support and rail of the overhead 30 ton capacity crane
Jeddah October 30 2007
SAFA General Contractors amp Enterprises Co
Ltd MIJAJCO
Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street
Jeddah September 20 2007
Ministry ofDefense Housing amp Planning Dept
Jeddah
Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning
Jeddah August 2007
Saudi Aramco Ashi amp Bushnag Co MIJAJCO
Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco
Saudi Aramco Jeddah Refinery
June 2007
Saudi Electricity Company MIJAJCO
Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment
Al-Qaseem Power Plant
June 2007
Fakieh Poultry Fram
MIJAJCO
Modification and Extension of Hatchery Building
Makkah May 2007
Fakieh Poultry Fram
MIJAJCO
Construction of Labour and staff accommodation Building
Makkah March 2007
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Fakieh Poultry Fram
MIJAJCOExtension of GP Hatchery Makkah April 2007
Fakieh Group MIJAJCO
Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F
Makkah February 2007
SAVOLA Edible oil MIJAJCO
Area Qualification Project (Civil Mechanical and Electrical) at Industrial City
JeddahCompleted December
2006
Ministry of Defense Housing amp Planning Dept
Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work
Jeddah December 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant
2)Tubes modification work on furnace B-3002 during TA of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Electricity CoYusuf Bin A
Kanoo MIJAJCO
Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line
Rabigh Power Plant
October 2006
Saudi Electricity Co Wood
Group MIJAJCO
Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables
Bisha Power Plant
October 2006
SCECOYusuf Bin A Kanoo
MIJAJCO
Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders
Rabigh Power Plant
October 2006
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
ABB Saudi Arabia
MIJAJCO
Servicing amp Site support for 18 MW Generator at Al-Baha
Al-Baha October 2006
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah September 2006
Saudi Electricity Co MIJAJCO
Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)
Bisha Power Plant
December 2005
Saudi Electricity Co MIJAJCO
Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18
Jazan Power Plant
November 2005
Saudi Electricity Co MIJAJCO
Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables
Power Plant -9
November 2005
SCECOAlstom Power
MIJAJCOReplacement of 18 Valve
Shoaiba Power Plant
September 2005
SCECOAlstom Power
MIJAJCO
Hot Tapping of Five Points 2 8 18 20
Shoaiba Power Plant
May 2005
SCECOSAS MIJAJCO
Construction of Site Camp amp Site Office facilities
Shoaiba Power Plant
May 2005
Saudi AramcoAshi Bushnag Co
MIJAJCO
Cable Pulling at Marine Area Jeddah Refinery
Saudi Aramco Jeddah
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Rotted Cables at GT 17
Makkah Power Plant
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Removal of oil and Carbon Heating Stator
Gazlan Power Plant
April 2005
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
SCECOYusuf Bin A Kanoo
MIJAJCO
Repair Cathodic Protection Test Posts PPII amp PPIII
Jeddah Power
Plant II amp III
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Routed Cables at GT 16
Makkah Power Plant
March 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz
Ummlujj Power Plant
February 2005
Redland Industrial
Services Ltd MIJAJCO
Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant
Shuqaiq Desalination Plant
February 2005
Saudi Electricity CoTIG-TESCO
Intl Ltd MIJAJCO
Bolts torquing and life assessment work with flow and retaining rings NDT test
Ghazlan Power Plant
Dammam
February 2005
Alstom GE Shoaiba Power
Plant MIJAJCO
Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant
Shoaiba Power Plant
December 2004
Alstom Shoaiba Power Plant
MIJAJCO
Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants
Shoaiba Power Plant
October 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )
Asir Power Plant
(Abha)
September 2004
Alstom Shoaiba Power Plant
MIJAJCO
Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant
Shoaiba Power Plant
August 2004
Alstom Shoaiba Power Plant MIJAJCO
Replacement of Expansion Joints HFOCO at Shoaiba Power Plant
Shoaiba Power Plant
July 2004
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Mechanical repairing works during emergency shutdown
Removal and reinstallation of 6 nos of fin-fan bundles
Luberef-1 Jeddah
February 2008
Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO
Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah
Jeddah KAIA
November 2007
Saline Water Conversion Corporation
(SWCC)
Dismantling of the structure support and rail of the overhead 30 ton capacity crane
Jeddah October 30 2007
SAFA General Contractors amp Enterprises Co
Ltd MIJAJCO
Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street
Jeddah September 20 2007
Ministry ofDefense Housing amp Planning Dept
Jeddah
Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning
Jeddah August 2007
Saudi Aramco Ashi amp Bushnag Co MIJAJCO
Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco
Saudi Aramco Jeddah Refinery
June 2007
Saudi Electricity Company MIJAJCO
Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment
Al-Qaseem Power Plant
June 2007
Fakieh Poultry Fram
MIJAJCO
Modification and Extension of Hatchery Building
Makkah May 2007
Fakieh Poultry Fram
MIJAJCO
Construction of Labour and staff accommodation Building
Makkah March 2007
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Fakieh Poultry Fram
MIJAJCOExtension of GP Hatchery Makkah April 2007
Fakieh Group MIJAJCO
Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F
Makkah February 2007
SAVOLA Edible oil MIJAJCO
Area Qualification Project (Civil Mechanical and Electrical) at Industrial City
JeddahCompleted December
2006
Ministry of Defense Housing amp Planning Dept
Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work
Jeddah December 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant
2)Tubes modification work on furnace B-3002 during TA of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Electricity CoYusuf Bin A
Kanoo MIJAJCO
Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line
Rabigh Power Plant
October 2006
Saudi Electricity Co Wood
Group MIJAJCO
Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables
Bisha Power Plant
October 2006
SCECOYusuf Bin A Kanoo
MIJAJCO
Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders
Rabigh Power Plant
October 2006
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
ABB Saudi Arabia
MIJAJCO
Servicing amp Site support for 18 MW Generator at Al-Baha
Al-Baha October 2006
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah September 2006
Saudi Electricity Co MIJAJCO
Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)
Bisha Power Plant
December 2005
Saudi Electricity Co MIJAJCO
Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18
Jazan Power Plant
November 2005
Saudi Electricity Co MIJAJCO
Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables
Power Plant -9
November 2005
SCECOAlstom Power
MIJAJCOReplacement of 18 Valve
Shoaiba Power Plant
September 2005
SCECOAlstom Power
MIJAJCO
Hot Tapping of Five Points 2 8 18 20
Shoaiba Power Plant
May 2005
SCECOSAS MIJAJCO
Construction of Site Camp amp Site Office facilities
Shoaiba Power Plant
May 2005
Saudi AramcoAshi Bushnag Co
MIJAJCO
Cable Pulling at Marine Area Jeddah Refinery
Saudi Aramco Jeddah
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Rotted Cables at GT 17
Makkah Power Plant
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Removal of oil and Carbon Heating Stator
Gazlan Power Plant
April 2005
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
SCECOYusuf Bin A Kanoo
MIJAJCO
Repair Cathodic Protection Test Posts PPII amp PPIII
Jeddah Power
Plant II amp III
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Routed Cables at GT 16
Makkah Power Plant
March 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz
Ummlujj Power Plant
February 2005
Redland Industrial
Services Ltd MIJAJCO
Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant
Shuqaiq Desalination Plant
February 2005
Saudi Electricity CoTIG-TESCO
Intl Ltd MIJAJCO
Bolts torquing and life assessment work with flow and retaining rings NDT test
Ghazlan Power Plant
Dammam
February 2005
Alstom GE Shoaiba Power
Plant MIJAJCO
Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant
Shoaiba Power Plant
December 2004
Alstom Shoaiba Power Plant
MIJAJCO
Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants
Shoaiba Power Plant
October 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )
Asir Power Plant
(Abha)
September 2004
Alstom Shoaiba Power Plant
MIJAJCO
Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant
Shoaiba Power Plant
August 2004
Alstom Shoaiba Power Plant MIJAJCO
Replacement of Expansion Joints HFOCO at Shoaiba Power Plant
Shoaiba Power Plant
July 2004
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Fakieh Poultry Fram
MIJAJCOExtension of GP Hatchery Makkah April 2007
Fakieh Group MIJAJCO
Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F
Makkah February 2007
SAVOLA Edible oil MIJAJCO
Area Qualification Project (Civil Mechanical and Electrical) at Industrial City
JeddahCompleted December
2006
Ministry of Defense Housing amp Planning Dept
Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work
Jeddah December 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Aramco Lubricating Oil
Refining Co (LUBEREF)
1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant
2)Tubes modification work on furnace B-3002 during TA of Process Plant
LUBEREF-1 Jeddah
November 2006
Saudi Electricity CoYusuf Bin A
Kanoo MIJAJCO
Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line
Rabigh Power Plant
October 2006
Saudi Electricity Co Wood
Group MIJAJCO
Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables
Bisha Power Plant
October 2006
SCECOYusuf Bin A Kanoo
MIJAJCO
Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders
Rabigh Power Plant
October 2006
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
ABB Saudi Arabia
MIJAJCO
Servicing amp Site support for 18 MW Generator at Al-Baha
Al-Baha October 2006
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah September 2006
Saudi Electricity Co MIJAJCO
Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)
Bisha Power Plant
December 2005
Saudi Electricity Co MIJAJCO
Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18
Jazan Power Plant
November 2005
Saudi Electricity Co MIJAJCO
Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables
Power Plant -9
November 2005
SCECOAlstom Power
MIJAJCOReplacement of 18 Valve
Shoaiba Power Plant
September 2005
SCECOAlstom Power
MIJAJCO
Hot Tapping of Five Points 2 8 18 20
Shoaiba Power Plant
May 2005
SCECOSAS MIJAJCO
Construction of Site Camp amp Site Office facilities
Shoaiba Power Plant
May 2005
Saudi AramcoAshi Bushnag Co
MIJAJCO
Cable Pulling at Marine Area Jeddah Refinery
Saudi Aramco Jeddah
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Rotted Cables at GT 17
Makkah Power Plant
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Removal of oil and Carbon Heating Stator
Gazlan Power Plant
April 2005
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
SCECOYusuf Bin A Kanoo
MIJAJCO
Repair Cathodic Protection Test Posts PPII amp PPIII
Jeddah Power
Plant II amp III
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Routed Cables at GT 16
Makkah Power Plant
March 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz
Ummlujj Power Plant
February 2005
Redland Industrial
Services Ltd MIJAJCO
Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant
Shuqaiq Desalination Plant
February 2005
Saudi Electricity CoTIG-TESCO
Intl Ltd MIJAJCO
Bolts torquing and life assessment work with flow and retaining rings NDT test
Ghazlan Power Plant
Dammam
February 2005
Alstom GE Shoaiba Power
Plant MIJAJCO
Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant
Shoaiba Power Plant
December 2004
Alstom Shoaiba Power Plant
MIJAJCO
Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants
Shoaiba Power Plant
October 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )
Asir Power Plant
(Abha)
September 2004
Alstom Shoaiba Power Plant
MIJAJCO
Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant
Shoaiba Power Plant
August 2004
Alstom Shoaiba Power Plant MIJAJCO
Replacement of Expansion Joints HFOCO at Shoaiba Power Plant
Shoaiba Power Plant
July 2004
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
ABB Saudi Arabia
MIJAJCO
Servicing amp Site support for 18 MW Generator at Al-Baha
Al-Baha October 2006
Saline Water Conversion Corporation (SWCC) MIJAJCO
Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)
Jeddah September 2006
Saudi Electricity Co MIJAJCO
Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)
Bisha Power Plant
December 2005
Saudi Electricity Co MIJAJCO
Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18
Jazan Power Plant
November 2005
Saudi Electricity Co MIJAJCO
Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables
Power Plant -9
November 2005
SCECOAlstom Power
MIJAJCOReplacement of 18 Valve
Shoaiba Power Plant
September 2005
SCECOAlstom Power
MIJAJCO
Hot Tapping of Five Points 2 8 18 20
Shoaiba Power Plant
May 2005
SCECOSAS MIJAJCO
Construction of Site Camp amp Site Office facilities
Shoaiba Power Plant
May 2005
Saudi AramcoAshi Bushnag Co
MIJAJCO
Cable Pulling at Marine Area Jeddah Refinery
Saudi Aramco Jeddah
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Rotted Cables at GT 17
Makkah Power Plant
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Removal of oil and Carbon Heating Stator
Gazlan Power Plant
April 2005
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
SCECOYusuf Bin A Kanoo
MIJAJCO
Repair Cathodic Protection Test Posts PPII amp PPIII
Jeddah Power
Plant II amp III
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Routed Cables at GT 16
Makkah Power Plant
March 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz
Ummlujj Power Plant
February 2005
Redland Industrial
Services Ltd MIJAJCO
Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant
Shuqaiq Desalination Plant
February 2005
Saudi Electricity CoTIG-TESCO
Intl Ltd MIJAJCO
Bolts torquing and life assessment work with flow and retaining rings NDT test
Ghazlan Power Plant
Dammam
February 2005
Alstom GE Shoaiba Power
Plant MIJAJCO
Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant
Shoaiba Power Plant
December 2004
Alstom Shoaiba Power Plant
MIJAJCO
Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants
Shoaiba Power Plant
October 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )
Asir Power Plant
(Abha)
September 2004
Alstom Shoaiba Power Plant
MIJAJCO
Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant
Shoaiba Power Plant
August 2004
Alstom Shoaiba Power Plant MIJAJCO
Replacement of Expansion Joints HFOCO at Shoaiba Power Plant
Shoaiba Power Plant
July 2004
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
SCECOYusuf Bin A Kanoo
MIJAJCO
Repair Cathodic Protection Test Posts PPII amp PPIII
Jeddah Power
Plant II amp III
April 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Testing and Commissioning of Re-Routed Cables at GT 16
Makkah Power Plant
March 2005
SCECOYusuf Bin A Kanoo
MIJAJCO
Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz
Ummlujj Power Plant
February 2005
Redland Industrial
Services Ltd MIJAJCO
Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant
Shuqaiq Desalination Plant
February 2005
Saudi Electricity CoTIG-TESCO
Intl Ltd MIJAJCO
Bolts torquing and life assessment work with flow and retaining rings NDT test
Ghazlan Power Plant
Dammam
February 2005
Alstom GE Shoaiba Power
Plant MIJAJCO
Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant
Shoaiba Power Plant
December 2004
Alstom Shoaiba Power Plant
MIJAJCO
Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants
Shoaiba Power Plant
October 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )
Asir Power Plant
(Abha)
September 2004
Alstom Shoaiba Power Plant
MIJAJCO
Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant
Shoaiba Power Plant
August 2004
Alstom Shoaiba Power Plant MIJAJCO
Replacement of Expansion Joints HFOCO at Shoaiba Power Plant
Shoaiba Power Plant
July 2004
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
CLIENT DESCRIPTION OF JOB LOCATION COMPLETED
Shoiaba Power Plant Alstom
MIJAJCO
Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant
Shoiaba Power Plant
June 2004
Saudi Electricity Co KANOO
MIJAJCO
Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant
Jizan Power Plant
May 2004
Alstom Shoaiba Power Plant MIJAJCO
Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants
Shoaiba Power Plant
May 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant
Jizan Power Plant
April 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant
Jizan Power Plant
Mar 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant
Jizan Power Plant
Mar2004
Saudi Aramco ABC MIJAJCO
Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area
Rabigh Refinery
Feb 2004
Saudi Electricity Co Wood
Group Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant
Jizan Power Plant
Feb 2004
Saudi Electricity Co Wood Group
Elect UK MIJAJCO
Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant
Jizan Power Plant
Jan2004
- 0 TABLE OF CONTENTSpdf
- 1) INTRODUCTIONpdf
- 2) GENERAL INFORMATIONpdf
- 21) ORGANIZATION CHARTpdf
- 22) BADM OFFICE LOCATIONpdf
- 3) BUSINESS FUNCTIONSpdf
- 4) LEGAL DOCUMENTSpdf
- 5) HUMAN amp EQUIPMENT Resourcespdf
- 6) SAFETY amp QA QC PROGRAMpdf
- 7) PROJECTSpdf
-
ORG-CHART
Sheet4
Sheet5
Sheet6
Sheet7
Sheet8
Sheet9
Sheet10
Sheet11
Sheet12
Sheet13
Sheet14
Sheet15
Sheet16
BASHIR AHMED DOST MOHAMMAD EST | |||||||||||||||||||||||||
Jeddah - Saudi Arabia | |||||||||||||||||||||||||
FINANCE MANAGER | TECHNICAL amp COOR | PLANNING amp CONTROL | ADMIN MANAGER | ||||||||||||||||||||||
DIVISION | |||||||||||||||||||||||||
Finance Controller | over-all Projects Coord | Planning amp Control Div Manager | Public Relation Off | ||||||||||||||||||||||
Cashier | Technical Support Staff | PlanningCost Engineer | Personnel Officer | ||||||||||||||||||||||
Electrical Engineer | |||||||||||||||||||||||||
Mechanical Engineer | |||||||||||||||||||||||||
Civil Engineer | |||||||||||||||||||||||||
Quantity Engineer | |||||||||||||||||||||||||
Design Draftsman | |||||||||||||||||||||||||
Computer Operator | |||||||||||||||||||||||||
Safety Loss Prev Engr | |||||||||||||||||||||||||
Quality Control Engineer | |||||||||||||||||||||||||
PROJECT OPERATIONS DIVISION | |||||||||||||||||||||||||
PROJECT OPERATIONS | |||||||||||||||||||||||||
ELECTRICAL | GENERATOR | PIPELINE amp CP | CIVIL | INDUSTRIAL | HVAC | MATERIAL | |||||||||||||||||||
DIVISION | OVERHAULING | SERVICES | CONSTRUCTION | MAINTENANCE | DIVISION | DIVISION | |||||||||||||||||||
DIVISION | DIVISION | DIVISION | DIVISION | ||||||||||||||||||||||
Supv Engineer | Supv Engineer | Supv Engineer | Supv Engineer | Supv Engineer | Supv Engineer | Material Planner | |||||||||||||||||||
Elect Engineer | Mechanical Engr | Pipeline CP Engr | Civil Engineer | Mechanical Engr | HVAC Engr | Purchaser | |||||||||||||||||||
Store keeper | |||||||||||||||||||||||||
Forman | Forman | Forman | Forman | Forman | Forman | Helper | |||||||||||||||||||
Skilled worker | Skilled worker | Skilled worker | Skilled worker | Skilled worker | Skilled worker | ||||||||||||||||||||
Unskilled workers | Unskilled workers | Unskilled workers | Unskilled workers | Unskilled workers | Unskilled workers |