table of contentsprince india 7, ghogari mansion, 2nd hasnabad lane santacruz (west) mumbai, india...

27
TABLE OF CONTENTS 1. INTRODUCTION 2. GENERAL INFORMATION 3. BUSINESS FUNCTIONS 4. LEGAL DOCUMENTS 5. HUMAN & EQUIPMENT RESOURCES 6. SAFETY & QA/QC PROGRAMS 7. PROJECTS 8. PROJECT PICTURES

Upload: others

Post on 13-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

TABLE OF CONTENTS

1 INTRODUCTION

2 GENERAL INFORMATION

3 BUSINESS FUNCTIONS

4 LEGAL DOCUMENTS

5 HUMAN amp EQUIPMENT RESOURCES

6 SAFETY amp QAQC PROGRAMS

7 PROJECTS

8 PROJECT PICTURES

INTRODUCTION

We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

Electro Mechanical amp Instrumentation Engineering

Maintenance amp installation of Power Generators

Turbine overhauling

Pipeline Construction Modification amp Maintenance

New installation amp Overhauling of Process Equipments of Refineries

Civil Construction Modification amp Maintenance

We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

We also supply industrial support material

Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

MISSION STATEMENT

Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

OUR HEAD OFFICE CONTACTS

AL-JASSIM Building (1st Floor)

Baladiya Street Al-Aziziya District Jeddah

PO Box 18607 Jeddah 21425 KSA

Tel +966 2 663 2382 050 4699 467

Fax +966 2 668 5850

E-mail i n fo bash i rdos t com

URL www bash i rdo st c om

OUR WORK SHOP

KILO- 16 OLD MAKKAH ROAD

PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

HVACDIVISION

HVAC Engr Purchaser

Store keeper

Forman Forman Forman Forman Forman Forman Helper

Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker

Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers

Cashier

Supv Engineer Supv Engineer

ELECTRICALDIVISION

Computer Operator

DIVISION

Mechanical EngrCivil EngineerElect Engineer

Supv Engineer

Pipeline CP Engr

Supv Engineer

Mechanical Engr

Public Relation Off

ADMIN MANAGER

SERVICES

Personnel Officer

Safety Loss Prev Engr

CONSTRUCTION

Planning amp Control Div Manager

OVERHAULINGPIPELINE amp CP GENERATOR

Civil Engineer

INDUSTRIALCIVIL

Design Draftsman

Mechanical Engineer

PROJECT OPERATIONS

DIVISION DIVISION

PLANNING amp CONTROL

Jeddah - Saudi Arabia

DIVISION

Quantity Engineer

DIVISION

over-all Projects Coord

Technical Support StaffElectrical Engineer

Quality Control Engineer

Supv Engineer Material Planner

BASHIR AHMED DOST MOHAMMAD EST

FINANCE MANAGER

Finance Controller

TECHNICAL amp COOR

PlanningCost Engineer

Supv Engineer

MATERIALMAINTENANCE DIVISION

Exec Secretary

Demo VersionDemo Version

BUSINESS FUNCTION

MAJOR ACTIVITIES

Generators Overhauling

Revamping of Power House Electrical system

Low Medium and High Voltage Switchgear Maintenance

Low Medium and High Voltage Motors Maintenance and overhauling

Electrical Repairing and Refurbishment

Process Plant Installation and Maintenance

Heat Exchanger Maintenance

Refurbishment of Distillation Tower

Boiler Maintenance

New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Cooling Tower Maintenance

Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Cathodic Protection System Installation Commissioning and maintenance

Cold Storage Refrigeration and HVAC System Installation and Maintenance

Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

Supply of Personal Protective Equipment amp Firefighting system

Civil Construction

Generators Overhauling

We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

Remove bearing caps inner and outer end shields end bearings

Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

Removing the existing end winding insulation and repair it where it required

Cleaning the stator housing and both end windings painting end winding with anti tracing paint

Cleaning all components properly and reinstall all the components on its original locations

Revamping of Power House Electrical system

Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

Low Medium and High Voltage Switchgear Maintenance

Switch gear Inspection and trouble shootingPer commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etcMechanical Alignment maintenance of the opening and closing system trouble shooting and Energization testProtection Relay system and CalibrationProtection system upgrading and refurbishment

Low Medium and High Voltage Motors Maintenance and overhauling

Inspection of motors

Dismantling

Carrying out all the required testsDeveloping of test records and their interpretation

Supply of motors

Rewinding of motors

Making the recommendations based on inspection and test

Electrical Repairing and Refurbishment

Electrical distribution maintenance troubleshooting and extensionsInstallation maintenance and extension of lighting distribution and low power systemsInstallation of low voltage distribution as well as control panelsInstallation laying and testing of low voltage cables and cable tray systemDC distribution including batteries and battery chargers and their installation testing and commissioningInstallation of emergency power generating systemProviding around the clock emergency services

Process Plant Installation and Maintenance

We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

Power PlantsWater Treatment PlantsCement PlantsSugar PlantsFood Industries

Heat Exchanger Maintenance

Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

Pulling of tube bundlesInternal and external hydro-blast cleaning of tubesRepair and Replacement of tubesRe-facing of tube sheetsFabrication of shellsPressure test

Refurbishment of Distillation Tower

Dismantling of traysCleaning of shell internals by hydro blast and grit blastRepair and replacement of bubble cup traysReplacement of rashing ringsCleaning and replacement of demister padsPressure test

Boiler Maintenance

Services are provided for the maintenance of water tube and fire tube boilers

Repair and replacement of tubes

De-scaling of internal and external boiler tubes including steam drums

Fire box and refractory repairs

New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Construction of steel tanks for petroleum chemicals and water

Tank cleaning

Bottom plate replacement

Repair and replacement of heating coils

Epoxy lining

Internal Coating

Replacement of Floating Fixed roof

Maintenance of pressure vacuum relief valve

Cooling Tower Maintenance

Cleaning of cooling tower cells

Replacement of wooden baffle plates

Repair maintenance amp replacement of Exhaust fan amp gearboxes

Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

Construction Maintenance amp Modification of buried carbon steel pipeline

Construction Maintenance amp Modification of non-metallic pipelines

Construction Maintenance amp Modification of fiberglass pipelines

Hydrostatic testing and commissioning of oil and gas pipelines

De commissioning and vacuum drying of pipelines

Mothballing of pipelines

Pigging and internal cleaning of pipelines

External coating repairs

Cathodic Protection System Installation Commissioning and maintenance

Cathodic protection (CP) system design and installation

Commissioning of Cathodic Protection system

Trouble shooting and maintenance of existing CP system

Up grading of existing CP system

Routine CP data monitoring

Data evaluation and upgrading recommendations

Cold Storage Refrigeration and HVAC System Installation and Maintenance

Installation and commissioning of cold storage systems

Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

Installation of cooling coils and condensers

Duct work installation Cleaning and Maintenance

Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

Supply of Personal Protective Equipment amp Firefighting system

Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

Human Resources

All personnel are able to understand speak both English and Arabic languages

Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

Block Visa available in our ESTABLISHMENT - Under Process

Following is the list of our affiliated Recruiting Agents

Agents Address Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom

Equipment Resources

The following table provides information of related equipment that is available for the work

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL

YEARMAKE

QTYOWNED

1 MOBILE CRANE 35 TON TADANO 1985 1

2 TANKER TRUCK (WATER)10000 amp

19000 GALNISSAN 1990 2

3 BOOM TRUCK 6 TON HINO 1985 1

4 POWER GENERATOR 35 KVA HONDA 1990 3

5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4

6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8

7 WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP LICON 1998 4

8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO

1991 1

9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1

10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO

1990 1

11 DEWATERING PUMP 600 GPM ROBIN 1990 3

12 PIPE THREADING MACHINE UP TO 16INCH

SET RIGID 1994 2

13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2

14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2

15 OXY-ACETYLENE CYLINDER SET -- 1993 8

16 ARGON-NITROGEN CYLINDER SET -- 5

17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4

18 CREW CAB 1frac12 TON NISSAN 1988 1

19 PASSENGER VAN 15 SEAT NISSAN 2002 2

20 FORKLIFT3 amp 7-12

TONTOYTO 1990 2

21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2

22 SAND BLASTING MACHINE SET GIRACO 1995 3

23 CATHODIC PROTECTION TEST EQUIPMENT

SET -- 1

24 UNDERGROUND PIPE LOCATOR SET -- 2

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMADEMODEL

YEARMAKE

QTYOWNED

25 SOIL COMPACTOR PORTABLE - 1

26 UNDERGROUNG CABEL DETECTOR SET -- 2

27 PIN BRAZING SET -- 3

28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3

29 EXCHANGER BUNDLE PULLER 9 METERS 1

30 BOBCAT 2

31 EXCAVATOR 1

32 MICRO TRENCHER 1

33 VACUUM TRUCK 14 TON NISSAN 1

34 ASPHALT CUTTER 2

35 HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI USA 1

36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3linkable Advantage 3 tempe-

rature programmer cont-rollers and 3 Energy regs

1

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

Safety meetings and dialoguesdiscussion

Safety Inspection

Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

GOING-ON PROJECTS

CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld

Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road

JeddahGoing-on

Saudi Electricity Company

ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length

or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-

lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah Going-on

Ministry of Defense

Engineering amp Housing Dept

Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah Going-on

Bashir Ahmed Dost Mohd Used

Lube Oil Re-refining Factory

1) Plot development2)Development of infrastructure for the

factory3)Construction of all underground

concrete tanks of utility4)Fabrication and Installation raw material

storage tanks intermediate storage tanks

Rabigh Going-on

COMPLETED PROJECTS

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd

MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJC

O

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd

MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Mechanical repairing works during emergency shutdown

Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation

(SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah October 30 2007

SAFA General Contractors amp Enterprises Co

Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah September 20 2007

Ministry ofDefense Housing amp Planning Dept

Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning

Jeddah August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram

MIJAJCO

Modification and Extension of Hatchery Building

Makkah May 2007

Fakieh Poultry Fram

MIJAJCO

Construction of Labour and staff accommodation Building

Makkah March 2007

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Fakieh Poultry Fram

MIJAJCOExtension of GP Hatchery Makkah April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

JeddahCompleted December

2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah December 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2)Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A

Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood

Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo

MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

ABB Saudi Arabia

MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power

MIJAJCOReplacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power

MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co

MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

SCECOYusuf Bin A Kanoo

MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power

Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial

Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant

Dammam

February 2005

Alstom GE Shoaiba Power

Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant

MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant

(Abha)

September 2004

Alstom Shoaiba Power Plant

MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 2: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

INTRODUCTION

We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

Electro Mechanical amp Instrumentation Engineering

Maintenance amp installation of Power Generators

Turbine overhauling

Pipeline Construction Modification amp Maintenance

New installation amp Overhauling of Process Equipments of Refineries

Civil Construction Modification amp Maintenance

We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

We also supply industrial support material

Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

MISSION STATEMENT

Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

OUR HEAD OFFICE CONTACTS

AL-JASSIM Building (1st Floor)

Baladiya Street Al-Aziziya District Jeddah

PO Box 18607 Jeddah 21425 KSA

Tel +966 2 663 2382 050 4699 467

Fax +966 2 668 5850

E-mail i n fo bash i rdos t com

URL www bash i rdo st c om

OUR WORK SHOP

KILO- 16 OLD MAKKAH ROAD

PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

HVACDIVISION

HVAC Engr Purchaser

Store keeper

Forman Forman Forman Forman Forman Forman Helper

Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker

Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers

Cashier

Supv Engineer Supv Engineer

ELECTRICALDIVISION

Computer Operator

DIVISION

Mechanical EngrCivil EngineerElect Engineer

Supv Engineer

Pipeline CP Engr

Supv Engineer

Mechanical Engr

Public Relation Off

ADMIN MANAGER

SERVICES

Personnel Officer

Safety Loss Prev Engr

CONSTRUCTION

Planning amp Control Div Manager

OVERHAULINGPIPELINE amp CP GENERATOR

Civil Engineer

INDUSTRIALCIVIL

Design Draftsman

Mechanical Engineer

PROJECT OPERATIONS

DIVISION DIVISION

PLANNING amp CONTROL

Jeddah - Saudi Arabia

DIVISION

Quantity Engineer

DIVISION

over-all Projects Coord

Technical Support StaffElectrical Engineer

Quality Control Engineer

Supv Engineer Material Planner

BASHIR AHMED DOST MOHAMMAD EST

FINANCE MANAGER

Finance Controller

TECHNICAL amp COOR

PlanningCost Engineer

Supv Engineer

MATERIALMAINTENANCE DIVISION

Exec Secretary

Demo VersionDemo Version

BUSINESS FUNCTION

MAJOR ACTIVITIES

Generators Overhauling

Revamping of Power House Electrical system

Low Medium and High Voltage Switchgear Maintenance

Low Medium and High Voltage Motors Maintenance and overhauling

Electrical Repairing and Refurbishment

Process Plant Installation and Maintenance

Heat Exchanger Maintenance

Refurbishment of Distillation Tower

Boiler Maintenance

New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Cooling Tower Maintenance

Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Cathodic Protection System Installation Commissioning and maintenance

Cold Storage Refrigeration and HVAC System Installation and Maintenance

Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

Supply of Personal Protective Equipment amp Firefighting system

Civil Construction

Generators Overhauling

We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

Remove bearing caps inner and outer end shields end bearings

Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

Removing the existing end winding insulation and repair it where it required

Cleaning the stator housing and both end windings painting end winding with anti tracing paint

Cleaning all components properly and reinstall all the components on its original locations

Revamping of Power House Electrical system

Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

Low Medium and High Voltage Switchgear Maintenance

Switch gear Inspection and trouble shootingPer commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etcMechanical Alignment maintenance of the opening and closing system trouble shooting and Energization testProtection Relay system and CalibrationProtection system upgrading and refurbishment

Low Medium and High Voltage Motors Maintenance and overhauling

Inspection of motors

Dismantling

Carrying out all the required testsDeveloping of test records and their interpretation

Supply of motors

Rewinding of motors

Making the recommendations based on inspection and test

Electrical Repairing and Refurbishment

Electrical distribution maintenance troubleshooting and extensionsInstallation maintenance and extension of lighting distribution and low power systemsInstallation of low voltage distribution as well as control panelsInstallation laying and testing of low voltage cables and cable tray systemDC distribution including batteries and battery chargers and their installation testing and commissioningInstallation of emergency power generating systemProviding around the clock emergency services

Process Plant Installation and Maintenance

We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

Power PlantsWater Treatment PlantsCement PlantsSugar PlantsFood Industries

Heat Exchanger Maintenance

Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

Pulling of tube bundlesInternal and external hydro-blast cleaning of tubesRepair and Replacement of tubesRe-facing of tube sheetsFabrication of shellsPressure test

Refurbishment of Distillation Tower

Dismantling of traysCleaning of shell internals by hydro blast and grit blastRepair and replacement of bubble cup traysReplacement of rashing ringsCleaning and replacement of demister padsPressure test

Boiler Maintenance

Services are provided for the maintenance of water tube and fire tube boilers

Repair and replacement of tubes

De-scaling of internal and external boiler tubes including steam drums

Fire box and refractory repairs

New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Construction of steel tanks for petroleum chemicals and water

Tank cleaning

Bottom plate replacement

Repair and replacement of heating coils

Epoxy lining

Internal Coating

Replacement of Floating Fixed roof

Maintenance of pressure vacuum relief valve

Cooling Tower Maintenance

Cleaning of cooling tower cells

Replacement of wooden baffle plates

Repair maintenance amp replacement of Exhaust fan amp gearboxes

Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

Construction Maintenance amp Modification of buried carbon steel pipeline

Construction Maintenance amp Modification of non-metallic pipelines

Construction Maintenance amp Modification of fiberglass pipelines

Hydrostatic testing and commissioning of oil and gas pipelines

De commissioning and vacuum drying of pipelines

Mothballing of pipelines

Pigging and internal cleaning of pipelines

External coating repairs

Cathodic Protection System Installation Commissioning and maintenance

Cathodic protection (CP) system design and installation

Commissioning of Cathodic Protection system

Trouble shooting and maintenance of existing CP system

Up grading of existing CP system

Routine CP data monitoring

Data evaluation and upgrading recommendations

Cold Storage Refrigeration and HVAC System Installation and Maintenance

Installation and commissioning of cold storage systems

Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

Installation of cooling coils and condensers

Duct work installation Cleaning and Maintenance

Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

Supply of Personal Protective Equipment amp Firefighting system

Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

Human Resources

All personnel are able to understand speak both English and Arabic languages

Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

Block Visa available in our ESTABLISHMENT - Under Process

Following is the list of our affiliated Recruiting Agents

Agents Address Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom

Equipment Resources

The following table provides information of related equipment that is available for the work

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL

YEARMAKE

QTYOWNED

1 MOBILE CRANE 35 TON TADANO 1985 1

2 TANKER TRUCK (WATER)10000 amp

19000 GALNISSAN 1990 2

3 BOOM TRUCK 6 TON HINO 1985 1

4 POWER GENERATOR 35 KVA HONDA 1990 3

5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4

6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8

7 WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP LICON 1998 4

8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO

1991 1

9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1

10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO

1990 1

11 DEWATERING PUMP 600 GPM ROBIN 1990 3

12 PIPE THREADING MACHINE UP TO 16INCH

SET RIGID 1994 2

13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2

14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2

15 OXY-ACETYLENE CYLINDER SET -- 1993 8

16 ARGON-NITROGEN CYLINDER SET -- 5

17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4

18 CREW CAB 1frac12 TON NISSAN 1988 1

19 PASSENGER VAN 15 SEAT NISSAN 2002 2

20 FORKLIFT3 amp 7-12

TONTOYTO 1990 2

21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2

22 SAND BLASTING MACHINE SET GIRACO 1995 3

23 CATHODIC PROTECTION TEST EQUIPMENT

SET -- 1

24 UNDERGROUND PIPE LOCATOR SET -- 2

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMADEMODEL

YEARMAKE

QTYOWNED

25 SOIL COMPACTOR PORTABLE - 1

26 UNDERGROUNG CABEL DETECTOR SET -- 2

27 PIN BRAZING SET -- 3

28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3

29 EXCHANGER BUNDLE PULLER 9 METERS 1

30 BOBCAT 2

31 EXCAVATOR 1

32 MICRO TRENCHER 1

33 VACUUM TRUCK 14 TON NISSAN 1

34 ASPHALT CUTTER 2

35 HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI USA 1

36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3linkable Advantage 3 tempe-

rature programmer cont-rollers and 3 Energy regs

1

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

Safety meetings and dialoguesdiscussion

Safety Inspection

Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

GOING-ON PROJECTS

CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld

Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road

JeddahGoing-on

Saudi Electricity Company

ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length

or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-

lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah Going-on

Ministry of Defense

Engineering amp Housing Dept

Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah Going-on

Bashir Ahmed Dost Mohd Used

Lube Oil Re-refining Factory

1) Plot development2)Development of infrastructure for the

factory3)Construction of all underground

concrete tanks of utility4)Fabrication and Installation raw material

storage tanks intermediate storage tanks

Rabigh Going-on

COMPLETED PROJECTS

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd

MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJC

O

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd

MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Mechanical repairing works during emergency shutdown

Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation

(SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah October 30 2007

SAFA General Contractors amp Enterprises Co

Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah September 20 2007

Ministry ofDefense Housing amp Planning Dept

Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning

Jeddah August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram

MIJAJCO

Modification and Extension of Hatchery Building

Makkah May 2007

Fakieh Poultry Fram

MIJAJCO

Construction of Labour and staff accommodation Building

Makkah March 2007

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Fakieh Poultry Fram

MIJAJCOExtension of GP Hatchery Makkah April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

JeddahCompleted December

2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah December 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2)Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A

Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood

Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo

MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

ABB Saudi Arabia

MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power

MIJAJCOReplacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power

MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co

MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

SCECOYusuf Bin A Kanoo

MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power

Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial

Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant

Dammam

February 2005

Alstom GE Shoaiba Power

Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant

MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant

(Abha)

September 2004

Alstom Shoaiba Power Plant

MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 3: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

MISSION STATEMENT

Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

OUR HEAD OFFICE CONTACTS

AL-JASSIM Building (1st Floor)

Baladiya Street Al-Aziziya District Jeddah

PO Box 18607 Jeddah 21425 KSA

Tel +966 2 663 2382 050 4699 467

Fax +966 2 668 5850

E-mail i n fo bash i rdos t com

URL www bash i rdo st c om

OUR WORK SHOP

KILO- 16 OLD MAKKAH ROAD

PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

HVACDIVISION

HVAC Engr Purchaser

Store keeper

Forman Forman Forman Forman Forman Forman Helper

Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker

Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers

Cashier

Supv Engineer Supv Engineer

ELECTRICALDIVISION

Computer Operator

DIVISION

Mechanical EngrCivil EngineerElect Engineer

Supv Engineer

Pipeline CP Engr

Supv Engineer

Mechanical Engr

Public Relation Off

ADMIN MANAGER

SERVICES

Personnel Officer

Safety Loss Prev Engr

CONSTRUCTION

Planning amp Control Div Manager

OVERHAULINGPIPELINE amp CP GENERATOR

Civil Engineer

INDUSTRIALCIVIL

Design Draftsman

Mechanical Engineer

PROJECT OPERATIONS

DIVISION DIVISION

PLANNING amp CONTROL

Jeddah - Saudi Arabia

DIVISION

Quantity Engineer

DIVISION

over-all Projects Coord

Technical Support StaffElectrical Engineer

Quality Control Engineer

Supv Engineer Material Planner

BASHIR AHMED DOST MOHAMMAD EST

FINANCE MANAGER

Finance Controller

TECHNICAL amp COOR

PlanningCost Engineer

Supv Engineer

MATERIALMAINTENANCE DIVISION

Exec Secretary

Demo VersionDemo Version

BUSINESS FUNCTION

MAJOR ACTIVITIES

Generators Overhauling

Revamping of Power House Electrical system

Low Medium and High Voltage Switchgear Maintenance

Low Medium and High Voltage Motors Maintenance and overhauling

Electrical Repairing and Refurbishment

Process Plant Installation and Maintenance

Heat Exchanger Maintenance

Refurbishment of Distillation Tower

Boiler Maintenance

New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Cooling Tower Maintenance

Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Cathodic Protection System Installation Commissioning and maintenance

Cold Storage Refrigeration and HVAC System Installation and Maintenance

Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

Supply of Personal Protective Equipment amp Firefighting system

Civil Construction

Generators Overhauling

We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

Remove bearing caps inner and outer end shields end bearings

Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

Removing the existing end winding insulation and repair it where it required

Cleaning the stator housing and both end windings painting end winding with anti tracing paint

Cleaning all components properly and reinstall all the components on its original locations

Revamping of Power House Electrical system

Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

Low Medium and High Voltage Switchgear Maintenance

Switch gear Inspection and trouble shootingPer commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etcMechanical Alignment maintenance of the opening and closing system trouble shooting and Energization testProtection Relay system and CalibrationProtection system upgrading and refurbishment

Low Medium and High Voltage Motors Maintenance and overhauling

Inspection of motors

Dismantling

Carrying out all the required testsDeveloping of test records and their interpretation

Supply of motors

Rewinding of motors

Making the recommendations based on inspection and test

Electrical Repairing and Refurbishment

Electrical distribution maintenance troubleshooting and extensionsInstallation maintenance and extension of lighting distribution and low power systemsInstallation of low voltage distribution as well as control panelsInstallation laying and testing of low voltage cables and cable tray systemDC distribution including batteries and battery chargers and their installation testing and commissioningInstallation of emergency power generating systemProviding around the clock emergency services

Process Plant Installation and Maintenance

We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

Power PlantsWater Treatment PlantsCement PlantsSugar PlantsFood Industries

Heat Exchanger Maintenance

Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

Pulling of tube bundlesInternal and external hydro-blast cleaning of tubesRepair and Replacement of tubesRe-facing of tube sheetsFabrication of shellsPressure test

Refurbishment of Distillation Tower

Dismantling of traysCleaning of shell internals by hydro blast and grit blastRepair and replacement of bubble cup traysReplacement of rashing ringsCleaning and replacement of demister padsPressure test

Boiler Maintenance

Services are provided for the maintenance of water tube and fire tube boilers

Repair and replacement of tubes

De-scaling of internal and external boiler tubes including steam drums

Fire box and refractory repairs

New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Construction of steel tanks for petroleum chemicals and water

Tank cleaning

Bottom plate replacement

Repair and replacement of heating coils

Epoxy lining

Internal Coating

Replacement of Floating Fixed roof

Maintenance of pressure vacuum relief valve

Cooling Tower Maintenance

Cleaning of cooling tower cells

Replacement of wooden baffle plates

Repair maintenance amp replacement of Exhaust fan amp gearboxes

Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

Construction Maintenance amp Modification of buried carbon steel pipeline

Construction Maintenance amp Modification of non-metallic pipelines

Construction Maintenance amp Modification of fiberglass pipelines

Hydrostatic testing and commissioning of oil and gas pipelines

De commissioning and vacuum drying of pipelines

Mothballing of pipelines

Pigging and internal cleaning of pipelines

External coating repairs

Cathodic Protection System Installation Commissioning and maintenance

Cathodic protection (CP) system design and installation

Commissioning of Cathodic Protection system

Trouble shooting and maintenance of existing CP system

Up grading of existing CP system

Routine CP data monitoring

Data evaluation and upgrading recommendations

Cold Storage Refrigeration and HVAC System Installation and Maintenance

Installation and commissioning of cold storage systems

Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

Installation of cooling coils and condensers

Duct work installation Cleaning and Maintenance

Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

Supply of Personal Protective Equipment amp Firefighting system

Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

Human Resources

All personnel are able to understand speak both English and Arabic languages

Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

Block Visa available in our ESTABLISHMENT - Under Process

Following is the list of our affiliated Recruiting Agents

Agents Address Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom

Equipment Resources

The following table provides information of related equipment that is available for the work

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL

YEARMAKE

QTYOWNED

1 MOBILE CRANE 35 TON TADANO 1985 1

2 TANKER TRUCK (WATER)10000 amp

19000 GALNISSAN 1990 2

3 BOOM TRUCK 6 TON HINO 1985 1

4 POWER GENERATOR 35 KVA HONDA 1990 3

5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4

6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8

7 WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP LICON 1998 4

8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO

1991 1

9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1

10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO

1990 1

11 DEWATERING PUMP 600 GPM ROBIN 1990 3

12 PIPE THREADING MACHINE UP TO 16INCH

SET RIGID 1994 2

13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2

14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2

15 OXY-ACETYLENE CYLINDER SET -- 1993 8

16 ARGON-NITROGEN CYLINDER SET -- 5

17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4

18 CREW CAB 1frac12 TON NISSAN 1988 1

19 PASSENGER VAN 15 SEAT NISSAN 2002 2

20 FORKLIFT3 amp 7-12

TONTOYTO 1990 2

21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2

22 SAND BLASTING MACHINE SET GIRACO 1995 3

23 CATHODIC PROTECTION TEST EQUIPMENT

SET -- 1

24 UNDERGROUND PIPE LOCATOR SET -- 2

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMADEMODEL

YEARMAKE

QTYOWNED

25 SOIL COMPACTOR PORTABLE - 1

26 UNDERGROUNG CABEL DETECTOR SET -- 2

27 PIN BRAZING SET -- 3

28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3

29 EXCHANGER BUNDLE PULLER 9 METERS 1

30 BOBCAT 2

31 EXCAVATOR 1

32 MICRO TRENCHER 1

33 VACUUM TRUCK 14 TON NISSAN 1

34 ASPHALT CUTTER 2

35 HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI USA 1

36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3linkable Advantage 3 tempe-

rature programmer cont-rollers and 3 Energy regs

1

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

Safety meetings and dialoguesdiscussion

Safety Inspection

Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

GOING-ON PROJECTS

CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld

Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road

JeddahGoing-on

Saudi Electricity Company

ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length

or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-

lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah Going-on

Ministry of Defense

Engineering amp Housing Dept

Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah Going-on

Bashir Ahmed Dost Mohd Used

Lube Oil Re-refining Factory

1) Plot development2)Development of infrastructure for the

factory3)Construction of all underground

concrete tanks of utility4)Fabrication and Installation raw material

storage tanks intermediate storage tanks

Rabigh Going-on

COMPLETED PROJECTS

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd

MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJC

O

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd

MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Mechanical repairing works during emergency shutdown

Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation

(SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah October 30 2007

SAFA General Contractors amp Enterprises Co

Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah September 20 2007

Ministry ofDefense Housing amp Planning Dept

Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning

Jeddah August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram

MIJAJCO

Modification and Extension of Hatchery Building

Makkah May 2007

Fakieh Poultry Fram

MIJAJCO

Construction of Labour and staff accommodation Building

Makkah March 2007

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Fakieh Poultry Fram

MIJAJCOExtension of GP Hatchery Makkah April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

JeddahCompleted December

2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah December 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2)Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A

Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood

Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo

MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

ABB Saudi Arabia

MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power

MIJAJCOReplacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power

MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co

MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

SCECOYusuf Bin A Kanoo

MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power

Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial

Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant

Dammam

February 2005

Alstom GE Shoaiba Power

Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant

MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant

(Abha)

September 2004

Alstom Shoaiba Power Plant

MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 4: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

OUR HEAD OFFICE CONTACTS

AL-JASSIM Building (1st Floor)

Baladiya Street Al-Aziziya District Jeddah

PO Box 18607 Jeddah 21425 KSA

Tel +966 2 663 2382 050 4699 467

Fax +966 2 668 5850

E-mail i n fo bash i rdos t com

URL www bash i rdo st c om

OUR WORK SHOP

KILO- 16 OLD MAKKAH ROAD

PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

HVACDIVISION

HVAC Engr Purchaser

Store keeper

Forman Forman Forman Forman Forman Forman Helper

Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker

Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers

Cashier

Supv Engineer Supv Engineer

ELECTRICALDIVISION

Computer Operator

DIVISION

Mechanical EngrCivil EngineerElect Engineer

Supv Engineer

Pipeline CP Engr

Supv Engineer

Mechanical Engr

Public Relation Off

ADMIN MANAGER

SERVICES

Personnel Officer

Safety Loss Prev Engr

CONSTRUCTION

Planning amp Control Div Manager

OVERHAULINGPIPELINE amp CP GENERATOR

Civil Engineer

INDUSTRIALCIVIL

Design Draftsman

Mechanical Engineer

PROJECT OPERATIONS

DIVISION DIVISION

PLANNING amp CONTROL

Jeddah - Saudi Arabia

DIVISION

Quantity Engineer

DIVISION

over-all Projects Coord

Technical Support StaffElectrical Engineer

Quality Control Engineer

Supv Engineer Material Planner

BASHIR AHMED DOST MOHAMMAD EST

FINANCE MANAGER

Finance Controller

TECHNICAL amp COOR

PlanningCost Engineer

Supv Engineer

MATERIALMAINTENANCE DIVISION

Exec Secretary

Demo VersionDemo Version

BUSINESS FUNCTION

MAJOR ACTIVITIES

Generators Overhauling

Revamping of Power House Electrical system

Low Medium and High Voltage Switchgear Maintenance

Low Medium and High Voltage Motors Maintenance and overhauling

Electrical Repairing and Refurbishment

Process Plant Installation and Maintenance

Heat Exchanger Maintenance

Refurbishment of Distillation Tower

Boiler Maintenance

New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Cooling Tower Maintenance

Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Cathodic Protection System Installation Commissioning and maintenance

Cold Storage Refrigeration and HVAC System Installation and Maintenance

Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

Supply of Personal Protective Equipment amp Firefighting system

Civil Construction

Generators Overhauling

We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

Remove bearing caps inner and outer end shields end bearings

Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

Removing the existing end winding insulation and repair it where it required

Cleaning the stator housing and both end windings painting end winding with anti tracing paint

Cleaning all components properly and reinstall all the components on its original locations

Revamping of Power House Electrical system

Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

Low Medium and High Voltage Switchgear Maintenance

Switch gear Inspection and trouble shootingPer commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etcMechanical Alignment maintenance of the opening and closing system trouble shooting and Energization testProtection Relay system and CalibrationProtection system upgrading and refurbishment

Low Medium and High Voltage Motors Maintenance and overhauling

Inspection of motors

Dismantling

Carrying out all the required testsDeveloping of test records and their interpretation

Supply of motors

Rewinding of motors

Making the recommendations based on inspection and test

Electrical Repairing and Refurbishment

Electrical distribution maintenance troubleshooting and extensionsInstallation maintenance and extension of lighting distribution and low power systemsInstallation of low voltage distribution as well as control panelsInstallation laying and testing of low voltage cables and cable tray systemDC distribution including batteries and battery chargers and their installation testing and commissioningInstallation of emergency power generating systemProviding around the clock emergency services

Process Plant Installation and Maintenance

We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

Power PlantsWater Treatment PlantsCement PlantsSugar PlantsFood Industries

Heat Exchanger Maintenance

Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

Pulling of tube bundlesInternal and external hydro-blast cleaning of tubesRepair and Replacement of tubesRe-facing of tube sheetsFabrication of shellsPressure test

Refurbishment of Distillation Tower

Dismantling of traysCleaning of shell internals by hydro blast and grit blastRepair and replacement of bubble cup traysReplacement of rashing ringsCleaning and replacement of demister padsPressure test

Boiler Maintenance

Services are provided for the maintenance of water tube and fire tube boilers

Repair and replacement of tubes

De-scaling of internal and external boiler tubes including steam drums

Fire box and refractory repairs

New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Construction of steel tanks for petroleum chemicals and water

Tank cleaning

Bottom plate replacement

Repair and replacement of heating coils

Epoxy lining

Internal Coating

Replacement of Floating Fixed roof

Maintenance of pressure vacuum relief valve

Cooling Tower Maintenance

Cleaning of cooling tower cells

Replacement of wooden baffle plates

Repair maintenance amp replacement of Exhaust fan amp gearboxes

Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

Construction Maintenance amp Modification of buried carbon steel pipeline

Construction Maintenance amp Modification of non-metallic pipelines

Construction Maintenance amp Modification of fiberglass pipelines

Hydrostatic testing and commissioning of oil and gas pipelines

De commissioning and vacuum drying of pipelines

Mothballing of pipelines

Pigging and internal cleaning of pipelines

External coating repairs

Cathodic Protection System Installation Commissioning and maintenance

Cathodic protection (CP) system design and installation

Commissioning of Cathodic Protection system

Trouble shooting and maintenance of existing CP system

Up grading of existing CP system

Routine CP data monitoring

Data evaluation and upgrading recommendations

Cold Storage Refrigeration and HVAC System Installation and Maintenance

Installation and commissioning of cold storage systems

Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

Installation of cooling coils and condensers

Duct work installation Cleaning and Maintenance

Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

Supply of Personal Protective Equipment amp Firefighting system

Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

Human Resources

All personnel are able to understand speak both English and Arabic languages

Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

Block Visa available in our ESTABLISHMENT - Under Process

Following is the list of our affiliated Recruiting Agents

Agents Address Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom

Equipment Resources

The following table provides information of related equipment that is available for the work

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL

YEARMAKE

QTYOWNED

1 MOBILE CRANE 35 TON TADANO 1985 1

2 TANKER TRUCK (WATER)10000 amp

19000 GALNISSAN 1990 2

3 BOOM TRUCK 6 TON HINO 1985 1

4 POWER GENERATOR 35 KVA HONDA 1990 3

5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4

6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8

7 WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP LICON 1998 4

8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO

1991 1

9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1

10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO

1990 1

11 DEWATERING PUMP 600 GPM ROBIN 1990 3

12 PIPE THREADING MACHINE UP TO 16INCH

SET RIGID 1994 2

13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2

14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2

15 OXY-ACETYLENE CYLINDER SET -- 1993 8

16 ARGON-NITROGEN CYLINDER SET -- 5

17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4

18 CREW CAB 1frac12 TON NISSAN 1988 1

19 PASSENGER VAN 15 SEAT NISSAN 2002 2

20 FORKLIFT3 amp 7-12

TONTOYTO 1990 2

21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2

22 SAND BLASTING MACHINE SET GIRACO 1995 3

23 CATHODIC PROTECTION TEST EQUIPMENT

SET -- 1

24 UNDERGROUND PIPE LOCATOR SET -- 2

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMADEMODEL

YEARMAKE

QTYOWNED

25 SOIL COMPACTOR PORTABLE - 1

26 UNDERGROUNG CABEL DETECTOR SET -- 2

27 PIN BRAZING SET -- 3

28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3

29 EXCHANGER BUNDLE PULLER 9 METERS 1

30 BOBCAT 2

31 EXCAVATOR 1

32 MICRO TRENCHER 1

33 VACUUM TRUCK 14 TON NISSAN 1

34 ASPHALT CUTTER 2

35 HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI USA 1

36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3linkable Advantage 3 tempe-

rature programmer cont-rollers and 3 Energy regs

1

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

Safety meetings and dialoguesdiscussion

Safety Inspection

Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

GOING-ON PROJECTS

CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld

Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road

JeddahGoing-on

Saudi Electricity Company

ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length

or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-

lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah Going-on

Ministry of Defense

Engineering amp Housing Dept

Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah Going-on

Bashir Ahmed Dost Mohd Used

Lube Oil Re-refining Factory

1) Plot development2)Development of infrastructure for the

factory3)Construction of all underground

concrete tanks of utility4)Fabrication and Installation raw material

storage tanks intermediate storage tanks

Rabigh Going-on

COMPLETED PROJECTS

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd

MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJC

O

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd

MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Mechanical repairing works during emergency shutdown

Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation

(SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah October 30 2007

SAFA General Contractors amp Enterprises Co

Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah September 20 2007

Ministry ofDefense Housing amp Planning Dept

Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning

Jeddah August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram

MIJAJCO

Modification and Extension of Hatchery Building

Makkah May 2007

Fakieh Poultry Fram

MIJAJCO

Construction of Labour and staff accommodation Building

Makkah March 2007

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Fakieh Poultry Fram

MIJAJCOExtension of GP Hatchery Makkah April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

JeddahCompleted December

2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah December 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2)Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A

Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood

Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo

MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

ABB Saudi Arabia

MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power

MIJAJCOReplacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power

MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co

MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

SCECOYusuf Bin A Kanoo

MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power

Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial

Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant

Dammam

February 2005

Alstom GE Shoaiba Power

Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant

MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant

(Abha)

September 2004

Alstom Shoaiba Power Plant

MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 5: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

HVACDIVISION

HVAC Engr Purchaser

Store keeper

Forman Forman Forman Forman Forman Forman Helper

Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker

Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers

Cashier

Supv Engineer Supv Engineer

ELECTRICALDIVISION

Computer Operator

DIVISION

Mechanical EngrCivil EngineerElect Engineer

Supv Engineer

Pipeline CP Engr

Supv Engineer

Mechanical Engr

Public Relation Off

ADMIN MANAGER

SERVICES

Personnel Officer

Safety Loss Prev Engr

CONSTRUCTION

Planning amp Control Div Manager

OVERHAULINGPIPELINE amp CP GENERATOR

Civil Engineer

INDUSTRIALCIVIL

Design Draftsman

Mechanical Engineer

PROJECT OPERATIONS

DIVISION DIVISION

PLANNING amp CONTROL

Jeddah - Saudi Arabia

DIVISION

Quantity Engineer

DIVISION

over-all Projects Coord

Technical Support StaffElectrical Engineer

Quality Control Engineer

Supv Engineer Material Planner

BASHIR AHMED DOST MOHAMMAD EST

FINANCE MANAGER

Finance Controller

TECHNICAL amp COOR

PlanningCost Engineer

Supv Engineer

MATERIALMAINTENANCE DIVISION

Exec Secretary

Demo VersionDemo Version

BUSINESS FUNCTION

MAJOR ACTIVITIES

Generators Overhauling

Revamping of Power House Electrical system

Low Medium and High Voltage Switchgear Maintenance

Low Medium and High Voltage Motors Maintenance and overhauling

Electrical Repairing and Refurbishment

Process Plant Installation and Maintenance

Heat Exchanger Maintenance

Refurbishment of Distillation Tower

Boiler Maintenance

New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Cooling Tower Maintenance

Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Cathodic Protection System Installation Commissioning and maintenance

Cold Storage Refrigeration and HVAC System Installation and Maintenance

Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

Supply of Personal Protective Equipment amp Firefighting system

Civil Construction

Generators Overhauling

We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

Remove bearing caps inner and outer end shields end bearings

Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

Removing the existing end winding insulation and repair it where it required

Cleaning the stator housing and both end windings painting end winding with anti tracing paint

Cleaning all components properly and reinstall all the components on its original locations

Revamping of Power House Electrical system

Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

Low Medium and High Voltage Switchgear Maintenance

Switch gear Inspection and trouble shootingPer commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etcMechanical Alignment maintenance of the opening and closing system trouble shooting and Energization testProtection Relay system and CalibrationProtection system upgrading and refurbishment

Low Medium and High Voltage Motors Maintenance and overhauling

Inspection of motors

Dismantling

Carrying out all the required testsDeveloping of test records and their interpretation

Supply of motors

Rewinding of motors

Making the recommendations based on inspection and test

Electrical Repairing and Refurbishment

Electrical distribution maintenance troubleshooting and extensionsInstallation maintenance and extension of lighting distribution and low power systemsInstallation of low voltage distribution as well as control panelsInstallation laying and testing of low voltage cables and cable tray systemDC distribution including batteries and battery chargers and their installation testing and commissioningInstallation of emergency power generating systemProviding around the clock emergency services

Process Plant Installation and Maintenance

We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

Power PlantsWater Treatment PlantsCement PlantsSugar PlantsFood Industries

Heat Exchanger Maintenance

Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

Pulling of tube bundlesInternal and external hydro-blast cleaning of tubesRepair and Replacement of tubesRe-facing of tube sheetsFabrication of shellsPressure test

Refurbishment of Distillation Tower

Dismantling of traysCleaning of shell internals by hydro blast and grit blastRepair and replacement of bubble cup traysReplacement of rashing ringsCleaning and replacement of demister padsPressure test

Boiler Maintenance

Services are provided for the maintenance of water tube and fire tube boilers

Repair and replacement of tubes

De-scaling of internal and external boiler tubes including steam drums

Fire box and refractory repairs

New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Construction of steel tanks for petroleum chemicals and water

Tank cleaning

Bottom plate replacement

Repair and replacement of heating coils

Epoxy lining

Internal Coating

Replacement of Floating Fixed roof

Maintenance of pressure vacuum relief valve

Cooling Tower Maintenance

Cleaning of cooling tower cells

Replacement of wooden baffle plates

Repair maintenance amp replacement of Exhaust fan amp gearboxes

Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

Construction Maintenance amp Modification of buried carbon steel pipeline

Construction Maintenance amp Modification of non-metallic pipelines

Construction Maintenance amp Modification of fiberglass pipelines

Hydrostatic testing and commissioning of oil and gas pipelines

De commissioning and vacuum drying of pipelines

Mothballing of pipelines

Pigging and internal cleaning of pipelines

External coating repairs

Cathodic Protection System Installation Commissioning and maintenance

Cathodic protection (CP) system design and installation

Commissioning of Cathodic Protection system

Trouble shooting and maintenance of existing CP system

Up grading of existing CP system

Routine CP data monitoring

Data evaluation and upgrading recommendations

Cold Storage Refrigeration and HVAC System Installation and Maintenance

Installation and commissioning of cold storage systems

Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

Installation of cooling coils and condensers

Duct work installation Cleaning and Maintenance

Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

Supply of Personal Protective Equipment amp Firefighting system

Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

Human Resources

All personnel are able to understand speak both English and Arabic languages

Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

Block Visa available in our ESTABLISHMENT - Under Process

Following is the list of our affiliated Recruiting Agents

Agents Address Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom

Equipment Resources

The following table provides information of related equipment that is available for the work

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL

YEARMAKE

QTYOWNED

1 MOBILE CRANE 35 TON TADANO 1985 1

2 TANKER TRUCK (WATER)10000 amp

19000 GALNISSAN 1990 2

3 BOOM TRUCK 6 TON HINO 1985 1

4 POWER GENERATOR 35 KVA HONDA 1990 3

5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4

6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8

7 WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP LICON 1998 4

8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO

1991 1

9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1

10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO

1990 1

11 DEWATERING PUMP 600 GPM ROBIN 1990 3

12 PIPE THREADING MACHINE UP TO 16INCH

SET RIGID 1994 2

13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2

14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2

15 OXY-ACETYLENE CYLINDER SET -- 1993 8

16 ARGON-NITROGEN CYLINDER SET -- 5

17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4

18 CREW CAB 1frac12 TON NISSAN 1988 1

19 PASSENGER VAN 15 SEAT NISSAN 2002 2

20 FORKLIFT3 amp 7-12

TONTOYTO 1990 2

21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2

22 SAND BLASTING MACHINE SET GIRACO 1995 3

23 CATHODIC PROTECTION TEST EQUIPMENT

SET -- 1

24 UNDERGROUND PIPE LOCATOR SET -- 2

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMADEMODEL

YEARMAKE

QTYOWNED

25 SOIL COMPACTOR PORTABLE - 1

26 UNDERGROUNG CABEL DETECTOR SET -- 2

27 PIN BRAZING SET -- 3

28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3

29 EXCHANGER BUNDLE PULLER 9 METERS 1

30 BOBCAT 2

31 EXCAVATOR 1

32 MICRO TRENCHER 1

33 VACUUM TRUCK 14 TON NISSAN 1

34 ASPHALT CUTTER 2

35 HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI USA 1

36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3linkable Advantage 3 tempe-

rature programmer cont-rollers and 3 Energy regs

1

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

Safety meetings and dialoguesdiscussion

Safety Inspection

Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

GOING-ON PROJECTS

CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld

Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road

JeddahGoing-on

Saudi Electricity Company

ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length

or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-

lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah Going-on

Ministry of Defense

Engineering amp Housing Dept

Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah Going-on

Bashir Ahmed Dost Mohd Used

Lube Oil Re-refining Factory

1) Plot development2)Development of infrastructure for the

factory3)Construction of all underground

concrete tanks of utility4)Fabrication and Installation raw material

storage tanks intermediate storage tanks

Rabigh Going-on

COMPLETED PROJECTS

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd

MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJC

O

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd

MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Mechanical repairing works during emergency shutdown

Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation

(SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah October 30 2007

SAFA General Contractors amp Enterprises Co

Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah September 20 2007

Ministry ofDefense Housing amp Planning Dept

Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning

Jeddah August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram

MIJAJCO

Modification and Extension of Hatchery Building

Makkah May 2007

Fakieh Poultry Fram

MIJAJCO

Construction of Labour and staff accommodation Building

Makkah March 2007

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Fakieh Poultry Fram

MIJAJCOExtension of GP Hatchery Makkah April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

JeddahCompleted December

2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah December 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2)Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A

Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood

Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo

MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

ABB Saudi Arabia

MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power

MIJAJCOReplacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power

MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co

MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

SCECOYusuf Bin A Kanoo

MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power

Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial

Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant

Dammam

February 2005

Alstom GE Shoaiba Power

Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant

MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant

(Abha)

September 2004

Alstom Shoaiba Power Plant

MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 6: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

Demo VersionDemo Version

BUSINESS FUNCTION

MAJOR ACTIVITIES

Generators Overhauling

Revamping of Power House Electrical system

Low Medium and High Voltage Switchgear Maintenance

Low Medium and High Voltage Motors Maintenance and overhauling

Electrical Repairing and Refurbishment

Process Plant Installation and Maintenance

Heat Exchanger Maintenance

Refurbishment of Distillation Tower

Boiler Maintenance

New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Cooling Tower Maintenance

Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Cathodic Protection System Installation Commissioning and maintenance

Cold Storage Refrigeration and HVAC System Installation and Maintenance

Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

Supply of Personal Protective Equipment amp Firefighting system

Civil Construction

Generators Overhauling

We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

Remove bearing caps inner and outer end shields end bearings

Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

Removing the existing end winding insulation and repair it where it required

Cleaning the stator housing and both end windings painting end winding with anti tracing paint

Cleaning all components properly and reinstall all the components on its original locations

Revamping of Power House Electrical system

Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

Low Medium and High Voltage Switchgear Maintenance

Switch gear Inspection and trouble shootingPer commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etcMechanical Alignment maintenance of the opening and closing system trouble shooting and Energization testProtection Relay system and CalibrationProtection system upgrading and refurbishment

Low Medium and High Voltage Motors Maintenance and overhauling

Inspection of motors

Dismantling

Carrying out all the required testsDeveloping of test records and their interpretation

Supply of motors

Rewinding of motors

Making the recommendations based on inspection and test

Electrical Repairing and Refurbishment

Electrical distribution maintenance troubleshooting and extensionsInstallation maintenance and extension of lighting distribution and low power systemsInstallation of low voltage distribution as well as control panelsInstallation laying and testing of low voltage cables and cable tray systemDC distribution including batteries and battery chargers and their installation testing and commissioningInstallation of emergency power generating systemProviding around the clock emergency services

Process Plant Installation and Maintenance

We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

Power PlantsWater Treatment PlantsCement PlantsSugar PlantsFood Industries

Heat Exchanger Maintenance

Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

Pulling of tube bundlesInternal and external hydro-blast cleaning of tubesRepair and Replacement of tubesRe-facing of tube sheetsFabrication of shellsPressure test

Refurbishment of Distillation Tower

Dismantling of traysCleaning of shell internals by hydro blast and grit blastRepair and replacement of bubble cup traysReplacement of rashing ringsCleaning and replacement of demister padsPressure test

Boiler Maintenance

Services are provided for the maintenance of water tube and fire tube boilers

Repair and replacement of tubes

De-scaling of internal and external boiler tubes including steam drums

Fire box and refractory repairs

New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Construction of steel tanks for petroleum chemicals and water

Tank cleaning

Bottom plate replacement

Repair and replacement of heating coils

Epoxy lining

Internal Coating

Replacement of Floating Fixed roof

Maintenance of pressure vacuum relief valve

Cooling Tower Maintenance

Cleaning of cooling tower cells

Replacement of wooden baffle plates

Repair maintenance amp replacement of Exhaust fan amp gearboxes

Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

Construction Maintenance amp Modification of buried carbon steel pipeline

Construction Maintenance amp Modification of non-metallic pipelines

Construction Maintenance amp Modification of fiberglass pipelines

Hydrostatic testing and commissioning of oil and gas pipelines

De commissioning and vacuum drying of pipelines

Mothballing of pipelines

Pigging and internal cleaning of pipelines

External coating repairs

Cathodic Protection System Installation Commissioning and maintenance

Cathodic protection (CP) system design and installation

Commissioning of Cathodic Protection system

Trouble shooting and maintenance of existing CP system

Up grading of existing CP system

Routine CP data monitoring

Data evaluation and upgrading recommendations

Cold Storage Refrigeration and HVAC System Installation and Maintenance

Installation and commissioning of cold storage systems

Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

Installation of cooling coils and condensers

Duct work installation Cleaning and Maintenance

Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

Supply of Personal Protective Equipment amp Firefighting system

Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

Human Resources

All personnel are able to understand speak both English and Arabic languages

Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

Block Visa available in our ESTABLISHMENT - Under Process

Following is the list of our affiliated Recruiting Agents

Agents Address Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom

Equipment Resources

The following table provides information of related equipment that is available for the work

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL

YEARMAKE

QTYOWNED

1 MOBILE CRANE 35 TON TADANO 1985 1

2 TANKER TRUCK (WATER)10000 amp

19000 GALNISSAN 1990 2

3 BOOM TRUCK 6 TON HINO 1985 1

4 POWER GENERATOR 35 KVA HONDA 1990 3

5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4

6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8

7 WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP LICON 1998 4

8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO

1991 1

9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1

10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO

1990 1

11 DEWATERING PUMP 600 GPM ROBIN 1990 3

12 PIPE THREADING MACHINE UP TO 16INCH

SET RIGID 1994 2

13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2

14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2

15 OXY-ACETYLENE CYLINDER SET -- 1993 8

16 ARGON-NITROGEN CYLINDER SET -- 5

17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4

18 CREW CAB 1frac12 TON NISSAN 1988 1

19 PASSENGER VAN 15 SEAT NISSAN 2002 2

20 FORKLIFT3 amp 7-12

TONTOYTO 1990 2

21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2

22 SAND BLASTING MACHINE SET GIRACO 1995 3

23 CATHODIC PROTECTION TEST EQUIPMENT

SET -- 1

24 UNDERGROUND PIPE LOCATOR SET -- 2

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMADEMODEL

YEARMAKE

QTYOWNED

25 SOIL COMPACTOR PORTABLE - 1

26 UNDERGROUNG CABEL DETECTOR SET -- 2

27 PIN BRAZING SET -- 3

28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3

29 EXCHANGER BUNDLE PULLER 9 METERS 1

30 BOBCAT 2

31 EXCAVATOR 1

32 MICRO TRENCHER 1

33 VACUUM TRUCK 14 TON NISSAN 1

34 ASPHALT CUTTER 2

35 HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI USA 1

36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3linkable Advantage 3 tempe-

rature programmer cont-rollers and 3 Energy regs

1

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

Safety meetings and dialoguesdiscussion

Safety Inspection

Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

GOING-ON PROJECTS

CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld

Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road

JeddahGoing-on

Saudi Electricity Company

ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length

or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-

lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah Going-on

Ministry of Defense

Engineering amp Housing Dept

Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah Going-on

Bashir Ahmed Dost Mohd Used

Lube Oil Re-refining Factory

1) Plot development2)Development of infrastructure for the

factory3)Construction of all underground

concrete tanks of utility4)Fabrication and Installation raw material

storage tanks intermediate storage tanks

Rabigh Going-on

COMPLETED PROJECTS

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd

MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJC

O

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd

MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Mechanical repairing works during emergency shutdown

Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation

(SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah October 30 2007

SAFA General Contractors amp Enterprises Co

Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah September 20 2007

Ministry ofDefense Housing amp Planning Dept

Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning

Jeddah August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram

MIJAJCO

Modification and Extension of Hatchery Building

Makkah May 2007

Fakieh Poultry Fram

MIJAJCO

Construction of Labour and staff accommodation Building

Makkah March 2007

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Fakieh Poultry Fram

MIJAJCOExtension of GP Hatchery Makkah April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

JeddahCompleted December

2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah December 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2)Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A

Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood

Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo

MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

ABB Saudi Arabia

MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power

MIJAJCOReplacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power

MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co

MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

SCECOYusuf Bin A Kanoo

MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power

Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial

Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant

Dammam

February 2005

Alstom GE Shoaiba Power

Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant

MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant

(Abha)

September 2004

Alstom Shoaiba Power Plant

MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 7: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

BUSINESS FUNCTION

MAJOR ACTIVITIES

Generators Overhauling

Revamping of Power House Electrical system

Low Medium and High Voltage Switchgear Maintenance

Low Medium and High Voltage Motors Maintenance and overhauling

Electrical Repairing and Refurbishment

Process Plant Installation and Maintenance

Heat Exchanger Maintenance

Refurbishment of Distillation Tower

Boiler Maintenance

New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Cooling Tower Maintenance

Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Cathodic Protection System Installation Commissioning and maintenance

Cold Storage Refrigeration and HVAC System Installation and Maintenance

Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

Supply of Personal Protective Equipment amp Firefighting system

Civil Construction

Generators Overhauling

We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

Remove bearing caps inner and outer end shields end bearings

Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

Removing the existing end winding insulation and repair it where it required

Cleaning the stator housing and both end windings painting end winding with anti tracing paint

Cleaning all components properly and reinstall all the components on its original locations

Revamping of Power House Electrical system

Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

Low Medium and High Voltage Switchgear Maintenance

Switch gear Inspection and trouble shootingPer commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etcMechanical Alignment maintenance of the opening and closing system trouble shooting and Energization testProtection Relay system and CalibrationProtection system upgrading and refurbishment

Low Medium and High Voltage Motors Maintenance and overhauling

Inspection of motors

Dismantling

Carrying out all the required testsDeveloping of test records and their interpretation

Supply of motors

Rewinding of motors

Making the recommendations based on inspection and test

Electrical Repairing and Refurbishment

Electrical distribution maintenance troubleshooting and extensionsInstallation maintenance and extension of lighting distribution and low power systemsInstallation of low voltage distribution as well as control panelsInstallation laying and testing of low voltage cables and cable tray systemDC distribution including batteries and battery chargers and their installation testing and commissioningInstallation of emergency power generating systemProviding around the clock emergency services

Process Plant Installation and Maintenance

We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

Power PlantsWater Treatment PlantsCement PlantsSugar PlantsFood Industries

Heat Exchanger Maintenance

Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

Pulling of tube bundlesInternal and external hydro-blast cleaning of tubesRepair and Replacement of tubesRe-facing of tube sheetsFabrication of shellsPressure test

Refurbishment of Distillation Tower

Dismantling of traysCleaning of shell internals by hydro blast and grit blastRepair and replacement of bubble cup traysReplacement of rashing ringsCleaning and replacement of demister padsPressure test

Boiler Maintenance

Services are provided for the maintenance of water tube and fire tube boilers

Repair and replacement of tubes

De-scaling of internal and external boiler tubes including steam drums

Fire box and refractory repairs

New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Construction of steel tanks for petroleum chemicals and water

Tank cleaning

Bottom plate replacement

Repair and replacement of heating coils

Epoxy lining

Internal Coating

Replacement of Floating Fixed roof

Maintenance of pressure vacuum relief valve

Cooling Tower Maintenance

Cleaning of cooling tower cells

Replacement of wooden baffle plates

Repair maintenance amp replacement of Exhaust fan amp gearboxes

Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

Construction Maintenance amp Modification of buried carbon steel pipeline

Construction Maintenance amp Modification of non-metallic pipelines

Construction Maintenance amp Modification of fiberglass pipelines

Hydrostatic testing and commissioning of oil and gas pipelines

De commissioning and vacuum drying of pipelines

Mothballing of pipelines

Pigging and internal cleaning of pipelines

External coating repairs

Cathodic Protection System Installation Commissioning and maintenance

Cathodic protection (CP) system design and installation

Commissioning of Cathodic Protection system

Trouble shooting and maintenance of existing CP system

Up grading of existing CP system

Routine CP data monitoring

Data evaluation and upgrading recommendations

Cold Storage Refrigeration and HVAC System Installation and Maintenance

Installation and commissioning of cold storage systems

Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

Installation of cooling coils and condensers

Duct work installation Cleaning and Maintenance

Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

Supply of Personal Protective Equipment amp Firefighting system

Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

Human Resources

All personnel are able to understand speak both English and Arabic languages

Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

Block Visa available in our ESTABLISHMENT - Under Process

Following is the list of our affiliated Recruiting Agents

Agents Address Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom

Equipment Resources

The following table provides information of related equipment that is available for the work

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL

YEARMAKE

QTYOWNED

1 MOBILE CRANE 35 TON TADANO 1985 1

2 TANKER TRUCK (WATER)10000 amp

19000 GALNISSAN 1990 2

3 BOOM TRUCK 6 TON HINO 1985 1

4 POWER GENERATOR 35 KVA HONDA 1990 3

5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4

6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8

7 WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP LICON 1998 4

8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO

1991 1

9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1

10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO

1990 1

11 DEWATERING PUMP 600 GPM ROBIN 1990 3

12 PIPE THREADING MACHINE UP TO 16INCH

SET RIGID 1994 2

13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2

14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2

15 OXY-ACETYLENE CYLINDER SET -- 1993 8

16 ARGON-NITROGEN CYLINDER SET -- 5

17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4

18 CREW CAB 1frac12 TON NISSAN 1988 1

19 PASSENGER VAN 15 SEAT NISSAN 2002 2

20 FORKLIFT3 amp 7-12

TONTOYTO 1990 2

21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2

22 SAND BLASTING MACHINE SET GIRACO 1995 3

23 CATHODIC PROTECTION TEST EQUIPMENT

SET -- 1

24 UNDERGROUND PIPE LOCATOR SET -- 2

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMADEMODEL

YEARMAKE

QTYOWNED

25 SOIL COMPACTOR PORTABLE - 1

26 UNDERGROUNG CABEL DETECTOR SET -- 2

27 PIN BRAZING SET -- 3

28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3

29 EXCHANGER BUNDLE PULLER 9 METERS 1

30 BOBCAT 2

31 EXCAVATOR 1

32 MICRO TRENCHER 1

33 VACUUM TRUCK 14 TON NISSAN 1

34 ASPHALT CUTTER 2

35 HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI USA 1

36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3linkable Advantage 3 tempe-

rature programmer cont-rollers and 3 Energy regs

1

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

Safety meetings and dialoguesdiscussion

Safety Inspection

Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

GOING-ON PROJECTS

CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld

Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road

JeddahGoing-on

Saudi Electricity Company

ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length

or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-

lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah Going-on

Ministry of Defense

Engineering amp Housing Dept

Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah Going-on

Bashir Ahmed Dost Mohd Used

Lube Oil Re-refining Factory

1) Plot development2)Development of infrastructure for the

factory3)Construction of all underground

concrete tanks of utility4)Fabrication and Installation raw material

storage tanks intermediate storage tanks

Rabigh Going-on

COMPLETED PROJECTS

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd

MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJC

O

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd

MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Mechanical repairing works during emergency shutdown

Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation

(SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah October 30 2007

SAFA General Contractors amp Enterprises Co

Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah September 20 2007

Ministry ofDefense Housing amp Planning Dept

Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning

Jeddah August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram

MIJAJCO

Modification and Extension of Hatchery Building

Makkah May 2007

Fakieh Poultry Fram

MIJAJCO

Construction of Labour and staff accommodation Building

Makkah March 2007

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Fakieh Poultry Fram

MIJAJCOExtension of GP Hatchery Makkah April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

JeddahCompleted December

2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah December 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2)Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A

Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood

Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo

MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

ABB Saudi Arabia

MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power

MIJAJCOReplacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power

MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co

MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

SCECOYusuf Bin A Kanoo

MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power

Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial

Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant

Dammam

February 2005

Alstom GE Shoaiba Power

Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant

MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant

(Abha)

September 2004

Alstom Shoaiba Power Plant

MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 8: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

Generators Overhauling

We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

Remove bearing caps inner and outer end shields end bearings

Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

Removing the existing end winding insulation and repair it where it required

Cleaning the stator housing and both end windings painting end winding with anti tracing paint

Cleaning all components properly and reinstall all the components on its original locations

Revamping of Power House Electrical system

Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

Low Medium and High Voltage Switchgear Maintenance

Switch gear Inspection and trouble shootingPer commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etcMechanical Alignment maintenance of the opening and closing system trouble shooting and Energization testProtection Relay system and CalibrationProtection system upgrading and refurbishment

Low Medium and High Voltage Motors Maintenance and overhauling

Inspection of motors

Dismantling

Carrying out all the required testsDeveloping of test records and their interpretation

Supply of motors

Rewinding of motors

Making the recommendations based on inspection and test

Electrical Repairing and Refurbishment

Electrical distribution maintenance troubleshooting and extensionsInstallation maintenance and extension of lighting distribution and low power systemsInstallation of low voltage distribution as well as control panelsInstallation laying and testing of low voltage cables and cable tray systemDC distribution including batteries and battery chargers and their installation testing and commissioningInstallation of emergency power generating systemProviding around the clock emergency services

Process Plant Installation and Maintenance

We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

Power PlantsWater Treatment PlantsCement PlantsSugar PlantsFood Industries

Heat Exchanger Maintenance

Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

Pulling of tube bundlesInternal and external hydro-blast cleaning of tubesRepair and Replacement of tubesRe-facing of tube sheetsFabrication of shellsPressure test

Refurbishment of Distillation Tower

Dismantling of traysCleaning of shell internals by hydro blast and grit blastRepair and replacement of bubble cup traysReplacement of rashing ringsCleaning and replacement of demister padsPressure test

Boiler Maintenance

Services are provided for the maintenance of water tube and fire tube boilers

Repair and replacement of tubes

De-scaling of internal and external boiler tubes including steam drums

Fire box and refractory repairs

New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Construction of steel tanks for petroleum chemicals and water

Tank cleaning

Bottom plate replacement

Repair and replacement of heating coils

Epoxy lining

Internal Coating

Replacement of Floating Fixed roof

Maintenance of pressure vacuum relief valve

Cooling Tower Maintenance

Cleaning of cooling tower cells

Replacement of wooden baffle plates

Repair maintenance amp replacement of Exhaust fan amp gearboxes

Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

Construction Maintenance amp Modification of buried carbon steel pipeline

Construction Maintenance amp Modification of non-metallic pipelines

Construction Maintenance amp Modification of fiberglass pipelines

Hydrostatic testing and commissioning of oil and gas pipelines

De commissioning and vacuum drying of pipelines

Mothballing of pipelines

Pigging and internal cleaning of pipelines

External coating repairs

Cathodic Protection System Installation Commissioning and maintenance

Cathodic protection (CP) system design and installation

Commissioning of Cathodic Protection system

Trouble shooting and maintenance of existing CP system

Up grading of existing CP system

Routine CP data monitoring

Data evaluation and upgrading recommendations

Cold Storage Refrigeration and HVAC System Installation and Maintenance

Installation and commissioning of cold storage systems

Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

Installation of cooling coils and condensers

Duct work installation Cleaning and Maintenance

Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

Supply of Personal Protective Equipment amp Firefighting system

Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

Human Resources

All personnel are able to understand speak both English and Arabic languages

Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

Block Visa available in our ESTABLISHMENT - Under Process

Following is the list of our affiliated Recruiting Agents

Agents Address Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom

Equipment Resources

The following table provides information of related equipment that is available for the work

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL

YEARMAKE

QTYOWNED

1 MOBILE CRANE 35 TON TADANO 1985 1

2 TANKER TRUCK (WATER)10000 amp

19000 GALNISSAN 1990 2

3 BOOM TRUCK 6 TON HINO 1985 1

4 POWER GENERATOR 35 KVA HONDA 1990 3

5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4

6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8

7 WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP LICON 1998 4

8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO

1991 1

9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1

10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO

1990 1

11 DEWATERING PUMP 600 GPM ROBIN 1990 3

12 PIPE THREADING MACHINE UP TO 16INCH

SET RIGID 1994 2

13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2

14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2

15 OXY-ACETYLENE CYLINDER SET -- 1993 8

16 ARGON-NITROGEN CYLINDER SET -- 5

17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4

18 CREW CAB 1frac12 TON NISSAN 1988 1

19 PASSENGER VAN 15 SEAT NISSAN 2002 2

20 FORKLIFT3 amp 7-12

TONTOYTO 1990 2

21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2

22 SAND BLASTING MACHINE SET GIRACO 1995 3

23 CATHODIC PROTECTION TEST EQUIPMENT

SET -- 1

24 UNDERGROUND PIPE LOCATOR SET -- 2

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMADEMODEL

YEARMAKE

QTYOWNED

25 SOIL COMPACTOR PORTABLE - 1

26 UNDERGROUNG CABEL DETECTOR SET -- 2

27 PIN BRAZING SET -- 3

28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3

29 EXCHANGER BUNDLE PULLER 9 METERS 1

30 BOBCAT 2

31 EXCAVATOR 1

32 MICRO TRENCHER 1

33 VACUUM TRUCK 14 TON NISSAN 1

34 ASPHALT CUTTER 2

35 HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI USA 1

36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3linkable Advantage 3 tempe-

rature programmer cont-rollers and 3 Energy regs

1

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

Safety meetings and dialoguesdiscussion

Safety Inspection

Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

GOING-ON PROJECTS

CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld

Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road

JeddahGoing-on

Saudi Electricity Company

ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length

or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-

lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah Going-on

Ministry of Defense

Engineering amp Housing Dept

Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah Going-on

Bashir Ahmed Dost Mohd Used

Lube Oil Re-refining Factory

1) Plot development2)Development of infrastructure for the

factory3)Construction of all underground

concrete tanks of utility4)Fabrication and Installation raw material

storage tanks intermediate storage tanks

Rabigh Going-on

COMPLETED PROJECTS

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd

MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJC

O

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd

MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Mechanical repairing works during emergency shutdown

Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation

(SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah October 30 2007

SAFA General Contractors amp Enterprises Co

Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah September 20 2007

Ministry ofDefense Housing amp Planning Dept

Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning

Jeddah August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram

MIJAJCO

Modification and Extension of Hatchery Building

Makkah May 2007

Fakieh Poultry Fram

MIJAJCO

Construction of Labour and staff accommodation Building

Makkah March 2007

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Fakieh Poultry Fram

MIJAJCOExtension of GP Hatchery Makkah April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

JeddahCompleted December

2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah December 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2)Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A

Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood

Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo

MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

ABB Saudi Arabia

MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power

MIJAJCOReplacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power

MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co

MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

SCECOYusuf Bin A Kanoo

MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power

Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial

Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant

Dammam

February 2005

Alstom GE Shoaiba Power

Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant

MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant

(Abha)

September 2004

Alstom Shoaiba Power Plant

MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 9: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

Low Medium and High Voltage Switchgear Maintenance

Switch gear Inspection and trouble shootingPer commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etcMechanical Alignment maintenance of the opening and closing system trouble shooting and Energization testProtection Relay system and CalibrationProtection system upgrading and refurbishment

Low Medium and High Voltage Motors Maintenance and overhauling

Inspection of motors

Dismantling

Carrying out all the required testsDeveloping of test records and their interpretation

Supply of motors

Rewinding of motors

Making the recommendations based on inspection and test

Electrical Repairing and Refurbishment

Electrical distribution maintenance troubleshooting and extensionsInstallation maintenance and extension of lighting distribution and low power systemsInstallation of low voltage distribution as well as control panelsInstallation laying and testing of low voltage cables and cable tray systemDC distribution including batteries and battery chargers and their installation testing and commissioningInstallation of emergency power generating systemProviding around the clock emergency services

Process Plant Installation and Maintenance

We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

Power PlantsWater Treatment PlantsCement PlantsSugar PlantsFood Industries

Heat Exchanger Maintenance

Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

Pulling of tube bundlesInternal and external hydro-blast cleaning of tubesRepair and Replacement of tubesRe-facing of tube sheetsFabrication of shellsPressure test

Refurbishment of Distillation Tower

Dismantling of traysCleaning of shell internals by hydro blast and grit blastRepair and replacement of bubble cup traysReplacement of rashing ringsCleaning and replacement of demister padsPressure test

Boiler Maintenance

Services are provided for the maintenance of water tube and fire tube boilers

Repair and replacement of tubes

De-scaling of internal and external boiler tubes including steam drums

Fire box and refractory repairs

New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Construction of steel tanks for petroleum chemicals and water

Tank cleaning

Bottom plate replacement

Repair and replacement of heating coils

Epoxy lining

Internal Coating

Replacement of Floating Fixed roof

Maintenance of pressure vacuum relief valve

Cooling Tower Maintenance

Cleaning of cooling tower cells

Replacement of wooden baffle plates

Repair maintenance amp replacement of Exhaust fan amp gearboxes

Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

Construction Maintenance amp Modification of buried carbon steel pipeline

Construction Maintenance amp Modification of non-metallic pipelines

Construction Maintenance amp Modification of fiberglass pipelines

Hydrostatic testing and commissioning of oil and gas pipelines

De commissioning and vacuum drying of pipelines

Mothballing of pipelines

Pigging and internal cleaning of pipelines

External coating repairs

Cathodic Protection System Installation Commissioning and maintenance

Cathodic protection (CP) system design and installation

Commissioning of Cathodic Protection system

Trouble shooting and maintenance of existing CP system

Up grading of existing CP system

Routine CP data monitoring

Data evaluation and upgrading recommendations

Cold Storage Refrigeration and HVAC System Installation and Maintenance

Installation and commissioning of cold storage systems

Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

Installation of cooling coils and condensers

Duct work installation Cleaning and Maintenance

Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

Supply of Personal Protective Equipment amp Firefighting system

Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

Human Resources

All personnel are able to understand speak both English and Arabic languages

Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

Block Visa available in our ESTABLISHMENT - Under Process

Following is the list of our affiliated Recruiting Agents

Agents Address Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom

Equipment Resources

The following table provides information of related equipment that is available for the work

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL

YEARMAKE

QTYOWNED

1 MOBILE CRANE 35 TON TADANO 1985 1

2 TANKER TRUCK (WATER)10000 amp

19000 GALNISSAN 1990 2

3 BOOM TRUCK 6 TON HINO 1985 1

4 POWER GENERATOR 35 KVA HONDA 1990 3

5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4

6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8

7 WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP LICON 1998 4

8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO

1991 1

9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1

10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO

1990 1

11 DEWATERING PUMP 600 GPM ROBIN 1990 3

12 PIPE THREADING MACHINE UP TO 16INCH

SET RIGID 1994 2

13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2

14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2

15 OXY-ACETYLENE CYLINDER SET -- 1993 8

16 ARGON-NITROGEN CYLINDER SET -- 5

17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4

18 CREW CAB 1frac12 TON NISSAN 1988 1

19 PASSENGER VAN 15 SEAT NISSAN 2002 2

20 FORKLIFT3 amp 7-12

TONTOYTO 1990 2

21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2

22 SAND BLASTING MACHINE SET GIRACO 1995 3

23 CATHODIC PROTECTION TEST EQUIPMENT

SET -- 1

24 UNDERGROUND PIPE LOCATOR SET -- 2

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMADEMODEL

YEARMAKE

QTYOWNED

25 SOIL COMPACTOR PORTABLE - 1

26 UNDERGROUNG CABEL DETECTOR SET -- 2

27 PIN BRAZING SET -- 3

28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3

29 EXCHANGER BUNDLE PULLER 9 METERS 1

30 BOBCAT 2

31 EXCAVATOR 1

32 MICRO TRENCHER 1

33 VACUUM TRUCK 14 TON NISSAN 1

34 ASPHALT CUTTER 2

35 HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI USA 1

36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3linkable Advantage 3 tempe-

rature programmer cont-rollers and 3 Energy regs

1

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

Safety meetings and dialoguesdiscussion

Safety Inspection

Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

GOING-ON PROJECTS

CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld

Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road

JeddahGoing-on

Saudi Electricity Company

ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length

or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-

lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah Going-on

Ministry of Defense

Engineering amp Housing Dept

Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah Going-on

Bashir Ahmed Dost Mohd Used

Lube Oil Re-refining Factory

1) Plot development2)Development of infrastructure for the

factory3)Construction of all underground

concrete tanks of utility4)Fabrication and Installation raw material

storage tanks intermediate storage tanks

Rabigh Going-on

COMPLETED PROJECTS

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd

MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJC

O

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd

MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Mechanical repairing works during emergency shutdown

Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation

(SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah October 30 2007

SAFA General Contractors amp Enterprises Co

Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah September 20 2007

Ministry ofDefense Housing amp Planning Dept

Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning

Jeddah August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram

MIJAJCO

Modification and Extension of Hatchery Building

Makkah May 2007

Fakieh Poultry Fram

MIJAJCO

Construction of Labour and staff accommodation Building

Makkah March 2007

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Fakieh Poultry Fram

MIJAJCOExtension of GP Hatchery Makkah April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

JeddahCompleted December

2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah December 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2)Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A

Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood

Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo

MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

ABB Saudi Arabia

MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power

MIJAJCOReplacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power

MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co

MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

SCECOYusuf Bin A Kanoo

MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power

Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial

Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant

Dammam

February 2005

Alstom GE Shoaiba Power

Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant

MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant

(Abha)

September 2004

Alstom Shoaiba Power Plant

MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 10: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

Process Plant Installation and Maintenance

We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

Power PlantsWater Treatment PlantsCement PlantsSugar PlantsFood Industries

Heat Exchanger Maintenance

Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

Pulling of tube bundlesInternal and external hydro-blast cleaning of tubesRepair and Replacement of tubesRe-facing of tube sheetsFabrication of shellsPressure test

Refurbishment of Distillation Tower

Dismantling of traysCleaning of shell internals by hydro blast and grit blastRepair and replacement of bubble cup traysReplacement of rashing ringsCleaning and replacement of demister padsPressure test

Boiler Maintenance

Services are provided for the maintenance of water tube and fire tube boilers

Repair and replacement of tubes

De-scaling of internal and external boiler tubes including steam drums

Fire box and refractory repairs

New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Construction of steel tanks for petroleum chemicals and water

Tank cleaning

Bottom plate replacement

Repair and replacement of heating coils

Epoxy lining

Internal Coating

Replacement of Floating Fixed roof

Maintenance of pressure vacuum relief valve

Cooling Tower Maintenance

Cleaning of cooling tower cells

Replacement of wooden baffle plates

Repair maintenance amp replacement of Exhaust fan amp gearboxes

Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

Construction Maintenance amp Modification of buried carbon steel pipeline

Construction Maintenance amp Modification of non-metallic pipelines

Construction Maintenance amp Modification of fiberglass pipelines

Hydrostatic testing and commissioning of oil and gas pipelines

De commissioning and vacuum drying of pipelines

Mothballing of pipelines

Pigging and internal cleaning of pipelines

External coating repairs

Cathodic Protection System Installation Commissioning and maintenance

Cathodic protection (CP) system design and installation

Commissioning of Cathodic Protection system

Trouble shooting and maintenance of existing CP system

Up grading of existing CP system

Routine CP data monitoring

Data evaluation and upgrading recommendations

Cold Storage Refrigeration and HVAC System Installation and Maintenance

Installation and commissioning of cold storage systems

Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

Installation of cooling coils and condensers

Duct work installation Cleaning and Maintenance

Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

Supply of Personal Protective Equipment amp Firefighting system

Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

Human Resources

All personnel are able to understand speak both English and Arabic languages

Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

Block Visa available in our ESTABLISHMENT - Under Process

Following is the list of our affiliated Recruiting Agents

Agents Address Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom

Equipment Resources

The following table provides information of related equipment that is available for the work

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL

YEARMAKE

QTYOWNED

1 MOBILE CRANE 35 TON TADANO 1985 1

2 TANKER TRUCK (WATER)10000 amp

19000 GALNISSAN 1990 2

3 BOOM TRUCK 6 TON HINO 1985 1

4 POWER GENERATOR 35 KVA HONDA 1990 3

5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4

6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8

7 WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP LICON 1998 4

8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO

1991 1

9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1

10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO

1990 1

11 DEWATERING PUMP 600 GPM ROBIN 1990 3

12 PIPE THREADING MACHINE UP TO 16INCH

SET RIGID 1994 2

13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2

14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2

15 OXY-ACETYLENE CYLINDER SET -- 1993 8

16 ARGON-NITROGEN CYLINDER SET -- 5

17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4

18 CREW CAB 1frac12 TON NISSAN 1988 1

19 PASSENGER VAN 15 SEAT NISSAN 2002 2

20 FORKLIFT3 amp 7-12

TONTOYTO 1990 2

21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2

22 SAND BLASTING MACHINE SET GIRACO 1995 3

23 CATHODIC PROTECTION TEST EQUIPMENT

SET -- 1

24 UNDERGROUND PIPE LOCATOR SET -- 2

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMADEMODEL

YEARMAKE

QTYOWNED

25 SOIL COMPACTOR PORTABLE - 1

26 UNDERGROUNG CABEL DETECTOR SET -- 2

27 PIN BRAZING SET -- 3

28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3

29 EXCHANGER BUNDLE PULLER 9 METERS 1

30 BOBCAT 2

31 EXCAVATOR 1

32 MICRO TRENCHER 1

33 VACUUM TRUCK 14 TON NISSAN 1

34 ASPHALT CUTTER 2

35 HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI USA 1

36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3linkable Advantage 3 tempe-

rature programmer cont-rollers and 3 Energy regs

1

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

Safety meetings and dialoguesdiscussion

Safety Inspection

Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

GOING-ON PROJECTS

CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld

Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road

JeddahGoing-on

Saudi Electricity Company

ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length

or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-

lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah Going-on

Ministry of Defense

Engineering amp Housing Dept

Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah Going-on

Bashir Ahmed Dost Mohd Used

Lube Oil Re-refining Factory

1) Plot development2)Development of infrastructure for the

factory3)Construction of all underground

concrete tanks of utility4)Fabrication and Installation raw material

storage tanks intermediate storage tanks

Rabigh Going-on

COMPLETED PROJECTS

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd

MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJC

O

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd

MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Mechanical repairing works during emergency shutdown

Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation

(SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah October 30 2007

SAFA General Contractors amp Enterprises Co

Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah September 20 2007

Ministry ofDefense Housing amp Planning Dept

Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning

Jeddah August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram

MIJAJCO

Modification and Extension of Hatchery Building

Makkah May 2007

Fakieh Poultry Fram

MIJAJCO

Construction of Labour and staff accommodation Building

Makkah March 2007

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Fakieh Poultry Fram

MIJAJCOExtension of GP Hatchery Makkah April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

JeddahCompleted December

2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah December 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2)Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A

Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood

Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo

MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

ABB Saudi Arabia

MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power

MIJAJCOReplacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power

MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co

MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

SCECOYusuf Bin A Kanoo

MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power

Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial

Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant

Dammam

February 2005

Alstom GE Shoaiba Power

Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant

MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant

(Abha)

September 2004

Alstom Shoaiba Power Plant

MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 11: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

Boiler Maintenance

Services are provided for the maintenance of water tube and fire tube boilers

Repair and replacement of tubes

De-scaling of internal and external boiler tubes including steam drums

Fire box and refractory repairs

New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Construction of steel tanks for petroleum chemicals and water

Tank cleaning

Bottom plate replacement

Repair and replacement of heating coils

Epoxy lining

Internal Coating

Replacement of Floating Fixed roof

Maintenance of pressure vacuum relief valve

Cooling Tower Maintenance

Cleaning of cooling tower cells

Replacement of wooden baffle plates

Repair maintenance amp replacement of Exhaust fan amp gearboxes

Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

Construction Maintenance amp Modification of buried carbon steel pipeline

Construction Maintenance amp Modification of non-metallic pipelines

Construction Maintenance amp Modification of fiberglass pipelines

Hydrostatic testing and commissioning of oil and gas pipelines

De commissioning and vacuum drying of pipelines

Mothballing of pipelines

Pigging and internal cleaning of pipelines

External coating repairs

Cathodic Protection System Installation Commissioning and maintenance

Cathodic protection (CP) system design and installation

Commissioning of Cathodic Protection system

Trouble shooting and maintenance of existing CP system

Up grading of existing CP system

Routine CP data monitoring

Data evaluation and upgrading recommendations

Cold Storage Refrigeration and HVAC System Installation and Maintenance

Installation and commissioning of cold storage systems

Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

Installation of cooling coils and condensers

Duct work installation Cleaning and Maintenance

Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

Supply of Personal Protective Equipment amp Firefighting system

Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

Human Resources

All personnel are able to understand speak both English and Arabic languages

Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

Block Visa available in our ESTABLISHMENT - Under Process

Following is the list of our affiliated Recruiting Agents

Agents Address Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom

Equipment Resources

The following table provides information of related equipment that is available for the work

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL

YEARMAKE

QTYOWNED

1 MOBILE CRANE 35 TON TADANO 1985 1

2 TANKER TRUCK (WATER)10000 amp

19000 GALNISSAN 1990 2

3 BOOM TRUCK 6 TON HINO 1985 1

4 POWER GENERATOR 35 KVA HONDA 1990 3

5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4

6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8

7 WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP LICON 1998 4

8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO

1991 1

9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1

10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO

1990 1

11 DEWATERING PUMP 600 GPM ROBIN 1990 3

12 PIPE THREADING MACHINE UP TO 16INCH

SET RIGID 1994 2

13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2

14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2

15 OXY-ACETYLENE CYLINDER SET -- 1993 8

16 ARGON-NITROGEN CYLINDER SET -- 5

17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4

18 CREW CAB 1frac12 TON NISSAN 1988 1

19 PASSENGER VAN 15 SEAT NISSAN 2002 2

20 FORKLIFT3 amp 7-12

TONTOYTO 1990 2

21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2

22 SAND BLASTING MACHINE SET GIRACO 1995 3

23 CATHODIC PROTECTION TEST EQUIPMENT

SET -- 1

24 UNDERGROUND PIPE LOCATOR SET -- 2

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMADEMODEL

YEARMAKE

QTYOWNED

25 SOIL COMPACTOR PORTABLE - 1

26 UNDERGROUNG CABEL DETECTOR SET -- 2

27 PIN BRAZING SET -- 3

28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3

29 EXCHANGER BUNDLE PULLER 9 METERS 1

30 BOBCAT 2

31 EXCAVATOR 1

32 MICRO TRENCHER 1

33 VACUUM TRUCK 14 TON NISSAN 1

34 ASPHALT CUTTER 2

35 HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI USA 1

36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3linkable Advantage 3 tempe-

rature programmer cont-rollers and 3 Energy regs

1

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

Safety meetings and dialoguesdiscussion

Safety Inspection

Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

GOING-ON PROJECTS

CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld

Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road

JeddahGoing-on

Saudi Electricity Company

ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length

or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-

lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah Going-on

Ministry of Defense

Engineering amp Housing Dept

Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah Going-on

Bashir Ahmed Dost Mohd Used

Lube Oil Re-refining Factory

1) Plot development2)Development of infrastructure for the

factory3)Construction of all underground

concrete tanks of utility4)Fabrication and Installation raw material

storage tanks intermediate storage tanks

Rabigh Going-on

COMPLETED PROJECTS

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd

MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJC

O

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd

MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Mechanical repairing works during emergency shutdown

Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation

(SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah October 30 2007

SAFA General Contractors amp Enterprises Co

Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah September 20 2007

Ministry ofDefense Housing amp Planning Dept

Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning

Jeddah August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram

MIJAJCO

Modification and Extension of Hatchery Building

Makkah May 2007

Fakieh Poultry Fram

MIJAJCO

Construction of Labour and staff accommodation Building

Makkah March 2007

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Fakieh Poultry Fram

MIJAJCOExtension of GP Hatchery Makkah April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

JeddahCompleted December

2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah December 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2)Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A

Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood

Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo

MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

ABB Saudi Arabia

MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power

MIJAJCOReplacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power

MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co

MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

SCECOYusuf Bin A Kanoo

MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power

Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial

Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant

Dammam

February 2005

Alstom GE Shoaiba Power

Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant

MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant

(Abha)

September 2004

Alstom Shoaiba Power Plant

MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 12: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

Construction Maintenance amp Modification of buried carbon steel pipeline

Construction Maintenance amp Modification of non-metallic pipelines

Construction Maintenance amp Modification of fiberglass pipelines

Hydrostatic testing and commissioning of oil and gas pipelines

De commissioning and vacuum drying of pipelines

Mothballing of pipelines

Pigging and internal cleaning of pipelines

External coating repairs

Cathodic Protection System Installation Commissioning and maintenance

Cathodic protection (CP) system design and installation

Commissioning of Cathodic Protection system

Trouble shooting and maintenance of existing CP system

Up grading of existing CP system

Routine CP data monitoring

Data evaluation and upgrading recommendations

Cold Storage Refrigeration and HVAC System Installation and Maintenance

Installation and commissioning of cold storage systems

Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

Installation of cooling coils and condensers

Duct work installation Cleaning and Maintenance

Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

Supply of Personal Protective Equipment amp Firefighting system

Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

Human Resources

All personnel are able to understand speak both English and Arabic languages

Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

Block Visa available in our ESTABLISHMENT - Under Process

Following is the list of our affiliated Recruiting Agents

Agents Address Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom

Equipment Resources

The following table provides information of related equipment that is available for the work

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL

YEARMAKE

QTYOWNED

1 MOBILE CRANE 35 TON TADANO 1985 1

2 TANKER TRUCK (WATER)10000 amp

19000 GALNISSAN 1990 2

3 BOOM TRUCK 6 TON HINO 1985 1

4 POWER GENERATOR 35 KVA HONDA 1990 3

5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4

6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8

7 WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP LICON 1998 4

8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO

1991 1

9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1

10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO

1990 1

11 DEWATERING PUMP 600 GPM ROBIN 1990 3

12 PIPE THREADING MACHINE UP TO 16INCH

SET RIGID 1994 2

13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2

14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2

15 OXY-ACETYLENE CYLINDER SET -- 1993 8

16 ARGON-NITROGEN CYLINDER SET -- 5

17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4

18 CREW CAB 1frac12 TON NISSAN 1988 1

19 PASSENGER VAN 15 SEAT NISSAN 2002 2

20 FORKLIFT3 amp 7-12

TONTOYTO 1990 2

21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2

22 SAND BLASTING MACHINE SET GIRACO 1995 3

23 CATHODIC PROTECTION TEST EQUIPMENT

SET -- 1

24 UNDERGROUND PIPE LOCATOR SET -- 2

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMADEMODEL

YEARMAKE

QTYOWNED

25 SOIL COMPACTOR PORTABLE - 1

26 UNDERGROUNG CABEL DETECTOR SET -- 2

27 PIN BRAZING SET -- 3

28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3

29 EXCHANGER BUNDLE PULLER 9 METERS 1

30 BOBCAT 2

31 EXCAVATOR 1

32 MICRO TRENCHER 1

33 VACUUM TRUCK 14 TON NISSAN 1

34 ASPHALT CUTTER 2

35 HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI USA 1

36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3linkable Advantage 3 tempe-

rature programmer cont-rollers and 3 Energy regs

1

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

Safety meetings and dialoguesdiscussion

Safety Inspection

Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

GOING-ON PROJECTS

CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld

Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road

JeddahGoing-on

Saudi Electricity Company

ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length

or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-

lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah Going-on

Ministry of Defense

Engineering amp Housing Dept

Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah Going-on

Bashir Ahmed Dost Mohd Used

Lube Oil Re-refining Factory

1) Plot development2)Development of infrastructure for the

factory3)Construction of all underground

concrete tanks of utility4)Fabrication and Installation raw material

storage tanks intermediate storage tanks

Rabigh Going-on

COMPLETED PROJECTS

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd

MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJC

O

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd

MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Mechanical repairing works during emergency shutdown

Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation

(SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah October 30 2007

SAFA General Contractors amp Enterprises Co

Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah September 20 2007

Ministry ofDefense Housing amp Planning Dept

Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning

Jeddah August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram

MIJAJCO

Modification and Extension of Hatchery Building

Makkah May 2007

Fakieh Poultry Fram

MIJAJCO

Construction of Labour and staff accommodation Building

Makkah March 2007

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Fakieh Poultry Fram

MIJAJCOExtension of GP Hatchery Makkah April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

JeddahCompleted December

2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah December 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2)Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A

Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood

Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo

MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

ABB Saudi Arabia

MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power

MIJAJCOReplacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power

MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co

MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

SCECOYusuf Bin A Kanoo

MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power

Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial

Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant

Dammam

February 2005

Alstom GE Shoaiba Power

Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant

MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant

(Abha)

September 2004

Alstom Shoaiba Power Plant

MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 13: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

Supply of Personal Protective Equipment amp Firefighting system

Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

Human Resources

All personnel are able to understand speak both English and Arabic languages

Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

Block Visa available in our ESTABLISHMENT - Under Process

Following is the list of our affiliated Recruiting Agents

Agents Address Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom

Equipment Resources

The following table provides information of related equipment that is available for the work

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL

YEARMAKE

QTYOWNED

1 MOBILE CRANE 35 TON TADANO 1985 1

2 TANKER TRUCK (WATER)10000 amp

19000 GALNISSAN 1990 2

3 BOOM TRUCK 6 TON HINO 1985 1

4 POWER GENERATOR 35 KVA HONDA 1990 3

5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4

6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8

7 WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP LICON 1998 4

8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO

1991 1

9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1

10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO

1990 1

11 DEWATERING PUMP 600 GPM ROBIN 1990 3

12 PIPE THREADING MACHINE UP TO 16INCH

SET RIGID 1994 2

13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2

14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2

15 OXY-ACETYLENE CYLINDER SET -- 1993 8

16 ARGON-NITROGEN CYLINDER SET -- 5

17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4

18 CREW CAB 1frac12 TON NISSAN 1988 1

19 PASSENGER VAN 15 SEAT NISSAN 2002 2

20 FORKLIFT3 amp 7-12

TONTOYTO 1990 2

21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2

22 SAND BLASTING MACHINE SET GIRACO 1995 3

23 CATHODIC PROTECTION TEST EQUIPMENT

SET -- 1

24 UNDERGROUND PIPE LOCATOR SET -- 2

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMADEMODEL

YEARMAKE

QTYOWNED

25 SOIL COMPACTOR PORTABLE - 1

26 UNDERGROUNG CABEL DETECTOR SET -- 2

27 PIN BRAZING SET -- 3

28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3

29 EXCHANGER BUNDLE PULLER 9 METERS 1

30 BOBCAT 2

31 EXCAVATOR 1

32 MICRO TRENCHER 1

33 VACUUM TRUCK 14 TON NISSAN 1

34 ASPHALT CUTTER 2

35 HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI USA 1

36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3linkable Advantage 3 tempe-

rature programmer cont-rollers and 3 Energy regs

1

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

Safety meetings and dialoguesdiscussion

Safety Inspection

Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

GOING-ON PROJECTS

CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld

Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road

JeddahGoing-on

Saudi Electricity Company

ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length

or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-

lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah Going-on

Ministry of Defense

Engineering amp Housing Dept

Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah Going-on

Bashir Ahmed Dost Mohd Used

Lube Oil Re-refining Factory

1) Plot development2)Development of infrastructure for the

factory3)Construction of all underground

concrete tanks of utility4)Fabrication and Installation raw material

storage tanks intermediate storage tanks

Rabigh Going-on

COMPLETED PROJECTS

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd

MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJC

O

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd

MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Mechanical repairing works during emergency shutdown

Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation

(SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah October 30 2007

SAFA General Contractors amp Enterprises Co

Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah September 20 2007

Ministry ofDefense Housing amp Planning Dept

Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning

Jeddah August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram

MIJAJCO

Modification and Extension of Hatchery Building

Makkah May 2007

Fakieh Poultry Fram

MIJAJCO

Construction of Labour and staff accommodation Building

Makkah March 2007

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Fakieh Poultry Fram

MIJAJCOExtension of GP Hatchery Makkah April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

JeddahCompleted December

2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah December 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2)Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A

Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood

Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo

MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

ABB Saudi Arabia

MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power

MIJAJCOReplacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power

MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co

MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

SCECOYusuf Bin A Kanoo

MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power

Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial

Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant

Dammam

February 2005

Alstom GE Shoaiba Power

Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant

MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant

(Abha)

September 2004

Alstom Shoaiba Power Plant

MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 14: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

Human Resources

All personnel are able to understand speak both English and Arabic languages

Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

Block Visa available in our ESTABLISHMENT - Under Process

Following is the list of our affiliated Recruiting Agents

Agents Address Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom

Equipment Resources

The following table provides information of related equipment that is available for the work

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL

YEARMAKE

QTYOWNED

1 MOBILE CRANE 35 TON TADANO 1985 1

2 TANKER TRUCK (WATER)10000 amp

19000 GALNISSAN 1990 2

3 BOOM TRUCK 6 TON HINO 1985 1

4 POWER GENERATOR 35 KVA HONDA 1990 3

5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4

6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8

7 WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP LICON 1998 4

8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO

1991 1

9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1

10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO

1990 1

11 DEWATERING PUMP 600 GPM ROBIN 1990 3

12 PIPE THREADING MACHINE UP TO 16INCH

SET RIGID 1994 2

13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2

14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2

15 OXY-ACETYLENE CYLINDER SET -- 1993 8

16 ARGON-NITROGEN CYLINDER SET -- 5

17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4

18 CREW CAB 1frac12 TON NISSAN 1988 1

19 PASSENGER VAN 15 SEAT NISSAN 2002 2

20 FORKLIFT3 amp 7-12

TONTOYTO 1990 2

21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2

22 SAND BLASTING MACHINE SET GIRACO 1995 3

23 CATHODIC PROTECTION TEST EQUIPMENT

SET -- 1

24 UNDERGROUND PIPE LOCATOR SET -- 2

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMADEMODEL

YEARMAKE

QTYOWNED

25 SOIL COMPACTOR PORTABLE - 1

26 UNDERGROUNG CABEL DETECTOR SET -- 2

27 PIN BRAZING SET -- 3

28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3

29 EXCHANGER BUNDLE PULLER 9 METERS 1

30 BOBCAT 2

31 EXCAVATOR 1

32 MICRO TRENCHER 1

33 VACUUM TRUCK 14 TON NISSAN 1

34 ASPHALT CUTTER 2

35 HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI USA 1

36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3linkable Advantage 3 tempe-

rature programmer cont-rollers and 3 Energy regs

1

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

Safety meetings and dialoguesdiscussion

Safety Inspection

Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

GOING-ON PROJECTS

CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld

Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road

JeddahGoing-on

Saudi Electricity Company

ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length

or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-

lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah Going-on

Ministry of Defense

Engineering amp Housing Dept

Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah Going-on

Bashir Ahmed Dost Mohd Used

Lube Oil Re-refining Factory

1) Plot development2)Development of infrastructure for the

factory3)Construction of all underground

concrete tanks of utility4)Fabrication and Installation raw material

storage tanks intermediate storage tanks

Rabigh Going-on

COMPLETED PROJECTS

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd

MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJC

O

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd

MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Mechanical repairing works during emergency shutdown

Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation

(SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah October 30 2007

SAFA General Contractors amp Enterprises Co

Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah September 20 2007

Ministry ofDefense Housing amp Planning Dept

Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning

Jeddah August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram

MIJAJCO

Modification and Extension of Hatchery Building

Makkah May 2007

Fakieh Poultry Fram

MIJAJCO

Construction of Labour and staff accommodation Building

Makkah March 2007

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Fakieh Poultry Fram

MIJAJCOExtension of GP Hatchery Makkah April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

JeddahCompleted December

2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah December 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2)Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A

Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood

Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo

MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

ABB Saudi Arabia

MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power

MIJAJCOReplacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power

MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co

MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

SCECOYusuf Bin A Kanoo

MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power

Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial

Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant

Dammam

February 2005

Alstom GE Shoaiba Power

Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant

MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant

(Abha)

September 2004

Alstom Shoaiba Power Plant

MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 15: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

Human Resources

All personnel are able to understand speak both English and Arabic languages

Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

Block Visa available in our ESTABLISHMENT - Under Process

Following is the list of our affiliated Recruiting Agents

Agents Address Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANYOEP Licence No 2051Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad LaneSantacruz (West) MumbaiINDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)New Airport Road ndashChairman BariBanani Dhaka ndash 1212BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411Fax +9122-24450222Email zahidinternationalhotmailcom zahidzahidintcom gulfjobszahidintcomwebsite wwwzahidintcom

Equipment Resources

The following table provides information of related equipment that is available for the work

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL

YEARMAKE

QTYOWNED

1 MOBILE CRANE 35 TON TADANO 1985 1

2 TANKER TRUCK (WATER)10000 amp

19000 GALNISSAN 1990 2

3 BOOM TRUCK 6 TON HINO 1985 1

4 POWER GENERATOR 35 KVA HONDA 1990 3

5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4

6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8

7 WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP LICON 1998 4

8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO

1991 1

9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1

10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO

1990 1

11 DEWATERING PUMP 600 GPM ROBIN 1990 3

12 PIPE THREADING MACHINE UP TO 16INCH

SET RIGID 1994 2

13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2

14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2

15 OXY-ACETYLENE CYLINDER SET -- 1993 8

16 ARGON-NITROGEN CYLINDER SET -- 5

17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4

18 CREW CAB 1frac12 TON NISSAN 1988 1

19 PASSENGER VAN 15 SEAT NISSAN 2002 2

20 FORKLIFT3 amp 7-12

TONTOYTO 1990 2

21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2

22 SAND BLASTING MACHINE SET GIRACO 1995 3

23 CATHODIC PROTECTION TEST EQUIPMENT

SET -- 1

24 UNDERGROUND PIPE LOCATOR SET -- 2

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMADEMODEL

YEARMAKE

QTYOWNED

25 SOIL COMPACTOR PORTABLE - 1

26 UNDERGROUNG CABEL DETECTOR SET -- 2

27 PIN BRAZING SET -- 3

28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3

29 EXCHANGER BUNDLE PULLER 9 METERS 1

30 BOBCAT 2

31 EXCAVATOR 1

32 MICRO TRENCHER 1

33 VACUUM TRUCK 14 TON NISSAN 1

34 ASPHALT CUTTER 2

35 HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI USA 1

36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3linkable Advantage 3 tempe-

rature programmer cont-rollers and 3 Energy regs

1

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

Safety meetings and dialoguesdiscussion

Safety Inspection

Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

GOING-ON PROJECTS

CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld

Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road

JeddahGoing-on

Saudi Electricity Company

ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length

or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-

lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah Going-on

Ministry of Defense

Engineering amp Housing Dept

Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah Going-on

Bashir Ahmed Dost Mohd Used

Lube Oil Re-refining Factory

1) Plot development2)Development of infrastructure for the

factory3)Construction of all underground

concrete tanks of utility4)Fabrication and Installation raw material

storage tanks intermediate storage tanks

Rabigh Going-on

COMPLETED PROJECTS

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd

MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJC

O

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd

MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Mechanical repairing works during emergency shutdown

Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation

(SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah October 30 2007

SAFA General Contractors amp Enterprises Co

Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah September 20 2007

Ministry ofDefense Housing amp Planning Dept

Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning

Jeddah August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram

MIJAJCO

Modification and Extension of Hatchery Building

Makkah May 2007

Fakieh Poultry Fram

MIJAJCO

Construction of Labour and staff accommodation Building

Makkah March 2007

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Fakieh Poultry Fram

MIJAJCOExtension of GP Hatchery Makkah April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

JeddahCompleted December

2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah December 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2)Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A

Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood

Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo

MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

ABB Saudi Arabia

MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power

MIJAJCOReplacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power

MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co

MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

SCECOYusuf Bin A Kanoo

MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power

Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial

Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant

Dammam

February 2005

Alstom GE Shoaiba Power

Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant

MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant

(Abha)

September 2004

Alstom Shoaiba Power Plant

MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 16: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

Equipment Resources

The following table provides information of related equipment that is available for the work

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMAKEMODEL

YEARMAKE

QTYOWNED

1 MOBILE CRANE 35 TON TADANO 1985 1

2 TANKER TRUCK (WATER)10000 amp

19000 GALNISSAN 1990 2

3 BOOM TRUCK 6 TON HINO 1985 1

4 POWER GENERATOR 35 KVA HONDA 1990 3

5 WELDING MACHINE ENGINE 400 AMP LICON 1992 4

6 WELDING MACHINE ELECTRIC HF UNIT 400 AMP MILLER 1996 8

7 WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP LICON 1998 4

8 AIR COMPRESSOR (COMPLETE) 350 CFMATLAS COPCO

1991 1

9 AIR COMPRESSOR (COMPLETE) 450 CFM CAT 1993 1

10 AIR COMPRESSOR (COMPLETE) 750 CFMATLAS COPCO

1990 1

11 DEWATERING PUMP 600 GPM ROBIN 1990 3

12 PIPE THREADING MACHINE UP TO 16INCH

SET RIGID 1994 2

13 AIRLESS SPRAY MACHINE 4500 PSI GRACO 1996 2

14 AIR SPRAY MACHINE 4500 PSI GRACO 1995 2

15 OXY-ACETYLENE CYLINDER SET -- 1993 8

16 ARGON-NITROGEN CYLINDER SET -- 5

17 PICK-UP (Double Cab) 1frac12 TON NISSAN 2005 4

18 CREW CAB 1frac12 TON NISSAN 1988 1

19 PASSENGER VAN 15 SEAT NISSAN 2002 2

20 FORKLIFT3 amp 7-12

TONTOYTO 1990 2

21 GENERATOR LIGHTING SET 15 KVA CAT 1994 2

22 SAND BLASTING MACHINE SET GIRACO 1995 3

23 CATHODIC PROTECTION TEST EQUIPMENT

SET -- 1

24 UNDERGROUND PIPE LOCATOR SET -- 2

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMADEMODEL

YEARMAKE

QTYOWNED

25 SOIL COMPACTOR PORTABLE - 1

26 UNDERGROUNG CABEL DETECTOR SET -- 2

27 PIN BRAZING SET -- 3

28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3

29 EXCHANGER BUNDLE PULLER 9 METERS 1

30 BOBCAT 2

31 EXCAVATOR 1

32 MICRO TRENCHER 1

33 VACUUM TRUCK 14 TON NISSAN 1

34 ASPHALT CUTTER 2

35 HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI USA 1

36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3linkable Advantage 3 tempe-

rature programmer cont-rollers and 3 Energy regs

1

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

Safety meetings and dialoguesdiscussion

Safety Inspection

Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

GOING-ON PROJECTS

CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld

Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road

JeddahGoing-on

Saudi Electricity Company

ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length

or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-

lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah Going-on

Ministry of Defense

Engineering amp Housing Dept

Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah Going-on

Bashir Ahmed Dost Mohd Used

Lube Oil Re-refining Factory

1) Plot development2)Development of infrastructure for the

factory3)Construction of all underground

concrete tanks of utility4)Fabrication and Installation raw material

storage tanks intermediate storage tanks

Rabigh Going-on

COMPLETED PROJECTS

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd

MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJC

O

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd

MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Mechanical repairing works during emergency shutdown

Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation

(SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah October 30 2007

SAFA General Contractors amp Enterprises Co

Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah September 20 2007

Ministry ofDefense Housing amp Planning Dept

Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning

Jeddah August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram

MIJAJCO

Modification and Extension of Hatchery Building

Makkah May 2007

Fakieh Poultry Fram

MIJAJCO

Construction of Labour and staff accommodation Building

Makkah March 2007

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Fakieh Poultry Fram

MIJAJCOExtension of GP Hatchery Makkah April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

JeddahCompleted December

2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah December 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2)Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A

Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood

Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo

MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

ABB Saudi Arabia

MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power

MIJAJCOReplacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power

MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co

MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

SCECOYusuf Bin A Kanoo

MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power

Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial

Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant

Dammam

February 2005

Alstom GE Shoaiba Power

Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant

MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant

(Abha)

September 2004

Alstom Shoaiba Power Plant

MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 17: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

ITEMNO

EQUIPMENT DESCRIPTION CAPACITYMADEMODEL

YEARMAKE

QTYOWNED

25 SOIL COMPACTOR PORTABLE - 1

26 UNDERGROUNG CABEL DETECTOR SET -- 2

27 PIN BRAZING SET -- 3

28 HYDRO PRESSURE TEST PUMP 1400 PSI -- 3

29 EXCHANGER BUNDLE PULLER 9 METERS 1

30 BOBCAT 2

31 EXCAVATOR 1

32 MICRO TRENCHER 1

33 VACUUM TRUCK 14 TON NISSAN 1

34 ASPHALT CUTTER 2

35 HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI USA 1

36INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3linkable Advantage 3 tempe-

rature programmer cont-rollers and 3 Energy regs

1

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

Safety meetings and dialoguesdiscussion

Safety Inspection

Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

GOING-ON PROJECTS

CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld

Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road

JeddahGoing-on

Saudi Electricity Company

ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length

or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-

lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah Going-on

Ministry of Defense

Engineering amp Housing Dept

Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah Going-on

Bashir Ahmed Dost Mohd Used

Lube Oil Re-refining Factory

1) Plot development2)Development of infrastructure for the

factory3)Construction of all underground

concrete tanks of utility4)Fabrication and Installation raw material

storage tanks intermediate storage tanks

Rabigh Going-on

COMPLETED PROJECTS

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd

MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJC

O

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd

MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Mechanical repairing works during emergency shutdown

Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation

(SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah October 30 2007

SAFA General Contractors amp Enterprises Co

Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah September 20 2007

Ministry ofDefense Housing amp Planning Dept

Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning

Jeddah August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram

MIJAJCO

Modification and Extension of Hatchery Building

Makkah May 2007

Fakieh Poultry Fram

MIJAJCO

Construction of Labour and staff accommodation Building

Makkah March 2007

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Fakieh Poultry Fram

MIJAJCOExtension of GP Hatchery Makkah April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

JeddahCompleted December

2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah December 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2)Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A

Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood

Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo

MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

ABB Saudi Arabia

MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power

MIJAJCOReplacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power

MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co

MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

SCECOYusuf Bin A Kanoo

MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power

Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial

Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant

Dammam

February 2005

Alstom GE Shoaiba Power

Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant

MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant

(Abha)

September 2004

Alstom Shoaiba Power Plant

MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 18: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

Safety meetings and dialoguesdiscussion

Safety Inspection

Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety TalkA weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

GOING-ON PROJECTS

CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld

Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road

JeddahGoing-on

Saudi Electricity Company

ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length

or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-

lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah Going-on

Ministry of Defense

Engineering amp Housing Dept

Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah Going-on

Bashir Ahmed Dost Mohd Used

Lube Oil Re-refining Factory

1) Plot development2)Development of infrastructure for the

factory3)Construction of all underground

concrete tanks of utility4)Fabrication and Installation raw material

storage tanks intermediate storage tanks

Rabigh Going-on

COMPLETED PROJECTS

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd

MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJC

O

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd

MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Mechanical repairing works during emergency shutdown

Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation

(SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah October 30 2007

SAFA General Contractors amp Enterprises Co

Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah September 20 2007

Ministry ofDefense Housing amp Planning Dept

Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning

Jeddah August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram

MIJAJCO

Modification and Extension of Hatchery Building

Makkah May 2007

Fakieh Poultry Fram

MIJAJCO

Construction of Labour and staff accommodation Building

Makkah March 2007

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Fakieh Poultry Fram

MIJAJCOExtension of GP Hatchery Makkah April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

JeddahCompleted December

2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah December 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2)Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A

Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood

Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo

MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

ABB Saudi Arabia

MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power

MIJAJCOReplacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power

MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co

MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

SCECOYusuf Bin A Kanoo

MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power

Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial

Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant

Dammam

February 2005

Alstom GE Shoaiba Power

Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant

MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant

(Abha)

September 2004

Alstom Shoaiba Power Plant

MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 19: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality ControlProcurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

GOING-ON PROJECTS

CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld

Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road

JeddahGoing-on

Saudi Electricity Company

ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length

or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-

lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah Going-on

Ministry of Defense

Engineering amp Housing Dept

Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah Going-on

Bashir Ahmed Dost Mohd Used

Lube Oil Re-refining Factory

1) Plot development2)Development of infrastructure for the

factory3)Construction of all underground

concrete tanks of utility4)Fabrication and Installation raw material

storage tanks intermediate storage tanks

Rabigh Going-on

COMPLETED PROJECTS

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd

MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJC

O

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd

MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Mechanical repairing works during emergency shutdown

Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation

(SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah October 30 2007

SAFA General Contractors amp Enterprises Co

Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah September 20 2007

Ministry ofDefense Housing amp Planning Dept

Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning

Jeddah August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram

MIJAJCO

Modification and Extension of Hatchery Building

Makkah May 2007

Fakieh Poultry Fram

MIJAJCO

Construction of Labour and staff accommodation Building

Makkah March 2007

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Fakieh Poultry Fram

MIJAJCOExtension of GP Hatchery Makkah April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

JeddahCompleted December

2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah December 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2)Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A

Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood

Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo

MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

ABB Saudi Arabia

MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power

MIJAJCOReplacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power

MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co

MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

SCECOYusuf Bin A Kanoo

MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power

Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial

Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant

Dammam

February 2005

Alstom GE Shoaiba Power

Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant

MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant

(Abha)

September 2004

Alstom Shoaiba Power Plant

MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 20: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction ProcedurePrior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

GOING-ON PROJECTS

CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld

Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road

JeddahGoing-on

Saudi Electricity Company

ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length

or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-

lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah Going-on

Ministry of Defense

Engineering amp Housing Dept

Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah Going-on

Bashir Ahmed Dost Mohd Used

Lube Oil Re-refining Factory

1) Plot development2)Development of infrastructure for the

factory3)Construction of all underground

concrete tanks of utility4)Fabrication and Installation raw material

storage tanks intermediate storage tanks

Rabigh Going-on

COMPLETED PROJECTS

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd

MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJC

O

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd

MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Mechanical repairing works during emergency shutdown

Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation

(SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah October 30 2007

SAFA General Contractors amp Enterprises Co

Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah September 20 2007

Ministry ofDefense Housing amp Planning Dept

Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning

Jeddah August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram

MIJAJCO

Modification and Extension of Hatchery Building

Makkah May 2007

Fakieh Poultry Fram

MIJAJCO

Construction of Labour and staff accommodation Building

Makkah March 2007

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Fakieh Poultry Fram

MIJAJCOExtension of GP Hatchery Makkah April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

JeddahCompleted December

2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah December 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2)Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A

Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood

Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo

MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

ABB Saudi Arabia

MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power

MIJAJCOReplacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power

MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co

MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

SCECOYusuf Bin A Kanoo

MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power

Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial

Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant

Dammam

February 2005

Alstom GE Shoaiba Power

Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant

MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant

(Abha)

September 2004

Alstom Shoaiba Power Plant

MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 21: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

GOING-ON PROJECTS

CLIENT DESCRIPTION LOCATION STATUSMS Huta Hegerfeld

Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road

JeddahGoing-on

Saudi Electricity Company

ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by 1) Cut amp replacing of damaged pipe-length

or2)Jacketing over effected length andor3)Applying of Balzona to the pitting pipe-

lengthBecause of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah Going-on

Ministry of Defense

Engineering amp Housing Dept

Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah Going-on

Bashir Ahmed Dost Mohd Used

Lube Oil Re-refining Factory

1) Plot development2)Development of infrastructure for the

factory3)Construction of all underground

concrete tanks of utility4)Fabrication and Installation raw material

storage tanks intermediate storage tanks

Rabigh Going-on

COMPLETED PROJECTS

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd

MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJC

O

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd

MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Mechanical repairing works during emergency shutdown

Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation

(SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah October 30 2007

SAFA General Contractors amp Enterprises Co

Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah September 20 2007

Ministry ofDefense Housing amp Planning Dept

Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning

Jeddah August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram

MIJAJCO

Modification and Extension of Hatchery Building

Makkah May 2007

Fakieh Poultry Fram

MIJAJCO

Construction of Labour and staff accommodation Building

Makkah March 2007

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Fakieh Poultry Fram

MIJAJCOExtension of GP Hatchery Makkah April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

JeddahCompleted December

2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah December 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2)Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A

Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood

Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo

MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

ABB Saudi Arabia

MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power

MIJAJCOReplacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power

MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co

MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

SCECOYusuf Bin A Kanoo

MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power

Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial

Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant

Dammam

February 2005

Alstom GE Shoaiba Power

Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant

MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant

(Abha)

September 2004

Alstom Shoaiba Power Plant

MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 22: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

COMPLETED PROJECTS

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd

MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJC

O

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd

MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Mechanical repairing works during emergency shutdown

Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation

(SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah October 30 2007

SAFA General Contractors amp Enterprises Co

Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah September 20 2007

Ministry ofDefense Housing amp Planning Dept

Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning

Jeddah August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram

MIJAJCO

Modification and Extension of Hatchery Building

Makkah May 2007

Fakieh Poultry Fram

MIJAJCO

Construction of Labour and staff accommodation Building

Makkah March 2007

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Fakieh Poultry Fram

MIJAJCOExtension of GP Hatchery Makkah April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

JeddahCompleted December

2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah December 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2)Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A

Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood

Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo

MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

ABB Saudi Arabia

MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power

MIJAJCOReplacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power

MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co

MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

SCECOYusuf Bin A Kanoo

MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power

Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial

Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant

Dammam

February 2005

Alstom GE Shoaiba Power

Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant

MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant

(Abha)

September 2004

Alstom Shoaiba Power Plant

MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 23: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Mechanical repairing works during emergency shutdown

Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation

(SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah October 30 2007

SAFA General Contractors amp Enterprises Co

Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah September 20 2007

Ministry ofDefense Housing amp Planning Dept

Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480package unit Cable termination testing and commissioning

Jeddah August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram

MIJAJCO

Modification and Extension of Hatchery Building

Makkah May 2007

Fakieh Poultry Fram

MIJAJCO

Construction of Labour and staff accommodation Building

Makkah March 2007

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Fakieh Poultry Fram

MIJAJCOExtension of GP Hatchery Makkah April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

JeddahCompleted December

2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah December 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2)Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A

Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood

Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo

MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

ABB Saudi Arabia

MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power

MIJAJCOReplacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power

MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co

MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

SCECOYusuf Bin A Kanoo

MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power

Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial

Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant

Dammam

February 2005

Alstom GE Shoaiba Power

Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant

MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant

(Abha)

September 2004

Alstom Shoaiba Power Plant

MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 24: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Fakieh Poultry Fram

MIJAJCOExtension of GP Hatchery Makkah April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

JeddahCompleted December

2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah December 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil

Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2)Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A

Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood

Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo

MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

ABB Saudi Arabia

MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power

MIJAJCOReplacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power

MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co

MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

SCECOYusuf Bin A Kanoo

MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power

Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial

Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant

Dammam

February 2005

Alstom GE Shoaiba Power

Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant

MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant

(Abha)

September 2004

Alstom Shoaiba Power Plant

MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 25: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

ABB Saudi Arabia

MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power

MIJAJCOReplacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power

MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co

MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

SCECOYusuf Bin A Kanoo

MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power

Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial

Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant

Dammam

February 2005

Alstom GE Shoaiba Power

Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant

MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant

(Abha)

September 2004

Alstom Shoaiba Power Plant

MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 26: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

SCECOYusuf Bin A Kanoo

MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power

Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo

MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial

Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant

Dammam

February 2005

Alstom GE Shoaiba Power

Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant

MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling of generator Frame 7GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant

(Abha)

September 2004

Alstom Shoaiba Power Plant

MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 27: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

CLIENT DESCRIPTION OF JOB LOCATION COMPLETED

Shoiaba Power Plant Alstom

MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO

MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 6GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood

Group Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group

Elect UK MIJAJCO

Overhauling the generator Frame 5GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

  • 0 TABLE OF CONTENTSpdf
  • 1) INTRODUCTIONpdf
  • 2) GENERAL INFORMATIONpdf
  • 21) ORGANIZATION CHARTpdf
  • 22) BADM OFFICE LOCATIONpdf
  • 3) BUSINESS FUNCTIONSpdf
  • 4) LEGAL DOCUMENTSpdf
  • 5) HUMAN amp EQUIPMENT Resourcespdf
  • 6) SAFETY amp QA QC PROGRAMpdf
  • 7) PROJECTSpdf
    • TABLE OF CONTENTS

      1 INTRODUCTION

      2 GENERAL INFORMATION

      3 BUSINESS FUNCTIONS

      4 LEGAL DOCUMENTS

      5 HUMAN amp EQUIPMENT RESOURCES

      6 SAFETY amp QAQC PROGRAMS

      7 PROJECTS

      8 PROJECT PICTURES

      INTRODUCTION

      We MS BASHIR AHMED DOST MOHD Contracting EST -- An associate of MIJAJCO have been providing services since 2000 through Kingdom of Saudi Arabia in the field of

      middot Electro Mechanical amp Instrumentation Engineering

      middot Maintenance amp installation of Power Generators

      middot Turbine overhauling

      middot Pipeline Construction Modification amp Maintenance

      middot New installation amp Overhauling of Process Equipments of Refineries

      middot Civil Construction Modification amp Maintenance

      We as a contracting Establishment mainly engaged with petroleum refineries Petroleum pipeline and Power Generator overhauling Our manpower comprises with vast experienced in petroleum refineries on maintenance of heat exchangers process amp distillation towers cooling towers boilers Process piping etc

      We also supply industrial support material

      Prior most of our projects were executed under the name of MIJAJCO In future we intend projects to be under BASHIR AHMED DOST MOHD EST all resources such as work force equipments machineries etc will be as before

      BASHIR AHMED DOST MOHD EST clientele include a number of large prestigious organizations of the Kingdom of Saudi Arabia Such as Saudi Electricity Co Saudi Aramco Lubricating Oil Refining Co FAKIEH Group Bandariya Intl Co Ltd Huta Hegerfeld Saudia Ltd Advance Triad-Turbine Services (ATTS) ACWA Power SASAKURA Saline Water Conversion Corporation (SWCC) YUSUF Bin Ahmed KANOO Ministry of Defense and other renowned Multinational Organizations

      MISSION STATEMENT

      Our mission and commitment is to provide services to our valued clients based on our vast and variety of experiences and Professional Engineering by means of Maintenance amp Construction Excellence and at the same time with marked competitive edge to the entire satisfaction of the clientele

      OUR HEAD OFFICE CONTACTS

      AL-JASSIM Building (1st Floor)

      Baladiya Street Al-Aziziya District Jeddah

      PO Box 18607 Jeddah 21425 KSA

      Tel +966 2 663 2382 050 4699 467

      Fax +966 2 668 5850

      E-mailinfobashirdostcom

      URLwwwbashirdostcom

      OUR WORK SHOP

      KILO- 16 OLD MAKKAH ROAD

      PLOT 11 amp 12 PHASE- III RABIGH INDUSTRIAL AREA

      13

      13

      13

      ORG-CHART

      ampCampArial MT BlackBoldamp14
      Exec Secretary

      Sheet4

      ampA
      Page ampP

      Sheet5

      ampA
      Page ampP

      Sheet6

      ampA
      Page ampP

      Sheet7

      ampA
      Page ampP

      Sheet8

      ampA
      Page ampP

      Sheet9

      ampA
      Page ampP

      Sheet10

      ampA
      Page ampP

      Sheet11

      ampA
      Page ampP

      Sheet12

      ampA
      Page ampP

      Sheet13

      ampA
      Page ampP

      Sheet14

      ampA
      Page ampP

      Sheet15

      ampA
      Page ampP

      Sheet16

      ampA
      Page ampP

      BUSINESS FUNCTION

      MAJOR ACTIVITIES

      middot Generators Overhauling

      middot Revamping of Power House Electrical system

      middot Low Medium and High Voltage Switchgear Maintenance

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      middot Electrical Repairing and Refurbishment

      middot Process Plant Installation and Maintenance

      middot Heat Exchanger Maintenance

      middot Refurbishment of Distillation Tower

      middot Boiler Maintenance

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      middot Cooling Tower Maintenance

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      middot Cathodic Protection System Installation Commissioning and maintenance

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      middot Generators Overhauling

      We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

      Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

      Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

      Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

      Remove bearing caps inner and outer end shields end bearings

      Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

      Removing the existing end winding insulation and repair it where it required

      Cleaning the stator housing and both end windings painting end winding with anti tracing paint

      Cleaning all components properly and reinstall all the components on its original locations

      middot Revamping of Power House Electrical system

      Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

      middot Low Medium and High Voltage Switchgear Maintenance

      Switch gear Inspection and trouble shooting

      Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

      Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

      Protection Relay system and Calibration

      Protection system upgrading and refurbishment

      middot Low Medium and High Voltage Motors Maintenance and overhauling

      Inspection of motors

      Dismantling

      Carrying out all the required tests

      Developing of test records and their interpretation

      Supply of motors

      Rewinding of motors

      Making the recommendations based on inspection and test

      middot Electrical Repairing and Refurbishment

      Electrical distribution maintenance troubleshooting and extensions

      Installation maintenance and extension of lighting distribution and low power systems

      Installation of low voltage distribution as well as control panels

      Installation laying and testing of low voltage cables and cable tray system

      DC distribution including batteries and battery chargers and their installation testing and commissioning

      Installation of emergency power generating system

      Providing around the clock emergency services

      middot Process Plant Installation and Maintenance

      We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

      Power Plants

      Water Treatment Plants

      Cement Plants

      Sugar Plants

      Food Industries

      middot Heat Exchanger Maintenance

      Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

      Pulling of tube bundles

      Internal and external hydro-blast cleaning of tubes

      Repair and Replacement of tubes

      Re-facing of tube sheets

      Fabrication of shells

      Pressure test

      middot Refurbishment of Distillation Tower

      Dismantling of trays

      Cleaning of shell internals by hydro blast and grit blast

      Repair and replacement of bubble cup trays

      Replacement of rashing rings

      Cleaning and replacement of demister pads

      Pressure test

      middot Boiler Maintenance

      Services are provided for the maintenance of water tube and fire tube boilers

      Repair and replacement of tubes

      De-scaling of internal and external boiler tubes including steam drums

      Fire box and refractory repairs

      middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

      Construction of steel tanks for petroleum chemicals and water

      Tank cleaning

      Bottom plate replacement

      Repair and replacement of heating coils

      Epoxy lining

      Internal Coating

      Replacement of Floating Fixed roof

      Maintenance of pressure vacuum relief valve

      middot Cooling Tower Maintenance

      Cleaning of cooling tower cells

      Replacement of wooden baffle plates

      Repair maintenance amp replacement of Exhaust fan amp gearboxes

      middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

      Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

      Construction Maintenance amp Modification of buried carbon steel pipeline

      Construction Maintenance amp Modification of non-metallic pipelines

      Construction Maintenance amp Modification of fiberglass pipelines

      Hydrostatic testing and commissioning of oil and gas pipelines

      De commissioning and vacuum drying of pipelines

      Mothballing of pipelines

      Pigging and internal cleaning of pipelines

      External coating repairs

      middot Cathodic Protection System Installation Commissioning and maintenance

      Cathodic protection (CP) system design and installation

      Commissioning of Cathodic Protection system

      Trouble shooting and maintenance of existing CP system

      Up grading of existing CP system

      Routine CP data monitoring

      Data evaluation and upgrading recommendations

      middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

      Installation and commissioning of cold storage systems

      Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

      Installation of cooling coils and condensers

      Duct work installation Cleaning and Maintenance

      middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

      middot Supply of Personal Protective Equipment amp Firefighting system

      middot Civil Construction

      Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

      Structure amp Foundation works

      New Construction of any kind

      Modifications and expansions works

      All kind of Finishing and Decoration works

      Swimming Pool constructions works

      Landscaping Handicapping amp Earth works

      Pre-Engineered Steel Structural building works

      Concrete repairing works

      Water proofing system of any kind suck as pools tanks etc

      LEGAL DOCUMENTS

      FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

      COMMERCIAL REGISTRATION CERTIFICATE

      CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

      SAGIA CERTIFICATE

      SOCIAL INSURANCE CERTIFICATE

      ZAKAH CERTIFICATE

      MUNICIPALTY CERTIFICATE

      13

      13

      13

      Human Resources

      middot All personnel are able to understand speak both English and Arabic languages

      middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

      middot Block Visa available in our ESTABLISHMENT - Under Process

      middot Following is the list of our affiliated Recruiting Agents

      Equipment Resources

      The following table provides information of related equipment that is available for the work

      SAFETY amp LOSS PREVENTION PROGRAM

      Objectives

      The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

      middot Safety meetings and dialoguesdiscussion

      middot Safety Inspection

      middot Enforcement of Establishment safety policies and procedures

      Programs Policies and Reports

      Weekly Project Manager Safety Meeting

      A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

      Weekly Site Safety Talk

      A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

      Duties and Responsibilities of Safety Inspectors

      Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

      Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

      Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

      Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

      QAQC PROGRAM

      The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

      Phase of Quality Control

      Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

      Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

      Quality Procurement Procedure

      Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

      A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

      Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

      A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

      Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

      Quality Construction Procedure

      Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

      Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

      As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

      Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

      13

      13

      13

      GOING-ON PROJECTS

      COMPLETED PROJECTS

      13

      13

      13

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

      Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

      Tihama Power Plant

      February 2009

      Saudi Electricity Co ATTS MIJAJCO

      Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

      Najran Power Plant

      February 2009

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

      Luberef-1 Jeddah

      February 2009

      Saudi Bin Laden GroupMIJAJCO

      Construction of Porta-cabin for office unit of the Railway project Haffar Battan

      Hafilul Batin

      December 2008

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of Existing and Installation of new heat exchanger

      Luberef-1 Jeddah

      October 2008

      SEC Bandariya Intl Co Ltd MIJAJCO

      Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

      Jazan Power Plant

      May 2008

      Saudi Electricity Co ATTS MIJAJCO

      All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

      Tabuk Power Plant

      May 2008

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      middot Mechanical repairing works during emergency shutdown

      middot Removal and reinstallation of 6 nos of fin-fan bundles

      Luberef-1 Jeddah

      February 2008

      Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

      Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

      Jeddah KAIA

      November 2007

      Saline Water Conversion Corporation (SWCC)

      Dismantling of the structure support and rail of the overhead 30 ton capacity crane

      Jeddah

      October 30 2007

      SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

      Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

      Jeddah

      September 20 2007

      Ministry ofDefense Housing amp Planning Dept Jeddah

      Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

      Jeddah

      August 2007

      Saudi Aramco Ashi amp Bushnag Co MIJAJCO

      Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

      Saudi Aramco Jeddah Refinery

      June 2007

      Saudi Electricity Company MIJAJCO

      Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

      Al-Qaseem Power Plant

      June 2007

      Fakieh Poultry Fram MIJAJCO

      Modification and Extension of Hatchery Building

      Makkah

      May 2007

      Fakieh Poultry Fram MIJAJCO

      Construction of Labour and staff accommodation Building

      Makkah

      March 2007

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Fakieh Poultry Fram MIJAJCO

      Extension of GP Hatchery

      Makkah

      April 2007

      Fakieh Group MIJAJCO

      Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

      Makkah

      February 2007

      SAVOLA Edible oil MIJAJCO

      Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

      Jeddah

      Completed December 2006

      Ministry of Defense Housing amp Planning Dept

      Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

      Jeddah

      December 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

      1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

      2) Tubes modification work on furnace B-3002 during TA of Process Plant

      LUBEREF-1 Jeddah

      November 2006

      Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

      Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

      Rabigh Power Plant

      October 2006

      Saudi Electricity Co Wood Group MIJAJCO

      Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

      Bisha Power Plant

      October 2006

      SCECOYusuf Bin A Kanoo MIJAJCO

      Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

      Rabigh Power Plant

      October 2006

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      ABB Saudi Arabia MIJAJCO

      Servicing amp Site support for 18 MW Generator at Al-Baha

      Al-Baha

      October 2006

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      September 2006

      Saudi Electricity Co MIJAJCO

      Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

      Bisha Power Plant

      December 2005

      Saudi Electricity Co MIJAJCO

      Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

      Jazan Power Plant

      November 2005

      Saudi Electricity Co MIJAJCO

      Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

      Power Plant -9

      November 2005

      SCECOAlstom Power MIJAJCO

      Replacement of 18 Valve

      Shoaiba Power Plant

      September 2005

      SCECOAlstom Power MIJAJCO

      Hot Tapping of Five Points 2 8 18 20

      Shoaiba Power Plant

      May 2005

      SCECOSAS MIJAJCO

      Construction of Site Camp amp Site Office facilities

      Shoaiba Power Plant

      May 2005

      Saudi AramcoAshi Bushnag Co MIJAJCO

      Cable Pulling at Marine Area Jeddah Refinery

      Saudi Aramco Jeddah

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Rotted Cables at GT 17

      Makkah Power Plant

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Removal of oil and Carbon Heating Stator

      Gazlan Power Plant

      April 2005

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      SCECOYusuf Bin A Kanoo MIJAJCO

      Repair Cathodic Protection Test Posts PPII amp PPIII

      Jeddah Power Plant II amp III

      April 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Testing and Commissioning of Re-Routed Cables at GT 16

      Makkah Power Plant

      March 2005

      SCECOYusuf Bin A Kanoo MIJAJCO

      Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

      Ummlujj Power Plant

      February 2005

      Redland Industrial Services Ltd MIJAJCO

      Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

      Shuqaiq Desalination Plant

      February 2005

      Saudi Electricity CoTIG-TESCO

      Intl Ltd MIJAJCO

      Bolts torquing and life assessment work with flow and retaining rings NDT test

      Ghazlan Power Plant Dammam

      February 2005

      Alstom GE Shoaiba Power Plant MIJAJCO

      Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

      Shoaiba Power Plant

      December 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

      Shoaiba Power Plant

      October 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

      Asir Power Plant (Abha)

      September 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

      Shoaiba Power Plant

      August 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

      Shoaiba Power Plant

      July 2004

      CLIENT

      DESCRIPTION OF JOB

      LOCATION

      COMPLETED

      Shoiaba Power Plant Alstom MIJAJCO

      Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

      Shoiaba Power Plant

      June 2004

      Saudi Electricity Co KANOO MIJAJCO

      Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

      Jizan Power Plant

      May 2004

      Alstom Shoaiba Power Plant MIJAJCO

      Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

      Shoaiba Power Plant

      May 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

      Jizan Power Plant

      April 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

      Jizan Power Plant

      Mar 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

      Jizan Power Plant

      Mar2004

      Saudi Aramco ABC MIJAJCO

      Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

      Rabigh Refinery

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

      Jizan Power Plant

      Feb 2004

      Saudi Electricity Co Wood Group Elect UK MIJAJCO

      Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

      Jizan Power Plant

      Jan2004

      CLIENT

      DESCRIPTION

      LOCATION

      STATUS

      MS Huta Hegerfeld Saudia Ltd MIJAJCO

      RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

      Old Makkah Road Jeddah

      Going-on

      Saudi Electricity Company ATTS MIJAJCO

      Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

      Makkah Power Plant

      Going-on

      Saline Water Conversion Corporation (SWCC) MIJAJCO

      Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

      1) Cut amp replacing of damaged pipe-length or

      2) Jacketing over effected length andor

      3) Applying of Balzona to the pitting pipe-length

      Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

      Jeddah

      Going-on

      Ministry of Defense Engineering amp Housing Dept Jeddah

      Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

      Jeddah

      Going-on

      Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

      1) Plot development

      2) Development of infrastructure for the factory

      3) Construction of all underground concrete tanks of utility

      4) Fabrication and Installation raw material storage tanks intermediate storage tanks

      Rabigh

      Going-on

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MADE

      MODEL

      YEARMAKE

      QTYOWNED

      25

      SOIL COMPACTOR PORTABLE

      -

      1

      26

      UNDERGROUNG CABEL DETECTOR

      SET

      --

      2

      27

      PIN BRAZING

      SET

      --

      3

      28

      HYDRO PRESSURE TEST PUMP

      1400 PSI

      --

      3

      29

      EXCHANGER BUNDLE PULLER

      9 METERS

      1

      30

      BOBCAT

      2

      31

      EXCAVATOR

      1

      32

      MICRO TRENCHER

      1

      33

      VACUUM TRUCK

      14 TON

      NISSAN

      1

      34

      ASPHALT CUTTER

      2

      35

      HIGH PRESSURE HYDRO-JETTING MACHINE

      20000 PSI

      USA

      1

      36

      INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

      50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

      1

      ITEMNO

      EQUIPMENT DESCRIPTION

      CAPACITY

      MAKE

      MODEL

      YEARMAKE

      QTYOWNED

      1

      MOBILE CRANE

      35 TON

      TADANO

      1985

      1

      2

      TANKER TRUCK (WATER)

      10000 amp 19000 GAL

      NISSAN

      1990

      2

      3

      BOOM TRUCK

      6 TON

      HINO

      1985

      1

      4

      POWER GENERATOR

      35 KVA

      HONDA

      1990

      3

      5

      WELDING MACHINE ENGINE

      400 AMP

      LICON

      1992

      4

      6

      WELDING MACHINE ELECTRIC HF UNIT

      400 AMP

      MILLER

      1996

      8

      7

      WELDING MACHINE ELECTRIC amp PORTABLE

      350 AMP

      LICON

      1998

      4

      8

      AIR COMPRESSOR (COMPLETE)

      350 CFM

      ATLAS COPCO

      1991

      1

      9

      AIR COMPRESSOR (COMPLETE)

      450 CFM

      CAT

      1993

      1

      10

      AIR COMPRESSOR (COMPLETE)

      750 CFM

      ATLAS COPCO

      1990

      1

      11

      DEWATERING PUMP

      600 GPM

      ROBIN

      1990

      3

      12

      PIPE THREADING MACHINE UP TO 16 INCH

      SET

      RIGID

      1994

      2

      13

      AIRLESS SPRAY MACHINE

      4500 PSI

      GRACO

      1996

      2

      14

      AIR SPRAY MACHINE

      4500 PSI

      GRACO

      1995

      2

      15

      OXY-ACETYLENE CYLINDER

      SET

      --

      1993

      8

      16

      ARGON-NITROGEN CYLINDER

      SET

      --

      5

      17

      PICK-UP (Double Cab)

      1frac12 TON

      NISSAN

      2005

      4

      18

      CREW CAB

      1frac12 TON

      NISSAN

      1988

      1

      19

      PASSENGER VAN

      15 SEAT

      NISSAN

      2002

      2

      20

      FORKLIFT

      3 amp 7-12 TON

      TOYTO

      1990

      2

      21

      GENERATOR LIGHTING SET

      15 KVA

      CAT

      1994

      2

      22

      SAND BLASTING MACHINE

      SET

      GIRACO

      1995

      3

      23

      CATHODIC PROTECTION TEST EQUIPMENT

      SET

      --

      1

      24

      UNDERGROUND PIPE LOCATOR

      SET

      --

      2

      Agents

      Address

      Contacts

      AL-AHRAM

      Trading amp Manpower Services

      Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

      QADER INTERNATIONAL

      License 2199

      Dira Ghazi khan

      Lahore

      PAKISTAN

      Ph +92-641-4670806

      Fax +92-641-460698

      BOKHARI amp COMPANY

      OEP Licence No 2051

      Overseas Employment Promptor

      Ali Complex 23-Empress Road Lahore

      PAKISTAN

      Ph +92-42-6365498

      6367869

      Fax +92-42-6365290

      PRINCE INDIA

      7 Ghogari Mansion 2nd Hasnabad Lane

      Santacruz (West) Mumbai

      INDIA

      NAZ ASSOCIATES

      H-79 Blockndash F (1st Flr)

      New Airport Road ndash Chairman Bari

      Banani Dhaka ndash 1212

      BANGLADESH

      ZAHID INTERNATIONAL

      109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

      INDIA

      Telephone +9122-24440023 24451411

      Fax +9122-24450222

      Email zahidinternationalhotmailcom

      zahidzahidintcom

      gulfjobszahidintcom

      website wwwzahidintcom

      BASHIR AHMED DOST MOHAMMAD EST
      Jeddah - Saudi Arabia
      FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
      DIVISION
      Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
      Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
      Electrical Engineer
      Mechanical Engineer
      Civil Engineer
      Quantity Engineer
      Design Draftsman
      Computer Operator
      Safety Loss Prev Engr
      Quality Control Engineer
      PROJECT OPERATIONS DIVISION
      PROJECT OPERATIONS
      ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
      DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
      DIVISION DIVISION DIVISION DIVISION
      Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
      Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
      Store keeper
      Forman Forman Forman Forman Forman Forman Helper
      Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
      Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 28: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

ORG-CHART

ampCampArial MT BlackBoldamp14
Exec Secretary

Sheet4

ampA
Page ampP

Sheet5

ampA
Page ampP

Sheet6

ampA
Page ampP

Sheet7

ampA
Page ampP

Sheet8

ampA
Page ampP

Sheet9

ampA
Page ampP

Sheet10

ampA
Page ampP

Sheet11

ampA
Page ampP

Sheet12

ampA
Page ampP

Sheet13

ampA
Page ampP

Sheet14

ampA
Page ampP

Sheet15

ampA
Page ampP

Sheet16

ampA
Page ampP

BUSINESS FUNCTION

MAJOR ACTIVITIES

middot Generators Overhauling

middot Revamping of Power House Electrical system

middot Low Medium and High Voltage Switchgear Maintenance

middot Low Medium and High Voltage Motors Maintenance and overhauling

middot Electrical Repairing and Refurbishment

middot Process Plant Installation and Maintenance

middot Heat Exchanger Maintenance

middot Refurbishment of Distillation Tower

middot Boiler Maintenance

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

middot Cooling Tower Maintenance

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

middot Cathodic Protection System Installation Commissioning and maintenance

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

middot Generators Overhauling

We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

Remove bearing caps inner and outer end shields end bearings

Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

Removing the existing end winding insulation and repair it where it required

Cleaning the stator housing and both end windings painting end winding with anti tracing paint

Cleaning all components properly and reinstall all the components on its original locations

middot Revamping of Power House Electrical system

Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

middot Low Medium and High Voltage Switchgear Maintenance

Switch gear Inspection and trouble shooting

Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

Protection Relay system and Calibration

Protection system upgrading and refurbishment

middot Low Medium and High Voltage Motors Maintenance and overhauling

Inspection of motors

Dismantling

Carrying out all the required tests

Developing of test records and their interpretation

Supply of motors

Rewinding of motors

Making the recommendations based on inspection and test

middot Electrical Repairing and Refurbishment

Electrical distribution maintenance troubleshooting and extensions

Installation maintenance and extension of lighting distribution and low power systems

Installation of low voltage distribution as well as control panels

Installation laying and testing of low voltage cables and cable tray system

DC distribution including batteries and battery chargers and their installation testing and commissioning

Installation of emergency power generating system

Providing around the clock emergency services

middot Process Plant Installation and Maintenance

We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

Power Plants

Water Treatment Plants

Cement Plants

Sugar Plants

Food Industries

middot Heat Exchanger Maintenance

Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

Pulling of tube bundles

Internal and external hydro-blast cleaning of tubes

Repair and Replacement of tubes

Re-facing of tube sheets

Fabrication of shells

Pressure test

middot Refurbishment of Distillation Tower

Dismantling of trays

Cleaning of shell internals by hydro blast and grit blast

Repair and replacement of bubble cup trays

Replacement of rashing rings

Cleaning and replacement of demister pads

Pressure test

middot Boiler Maintenance

Services are provided for the maintenance of water tube and fire tube boilers

Repair and replacement of tubes

De-scaling of internal and external boiler tubes including steam drums

Fire box and refractory repairs

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Construction of steel tanks for petroleum chemicals and water

Tank cleaning

Bottom plate replacement

Repair and replacement of heating coils

Epoxy lining

Internal Coating

Replacement of Floating Fixed roof

Maintenance of pressure vacuum relief valve

middot Cooling Tower Maintenance

Cleaning of cooling tower cells

Replacement of wooden baffle plates

Repair maintenance amp replacement of Exhaust fan amp gearboxes

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

Construction Maintenance amp Modification of buried carbon steel pipeline

Construction Maintenance amp Modification of non-metallic pipelines

Construction Maintenance amp Modification of fiberglass pipelines

Hydrostatic testing and commissioning of oil and gas pipelines

De commissioning and vacuum drying of pipelines

Mothballing of pipelines

Pigging and internal cleaning of pipelines

External coating repairs

middot Cathodic Protection System Installation Commissioning and maintenance

Cathodic protection (CP) system design and installation

Commissioning of Cathodic Protection system

Trouble shooting and maintenance of existing CP system

Up grading of existing CP system

Routine CP data monitoring

Data evaluation and upgrading recommendations

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

Installation and commissioning of cold storage systems

Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

Installation of cooling coils and condensers

Duct work installation Cleaning and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

13

13

13

Human Resources

middot All personnel are able to understand speak both English and Arabic languages

middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

middot Block Visa available in our ESTABLISHMENT - Under Process

middot Following is the list of our affiliated Recruiting Agents

Equipment Resources

The following table provides information of related equipment that is available for the work

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

middot Safety meetings and dialoguesdiscussion

middot Safety Inspection

middot Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety Talk

A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality Control

Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction Procedure

Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

13

13

13

GOING-ON PROJECTS

COMPLETED PROJECTS

13

13

13

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJCO

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

middot Mechanical repairing works during emergency shutdown

middot Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation (SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah

October 30 2007

SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah

September 20 2007

Ministry ofDefense Housing amp Planning Dept Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

Jeddah

August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram MIJAJCO

Modification and Extension of Hatchery Building

Makkah

May 2007

Fakieh Poultry Fram MIJAJCO

Construction of Labour and staff accommodation Building

Makkah

March 2007

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Fakieh Poultry Fram MIJAJCO

Extension of GP Hatchery

Makkah

April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah

February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

Jeddah

Completed December 2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah

December 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2) Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

ABB Saudi Arabia MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha

October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power MIJAJCO

Replacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

SCECOYusuf Bin A Kanoo MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant Dammam

February 2005

Alstom GE Shoaiba Power Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant (Abha)

September 2004

Alstom Shoaiba Power Plant MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Shoiaba Power Plant Alstom MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

CLIENT

DESCRIPTION

LOCATION

STATUS

MS Huta Hegerfeld Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road Jeddah

Going-on

Saudi Electricity Company ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

1) Cut amp replacing of damaged pipe-length or

2) Jacketing over effected length andor

3) Applying of Balzona to the pitting pipe-length

Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

Going-on

Ministry of Defense Engineering amp Housing Dept Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah

Going-on

Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

1) Plot development

2) Development of infrastructure for the factory

3) Construction of all underground concrete tanks of utility

4) Fabrication and Installation raw material storage tanks intermediate storage tanks

Rabigh

Going-on

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MADE

MODEL

YEARMAKE

QTYOWNED

25

SOIL COMPACTOR PORTABLE

-

1

26

UNDERGROUNG CABEL DETECTOR

SET

--

2

27

PIN BRAZING

SET

--

3

28

HYDRO PRESSURE TEST PUMP

1400 PSI

--

3

29

EXCHANGER BUNDLE PULLER

9 METERS

1

30

BOBCAT

2

31

EXCAVATOR

1

32

MICRO TRENCHER

1

33

VACUUM TRUCK

14 TON

NISSAN

1

34

ASPHALT CUTTER

2

35

HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI

USA

1

36

INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

1

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MAKE

MODEL

YEARMAKE

QTYOWNED

1

MOBILE CRANE

35 TON

TADANO

1985

1

2

TANKER TRUCK (WATER)

10000 amp 19000 GAL

NISSAN

1990

2

3

BOOM TRUCK

6 TON

HINO

1985

1

4

POWER GENERATOR

35 KVA

HONDA

1990

3

5

WELDING MACHINE ENGINE

400 AMP

LICON

1992

4

6

WELDING MACHINE ELECTRIC HF UNIT

400 AMP

MILLER

1996

8

7

WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP

LICON

1998

4

8

AIR COMPRESSOR (COMPLETE)

350 CFM

ATLAS COPCO

1991

1

9

AIR COMPRESSOR (COMPLETE)

450 CFM

CAT

1993

1

10

AIR COMPRESSOR (COMPLETE)

750 CFM

ATLAS COPCO

1990

1

11

DEWATERING PUMP

600 GPM

ROBIN

1990

3

12

PIPE THREADING MACHINE UP TO 16 INCH

SET

RIGID

1994

2

13

AIRLESS SPRAY MACHINE

4500 PSI

GRACO

1996

2

14

AIR SPRAY MACHINE

4500 PSI

GRACO

1995

2

15

OXY-ACETYLENE CYLINDER

SET

--

1993

8

16

ARGON-NITROGEN CYLINDER

SET

--

5

17

PICK-UP (Double Cab)

1frac12 TON

NISSAN

2005

4

18

CREW CAB

1frac12 TON

NISSAN

1988

1

19

PASSENGER VAN

15 SEAT

NISSAN

2002

2

20

FORKLIFT

3 amp 7-12 TON

TOYTO

1990

2

21

GENERATOR LIGHTING SET

15 KVA

CAT

1994

2

22

SAND BLASTING MACHINE

SET

GIRACO

1995

3

23

CATHODIC PROTECTION TEST EQUIPMENT

SET

--

1

24

UNDERGROUND PIPE LOCATOR

SET

--

2

Agents

Address

Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANY

OEP Licence No 2051

Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad Lane

Santacruz (West) Mumbai

INDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)

New Airport Road ndash Chairman Bari

Banani Dhaka ndash 1212

BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411

Fax +9122-24450222

Email zahidinternationalhotmailcom

zahidzahidintcom

gulfjobszahidintcom

website wwwzahidintcom

BASHIR AHMED DOST MOHAMMAD EST
Jeddah - Saudi Arabia
FINANCE MANAGER TECHNICAL amp COOR PLANNING amp CONTROL ADMIN MANAGER
DIVISION
Finance Controller over-all Projects Coord Planning amp Control Div Manager Public Relation Off
Cashier Technical Support Staff PlanningCost Engineer Personnel Officer
Electrical Engineer
Mechanical Engineer
Civil Engineer
Quantity Engineer
Design Draftsman
Computer Operator
Safety Loss Prev Engr
Quality Control Engineer
PROJECT OPERATIONS DIVISION
PROJECT OPERATIONS
ELECTRICAL GENERATOR PIPELINE amp CP CIVIL INDUSTRIAL HVAC MATERIAL
DIVISION OVERHAULING SERVICES CONSTRUCTION MAINTENANCE DIVISION DIVISION
DIVISION DIVISION DIVISION DIVISION
Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Supv Engineer Material Planner
Elect Engineer Mechanical Engr Pipeline CP Engr Civil Engineer Mechanical Engr HVAC Engr Purchaser
Store keeper
Forman Forman Forman Forman Forman Forman Helper
Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker Skilled worker
Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers Unskilled workers
Page 29: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

Sheet4

ampA
Page ampP

Sheet5

ampA
Page ampP

Sheet6

ampA
Page ampP

Sheet7

ampA
Page ampP

Sheet8

ampA
Page ampP

Sheet9

ampA
Page ampP

Sheet10

ampA
Page ampP

Sheet11

ampA
Page ampP

Sheet12

ampA
Page ampP

Sheet13

ampA
Page ampP

Sheet14

ampA
Page ampP

Sheet15

ampA
Page ampP

Sheet16

ampA
Page ampP

BUSINESS FUNCTION

MAJOR ACTIVITIES

middot Generators Overhauling

middot Revamping of Power House Electrical system

middot Low Medium and High Voltage Switchgear Maintenance

middot Low Medium and High Voltage Motors Maintenance and overhauling

middot Electrical Repairing and Refurbishment

middot Process Plant Installation and Maintenance

middot Heat Exchanger Maintenance

middot Refurbishment of Distillation Tower

middot Boiler Maintenance

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

middot Cooling Tower Maintenance

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

middot Cathodic Protection System Installation Commissioning and maintenance

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

middot Generators Overhauling

We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

Remove bearing caps inner and outer end shields end bearings

Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

Removing the existing end winding insulation and repair it where it required

Cleaning the stator housing and both end windings painting end winding with anti tracing paint

Cleaning all components properly and reinstall all the components on its original locations

middot Revamping of Power House Electrical system

Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

middot Low Medium and High Voltage Switchgear Maintenance

Switch gear Inspection and trouble shooting

Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

Protection Relay system and Calibration

Protection system upgrading and refurbishment

middot Low Medium and High Voltage Motors Maintenance and overhauling

Inspection of motors

Dismantling

Carrying out all the required tests

Developing of test records and their interpretation

Supply of motors

Rewinding of motors

Making the recommendations based on inspection and test

middot Electrical Repairing and Refurbishment

Electrical distribution maintenance troubleshooting and extensions

Installation maintenance and extension of lighting distribution and low power systems

Installation of low voltage distribution as well as control panels

Installation laying and testing of low voltage cables and cable tray system

DC distribution including batteries and battery chargers and their installation testing and commissioning

Installation of emergency power generating system

Providing around the clock emergency services

middot Process Plant Installation and Maintenance

We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

Power Plants

Water Treatment Plants

Cement Plants

Sugar Plants

Food Industries

middot Heat Exchanger Maintenance

Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

Pulling of tube bundles

Internal and external hydro-blast cleaning of tubes

Repair and Replacement of tubes

Re-facing of tube sheets

Fabrication of shells

Pressure test

middot Refurbishment of Distillation Tower

Dismantling of trays

Cleaning of shell internals by hydro blast and grit blast

Repair and replacement of bubble cup trays

Replacement of rashing rings

Cleaning and replacement of demister pads

Pressure test

middot Boiler Maintenance

Services are provided for the maintenance of water tube and fire tube boilers

Repair and replacement of tubes

De-scaling of internal and external boiler tubes including steam drums

Fire box and refractory repairs

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Construction of steel tanks for petroleum chemicals and water

Tank cleaning

Bottom plate replacement

Repair and replacement of heating coils

Epoxy lining

Internal Coating

Replacement of Floating Fixed roof

Maintenance of pressure vacuum relief valve

middot Cooling Tower Maintenance

Cleaning of cooling tower cells

Replacement of wooden baffle plates

Repair maintenance amp replacement of Exhaust fan amp gearboxes

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

Construction Maintenance amp Modification of buried carbon steel pipeline

Construction Maintenance amp Modification of non-metallic pipelines

Construction Maintenance amp Modification of fiberglass pipelines

Hydrostatic testing and commissioning of oil and gas pipelines

De commissioning and vacuum drying of pipelines

Mothballing of pipelines

Pigging and internal cleaning of pipelines

External coating repairs

middot Cathodic Protection System Installation Commissioning and maintenance

Cathodic protection (CP) system design and installation

Commissioning of Cathodic Protection system

Trouble shooting and maintenance of existing CP system

Up grading of existing CP system

Routine CP data monitoring

Data evaluation and upgrading recommendations

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

Installation and commissioning of cold storage systems

Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

Installation of cooling coils and condensers

Duct work installation Cleaning and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

13

13

13

Human Resources

middot All personnel are able to understand speak both English and Arabic languages

middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

middot Block Visa available in our ESTABLISHMENT - Under Process

middot Following is the list of our affiliated Recruiting Agents

Equipment Resources

The following table provides information of related equipment that is available for the work

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

middot Safety meetings and dialoguesdiscussion

middot Safety Inspection

middot Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety Talk

A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality Control

Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction Procedure

Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

13

13

13

GOING-ON PROJECTS

COMPLETED PROJECTS

13

13

13

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJCO

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

middot Mechanical repairing works during emergency shutdown

middot Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation (SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah

October 30 2007

SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah

September 20 2007

Ministry ofDefense Housing amp Planning Dept Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

Jeddah

August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram MIJAJCO

Modification and Extension of Hatchery Building

Makkah

May 2007

Fakieh Poultry Fram MIJAJCO

Construction of Labour and staff accommodation Building

Makkah

March 2007

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Fakieh Poultry Fram MIJAJCO

Extension of GP Hatchery

Makkah

April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah

February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

Jeddah

Completed December 2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah

December 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2) Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

ABB Saudi Arabia MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha

October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power MIJAJCO

Replacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

SCECOYusuf Bin A Kanoo MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant Dammam

February 2005

Alstom GE Shoaiba Power Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant (Abha)

September 2004

Alstom Shoaiba Power Plant MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Shoiaba Power Plant Alstom MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

CLIENT

DESCRIPTION

LOCATION

STATUS

MS Huta Hegerfeld Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road Jeddah

Going-on

Saudi Electricity Company ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

1) Cut amp replacing of damaged pipe-length or

2) Jacketing over effected length andor

3) Applying of Balzona to the pitting pipe-length

Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

Going-on

Ministry of Defense Engineering amp Housing Dept Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah

Going-on

Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

1) Plot development

2) Development of infrastructure for the factory

3) Construction of all underground concrete tanks of utility

4) Fabrication and Installation raw material storage tanks intermediate storage tanks

Rabigh

Going-on

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MADE

MODEL

YEARMAKE

QTYOWNED

25

SOIL COMPACTOR PORTABLE

-

1

26

UNDERGROUNG CABEL DETECTOR

SET

--

2

27

PIN BRAZING

SET

--

3

28

HYDRO PRESSURE TEST PUMP

1400 PSI

--

3

29

EXCHANGER BUNDLE PULLER

9 METERS

1

30

BOBCAT

2

31

EXCAVATOR

1

32

MICRO TRENCHER

1

33

VACUUM TRUCK

14 TON

NISSAN

1

34

ASPHALT CUTTER

2

35

HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI

USA

1

36

INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

1

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MAKE

MODEL

YEARMAKE

QTYOWNED

1

MOBILE CRANE

35 TON

TADANO

1985

1

2

TANKER TRUCK (WATER)

10000 amp 19000 GAL

NISSAN

1990

2

3

BOOM TRUCK

6 TON

HINO

1985

1

4

POWER GENERATOR

35 KVA

HONDA

1990

3

5

WELDING MACHINE ENGINE

400 AMP

LICON

1992

4

6

WELDING MACHINE ELECTRIC HF UNIT

400 AMP

MILLER

1996

8

7

WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP

LICON

1998

4

8

AIR COMPRESSOR (COMPLETE)

350 CFM

ATLAS COPCO

1991

1

9

AIR COMPRESSOR (COMPLETE)

450 CFM

CAT

1993

1

10

AIR COMPRESSOR (COMPLETE)

750 CFM

ATLAS COPCO

1990

1

11

DEWATERING PUMP

600 GPM

ROBIN

1990

3

12

PIPE THREADING MACHINE UP TO 16 INCH

SET

RIGID

1994

2

13

AIRLESS SPRAY MACHINE

4500 PSI

GRACO

1996

2

14

AIR SPRAY MACHINE

4500 PSI

GRACO

1995

2

15

OXY-ACETYLENE CYLINDER

SET

--

1993

8

16

ARGON-NITROGEN CYLINDER

SET

--

5

17

PICK-UP (Double Cab)

1frac12 TON

NISSAN

2005

4

18

CREW CAB

1frac12 TON

NISSAN

1988

1

19

PASSENGER VAN

15 SEAT

NISSAN

2002

2

20

FORKLIFT

3 amp 7-12 TON

TOYTO

1990

2

21

GENERATOR LIGHTING SET

15 KVA

CAT

1994

2

22

SAND BLASTING MACHINE

SET

GIRACO

1995

3

23

CATHODIC PROTECTION TEST EQUIPMENT

SET

--

1

24

UNDERGROUND PIPE LOCATOR

SET

--

2

Agents

Address

Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANY

OEP Licence No 2051

Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad Lane

Santacruz (West) Mumbai

INDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)

New Airport Road ndash Chairman Bari

Banani Dhaka ndash 1212

BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411

Fax +9122-24450222

Email zahidinternationalhotmailcom

zahidzahidintcom

gulfjobszahidintcom

website wwwzahidintcom

Page 30: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

Sheet5

ampA
Page ampP

Sheet6

ampA
Page ampP

Sheet7

ampA
Page ampP

Sheet8

ampA
Page ampP

Sheet9

ampA
Page ampP

Sheet10

ampA
Page ampP

Sheet11

ampA
Page ampP

Sheet12

ampA
Page ampP

Sheet13

ampA
Page ampP

Sheet14

ampA
Page ampP

Sheet15

ampA
Page ampP

Sheet16

ampA
Page ampP

BUSINESS FUNCTION

MAJOR ACTIVITIES

middot Generators Overhauling

middot Revamping of Power House Electrical system

middot Low Medium and High Voltage Switchgear Maintenance

middot Low Medium and High Voltage Motors Maintenance and overhauling

middot Electrical Repairing and Refurbishment

middot Process Plant Installation and Maintenance

middot Heat Exchanger Maintenance

middot Refurbishment of Distillation Tower

middot Boiler Maintenance

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

middot Cooling Tower Maintenance

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

middot Cathodic Protection System Installation Commissioning and maintenance

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

middot Generators Overhauling

We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

Remove bearing caps inner and outer end shields end bearings

Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

Removing the existing end winding insulation and repair it where it required

Cleaning the stator housing and both end windings painting end winding with anti tracing paint

Cleaning all components properly and reinstall all the components on its original locations

middot Revamping of Power House Electrical system

Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

middot Low Medium and High Voltage Switchgear Maintenance

Switch gear Inspection and trouble shooting

Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

Protection Relay system and Calibration

Protection system upgrading and refurbishment

middot Low Medium and High Voltage Motors Maintenance and overhauling

Inspection of motors

Dismantling

Carrying out all the required tests

Developing of test records and their interpretation

Supply of motors

Rewinding of motors

Making the recommendations based on inspection and test

middot Electrical Repairing and Refurbishment

Electrical distribution maintenance troubleshooting and extensions

Installation maintenance and extension of lighting distribution and low power systems

Installation of low voltage distribution as well as control panels

Installation laying and testing of low voltage cables and cable tray system

DC distribution including batteries and battery chargers and their installation testing and commissioning

Installation of emergency power generating system

Providing around the clock emergency services

middot Process Plant Installation and Maintenance

We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

Power Plants

Water Treatment Plants

Cement Plants

Sugar Plants

Food Industries

middot Heat Exchanger Maintenance

Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

Pulling of tube bundles

Internal and external hydro-blast cleaning of tubes

Repair and Replacement of tubes

Re-facing of tube sheets

Fabrication of shells

Pressure test

middot Refurbishment of Distillation Tower

Dismantling of trays

Cleaning of shell internals by hydro blast and grit blast

Repair and replacement of bubble cup trays

Replacement of rashing rings

Cleaning and replacement of demister pads

Pressure test

middot Boiler Maintenance

Services are provided for the maintenance of water tube and fire tube boilers

Repair and replacement of tubes

De-scaling of internal and external boiler tubes including steam drums

Fire box and refractory repairs

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Construction of steel tanks for petroleum chemicals and water

Tank cleaning

Bottom plate replacement

Repair and replacement of heating coils

Epoxy lining

Internal Coating

Replacement of Floating Fixed roof

Maintenance of pressure vacuum relief valve

middot Cooling Tower Maintenance

Cleaning of cooling tower cells

Replacement of wooden baffle plates

Repair maintenance amp replacement of Exhaust fan amp gearboxes

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

Construction Maintenance amp Modification of buried carbon steel pipeline

Construction Maintenance amp Modification of non-metallic pipelines

Construction Maintenance amp Modification of fiberglass pipelines

Hydrostatic testing and commissioning of oil and gas pipelines

De commissioning and vacuum drying of pipelines

Mothballing of pipelines

Pigging and internal cleaning of pipelines

External coating repairs

middot Cathodic Protection System Installation Commissioning and maintenance

Cathodic protection (CP) system design and installation

Commissioning of Cathodic Protection system

Trouble shooting and maintenance of existing CP system

Up grading of existing CP system

Routine CP data monitoring

Data evaluation and upgrading recommendations

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

Installation and commissioning of cold storage systems

Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

Installation of cooling coils and condensers

Duct work installation Cleaning and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

13

13

13

Human Resources

middot All personnel are able to understand speak both English and Arabic languages

middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

middot Block Visa available in our ESTABLISHMENT - Under Process

middot Following is the list of our affiliated Recruiting Agents

Equipment Resources

The following table provides information of related equipment that is available for the work

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

middot Safety meetings and dialoguesdiscussion

middot Safety Inspection

middot Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety Talk

A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality Control

Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction Procedure

Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

13

13

13

GOING-ON PROJECTS

COMPLETED PROJECTS

13

13

13

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJCO

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

middot Mechanical repairing works during emergency shutdown

middot Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation (SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah

October 30 2007

SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah

September 20 2007

Ministry ofDefense Housing amp Planning Dept Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

Jeddah

August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram MIJAJCO

Modification and Extension of Hatchery Building

Makkah

May 2007

Fakieh Poultry Fram MIJAJCO

Construction of Labour and staff accommodation Building

Makkah

March 2007

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Fakieh Poultry Fram MIJAJCO

Extension of GP Hatchery

Makkah

April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah

February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

Jeddah

Completed December 2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah

December 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2) Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

ABB Saudi Arabia MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha

October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power MIJAJCO

Replacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

SCECOYusuf Bin A Kanoo MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant Dammam

February 2005

Alstom GE Shoaiba Power Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant (Abha)

September 2004

Alstom Shoaiba Power Plant MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Shoiaba Power Plant Alstom MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

CLIENT

DESCRIPTION

LOCATION

STATUS

MS Huta Hegerfeld Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road Jeddah

Going-on

Saudi Electricity Company ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

1) Cut amp replacing of damaged pipe-length or

2) Jacketing over effected length andor

3) Applying of Balzona to the pitting pipe-length

Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

Going-on

Ministry of Defense Engineering amp Housing Dept Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah

Going-on

Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

1) Plot development

2) Development of infrastructure for the factory

3) Construction of all underground concrete tanks of utility

4) Fabrication and Installation raw material storage tanks intermediate storage tanks

Rabigh

Going-on

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MADE

MODEL

YEARMAKE

QTYOWNED

25

SOIL COMPACTOR PORTABLE

-

1

26

UNDERGROUNG CABEL DETECTOR

SET

--

2

27

PIN BRAZING

SET

--

3

28

HYDRO PRESSURE TEST PUMP

1400 PSI

--

3

29

EXCHANGER BUNDLE PULLER

9 METERS

1

30

BOBCAT

2

31

EXCAVATOR

1

32

MICRO TRENCHER

1

33

VACUUM TRUCK

14 TON

NISSAN

1

34

ASPHALT CUTTER

2

35

HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI

USA

1

36

INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

1

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MAKE

MODEL

YEARMAKE

QTYOWNED

1

MOBILE CRANE

35 TON

TADANO

1985

1

2

TANKER TRUCK (WATER)

10000 amp 19000 GAL

NISSAN

1990

2

3

BOOM TRUCK

6 TON

HINO

1985

1

4

POWER GENERATOR

35 KVA

HONDA

1990

3

5

WELDING MACHINE ENGINE

400 AMP

LICON

1992

4

6

WELDING MACHINE ELECTRIC HF UNIT

400 AMP

MILLER

1996

8

7

WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP

LICON

1998

4

8

AIR COMPRESSOR (COMPLETE)

350 CFM

ATLAS COPCO

1991

1

9

AIR COMPRESSOR (COMPLETE)

450 CFM

CAT

1993

1

10

AIR COMPRESSOR (COMPLETE)

750 CFM

ATLAS COPCO

1990

1

11

DEWATERING PUMP

600 GPM

ROBIN

1990

3

12

PIPE THREADING MACHINE UP TO 16 INCH

SET

RIGID

1994

2

13

AIRLESS SPRAY MACHINE

4500 PSI

GRACO

1996

2

14

AIR SPRAY MACHINE

4500 PSI

GRACO

1995

2

15

OXY-ACETYLENE CYLINDER

SET

--

1993

8

16

ARGON-NITROGEN CYLINDER

SET

--

5

17

PICK-UP (Double Cab)

1frac12 TON

NISSAN

2005

4

18

CREW CAB

1frac12 TON

NISSAN

1988

1

19

PASSENGER VAN

15 SEAT

NISSAN

2002

2

20

FORKLIFT

3 amp 7-12 TON

TOYTO

1990

2

21

GENERATOR LIGHTING SET

15 KVA

CAT

1994

2

22

SAND BLASTING MACHINE

SET

GIRACO

1995

3

23

CATHODIC PROTECTION TEST EQUIPMENT

SET

--

1

24

UNDERGROUND PIPE LOCATOR

SET

--

2

Agents

Address

Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANY

OEP Licence No 2051

Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad Lane

Santacruz (West) Mumbai

INDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)

New Airport Road ndash Chairman Bari

Banani Dhaka ndash 1212

BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411

Fax +9122-24450222

Email zahidinternationalhotmailcom

zahidzahidintcom

gulfjobszahidintcom

website wwwzahidintcom

Page 31: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

Sheet6

ampA
Page ampP

Sheet7

ampA
Page ampP

Sheet8

ampA
Page ampP

Sheet9

ampA
Page ampP

Sheet10

ampA
Page ampP

Sheet11

ampA
Page ampP

Sheet12

ampA
Page ampP

Sheet13

ampA
Page ampP

Sheet14

ampA
Page ampP

Sheet15

ampA
Page ampP

Sheet16

ampA
Page ampP

BUSINESS FUNCTION

MAJOR ACTIVITIES

middot Generators Overhauling

middot Revamping of Power House Electrical system

middot Low Medium and High Voltage Switchgear Maintenance

middot Low Medium and High Voltage Motors Maintenance and overhauling

middot Electrical Repairing and Refurbishment

middot Process Plant Installation and Maintenance

middot Heat Exchanger Maintenance

middot Refurbishment of Distillation Tower

middot Boiler Maintenance

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

middot Cooling Tower Maintenance

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

middot Cathodic Protection System Installation Commissioning and maintenance

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

middot Generators Overhauling

We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

Remove bearing caps inner and outer end shields end bearings

Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

Removing the existing end winding insulation and repair it where it required

Cleaning the stator housing and both end windings painting end winding with anti tracing paint

Cleaning all components properly and reinstall all the components on its original locations

middot Revamping of Power House Electrical system

Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

middot Low Medium and High Voltage Switchgear Maintenance

Switch gear Inspection and trouble shooting

Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

Protection Relay system and Calibration

Protection system upgrading and refurbishment

middot Low Medium and High Voltage Motors Maintenance and overhauling

Inspection of motors

Dismantling

Carrying out all the required tests

Developing of test records and their interpretation

Supply of motors

Rewinding of motors

Making the recommendations based on inspection and test

middot Electrical Repairing and Refurbishment

Electrical distribution maintenance troubleshooting and extensions

Installation maintenance and extension of lighting distribution and low power systems

Installation of low voltage distribution as well as control panels

Installation laying and testing of low voltage cables and cable tray system

DC distribution including batteries and battery chargers and their installation testing and commissioning

Installation of emergency power generating system

Providing around the clock emergency services

middot Process Plant Installation and Maintenance

We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

Power Plants

Water Treatment Plants

Cement Plants

Sugar Plants

Food Industries

middot Heat Exchanger Maintenance

Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

Pulling of tube bundles

Internal and external hydro-blast cleaning of tubes

Repair and Replacement of tubes

Re-facing of tube sheets

Fabrication of shells

Pressure test

middot Refurbishment of Distillation Tower

Dismantling of trays

Cleaning of shell internals by hydro blast and grit blast

Repair and replacement of bubble cup trays

Replacement of rashing rings

Cleaning and replacement of demister pads

Pressure test

middot Boiler Maintenance

Services are provided for the maintenance of water tube and fire tube boilers

Repair and replacement of tubes

De-scaling of internal and external boiler tubes including steam drums

Fire box and refractory repairs

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Construction of steel tanks for petroleum chemicals and water

Tank cleaning

Bottom plate replacement

Repair and replacement of heating coils

Epoxy lining

Internal Coating

Replacement of Floating Fixed roof

Maintenance of pressure vacuum relief valve

middot Cooling Tower Maintenance

Cleaning of cooling tower cells

Replacement of wooden baffle plates

Repair maintenance amp replacement of Exhaust fan amp gearboxes

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

Construction Maintenance amp Modification of buried carbon steel pipeline

Construction Maintenance amp Modification of non-metallic pipelines

Construction Maintenance amp Modification of fiberglass pipelines

Hydrostatic testing and commissioning of oil and gas pipelines

De commissioning and vacuum drying of pipelines

Mothballing of pipelines

Pigging and internal cleaning of pipelines

External coating repairs

middot Cathodic Protection System Installation Commissioning and maintenance

Cathodic protection (CP) system design and installation

Commissioning of Cathodic Protection system

Trouble shooting and maintenance of existing CP system

Up grading of existing CP system

Routine CP data monitoring

Data evaluation and upgrading recommendations

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

Installation and commissioning of cold storage systems

Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

Installation of cooling coils and condensers

Duct work installation Cleaning and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

13

13

13

Human Resources

middot All personnel are able to understand speak both English and Arabic languages

middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

middot Block Visa available in our ESTABLISHMENT - Under Process

middot Following is the list of our affiliated Recruiting Agents

Equipment Resources

The following table provides information of related equipment that is available for the work

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

middot Safety meetings and dialoguesdiscussion

middot Safety Inspection

middot Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety Talk

A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality Control

Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction Procedure

Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

13

13

13

GOING-ON PROJECTS

COMPLETED PROJECTS

13

13

13

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJCO

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

middot Mechanical repairing works during emergency shutdown

middot Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation (SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah

October 30 2007

SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah

September 20 2007

Ministry ofDefense Housing amp Planning Dept Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

Jeddah

August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram MIJAJCO

Modification and Extension of Hatchery Building

Makkah

May 2007

Fakieh Poultry Fram MIJAJCO

Construction of Labour and staff accommodation Building

Makkah

March 2007

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Fakieh Poultry Fram MIJAJCO

Extension of GP Hatchery

Makkah

April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah

February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

Jeddah

Completed December 2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah

December 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2) Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

ABB Saudi Arabia MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha

October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power MIJAJCO

Replacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

SCECOYusuf Bin A Kanoo MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant Dammam

February 2005

Alstom GE Shoaiba Power Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant (Abha)

September 2004

Alstom Shoaiba Power Plant MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Shoiaba Power Plant Alstom MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

CLIENT

DESCRIPTION

LOCATION

STATUS

MS Huta Hegerfeld Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road Jeddah

Going-on

Saudi Electricity Company ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

1) Cut amp replacing of damaged pipe-length or

2) Jacketing over effected length andor

3) Applying of Balzona to the pitting pipe-length

Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

Going-on

Ministry of Defense Engineering amp Housing Dept Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah

Going-on

Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

1) Plot development

2) Development of infrastructure for the factory

3) Construction of all underground concrete tanks of utility

4) Fabrication and Installation raw material storage tanks intermediate storage tanks

Rabigh

Going-on

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MADE

MODEL

YEARMAKE

QTYOWNED

25

SOIL COMPACTOR PORTABLE

-

1

26

UNDERGROUNG CABEL DETECTOR

SET

--

2

27

PIN BRAZING

SET

--

3

28

HYDRO PRESSURE TEST PUMP

1400 PSI

--

3

29

EXCHANGER BUNDLE PULLER

9 METERS

1

30

BOBCAT

2

31

EXCAVATOR

1

32

MICRO TRENCHER

1

33

VACUUM TRUCK

14 TON

NISSAN

1

34

ASPHALT CUTTER

2

35

HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI

USA

1

36

INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

1

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MAKE

MODEL

YEARMAKE

QTYOWNED

1

MOBILE CRANE

35 TON

TADANO

1985

1

2

TANKER TRUCK (WATER)

10000 amp 19000 GAL

NISSAN

1990

2

3

BOOM TRUCK

6 TON

HINO

1985

1

4

POWER GENERATOR

35 KVA

HONDA

1990

3

5

WELDING MACHINE ENGINE

400 AMP

LICON

1992

4

6

WELDING MACHINE ELECTRIC HF UNIT

400 AMP

MILLER

1996

8

7

WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP

LICON

1998

4

8

AIR COMPRESSOR (COMPLETE)

350 CFM

ATLAS COPCO

1991

1

9

AIR COMPRESSOR (COMPLETE)

450 CFM

CAT

1993

1

10

AIR COMPRESSOR (COMPLETE)

750 CFM

ATLAS COPCO

1990

1

11

DEWATERING PUMP

600 GPM

ROBIN

1990

3

12

PIPE THREADING MACHINE UP TO 16 INCH

SET

RIGID

1994

2

13

AIRLESS SPRAY MACHINE

4500 PSI

GRACO

1996

2

14

AIR SPRAY MACHINE

4500 PSI

GRACO

1995

2

15

OXY-ACETYLENE CYLINDER

SET

--

1993

8

16

ARGON-NITROGEN CYLINDER

SET

--

5

17

PICK-UP (Double Cab)

1frac12 TON

NISSAN

2005

4

18

CREW CAB

1frac12 TON

NISSAN

1988

1

19

PASSENGER VAN

15 SEAT

NISSAN

2002

2

20

FORKLIFT

3 amp 7-12 TON

TOYTO

1990

2

21

GENERATOR LIGHTING SET

15 KVA

CAT

1994

2

22

SAND BLASTING MACHINE

SET

GIRACO

1995

3

23

CATHODIC PROTECTION TEST EQUIPMENT

SET

--

1

24

UNDERGROUND PIPE LOCATOR

SET

--

2

Agents

Address

Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANY

OEP Licence No 2051

Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad Lane

Santacruz (West) Mumbai

INDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)

New Airport Road ndash Chairman Bari

Banani Dhaka ndash 1212

BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411

Fax +9122-24450222

Email zahidinternationalhotmailcom

zahidzahidintcom

gulfjobszahidintcom

website wwwzahidintcom

Page 32: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

Sheet7

ampA
Page ampP

Sheet8

ampA
Page ampP

Sheet9

ampA
Page ampP

Sheet10

ampA
Page ampP

Sheet11

ampA
Page ampP

Sheet12

ampA
Page ampP

Sheet13

ampA
Page ampP

Sheet14

ampA
Page ampP

Sheet15

ampA
Page ampP

Sheet16

ampA
Page ampP

BUSINESS FUNCTION

MAJOR ACTIVITIES

middot Generators Overhauling

middot Revamping of Power House Electrical system

middot Low Medium and High Voltage Switchgear Maintenance

middot Low Medium and High Voltage Motors Maintenance and overhauling

middot Electrical Repairing and Refurbishment

middot Process Plant Installation and Maintenance

middot Heat Exchanger Maintenance

middot Refurbishment of Distillation Tower

middot Boiler Maintenance

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

middot Cooling Tower Maintenance

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

middot Cathodic Protection System Installation Commissioning and maintenance

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

middot Generators Overhauling

We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

Remove bearing caps inner and outer end shields end bearings

Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

Removing the existing end winding insulation and repair it where it required

Cleaning the stator housing and both end windings painting end winding with anti tracing paint

Cleaning all components properly and reinstall all the components on its original locations

middot Revamping of Power House Electrical system

Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

middot Low Medium and High Voltage Switchgear Maintenance

Switch gear Inspection and trouble shooting

Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

Protection Relay system and Calibration

Protection system upgrading and refurbishment

middot Low Medium and High Voltage Motors Maintenance and overhauling

Inspection of motors

Dismantling

Carrying out all the required tests

Developing of test records and their interpretation

Supply of motors

Rewinding of motors

Making the recommendations based on inspection and test

middot Electrical Repairing and Refurbishment

Electrical distribution maintenance troubleshooting and extensions

Installation maintenance and extension of lighting distribution and low power systems

Installation of low voltage distribution as well as control panels

Installation laying and testing of low voltage cables and cable tray system

DC distribution including batteries and battery chargers and their installation testing and commissioning

Installation of emergency power generating system

Providing around the clock emergency services

middot Process Plant Installation and Maintenance

We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

Power Plants

Water Treatment Plants

Cement Plants

Sugar Plants

Food Industries

middot Heat Exchanger Maintenance

Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

Pulling of tube bundles

Internal and external hydro-blast cleaning of tubes

Repair and Replacement of tubes

Re-facing of tube sheets

Fabrication of shells

Pressure test

middot Refurbishment of Distillation Tower

Dismantling of trays

Cleaning of shell internals by hydro blast and grit blast

Repair and replacement of bubble cup trays

Replacement of rashing rings

Cleaning and replacement of demister pads

Pressure test

middot Boiler Maintenance

Services are provided for the maintenance of water tube and fire tube boilers

Repair and replacement of tubes

De-scaling of internal and external boiler tubes including steam drums

Fire box and refractory repairs

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Construction of steel tanks for petroleum chemicals and water

Tank cleaning

Bottom plate replacement

Repair and replacement of heating coils

Epoxy lining

Internal Coating

Replacement of Floating Fixed roof

Maintenance of pressure vacuum relief valve

middot Cooling Tower Maintenance

Cleaning of cooling tower cells

Replacement of wooden baffle plates

Repair maintenance amp replacement of Exhaust fan amp gearboxes

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

Construction Maintenance amp Modification of buried carbon steel pipeline

Construction Maintenance amp Modification of non-metallic pipelines

Construction Maintenance amp Modification of fiberglass pipelines

Hydrostatic testing and commissioning of oil and gas pipelines

De commissioning and vacuum drying of pipelines

Mothballing of pipelines

Pigging and internal cleaning of pipelines

External coating repairs

middot Cathodic Protection System Installation Commissioning and maintenance

Cathodic protection (CP) system design and installation

Commissioning of Cathodic Protection system

Trouble shooting and maintenance of existing CP system

Up grading of existing CP system

Routine CP data monitoring

Data evaluation and upgrading recommendations

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

Installation and commissioning of cold storage systems

Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

Installation of cooling coils and condensers

Duct work installation Cleaning and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

13

13

13

Human Resources

middot All personnel are able to understand speak both English and Arabic languages

middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

middot Block Visa available in our ESTABLISHMENT - Under Process

middot Following is the list of our affiliated Recruiting Agents

Equipment Resources

The following table provides information of related equipment that is available for the work

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

middot Safety meetings and dialoguesdiscussion

middot Safety Inspection

middot Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety Talk

A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality Control

Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction Procedure

Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

13

13

13

GOING-ON PROJECTS

COMPLETED PROJECTS

13

13

13

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJCO

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

middot Mechanical repairing works during emergency shutdown

middot Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation (SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah

October 30 2007

SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah

September 20 2007

Ministry ofDefense Housing amp Planning Dept Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

Jeddah

August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram MIJAJCO

Modification and Extension of Hatchery Building

Makkah

May 2007

Fakieh Poultry Fram MIJAJCO

Construction of Labour and staff accommodation Building

Makkah

March 2007

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Fakieh Poultry Fram MIJAJCO

Extension of GP Hatchery

Makkah

April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah

February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

Jeddah

Completed December 2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah

December 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2) Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

ABB Saudi Arabia MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha

October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power MIJAJCO

Replacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

SCECOYusuf Bin A Kanoo MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant Dammam

February 2005

Alstom GE Shoaiba Power Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant (Abha)

September 2004

Alstom Shoaiba Power Plant MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Shoiaba Power Plant Alstom MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

CLIENT

DESCRIPTION

LOCATION

STATUS

MS Huta Hegerfeld Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road Jeddah

Going-on

Saudi Electricity Company ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

1) Cut amp replacing of damaged pipe-length or

2) Jacketing over effected length andor

3) Applying of Balzona to the pitting pipe-length

Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

Going-on

Ministry of Defense Engineering amp Housing Dept Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah

Going-on

Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

1) Plot development

2) Development of infrastructure for the factory

3) Construction of all underground concrete tanks of utility

4) Fabrication and Installation raw material storage tanks intermediate storage tanks

Rabigh

Going-on

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MADE

MODEL

YEARMAKE

QTYOWNED

25

SOIL COMPACTOR PORTABLE

-

1

26

UNDERGROUNG CABEL DETECTOR

SET

--

2

27

PIN BRAZING

SET

--

3

28

HYDRO PRESSURE TEST PUMP

1400 PSI

--

3

29

EXCHANGER BUNDLE PULLER

9 METERS

1

30

BOBCAT

2

31

EXCAVATOR

1

32

MICRO TRENCHER

1

33

VACUUM TRUCK

14 TON

NISSAN

1

34

ASPHALT CUTTER

2

35

HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI

USA

1

36

INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

1

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MAKE

MODEL

YEARMAKE

QTYOWNED

1

MOBILE CRANE

35 TON

TADANO

1985

1

2

TANKER TRUCK (WATER)

10000 amp 19000 GAL

NISSAN

1990

2

3

BOOM TRUCK

6 TON

HINO

1985

1

4

POWER GENERATOR

35 KVA

HONDA

1990

3

5

WELDING MACHINE ENGINE

400 AMP

LICON

1992

4

6

WELDING MACHINE ELECTRIC HF UNIT

400 AMP

MILLER

1996

8

7

WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP

LICON

1998

4

8

AIR COMPRESSOR (COMPLETE)

350 CFM

ATLAS COPCO

1991

1

9

AIR COMPRESSOR (COMPLETE)

450 CFM

CAT

1993

1

10

AIR COMPRESSOR (COMPLETE)

750 CFM

ATLAS COPCO

1990

1

11

DEWATERING PUMP

600 GPM

ROBIN

1990

3

12

PIPE THREADING MACHINE UP TO 16 INCH

SET

RIGID

1994

2

13

AIRLESS SPRAY MACHINE

4500 PSI

GRACO

1996

2

14

AIR SPRAY MACHINE

4500 PSI

GRACO

1995

2

15

OXY-ACETYLENE CYLINDER

SET

--

1993

8

16

ARGON-NITROGEN CYLINDER

SET

--

5

17

PICK-UP (Double Cab)

1frac12 TON

NISSAN

2005

4

18

CREW CAB

1frac12 TON

NISSAN

1988

1

19

PASSENGER VAN

15 SEAT

NISSAN

2002

2

20

FORKLIFT

3 amp 7-12 TON

TOYTO

1990

2

21

GENERATOR LIGHTING SET

15 KVA

CAT

1994

2

22

SAND BLASTING MACHINE

SET

GIRACO

1995

3

23

CATHODIC PROTECTION TEST EQUIPMENT

SET

--

1

24

UNDERGROUND PIPE LOCATOR

SET

--

2

Agents

Address

Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANY

OEP Licence No 2051

Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad Lane

Santacruz (West) Mumbai

INDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)

New Airport Road ndash Chairman Bari

Banani Dhaka ndash 1212

BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411

Fax +9122-24450222

Email zahidinternationalhotmailcom

zahidzahidintcom

gulfjobszahidintcom

website wwwzahidintcom

Page 33: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

Sheet8

ampA
Page ampP

Sheet9

ampA
Page ampP

Sheet10

ampA
Page ampP

Sheet11

ampA
Page ampP

Sheet12

ampA
Page ampP

Sheet13

ampA
Page ampP

Sheet14

ampA
Page ampP

Sheet15

ampA
Page ampP

Sheet16

ampA
Page ampP

BUSINESS FUNCTION

MAJOR ACTIVITIES

middot Generators Overhauling

middot Revamping of Power House Electrical system

middot Low Medium and High Voltage Switchgear Maintenance

middot Low Medium and High Voltage Motors Maintenance and overhauling

middot Electrical Repairing and Refurbishment

middot Process Plant Installation and Maintenance

middot Heat Exchanger Maintenance

middot Refurbishment of Distillation Tower

middot Boiler Maintenance

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

middot Cooling Tower Maintenance

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

middot Cathodic Protection System Installation Commissioning and maintenance

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

middot Generators Overhauling

We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

Remove bearing caps inner and outer end shields end bearings

Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

Removing the existing end winding insulation and repair it where it required

Cleaning the stator housing and both end windings painting end winding with anti tracing paint

Cleaning all components properly and reinstall all the components on its original locations

middot Revamping of Power House Electrical system

Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

middot Low Medium and High Voltage Switchgear Maintenance

Switch gear Inspection and trouble shooting

Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

Protection Relay system and Calibration

Protection system upgrading and refurbishment

middot Low Medium and High Voltage Motors Maintenance and overhauling

Inspection of motors

Dismantling

Carrying out all the required tests

Developing of test records and their interpretation

Supply of motors

Rewinding of motors

Making the recommendations based on inspection and test

middot Electrical Repairing and Refurbishment

Electrical distribution maintenance troubleshooting and extensions

Installation maintenance and extension of lighting distribution and low power systems

Installation of low voltage distribution as well as control panels

Installation laying and testing of low voltage cables and cable tray system

DC distribution including batteries and battery chargers and their installation testing and commissioning

Installation of emergency power generating system

Providing around the clock emergency services

middot Process Plant Installation and Maintenance

We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

Power Plants

Water Treatment Plants

Cement Plants

Sugar Plants

Food Industries

middot Heat Exchanger Maintenance

Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

Pulling of tube bundles

Internal and external hydro-blast cleaning of tubes

Repair and Replacement of tubes

Re-facing of tube sheets

Fabrication of shells

Pressure test

middot Refurbishment of Distillation Tower

Dismantling of trays

Cleaning of shell internals by hydro blast and grit blast

Repair and replacement of bubble cup trays

Replacement of rashing rings

Cleaning and replacement of demister pads

Pressure test

middot Boiler Maintenance

Services are provided for the maintenance of water tube and fire tube boilers

Repair and replacement of tubes

De-scaling of internal and external boiler tubes including steam drums

Fire box and refractory repairs

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Construction of steel tanks for petroleum chemicals and water

Tank cleaning

Bottom plate replacement

Repair and replacement of heating coils

Epoxy lining

Internal Coating

Replacement of Floating Fixed roof

Maintenance of pressure vacuum relief valve

middot Cooling Tower Maintenance

Cleaning of cooling tower cells

Replacement of wooden baffle plates

Repair maintenance amp replacement of Exhaust fan amp gearboxes

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

Construction Maintenance amp Modification of buried carbon steel pipeline

Construction Maintenance amp Modification of non-metallic pipelines

Construction Maintenance amp Modification of fiberglass pipelines

Hydrostatic testing and commissioning of oil and gas pipelines

De commissioning and vacuum drying of pipelines

Mothballing of pipelines

Pigging and internal cleaning of pipelines

External coating repairs

middot Cathodic Protection System Installation Commissioning and maintenance

Cathodic protection (CP) system design and installation

Commissioning of Cathodic Protection system

Trouble shooting and maintenance of existing CP system

Up grading of existing CP system

Routine CP data monitoring

Data evaluation and upgrading recommendations

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

Installation and commissioning of cold storage systems

Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

Installation of cooling coils and condensers

Duct work installation Cleaning and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

13

13

13

Human Resources

middot All personnel are able to understand speak both English and Arabic languages

middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

middot Block Visa available in our ESTABLISHMENT - Under Process

middot Following is the list of our affiliated Recruiting Agents

Equipment Resources

The following table provides information of related equipment that is available for the work

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

middot Safety meetings and dialoguesdiscussion

middot Safety Inspection

middot Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety Talk

A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality Control

Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction Procedure

Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

13

13

13

GOING-ON PROJECTS

COMPLETED PROJECTS

13

13

13

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJCO

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

middot Mechanical repairing works during emergency shutdown

middot Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation (SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah

October 30 2007

SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah

September 20 2007

Ministry ofDefense Housing amp Planning Dept Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

Jeddah

August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram MIJAJCO

Modification and Extension of Hatchery Building

Makkah

May 2007

Fakieh Poultry Fram MIJAJCO

Construction of Labour and staff accommodation Building

Makkah

March 2007

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Fakieh Poultry Fram MIJAJCO

Extension of GP Hatchery

Makkah

April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah

February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

Jeddah

Completed December 2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah

December 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2) Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

ABB Saudi Arabia MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha

October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power MIJAJCO

Replacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

SCECOYusuf Bin A Kanoo MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant Dammam

February 2005

Alstom GE Shoaiba Power Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant (Abha)

September 2004

Alstom Shoaiba Power Plant MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Shoiaba Power Plant Alstom MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

CLIENT

DESCRIPTION

LOCATION

STATUS

MS Huta Hegerfeld Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road Jeddah

Going-on

Saudi Electricity Company ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

1) Cut amp replacing of damaged pipe-length or

2) Jacketing over effected length andor

3) Applying of Balzona to the pitting pipe-length

Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

Going-on

Ministry of Defense Engineering amp Housing Dept Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah

Going-on

Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

1) Plot development

2) Development of infrastructure for the factory

3) Construction of all underground concrete tanks of utility

4) Fabrication and Installation raw material storage tanks intermediate storage tanks

Rabigh

Going-on

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MADE

MODEL

YEARMAKE

QTYOWNED

25

SOIL COMPACTOR PORTABLE

-

1

26

UNDERGROUNG CABEL DETECTOR

SET

--

2

27

PIN BRAZING

SET

--

3

28

HYDRO PRESSURE TEST PUMP

1400 PSI

--

3

29

EXCHANGER BUNDLE PULLER

9 METERS

1

30

BOBCAT

2

31

EXCAVATOR

1

32

MICRO TRENCHER

1

33

VACUUM TRUCK

14 TON

NISSAN

1

34

ASPHALT CUTTER

2

35

HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI

USA

1

36

INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

1

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MAKE

MODEL

YEARMAKE

QTYOWNED

1

MOBILE CRANE

35 TON

TADANO

1985

1

2

TANKER TRUCK (WATER)

10000 amp 19000 GAL

NISSAN

1990

2

3

BOOM TRUCK

6 TON

HINO

1985

1

4

POWER GENERATOR

35 KVA

HONDA

1990

3

5

WELDING MACHINE ENGINE

400 AMP

LICON

1992

4

6

WELDING MACHINE ELECTRIC HF UNIT

400 AMP

MILLER

1996

8

7

WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP

LICON

1998

4

8

AIR COMPRESSOR (COMPLETE)

350 CFM

ATLAS COPCO

1991

1

9

AIR COMPRESSOR (COMPLETE)

450 CFM

CAT

1993

1

10

AIR COMPRESSOR (COMPLETE)

750 CFM

ATLAS COPCO

1990

1

11

DEWATERING PUMP

600 GPM

ROBIN

1990

3

12

PIPE THREADING MACHINE UP TO 16 INCH

SET

RIGID

1994

2

13

AIRLESS SPRAY MACHINE

4500 PSI

GRACO

1996

2

14

AIR SPRAY MACHINE

4500 PSI

GRACO

1995

2

15

OXY-ACETYLENE CYLINDER

SET

--

1993

8

16

ARGON-NITROGEN CYLINDER

SET

--

5

17

PICK-UP (Double Cab)

1frac12 TON

NISSAN

2005

4

18

CREW CAB

1frac12 TON

NISSAN

1988

1

19

PASSENGER VAN

15 SEAT

NISSAN

2002

2

20

FORKLIFT

3 amp 7-12 TON

TOYTO

1990

2

21

GENERATOR LIGHTING SET

15 KVA

CAT

1994

2

22

SAND BLASTING MACHINE

SET

GIRACO

1995

3

23

CATHODIC PROTECTION TEST EQUIPMENT

SET

--

1

24

UNDERGROUND PIPE LOCATOR

SET

--

2

Agents

Address

Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANY

OEP Licence No 2051

Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad Lane

Santacruz (West) Mumbai

INDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)

New Airport Road ndash Chairman Bari

Banani Dhaka ndash 1212

BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411

Fax +9122-24450222

Email zahidinternationalhotmailcom

zahidzahidintcom

gulfjobszahidintcom

website wwwzahidintcom

Page 34: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

Sheet9

ampA
Page ampP

Sheet10

ampA
Page ampP

Sheet11

ampA
Page ampP

Sheet12

ampA
Page ampP

Sheet13

ampA
Page ampP

Sheet14

ampA
Page ampP

Sheet15

ampA
Page ampP

Sheet16

ampA
Page ampP

BUSINESS FUNCTION

MAJOR ACTIVITIES

middot Generators Overhauling

middot Revamping of Power House Electrical system

middot Low Medium and High Voltage Switchgear Maintenance

middot Low Medium and High Voltage Motors Maintenance and overhauling

middot Electrical Repairing and Refurbishment

middot Process Plant Installation and Maintenance

middot Heat Exchanger Maintenance

middot Refurbishment of Distillation Tower

middot Boiler Maintenance

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

middot Cooling Tower Maintenance

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

middot Cathodic Protection System Installation Commissioning and maintenance

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

middot Generators Overhauling

We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

Remove bearing caps inner and outer end shields end bearings

Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

Removing the existing end winding insulation and repair it where it required

Cleaning the stator housing and both end windings painting end winding with anti tracing paint

Cleaning all components properly and reinstall all the components on its original locations

middot Revamping of Power House Electrical system

Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

middot Low Medium and High Voltage Switchgear Maintenance

Switch gear Inspection and trouble shooting

Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

Protection Relay system and Calibration

Protection system upgrading and refurbishment

middot Low Medium and High Voltage Motors Maintenance and overhauling

Inspection of motors

Dismantling

Carrying out all the required tests

Developing of test records and their interpretation

Supply of motors

Rewinding of motors

Making the recommendations based on inspection and test

middot Electrical Repairing and Refurbishment

Electrical distribution maintenance troubleshooting and extensions

Installation maintenance and extension of lighting distribution and low power systems

Installation of low voltage distribution as well as control panels

Installation laying and testing of low voltage cables and cable tray system

DC distribution including batteries and battery chargers and their installation testing and commissioning

Installation of emergency power generating system

Providing around the clock emergency services

middot Process Plant Installation and Maintenance

We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

Power Plants

Water Treatment Plants

Cement Plants

Sugar Plants

Food Industries

middot Heat Exchanger Maintenance

Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

Pulling of tube bundles

Internal and external hydro-blast cleaning of tubes

Repair and Replacement of tubes

Re-facing of tube sheets

Fabrication of shells

Pressure test

middot Refurbishment of Distillation Tower

Dismantling of trays

Cleaning of shell internals by hydro blast and grit blast

Repair and replacement of bubble cup trays

Replacement of rashing rings

Cleaning and replacement of demister pads

Pressure test

middot Boiler Maintenance

Services are provided for the maintenance of water tube and fire tube boilers

Repair and replacement of tubes

De-scaling of internal and external boiler tubes including steam drums

Fire box and refractory repairs

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Construction of steel tanks for petroleum chemicals and water

Tank cleaning

Bottom plate replacement

Repair and replacement of heating coils

Epoxy lining

Internal Coating

Replacement of Floating Fixed roof

Maintenance of pressure vacuum relief valve

middot Cooling Tower Maintenance

Cleaning of cooling tower cells

Replacement of wooden baffle plates

Repair maintenance amp replacement of Exhaust fan amp gearboxes

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

Construction Maintenance amp Modification of buried carbon steel pipeline

Construction Maintenance amp Modification of non-metallic pipelines

Construction Maintenance amp Modification of fiberglass pipelines

Hydrostatic testing and commissioning of oil and gas pipelines

De commissioning and vacuum drying of pipelines

Mothballing of pipelines

Pigging and internal cleaning of pipelines

External coating repairs

middot Cathodic Protection System Installation Commissioning and maintenance

Cathodic protection (CP) system design and installation

Commissioning of Cathodic Protection system

Trouble shooting and maintenance of existing CP system

Up grading of existing CP system

Routine CP data monitoring

Data evaluation and upgrading recommendations

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

Installation and commissioning of cold storage systems

Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

Installation of cooling coils and condensers

Duct work installation Cleaning and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

13

13

13

Human Resources

middot All personnel are able to understand speak both English and Arabic languages

middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

middot Block Visa available in our ESTABLISHMENT - Under Process

middot Following is the list of our affiliated Recruiting Agents

Equipment Resources

The following table provides information of related equipment that is available for the work

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

middot Safety meetings and dialoguesdiscussion

middot Safety Inspection

middot Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety Talk

A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality Control

Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction Procedure

Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

13

13

13

GOING-ON PROJECTS

COMPLETED PROJECTS

13

13

13

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJCO

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

middot Mechanical repairing works during emergency shutdown

middot Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation (SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah

October 30 2007

SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah

September 20 2007

Ministry ofDefense Housing amp Planning Dept Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

Jeddah

August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram MIJAJCO

Modification and Extension of Hatchery Building

Makkah

May 2007

Fakieh Poultry Fram MIJAJCO

Construction of Labour and staff accommodation Building

Makkah

March 2007

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Fakieh Poultry Fram MIJAJCO

Extension of GP Hatchery

Makkah

April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah

February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

Jeddah

Completed December 2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah

December 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2) Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

ABB Saudi Arabia MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha

October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power MIJAJCO

Replacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

SCECOYusuf Bin A Kanoo MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant Dammam

February 2005

Alstom GE Shoaiba Power Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant (Abha)

September 2004

Alstom Shoaiba Power Plant MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Shoiaba Power Plant Alstom MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

CLIENT

DESCRIPTION

LOCATION

STATUS

MS Huta Hegerfeld Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road Jeddah

Going-on

Saudi Electricity Company ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

1) Cut amp replacing of damaged pipe-length or

2) Jacketing over effected length andor

3) Applying of Balzona to the pitting pipe-length

Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

Going-on

Ministry of Defense Engineering amp Housing Dept Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah

Going-on

Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

1) Plot development

2) Development of infrastructure for the factory

3) Construction of all underground concrete tanks of utility

4) Fabrication and Installation raw material storage tanks intermediate storage tanks

Rabigh

Going-on

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MADE

MODEL

YEARMAKE

QTYOWNED

25

SOIL COMPACTOR PORTABLE

-

1

26

UNDERGROUNG CABEL DETECTOR

SET

--

2

27

PIN BRAZING

SET

--

3

28

HYDRO PRESSURE TEST PUMP

1400 PSI

--

3

29

EXCHANGER BUNDLE PULLER

9 METERS

1

30

BOBCAT

2

31

EXCAVATOR

1

32

MICRO TRENCHER

1

33

VACUUM TRUCK

14 TON

NISSAN

1

34

ASPHALT CUTTER

2

35

HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI

USA

1

36

INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

1

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MAKE

MODEL

YEARMAKE

QTYOWNED

1

MOBILE CRANE

35 TON

TADANO

1985

1

2

TANKER TRUCK (WATER)

10000 amp 19000 GAL

NISSAN

1990

2

3

BOOM TRUCK

6 TON

HINO

1985

1

4

POWER GENERATOR

35 KVA

HONDA

1990

3

5

WELDING MACHINE ENGINE

400 AMP

LICON

1992

4

6

WELDING MACHINE ELECTRIC HF UNIT

400 AMP

MILLER

1996

8

7

WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP

LICON

1998

4

8

AIR COMPRESSOR (COMPLETE)

350 CFM

ATLAS COPCO

1991

1

9

AIR COMPRESSOR (COMPLETE)

450 CFM

CAT

1993

1

10

AIR COMPRESSOR (COMPLETE)

750 CFM

ATLAS COPCO

1990

1

11

DEWATERING PUMP

600 GPM

ROBIN

1990

3

12

PIPE THREADING MACHINE UP TO 16 INCH

SET

RIGID

1994

2

13

AIRLESS SPRAY MACHINE

4500 PSI

GRACO

1996

2

14

AIR SPRAY MACHINE

4500 PSI

GRACO

1995

2

15

OXY-ACETYLENE CYLINDER

SET

--

1993

8

16

ARGON-NITROGEN CYLINDER

SET

--

5

17

PICK-UP (Double Cab)

1frac12 TON

NISSAN

2005

4

18

CREW CAB

1frac12 TON

NISSAN

1988

1

19

PASSENGER VAN

15 SEAT

NISSAN

2002

2

20

FORKLIFT

3 amp 7-12 TON

TOYTO

1990

2

21

GENERATOR LIGHTING SET

15 KVA

CAT

1994

2

22

SAND BLASTING MACHINE

SET

GIRACO

1995

3

23

CATHODIC PROTECTION TEST EQUIPMENT

SET

--

1

24

UNDERGROUND PIPE LOCATOR

SET

--

2

Agents

Address

Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANY

OEP Licence No 2051

Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad Lane

Santacruz (West) Mumbai

INDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)

New Airport Road ndash Chairman Bari

Banani Dhaka ndash 1212

BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411

Fax +9122-24450222

Email zahidinternationalhotmailcom

zahidzahidintcom

gulfjobszahidintcom

website wwwzahidintcom

Page 35: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

Sheet10

ampA
Page ampP

Sheet11

ampA
Page ampP

Sheet12

ampA
Page ampP

Sheet13

ampA
Page ampP

Sheet14

ampA
Page ampP

Sheet15

ampA
Page ampP

Sheet16

ampA
Page ampP

BUSINESS FUNCTION

MAJOR ACTIVITIES

middot Generators Overhauling

middot Revamping of Power House Electrical system

middot Low Medium and High Voltage Switchgear Maintenance

middot Low Medium and High Voltage Motors Maintenance and overhauling

middot Electrical Repairing and Refurbishment

middot Process Plant Installation and Maintenance

middot Heat Exchanger Maintenance

middot Refurbishment of Distillation Tower

middot Boiler Maintenance

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

middot Cooling Tower Maintenance

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

middot Cathodic Protection System Installation Commissioning and maintenance

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

middot Generators Overhauling

We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

Remove bearing caps inner and outer end shields end bearings

Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

Removing the existing end winding insulation and repair it where it required

Cleaning the stator housing and both end windings painting end winding with anti tracing paint

Cleaning all components properly and reinstall all the components on its original locations

middot Revamping of Power House Electrical system

Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

middot Low Medium and High Voltage Switchgear Maintenance

Switch gear Inspection and trouble shooting

Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

Protection Relay system and Calibration

Protection system upgrading and refurbishment

middot Low Medium and High Voltage Motors Maintenance and overhauling

Inspection of motors

Dismantling

Carrying out all the required tests

Developing of test records and their interpretation

Supply of motors

Rewinding of motors

Making the recommendations based on inspection and test

middot Electrical Repairing and Refurbishment

Electrical distribution maintenance troubleshooting and extensions

Installation maintenance and extension of lighting distribution and low power systems

Installation of low voltage distribution as well as control panels

Installation laying and testing of low voltage cables and cable tray system

DC distribution including batteries and battery chargers and their installation testing and commissioning

Installation of emergency power generating system

Providing around the clock emergency services

middot Process Plant Installation and Maintenance

We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

Power Plants

Water Treatment Plants

Cement Plants

Sugar Plants

Food Industries

middot Heat Exchanger Maintenance

Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

Pulling of tube bundles

Internal and external hydro-blast cleaning of tubes

Repair and Replacement of tubes

Re-facing of tube sheets

Fabrication of shells

Pressure test

middot Refurbishment of Distillation Tower

Dismantling of trays

Cleaning of shell internals by hydro blast and grit blast

Repair and replacement of bubble cup trays

Replacement of rashing rings

Cleaning and replacement of demister pads

Pressure test

middot Boiler Maintenance

Services are provided for the maintenance of water tube and fire tube boilers

Repair and replacement of tubes

De-scaling of internal and external boiler tubes including steam drums

Fire box and refractory repairs

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Construction of steel tanks for petroleum chemicals and water

Tank cleaning

Bottom plate replacement

Repair and replacement of heating coils

Epoxy lining

Internal Coating

Replacement of Floating Fixed roof

Maintenance of pressure vacuum relief valve

middot Cooling Tower Maintenance

Cleaning of cooling tower cells

Replacement of wooden baffle plates

Repair maintenance amp replacement of Exhaust fan amp gearboxes

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

Construction Maintenance amp Modification of buried carbon steel pipeline

Construction Maintenance amp Modification of non-metallic pipelines

Construction Maintenance amp Modification of fiberglass pipelines

Hydrostatic testing and commissioning of oil and gas pipelines

De commissioning and vacuum drying of pipelines

Mothballing of pipelines

Pigging and internal cleaning of pipelines

External coating repairs

middot Cathodic Protection System Installation Commissioning and maintenance

Cathodic protection (CP) system design and installation

Commissioning of Cathodic Protection system

Trouble shooting and maintenance of existing CP system

Up grading of existing CP system

Routine CP data monitoring

Data evaluation and upgrading recommendations

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

Installation and commissioning of cold storage systems

Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

Installation of cooling coils and condensers

Duct work installation Cleaning and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

13

13

13

Human Resources

middot All personnel are able to understand speak both English and Arabic languages

middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

middot Block Visa available in our ESTABLISHMENT - Under Process

middot Following is the list of our affiliated Recruiting Agents

Equipment Resources

The following table provides information of related equipment that is available for the work

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

middot Safety meetings and dialoguesdiscussion

middot Safety Inspection

middot Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety Talk

A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality Control

Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction Procedure

Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

13

13

13

GOING-ON PROJECTS

COMPLETED PROJECTS

13

13

13

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJCO

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

middot Mechanical repairing works during emergency shutdown

middot Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation (SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah

October 30 2007

SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah

September 20 2007

Ministry ofDefense Housing amp Planning Dept Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

Jeddah

August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram MIJAJCO

Modification and Extension of Hatchery Building

Makkah

May 2007

Fakieh Poultry Fram MIJAJCO

Construction of Labour and staff accommodation Building

Makkah

March 2007

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Fakieh Poultry Fram MIJAJCO

Extension of GP Hatchery

Makkah

April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah

February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

Jeddah

Completed December 2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah

December 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2) Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

ABB Saudi Arabia MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha

October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power MIJAJCO

Replacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

SCECOYusuf Bin A Kanoo MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant Dammam

February 2005

Alstom GE Shoaiba Power Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant (Abha)

September 2004

Alstom Shoaiba Power Plant MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Shoiaba Power Plant Alstom MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

CLIENT

DESCRIPTION

LOCATION

STATUS

MS Huta Hegerfeld Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road Jeddah

Going-on

Saudi Electricity Company ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

1) Cut amp replacing of damaged pipe-length or

2) Jacketing over effected length andor

3) Applying of Balzona to the pitting pipe-length

Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

Going-on

Ministry of Defense Engineering amp Housing Dept Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah

Going-on

Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

1) Plot development

2) Development of infrastructure for the factory

3) Construction of all underground concrete tanks of utility

4) Fabrication and Installation raw material storage tanks intermediate storage tanks

Rabigh

Going-on

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MADE

MODEL

YEARMAKE

QTYOWNED

25

SOIL COMPACTOR PORTABLE

-

1

26

UNDERGROUNG CABEL DETECTOR

SET

--

2

27

PIN BRAZING

SET

--

3

28

HYDRO PRESSURE TEST PUMP

1400 PSI

--

3

29

EXCHANGER BUNDLE PULLER

9 METERS

1

30

BOBCAT

2

31

EXCAVATOR

1

32

MICRO TRENCHER

1

33

VACUUM TRUCK

14 TON

NISSAN

1

34

ASPHALT CUTTER

2

35

HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI

USA

1

36

INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

1

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MAKE

MODEL

YEARMAKE

QTYOWNED

1

MOBILE CRANE

35 TON

TADANO

1985

1

2

TANKER TRUCK (WATER)

10000 amp 19000 GAL

NISSAN

1990

2

3

BOOM TRUCK

6 TON

HINO

1985

1

4

POWER GENERATOR

35 KVA

HONDA

1990

3

5

WELDING MACHINE ENGINE

400 AMP

LICON

1992

4

6

WELDING MACHINE ELECTRIC HF UNIT

400 AMP

MILLER

1996

8

7

WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP

LICON

1998

4

8

AIR COMPRESSOR (COMPLETE)

350 CFM

ATLAS COPCO

1991

1

9

AIR COMPRESSOR (COMPLETE)

450 CFM

CAT

1993

1

10

AIR COMPRESSOR (COMPLETE)

750 CFM

ATLAS COPCO

1990

1

11

DEWATERING PUMP

600 GPM

ROBIN

1990

3

12

PIPE THREADING MACHINE UP TO 16 INCH

SET

RIGID

1994

2

13

AIRLESS SPRAY MACHINE

4500 PSI

GRACO

1996

2

14

AIR SPRAY MACHINE

4500 PSI

GRACO

1995

2

15

OXY-ACETYLENE CYLINDER

SET

--

1993

8

16

ARGON-NITROGEN CYLINDER

SET

--

5

17

PICK-UP (Double Cab)

1frac12 TON

NISSAN

2005

4

18

CREW CAB

1frac12 TON

NISSAN

1988

1

19

PASSENGER VAN

15 SEAT

NISSAN

2002

2

20

FORKLIFT

3 amp 7-12 TON

TOYTO

1990

2

21

GENERATOR LIGHTING SET

15 KVA

CAT

1994

2

22

SAND BLASTING MACHINE

SET

GIRACO

1995

3

23

CATHODIC PROTECTION TEST EQUIPMENT

SET

--

1

24

UNDERGROUND PIPE LOCATOR

SET

--

2

Agents

Address

Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANY

OEP Licence No 2051

Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad Lane

Santacruz (West) Mumbai

INDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)

New Airport Road ndash Chairman Bari

Banani Dhaka ndash 1212

BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411

Fax +9122-24450222

Email zahidinternationalhotmailcom

zahidzahidintcom

gulfjobszahidintcom

website wwwzahidintcom

Page 36: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

Sheet11

ampA
Page ampP

Sheet12

ampA
Page ampP

Sheet13

ampA
Page ampP

Sheet14

ampA
Page ampP

Sheet15

ampA
Page ampP

Sheet16

ampA
Page ampP

BUSINESS FUNCTION

MAJOR ACTIVITIES

middot Generators Overhauling

middot Revamping of Power House Electrical system

middot Low Medium and High Voltage Switchgear Maintenance

middot Low Medium and High Voltage Motors Maintenance and overhauling

middot Electrical Repairing and Refurbishment

middot Process Plant Installation and Maintenance

middot Heat Exchanger Maintenance

middot Refurbishment of Distillation Tower

middot Boiler Maintenance

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

middot Cooling Tower Maintenance

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

middot Cathodic Protection System Installation Commissioning and maintenance

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

middot Generators Overhauling

We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

Remove bearing caps inner and outer end shields end bearings

Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

Removing the existing end winding insulation and repair it where it required

Cleaning the stator housing and both end windings painting end winding with anti tracing paint

Cleaning all components properly and reinstall all the components on its original locations

middot Revamping of Power House Electrical system

Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

middot Low Medium and High Voltage Switchgear Maintenance

Switch gear Inspection and trouble shooting

Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

Protection Relay system and Calibration

Protection system upgrading and refurbishment

middot Low Medium and High Voltage Motors Maintenance and overhauling

Inspection of motors

Dismantling

Carrying out all the required tests

Developing of test records and their interpretation

Supply of motors

Rewinding of motors

Making the recommendations based on inspection and test

middot Electrical Repairing and Refurbishment

Electrical distribution maintenance troubleshooting and extensions

Installation maintenance and extension of lighting distribution and low power systems

Installation of low voltage distribution as well as control panels

Installation laying and testing of low voltage cables and cable tray system

DC distribution including batteries and battery chargers and their installation testing and commissioning

Installation of emergency power generating system

Providing around the clock emergency services

middot Process Plant Installation and Maintenance

We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

Power Plants

Water Treatment Plants

Cement Plants

Sugar Plants

Food Industries

middot Heat Exchanger Maintenance

Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

Pulling of tube bundles

Internal and external hydro-blast cleaning of tubes

Repair and Replacement of tubes

Re-facing of tube sheets

Fabrication of shells

Pressure test

middot Refurbishment of Distillation Tower

Dismantling of trays

Cleaning of shell internals by hydro blast and grit blast

Repair and replacement of bubble cup trays

Replacement of rashing rings

Cleaning and replacement of demister pads

Pressure test

middot Boiler Maintenance

Services are provided for the maintenance of water tube and fire tube boilers

Repair and replacement of tubes

De-scaling of internal and external boiler tubes including steam drums

Fire box and refractory repairs

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Construction of steel tanks for petroleum chemicals and water

Tank cleaning

Bottom plate replacement

Repair and replacement of heating coils

Epoxy lining

Internal Coating

Replacement of Floating Fixed roof

Maintenance of pressure vacuum relief valve

middot Cooling Tower Maintenance

Cleaning of cooling tower cells

Replacement of wooden baffle plates

Repair maintenance amp replacement of Exhaust fan amp gearboxes

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

Construction Maintenance amp Modification of buried carbon steel pipeline

Construction Maintenance amp Modification of non-metallic pipelines

Construction Maintenance amp Modification of fiberglass pipelines

Hydrostatic testing and commissioning of oil and gas pipelines

De commissioning and vacuum drying of pipelines

Mothballing of pipelines

Pigging and internal cleaning of pipelines

External coating repairs

middot Cathodic Protection System Installation Commissioning and maintenance

Cathodic protection (CP) system design and installation

Commissioning of Cathodic Protection system

Trouble shooting and maintenance of existing CP system

Up grading of existing CP system

Routine CP data monitoring

Data evaluation and upgrading recommendations

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

Installation and commissioning of cold storage systems

Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

Installation of cooling coils and condensers

Duct work installation Cleaning and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

13

13

13

Human Resources

middot All personnel are able to understand speak both English and Arabic languages

middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

middot Block Visa available in our ESTABLISHMENT - Under Process

middot Following is the list of our affiliated Recruiting Agents

Equipment Resources

The following table provides information of related equipment that is available for the work

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

middot Safety meetings and dialoguesdiscussion

middot Safety Inspection

middot Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety Talk

A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality Control

Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction Procedure

Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

13

13

13

GOING-ON PROJECTS

COMPLETED PROJECTS

13

13

13

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJCO

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

middot Mechanical repairing works during emergency shutdown

middot Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation (SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah

October 30 2007

SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah

September 20 2007

Ministry ofDefense Housing amp Planning Dept Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

Jeddah

August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram MIJAJCO

Modification and Extension of Hatchery Building

Makkah

May 2007

Fakieh Poultry Fram MIJAJCO

Construction of Labour and staff accommodation Building

Makkah

March 2007

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Fakieh Poultry Fram MIJAJCO

Extension of GP Hatchery

Makkah

April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah

February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

Jeddah

Completed December 2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah

December 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2) Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

ABB Saudi Arabia MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha

October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power MIJAJCO

Replacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

SCECOYusuf Bin A Kanoo MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant Dammam

February 2005

Alstom GE Shoaiba Power Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant (Abha)

September 2004

Alstom Shoaiba Power Plant MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Shoiaba Power Plant Alstom MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

CLIENT

DESCRIPTION

LOCATION

STATUS

MS Huta Hegerfeld Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road Jeddah

Going-on

Saudi Electricity Company ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

1) Cut amp replacing of damaged pipe-length or

2) Jacketing over effected length andor

3) Applying of Balzona to the pitting pipe-length

Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

Going-on

Ministry of Defense Engineering amp Housing Dept Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah

Going-on

Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

1) Plot development

2) Development of infrastructure for the factory

3) Construction of all underground concrete tanks of utility

4) Fabrication and Installation raw material storage tanks intermediate storage tanks

Rabigh

Going-on

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MADE

MODEL

YEARMAKE

QTYOWNED

25

SOIL COMPACTOR PORTABLE

-

1

26

UNDERGROUNG CABEL DETECTOR

SET

--

2

27

PIN BRAZING

SET

--

3

28

HYDRO PRESSURE TEST PUMP

1400 PSI

--

3

29

EXCHANGER BUNDLE PULLER

9 METERS

1

30

BOBCAT

2

31

EXCAVATOR

1

32

MICRO TRENCHER

1

33

VACUUM TRUCK

14 TON

NISSAN

1

34

ASPHALT CUTTER

2

35

HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI

USA

1

36

INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

1

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MAKE

MODEL

YEARMAKE

QTYOWNED

1

MOBILE CRANE

35 TON

TADANO

1985

1

2

TANKER TRUCK (WATER)

10000 amp 19000 GAL

NISSAN

1990

2

3

BOOM TRUCK

6 TON

HINO

1985

1

4

POWER GENERATOR

35 KVA

HONDA

1990

3

5

WELDING MACHINE ENGINE

400 AMP

LICON

1992

4

6

WELDING MACHINE ELECTRIC HF UNIT

400 AMP

MILLER

1996

8

7

WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP

LICON

1998

4

8

AIR COMPRESSOR (COMPLETE)

350 CFM

ATLAS COPCO

1991

1

9

AIR COMPRESSOR (COMPLETE)

450 CFM

CAT

1993

1

10

AIR COMPRESSOR (COMPLETE)

750 CFM

ATLAS COPCO

1990

1

11

DEWATERING PUMP

600 GPM

ROBIN

1990

3

12

PIPE THREADING MACHINE UP TO 16 INCH

SET

RIGID

1994

2

13

AIRLESS SPRAY MACHINE

4500 PSI

GRACO

1996

2

14

AIR SPRAY MACHINE

4500 PSI

GRACO

1995

2

15

OXY-ACETYLENE CYLINDER

SET

--

1993

8

16

ARGON-NITROGEN CYLINDER

SET

--

5

17

PICK-UP (Double Cab)

1frac12 TON

NISSAN

2005

4

18

CREW CAB

1frac12 TON

NISSAN

1988

1

19

PASSENGER VAN

15 SEAT

NISSAN

2002

2

20

FORKLIFT

3 amp 7-12 TON

TOYTO

1990

2

21

GENERATOR LIGHTING SET

15 KVA

CAT

1994

2

22

SAND BLASTING MACHINE

SET

GIRACO

1995

3

23

CATHODIC PROTECTION TEST EQUIPMENT

SET

--

1

24

UNDERGROUND PIPE LOCATOR

SET

--

2

Agents

Address

Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANY

OEP Licence No 2051

Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad Lane

Santacruz (West) Mumbai

INDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)

New Airport Road ndash Chairman Bari

Banani Dhaka ndash 1212

BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411

Fax +9122-24450222

Email zahidinternationalhotmailcom

zahidzahidintcom

gulfjobszahidintcom

website wwwzahidintcom

Page 37: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

Sheet12

ampA
Page ampP

Sheet13

ampA
Page ampP

Sheet14

ampA
Page ampP

Sheet15

ampA
Page ampP

Sheet16

ampA
Page ampP

BUSINESS FUNCTION

MAJOR ACTIVITIES

middot Generators Overhauling

middot Revamping of Power House Electrical system

middot Low Medium and High Voltage Switchgear Maintenance

middot Low Medium and High Voltage Motors Maintenance and overhauling

middot Electrical Repairing and Refurbishment

middot Process Plant Installation and Maintenance

middot Heat Exchanger Maintenance

middot Refurbishment of Distillation Tower

middot Boiler Maintenance

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

middot Cooling Tower Maintenance

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

middot Cathodic Protection System Installation Commissioning and maintenance

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

middot Generators Overhauling

We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

Remove bearing caps inner and outer end shields end bearings

Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

Removing the existing end winding insulation and repair it where it required

Cleaning the stator housing and both end windings painting end winding with anti tracing paint

Cleaning all components properly and reinstall all the components on its original locations

middot Revamping of Power House Electrical system

Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

middot Low Medium and High Voltage Switchgear Maintenance

Switch gear Inspection and trouble shooting

Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

Protection Relay system and Calibration

Protection system upgrading and refurbishment

middot Low Medium and High Voltage Motors Maintenance and overhauling

Inspection of motors

Dismantling

Carrying out all the required tests

Developing of test records and their interpretation

Supply of motors

Rewinding of motors

Making the recommendations based on inspection and test

middot Electrical Repairing and Refurbishment

Electrical distribution maintenance troubleshooting and extensions

Installation maintenance and extension of lighting distribution and low power systems

Installation of low voltage distribution as well as control panels

Installation laying and testing of low voltage cables and cable tray system

DC distribution including batteries and battery chargers and their installation testing and commissioning

Installation of emergency power generating system

Providing around the clock emergency services

middot Process Plant Installation and Maintenance

We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

Power Plants

Water Treatment Plants

Cement Plants

Sugar Plants

Food Industries

middot Heat Exchanger Maintenance

Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

Pulling of tube bundles

Internal and external hydro-blast cleaning of tubes

Repair and Replacement of tubes

Re-facing of tube sheets

Fabrication of shells

Pressure test

middot Refurbishment of Distillation Tower

Dismantling of trays

Cleaning of shell internals by hydro blast and grit blast

Repair and replacement of bubble cup trays

Replacement of rashing rings

Cleaning and replacement of demister pads

Pressure test

middot Boiler Maintenance

Services are provided for the maintenance of water tube and fire tube boilers

Repair and replacement of tubes

De-scaling of internal and external boiler tubes including steam drums

Fire box and refractory repairs

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Construction of steel tanks for petroleum chemicals and water

Tank cleaning

Bottom plate replacement

Repair and replacement of heating coils

Epoxy lining

Internal Coating

Replacement of Floating Fixed roof

Maintenance of pressure vacuum relief valve

middot Cooling Tower Maintenance

Cleaning of cooling tower cells

Replacement of wooden baffle plates

Repair maintenance amp replacement of Exhaust fan amp gearboxes

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

Construction Maintenance amp Modification of buried carbon steel pipeline

Construction Maintenance amp Modification of non-metallic pipelines

Construction Maintenance amp Modification of fiberglass pipelines

Hydrostatic testing and commissioning of oil and gas pipelines

De commissioning and vacuum drying of pipelines

Mothballing of pipelines

Pigging and internal cleaning of pipelines

External coating repairs

middot Cathodic Protection System Installation Commissioning and maintenance

Cathodic protection (CP) system design and installation

Commissioning of Cathodic Protection system

Trouble shooting and maintenance of existing CP system

Up grading of existing CP system

Routine CP data monitoring

Data evaluation and upgrading recommendations

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

Installation and commissioning of cold storage systems

Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

Installation of cooling coils and condensers

Duct work installation Cleaning and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

13

13

13

Human Resources

middot All personnel are able to understand speak both English and Arabic languages

middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

middot Block Visa available in our ESTABLISHMENT - Under Process

middot Following is the list of our affiliated Recruiting Agents

Equipment Resources

The following table provides information of related equipment that is available for the work

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

middot Safety meetings and dialoguesdiscussion

middot Safety Inspection

middot Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety Talk

A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality Control

Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction Procedure

Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

13

13

13

GOING-ON PROJECTS

COMPLETED PROJECTS

13

13

13

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJCO

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

middot Mechanical repairing works during emergency shutdown

middot Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation (SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah

October 30 2007

SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah

September 20 2007

Ministry ofDefense Housing amp Planning Dept Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

Jeddah

August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram MIJAJCO

Modification and Extension of Hatchery Building

Makkah

May 2007

Fakieh Poultry Fram MIJAJCO

Construction of Labour and staff accommodation Building

Makkah

March 2007

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Fakieh Poultry Fram MIJAJCO

Extension of GP Hatchery

Makkah

April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah

February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

Jeddah

Completed December 2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah

December 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2) Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

ABB Saudi Arabia MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha

October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power MIJAJCO

Replacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

SCECOYusuf Bin A Kanoo MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant Dammam

February 2005

Alstom GE Shoaiba Power Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant (Abha)

September 2004

Alstom Shoaiba Power Plant MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Shoiaba Power Plant Alstom MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

CLIENT

DESCRIPTION

LOCATION

STATUS

MS Huta Hegerfeld Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road Jeddah

Going-on

Saudi Electricity Company ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

1) Cut amp replacing of damaged pipe-length or

2) Jacketing over effected length andor

3) Applying of Balzona to the pitting pipe-length

Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

Going-on

Ministry of Defense Engineering amp Housing Dept Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah

Going-on

Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

1) Plot development

2) Development of infrastructure for the factory

3) Construction of all underground concrete tanks of utility

4) Fabrication and Installation raw material storage tanks intermediate storage tanks

Rabigh

Going-on

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MADE

MODEL

YEARMAKE

QTYOWNED

25

SOIL COMPACTOR PORTABLE

-

1

26

UNDERGROUNG CABEL DETECTOR

SET

--

2

27

PIN BRAZING

SET

--

3

28

HYDRO PRESSURE TEST PUMP

1400 PSI

--

3

29

EXCHANGER BUNDLE PULLER

9 METERS

1

30

BOBCAT

2

31

EXCAVATOR

1

32

MICRO TRENCHER

1

33

VACUUM TRUCK

14 TON

NISSAN

1

34

ASPHALT CUTTER

2

35

HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI

USA

1

36

INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

1

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MAKE

MODEL

YEARMAKE

QTYOWNED

1

MOBILE CRANE

35 TON

TADANO

1985

1

2

TANKER TRUCK (WATER)

10000 amp 19000 GAL

NISSAN

1990

2

3

BOOM TRUCK

6 TON

HINO

1985

1

4

POWER GENERATOR

35 KVA

HONDA

1990

3

5

WELDING MACHINE ENGINE

400 AMP

LICON

1992

4

6

WELDING MACHINE ELECTRIC HF UNIT

400 AMP

MILLER

1996

8

7

WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP

LICON

1998

4

8

AIR COMPRESSOR (COMPLETE)

350 CFM

ATLAS COPCO

1991

1

9

AIR COMPRESSOR (COMPLETE)

450 CFM

CAT

1993

1

10

AIR COMPRESSOR (COMPLETE)

750 CFM

ATLAS COPCO

1990

1

11

DEWATERING PUMP

600 GPM

ROBIN

1990

3

12

PIPE THREADING MACHINE UP TO 16 INCH

SET

RIGID

1994

2

13

AIRLESS SPRAY MACHINE

4500 PSI

GRACO

1996

2

14

AIR SPRAY MACHINE

4500 PSI

GRACO

1995

2

15

OXY-ACETYLENE CYLINDER

SET

--

1993

8

16

ARGON-NITROGEN CYLINDER

SET

--

5

17

PICK-UP (Double Cab)

1frac12 TON

NISSAN

2005

4

18

CREW CAB

1frac12 TON

NISSAN

1988

1

19

PASSENGER VAN

15 SEAT

NISSAN

2002

2

20

FORKLIFT

3 amp 7-12 TON

TOYTO

1990

2

21

GENERATOR LIGHTING SET

15 KVA

CAT

1994

2

22

SAND BLASTING MACHINE

SET

GIRACO

1995

3

23

CATHODIC PROTECTION TEST EQUIPMENT

SET

--

1

24

UNDERGROUND PIPE LOCATOR

SET

--

2

Agents

Address

Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANY

OEP Licence No 2051

Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad Lane

Santacruz (West) Mumbai

INDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)

New Airport Road ndash Chairman Bari

Banani Dhaka ndash 1212

BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411

Fax +9122-24450222

Email zahidinternationalhotmailcom

zahidzahidintcom

gulfjobszahidintcom

website wwwzahidintcom

Page 38: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

Sheet13

ampA
Page ampP

Sheet14

ampA
Page ampP

Sheet15

ampA
Page ampP

Sheet16

ampA
Page ampP

BUSINESS FUNCTION

MAJOR ACTIVITIES

middot Generators Overhauling

middot Revamping of Power House Electrical system

middot Low Medium and High Voltage Switchgear Maintenance

middot Low Medium and High Voltage Motors Maintenance and overhauling

middot Electrical Repairing and Refurbishment

middot Process Plant Installation and Maintenance

middot Heat Exchanger Maintenance

middot Refurbishment of Distillation Tower

middot Boiler Maintenance

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

middot Cooling Tower Maintenance

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

middot Cathodic Protection System Installation Commissioning and maintenance

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

middot Generators Overhauling

We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

Remove bearing caps inner and outer end shields end bearings

Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

Removing the existing end winding insulation and repair it where it required

Cleaning the stator housing and both end windings painting end winding with anti tracing paint

Cleaning all components properly and reinstall all the components on its original locations

middot Revamping of Power House Electrical system

Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

middot Low Medium and High Voltage Switchgear Maintenance

Switch gear Inspection and trouble shooting

Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

Protection Relay system and Calibration

Protection system upgrading and refurbishment

middot Low Medium and High Voltage Motors Maintenance and overhauling

Inspection of motors

Dismantling

Carrying out all the required tests

Developing of test records and their interpretation

Supply of motors

Rewinding of motors

Making the recommendations based on inspection and test

middot Electrical Repairing and Refurbishment

Electrical distribution maintenance troubleshooting and extensions

Installation maintenance and extension of lighting distribution and low power systems

Installation of low voltage distribution as well as control panels

Installation laying and testing of low voltage cables and cable tray system

DC distribution including batteries and battery chargers and their installation testing and commissioning

Installation of emergency power generating system

Providing around the clock emergency services

middot Process Plant Installation and Maintenance

We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

Power Plants

Water Treatment Plants

Cement Plants

Sugar Plants

Food Industries

middot Heat Exchanger Maintenance

Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

Pulling of tube bundles

Internal and external hydro-blast cleaning of tubes

Repair and Replacement of tubes

Re-facing of tube sheets

Fabrication of shells

Pressure test

middot Refurbishment of Distillation Tower

Dismantling of trays

Cleaning of shell internals by hydro blast and grit blast

Repair and replacement of bubble cup trays

Replacement of rashing rings

Cleaning and replacement of demister pads

Pressure test

middot Boiler Maintenance

Services are provided for the maintenance of water tube and fire tube boilers

Repair and replacement of tubes

De-scaling of internal and external boiler tubes including steam drums

Fire box and refractory repairs

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Construction of steel tanks for petroleum chemicals and water

Tank cleaning

Bottom plate replacement

Repair and replacement of heating coils

Epoxy lining

Internal Coating

Replacement of Floating Fixed roof

Maintenance of pressure vacuum relief valve

middot Cooling Tower Maintenance

Cleaning of cooling tower cells

Replacement of wooden baffle plates

Repair maintenance amp replacement of Exhaust fan amp gearboxes

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

Construction Maintenance amp Modification of buried carbon steel pipeline

Construction Maintenance amp Modification of non-metallic pipelines

Construction Maintenance amp Modification of fiberglass pipelines

Hydrostatic testing and commissioning of oil and gas pipelines

De commissioning and vacuum drying of pipelines

Mothballing of pipelines

Pigging and internal cleaning of pipelines

External coating repairs

middot Cathodic Protection System Installation Commissioning and maintenance

Cathodic protection (CP) system design and installation

Commissioning of Cathodic Protection system

Trouble shooting and maintenance of existing CP system

Up grading of existing CP system

Routine CP data monitoring

Data evaluation and upgrading recommendations

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

Installation and commissioning of cold storage systems

Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

Installation of cooling coils and condensers

Duct work installation Cleaning and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

13

13

13

Human Resources

middot All personnel are able to understand speak both English and Arabic languages

middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

middot Block Visa available in our ESTABLISHMENT - Under Process

middot Following is the list of our affiliated Recruiting Agents

Equipment Resources

The following table provides information of related equipment that is available for the work

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

middot Safety meetings and dialoguesdiscussion

middot Safety Inspection

middot Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety Talk

A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality Control

Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction Procedure

Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

13

13

13

GOING-ON PROJECTS

COMPLETED PROJECTS

13

13

13

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJCO

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

middot Mechanical repairing works during emergency shutdown

middot Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation (SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah

October 30 2007

SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah

September 20 2007

Ministry ofDefense Housing amp Planning Dept Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

Jeddah

August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram MIJAJCO

Modification and Extension of Hatchery Building

Makkah

May 2007

Fakieh Poultry Fram MIJAJCO

Construction of Labour and staff accommodation Building

Makkah

March 2007

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Fakieh Poultry Fram MIJAJCO

Extension of GP Hatchery

Makkah

April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah

February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

Jeddah

Completed December 2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah

December 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2) Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

ABB Saudi Arabia MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha

October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power MIJAJCO

Replacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

SCECOYusuf Bin A Kanoo MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant Dammam

February 2005

Alstom GE Shoaiba Power Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant (Abha)

September 2004

Alstom Shoaiba Power Plant MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Shoiaba Power Plant Alstom MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

CLIENT

DESCRIPTION

LOCATION

STATUS

MS Huta Hegerfeld Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road Jeddah

Going-on

Saudi Electricity Company ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

1) Cut amp replacing of damaged pipe-length or

2) Jacketing over effected length andor

3) Applying of Balzona to the pitting pipe-length

Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

Going-on

Ministry of Defense Engineering amp Housing Dept Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah

Going-on

Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

1) Plot development

2) Development of infrastructure for the factory

3) Construction of all underground concrete tanks of utility

4) Fabrication and Installation raw material storage tanks intermediate storage tanks

Rabigh

Going-on

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MADE

MODEL

YEARMAKE

QTYOWNED

25

SOIL COMPACTOR PORTABLE

-

1

26

UNDERGROUNG CABEL DETECTOR

SET

--

2

27

PIN BRAZING

SET

--

3

28

HYDRO PRESSURE TEST PUMP

1400 PSI

--

3

29

EXCHANGER BUNDLE PULLER

9 METERS

1

30

BOBCAT

2

31

EXCAVATOR

1

32

MICRO TRENCHER

1

33

VACUUM TRUCK

14 TON

NISSAN

1

34

ASPHALT CUTTER

2

35

HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI

USA

1

36

INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

1

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MAKE

MODEL

YEARMAKE

QTYOWNED

1

MOBILE CRANE

35 TON

TADANO

1985

1

2

TANKER TRUCK (WATER)

10000 amp 19000 GAL

NISSAN

1990

2

3

BOOM TRUCK

6 TON

HINO

1985

1

4

POWER GENERATOR

35 KVA

HONDA

1990

3

5

WELDING MACHINE ENGINE

400 AMP

LICON

1992

4

6

WELDING MACHINE ELECTRIC HF UNIT

400 AMP

MILLER

1996

8

7

WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP

LICON

1998

4

8

AIR COMPRESSOR (COMPLETE)

350 CFM

ATLAS COPCO

1991

1

9

AIR COMPRESSOR (COMPLETE)

450 CFM

CAT

1993

1

10

AIR COMPRESSOR (COMPLETE)

750 CFM

ATLAS COPCO

1990

1

11

DEWATERING PUMP

600 GPM

ROBIN

1990

3

12

PIPE THREADING MACHINE UP TO 16 INCH

SET

RIGID

1994

2

13

AIRLESS SPRAY MACHINE

4500 PSI

GRACO

1996

2

14

AIR SPRAY MACHINE

4500 PSI

GRACO

1995

2

15

OXY-ACETYLENE CYLINDER

SET

--

1993

8

16

ARGON-NITROGEN CYLINDER

SET

--

5

17

PICK-UP (Double Cab)

1frac12 TON

NISSAN

2005

4

18

CREW CAB

1frac12 TON

NISSAN

1988

1

19

PASSENGER VAN

15 SEAT

NISSAN

2002

2

20

FORKLIFT

3 amp 7-12 TON

TOYTO

1990

2

21

GENERATOR LIGHTING SET

15 KVA

CAT

1994

2

22

SAND BLASTING MACHINE

SET

GIRACO

1995

3

23

CATHODIC PROTECTION TEST EQUIPMENT

SET

--

1

24

UNDERGROUND PIPE LOCATOR

SET

--

2

Agents

Address

Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANY

OEP Licence No 2051

Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad Lane

Santacruz (West) Mumbai

INDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)

New Airport Road ndash Chairman Bari

Banani Dhaka ndash 1212

BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411

Fax +9122-24450222

Email zahidinternationalhotmailcom

zahidzahidintcom

gulfjobszahidintcom

website wwwzahidintcom

Page 39: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

Sheet14

ampA
Page ampP

Sheet15

ampA
Page ampP

Sheet16

ampA
Page ampP

BUSINESS FUNCTION

MAJOR ACTIVITIES

middot Generators Overhauling

middot Revamping of Power House Electrical system

middot Low Medium and High Voltage Switchgear Maintenance

middot Low Medium and High Voltage Motors Maintenance and overhauling

middot Electrical Repairing and Refurbishment

middot Process Plant Installation and Maintenance

middot Heat Exchanger Maintenance

middot Refurbishment of Distillation Tower

middot Boiler Maintenance

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

middot Cooling Tower Maintenance

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

middot Cathodic Protection System Installation Commissioning and maintenance

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

middot Generators Overhauling

We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

Remove bearing caps inner and outer end shields end bearings

Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

Removing the existing end winding insulation and repair it where it required

Cleaning the stator housing and both end windings painting end winding with anti tracing paint

Cleaning all components properly and reinstall all the components on its original locations

middot Revamping of Power House Electrical system

Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

middot Low Medium and High Voltage Switchgear Maintenance

Switch gear Inspection and trouble shooting

Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

Protection Relay system and Calibration

Protection system upgrading and refurbishment

middot Low Medium and High Voltage Motors Maintenance and overhauling

Inspection of motors

Dismantling

Carrying out all the required tests

Developing of test records and their interpretation

Supply of motors

Rewinding of motors

Making the recommendations based on inspection and test

middot Electrical Repairing and Refurbishment

Electrical distribution maintenance troubleshooting and extensions

Installation maintenance and extension of lighting distribution and low power systems

Installation of low voltage distribution as well as control panels

Installation laying and testing of low voltage cables and cable tray system

DC distribution including batteries and battery chargers and their installation testing and commissioning

Installation of emergency power generating system

Providing around the clock emergency services

middot Process Plant Installation and Maintenance

We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

Power Plants

Water Treatment Plants

Cement Plants

Sugar Plants

Food Industries

middot Heat Exchanger Maintenance

Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

Pulling of tube bundles

Internal and external hydro-blast cleaning of tubes

Repair and Replacement of tubes

Re-facing of tube sheets

Fabrication of shells

Pressure test

middot Refurbishment of Distillation Tower

Dismantling of trays

Cleaning of shell internals by hydro blast and grit blast

Repair and replacement of bubble cup trays

Replacement of rashing rings

Cleaning and replacement of demister pads

Pressure test

middot Boiler Maintenance

Services are provided for the maintenance of water tube and fire tube boilers

Repair and replacement of tubes

De-scaling of internal and external boiler tubes including steam drums

Fire box and refractory repairs

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Construction of steel tanks for petroleum chemicals and water

Tank cleaning

Bottom plate replacement

Repair and replacement of heating coils

Epoxy lining

Internal Coating

Replacement of Floating Fixed roof

Maintenance of pressure vacuum relief valve

middot Cooling Tower Maintenance

Cleaning of cooling tower cells

Replacement of wooden baffle plates

Repair maintenance amp replacement of Exhaust fan amp gearboxes

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

Construction Maintenance amp Modification of buried carbon steel pipeline

Construction Maintenance amp Modification of non-metallic pipelines

Construction Maintenance amp Modification of fiberglass pipelines

Hydrostatic testing and commissioning of oil and gas pipelines

De commissioning and vacuum drying of pipelines

Mothballing of pipelines

Pigging and internal cleaning of pipelines

External coating repairs

middot Cathodic Protection System Installation Commissioning and maintenance

Cathodic protection (CP) system design and installation

Commissioning of Cathodic Protection system

Trouble shooting and maintenance of existing CP system

Up grading of existing CP system

Routine CP data monitoring

Data evaluation and upgrading recommendations

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

Installation and commissioning of cold storage systems

Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

Installation of cooling coils and condensers

Duct work installation Cleaning and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

13

13

13

Human Resources

middot All personnel are able to understand speak both English and Arabic languages

middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

middot Block Visa available in our ESTABLISHMENT - Under Process

middot Following is the list of our affiliated Recruiting Agents

Equipment Resources

The following table provides information of related equipment that is available for the work

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

middot Safety meetings and dialoguesdiscussion

middot Safety Inspection

middot Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety Talk

A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality Control

Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction Procedure

Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

13

13

13

GOING-ON PROJECTS

COMPLETED PROJECTS

13

13

13

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJCO

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

middot Mechanical repairing works during emergency shutdown

middot Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation (SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah

October 30 2007

SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah

September 20 2007

Ministry ofDefense Housing amp Planning Dept Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

Jeddah

August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram MIJAJCO

Modification and Extension of Hatchery Building

Makkah

May 2007

Fakieh Poultry Fram MIJAJCO

Construction of Labour and staff accommodation Building

Makkah

March 2007

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Fakieh Poultry Fram MIJAJCO

Extension of GP Hatchery

Makkah

April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah

February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

Jeddah

Completed December 2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah

December 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2) Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

ABB Saudi Arabia MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha

October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power MIJAJCO

Replacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

SCECOYusuf Bin A Kanoo MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant Dammam

February 2005

Alstom GE Shoaiba Power Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant (Abha)

September 2004

Alstom Shoaiba Power Plant MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Shoiaba Power Plant Alstom MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

CLIENT

DESCRIPTION

LOCATION

STATUS

MS Huta Hegerfeld Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road Jeddah

Going-on

Saudi Electricity Company ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

1) Cut amp replacing of damaged pipe-length or

2) Jacketing over effected length andor

3) Applying of Balzona to the pitting pipe-length

Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

Going-on

Ministry of Defense Engineering amp Housing Dept Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah

Going-on

Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

1) Plot development

2) Development of infrastructure for the factory

3) Construction of all underground concrete tanks of utility

4) Fabrication and Installation raw material storage tanks intermediate storage tanks

Rabigh

Going-on

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MADE

MODEL

YEARMAKE

QTYOWNED

25

SOIL COMPACTOR PORTABLE

-

1

26

UNDERGROUNG CABEL DETECTOR

SET

--

2

27

PIN BRAZING

SET

--

3

28

HYDRO PRESSURE TEST PUMP

1400 PSI

--

3

29

EXCHANGER BUNDLE PULLER

9 METERS

1

30

BOBCAT

2

31

EXCAVATOR

1

32

MICRO TRENCHER

1

33

VACUUM TRUCK

14 TON

NISSAN

1

34

ASPHALT CUTTER

2

35

HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI

USA

1

36

INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

1

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MAKE

MODEL

YEARMAKE

QTYOWNED

1

MOBILE CRANE

35 TON

TADANO

1985

1

2

TANKER TRUCK (WATER)

10000 amp 19000 GAL

NISSAN

1990

2

3

BOOM TRUCK

6 TON

HINO

1985

1

4

POWER GENERATOR

35 KVA

HONDA

1990

3

5

WELDING MACHINE ENGINE

400 AMP

LICON

1992

4

6

WELDING MACHINE ELECTRIC HF UNIT

400 AMP

MILLER

1996

8

7

WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP

LICON

1998

4

8

AIR COMPRESSOR (COMPLETE)

350 CFM

ATLAS COPCO

1991

1

9

AIR COMPRESSOR (COMPLETE)

450 CFM

CAT

1993

1

10

AIR COMPRESSOR (COMPLETE)

750 CFM

ATLAS COPCO

1990

1

11

DEWATERING PUMP

600 GPM

ROBIN

1990

3

12

PIPE THREADING MACHINE UP TO 16 INCH

SET

RIGID

1994

2

13

AIRLESS SPRAY MACHINE

4500 PSI

GRACO

1996

2

14

AIR SPRAY MACHINE

4500 PSI

GRACO

1995

2

15

OXY-ACETYLENE CYLINDER

SET

--

1993

8

16

ARGON-NITROGEN CYLINDER

SET

--

5

17

PICK-UP (Double Cab)

1frac12 TON

NISSAN

2005

4

18

CREW CAB

1frac12 TON

NISSAN

1988

1

19

PASSENGER VAN

15 SEAT

NISSAN

2002

2

20

FORKLIFT

3 amp 7-12 TON

TOYTO

1990

2

21

GENERATOR LIGHTING SET

15 KVA

CAT

1994

2

22

SAND BLASTING MACHINE

SET

GIRACO

1995

3

23

CATHODIC PROTECTION TEST EQUIPMENT

SET

--

1

24

UNDERGROUND PIPE LOCATOR

SET

--

2

Agents

Address

Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANY

OEP Licence No 2051

Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad Lane

Santacruz (West) Mumbai

INDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)

New Airport Road ndash Chairman Bari

Banani Dhaka ndash 1212

BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411

Fax +9122-24450222

Email zahidinternationalhotmailcom

zahidzahidintcom

gulfjobszahidintcom

website wwwzahidintcom

Page 40: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

Sheet15

ampA
Page ampP

Sheet16

ampA
Page ampP

BUSINESS FUNCTION

MAJOR ACTIVITIES

middot Generators Overhauling

middot Revamping of Power House Electrical system

middot Low Medium and High Voltage Switchgear Maintenance

middot Low Medium and High Voltage Motors Maintenance and overhauling

middot Electrical Repairing and Refurbishment

middot Process Plant Installation and Maintenance

middot Heat Exchanger Maintenance

middot Refurbishment of Distillation Tower

middot Boiler Maintenance

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

middot Cooling Tower Maintenance

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

middot Cathodic Protection System Installation Commissioning and maintenance

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

middot Generators Overhauling

We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

Remove bearing caps inner and outer end shields end bearings

Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

Removing the existing end winding insulation and repair it where it required

Cleaning the stator housing and both end windings painting end winding with anti tracing paint

Cleaning all components properly and reinstall all the components on its original locations

middot Revamping of Power House Electrical system

Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

middot Low Medium and High Voltage Switchgear Maintenance

Switch gear Inspection and trouble shooting

Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

Protection Relay system and Calibration

Protection system upgrading and refurbishment

middot Low Medium and High Voltage Motors Maintenance and overhauling

Inspection of motors

Dismantling

Carrying out all the required tests

Developing of test records and their interpretation

Supply of motors

Rewinding of motors

Making the recommendations based on inspection and test

middot Electrical Repairing and Refurbishment

Electrical distribution maintenance troubleshooting and extensions

Installation maintenance and extension of lighting distribution and low power systems

Installation of low voltage distribution as well as control panels

Installation laying and testing of low voltage cables and cable tray system

DC distribution including batteries and battery chargers and their installation testing and commissioning

Installation of emergency power generating system

Providing around the clock emergency services

middot Process Plant Installation and Maintenance

We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

Power Plants

Water Treatment Plants

Cement Plants

Sugar Plants

Food Industries

middot Heat Exchanger Maintenance

Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

Pulling of tube bundles

Internal and external hydro-blast cleaning of tubes

Repair and Replacement of tubes

Re-facing of tube sheets

Fabrication of shells

Pressure test

middot Refurbishment of Distillation Tower

Dismantling of trays

Cleaning of shell internals by hydro blast and grit blast

Repair and replacement of bubble cup trays

Replacement of rashing rings

Cleaning and replacement of demister pads

Pressure test

middot Boiler Maintenance

Services are provided for the maintenance of water tube and fire tube boilers

Repair and replacement of tubes

De-scaling of internal and external boiler tubes including steam drums

Fire box and refractory repairs

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Construction of steel tanks for petroleum chemicals and water

Tank cleaning

Bottom plate replacement

Repair and replacement of heating coils

Epoxy lining

Internal Coating

Replacement of Floating Fixed roof

Maintenance of pressure vacuum relief valve

middot Cooling Tower Maintenance

Cleaning of cooling tower cells

Replacement of wooden baffle plates

Repair maintenance amp replacement of Exhaust fan amp gearboxes

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

Construction Maintenance amp Modification of buried carbon steel pipeline

Construction Maintenance amp Modification of non-metallic pipelines

Construction Maintenance amp Modification of fiberglass pipelines

Hydrostatic testing and commissioning of oil and gas pipelines

De commissioning and vacuum drying of pipelines

Mothballing of pipelines

Pigging and internal cleaning of pipelines

External coating repairs

middot Cathodic Protection System Installation Commissioning and maintenance

Cathodic protection (CP) system design and installation

Commissioning of Cathodic Protection system

Trouble shooting and maintenance of existing CP system

Up grading of existing CP system

Routine CP data monitoring

Data evaluation and upgrading recommendations

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

Installation and commissioning of cold storage systems

Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

Installation of cooling coils and condensers

Duct work installation Cleaning and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

13

13

13

Human Resources

middot All personnel are able to understand speak both English and Arabic languages

middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

middot Block Visa available in our ESTABLISHMENT - Under Process

middot Following is the list of our affiliated Recruiting Agents

Equipment Resources

The following table provides information of related equipment that is available for the work

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

middot Safety meetings and dialoguesdiscussion

middot Safety Inspection

middot Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety Talk

A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality Control

Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction Procedure

Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

13

13

13

GOING-ON PROJECTS

COMPLETED PROJECTS

13

13

13

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJCO

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

middot Mechanical repairing works during emergency shutdown

middot Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation (SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah

October 30 2007

SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah

September 20 2007

Ministry ofDefense Housing amp Planning Dept Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

Jeddah

August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram MIJAJCO

Modification and Extension of Hatchery Building

Makkah

May 2007

Fakieh Poultry Fram MIJAJCO

Construction of Labour and staff accommodation Building

Makkah

March 2007

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Fakieh Poultry Fram MIJAJCO

Extension of GP Hatchery

Makkah

April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah

February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

Jeddah

Completed December 2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah

December 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2) Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

ABB Saudi Arabia MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha

October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power MIJAJCO

Replacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

SCECOYusuf Bin A Kanoo MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant Dammam

February 2005

Alstom GE Shoaiba Power Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant (Abha)

September 2004

Alstom Shoaiba Power Plant MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Shoiaba Power Plant Alstom MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

CLIENT

DESCRIPTION

LOCATION

STATUS

MS Huta Hegerfeld Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road Jeddah

Going-on

Saudi Electricity Company ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

1) Cut amp replacing of damaged pipe-length or

2) Jacketing over effected length andor

3) Applying of Balzona to the pitting pipe-length

Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

Going-on

Ministry of Defense Engineering amp Housing Dept Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah

Going-on

Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

1) Plot development

2) Development of infrastructure for the factory

3) Construction of all underground concrete tanks of utility

4) Fabrication and Installation raw material storage tanks intermediate storage tanks

Rabigh

Going-on

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MADE

MODEL

YEARMAKE

QTYOWNED

25

SOIL COMPACTOR PORTABLE

-

1

26

UNDERGROUNG CABEL DETECTOR

SET

--

2

27

PIN BRAZING

SET

--

3

28

HYDRO PRESSURE TEST PUMP

1400 PSI

--

3

29

EXCHANGER BUNDLE PULLER

9 METERS

1

30

BOBCAT

2

31

EXCAVATOR

1

32

MICRO TRENCHER

1

33

VACUUM TRUCK

14 TON

NISSAN

1

34

ASPHALT CUTTER

2

35

HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI

USA

1

36

INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

1

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MAKE

MODEL

YEARMAKE

QTYOWNED

1

MOBILE CRANE

35 TON

TADANO

1985

1

2

TANKER TRUCK (WATER)

10000 amp 19000 GAL

NISSAN

1990

2

3

BOOM TRUCK

6 TON

HINO

1985

1

4

POWER GENERATOR

35 KVA

HONDA

1990

3

5

WELDING MACHINE ENGINE

400 AMP

LICON

1992

4

6

WELDING MACHINE ELECTRIC HF UNIT

400 AMP

MILLER

1996

8

7

WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP

LICON

1998

4

8

AIR COMPRESSOR (COMPLETE)

350 CFM

ATLAS COPCO

1991

1

9

AIR COMPRESSOR (COMPLETE)

450 CFM

CAT

1993

1

10

AIR COMPRESSOR (COMPLETE)

750 CFM

ATLAS COPCO

1990

1

11

DEWATERING PUMP

600 GPM

ROBIN

1990

3

12

PIPE THREADING MACHINE UP TO 16 INCH

SET

RIGID

1994

2

13

AIRLESS SPRAY MACHINE

4500 PSI

GRACO

1996

2

14

AIR SPRAY MACHINE

4500 PSI

GRACO

1995

2

15

OXY-ACETYLENE CYLINDER

SET

--

1993

8

16

ARGON-NITROGEN CYLINDER

SET

--

5

17

PICK-UP (Double Cab)

1frac12 TON

NISSAN

2005

4

18

CREW CAB

1frac12 TON

NISSAN

1988

1

19

PASSENGER VAN

15 SEAT

NISSAN

2002

2

20

FORKLIFT

3 amp 7-12 TON

TOYTO

1990

2

21

GENERATOR LIGHTING SET

15 KVA

CAT

1994

2

22

SAND BLASTING MACHINE

SET

GIRACO

1995

3

23

CATHODIC PROTECTION TEST EQUIPMENT

SET

--

1

24

UNDERGROUND PIPE LOCATOR

SET

--

2

Agents

Address

Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANY

OEP Licence No 2051

Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad Lane

Santacruz (West) Mumbai

INDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)

New Airport Road ndash Chairman Bari

Banani Dhaka ndash 1212

BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411

Fax +9122-24450222

Email zahidinternationalhotmailcom

zahidzahidintcom

gulfjobszahidintcom

website wwwzahidintcom

Page 41: TABLE OF CONTENTSPRINCE INDIA 7, Ghogari Mansion, 2nd Hasnabad Lane Santacruz (West) Mumbai, INDIA NAZ ASSOCIATES H-79, Block– F (1st Flr) New Airport Road – Chairman Bari Banani,

Sheet16

ampA
Page ampP

BUSINESS FUNCTION

MAJOR ACTIVITIES

middot Generators Overhauling

middot Revamping of Power House Electrical system

middot Low Medium and High Voltage Switchgear Maintenance

middot Low Medium and High Voltage Motors Maintenance and overhauling

middot Electrical Repairing and Refurbishment

middot Process Plant Installation and Maintenance

middot Heat Exchanger Maintenance

middot Refurbishment of Distillation Tower

middot Boiler Maintenance

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

middot Cooling Tower Maintenance

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

middot Cathodic Protection System Installation Commissioning and maintenance

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

middot Generators Overhauling

We provide services in powerhouse sector for complete Gas Turbine Generator overhauling and other generator machines as per blow scope of work

Disconnect transformer main cables main HV DC cables and control cables from GAC disconnect bus bar amp remove insulation

Dismantle bus bar assembly GAC air duct and all pipe work from booth collector end and turbine

Decouple coupling bolts Removal of brush ringing assembly slip ring casing take record of clearances before dismantling of oil deflectors bearings and inner and outer end shields

Remove bearing caps inner and outer end shields end bearings

Remove rotor from stator locate rotor under shade and remove retaining rings of both sides by heating with induction heater machine using HD jacks and other machines

Removing the existing end winding insulation and repair it where it required

Cleaning the stator housing and both end windings painting end winding with anti tracing paint

Cleaning all components properly and reinstall all the components on its original locations

middot Revamping of Power House Electrical system

Cable laying Duct bank work Cable tray installation Cable termination Cable insulation tests Electrical panel installation Protection and control panel Protection and Battery chargers and UPS system Fire fighting system In door amp out door lighting distribution system Grounding and Lightning Protection

middot Low Medium and High Voltage Switchgear Maintenance

Switch gear Inspection and trouble shooting

Per commission tests such as Insulation measurement Over voltage test Contact resistance measurement De-electric tests etc

Mechanical Alignment maintenance of the opening and closing system trouble shooting and Energization test

Protection Relay system and Calibration

Protection system upgrading and refurbishment

middot Low Medium and High Voltage Motors Maintenance and overhauling

Inspection of motors

Dismantling

Carrying out all the required tests

Developing of test records and their interpretation

Supply of motors

Rewinding of motors

Making the recommendations based on inspection and test

middot Electrical Repairing and Refurbishment

Electrical distribution maintenance troubleshooting and extensions

Installation maintenance and extension of lighting distribution and low power systems

Installation of low voltage distribution as well as control panels

Installation laying and testing of low voltage cables and cable tray system

DC distribution including batteries and battery chargers and their installation testing and commissioning

Installation of emergency power generating system

Providing around the clock emergency services

middot Process Plant Installation and Maintenance

We provide plans and services for new installation shut down turn around and all preventive maintenance of process plant with specialized expertise in oil Refineries and other plants that includes

Power Plants

Water Treatment Plants

Cement Plants

Sugar Plants

Food Industries

middot Heat Exchanger Maintenance

Services are provided for heat exchangers and Lube oil coolers with Straight tubes U tubes Screw and finned tubes Carbon steel Stainless steel Bronze and Copper tubes The range of services also the following

Pulling of tube bundles

Internal and external hydro-blast cleaning of tubes

Repair and Replacement of tubes

Re-facing of tube sheets

Fabrication of shells

Pressure test

middot Refurbishment of Distillation Tower

Dismantling of trays

Cleaning of shell internals by hydro blast and grit blast

Repair and replacement of bubble cup trays

Replacement of rashing rings

Cleaning and replacement of demister pads

Pressure test

middot Boiler Maintenance

Services are provided for the maintenance of water tube and fire tube boilers

Repair and replacement of tubes

De-scaling of internal and external boiler tubes including steam drums

Fire box and refractory repairs

middot New Construction Cleaning and Repairing of Above Ground Storage Tanks for Petroleum Chemicals and Water

Construction of steel tanks for petroleum chemicals and water

Tank cleaning

Bottom plate replacement

Repair and replacement of heating coils

Epoxy lining

Internal Coating

Replacement of Floating Fixed roof

Maintenance of pressure vacuum relief valve

middot Cooling Tower Maintenance

Cleaning of cooling tower cells

Replacement of wooden baffle plates

Repair maintenance amp replacement of Exhaust fan amp gearboxes

middot Pipeline Construction Maintenance amp Modification for Oil Gas and fire water

Construction Maintenance amp Modification of carbon steel stainless steel and alloy steel piping

Construction Maintenance amp Modification of buried carbon steel pipeline

Construction Maintenance amp Modification of non-metallic pipelines

Construction Maintenance amp Modification of fiberglass pipelines

Hydrostatic testing and commissioning of oil and gas pipelines

De commissioning and vacuum drying of pipelines

Mothballing of pipelines

Pigging and internal cleaning of pipelines

External coating repairs

middot Cathodic Protection System Installation Commissioning and maintenance

Cathodic protection (CP) system design and installation

Commissioning of Cathodic Protection system

Trouble shooting and maintenance of existing CP system

Up grading of existing CP system

Routine CP data monitoring

Data evaluation and upgrading recommendations

middot Cold Storage Refrigeration and HVAC System Installation and Maintenance

Installation and commissioning of cold storage systems

Installation and commissioning of reciprocating compressors Screw compressors and Centrifugal compressors

Installation of cooling coils and condensers

Duct work installation Cleaning and Maintenance

middot Supply Installation amp Maintenance of Telecom system-CCTV MATV etc

middot Supply of Personal Protective Equipment amp Firefighting system

middot Civil Construction

Any kind of Design amp Construction of Civil works as turnkey basis and as per the requirement of our valuable clients

Structure amp Foundation works

New Construction of any kind

Modifications and expansions works

All kind of Finishing and Decoration works

Swimming Pool constructions works

Landscaping Handicapping amp Earth works

Pre-Engineered Steel Structural building works

Concrete repairing works

Water proofing system of any kind suck as pools tanks etc

LEGAL DOCUMENTS

FOLLOWING LEGAL DOCUMENTS ARE AVAILABLE ON REGUEST

COMMERCIAL REGISTRATION CERTIFICATE

CHAMBER OF COMMERCE AND INDUSTRIES MEMBERSHIP CERTIFICATE

SAGIA CERTIFICATE

SOCIAL INSURANCE CERTIFICATE

ZAKAH CERTIFICATE

MUNICIPALTY CERTIFICATE

13

13

13

Human Resources

middot All personnel are able to understand speak both English and Arabic languages

middot Total Manpower (Engineers Supervisors Foremen Welders Fabricators Mechanical amp Electrical technicians Instrumentation technicians Plumbers Masons helpers and Office staff) of our ESTABLISHMENT at present is 55 On requirement we able to bring more Engineers and technicians in short notice from the following mention countries

middot Block Visa available in our ESTABLISHMENT - Under Process

middot Following is the list of our affiliated Recruiting Agents

Equipment Resources

The following table provides information of related equipment that is available for the work

SAFETY amp LOSS PREVENTION PROGRAM

Objectives

The objectives of MS BASHIR AHMED DOST MOHD EST Safety amp Loss Prevention Unit is to prevent accidents and injuries to recognize and correct Safety Hazards promote safety awareness among all employees of Establishment and Establishmentrsquos sub-contractor These objectives will be obtained through

middot Safety meetings and dialoguesdiscussion

middot Safety Inspection

middot Enforcement of Establishment safety policies and procedures

Programs Policies and Reports

Weekly Project Manager Safety Meeting

A weekly safety meeting is chaired by Projects Manager on every Thursday among his immediate staff (safety officer construction manager procurement officer QA amp QC engineers project engineers and site engineers) to review the implementation of on the job safety procedures and policies and discuss ways and means to prevent recurrences

Weekly Site Safety Talk

A weekly site safety and communicationmeeting is held on every Saturday among site engineers and the workers to discuss variety on the job safety matters such as the use of safety helmet safety shoes goggles hand gloves etc and the importance of wearing them Each supervisor has to speak about his views and suggestions regarding the implementation of safety working environment and ensures these measures are followed by each employee under him

Duties and Responsibilities of Safety Inspectors

Insure that each site engineer followadhere to the Safety and Loss Prevention Policies within his area of responsibility

Insure that all employees including those sub-contractorsrsquo employees to know how to perform their jobs safely and properly

Conduct safety demonstrations among site employees Prepares weekly safety reports and statistical report regarding Motor vehicle collision Work related accidentsinjuries Fire related accident and other different types of accidents

Familiarize all employees about the proper ways of reporting and handling injuries (First Aid)

QAQC PROGRAM

The following outline provides description about Quality Assurance (QA) and Quality Control (QC) Program followed by MS BASHIR AHMED DOST MOHD EST

Phase of Quality Control

Procurement Phase ndash This phase make sure that all material and equipment that will be purchased and incorporated into the work shall comply with clientrsquos specifications and standards

Construction Phase ndash Ensure that the project is built in accordance with the standards and specifications set by clients

Quality Procurement Procedure

Set of clientsrsquo specifications and standards codes etc will be established for materials suppliers and equipment to provide ready and quick reference

A group of quality control program is assigned to review all quotations proposals and submittals and ensure compliance with applicable standards and specifications for products in procurement and delivery

Communication with vendors is maintained at high level to prompt develop awareness and compliance with required standards and specifications during procurement stage

A close contact to be established with clients customers to provide technical coordination and compliance to applicable standards and specifications Meetings are organized to establish complete understanding of the clientsrsquo quality requirements and procedure for the project

Random checks are carried out during shipment of commodities to ensure that the basic intent of quality control is implemented Quality Control field men are deputized to perform this function and appropriate action is dispensed

Quality Construction Procedure

Prior to construction stage quality control personnel will establish inspection guidelines and formats detailing all aspects of quality control compliance to applicable standards and specifications

Quality Control inspection checklist is prepared and approved by the project management team This outline is the quality requirement from start to project completion

As the project is on progress quality workmanship of every phase is maintained through strict adherence to applicable standards and specifications The QAQC inspectorfieldsmen ensure that relevant project standards are followed Corrective actions are sought with the project management when deficiency is observed

Records of regular quality control inspection reports observations and comments are maintained in this reference a regular meeting is developed to correct mistakes and prevent recurrence In this meeting all site foremen and supervisors are required to attend and actively participate in the discussions of matters pertaining their work areas Suggestions and comments are encouraged among site workers to develop and promote better understanding to quality control requirement

13

13

13

GOING-ON PROJECTS

COMPLETED PROJECTS

13

13

13

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Electricity Co Bandariya Intl Co Ltd MIJAJCO

Complete overhauling amp Life Assessment of GE Frame 7 GT 9 at Tihama Power Plant Qty 1 No

Tihama Power Plant

February 2009

Saudi Electricity Co ATTS MIJAJCO

Replacement of old Retaining Rings by new sets on old FIAT Generator 1 Rotor amp Installation of this Rotor in Stator of Generator 5 as replacement for the actual one Najran Power Plant

Najran Power Plant

February 2009

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Open Clean and Repair of Six Cooling Towers of Furfural Unit at Luberef-1 Jeddah activities included to installation amp removal of blinds removalreinstall replacement of gate valvespressure relief valve trays bubble caps removal reinstallation hydrostatic test removal reinstallation of pumps with strainers etc

Luberef-1 Jeddah

February 2009

Saudi Bin Laden GroupMIJAJCO

Construction of Porta-cabin for office unit of the Railway project Haffar Battan

Hafilul Batin

December 2008

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of Existing and Installation of new heat exchanger

Luberef-1 Jeddah

October 2008

SEC Bandariya Intl Co Ltd MIJAJCO

Re-insertion of rotor and boxing up of everything and run generators Qty 1 No

Jazan Power Plant

May 2008

Saudi Electricity Co ATTS MIJAJCO

All necessary works prior to pulling out rotor pulling out rotor replacement of retaining rings reinsertion of rotor and boxing up everything and run generators Qty 2 Nos

Tabuk Power Plant

May 2008

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

middot Mechanical repairing works during emergency shutdown

middot Removal and reinstallation of 6 nos of fin-fan bundles

Luberef-1 Jeddah

February 2008

Saudi Bin Laden Al-Henaki Trdg Est MIJAJCO

Relocation of 1 Tapping Lines on 20 Jet fuel oil pipeline at Haj Terminal Jeddah

Jeddah KAIA

November 2007

Saline Water Conversion Corporation (SWCC)

Dismantling of the structure support and rail of the overhead 30 ton capacity crane

Jeddah

October 30 2007

SAFA General Contractors amp Enterprises Co Ltd MIJAJCO

Construction of 10rdquo amp 650 meter lengths of new pipeline as a Re-routing of existing fuel oil pipeline of SWCC at underpass of King Fahd Street amp Thaliya Street

Jeddah

September 20 2007

Ministry ofDefense Housing amp Planning Dept Jeddah

Removing of old package unit making a foundation (civil work) and installation of new 1000 KVA 138 KV 480 package unit Cable termination testing and commissioning

Jeddah

August 2007

Saudi Aramco Ashi amp Bushnag Co MIJAJCO

Installation of Emergency Shutdown (ESD) amp Grounding System Jeddah Refinery Saudi Aramco

Saudi Aramco Jeddah Refinery

June 2007

Saudi Electricity Company MIJAJCO

Dismantle of transformer re-installation of gas turbine 138 KV board with protective relays and associated auxiliary material and equipment

Al-Qaseem Power Plant

June 2007

Fakieh Poultry Fram MIJAJCO

Modification and Extension of Hatchery Building

Makkah

May 2007

Fakieh Poultry Fram MIJAJCO

Construction of Labour and staff accommodation Building

Makkah

March 2007

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Fakieh Poultry Fram MIJAJCO

Extension of GP Hatchery

Makkah

April 2007

Fakieh Group MIJAJCO

Finishing work of Sheikh Abdu Rahman School Sector- H I N amp F

Makkah

February 2007

SAVOLA Edible oil MIJAJCO

Area Qualification Project (Civil Mechanical and Electrical) at Industrial City

Jeddah

Completed December 2006

Ministry of Defense Housing amp Planning Dept

Replacement of HV isolating switch of sub- station amp two new RMU General civil work and electrical cabling work

Jeddah

December 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

Removal of existing amp Fabrication supply and installation of new flue gas exhaust ducts (Qty 2 nos) at furnace B-3001 during Turn Around (TA) of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Aramco Lubricating Oil Refining Co (LUBEREF)

1) Removal of existing amp Installation of two new horizontal drums and one tank during TA of Process Plant

2) Tubes modification work on furnace B-3002 during TA of Process Plant

LUBEREF-1 Jeddah

November 2006

Saudi Electricity CoYusuf Bin A Kanoo MIJAJCO

Modification newly installed 2 hydrogen line pressure test of the line and purging of carbon dioxide into the line

Rabigh Power Plant

October 2006

Saudi Electricity Co Wood Group MIJAJCO

Removal of old installation and testing commissioning of ABB MV new Switch Gear including Auxiliary Transformers (15 MVA 138480V) Rerouting of MV cables LV cables termination jointing and testing of cables

Bisha Power Plant

October 2006

SCECOYusuf Bin A Kanoo MIJAJCO

Pressure test up to 200 bar dehumidify and test of contamination to the 35 number of hydrogen cylinders

Rabigh Power Plant

October 2006

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

ABB Saudi Arabia MIJAJCO

Servicing amp Site support for 18 MW Generator at Al-Baha

Al-Baha

October 2006

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repair of seven points affected by corrosion to the fuel oil pipeline supply from Jeddah Refinery to SWCC Plant (16 Dia 360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

September 2006

Saudi Electricity Co MIJAJCO

Sand Blasting Coating and Cathodic Protection System for Two (Water Tanks)

Bisha Power Plant

December 2005

Saudi Electricity Co MIJAJCO

Additional 6 amp 8 Fuel Supply and Return Lines of GT ndash 17 amp GT ndash 18

Jazan Power Plant

November 2005

Saudi Electricity Co MIJAJCO

Installation of new MV Switch Gear Auxiliary Transformers Battery Room Battery charger cables termination and testing of cables

Power Plant -9

November 2005

SCECOAlstom Power MIJAJCO

Replacement of 18 Valve

Shoaiba Power Plant

September 2005

SCECOAlstom Power MIJAJCO

Hot Tapping of Five Points 2 8 18 20

Shoaiba Power Plant

May 2005

SCECOSAS MIJAJCO

Construction of Site Camp amp Site Office facilities

Shoaiba Power Plant

May 2005

Saudi AramcoAshi Bushnag Co MIJAJCO

Cable Pulling at Marine Area Jeddah Refinery

Saudi Aramco Jeddah

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Rotted Cables at GT 17

Makkah Power Plant

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Removal of oil and Carbon Heating Stator

Gazlan Power Plant

April 2005

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

SCECOYusuf Bin A Kanoo MIJAJCO

Repair Cathodic Protection Test Posts PPII amp PPIII

Jeddah Power Plant II amp III

April 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Testing and Commissioning of Re-Routed Cables at GT 16

Makkah Power Plant

March 2005

SCECOYusuf Bin A Kanoo MIJAJCO

Dismantling inspection and re-assembling of two cylinder heads to rectify the leakage of exhaust gases on dutz

Ummlujj Power Plant

February 2005

Redland Industrial Services Ltd MIJAJCO

Modification and Mechanical work of the Boiler at SWCC-Shuqaiq Desalination Plant

Shuqaiq Desalination Plant

February 2005

Saudi Electricity CoTIG-TESCO

Intl Ltd MIJAJCO

Bolts torquing and life assessment work with flow and retaining rings NDT test

Ghazlan Power Plant Dammam

February 2005

Alstom GE Shoaiba Power Plant MIJAJCO

Thermowell Drilling 114 on Steam Line at Shoaiba Power Plant

Shoaiba Power Plant

December 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping 2 Off 34 150 and 300 at Shoaiba Power Plants

Shoaiba Power Plant

October 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling of generator Frame 7 GE machine GT 02 at Asir Power Plant (Abha )

Asir Power Plant (Abha)

September 2004

Alstom Shoaiba Power Plant MIJAJCO

Purging of 36 heavy fuel oil pipeline part 1 at Shoaiba Power Plant

Shoaiba Power Plant

August 2004

Alstom Shoaiba Power Plant MIJAJCO

Replacement of Expansion Joints HFOCO at Shoaiba Power Plant

Shoaiba Power Plant

July 2004

CLIENT

DESCRIPTION OF JOB

LOCATION

COMPLETED

Shoiaba Power Plant Alstom MIJAJCO

Supply of the Air compressor rental basis 750CFM at Shoiaba Power Plant

Shoiaba Power Plant

June 2004

Saudi Electricity Co KANOO MIJAJCO

Overhauling of gas turbine and generator Frame 5 GE machine GT 08 at Jizan Power Plant

Jizan Power Plant

May 2004

Alstom Shoaiba Power Plant MIJAJCO

Hot Tapping six locations at the at fuel forwarding pumps Shoaiba Power Plants

Shoaiba Power Plant

May 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 05 at Jazan Power Plant

Jizan Power Plant

April 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 6 GE machine GT 06 at Jizan Power Plant

Jizan Power Plant

Mar 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 Hitachi machine GT 12 at Jazan Power Plant

Jizan Power Plant

Mar2004

Saudi Aramco ABC MIJAJCO

Fabrication of Fire Hydrant Risers and tie Joints existing 14 fire water line at Rabigh truck loading area

Rabigh Refinery

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 04 at Jazan Power Plant

Jizan Power Plant

Feb 2004

Saudi Electricity Co Wood Group Elect UK MIJAJCO

Overhauling the generator Frame 5 GE machine GT 02 at Jazan Power Plant

Jizan Power Plant

Jan2004

CLIENT

DESCRIPTION

LOCATION

STATUS

MS Huta Hegerfeld Saudia Ltd MIJAJCO

RelocationRerouting of 10 petroleum pipeline of SWCC at OLD MAKKAH Road Approximate length 265 Linear Meter

Old Makkah Road Jeddah

Going-on

Saudi Electricity Company ATTS MIJAJCO

Replacement of Cracked Rotor Wedges of Generator Rotors of GT 9 amp 10 at Makkah Power Plant activities included removalreinstallation of exciter exciter fan retaining rings removal of cracked rotor wedges and reinstall new

Makkah Power Plant

Going-on

Saline Water Conversion Corporation (SWCC) MIJAJCO

Repairing at 30 different locations of 16 diameter Fuel oil Pipeline B of SWCC (Total 750 Meters of different length) by

1) Cut amp replacing of damaged pipe-length or

2) Jacketing over effected length andor

3) Applying of Balzona to the pitting pipe-length

Because of the pipeline was affected due to the corrosion This pipeline is supplying fuel oil from Jeddah Refinery to SWCC Plant (360 tonhr rate 55 bars design pressure amp About 38 Km length)

Jeddah

Going-on

Ministry of Defense Engineering amp Housing Dept Jeddah

Installation of new 138 KV Ring Main unit Rerouting of MV cables control amp signal cables and testing commissioning

Jeddah

Going-on

Bashir Ahmed Dost Mohd Used Lube Oil Re-refining Factory

1) Plot development

2) Development of infrastructure for the factory

3) Construction of all underground concrete tanks of utility

4) Fabrication and Installation raw material storage tanks intermediate storage tanks

Rabigh

Going-on

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MADE

MODEL

YEARMAKE

QTYOWNED

25

SOIL COMPACTOR PORTABLE

-

1

26

UNDERGROUNG CABEL DETECTOR

SET

--

2

27

PIN BRAZING

SET

--

3

28

HYDRO PRESSURE TEST PUMP

1400 PSI

--

3

29

EXCHANGER BUNDLE PULLER

9 METERS

1

30

BOBCAT

2

31

EXCAVATOR

1

32

MICRO TRENCHER

1

33

VACUUM TRUCK

14 TON

NISSAN

1

34

ASPHALT CUTTER

2

35

HIGH PRESSURE HYDRO-JETTING MACHINE

20000 PSI

USA

1

36

INDUCTION HEATER (USE FOR HEATING TO REMOVE RETAINING RINGS OF THE ROTOR OF GTS)

50 KVA 3 way HTU with 3 linkable Advantage 3 tempe-rature programmer cont-rollers and 3 Energy regs

1

ITEMNO

EQUIPMENT DESCRIPTION

CAPACITY

MAKE

MODEL

YEARMAKE

QTYOWNED

1

MOBILE CRANE

35 TON

TADANO

1985

1

2

TANKER TRUCK (WATER)

10000 amp 19000 GAL

NISSAN

1990

2

3

BOOM TRUCK

6 TON

HINO

1985

1

4

POWER GENERATOR

35 KVA

HONDA

1990

3

5

WELDING MACHINE ENGINE

400 AMP

LICON

1992

4

6

WELDING MACHINE ELECTRIC HF UNIT

400 AMP

MILLER

1996

8

7

WELDING MACHINE ELECTRIC amp PORTABLE

350 AMP

LICON

1998

4

8

AIR COMPRESSOR (COMPLETE)

350 CFM

ATLAS COPCO

1991

1

9

AIR COMPRESSOR (COMPLETE)

450 CFM

CAT

1993

1

10

AIR COMPRESSOR (COMPLETE)

750 CFM

ATLAS COPCO

1990

1

11

DEWATERING PUMP

600 GPM

ROBIN

1990

3

12

PIPE THREADING MACHINE UP TO 16 INCH

SET

RIGID

1994

2

13

AIRLESS SPRAY MACHINE

4500 PSI

GRACO

1996

2

14

AIR SPRAY MACHINE

4500 PSI

GRACO

1995

2

15

OXY-ACETYLENE CYLINDER

SET

--

1993

8

16

ARGON-NITROGEN CYLINDER

SET

--

5

17

PICK-UP (Double Cab)

1frac12 TON

NISSAN

2005

4

18

CREW CAB

1frac12 TON

NISSAN

1988

1

19

PASSENGER VAN

15 SEAT

NISSAN

2002

2

20

FORKLIFT

3 amp 7-12 TON

TOYTO

1990

2

21

GENERATOR LIGHTING SET

15 KVA

CAT

1994

2

22

SAND BLASTING MACHINE

SET

GIRACO

1995

3

23

CATHODIC PROTECTION TEST EQUIPMENT

SET

--

1

24

UNDERGROUND PIPE LOCATOR

SET

--

2

Agents

Address

Contacts

AL-AHRAM

Trading amp Manpower Services

Suite 300-301 Gedisco Center 1564 Mabini Street Manila PHILIPPINE

QADER INTERNATIONAL

License 2199

Dira Ghazi khan

Lahore

PAKISTAN

Ph +92-641-4670806

Fax +92-641-460698

BOKHARI amp COMPANY

OEP Licence No 2051

Overseas Employment Promptor

Ali Complex 23-Empress Road Lahore

PAKISTAN

Ph +92-42-6365498

6367869

Fax +92-42-6365290

PRINCE INDIA

7 Ghogari Mansion 2nd Hasnabad Lane

Santacruz (West) Mumbai

INDIA

NAZ ASSOCIATES

H-79 Blockndash F (1st Flr)

New Airport Road ndash Chairman Bari

Banani Dhaka ndash 1212

BANGLADESH

ZAHID INTERNATIONAL

109 Mustafa Building Office 3 Cadell Road Mahim Mumbai 400 016

INDIA

Telephone +9122-24440023 24451411

Fax +9122-24450222

Email zahidinternationalhotmailcom