Tabulador Página 1 de 751 INIFECH INSTITUTO DE LA INFRAESTRUCTURA FISICA EDUCATIVA DEL ESTADO DE CHIAPAS 1 TABULADOR DE PRECIOS UNITARIOS 2013  CODIGO CONCEPTO DE TRABAJO UNIDAD REGION 1 REGION 2 REGION 3 REGION 4 REGION 5 REGION 6 REGION 7 1101000010 M2 53.65 53.65 53.65 53.65 53.65 53.65 53.65 1101000011 M2 10.33 10.40 10.57 10.54 10.63 10.56 10.37 1101000012 KG 3.15 3.15 3.15 3.15 3.16 3.16 3.15 1101000013 PZA 2,047.87 2,047.87 2,047.92 2,047.92 2,047.92 2,047.92 2,047.92 1101000014 PZA 1,531.50 1,531.50 1,530.73 1,530.73 1,533.43 1,533.43 1,531.53 1101000015 PODADO DE ARBOLES EN AREA DONDE PASARA LA LINEA, INCLUYE !ERRAMIEN"A, MANO DE OBRA Y ACARREOS DEN"RO Y #UERA DE LA OBRA. M 32.08 32.08 32.08 32.08 32.08 32.08 32.08 1101000016 COR"E DE ARBOL DE 70CM. DE DIAME"RO, INCLUYE E$CA%ACION Y COR"E DE "ACONES, DESENRRAIZANDO. PZA 3,222.78 3,222.78 3,222.85 3,222.85 3,222.85 3,222.85 3,222.85 1101000017 M3 132.59 132.59 132.59 132.59 132.59 132.59 132.59 1101000020 M2 83.43 83.43 83.43 83.43 83.43 83.43 83.43 1101000021 M2 8.35 8.35 8.35 8.35 8.35 8.35 8.35 1101000023 PZA 1,182.00 1,182.00 1,182.03 1,182.03 1,182.03 1,182.03 1,182.03 1101000024 PZA 1,565.66 1,565.66 1,565.70 1,565.70 1,565.70 1,565.70 1,565.70 1101000025 PZA 1,491.42 1,491.42 1,491.46 1,491.46 1,491.46 1,491.46 1,491.46 1101000026 PZA 1,116.03 1,116.03 1,116.06 1,116.06 1,116.06 1,116.06 1,116.06 1101000027 PZA 343.03 343.03 343.04 343.04 343.04 343.04 343.04 1101000028 M 97.29 97.29 97.29 97.29 97.29 97.29 97.29 1101000029 M2 17.85 17.85 17.85 17.85 17.85 17.85 17.85 1101000030 M 64.98 64.98 64.98 64.98 64.98 64.98 64.98 1101000031 M3 86.63 86.63 86.63 86.63 86.63 86.63 86.63 1101000032 M3 91.81 91.81 91.81 91.81 91.81 91.81 91.81 1101000033 M3 313.86 313.86 313.86 313.86 313.86 313.86 313.86 1101000034 PZA 35.92 35.92 35.92 35.92 35.92 35.92 35.92 1101000035 M3 287.38 287.38 287.38 287.38 287.38 287.38 287.38 1101000036 PZA 700.79 700.79 700.80 700.80 700.80 700.80 700.80 1101000037 PZA 875.99 875.99 876.02 876.02 876.02 876.02 876.02 1101000038 PZA 657.71 657.71 657.73 657.73 657.73 657.73 657.73 1101000039 PZA 396.67 396.67 396.68 396.68 396.68 396.68 396.68 1101000040 M 24.91 24.91 24.91 24.91 24.91 24.91 24.91 1101000041 ML 80.06 80.40 81.12 80.60 82.15 81.71 79.69 1101000042 ML 113.33 113.52 114.21 113.74 114.86 114.66 113.05 1101000043 M 88.03 88.03 88.15 88.55 88.15 88.13 88.04 1101000044 PZA 35.92 35.92 35.92 35.92 35.92 35.92 35.92 1101000045 PZA 106.25 107.14 109.10 107.68 111.81 110.69 105.28 1101000046 M2 50.50 50.50 50.50 50.13 50.50 50.50 50.50 LIMPIEZA #INA DE OBRA, EN AREA DE ANDADORES, INCLUYE LIMPIEZA Y RE"IRO DE ARENA PARA PRO"ECCION DE ADO&UIN, REMOCION DE MA"ERIALES 'LODO(, !ERRAMIEN"A , MANO DE OBRA Y ACARREOS DEN"RO Y #UERA DE LA OBRA. LIMPIEZA, "RAZO Y NI%ELACION EN AREA DE DESPLAN"E DE EDI#ICIOS, INCL. !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA. LIMPIEZA Y CARDEADO E$AUS"I%O DE ELEMEN"OS ES"RUC"URALES, SUMINIS"RADOS POR LA DEPENDENCIA, CON AL"O CON"ENIDO DE AREAS O$IDADAS, INCLUYE MANO DE OBRA, !ERRAMIEN"AS, ACARREOS #UERA Y DEN"RO DE LA OBRA. "ALA DE ARBOLES, INCLUYE DESRRAME A MANO, MADERA "ROCEADA MANO, CARGA, ACARREO Y DESCARGA DEN"RO Y #UERA DE LA OBRA, E$"RACCION DE "RONCOS Y DESENRAICE PARA PERIME"ROS DEL "RONCO CON MA&UINA, NO INCLUYE EL DERRIBE, PARA DE ARBOLES DE .50 A 1.50 DE PERIME"RO. COR"ADO Y DERRIBE DE ARBOLES E$IS"EN"ES EN AREA DE CONS"RUCCION CON AL"URA PROMEDIO DE 15 M"S.INCLUYE ACARREOS DEN"RO Y #UERA DE OBRA !ERRAMIEN"A Y MANO DE OBRA. RE"IRO DE ESCOMBRO O RIPIO PRODUC"O DE DEMOLICIONES #UERA DE LA OBRA INCLUYE CARGA Y "RANSPOR"E !AS"A EL DES"INO #INAL, MANO DE OBRA, !ERRAMIEN"A, A CUAL&UIER DIS"ANCIA. LIMPIEZA ESPECIALIZADA CON ASPIRADORA EN AREA IN"ERIOR DE PLANE"ARIO, EN PISOS Y MUROS APLANADOS DE ACUERDO A SOLICI"UD DE ECOSIS"EMA DE ME$ICO PARA GARAN"IZAR EL BUEN #UNCIONAMIEN"O DEL E&UIPO DIGI"AL I NCLUYE !ERRAMIEN"A, MANO DE OBRA, ANDAMIOS, MA"ERIALES, ACARREOS DEN"RO Y #UERA DE LA OBRA. LIMPIEZA Y DES!IERBE DEL "ERRENO, A"A&UE OBLIGADO A MANO, INCL. !ERREMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA Y ACOMODO PARA SU POS"ERIOR E$"RACCION. "ALA DE ARBOLES DE 0.25 A 0.75) DE DIAME"RO, MEDIDO A 1.00) DEL "ERRENO NA"URAL, INCLUYENDO PAGO DEL PERMISO DE DERRIBE DE ARBOLES, AN"E LA DEPENDENCIA CORRESPONDIEN"E, DESRAME, CARGA Y DESCARGA, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA, CON MADERA "ROCEADA A DISPOSICION DEL INI#EC!, NO SE INCLUYE E$"RACCION DE "RONCOS NI DESENRRAICE. "ALA DE ARBOLES DE 0.75 A 1.20) DE DIAME"RO, MEDIDO A 1.00) DEL "ERRENO NA"URAL, INCLUYENDO PAGO DEL PERMISO DE DERRIBE DE ARBOLES, AN"E LA DEPENDENCIA CORRESPONDIEN"E, DERRIBE, DESRAME, CARGA Y DESCARGA, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA, CON MADERA "ROCEADA A DISPOSICION DEL INI#EC!, CONSIDERANDO LA E$"RACCION DE "RONCOS Y DESENRRAICE. E$"RACCION DE "OCONES INCLUYENDO E$CA%ACION, DESENRAICE, CARGA, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA, Y DESCARGA DEN"RO DE LA OBRA PARA DIAME"ROS DEL "OCON MEDIDOS A 1.00 M. DEL "ERRENO NA"URAL. E$"RACCION DE "OCONES DE 0.25 A 0.75 M. DE DIAME"RO. "ALA DE ARBOLES DE 0.25 A 0.75) DE DIAME"RO, MEDIDO A 1.00) DEL "ERRENO NA"URAL, INCLUYENDO PAGO DEL PERMISO DE DERRIBE DE ARBOLES, AN"E LA DEPENDENCIA CORRESPONDIEN"E, DESRAME, CARGA Y DESCARGA, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA, CON MADERA "ROCEADA A DISPOSICION DEL INI#EC!, CONSIDERAR LA E$"RACCION DE "RONCOS Y DESENRRAICE. DESENRRAICE Y DERRI%E DE "RONCO E$IS"EN"E EN AREA DE REGIS"RO ELEC"RICO CON DIAME"RO APRO$IMADO DE 1.00 M"S. Y 1.40 M"S. DE PRO#UNDIDAD, INCLUYE !ERRAMIEN"A, MANO DE OBRA Y RE"IRO DE MA"ERIAL RESUL"AN"E #UERA DE LA OBRA. LIMPIEZA, DES!IERBE Y RE"IRO DE CERCADO A BASE DE ALAMBRE DE PUAS Y POS"ES DE MADERA, INCLUYE RE"IRO DE MA"ERIALES SIN RECUPERACION Y DE*AR LA SUPER#ICIE LIS"A PARA LA INS"ALACION DE MALLA CICLON, INCLUYE !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA. LIMPIEZA DE AREA DE "APANCO INCLUYE EN*AMBRES, INSEC"OS DI%ERSOS CON INSEC"ICIDA, AGUA, !UMO, Y "ODO LO NECESARIO PARA SU CORREC"A E*ECUCION LIMPIEZA Y "RA"AMIEN"O DE %IGAS CON #ES"ERMICIDA A RAZON DE 0.5+)2 APLICACION DE MICROLAS"IC EN %IGAS, MANCUERNAS, "I*ERAS, LARGUEROS DE SECCION APRO$IMADA DE 0.200.25M-. INCLUYE ANDAMIOS DE 0. 000 !AS"A 12.00 M"S DE AL"URA Y "ODO LO NECESARIO PARA SU CORREC"A E*ECUCION. DESPALME DE "ERRENO !AS"A 25 CMS.DE PRO#UNDIDAD PARA &UI"AR CAPA DE "IERRA %EGE"AL INCLUYE DESENRRAICE, !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA. DESPALME DE "ERRENO A MA&UINA !AS"A 50 CMS DE PRO#UNDIDAD, PARA &UI"AR CAPA DE "IERRA %EGE"AL, INCLUYE DESENRRAICE, MANO DE OBRA, !ERRAMIEN"A NECESARIA PARA LA REMOCION Y ACARREOS #UERA Y DEN"RO DE LA OBRA, MEDIDO EN BANCO. E$CA%ACION A MANO EN "ERRENO SA"URADO DE 0.0 A 2.00 M"S. DE PRO#UNDIDAD SECCION OBLIGADA, INCLUYE AC!I&UE, BOMBEO, A#INE DE "ALUDES Y #ONDO, ADEME, "RASPALEO, DESASOL%E, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA Y "RASPALEOS. RE"IRO DE MUEBLES %ARIOS'MALLA DE GALLINERO, CICLON, CAMAS, CABECERAS DE CAMA, LAMINAS, E"C.( LOCALIZADO Y UBICADO EN EL "APANCO. INCLUYE BA*ADA CON LAZO, MANO DE OBRA, A UNA AL"URA DE 6.00 M"S., ACARREOS DEN"RO Y #UERA DE LA OBRA. RE"IRO DE ESCOMBRO LOCALIZADO Y UBICADO EN EL "APANCO DEL EDI#ICIO, PRODUC"O DE DEMOLICIONES REALIZADAS EN EL PASADO, INCLUYE BA*ADA DEL MISMO CON BO"E DE 19 L"S. Y LAZOS A UNA AL"URA DE 6.00 M"S. DESMAN"ELAMIEN"O Y RE"IRO DE "UBERIA GAL%ANIZADA E$IS"EN"E PARA SUS"I"UIRLA POR "UBERIA DE CU "IPO /M/ EN REPARACION, INCLUYE RE"IRO DE 2.88 M"S DE "UBO #G DE 1/, 6.75 M"S DE "UBO #G DE 1+2/, NIPLES DE 1/$0.55, 0.11, .09 M"S Y DE 1+2/$ 0.10, 0.43, 0.83 M"S, 2 CODOS DE 1/, 5 CODOS DE 1+2/ , 2 REDUCCION BUS!ING 1/ $ 1+2/, COPLE, LLA%E NARIZ, !ERRAMIEN"A, MANO DE OBRA Y ACARREOS DEN"RO Y #UERA DE LA OBRA. DESMAN"ELAMIEN"O DE "UBERIA !IDRAULICA EN MAL ES"ADO PARA SUS"I"UIRLA POR "UBERIA DE CU "IPO /M/ PARA MODI#ICACION DE INS"ALACION DE BOILERS EN AZO"EA, INCLUYE RE"IRO DE 33.37 M"S DE "UBO DE CU DE 1+2/, 13.25 M"S DE "UBO DE CU DE 1/ , NIPLES DE 1/ $ 0.80,0.27, 0.38, 0.32, 0.40 M"S, NIPLES DE 1+2/ $ 0.05, 0.14, 0.25, 0.65, 9 REDUCCION BUS!ING DE 1/ $ 1+2/, 10 "EE DE CU DE 1/, CODO DE CU DE 1/, 14 CODOS DE 1+2/ , "EE DE CU DE 1+2/, !ERRAMIEN"A, MANO DE OBRA, Y ACARREOS DEN"RO Y #UERA DE LA OBRA. REPARACION DE #UGA EN SANI". MU*ERES EN "UBERIA DE AGUA #RIA PARA REGADERAS, CON "UBO DE CU "IPO /M/ SOBRE PISO, INCLUYE COR"ES, PRUEBAS, MANO DE OBRA, MA"ERIAL, !ERRAMIEN"A, Y ACARREOS DEN"RO Y #UERA DE LA OBRA. REPARACION DE #UGA EN "AN&UE DE ALMACENAMIEN"O EN PA"IO DE SER%ICIO CON "UBERIA DE CU "IPO /M/ INCLUYE COR"ES, PRUEBAS, MANO DE OBRA,3 CODOS DE CU DE 1+2/ $ 90, NIPLES, MA"ERIALES, !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA. DESMON"A*E DE MALLA CICLONICA, ALAMBRADO DE PUAS, E$IS"EN"E EN COLINDANCIAS DEL PLAN"EL !AS"A UNA AL"URA DE 2.5 M"S, CON RECUPERACION, INCLUYE E$CA%ACION, DEMOLICION EN CIMEN"ACION, ACARREOS #UERA Y DEN"RO DE LA OBRA, !ERRAMIEN"AS Y COLOCACION DE MALLA CICLONICA PRO%ISIONAL A UN ME"RO DEN"RO DEL E*E. RANURADO DE MURO DE BLOCK Y APLANADO CON MOR"ERO CEMARENA, ANC!O DE 5 A 10 CMS DE ESPESOR, PARA OCUL"AR "UBERIA ELEC"RICA, INCLUYE RELLENO Y RESANE CON MOR"ERO CEMARENA PROP.14, MA"ERIALES, !ERRAMIEN"AS, MANO DE OBRA Y ACARREOS DEN"RO Y #UERA DE LA OBRA. RANURADO DE PISO DE CONCRE"O ANC!O DE 5 A 10 CMS, Y ESPESOR DE 10 CMS. PARA OCUL"AR "UBERIA ELEC"RICA, INCLUYE RELLENO, RESANE CON CONCRE"O #C150 KG+CM2, MA"ERILAES, !ERRAMIEN"AS, MANO DE OBRA Y ACARREOS DEN"RO Y #UERA DE LA OBRA. SUMINIS"RO Y COLOCACION DE "APEAL A BASE DE LAMINA GAL%ANIZADA Y BAS"IDOR DE MADERA CON POLINES Y DUELA, A UNA AL"URA DE 2.44 M"S. INCLUYE E$CA%ACION, RELLENO, MA"ERIALES PARA #I*ACION, DESMAN"ELAMIEN"O Y RE"IRO AL #INALIZAR LA OBRA. 'INCLUYE MA"ERIAL RECUPERABLE PARA EL CON"RA"IS"A(. DESMAN"ELAMIEN"O Y RE"IRO DE PUER"A ME"ALICA DE 1.540.60 M"S. EN MAMPARA DE CONCRE"O ARMADO, INCLUYE ACARREOS DEN"RO Y #UERA DE LA OBRA, !ERRAMIEN"A, Y MANO DE OBRA. PASO EN LOSA Y MUROS DE CONCRE"O DE SECCION PROMEDIO DE 2/4/ PARA E&UIPOS DE AIRE ACONDICIONADO, INCLUYE RESANE CON MOR"ERO CEMARE PROP. 14, #ES"ERBOND, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA. DEMOLICION DE APLANADOS DE MOR"ERO CEMARENA DE 5 CMS. DE ESPESOR EN MURO DE CON"ENSION DE PIEDRA BRAZA, INCLUYE !ERRAMIEN"A, ANDAMIOS, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA.

Upload: madikai98

Post on 06-Jul-2018

227 views

Category:

Documents


0 download

TRANSCRIPT

INIFECH
INSTITUTO DE LA INFRAESTRUCTURA FISICA EDUCATIVA DEL ESTADO DE CHIAPAS 1
TABULADOR DE PRECIOS UNITARIOS 2013
 CODIGO CONCEPTO DE TRABAJO UNIDAD REGION 1 REGION 2 REGION 3 REGION 4 REGION 5 REGION 6 REGION 7
1101000010 M2 53.65 53.65 53.65 53.65 53.65 53.65 53.65
1101000011 M2 10.33 10.40 10.57 10.54 10.63 10.56 10.37
1101000012 KG 3.15 3.15 3.15 3.15 3.16 3.16 3.15
1101000013 PZA 2,047.87 2,047.87 2,047.92 2,047.92 2,047.92 2,047.92 2,047.92
1101000014 PZA 1,531.50 1,531.50 1,530.73 1,530.73 1,533.43 1,533.43 1,531.53
1101000015 PODADO DE ARBOLES EN AREA DONDE PASARA LA LINEA, INCLUYE !ERRAMIEN"A, MANO DE OBRA Y ACARREOS DEN"RO Y #UERA DE LA OBRA. M 32.08 32.08 32.08 32.08 32.08 32.08 32.08
1101000016 COR"E DE ARBOL DE 70CM. DE DIAME"RO, INCLUYE E$CA%ACION Y COR"E DE "ACONES, DESENRRAIZANDO. PZA 3,222.78 3,222.78 3,222.85 3,222.85 3,222.85 3,222.85 3,222.85 1101000017 M3 132.59 132.59 132.59 132.59 132.59 132.59 132.59
1101000020 M2 83.43 83.43 83.43 83.43 83.43 83.43 83.43
1101000021 M2 8.35 8.35 8.35 8.35 8.35 8.35 8.35
1101000023 PZA 1,182.00 1,182.00 1,182.03 1,182.03 1,182.03 1,182.03 1,182.03
1101000024 PZA 1,565.66 1,565.66 1,565.70 1,565.70 1,565.70 1,565.70 1,565.70
1101000025 PZA 1,491.42 1,491.42 1,491.46 1,491.46 1,491.46 1,491.46 1,491.46
1101000026 PZA 1,116.03 1,116.03 1,116.06 1,116.06 1,116.06 1,116.06 1,116.06
1101000027 PZA 343.03 343.03 343.04 343.04 343.04 343.04 343.04
1101000028 M 97.29 97.29 97.29 97.29 97.29 97.29 97.29
1101000029 M2 17.85 17.85 17.85 17.85 17.85 17.85 17.85
1101000030 M 64.98 64.98 64.98 64.98 64.98 64.98 64.98
1101000031 M3 86.63 86.63 86.63 86.63 86.63 86.63 86.63
1101000032 M3 91.81 91.81 91.81 91.81 91.81 91.81 91.81
1101000033 M3 313.86 313.86 313.86 313.86 313.86 313.86 313.86
1101000034 PZA 35.92 35.92 35.92 35.92 35.92 35.92 35.92
1101000035 M3 287.38 287.38 287.38 287.38 287.38 287.38 287.38
1101000036 PZA 700.79 700.79 700.80 700.80 700.80 700.80 700.80
1101000037 PZA 875.99 875.99 876.02 876.02 876.02 876.02 876.02
1101000038 PZA 657.71 657.71 657.73 657.73 657.73 657.73 657.73
1101000039 PZA 396.67 396.67 396.68 396.68 396.68 396.68 396.68
1101000040 M 24.91 24.91 24.91 24.91 24.91 24.91 24.91
1101000041 ML 80.06 80.40 81.12 80.60 82.15 81.71 79.69
1101000042 ML 113.33 113.52 114.21 113.74 114.86 114.66 113.05
1101000043 M 88.03 88.03 88.15 88.55 88.15 88.13 88.04
1101000044 PZA 35.92 35.92 35.92 35.92 35.92 35.92 35.92
1101000045 PZA 106.25 107.14 109.10 107.68 111.81 110.69 105.28
1101000046 M2 50.50 50.50 50.50 50.13 50.50 50.50 50.50
LIMPIEZA #INA DE OBRA, EN AREA DE ANDADORES, INCLUYE LIMPIEZA Y RE"IRO DE ARENA PARA PRO"ECCION DE ADO&UIN, REMOCION DE MA"ERIALES 'LODO(, !ERRAMIEN"A , MANO DE OBRA Y ACARREOS DEN"RO Y #UERA DE LA OBRA.
LIMPIEZA, "RAZO Y NI%ELACION EN AREA DE DESPLAN"E DE EDI#ICIOS, INCL. !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
LIMPIEZA Y CARDEADO E$AUS"I%O DE ELEMEN"OS ES"RUC"URALES, SUMINIS"RADOS POR LA DEPENDENCIA, CON AL"O CON"ENIDO DE AREAS O$IDADAS, INCLUYE MANO DE OBRA, !ERRAMIEN"AS, ACARREOS #UERA Y DEN"RO DE LA OBRA.
"ALA DE ARBOLES, INCLUYE DESRRAME A MANO, MADERA "ROCEADA MANO, CARGA, ACARREO Y DESCARGA DEN"RO Y #UERA DE LA OBRA, E$"RACCION DE "RONCOS Y DESENRAICE PARA PERIME"ROS DEL "RONCO CON MA&UINA, NO INCLUYE EL DERRIBE, PARA DE ARBOLES DE .50 A 1.50 DE PERIME"RO.
COR"ADO Y DERRIBE DE ARBOLES E$IS"EN"ES EN AREA DE CONS"RUCCION CON AL"URA PROMEDIO DE 15 M"S.INCLUYE ACARREOS DEN"RO Y #UERA DE OBRA !ERRAMIEN"A Y MANO DE OBRA.
RE"IRO DE ESCOMBRO O RIPIO PRODUC"O DE DEMOLICIONES #UERA DE LA OBRA INCLUYE CARGA Y "RANSPOR"E !AS"A EL DES"INO #INAL, MANO DE OBRA, !ERRAMIEN"A, A CUAL&UIER DIS"ANCIA.
LIMPIEZA ESPECIALIZADA CON ASPIRADORA EN AREA IN"ERIOR DE PLANE"ARIO, EN PISOS Y MUROS APLANADOS DE ACUERDO A SOLICI"UD DE ECOSIS"EMA DE ME$ICO PARA GARAN"IZAR EL BUEN #UNCIONAMIEN"O DEL E&UIPO DIGI"AL INCLUYE !ERRAMIEN"A, MANO DE OBRA, ANDAMIOS, MA"ERIALES, ACARREOS DEN"RO Y #UERA DE LA OBRA.
LIMPIEZA Y DES!IERBE DEL "ERRENO, A"A&UE OBLIGADO A MANO, INCL. !ERREMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA Y ACOMODO PARA SU POS"ERIOR E$"RACCION.
"ALA DE ARBOLES DE 0.25 A 0.75) DE DIAME"RO, MEDIDO A 1.00) DEL "ERRENO NA"URAL, INCLUYENDO PAGO DEL PERMISO DE DERRIBE DE ARBOLES, AN"E LA DEPENDENCIA CORRESPONDIEN"E, DESRAME, CARGA Y DESCARGA, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA, CON MADERA "ROCEADA A DISPOSICION DEL INI#EC!, NO SE INCLUYE E$"RACCION DE "RONCOS NI DESENRRAICE.
"ALA DE ARBOLES DE 0.75 A 1.20) DE DIAME"RO, MEDIDO A 1.00) DEL "ERRENO NA"URAL, INCLUYENDO PAGO DEL PERMISO DE DERRIBE DE ARBOLES, AN"E LA DEPENDENCIA CORRESPONDIEN"E, DERRIBE, DESRAME, CARGA Y DESCARGA, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA, CON MADERA "ROCEADA A DISPOSICION DEL INI#EC!, CONSIDERANDO LA E$"RACCION DE "RONCOS Y DESENRRAICE.
E$"RACCION DE "OCONES INCLUYENDO E$CA%ACION, DESENRAICE, CARGA, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA, Y DESCARGA DEN"RO DE LA OBRA PARA DIAME"ROS DEL "OCON MEDIDOS A 1.00 M. DEL "ERRENO NA"URAL. E$"RACCION DE "OCONES DE 0.25 A 0.75 M. DE DIAME"RO.
"ALA DE ARBOLES DE 0.25 A 0.75) DE DIAME"RO, MEDIDO A 1.00) DEL "ERRENO NA"URAL, INCLUYENDO PAGO DEL PERMISO DE DERRIBE DE ARBOLES, AN"E LA DEPENDENCIA CORRESPONDIEN"E, DESRAME, CARGA Y DESCARGA, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA, CON MADERA "ROCEADA A DISPOSICION DEL INI#EC!, CONSIDERAR LA E$"RACCION DE "RONCOS Y DESENRRAICE.
DESENRRAICE Y DERRI%E DE "RONCO E$IS"EN"E EN AREA DE REGIS"RO ELEC"RICO CON DIAME"RO APRO$IMADO DE 1.00 M"S. Y 1.40 M"S. DE PRO#UNDIDAD, INCLUYE !ERRAMIEN"A, MANO DE OBRA Y RE"IRO DE MA"ERIAL RESUL"AN"E #UERA DE LA OBRA.
LIMPIEZA, DES!IERBE Y RE"IRO DE CERCADO A BASE DE ALAMBRE DE PUAS Y POS"ES DE MADERA, INCLUYE RE"IRO DE MA"ERIALES SIN RECUPERACION Y DE*AR LA SUPER#ICIE LIS"A PARA LA INS"ALACION DE MALLA CICLON, INCLUYE !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
LIMPIEZA DE AREA DE "APANCO INCLUYE EN*AMBRES, INSEC"OS DI%ERSOS CON INSEC"ICIDA, AGUA, !UMO, Y "ODO LO NECESARIO PARA SU CORREC"A E*ECUCION
LIMPIEZA Y "RA"AMIEN"O DE %IGAS CON #ES"ERMICIDA A RAZON DE 0.5+)2 APLICACION DE MICROLAS"IC EN %IGAS, MANCUERNAS, "I*ERAS, LARGUEROS DE SECCION APRO$IMADA DE 0.200.25M-. INCLUYE ANDAMIOS DE 0.000 !AS"A 12.00 M"S DE AL"URA Y "ODO LO NECESARIO PARA SU CORREC"A E*ECUCION.
DESPALME DE "ERRENO !AS"A 25 CMS.DE PRO#UNDIDAD PARA &UI"AR CAPA DE "IERRA %EGE"AL INCLUYE DESENRRAICE, !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
DESPALME DE "ERRENO A MA&UINA !AS"A 50 CMS DE PRO#UNDIDAD, PARA &UI"AR CAPA DE "IERRA %EGE"AL, INCLUYE DESENRRAICE, MANO DE OBRA, !ERRAMIEN"A NECESARIA PARA LA REMOCION Y ACARREOS #UERA Y DEN"RO DE LA OBRA, MEDIDO EN BANCO.
E$CA%ACION A MANO EN "ERRENO SA"URADO DE 0.0 A 2.00 M"S. DE PRO#UNDIDAD SECCION OBLIGADA, INCLUYE AC!I&UE, BOMBEO, A#INE DE "ALUDES Y #ONDO, ADEME, "RASPALEO, DESASOL%E, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA Y "RASPALEOS.
RE"IRO DE MUEBLES %ARIOS'MALLA DE GALLINERO, CICLON, CAMAS, CABECERAS DE CAMA, LAMINAS, E"C.( LOCALIZADO Y UBICADO EN EL "APANCO. INCLUYE BA*ADA CON LAZO, MANO DE OBRA, A UNA AL"URA DE 6.00 M"S., ACARREOS DEN"RO Y #UERA DE LA OBRA.
RE"IRO DE ESCOMBRO LOCALIZADO Y UBICADO EN EL "APANCO DEL EDI#ICIO, PRODUC"O DE DEMOLICIONES REALIZADAS EN EL PASADO, INCLUYE BA*ADA DEL MISMO CON BO"E DE 19 L"S. Y LAZOS A UNA AL"URA DE 6.00 M"S.
DESMAN"ELAMIEN"O Y RE"IRO DE "UBERIA GAL%ANIZADA E$IS"EN"E PARA SUS"I"UIRLA POR "UBERIA DE CU "IPO /M/ EN REPARACION, INCLUYE RE"IRO DE 2.88 M"S DE "UBO #G DE 1/, 6.75 M"S DE "UBO #G DE 1+2/, NIPLES DE 1/$0.55, 0.11, .09 M"S Y DE 1+2/$ 0.10, 0.43, 0.83 M"S, 2 CODOS DE 1/, 5 CODOS DE 1+2/ , 2 REDUCCION BUS!ING 1/ $ 1+2/, COPLE, LLA%E NARIZ, !ERRAMIEN"A, MANO DE OBRA Y ACARREOS DEN"RO Y #UERA DE LA OBRA.
DESMAN"ELAMIEN"O DE "UBERIA !IDRAULICA EN MAL ES"ADO PARA SUS"I"UIRLA POR "UBERIA DE CU "IPO /M/ PARA MODI#ICACION DE INS"ALACION DE BOILERS EN AZO"EA, INCLUYE RE"IRO DE 33.37 M"S DE "UBO DE CU DE 1+2/, 13.25 M"S DE "UBO DE CU DE 1/ , NIPLES DE 1/ $ 0.80,0.27, 0.38, 0.32, 0.40 M"S, NIPLES DE 1+2/ $ 0.05, 0.14, 0.25, 0.65, 9 REDUCCION BUS!ING DE 1/ $ 1+2/, 10 "EE DE CU DE 1/, CODO DE CU DE 1/, 14 CODOS DE 1+2/ , "EE DE CU DE 1+2/, !ERRAMIEN"A, MANO DE OBRA, Y ACARREOS DEN"RO Y #UERA DE LA OBRA.
REPARACION DE #UGA EN SANI". MU*ERES EN "UBERIA DE AGUA #RIA PARA REGADERAS, CON "UBO DE CU "IPO /M/ SOBRE PISO, INCLUYE COR"ES, PRUEBAS, MANO DE OBRA, MA"ERIAL, !ERRAMIEN"A, Y ACARREOS DEN"RO Y #UERA DE LA OBRA.
REPARACION DE #UGA EN "AN&UE DE ALMACENAMIEN"O EN PA"IO DE SER%ICIO CON "UBERIA DE CU "IPO /M/ INCLUYE COR"ES, PRUEBAS, MANO DE OBRA,3 CODOS DE CU DE 1+2/ $ 90, NIPLES, MA"ERIALES, !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
DESMON"A*E DE MALLA CICLONICA, ALAMBRADO DE PUAS, E$IS"EN"E EN COLINDANCIAS DEL PLAN"EL !AS"A UNA AL"URA DE 2.5 M"S, CON RECUPERACION, INCLUYE E$CA%ACION, DEMOLICION EN CIMEN"ACION, ACARREOS #UERA Y DEN"RO DE LA OBRA, !ERRAMIEN"AS Y COLOCACION DE MALLA CICLONICA PRO%ISIONAL A UN ME"RO DEN"RO DEL E*E.
RANURADO DE MURO DE BLOCK Y APLANADO CON MOR"ERO CEMARENA, ANC!O DE 5 A 10 CMS DE ESPESOR, PARA OCUL"AR "UBERIA ELEC"RICA, INCLUYE RELLENO Y RESANE CON MOR"ERO CEMARENA PROP.14, MA"ERIALES, !ERRAMIEN"AS, MANO DE OBRA Y ACARREOS DEN"RO Y #UERA DE LA OBRA.
RANURADO DE PISO DE CONCRE"O ANC!O DE 5 A 10 CMS, Y ESPESOR DE 10 CMS. PARA OCUL"AR "UBERIA ELEC"RICA, INCLUYE RELLENO, RESANE CON CONCRE"O #C150 KG+CM2, MA"ERILAES, !ERRAMIEN"AS, MANO DE OBRA Y ACARREOS DEN"RO Y #UERA DE LA OBRA.
SUMINIS"RO Y COLOCACION DE "APEAL A BASE DE LAMINA GAL%ANIZADA Y BAS"IDOR DE MADERA CON POLINES Y DUELA, A UNA AL"URA DE 2.44 M"S. INCLUYE E$CA%ACION, RELLENO, MA"ERIALES PARA #I*ACION, DESMAN"ELAMIEN"O Y RE"IRO AL #INALIZAR LA OBRA. 'INCLUYE MA"ERIAL RECUPERABLE PARA EL CON"RA"IS"A(.
DESMAN"ELAMIEN"O Y RE"IRO DE PUER"A ME"ALICA DE 1.540.60 M"S. EN MAMPARA DE CONCRE"O ARMADO, INCLUYE ACARREOS DEN"RO Y #UERA DE LA OBRA, !ERRAMIEN"A, Y MANO DE OBRA.
PASO EN LOSA Y MUROS DE CONCRE"O DE SECCION PROMEDIO DE 2/4/ PARA E&UIPOS DE AIRE ACONDICIONADO, INCLUYE RESANE CON MOR"ERO CEMARE PROP.14, #ES"ERBOND, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA.
 
INIFECH
INSTITUTO DE LA INFRAESTRUCTURA FISICA EDUCATIVA DEL ESTADO DE CHIAPAS 1
TABULADOR DE PRECIOS UNITARIOS 2013
 CODIGO CONCEPTO DE TRABAJO UNIDAD REGION 1 REGION 2 REGION 3 REGION 4 REGION 5 REGION 6 REGION 7
1101000047 PZA 11,359.62 11,359.62 11,359.91 11,359.91 11,359.91 11,359.91 11,359.91
1101000048 DEMOLICION DE CONCRE"O ARMADO CON %ARS. N.3, INCLUYE MANO DE OBRA, !ERRAMIEN"AS, ACARREOS #UERA Y DEN"RO DE LA OBRA. M2 98.09 98.09 98.09 98.09 98.09 98.09 98.09
1101000049 M3 189.01 189.01 189.01 189.01 189.01 189.01 189.01
1101000050 M3 285.87 285.87 285.88 285.88 285.88 285.88 285.88
1101000051 BOMBEO DE AC!I&UE CON BOMBA AU"OCEBAN"E, PROPIEDAD DEL CON"RA"IS"A DE 2/ DE DIAME"RO Y 4 !.P. !R 109.32 109.32 109.33 109.33 109.33 109.33 109.33
1101000052 PZA 85.76 85.76 85.76 85.76 85.76 85.76 85.76
1101000053 M 44.45 44.45 44.45 44.45 44.45 44.45 44.45
1101000054 M2 39.74 39.74 39.74 39.74 39.74 39.74 39.74
1101000055 PZA 343.03 343.03 343.04 343.04 343.04 343.04 343.04
1101000056 M3 49.01 49.01 49.02 49.02 49.02 49.02 49.02
1101000057 M3 228.69 228.69 228.69 228.69 228.69 228.69 228.69
1101000058 DESMAN"ELAMIEN"O DE CABLES ELEC"RICOS AEREOS, INCLUYE DESCONE$ION, !ERRAMIEN"A Y MANO DE OBRA. M 7.43 7.43 7.43 7.43 7.43 7.43 7.43 1101000059 M 66.88 67.04 67.43 67.15 67.98 67.76 66.68
1101000060 !R 109.32 109.32 109.33 109.33 109.33 109.33 109.33
1101000061 M3 393.78 393.78 393.79 393.79 393.79 393.79 393.79
1101000062 M 54.95 55.20 55.78 55.37 56.58 56.24 54.68
1101000063 M2 85.76 85.76 85.76 85.76 85.76 85.76 85.76
1101000064 M 7.40 7.40 7.40 7.40 7.40 7.40 7.40
1101000065 M2 172.90 172.90 172.91 172.91 172.91 172.91 172.91
1101000066 PZA 171.52 171.52 171.53 171.53 171.53 171.53 171.53
1101000067 M2 85.76 85.76 85.76 85.76 85.76 85.76 85.76
1101000068 PZA 2,207.25 2,207.25 2,204.55 2,204.55 2,213.99 2,213.99 2,207.30
1101000069 DEMOLICION DE ARRIA"ES DE 1.541.54 M"S. INCLUYE MANO DE OBRA, !ERRAMIEN"AS, ACARREOS #UERA Y DEN"RO DE LA OBRA. PZA 1,429.59 1,429.59 1,427.65 1,427.65 1,434.40 1,434.40 1,429.62
1101000070 )2 10.95 10.99 11.17 11.11 11.29 11.24 10.94
1101000071 M2 28.59 28.59 28.59 28.59 28.59 28.59 28.59
1101000072 M2 11.44 11.44 11.45 11.45 11.45 11.45 11.45
1101000073 LIMPIEZA DE LODO EN PISOS DE AULA E$IS"EN"ES EN OBRA, INCLUYE LIMPIEZA DE LODO CON AGUA Y *ABON, !ERRAMIEN"A, MANO DE OBRA. M2 6.86 6.86 6.86 6.86 6.86 6.86 6.86
1101000074 DESMON"E DE "ERRENO NA"URAL EN MALESA BA*A, INCLUYE !ERRAMIEN"A, MANO DE OBRA Y ACARREOS DEN"RO Y #UERA DE LA OBRA. M2 6.86 6.86 6.86 6.86 6.86 6.86 6.86
1101000075 M2 40.65 40.65 40.65 40.65 40.65 40.65 40.65
1101000076 M2 50.14 50.14 50.14 50.14 50.14 50.14 50.14
1101000077 M2 127.80 127.80 127.81 127.81 127.81 127.81 127.81
1101000078 M2 37.10 37.10 37.10 37.10 37.10 37.10 37.10
1101000079 DEMOLICION DE PE"A"ILLO EN AZO"EA, INCLUYE ACARREO EN CARRE"ILLA !AS"A 50 M"S. Y ACCARREOS #UERA DE LA OBRA. M2 49.58 49.58 49.58 49.58 49.58 49.58 49.58 1101000080 M 145.09 145.09 145.20 145.61 145.20 145.17 145.09
1101000081 DESMAN"ELAMIEN"O DE MALLA CICLON, INCLUYE RE"IRO DEL MA"ERIAL DEN"RO Y #UERA DE LA OBRA, MANO DE OBRA Y !ERRAMIEN"AS. M 17.15 17.15 17.15 17.15 17.15 17.15 17.15
1101000082 PZA 306.48 306.48 306.49 306.49 306.49 306.49 306.49
1101000083 PZA 534.28 538.27 551.76 538.83 562.44 558.61 531.76
1101000084 RE"IRO DE *UEGOS IN#AN"ILES, INCLUYE E$CA%ACION, DEMOLICION DE BASE DE CONCRE"O Y ACARREOS DEN"RO Y #UERA DE LA OBRA. PZA 230.78 230.78 230.78 230.78 230.78 230.78 230.78
1101000085 PZA 749.34 752.21 757.13 746.19 759.26 756.66 745.59
1101000086 RE"IRO DE LLAN"AS EN"ERRADAS EN AREA DE *UEGOS IN#AN"ILES, INCLUYE ACARREOS DEN"RO Y #UERA DE LA OBRA. PZA 14.91 14.91 14.91 14.91 14.91 14.91 14.91 1101000087 PZA 477.58 477.58 477.59 477.59 477.59 477.59 477.59
1101000088 PZA 955.17 955.17 955.20 955.20 955.20 955.20 955.20
1101000089 DEMOLICION DE BANCA DE CONCRE"O ARMADO DE 10 CM. DE ESPESOR, INCLUYE ACARREO A 20 M"., !ERRAMIEN"A Y MANO DE OBRA. M3 42.90 42.90 42.90 42.90 42.90 42.90 42.90
1101000090 M3 775.75 775.75 775.78 775.78 775.78 775.78 775.78
DEMOLICION DE CIS"ERNA DE 10 M3 DE CONCRE"O ARMADO EN MUROS, PISOS Y LOSA, INCLUYE DEMOLICION DE REGIS"ROS, ACARREOS A MANO !AS"A 20 M"S. Y EN CAMION #UERA DE LA OBRA, CARGA Y DESCARGA, MANO DE OBRA Y !ERRAMIEN"AS.
DEMOLICION DE MURO DE BLOCK MACIZO APLANADO EN AMBAS CARAS, INCLUYE MANO DE OBRA, !ERRAMIEN"AS, ACARREOS #UERA Y DEN"RO DE LA OBRA.
E$"RACCION A MANO CON PALA Y BO"E DE MA"ERIAL /B/ EN AGUA PRODUC"O DE DERRUMBES DE "ALUDES DE LA S CEPAS DE E$CA%ACION PRO%OCADO POR LA SOBRE SA"URACION DEL SUELO INCLUYE LA E$"RACCION, ACARREO Y %ACIADO A UNA DIS"ANCIA DE 10 M"S.
LIMPIEZA DE REGIS"ROS SANI"ARIOSE$IS"EN"ES 40 $ 60 CMS PARA SU DESASOL%E, CON %ARILLAS. BARRE"A, ALAMBRE, INCLUYE ACARREOS #UERA Y DEN"RO DE LA OBRA, MANO DE OBRA Y !ERRAMIEN"A.
DESMAN"ELAMIEN"O DE MALLA CICLON DE 2.50 M"S. DE AL"URA INCL. LE%AN"AR MALLA, &UI"AR POS"ES, DEMOLICION DE C!A#LANES, !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
DEMOLICION Y DESMAN"ELAMIEN"O DE APLANADO EN PLA#OND, EN MAL ES"ADO, INCLUYE RE"IRO DEL MA"ERIAL #UERA DE LA OBRA, LIMPIEZA DEL ACERO CON CEPILLO DE ALAMBRE, !ERRAMIEN"AS Y MANO DE OBRA.
DEMOLICION DE "AN&UE DE "ABICON SOBRE LOSA DE MODULO SER%ICIO SANI"ARIO DE 6.05 $ 1.38 $ 0.74 M"S. INCLUYE !ERRAMIEN"A, MANO DE OBRA Y ACARREOS DEN"RO Y #UERA DE LA OBRA.
ACARREO EN CARRE"ILLA DE "IERRA Y MA"ERIAL MI$"O PRODUC"O DE E$CA%ACION Y+O DEMOLICIONES, INCLUYE CARGA Y DESCARGA EN ES"ACIONES DE 20 ME"ROS MEDIDO EN BANCO. PRIMERA ES"ACION.
DEMOLICION DE CALLES DE CONCRE"O SIMPLE DE #C100 KG+CM2 DE 20 CMS DE ESPESOR , INCLUYE ACARREOS A 20 M"S. DE LA DEMOLICION , !ERRAMIEN"A Y MANO DE OBRA.
RANURADO DE MURO DE BLOCK Y APLANADO CON MOR"ERO CEMARENA, ANC!O DE 5 A 10 CMS DE ESPESOR, PARA OCUL"AR "UBERIA ELEC"RICA, INCLUYE RELLENO Y RESANE CON MOR"ERO CEMARENA PROP.15, MA"ERIALES, !ERRAMIEN"AS, MANO DE OBRA Y ACARREOS DEN"RO Y #UERA DE LA OBRA.
BOMBEO Y DRENADO DE AGUAS #REA"ICAS EN E$CA%ACION PARA CIMEN"ACION DE ES"RUC"URAS, POR MAS DE 12 !ORAS CON"INUAS, INCLUYE BOMBA CON MO"OR DE GASOLINA.
SUMINIS"RO DE MA"ERIAL DE BANCO PARA RE%ES"IMIEN"O DEL CAMINO DE ACCESO, INCLUYE ACARREOS Y SOBREACARREOS EN CARRE"ILLA POR DI#ICUL"AD DE ACCESO DE %E!ICULOS, SELECCION, "ENDIDO, COMPAC"ADO, #ORMACION DE CUNE"AS, !ERRAMIEN"A Y MANO DE OBRA.
RANURA EN MUROS DE "ABI&UE O CONCRE"O PARA ALO*AMIEN"O DE "UBERIA ELEC"RICA EN DI#EREN"ES DIAME"ROS, INCLUYE RESANE CON MOR"ERO CEMARE 14, MA"ERIALES, !ERRAMIEN"AS, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA.
DEMOLICION DE MUROS DE "ABI&UE O BLOCK, CADENAS Y CAS"ILLOS A MANO, INCLUYE DESMAN"ELAMIEN"O DE INS"ALACIONES, !ERRAMIEN"AS, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA.
DESMAN"ELAMIEN"O DE INS"ALACIONES DE "UBERIAS CONDUI" GAL%ANIZADA, INCLUYE MANO DE OBRA, !ERRAMIEN"AS, ACARREOS #UERA Y DEN"RO DE LA OBRA.
DES%AS"ADO, PULIDO Y BRILLADO DE MOSAICO DE PAS"A CON MA&UINA, INCLUYE ENCERAD, !ERRAMIEN"A, MA"ERIALES, MANO DE OBRA Y ACARREOS DEN"RO Y #UERA DE LA OBRA.
DEMOLICION DE MESA DE CONCRE"O ARMADO #ORMADO POR LOSA DE SECCION 1.350.45 M"S. Y DOS CAS"ILLOS DE 0.200.20 M"S. INCLUYE !ERRAMIEN"AS, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA.
DEMOLICION DE PISO DE CONCRE"O DE 15 CMS. DE ESPESOR EN CALLE, INCLUYE MANO DE OBRA, !ERRAMIEN"AS, ACARREOS #UERA Y DEN"RO DE LA OBRA.
"ALA DE ARBOLES INCLUYENDO DERRIBE, DESRAME, CARGA, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA, DESCARGA DEN"RO DE LA OBRA CON MADERA "ROCEADA A DISPOSICION DEL INI#EC!, NO SE INCLUYE E$"RACCION DE "RONCOS NI DESENRRAICE PARA PERIME"ROS DEL "RONCO MEDIDO A 1.00 M"S. DEL NI%EL DEL "ERRENO NA"URAL, "ALA DE ARBOLES DE 0.250.75 M"S. DE PERIME"RO.
LIMPIEZA, "RAZO Y %ERI#ICACION DE NI%ELES. INCLUYE E&UIPO, "OPOGRA#ICOS, "ROMPOS, PIN"URAS, CADENEROS, ES"ADALEROS, AYUDAN"ES, !ERRAMIEN"AS, Y "ODO LO NECESARIO PARA LA %ERI#ICACION.
LIMPIEZA GRUESA EN "ODA EL AREA DEL PLAN"EL INCLUYE RE"IRO DE LODO PRODUC"O DEL ASOL%E POR LLU%IAS DE LA "ORMEN"A LARRY, RE"IRO DE ESCOMBRO, ACARREO EN CARRE"ILLA A LA PAR"E DEL ACCESO PRINCIPAL DE LA ESCUELA 'PROMEDIO 60 M"S.(, !ERRAMIEN"A Y MANO DE OBRA.
LIMPIEZA DE CANCELERIA E$IS"EN"E EN OBRA, INCLUYE LIMPIEZA DE LODO DE %IDRIOS Y "ABLE"AS, *AMBAS DE ALUMINIO, CANCELERIA DE #IERRO, !ERRAMIEN"A Y MANO DE OBRA.
LIMPIEZA GRUESA EN "ODA EL AREA DEL PLAN"EL INCLUYE RE"IRO DE LODO '30 CMS.( APRO$IMADAMEN"E PRODUC"O DEL ASOL%E POR LLU%IAS DE LA "ORMEN"A LARRY, RE"IRO DE ESCOMBRO, ACARREO EN CARRE"ILLA A LA PAR"E DEL ACCESO PRINCIPAL DE LA ESCUELA 'PROMEDIO DE 60 M"S.(, LUEGO ACARREO EN CAMION DE %OL"EO AUN LUGAR A*ENO A LA OBRA, !ERRAMIEN"A MENOR Y MANO DE OBRA.
DEMOLICION DE PISO O BAN&UE"A DE CONCRE"O DE 10 CMS. DE ESP. U"ILIZANDO DISCO DE COR"E CON PUN"A DE DIAMAN"E A DEMOLER, INCLUYE MANO DE OBRA, DISCO DE COR"E Y !ERRAMIEN"A MENOR 
DEMOLICION DE MUROS DE "ABI&UE O BLOCK DE 15.00 CMS. DE ESPESOR CON CADENAS Y CAS"ILLOS, INCLUYE !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
DEMOLICION DE MUROS DE "ABI&UE O BLOCK DE 21.00 CMS. DE ESPESOR INCLUYE !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
SUMINIS"RO Y COLOCACION DE "APIAL A BASE DE LAMINA GAL%ANIZADA CAL. 26 Y BAS"IDOR DE MADERA CON POLINES DE 4/4/2.50 M 3 M.,. INCLUYE E$CA%ACION, RELLENO, MA"ERIALES PARA #I*ACION, DESMAN"ELAMIEN"O Y RE"IRO AL #INALIZAR LA OBRA. 'INCLUYE MA"ERIAL RECUPERABLE PARA EL CON"RA"IS"A(.
RE"IRO DE BASURERO ME"ALICOS INCLUYE DEMOLICION DE 2 BASES DE CONCRE"O DE 2020 CMS. Y UNA PRO#UNDIDAD DE 30 CMS., RE"IRO DEL MA"ERIAL, ACARREOS DEN"RO Y #UERA DE LA OBRA Y !ERRAMIEN"AS.
COLOCACION DE BASURERO ME"ALICO, INCLUYE E$CA%ACION, BASE DE CONCRE"O DE 303040 CMS., RELLENO CON MA"ERIAL PRODUC"O DE LA E$CA%ACION Y ACARREOS DEN"RO Y #UERA DE LA OBRA.
COLOCACION DE *UEGO IN#AN"IL INCLUYE E$CA%ACION, COLADO DE BASE DE CONCRE"O, PLOMEADO, RELLENO Y ACARREOS DEN"RO Y #UERA DE LA OBRA.
DESRRAME Y DERRIBE DE ARBOLES'BEN*AMINA( DE 20.00 CM. DE DIAME"RO DE "ALLO Y 4 M". DE AL"URA, INCLUYE DERRIBE, DESRRAME, COR"ES, ACARREOS, CARGA Y ACARREO #UERA DE LA OBRA EN CAMION.
DESRRAME Y DERRIBE DE ARBOL'PALMERA( DE 40 CM. DE DIAME"RO DE "ALLO Y 10 M". DE AL"URA, INCLUYE E$CA%ACION, DERRIBE, DES"RON&UE, DESRRAME, COR"ES, CARGA Y ACARREO EN CAMION #UERA DE LA OBRA
 
INIFECH
INSTITUTO DE LA INFRAESTRUCTURA FISICA EDUCATIVA DEL ESTADO DE CHIAPAS 1
TABULADOR DE PRECIOS UNITARIOS 2013
 CODIGO CONCEPTO DE TRABAJO UNIDAD REGION 1 REGION 2 REGION 3 REGION 4 REGION 5 REGION 6 REGION 7
1101000091 DESMAN"ELAMIEN"O DE %IDRIO, MA"ERIAL RECUPERABLE, INCLUYE ACARREO A 20 M"S, !ERRMIEN"A Y MANO DE OBRA M2 28.74 28.74 28.74 28.74 28.74 28.74 28.74 1101000092 M2 40.66 40.66 42.16 42.16 42.16 45.93 40.66
1101000093 !R 451.36 451.36 451.37 451.37 451.37 451.37 451.37
1101000094 RE!ABILI"ACION DE ACCESO PARA %E!ICULOS EN CRUCE DEL PUEN"E, INCLUYE SUMINIS"RO DE GRA%A GRUESA, Y MANO DE OBRA. M3 658.96 656.81 810.33 714.68 859.29 879.59 722.83
1101000095 M2 66.55 66.55 66.55 66.55 66.55 66.55 66.55
1101000096 M 8.90 8.90 8.90 8.90 8.90 8.90 8.90
1101000097 M2 79.37 79.37 79.37 79.37 79.37 79.37 79.37
1101000098 M2 55.24 55.24 55.25 55.25 55.27 55.27 55.25
1101000099 M2 45.43 45.43 45.43 45.43 45.43 45.43 45.43
1101000100 PZA 189.56 189.56 189.55 189.55 189.60 189.60 189.56
1101000101 PZA 235.03 235.03 235.00 235.00 235.06 235.06 235.03
1101000102 PZA 529.38 529.38 529.39 529.39 529.39 529.39 529.39
1101000103 M2 60.14 60.14 60.13 60.13 60.16 60.16 60.14
1101000104 PZA 113.58 113.58 113.59 113.59 113.59 113.59 113.59
1101000105 M2 85.74 85.74 85.74 85.74 85.74 85.74 85.74
1101000106 M 32.58 32.58 32.58 32.58 32.58 32.58 32.58
1101000107 M2 10.67 10.67 10.67 10.67 10.67 10.67 10.67
1101000108 PZA 178.38 178.38 178.38 178.38 178.38 178.38 178.38
1101000109 PZA 843.81 843.90 843.96 843.91 844.01 843.94 843.70
1101000110 PZA 254.10 254.10 254.10 254.10 254.10 254.10 254.10
1101000111 PZA 176.94 176.94 176.93 176.93 176.98 176.98 176.94
1101000112 DEMOLICION DE MURO DE "ABI&UE INCLUYE RE"IRO DE ESCOMBRO DEN"RO Y #UERA DE LA OBRA. M2 59.77 59.77 59.77 59.77 59.77 59.77 59.77 1101000113 M2 46.43 46.43 46.43 46.43 46.43 46.43 46.43
1101000114 M2 83.76 83.76 83.76 83.76 83.76 83.76 83.76
1101000115 M 5.24 5.24 5.24 5.24 5.24 5.24 5.24
1101000116 M 530.19 530.19 530.21 530.21 530.21 530.21 530.21
1101000117 M 37.40 37.40 37.39 37.39 37.40 37.40 37.40
1101000118 M2 33.73 33.73 33.73 33.73 33.73 33.73 33.73
1101000119 M 119.22 119.22 119.71 119.15 119.71 119.60 119.23
1101000121 M2 168.01 168.01 168.01 168.01 168.01 168.01 168.01
1101000123 M 215.29 215.29 215.39 215.80 215.39 215.37 215.29
1101000126 M2 16.93 16.93 16.80 16.77 16.80 16.80 16.77
1101000128 M3 220.43 220.43 220.43 220.43 220.43 220.43 220.43
1101000129 PZA 673.93 673.93 673.94 673.94 673.94 673.94 673.94
1101000131 LIMPIEZA GRUESA DE OBRA, INCLUYE !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA. M2 19.43 19.43 19.43 19.43 19.43 19.43 19.43 1101000134 M2 8.90 8.90 8.90 8.90 8.90 8.90 8.90
1101000135 PZA 1,893.70 1,893.70 1,891.37 1,891.37 1,899.46 1,899.46 1,893.75
1101000137 PZA 1,356.31 1,356.31 1,356.35 1,356.35 1,356.35 1,356.35 1,356.35
1101000138 M3 86.29 86.29 86.29 86.29 86.29 86.29 86.29
SUMINIS"RO Y COLOCACION DE "APIAL DE PRO"ECCION A BASE DE MALLA LAC 66+1010 Y POLINES DE 4/$4/ $ 2.50 M". ANCLADOS A CADA 2.50 M"S., INCLUYE E$CA%ACION DE AGU*EROS PARA ANCLAR LOS POLINES, RELLENOS, CONCRE"O, MA"ERIAL, !ERRAMIEN"A Y MANO DE OBRA
BOMBEO CON BOMBA ES".DE 00 A 15 M. %ER"ICAL Y AC!I&UES PARA E%I"AR SA"URADO DE AGUA EN CIMEN"ACION, INCLUYE MANO DE OBRA, E&UIPO Y !ERRAMIEN"A.
DESMON"A*E DE LAMINA PIN"RO O SIMILAR CON UNA CAPA SUPERIOR DE CONCRE"O, INCLUYE ANDAMIOS, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA..
DESMAN"ELAMIEN"O DE CABLEADO DE RED ELEC"RICA E$"ERIOR, CALIBRES 2 Y 4, INCLUYE !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
DEMOLICION DE MUROS DE "ABI&UE DE 14 CM DE ESPESOR CON RECUBRIMIEN"O DE APLANADO DE MOR"ERO CEMEN"O ARENA PROP. 13 AMBOS LADOS, ENMARCADOS POR CAS"ILLOS Y CADENA DE CONCRE"O ARMADO A CADA ME"RO , INCLUYE !ERRAMIEN"AS, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA.
DESMAN"ELAMIEN"O DE CANCELERIA ME"ALICA O DE ALUMINIO CON RECUMERACION DE MA"ERIAL, INCLUYE !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
DESMON"A*E Y MON"A*E DE MALLA CICLON E$IS"EN"E, INCLUYE RECUPERACION, ALMACENA*E DEL MA"ERIAL, ACARREOS DEN"RO Y #UERA DE LA OBRA COLOCACION DE POS"ERIA, "RAZO Y NI%ELACION.
DESMAN"ELAMIEN"O DE PUER"A DE "AMBOR DE 1.20$2.50 M"S., INCLUYE DESMAN"ELAR C!AMBRANAS Y PUER"A, ACARREO DEN"RO Y #UERA DE LA OBRA, MANO DE OBRA Y !ERRAMIEN"A.
DESMAN"ELAMIEN"O DE PUER"A DE ALUMINIO Y CRIS"AL DE 1.82$2.50 M"S. RECUPERANDO EL MA"ERIAL, INCLUYE MANO DE OBRA, !ERRAMIEN"A, ACARREOS DEN"RO Y #UERA DE LA OBRA.
DESMON"A*E Y MON"A*E DE LUMINARIAS E$IS"EN"ES A CUAL&UIER AL"URA, INCLUYE CAMBIO DE ACRILICO, LIMPIEZA GENERAL, INS"ALACIONES, PIN"URA 'CON PRO"ECCION U.%.( DEL GABINE"E, PRUEBAS, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA, "ODO LO  NECESARIO PARA SU BUEN #UNCIONAMIEN"O.
DESMAN"ELAMIEN"O Y RE"IRO DE PUER"A DE MUL"IPANEL CON MARCO E$IS"EN"E, INCLUYE !ERRAMIEN"A, ANDAMIOS, ACARREOS DEN"RO Y #UERA DE LA OBRA.
DESMAN"ELAMIEN"O DE MUEBLE !EC!O EN OBRA, RECUPERANDO EL MA"ERIAL, INCLUYE !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE OBRA.
DEMOLICION DE #IRME DE CONCRE"O SIN ARMAR DE 15 CMS DE ESPESOR, INCLUYE !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO D ELA OBRA.
COR"E CON COR"ADORA DE CONCRE"O DE DISCO DE DIAMAN"E DE 14/ EN PISO DE CONCRE"O !IDRAULICO CON UNA PRO#UNDIDAD DE 8 A 10 CMS.INCLUYE !ERRAMIEN"A, MANO DE OBRA, MA"ERIALES Y ACARREOS DEN"RO Y #UERA DE LA OBRA.
CEPILLADO, REMOCION Y LIMPIEZA DE %ARILLAS DE ELEMEN"OS ES"RUC"URALES, E$PUES"AS A LA IN"ERPERIE, PRODUC"O DE LA CORROSION, INCLUYE ANDAMIOS, MA"ERIALES NECESARIOS, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA, DE*ANDO LA SUPER#ICIE EN CONDICIONES PARA SU REPARACION.
DESMAN"ELAMIEN"O DE MUEBLE !EC!O EN OBRA CON RECUPERACION DE MA"ERIAL. INCLUYE !ERRAMIEN"AS, MANO DE OBRA Y ACARREOS DEN"RO Y #UERA DE LA OBRA.
DESMON"A*E Y MON"A*E DE SENSOR MAGNE"ICO DE"EC"OR DE LIBROS EN AREA DE BIBLIO"ECA, INCLUYE DESINS"ALACION E INS"ALACION ELEC"RICA, ARMADO, DESARMADO DE "ODOS SUS COMPONEN"ES, MA"ERIAL NECESARIO PARA SU REINS"ALACION, PRUEBAS, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA, "ODO LO NECESARIO PARA SU CORREC"O #UNCIONAMIEN"O.
DESMON"A*E Y MON"A*E DE PUER"A GIRA"ORIA PARA EN"RADA, "IPO "IENDA DE AU"OSER%ICIO, INCLUYE DESARMADO, ARMADO, ANCLA*E, BARRENACION, COLOCACION, PRUEBAS, MA"ERIALES PARA SU REINS"ALACION, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA. 'SEGUN PROYEC"O(
DESMAN"ELAMIEN"O DE RE*ILLA DI#USOR DE AIRE Y RE"ORNO A CUAL&UIER AL"URA, INCLUYE !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA.
DESMON"A*E DE #ALSO PLA#ON DE "ABLAROCA, INCLUYE RE"IRO DEL MA"ERIAL PRODUC"O DE LA DEMOLICION DEN"RO Y #UERA DE LA OBRA, LIMPIEZA GENERAL DE LOS #REN"ES DE "RABA*O, !ERRAMIEN"AS Y MANO DE OBRA.
RE"IRO DE MURO DE "ABLAROCA, INCLUYE RE"IRO DE ESCOMBRO #UERA DE LA OBRA, E&UIPO, !ERRAMIEN"AS, MANO DE OBRA, BAS"IDOR DE LAMINA O PER#IL "UBULAR CAL. 26, "A&UE"ES, !ERRA*ES Y LIMPIEZA.
DESMON"E DE "UBO CONDUI" GAL%ANIZADO APAREN"E, "ODOS LOS DIAME"ROS, INCLUYE RESANES, LIMPIEZA DEL #REN"E Y RE"IRO #UERA DE OBRA.
COR"E PARA ES"ABILIZAR "ALUDES CON SA"URACION DE AGUA, INCLUYE ACARREOS EN SACO PRIMERAS 2 ES"ACIONES Y ACARREO A %OL"EO CON CARGA MECANICA ES"ACIONES SUBSECUEN"ES, MANO D EOBRA, !ERRAMIEN"AS, "RASPALEOS Y A#INES DE "ALUDES Y "ODO LO NECESARIOS PARA SU CORREC"A E*ECUCION.
DESMAN"ELAMIEN"O DE PLA#ON DE "ABLAROCA CON SECCION PROMEDIO DE 1.20 M"S. DE ANC!O PARA COLOCACION DE SOPOR"ERIA Y MURO MO%IL EN EDI#ICIO /A/, P.B. Y P.A. INCLUYE !ERRAMIEN"A, MANO DE OBRA, ACARREOS DEN"RO Y #UERA DE LA OBRA.
SUMINIS"RO Y COLOCACION DE "APIALES PARA PRO"ECCION A BASE DE LAMINA DE CAR"ON, INCLUYE POS"ES DE MADERA, MA"ERIALES PARA SU #I*ACION, ACARREOS DEN"RO Y #UERA DE LA OBRA, !ERRAMIEN"A Y MANO DE OBRA.
SUMINIS"RO, COLOCACION DE "APIAL DE LAMINA GAL%ANIZADA DE 2.44 M"S DE AL"URA, CON POS"ES DE POLIN DE 4/4/ 2.50 M"S, Y 3 REGLAS DE 1/$4/, INCLUYE E$CA%ACION DE O.15.30 M"S, CLA%OS, MANO DE OBRA PARA SU COLOCACION Y RE"IRO DESPUES DE SU U"ILIZACION.
DEMOLICION DE PISO DE CONCRE"O DE 10 CMS DE ESPESOR MEDIAN"E LA U"ILIZACION DE MEDIOS MECANICOS, INCLUYE ACAMELLONADO DEL MA"ERIAL, CARGA A CAMION Y ACARREOS #UERA DE LA OBRA.
SUMINIS"RO Y COLOCACIN DE "APIAL DE PRO"ECCION DE L:MINA DE CAR"ON CON POLINES %ER"ICALES DE 4/ $ 4/ 2.40 M Y 3 RE#UERZOS !ORIZON"ALES DE 2/ $ 4/, SU*E"ADO CON CLA%O COMERCIAL DE 2 1+2/ Y 4/ INCLUYE DEMOLICON DE PISO DE CONCRE"O Y E$CA%ACION PARA EN"ERRAR LOS POS"ES A 0.30 M, MA"ERIALES, MANO DE OBRA Y !ERRAMIEN"A A UNA AL"URA DE 2.44 M ' 3 USOS EN MADERA(.
LIMPIEZA DE CANCELERIA DE ALUMINIO CON CRIS"AL #LO"ADO CLARO, INCLUYE AGUA, *ABON Y LI&UIDO PARA LIMPIAR CRIS"ALES, MANO DE OBRA, !ERRAMIEN"A Y ACARREOS DEN"RO Y #UERA DE LA OBRA.
DESASOL%ES EN CEPAS DE CIMEN"ACION, %UEL"A A RELLENAR POR LAS LLU%IAS DEL !URACAN /S"AN/, REALIZADA A MANO Y AC!I&UE CON BOMBA DE GASOLINA, INCLUYE MANO DE OBRA, !ERRAMIEN"A, OPERADOR, COMBUS"IBLE. PRO%OCADO POR !URACAN S"AN, ACARREOS DEN"RO Y #UERA DE LA OBRA.
E$"RACCION Y "RASPLAN"E DE ARBOL DE 0 A 3.00 M". DE AL"URA .INCLUYE E$CA%ACION !AS"A EL "O"AL DESENRAICE Y ASI MISMO PARA SU "RASPLAN"E, PREPARACION DEL AREA DE SEMBRADO CON AGUA NECESARIA Y "IERRA %EGE"AL, RELLENO DEL AREA DE E$"RACCION Y AREA SOBRAN"E DE SEMBRADO, MANIOBRAS, !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
DESMAN"ELAMIEN"O DE MALLA CICLON EN %EN"ANA, INCLUYE RE"IRO DEL MA"ERIAL DEN"RO Y #UERA DE LA OBRA, MANO DE OBRA Y !ERRAMIEN"AS.
DESRRAME Y RE"IRO DE ARBOL DE 10 M"S. DE AL"URAY 50 CMS. DE DIAME"RO, INCLUYE DERRI%O "O"AL DEL ARBOL, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA.
"ALA DE ARBOL DE 0.50 M DE DIAME"RO Y DE 3.5 M DE AL"URA. INCLUYE DESARRAME, DESENRAICE, MANO DE OBRA, !ERRAMIEN"AS Y ACARREOS DEN"RO Y #UERA DE LA OBRA.
 
INIFECH
INSTITUTO DE LA INFRAESTRUCTURA FISICA EDUCATIVA DEL ESTADO DE CHIAPAS 1
TABULADOR DE PRECIOS UNITARIOS 2013
 CODIGO CONCEPTO DE TRABAJO UNIDAD REGION 1 REGION 2 REGION 3 REGION 4 REGION 5 REGION 6 REGION 7
1101000139 PZA 1,308.71 1,308.71 1,308.53 1,308.53 1,309.27 1,309.27 1,308.75
1101000140 PZA 6,202.18 6,202.18 6,202.33 6,202.33 6,202.33 6,202.33 6,202.33
1101000141 DESMAN"ELAMIEN"O DE PLA#ON DE "ABLAROCA. INCLUYE !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA. M2 44.61 44.61 44.61 44.61 44.61 44.61 44.61
1101000142 PZA 55.57 55.57 55.57 55.57 55.57 55.57 55.57
1101000144 M2 22.07 22.07 22.07 22.07 22.07 22.07 22.07
1101000152 M3 81.44 81.44 81.44 81.44 81.44 81.44 81.44
1101000153 M2 37.81 37.81 37.81 37.81 37.81 37.81 37.81
1101000155 M2 15.88 15.88 15.88 15.88 15.88 15.88 15.88
1101000158 M2 45.64 45.64 45.64 45.64 45.64 45.64 45.64
1101000160 PZA 2,091.88 2,091.88 2,091.93 2,091.93 2,091.93 2,091.93 2,091.93
1101000164 M 64.70 64.70 64.70 64.70 64.70 64.70 64.70
1101000165 PZA 1,804.85 1,804.85 1,804.89 1,804.89 1,804.89 1,804.89 1,804.89
1101000166 PZA 1,118.79 1,118.79 1,118.82 1,118.82 1,118.82 1,118.82 1,118.82
1101000167 PZA 470.20 470.20 470.21 470.21 470.21 470.21 470.21
1101000168 M3 127.06 127.06 127.06 127.06 127.06 127.06 127.06
1101000169 PZA 193.10 193.79 195.37 194.24 197.55 196.69 192.36
1101000171 M3 919.23 919.23 919.25 919.25 919.25 919.25 919.25
1101000172 PZA 815.01 815.01 815.27 814.31 815.27 815.03 815.03
1101000173 DEMOLICION DE MUROS DE PIEDRA, INCLUYE ACARREO DE ESCOMBRO #UERA DE LA OBRA DEL MA"ERIAL NO U"ILIZABLE. M3 501.34 501.34 501.36 501.36 501.36 501.36 501.36 1101000174 M2 61.46 61.46 61.46 61.46 61.46 61.46 61.46
1101000175 M2 90.88 90.88 90.88 90.88 90.88 90.88 90.88
1101000176 M2 37.55 37.55 37.50 37.50 37.64 37.64 37.55
1101000177 M2 21.90 21.90 21.91 21.91 21.91 21.91 21.91
1101000178 M3 372.29 372.29 372.30 372.30 372.30 372.30 372.30
1101000179 RUP"URA DE PISO DE CONCRE"O DE 10 CMS DE ESPESOR, INCLUYE !ERRAMIEN"A, MANO DE OBRA Y ACARREOS DEN"RO Y #UERA DE LA OBRA M2 68.61 68.61 68.61 68.61 68.61 68.61 68.61
1101000180 M3 341.16 341.16 341.17 341.17 341.17 341.17 341.17
1101000181 M3 785.30 785.30 785.32 785.32 785.32 785.32 785.32
1101000185 M2 237.90 237.90 239.81 235.06 239.84 239.59 237.83
1101000186 M2 90.20 90.20 90.20 90.20 90.20 90.20 90.20
1101000187 M 110.62 111.88 116.76 113.42 121.20 119.93 110.12
1101000188 M2 58.66 58.66 58.66 58.66 58.66 58.66 58.66
1101000189 PZA 1,348.68 1,348.68 1,348.71 1,348.71 1,348.71 1,348.71 1,348.71
1101000190 M2 27.91 27.91 27.91 27.91 27.91 27.91 27.91
1101000191 PZA 126.47 126.47 126.47 126.47 126.47 126.47 126.47
1101000192 M2 36.61 36.61 36.61 36.61 36.61 36.61 36.61
1101000195 DEMOLICION DE CIS"ERNA DE 6 M3 INCLUYE MANO DE OBRA, !ERRAMIEN"A Y ACARREOS DEN"RO Y #UERA DE OBRA PZA 2,046.98 2,046.98 2,047.03 2,047.03 2,047.03 2,047.03 2,047.03
1101000196 DESMAN"ELAMIEN"O DE MURO A BASE DE "RIPLAY DE 16 MM. INCLUYE RECUPERACION DE MADERA, !ERRAMIEN"A, MANO DE OBRA Y ACARREOS M2 35.31 35.31 35.31 35.31 35.31 35.31 35.31
1101000197 PZA 4,096.79 4,096.79 4,096.90 4,096.90 4,096.90 4,096.90 4,096.90
"ALA DE ARBOLES DE 0.1 A 0.25 M. DE DIAME"RO, INCLUYE DESRAME, CARGA Y DESCARGA, !ERRAMIEN"A, MANO D EOBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA CON MADERA "ROCEADA, CONSIDERAR LA E$"RACCION DE "RONCOS Y DESENRRAICE.
DERRI%O DE PALMERAS DE 12.00 M"S DE AL"URA CON U"ILIZACION DE GRUA DE 8 "ONELAS, INCLUYE MANIOBRAS, "ROCEADO DE "RONCO CON MO"OSIERRA, ACARREO DE MA"ERIAL DEN"RO Y #UERA DE LA OBRA, ANDAMIOS, MANO DE OBRA Y !ERRAMIEN"AS.
DESMAN"ELAMIEN"O Y RE"IRO DE PUER"A ME"ALICA DE 1.600.60 M"S. EN MAMPARA DE CONCRE"O ARMADO, INCLUYE ACARREOS DEN"RO Y #UERA DE LA OBRA, !ERRAMIEN"A, Y MANO DE OBRA.
DESMAN"ELAMIEN"O DE DUELA DE "RIPLAY MAC!IMBRADA, INCLUYE BAS"IDOR, LIMPIEZA DEL AREA, !ERRAMIEN"A, MANO DE OBRA, ACARREOS DEN"RO Y #UERA DE LA OBRA.
E$CA%ACION EN MA"ERIAL /B/, "ODAS LAS ZONAS POR MEDIOS MECANICOS. INCLUYE E&UIPO. ACARREOS, RE"IRO DEL MA"ERIAL #UERA DE LA OBRA.
DEMOLICION DE MUROS DE "ABI&UE O BLOCK CON RECUBRIMIEN"O DE AZULE*O EN AMBAS CARAS. INCLUYE !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
DESMON"E DE MALEZA DE !AS"A 1.90 M DE AL"URA CON AYUDA DE E&UIPO MECANICO DESPALMANDO EL "ERRENO PARA PODER "RAZAR Y E$CA%AR LINEA DE CONDUCCION !IDRAULICA, INCLUYE !ERRAMIEN"A, MANO DE OBRA, "RASPALEOS, ACARREOS DEN"RO Y #UERA DE LA OBRA.
RE"IRO DE PIN"URA ESMAL"E E$IS"EN"E !AS"A 4 CAPAS DE PIN"URA U"ILIZANDO REMO%EDOR, "!INNER PARA LIMPIEZA Y ES"OPA. INCLUYE MA"ERIAL, MANO DE OBRA, !ERRAMIEN"AS Y ACARREOS DEN"RO Y #UERA DE LA OBRA.
DERRIBE DE ARBOL DE 6.00 M"S. DE AL"URA CON !ERRAMIEN"A DE MANO '!AC!A(, INCLUYE DESRAME, E$"RACCION DE "OCONES DE 1.20 M"S. DE PERIME"RO Y 1.20 M"S. DE PRO#UNDIDAD, ASI COMO EL RE"IRO DEL MISMO #UERA DE LA OBRA.
DEMOLICION DE CE*A PERIME"RAL DE CONCRE"O ARMADO DE 25 CMS. INCLUYE MANO DE OBRA, !ERRAMIEN"AS Y ACARREOS DEN"RO Y #UERA DE LA OBRA.
"ALA DE ARBOLES Y ARBUS"OS DE DIAME"ROS EN"RE 60 Y 70 CMS, Y 7 A 8 M"S DE AL"URA, &UE SE LOCALICEN DEN"RO DEL AREA DE CONS"RUCCION, INCLUYE ACARREOS IN"ERNOS Y RE"IRO DE MA"ERIAL PRODUC"O DE LA "ALA #UERA DE LA OBRA, MANO DE OBRA, E&UIPO Y !ERRAMIEN"A,.
"ALA DE ARBOLES Y ARBUS"OS DE DIAME"ROS EN"RE 20 Y 30 CMS, Y 2 A 3 M"S DE AL"URA, &UE SE LOCALICEN DEN"RO DEL AREA DE CONS"RUCCION, INCLUYE ACARREOS IN"ERNOS Y RE"IRO DE MA"ERIAL PRODUC"O DE LA "ALA #UERA DE LA OBRA, MANO DE OBRA, E&UIPO Y !ERRAMIEN"A,.
"ALA DE ARBOLES DE 30 A 40 CMS. DE DIAME"RO, INCL. "ROCEADO DE ARBOL, ACARREO #UERA DE LA OBRA, MANO DE OBRA Y !ERRAMIEN"A  NECESARIA. 'NO INCL. "OCON(
E$CA%ACION A MANO EN "ERRENO IN%ES"IGADO EN OBRA, 0.00 A 2.00 M"S DE PRO#UNDIDAD SECCION OBLIGADA. CON SA"URACION DE RAIZ. INCLUYE RA"IRO DE RAIZ, A#INE DE "ALUDES, ACARREOS #UERA Y DEN"RO DE LA OBRA, MANO DE OBRA, !ERRAMIEN"A, "RASPALEOS, A#INES DE #ONDO Y AC!I&UES.
DESMON"A*E DE BASE DE "ELE%ISOR. INCLUYE RESANE CON MOR"ERO CEMARENA 15, MA"ERIAL, MANO DE OBRA, !ERRAMIEN"AS Y ACARREOS DEN"RO Y #UERA DE LA OBRA.
DEMOLICION DE LE"RINA E$IS"EN"E, INCLUYE DEMOLICION DE CIMIEN"OS, MURO DE "ABI&UE, CADENAS, CAS"ILLOS, LOSA, PISO DE CONCRE"O, DESMON"A*E DE MUEBLES SANI"ARIOS, !ERRAMIEN"A, MANO DE OBRA, ACARREOS DEN"RO Y #UERA DE LA OBRA.
DESMAN"ELAMIEN"O DE LE"RINA E$IS"EN"E, INCLUYE DESMAN"ELAMIEN"O DE "EC!UMBRE DE LAMINA Y PUER"AS, !ERRAMIEN"AS, MANO DE OBRA, ACARREOS DEN"RO Y #UERA DE LA OBRA.
DESMAN"ELAMIEN"O DE PLA#ON DE MADERA A BASE DE DUELA, !AS"A 3.0 M"S DE AL"URA, INCLUYE !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
DESMAN"ELAMIEN"O DE PUER"A, %EN"ANA Y POR"ONES, MARCO, CON"RAMARCOS, A BASE DE PER#IL "UBULAR, DE 2.5 $ 5 CMS. DE ESPESOR INCLUYE !ERRAMIEN"A, MANO DE OBRA Y "ODO LO NECESARIO PARA SU E*ECUCION.
DESMAN"ELAMIEN"O DE CANCELERIA DE ALUMINIO SIN RECUPERACION DEL MA"ERIAL, INCLUYE !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
DESMAN"ELAMIEN"O DE CRIS"AL CLARO DE 6 MM EN #I*OS SIN RECUPERACION DEL MA"ERIAL, INCLUYE !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
DEMOLICION DE CONCRE"O #C 250 KG+CM2 EN CIMEN"ACIONES INCLUYE MANO DE OBRA, !ERRAMIEN"A Y ACARREOS DEN"RO Y #UERA DE OBRA
DESASOL%E DE LOSA DE AZO"EA DEL PRODUC"O DEL MA"ERIAL %EGE"AL ACUMULADO SOBRE LA MISMA CON UN ESPESOR PROMEDIO DE 30 CMS.INCLUYE BA*AR EL MA"ERIAL !AS"A LA PLAN"A BA*A,!ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
DEMOLICION DE MURO DE CONCRE"O ARMADO CON UN ESPESOR DE 0.20 M. INCLUYE MANO DE OBRA, !ERRAMIEN"AS, ACARREOS DEN"RO DE LA OBRA, !AS"A 60 M. Y #UERA DE LA OBRA ACARREO LIBRE, INCLUYEN ZAPA"AS DE CONCRE"O ARMADO, CON"RA#UER"ES DE CONCRE"O ARMADO CON MEDIADAS 0.200.50M, CADENAS Y CAS"ILLOS DE 1520 CM. NO INCLUYE E$CA%ACIONES
CONS"RUCCION DE ADEME A BASE DE CIMBRA COMUN PARA E%I"AR AZOL%E EN AREA DE CONS"RUCCION DE MURO DE CON"ENSION Y CON"ENER "ALUD. INCLUYE CIMBRA, BARRO"ES, POLINES, MA"ERIAL, MANO DE OBRA, !ERRAMIEN"AS Y ACARREOS DEN"RO Y #UERA DE LA OBRA.
DEMOLICION DE LOSA "APA DE CIS"ERNA DE CONCRE"O ARMADO DE 5.004.000.20 M"S CON %ARILLA N. 4 A 0.20 CMS. INCLUYE MANO DE OBRA, !ERRAMIEN"AS, #LE"ES Y ACARREOS Y COR"E DE %ARILLAS Y RE"IRO DE MA"ERIALES SOBRAN"ES #UERA Y DEN"RO DE LA OBRA.
DESMON"A*E DE MALLA CICLONICA, ALAMBRADO DE PUAS, E$IS"EN"ES EN COLINDANCIA DEL PLAN"EL !AS"A UNA AL"URA DE 2.50 M"S CON RECUPERACION. INCLUYE DEMOLICION DE MUROS DONDE SE ENCUEN"RA A!OGADO, CON UN ESPESOR DE 0.401.05 M"S, ACARREOS DEN"RO Y #UERA DE LA OBRA, MANO DE OBRA, !ERRAMIEN"A, CONCRE"O #;C100 KG+CM2, COLOCACION DE MALLA CICLONICA PRO%ISIONAL A UN ME"RO DEL E*E &UE SE RE"IRO.
DEMOLICION DE "AN&UE SUPER#ICIAL DE MUROS DE "ABI&UE , CADENAS Y CAS"ILLOS DE CONCRE"O ARMADO DE 1.801.301.20 M"S. INCLUYE MANO DE OBRA, !ERRAMIEN"AS, #LE"ES Y ACARREOS Y RE"IRO DE MA"ERIALES SOBRAN"ES #UERA Y DEN"RO DE LA OBRA.
DEMOLICION DE POZO ABSORCION DE 2.002.40 M"S DE ALRU"A !EC!O CON "ABICON DE CONCRE"O SIMPLE. INCLUYE MANO DE OBRA, !ERRAMIEN"AS, DESASOL%E DE LODOS POR MEDIO DE BOMBEO DE AC!I&UE, LA DEMOLICION Y EL RE"IRO DE MA"ERIAL SOBRAN"E #UERA Y DEN"RO DE LA OBRA.
DESMAN"ELAMIEN"O DE "E*A DE BARRO DE 0.40$0.15 M"S. E$IS"EN"E EN LOSA DE AZO"EA. INCLUYE DEMOLICION DE MOR"ERO CEMARE 15, !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
DESMON"A*E Y MON"A*E DE LUMINARIAS E$IS"EN"ES A CUAL&UIER AL"URA, INCLUYE LIMPIEZA GENERAL, INS"ALACIONES, PRUEBAS, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA, "ODO LO NECESARIO PARA SU BUEN #UNCIONAMIEN"O.
RE"IRO DE IMPERMEABILIZAN"E EN #RIO A BASE DE DOS MEMBRANAS, PIN"URA, RASPADO CON CEPILLO DE ALAMBRE, LIMPIEZA, BA*AR EL MA"ERIAL DESMAN"ELADO DE LA AZO"EA A BASE DE CUBE"AS Y CUERDA, ACARREO A 20 M"RS, !AS"A 6 M"RS DE AL"URA, INCL. MANO DE OBRA
 
INIFECH
INSTITUTO DE LA INFRAESTRUCTURA FISICA EDUCATIVA DEL ESTADO DE CHIAPAS 1
TABULADOR DE PRECIOS UNITARIOS 2013
 CODIGO CONCEPTO DE TRABAJO UNIDAD REGION 1 REGION 2 REGION 3 REGION 4 REGION 5 REGION 6 REGION 7
1101000199 PZA 1,706.03 1,706.03 1,706.08 1,706.08 1,706.08 1,706.08 1,706.08
1101000200 PZA 3,519.98 3,519.98 3,520.07 3,520.07 3,520.07 3,520.07 3,520.07
1101000204 M 20.59 20.59 20.59 20.59 20.59 20.59 20.59
1101000205 M 23.94 23.94 23.95 23.95 23.95 23.95 23.95
1101000206 PZA 432.72 432.72 432.73 432.73 432.73 432.73 432.73
1101000206 PZA 432.72 432.72 432.73 432.73 432.73 432.73 432.73
1101000209 M 124.37 124.91 126.82 125.52 128.60 128.07 123.62
1101000215 M2 10.95 10.99 11.17 11.11 11.29 11.24 10.94
1101000216 M2 17.81 17.81 17.81 17.81 17.81 17.81 17.81
1101000217 M3 27.90 27.90 27.91 27.91 27.91 27.91 27.91
1101000218 M2 99.67 99.67 99.67 99.67 99.67 99.67 99.67
1101000224 )2 64.26 64.26 64.25 64.25 64.30 64.30 64.26
1101022405 PZA 2,223.26 2,223.26 2,223.31 2,223.31 2,223.31 2,223.31 2,223.31
1102000010 M3 1,385.67 1,385.67 1,385.70 1,385.70 1,385.70 1,385.70 1,385.70
1102000011 M3 99.66 99.66 99.66 99.66 99.66 99.66 99.66
1102000012 M3 20.82 20.82 20.82 20.82 20.82 20.82 20.82
1102000013 M3 394.45 394.45 394.46 394.46 394.46 394.46 394.46
1102000019 M3 280.47 280.47 280.48 280.48 280.48 280.48 280.48
1102000021 M3 221.55 221.55 221.56 221.56 221.56 221.56 195.24
1102000022 M3 173.84 173.84 173.93 173.83 173.93 173.92 173.85
1102000023 M3 412.39 412.39 412.40 412.40 412.40 412.40 412.40
1102000025 M3 227.18 227.18 227.18 227.18 227.18 227.18 227.18
1102000031 M3 367.50 367.50 367.51 367.51 367.51 367.51 367.51
1102000032 M3 420.67 420.67 420.76 420.66 420.76 420.74 420.68
1102000033 M3 118.61 118.61 118.61 118.61 118.61 118.61 118.61
1102000034 M3 289.89 289.89 289.90 289.90 289.90 289.90 289.90
1102000036 M3 61.67 61.67 61.67 61.67 61.67 61.67 61.67
1102000037 M3 155.91 155.91 155.91 155.91 155.91 155.91 155.91
1102000038 M3 193.94 193.94 193.95 193.95 193.95 193.95 193.95
1102000039 M3 141.37 141.37 141.37 141.37 141.37 141.37 141.37
1102000045 M3 472.12 472.12 472.13 472.13 472.13 472.13 472.13
DERRIBO DE ARBOLES E$IS"EN"ES DE 2.80 A 1.65 M"S DE PERIME"RO Y 9.50 M"S DE AL"URA, PARA LA LIMPIEZA DE LA ZONA DE "RAZO DE EDI#ICIO, CON MO"OSIERRA ,INCLUYE DESRAME, COR"ES, MANIOBRAS EN AL"URAS, ACORDONAMIEN"O DEL AREA DE "RABA*O, 'ESCUELA EN #UNCIONAMIEN"O NORMAL( Y DERRIBO DE ARBOL !AS"A 80 CMS ARRIBA DEL NI%EL DE "ERRENO NA"URAL, ACARREOS DE "ODO EL MA"ERIAL PRODUC"O DE EL DERRIBO DE ARBOL !AS"A EL BASURERO MUNICIPAL, INCLUYE "RAMI"ES AN"E EL AYUN"AMIEN"O MUNICIPAL.
"RABA*OS DE DES"RONCONAMIEN"O DE ARBOLES DE 2.80 !AS"AS 1.65 M"S DE PERIME"RO Y 80 CMS DE AL"URA DEL NI%EL DE "ERRENO NA"URAL, !AS"A LA PRO#UNDIDAD DE 1.50 M"S &UE ES LA PRO#UNDIDAD DE EL DESPLAN"E DE EL EDI#ICIO, INCLUYE EL RE"IRO DE LAS RAICES, ACARREOS #UERA DE LA OBRA !AS"A EL BASURERO MUNICIPAL, INCLUYE, E$CA%ACION NECESARIA Y DEMOLICIONES DE ES"RUC"URA DE CONCRE"O ENCON"RADA EN EL LUGAR. E&UIPO, !ERRAMIEN"A Y MANO DE OBRA
DEMOLICION DE CE*A PERIME"RAL DE CONCRE"O #C150 KG+CM2 DE 20 CMS. DE ANC!O Y 10 CMS. DE ESPESOR, INCLUYE !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
RE"IRO Y DESMAN"ELAMIEN"O DE MALLA CICLON PARA CERCADO PERIME"RAL DE 2.00 M"S. DE AL"URA INCLUYE MANO DE OBRA, !ERRAMIEN"A, ACARREOS #UERA Y DEN"RO DE LA OBRA Y "ODO LO NECESARIO PARA SU CORREC"A E*ECUCIN.
"ALA DE :RBOLES DE 0.10 A 0.25 M"S. DE DIAME"RO DE "RONCO MEDIDO A 1.00 ME"RO DEL NI%EL DEL "ERRENO NA"URAL, CON DERRIBE, DESRAME, CARGA , ACARREO Y DESCARGA DEN"RO DE LA OBRA, CON MADERA "ROCEADA A DISPOSICIN DE LA DEPENDENCIA, INCLUYE !ERRAMIEN"A MENOR, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA Y "ODO LO NECESARIO PARA SU CORREC"A E*ECUCION.'NO SE INCLUYE E$"RACCIN DE "RONCOS NI DESENRAICE(
"ALA DE :RBOLES DE 0.10 A 0.25 M"S. DE DIAME"RO DE "RONCO MEDIDO A 1.00 ME"RO DEL NI%EL DEL "ERRENO NA"URAL, CON DERRIBE, DESRAME, CARGA , ACARREO Y DESCARGA DEN"RO DE LA OBRA, CON MADERA "ROCEADA A DISPOSICIN DE LA DEPENDENCIA, INCLUYE !ERRAMIEN"A MENOR, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA Y "ODO LO NECESARIO PARA SU CORREC"A E*ECUCION.'NO SE INCLUYE E$"RACCIN DE "RONCOS NI DESENRAICE(
RANURADO DE PISO DE CONCRE"O ANC!O DE 5 A 10 CMS, Y ESPESOR DE 10 CMS. PARA OCUL"AR "UBERIA ELEC"RICA, INCLUYE RELLENO, RESANE CON CONCRE"O #C100 KG+CM2, MA"ERILAES, !ERRAMIEN"AS, MANO DE OBRA Y ACARREOS DEN"RO Y #UERA DE LA OBRA.
"RAZO, NI%ELACIN Y %ERI#ICACIN PERMANEN"E CON E&UIPO DE "OPOGRA#<A DE AL"A PRECISIN, ES"ABLECIENDO E*ES DE RE#ERENCIA Y BANCOS DE NI%EL, INCLUYE MA"ERIALES, !ERRAMIEN"A, E&UIPO, PLANOS EN #ORMA"O ELEC"RNICO Y MANO DE OBRA AS< COMO LO NECESARIO PARA SU CORREC"A E*ECUCIN EN PIS"A DE A"LE"ISMO 'GUARNICIONES, DREN PERIME"RAL DE DESAG=E Y GUARNICIONES EN CA*A DE SAL"O Y RIAS( CON "OLERANCIAS M:$IMAS SEG>N ESPECI#ICACIONES ES"ABLECIDAS POR LA IAA#.
DESPALME DE "ERRENO, CAPA %EGE"AL, ARCILLA, "EZON"LE EN :REA DE PIS"A Y MEDIAS LUNAS DE 20 CMS. DE ESPESOR CON MEDIOS, MEC:NICOS INCLUYE ACARREO A 100 M"S. CON MEDIOS MEC:NICOS EN "ERRENO PLANO !ERRAMIEN"A, E&UIPO Y MANO DE OBRA.
E$CA%ACIN EN CA*A PARA ME*ORAMIEN"O DE "ERRENO, DE 0.00 A 60CMS APRO$IMADAMEN"E DE PRO#UNDIDAD POR MEDIOS MEC:NICOS "ODAS LAS ZONAS MA"ERIAL SECO "IPO II, INCLUYE !ERRAMIEN"A, E&UIPO Y MANO DE OBRA AS< COMO "ODO LO NECESARIO PARA SU CORREC"A E*ECUCIN.
PLA"A#ORMA BASE PARA SUPER#ICIES DEPOR"I%AS A BASE DE MA"ERIAL CON"ROLADO DE LA REGIN A UN ESPESOR PROMEDIO DE 20 CM. COMPAC"ADO AL 90 ? PPS, INCLUYE NI%ELACIN CON E&UIPO DE "OPOGRA#<A 2.00 M, MA"ERIALES, MANO DE OBRA, E&UIPO Y CONSUMIBLES.
DESMAN"ELAMIEN"O DE MUEBLE !EC!O EN OBRA A BASE DE "ABLA ROCA INCLUYE !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA.
DESRRAME DE ARBOLES DE 1.50 A 10.00 M"S., DE AL"URA INCLUYE "ROCEADO DE RAMAS, ACAREOS #UERA DE LA OBRA A 20 M, !ERRAMIEN"A MENOR, MANO DE OBRA Y "ODO LO NECESARIO PARA SU CORREC"A E*ECUCION.
E$CA%ACIN A MANO "ERRENO "IPO /A/ IN%ES". EN OBRA, CUAL&. PRO#. INCL. A#INE DE "ALUD. Y ACARR. DEN"RO Y #UERA DE OBRA DEL MA"ERIAL  NO U"ILIZADO.
E$CA%ACION A MANO EN "ERRENO "IPO /A/ DE 0.0 A 2.00 M"S. DE PRO#UNDIDAD SECCION OBLIGADA, INCLUYE AC!I&UE, A#INE DE "ALUDES, ADEME, "RASPALEO, DESASOL%E, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA, "RASPALEOS Y A#INES DE #ONDO.
E$CA%ACION CON AYUDA DE E&UIPO MECANICO 'COMPRESOR CON RO"OMAR"ILLO( EN "ERRENO "IPO / C / 'ROCA MACIZA(, 0.00 A 2.00 M"S. DE PRO#UNDIDAD SECCION OBLIGADA, INCLUYE A#INE DE "ALUDES, ACARREOS #UERA Y DEN"RO DE LA OBRA, !ERRAMIEN"A, "RASLAPEOS, A#INES DE #ONDO Y AC!I&UE.
E$CA%ACION EN "ERRENO "IPO /C/ CON MAR"ILLO !IDRAULICO MON"ADO EN RE"ROE$CA%ADORA, DE 0.0 A 2.00 M"S. DE PRO#UNDIDAD SECCION OBLIGADA, INCLUYE E$"RACCION DE REZAGA, A#INE DE #ONDO Y "ALUDES, "RASPALEO, DESASOL%E, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA.
E$CA%ACION A MANO EN "ERRENO "IPO /C/ A"ACADO CON MEDIOS MECANICOS INCLUYE AC!I&UE, A#INE DE "ALUDES, ADEME, "RASPALEO, DESASOL%E,RE"IRO DE PIEDRA Y REZAGA #UERA DEL AREA DE MANIOBRAS !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA, "RASPALEOS Y A#INES DE #ONDO.
E$CA%ACION A MANO EN "ERRENO IN%ES"IGADO EN OBRA, DE 0.0 A 2.00 M"S. DE PRO#UNDIDAD SECCION OBLIGADA. INCLUYE AC!I&UE, A#INE DE "ALUDES, ADEME, "RASPALEO, DESASOL%E, ACARREOS #UERA Y DEN"RO DE LA OBRA, MANO DE OBRA, !ERRAMIEN"A, "RASPALEOS, A#INES DE #ONDO Y AC!I&UES.
E$CA%ACION A MANO EN "ERRENO IN%ES"IGADO EN OBRA, MAYOR DE 2.00 M"S DE PRO#UNDIDAD SECCION OBLIGADA. INCLUYE A#INE DE "ALUDES, ACARREOS #UERA Y DEN"RO DE LA OBRA, MANO DE OBRA, !ERRAMIEN"A, "RASPALEOS, A#INES DE #ONDO Y AC!I&UES.
E$CA%ACION A MANO CON MARRO Y CU@A EN PIEDRA DE 0.00 A 2.00 M"S. DE PRO#UNDIDAD, SECCION OBLIGADA INCL. A#INE DE "ALUDES, ACARREOS #UERA Y DEN"RO DE LA OBRA, MANO DE OBRA, !ERRAMIEN"A, "RASPALEOS Y A#INE DE #ONDO.
E$CA%ACION A MANO EN "ERRENO "IPO /B/ DE 0.0 A 2.00 M"S. DE PRO#UNDIDAD SECCION OBLIGADA INCLUYE AC!I&UE, A#INE DE "ALUDES, ADEME, "RASPALEO, DESASOL%E, , !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA, "RASPALEOS Y A#INES DE #ONDO.
E$CA%ACION A MANO EN "ERRENO "IPO /C/ DE 0.0 A 2.00 M"S. DE PRO#UNDIDAD SECCION OBLIGADA INCLUYE AC!I&UE, A#INE DE "ALUDES, ADEME, "RASPALEO, DESASOL%E, , !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA, "RASPALEOS Y A#INES DE #ONDO.
E$CA%ACION A MANO EN "ERRENO "IPO /C/ A CUAL&UIER PRO#UNDIDAD SECCION OBLIGADA INCLUYE AC!I&UE, A#INE DE "ALUDES, ADEME, "RASPALEO, DESASOL%E, , !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA, "RASPALEOS Y A#INES DE #ONDO.
E$CA%ACION EN "ERRENO "IPO /B/ EN SECO DE 0.0 A 2.00 M"S. DE PRO#UNDIDAD, CON AU$ILIO DE E&UIPO NEUMA"ICO, INCL. "RASPALEOS, A#INES DE #ONDO, AC!I&UE, A#INE DE "ALUDES, ADEME, DESASOL%E, !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
E$CA%ACION A MANO EN "ERRENO "IPO /C/ CON MARRO, CU@A, BARRE"A O BARRE"ON SEGUN SEA EL CASO, A CUAL&UIER PRO#UNDIDAD SECCION OBLIGADA, INCLUYE AC!I&UE, A#INE DE "ALUDES, ADEME, "RASPALEO, A#INES DE #ONDO, DESASOL%E, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA.
E$CA%ACION A MA&UINA EN CA*A, MA"ERIAL "IPO /B/, EN SECO, A CUAL&UIER PRO#UNDIDAD INCLUYE COR"E, ACAMELLONADO DE MA"ERIAL, AC!I&UE, A#INE DE "ALUDES, ADEME, "RASPALEO, DESASOL%E, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA, %OLUMEN MEDIDO EN BANCO.
E$CA%ACION A MANO PARA DESPLAN"E EN ES"RUC"URAS, EN MA"ERIAL /B/, EN SECO, CON A#LO*E Y E$"RACCION DEL MA"ERIAL, AMACICE O LIMPIEZA DE PLAN"ILLA Y "ALUDES, REMOCION, ACARREO !AS"A 10 M. DEN"RO DE LA MISMA Y "RASLAPEOS %ER"ICALES PARA SU E$"RACCION E$CA%ACION DE 0.00 A 2.00 M. DE PRO#UNDIDAD.
E$CA%ACION SIN USO DE E$PLOSI%OS Y E$"RACCION DE REZAGA A MANO PARA DESPLAN"E DE ES"RUC"URAS, EN MA"ERIAL /C/, EN SECO, A#LO*E Y E$"RACCION DEL MA"ERIAL CON E&UIPO !IDRONEUMA"ICO, AMACICE O LIMPIEZA DE PLAN"ILLA Y "ALUDES Y REMOCION E$CA%ACION DE 0.00 A 2.00 M DE PRO#UNDIDAD.
E$CA%ACION CON MA&UINARIA A CIELO ABIER"O, EN AREA DE *ARDINERAS, EN MA"ERIAL IN%ES"IGADO EN OBRA, A CUAL&UIER PRO#UNDIDAD INCLUYE COR"E, ACAMELLONADO DE MA"ERIAL, MANO DE OBRA, ACARREOS DEN"RO Y #UERA DE LA OBRA
 
INIFECH
INSTITUTO DE LA INFRAESTRUCTURA FISICA EDUCATIVA DEL ESTADO DE CHIAPAS 1
TABULADOR DE PRECIOS UNITARIOS 2013
 CODIGO CONCEPTO DE TRABAJO UNIDAD REGION 1 REGION 2 REGION 3 REGION 4 REGION 5 REGION 6 REGION 7
1102000051 M3 174.15 174.15 174.15 174.15 174.15 174.15 174.15
1102000052 M3 170.28 170.28 170.28 170.28 170.28 170.28 170.28
1102000053 M3 85.44 85.44 85.44 85.44 85.44 85.44 85.44
1102000054 M3 320.22 320.22 320.23 320.23 320.23 320.23 320.23
1102000055 M3 126.01 126.01 126.01 126.01 126.01 126.01 126.01
1102000056 M3 178.30 178.30 178.30 178.30 178.30 178.30 178.30
1102000057 M3 356.56 356.56 356.57 356.57 356.57 356.57 356.57
1102000058 M3 179.62 179.62 179.63 179.63 179.63 179.63 179.63
1102000059 M3 216.58 216.58 216.59 216.59 216.59 216.59 216.59
1102000060 M3 197.00 197.00 197.00 197.00 197.00 197.00 197.00
1102000061 M3 137.22 137.22 137.22 137.22 137.22 137.22 137.22
1102000062 M3 220.39 220.39 220.40 220.40 220.40 220.40 220.40
1102000063 M3 397.71 397.71 397.72 397.72 397.72 397.72 397.72
1102000081 M3 41.34 41.34 41.34 41.34 41.34 41.34 41.34
1102000082 M3 296.78 296.78 296.79 296.79 296.79 296.79 296.79
1102000083 M3 365.39 365.39 365.40 365.40 365.40 365.40 365.40
1102000084 M3 446.98 446.98 446.99 446.99 446.99 446.99 446.99
1102000085 M3 585.31 585.31 585.33 585.33 585.33 585.33 585.33
1102000111 M3 125.04 125.04 125.08 125.04 125.08 125.07 125.04
1102000112 "RASPALEO 2.00) %ER".3.00) !"AL MA" III M3 31.91 31.91 31.91 31.91 31.91 31.91 31.91 1102000113 "RASPALEO 2.00) %ER".3.00) !"AL MA" III M3 41.57 41.57 41.57 41.57 41.57 41.57 41.57 1102000114 "RASPALEO !"AL MA" I ABUND DIS" 3.00) M3 31.91 31.91 31.91 31.91 31.91 31.91 31.91
1102000115 "RASPALEO !"AL MA" II ABUND DIS" 3.00) M3 39.88 39.88 39.88 39.88 39.88 39.88 39.88 1102000116 "RASPALEO !"AL MA" IIA ABUND DIS" 3.00) M3 41.57 41.57 41.57 41.57 41.57 41.57 41.57 1102000117 "RASPALEO %"AL MA" I ABUND AL" 2.00) M3 64.71 64.71 64.71 64.71 64.71 64.71 64.71
1102000118 "RASPALEO %"AL MA" II ABUND AL" 2.00) M3 40.85 40.85 40.85 40.85 40.85 40.85 40.85 1102000119 "RASPALEO %"AL MA" IIA ABUND AL" 2.00) M3 42.90 42.90 42.90 42.90 42.90 42.90 42.90 1102000120 "RASPALEO !"AL MA" III ABUND AL" 2.00) M3 171.52 171.52 171.53 171.53 171.53 171.53 171.53 1102000121 EN"ARIMADO P+"RASP %ER" E$C 24) AL" M3 53.42 53.42 53.49 53.40 53.49 53.48 53.42
1102000122 EN"ARIMADO P+"RASP %ER" E$C 46) AL" M3 129.32 129.32 129.79 129.20 129.79 129.68 129.32 1102000123 A#INE E$C MA" I 10) PROM !2.00) M2 9.80 9.80 9.80 9.80 9.80 9.80 9.80 1102000124 A#INE E$C MA" I 10) PROM !4.00) M2 25.15 25.15 25.16 25.15 25.16 25.16 25.15 1102000125 A#INE E$C MA" II 10CM PROM !2.00) M2 19.06 19.06 19.06 19.06 19.06 19.06 19.06
1102000126 A#INE E$C MA" II 10CM PROM !4.00) M2 25.74 25.74 25.75 25.74 25.75 25.75 25.74 1102000127 M3 308.41 308.41 308.42 308.42 308.42 308.42 308.42
1102000128 M3 343.03 343.03 343.04 343.04 343.04 343.04 343.04
1102000129 M3 108.24 108.24 108.24 108.24 108.24 108.24 108.24
1102000130 COR"E DE "ERRENO CON AU$ILIO DE E&UIPO MECANICO, INCLUYE ACAMELLONADO DE MA"ERIAL, ACARREOS #UERA Y DEN"RO DE LA OBRA. M3 320.08 320.08 320.09 320.09 320.09 320.09 320.09
1102000131 M3 80.18 80.18 80.19 80.19 80.19 80.19 80.19
1102000132 M2 35.32 35.32 35.32 35.32 35.32 35.32 35.32
1102000133 PZA 291.70 291.70 291.70 291.70 291.70 291.70 291.70
1102000134 PZA 114.33 114.33 114.33 114.33 114.33 114.33 114.33
1102000135 PZA 240.12 240.12 240.13 240.13 240.13 240.13 240.13
1102000136 SAL 219.00 219.00 219.00 219.00 219.00 219.00 219.00
E$CA%ACION A MANO EN "ERRENO IN%ES"IGADO EN OBRA PARA #ORMACION DE PLAZAS CI%ICAS, CANC!AS DEPOR"I%AS Y DESPLAN"E DE EDI#ICIOS, A CUAL&UIER PRO#UNDIDAD INCLUYE AC!I&UE, A#INE DE "ALUDES, ADEME, "RASPALEO, DESASOL%E, ACARREOS #UERA Y DEN"RO DE LA OBRA, !ERRAMIEN"A Y MANO DE OBRA.
E$CA%ACION EN "ERRENO IN%ES"IGADO EN OBRA DE 0.0 A 2.50 M"S. DE PRO#UNDIDAD SECCION OBLIGADA PARA DESPALME DE EDI#ICIOS, PLAZAS CI%ICAS Y CANC!AS DEPOR"I%AS, INCLUYE DESPALME DE "ERRENO, A#INE DE "ALUDES, A#INE DE #ONDO, "RASPALEOS,AC!I&UE, A#INE DE "ALUDES, ADEME, DESASOL%E, !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
E$CA%ACION EN "ERRENO IN%ES"IGADO EN OBRA A CUAL&UIER PRO#UNDIDAD CON AYUDA DE E&UIPO MACANICO, INCLUYENDO "RASPALEOS A#INE DE #ONDO, AC!I&UE, A#INE DE "ALUDES, ADEME, "RASPALEO, DESASOL%E, !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
E$CA%ACION PARA COR"E DE "ERRENO SUPER#ICIE CON PIEDRA Y CON DEMASIADO LODO EN "ERRENO IN%ES"IGADO EN OBRA DE 0.00 A 2.50 M"S. DE PRO#UNDIDAD CON AYUDA DE E&UIPO MACANICO, INCLUYENDO "RASPALEOS, DESAZOL%ES, A#INE DE #ONDO, "ALUDES, !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
E$CA%ACION EN "ERRENO "IPO C EN SECO A CUAL&UIER PRO#UNDIDAD CON AYUDA DE E&UIPO MACANICO, INCLUYENDO "RASPALEOS A#INE DE #ONDO, AC!I&UE, A#INE DE "ALUDES, ADEME, "RASPALEO, DESASOL%E, !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
E$CA%ACION A MA&UINA EN CA*A, MA"ERIAL "IPO /B/ CON AL"O CON"ENIDO DE AGUA, INCLUYE COR"E, ACAMELLONADO DEL MA"ERIAL Y ACARREOS #UERA Y DEN"RO DE LA OBRA, ACARREO DEL 100? DEL MA"ERIAL PRODUC"O DEL COR"E A #UERA DE LA OBRA '9 KMS. PROMEDIO( %OLUMEN MEDIDO EN BANCO.
E$CA%ACION A MANO EN "ERRENO "IPO /C/ A BASE DE MARRO, PUNZON Y UNIDAD !IDRAULICA DE 13 !P C+ MANGUERA Y MAR"ILLO, DE 0.00 A 2.00 M"S DE PRO#UNDIDAD SECCION OBLIGADA. INCLUYE A#INE DE "ALUDES, ACARREOS #UERA Y DEN"RO DE LA OBRA, MANO DE OBRA, !ERRAMIEN"A, "RASPALEOS, A#INES DE #ONDO Y AC!I&UES.
E$CA%ACION A MANO EN "ERRENO "IPO /B/ PARA #ORMACION DE PLAZAS CI%ICAS, CANC!AS DEPOR"I%AS Y DESPLAN"E DE EDI#ICIOS, A CUAL&UIER PRO#UNDIDAD INCLUYE ACARREOS #UERA Y DEN"RO DE LA OBRA, !ERRAMIEN"A Y MANO DE OBRA.
E$CA%ACION CON MEDIOS MECANICOS EN "ERRENO "IPO /C/ DE 0.0 A 2.00 M"S. DE PRO#UNDIDAD SECCION OBLIGADA INCLUYE A#INE DE "ALUDES, ACARREOS DEN"RO Y #UERA DE LA OBRA, MANO DE OBRA, !ERRAMIEN"AS, "RASPALEOS, A#INE DE #ONDO Y AC!I&UES.
E$CA%ACION CON MEDIOS MECANICOS EN "ERRENO "IPO /C/ PARA #ORMACION DE PLAZAS CI%ICAS, CANC!AS DEPOR"I%AS Y DESPLAN"E DE EDI#ICIOS, A CUAL&UIER PRO#UNDIDAD. INCLUYEA#INE DE "ALUDES, ACARREOS #UERA Y DEN"RO DE LA OBRA, !ERRAMIEN"A Y MANO DE OBRA, "RASPALEOS, A#INE DE #ONDOS Y AC!I&UES.
E$CA%ACION A MANO EN "ERRENO IN%ES"IGADO EN OBRA PARA #ORMACION DE PLAZAS CI%ICAS, CANC!AS DEPOR"I%AS Y DESPLAN"E DE EDI#ICIOS, INCLUYE ACARREOS #UERA Y DEN"RO DE LA OBRA, !ERRAMIEN"A Y MANO DE OBRA.
E$CA%ACION EN "ERRENO "IPO /C/ EN SECO DE 0.00 A 2.00 ME"ROS DE PRO#UNDIDAD, CON AU$ILIO DE E&UIPO MECANICO INCLUYE ACARREO A 20 ME"ROS, A#INES DE "ALUDES, "RASPALEOS, A#INES DE #ONDO, !ERRAMIEN"A MENOR Y MANO DE OBRA. INCLUYE "ODO LO NECESARIO PARA SU CORREC"A E*ECUCION.
E$CA%ACION A MANO EN "ERRENO "IPO /C/ EN SECO, INCLUYE A#LO*E Y E$"RACCION DEL MA"ERIAL, AMACICE O LIMPIEZA DE PLAN"ILLA Y "ALUDES, REMOCION, "RASPALEOS %ER"ICALES PARA SU E$"RACCION Y CONSER%ACION DE LA E$CA%ACION !AS"A LA INS"ALACION SA"IS#AC"ORIA DE LA ES"RUC"URA, ACOPIO, ACARREO DE ESCOMBRO #UERA Y DEN"RO DE LA OBRA, DE 0.00 A 2.00 M DE PRO#UNDIDAD, MANO DE OBRA Y !ERRAMIEN"A.
E$CA%ACION A MA&UINA EN BANCO, MA"ERIAL "IPO /B/, A CUAL&UIER PRO#UNDIDAD, INCLUYE COR"E, ACAMELLONADO DEL MA"ERIAL, AC!I&UE, A#INE DE "ALUDES, ADEME, "RASPALEO, DESASOL%E, !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA, PARA #ORMACION DE PLA"A#ORMAS.
E$CA%ACION A MANO EN "ERRENO IN%ES"IGADO EN OBRA, 2.00 A 4.00 M"S DE PRO#UNDIDAD EN POZO AR"ESIANO, INCLUYE A#INE DE "ALUDES, ACARREOS #UERA Y DEN"RO DE LA OBRA, MANO DE OBRA, "RASLAPEOS, A#INES DE #ONDO Y AC!I&UES.
E$CA%ACION A MANO EN "ERRENO IN%ES"IGADO EN OBRA, 4.00 A 6.00 M"S DE PRO#UNDIDAD EN POZO AR"ESIANO, INCLUYE A#INE DE "ALUDES, ACARREOS #UERA Y DEN"RO DE LA OBRA, MANO DE OBRA, "RASLAPEOS, A#INES DE #ONDO Y AC!I&UES.
E$CA%ACION A MANO EN "ERRENO IN%ES"IGADO EN OBRA, 6.00 A 8.00 M"S DE PRO#UNDIDAD EN POZO AR"ESIANO, INCLUYE A#INE DE "ALUDES, ACARREOS #UERA Y DEN"RO DE LA OBRA, MANO DE OBRA, "RASLAPEOS, A#INES DE #ONDO Y AC!I&UES.
E$CA%ACION A MANO EN "ERRENO IN%ES"IGADO EN OBRA, 8.00 A 10.00 M"S DE PRO#UNDIDAD EN POZO AR"ESIANO, INCLUYE A#INE DE "ALUDES, ACARREOS #UERA Y DEN"RO DE LA OBRA, MANO DE OBRA, "RASLAPEOS, A#INES DE #ONDO Y AC!I&UES.
E$CA%ACION A MANO EN "ERRENO "IPO /A/ DE 2.0 0 A 4.00 M"S. DE PRO#UNDIDAD SECCION OBLIGADA, INCLUYE A#INE DE "ALUDES, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA, "RASPALEOS Y A#INES DE #ONDO.
E$CA%ACION CON E&UIPO NEUMA"ICO &UE CONS"A DE COMPRESOR MCA. INGERSOLL RAND MOD. P185 NECI07 PARA DOS MAR"ILLOS MCA. !ARPER DE 0.00 A 2.00 M"S. SECCION OBLIGADA, INCLUYE A#INE DE "ALUDES, ACARREOS #UERA Y DEN"RO DE LA OBRA, "RASPALEOS, A&C!I&UES, COMBUS"IBLE, LUBRICAN"ES, PULSE"AS "IPO PUN"A DE LAPIZ, !ERRAMIEN"A, MANO DE OBRA Y ACARREOS DEN"RO Y #UERA DE LA OBRA.
E$CA%ACIN SIN USO DE E$PLOSI%OS Y E$"RACCION DE REZAGA A MANO PARA DESPLAN"E DE ES"RUC"URAS, EN MA"ERIAL "IPO /C/, EN SECO, CON PICO, CU@A Y MARRO A MANO INCLUYE E$"RACCIN DEL MA"ERIAL, AMACICE O LIMPIEZA DE PLAN"ILLA Y "ALUDES DE 0.00 A 2.00 M. DE PREO#UNDIDAD, ACARREOS DEN"RO Y #UERA DE LA OBRA.
COR"E DE "ERRAPLEN DE MA"ERIAL "IPO /B/ Y /C/, !AS"A 3 M"S. DE AL"URA PARA DESPLAN"E DE EDI#ICIO CON AYUDA DE E&UIPO MECANICO, INCLUYE CARGA CON E&UIPO MECANICO PARA MO%IMIEN"O DE "IERRA Y "RASLADO EN CAMION %OL"EO DEN"RO Y #UERA DE LA OBRA.
RELLENO DE E$CA%ACIONES CON MA"ERIAL ME*ORADO, SUMINIS"RADO POR CONALEP, PARA ES"RUC"URAS Y+O PARA ALCANZAR NI%ELES DE PROYEC"O, EN CAPAS DE 20 CMS DE ESPESOR, COMPAC"ADO CON PIZON AL 90 ?, SEGUN PRUEBA PROC"OR, PRE%IA LA INCORPORACION DEL AGUA  NECESARIA, INCLUYESUMINIS"RO Y E$"ENDIDO DEL MA"ERIAL, MEDIDO COMPAC"ADO. !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
DEMOLICION DE AZULE*O DE 20 20 EN MUROS, INCLUYE MA"ERIALES, MANO DE OBRA !ERRAMIEN"A Y E&UIPO, ACARREOS DEN"RO Y #UERA DE LA OBRA.
DESMON"A*E DE INS"ALACION DE GAS, INCLUYE DESMON"A*E DE "UBERIA, DESMON"A*E DE "AN&UES DE GAS, MA"ERIALES, MANO DE OBRA, !ERRAMIEN"A Y E&UIPO.
DEMOLICION DE MUROS DE "ABI&UE O BLOCK CON CADENAS Y CAS"ILLOS APLANADOS EN AMBAS CARAS, DE 0.50 M. DE ANC!O POR 0.84 M. DE AL"O, INCLUYE !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
DESMON"A*E DE PUER"A ME"ALICA O PRE#ABRICADA, DE 0.70 A 1.00 M"S. DE ANC!O, POR 2.10 A 2.50 DE AL"O, INC. MA"ERIALES, MANO DE OBRA, !ERRAMIEN"A Y E&UIPO, ACARREOS DEN"RO Y #UERA DE LA OBRA.
 
INIFECH
INSTITUTO DE LA INFRAESTRUCTURA FISICA EDUCATIVA DEL ESTADO DE CHIAPAS 1
TABULADOR DE PRECIOS UNITARIOS 2013
 CODIGO CONCEPTO DE TRABAJO UNIDAD REGION 1 REGION 2 REGION 3 REGION 4 REGION 5 REGION 6 REGION 7
1102000137 PZA 222.34 222.34 222.34 222.34 222.34 222.34 222.34
1102000138 DEMOLICION DE MURO DE "ABI&UE, INCLUYENDO RECUBRIMIEN"O EN CUAL&UIER NI%EL Y ACARREO A 20 M, MANO DE OBRA Y !ERRAMIEN"A. M2 70.29 70.29 70.29 70.29 70.29 70.29 70.29
1102000139 M2 45.43 45.43 45.43 45.43 45.43 45.43 45.43
1102000140 M2 44.14 44.14 44.14 44.14 44.14 44.14 44.14
1102000141 M3 123.79 123.79 123.80 123.80 123.80 123.80 123.80
1102000142 M3 202.61 202.61 202.62 202.62 202.62 202.62 202.62
1102000143 M3 47.35 47.35 47.35 47.35 47.35 47.35 47.35
1102000146 M3 488.17 488.17 488.18 488.18 488.18 488.18 488.18
1102000147 M3 305.98 305.98 305.98 305.98 305.98 305.98 305.98
1102000148 M3 52.50 52.50 52.50 52.50 52.50 52.50 52.50
1102000149 M3 53.81 53.81 53.81 53.81 53.81 53.81 53.81
1102000150 M3 1,044.89 1,044.89 1,044.91 1,044.91 1,044.91 1,044.91 1,044.91
1102000151 M3 323.82 323.82 323.83 323.83 323.83 323.83 323.83
1102000152 M2 57.47 57.47 57.47 57.47 57.47 57.47 57.47
1102000153 M2 12.54 12.54 12.49 12.49 12.49 12.49 12.49
1102000154 M3 87.15 87.15 87.15 87.15 87.15 87.15 87.15
1102000155 M3 144.81 144.81 144.81 144.81 144.81 144.81 144.81
1102000156 M3 100.50 100.50 100.51 100.51 100.51 100.51 100.51
1102000157 M3 74.29 74.29 74.29 74.29 74.29 74.29 74.29
1102000158 M3 343.03 343.03 343.04 343.04 343.04 343.04 343.04
1102000160 M2 42.93 42.93 42.93 42.93 42.93 42.93 42.93
1102000165 M2 146.00 146.00 146.00 146.00 146.00 146.00 146.00
1102000170 SAL 125.45 127.43 131.26 128.43 136.66 134.33 123.23
1102000174 PZA 111.18 111.18 111.19 111.19 111.19 111.19 111.19
1102000177 M2 45.43 45.43 45.43 45.43 45.43 45.43 45.43
1102000180 DESMON"A*E DE PER#IL EN ES"RUC"URA, INCLUYE COR"ES, ACARREOS DEN"RO Y #UERA DE LA OBRA, !ERRAMIEN"A Y MANO DE OBRA KG 10.46 10.46 10.46 10.46 10.46 10.46 10.46
1102000707 M3 227.61 227.61 227.62 227.62 227.62 227.62 227.62
1103000011 M3 89.98 89.98 89.98 89.98 89.98 89.98 89.98
1103000012 M3 49.01 49.01 49.02 49.02 49.02 49.02 49.02
1103000013 M3 63.48 63.48 63.49 63.49 63.49 63.49 63.49
1103000014 M3 418.61 418.61 418.62 418.62 418.62 418.62 418.62
1103000015 M3 498.60 498.60 498.61 498.61 498.61 498.61 498.61
1103000016 M3 369.41 383.87 571.89 544.11 606.59 600.81 359.63
1103000019 M3 303.55 315.02 463.97 441.96 491.46 486.88 295.80
1103000020 M3 396.87 396.87 396.88 396.88 396.88 396.88 396.88
1103000021 SUMINIS"RO DE MA"ERIAL ME*ORADO COMPAC"ADO, INCLUYE !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA. M3 410.64 410.64 410.65 410.65 410.65 410.65 410.65
DESMON"A*E DE INS"ALACION ELEC"RICA DE CON"AC"O %ISIBLE, INC. MANO DE OBRA, !ERRAMIEN"A Y E&UIPO, ACARREOS DEN"RO Y #UERA DE LA OBRA.
DESMAN"ELAMIEN"O DE PRO"ECCION ME"ALICA DE 1.95 1.60 M"S., CON RECUPERACION DEL MA"ERIAL, INCLUYE MANO DE OBRA, !ERRAMIEN"A Y ACARREO A 20 M"S.
DESMAN"ELAMIEN"O DE #ALSO PLA#ON DE MADERA A CUAL&UIER AL"URA, CON RECUPERACION DE MA"ERIAL. INCLUYE. !ERRAMIEN"AS, MA"ERIALES, MANO DE OBRA, ACARREOS DEN"RO Y #UERA DE LA OBRA.
E$CA%ACION A MANO EN "ERRENO IN%ES"IGADO EN OBRA PARA #ORMACION DE RAMPAS PARA ESCALERAS A CUAL&UIER PRO#UNDIDAD INCLUYE A#INES DE "ALUDES, ADAME, "RASPALEOS, ACARREOS DEN"RO Y #UERA DE LA OBRA, MANO DE OBRA.
E$CA%ACION A MANO EN "ERRENO IN%ES"IGADO EN OBRA, DE 0.0 A 3.00 M"S. DE PRO#UNDIDAD SECCION OBLIGADA. INCLUYE AC!I&UE, A#INE DE "ALUDES, ADEME, "RASPALEO, DESASOL%E, , ACARREOS #UERA Y DEN"RO DE LA OBRA, MANO DE OBRA, !ERRAMIEN"A, "RASPALEOS, A#INES DE #ONDO Y AC!I&UES.
E$CA%ACION EN "ERRENO IN%ES"IGADO EN OBRA DE 0.00 A 2.00 M"S. DE PRO#UNDIDAD SECCION OBLIGADA CON AYUDA DE E&UIPO MECANICO, INCLUYENDO "RASPALEOS A#INE DE #ONDO, AC!I&UE, A#INE DE "ALUDES, ADEME, "RASPALEO, DESASOL%E, !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
E$CA%ACION A MANO EN "ERRENO IN%ES"IGADO EN OBRA, 0.00 A 2.00 M"S DE PRO#UNDIDAD SECCION OBLIGADA. CON SA"URACION DE AGUA AL 100?, INCLUYE A#INE DE "ALUDES, ACARREOS #UERA Y DEN"RO DE LA OBRA, MANO DE OBRA, !ERRAMIEN"A, "RASPALEOS, A#INES DE #ONDO Y AC!I&UES.
E$CA%ACION EN "ERRENO IN%ES"IGADO EN OBRA SA"URADO EN AGUA AL 50 ? DE 0.00 A 2.00 M"S. DE PRO#UNDIDAD SECCION OBLIGADA EN "ERRAPLENES Y DESPALME, INCLUYE A#INE DE "ALUDES, A#INE DE #ONDO, "RASPALEOS, BOMBEO, AC!I&UE, !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
E$CA%ACION EN CEPAS PARA DESPLAN"E DE CIMEN"ACIONES PARA ES"RUC"URAS, U"ILIZANDO E&UIPO DE PER#ORACION Y !ERRAMIEN"A MANUAL. PRO#UNDIDAD DE 0.00 A 2.00 M"S, INCLUYE AC!I&UE, A#INE, ADEME, "RASPALEO, DESASOL%E Y ACARREO LIBRE DEN"RO Y #UERA DE LA OBRA.
E$CA%ACION EN CEPAS PARA DESPLAN"E DE CIMEN"ACIONES PARA ES"RUC"URAS, U"ILIZANDO E&UIPO DE PER#ORACION Y !ERRAMIEN"A MANUAL. PRO#UNDIDAD DE 2.00 A 3.00 M"S, INCLUYE AC!I&UE, A#INE, ADEME, "RASPALEO, DESASOL%E Y ACARREO LIBRE DEN"RO Y #UERA DE LA OBRA.
E$CA%ACION A MANO EN "ERRENO "IPO /C/ 'ROCA(, DE 0.0 A 2.00 M"S. DE PRO#UNDIDAD SECCION OBLIGADA. INCLUYE AC!I&UE, A#INE DE "ALUDES, ADEME, "RASPALEO, DESASOL%E, , ACARREOS #UERA Y DEN"RO DE LA OBRA ' 5 ES"ACIONES Y 10 KMS(, MANO DE OBRA, !ERRAMIEN"A, "RASPALEOS, A#INES DE #ONDO Y AC!I&UES.
E$CA%ACION A MANO EN "ERRENO "IPO /B/ ' NO ROCA(, DE 0.0 A 2.00 M"S. DE PRO#UNDIDAD SECCION OBLIGADA. INCLUYE AC!I&UE, A#INE DE "ALUDES, ADEME, "RASPALEO, DESASOL%E, , ACARREOS #UERA Y DEN"RO DE LA OBRA ' 5 ES"ACIONES Y 11 KMS(, MANO DE OBRA, !ERRAMIEN"A, "RASPALEOS, A#INES DE #ONDO Y AC!I&UES.
DESMAN"ELAMIEN"O DE "EC!UMBRES DE LAMINA Y ES"RUC"URA DE MADERA E$IS"EN"E EN MAL ES"ADO !AS"A 3.0 M"S. DE AL"URA. INCLUYE !ERRAMIEN"AS, MA"ERIALES, MANO DE OBRA, ACARREOS DEN"RO Y #UERA DE LA OBRA.
LIMPIEZA DE %IDRIOS CON AGUA Y *ABON POR AMBAS CARAS, INCLUYE !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
E$CA%ACION EN "ERRENO IN%ES"IGADO EN OBRA A CUAL&UIER PRO#UNDIDAD, CON AU$ILIO DE E&UIPO NEUMA"ICO, INCL. "RASPALEOS, A#INES DE #ONDO, AC!I&UE, A#INE DE "ALUDES, ADEME, DESASOL%E, !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
E$CA%ACION A MA&UINA EN BANCO EN "ERRENO IN%ES"IGADO EN OBRA, A CUAL&UIER PRO#UNDIDAD, INCLUYE COR"E, ACAMELLONADO DEL MA"ERIAL, AC!I&UE, A#INE DE "ALUDES, ADEME, "RASPALEO, DESASOL%E, !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA, PARA #ORMACION DE PLA"A#ORMAS.
E$CA%ACION CON MEDIOS MECANICOS EN "ERRENO IN%ES"IGADO EN OBRA PARA #ORMACION DE PLAZAS CI%ICAS, CANC!AS DEPOR"I%AS Y DESPLAN"E DE EDI#ICIOS, A CUAL&UIER PRO#UNDIDAD. INCLUYE AC!I&UES, A#INE DE "ALUDES, A#INE DE #ONDOS, "RASPALEOS, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA.
E$CA%ACION EN MA"ERIAL "IPO B CON E&UIPO MECANICO PARA #ORMACION DE PLA"A#ORMA, INCLUYE E&UIPO, A#INES, ADEMES, AC!I&UE, CARGA EN CAMION Y ACARREOS #UERA Y DEN"RO DE LA OBRA
E$CA%ACION A MANO EN "ERRENO IN%ES"IGADO "IPO /C/, DE 0.00 A 3.00 M"S. DE PRO#UNDIDAD SECCION OBLIGADA, INCLUYE A#INE DE "ALUDES, ACARREOS #UERA Y DEN"RO DE LA OBRA, MANO DE OBRA, !ERRAMIEN"A, "RASPALEOS, A#INES DE #ONDO Y AC!I&UES.
DESMAN"ELAMIEN"O DE PRO"ECCION PARA %EN"ANA ME"ALICA, CON MA"ERIAL RECUPERABLE, INCLUYE !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA.
DESMAN"ELAMIEN"O DE CANCELERIA DE ALUMINIO Y CRIS"ALES, CON RECUPERACION, INCLUYE!ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA
DESMAN"ELAMIEN"O DE SALIDAS !IDRAULICA Y SANI"ARIA E$IS"EN"ES, INCL. E$CA%ACION, DESCONE$ION DE PIEZAS DE COBRE Y P%C SANI"ARIO, &UI"AR COLADERA DE P%C, !ERRAMIEN"A Y MANO DE OBRA.
DESMAN"ELAMIEN"O DE PUER"A ME"ALICA, CON MA"ERIAL RECUPERABLE, INCLUYE !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA.
DESMAN"ELAMIEN"O DE PRO"ECCION ME"ALICA CON MA"ERIAL RECUPERABLE, INCLUYE !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA.
E$CA%ACION A MANO DEL MA"ERIAL ME*ORADO Y COMPAC"ADO E$IS"EN"E DE 0.00 A 2.00 M"S. DE PRO#UNDIDAD, INCLUYE MANO DE OBRA, !ERRAMIEN"AS, "RASPALEOS, ACARREOS DEN"RO Y #UERA DE LA OBRA Y "ODO LO NECESARIO PARA SU CORREC"A E*ECUCION.
RELLENO DE E$CA%ACIONES CON MA"ERIAL PRODUC"O DE LA E$CA%ACION, PARA ES"RUC"URAS Y+O PARA ALCANZAR NI%ELES DE PROYEC"O, EN CAPAS DE 20 CMS DE ESP., COMPAC"ADAS CON PIZON AL 90? SEGUN PRUEBA PROC"OR, PRE%IA LA INCORPORACION DEL AGUA NECESARIA, INCL. E$"ENDIDO DEL MA"ERIAL, MEDIDO COMPAC"ADO, !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
RELLENO A %OL"EO CON MA"ERIAL PRODUC"O DE LA E$CA%ACION, INCL. E$"ENDIDO DEL MA"ERIAL, !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
RELLENO DE E$CA%ACIONES PARA ES"RUC"URAS Y+O PARA ALCANZAR NI%ELES DE PROYEC"O, EN CAPAS DE 20 CMS DE ESPESOR, COMPAC"ADOS CON RODILLO %IBRA"ORIO O E&UIPO SIMILAR, AL 90? SEGUN PRUEBA PROC"OR, PRE%IA LA INCORPORACION DEL AGUA NECESARIA, INCL. E$"ENDIDO DEL MA"ERIAL, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA, MEDIDO COMPAC"ADO CON MA"ERIAL PRODUC"O DE E$CA%ACION.
RELLENO CON GRA%A GRADUADA EN GRE@A DE DIAME"RO !AS"A 1/ PULGADA PARA #IL"RO EN POZO DE ABSORCION COLOCADO EN CAPAS, INCLUYE MA"ERIAL, ACARREO DEL MA"ERIAL A 5 ES"ACIONES Y MANO DE OBRA.
SUMINIS"RO Y RELLENO DE GRA%A GRADUADA PARA ME*ORAMIEN"O DE "ERRENO BA*O DESPLAN"E DE ZAPA"AS COMPAC"ADA CON PISON A MANO. INCLUYE E$"ENDIDO DEL MA"ERIAL, MANO DE OBRA, !ERRAMIEN"AS Y ACARREOS DEN"RO Y #UERA DE LA OBRA.
SUM.Y RELLENO D+MA".INER"E O ME*ORADO,COMPAC"ADO C+PISON Y AGUA,EN CAPAS DE 2OCM.ESP.INCL.ACARREO DEN"RO DE LA OBRA,MEDIR COMPAC"
RELLENO CON MA"ERIAL ME*ORADO PARA NI%ELACION DE "ERRENO EN AREAS ESPEC<#ICAS, COMPAC"ACION AL 90? SEG>N PRUEBA PROC"OR, PRE%IA INCORPORACION DEL AGUA NECESARIA.INCLUYE !ERRAMIEN"A, MANO DE OBRA.
 
INIFECH
INSTITUTO DE LA INFRAESTRUCTURA FISICA EDUCATIVA DEL ESTADO DE CHIAPAS 1
TABULADOR DE PRECIOS UNITARIOS 2013
 CODIGO CONCEPTO DE TRABAJO UNIDAD REGION 1 REGION 2 REGION 3 REGION 4 REGION 5 REGION 6 REGION 7
1103000022 M3 560.11 560.11 560.13 560.13 560.13 560.13 560.13
1103000023 M3 479.33 479.33 479.34 479.34 479.34 479.34 479.34
1103000024 M2 302.83 307.33 335.33 316.67 360.77 355.02 303.32
1103000025 RELLENO DE GRA%A GRADUADA DE 3+4/ A 1+2/ PAR& #IL"RO, INCLUYE ACARREO A 50 M"S. M3 554.83 554.83 554.85 554.85 554.85 554.85 554.85 1103000027 M3 28.56 28.56 28.56 28.56 28.56 28.56 28.56
1103000028 M3 358.00 372.46 560.46 532.70 595.18 589.39 348.21
1103000029 M3 572.34 572.34 572.35 572.35 572.35 572.35 572.35
1103000031 SUMINIS"RO Y RELLENO DE ARENA, INCL. E$"ENDIDO DEL MA"ERIAL, ACARREOS #UERA Y DEN"RO DE LA OBRA, MANO DE OBRA Y !ERRAMIEN"A. M3 451.75 509.59 702.73 567.47 968.58 876.97 393.99
1103000032 M3 388.99 388.99 389.00 389.00 389.00 389.00 389.00
1103000033 M3 286.74 286.74 286.74 286.74 286.74 286.74 286.74
1103000034 M2 9.19 9.19 9.19 9.19 9.19 9.19 9.19
1103000041 M3 656.38 654.23 807.75 712.08 856.70 876.97 720.24
1103000042 M3 656.38 654.23 807.75 712.08 856.70 876.97 720.24
1103000045 M3 550.10 550.10 550.12 550.12 550.12 550.12 550.12
1103000046 M3 573.94 573.94 573.96 573.96 573.96 573.96 573.96
1103000051 M3 422.77 437.22 625.23 634.28 659.94 654.16 449.82
1103000052 M3 356.47 370.92 558.94 531.17 593.63 587.86 346.69
1103000053 M3 80.19 80.19 80.20 80.20 80.20 80.20 80.20
1103000054 M3 72.85 72.85 72.85 72.85 72.85 72.85 72.85
1103000055 M3 487.09 494.85 668.92 613.75 709.38 714.14 507.06
1103000059 M3 442.86 460.67 847.15 805.55 928.97 789.55 425.09
1103000061 M3 536.70 534.96 658.96 581.68 698.49 714.88 588.27
1103000062 M3 1,433.74 1,460.93 1,473.04 1,460.28 1,492.73 1,472.60 1,399.45
1103000078 M2 29.91 29.91 29.92 29.92 29.92 29.92 29.92
1103000079 SUMINIS"RO Y COLOCACION DE MA"ERIAL GRADUADO COMPAC"ADO PARA #ORMACION DE RE%ES"IMIEN"O DE ACCESO A LA OBRA. M3 273.75 273.75 273.76 273.76 273.76 273.76 273.76
1103000080 LO"E 5,072.68 5,072.68 5,072.81 5,072.81 5,072.81 5,072.81 5,072.81
1103000151 M3 577.97 592.44 780.45 752.68 815.16 809.38 568.20
1103000152 M3 768.44 766.29 919.83 824.15 968.79 989.07 832.31
1103000153 M2 58.41 58.41 58.41 58.41 58.41 58.41 58.41
1103000154 M3 80.18 80.18 80.19 80.19 80.19 80.19 80.19
1103000155 ES" 46,695.40 46,695.40 46,696.56 46,696.56 46,696.56 46,696.56 46,696.56
RELLENO CON MA"ERIAL DE GRA%A RO*A, EN CAPAS DE 20 CMS DE ESPESOR, COMPAC"ADO CON PIZON AL 90 ?, SEGUN PRUEBA PROC"OR, PRE%IA LA INCORPORACION DEL AGUA NECESARIA, INCLUYESUMINIS"RO Y E$"ENDIDO DEL MA"ERIAL, MEDIDO COMPAC"ADO. !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
RELLENO DE E$CA%ACIONES PARA ES"RUC"URAS Y+O PARA ALCANZAR NI%ELES DE PROYEC"O, EN CAPAS DE 20 CMS DE ESPESOR, COMPAC"ADAS CON PIZON AL 90? SEGUN PRUEBA PROC"OR, PRE%IA LA INCORPORACION DEL AGUA NECESARIA, INCL. E$"ENDIDO DEL MA"ERIAL, !ERRAMIEN"A, MANO DE OBRA, ACARREOS #UERA Y DEN"RO DE LA OBRA, MEDIDO COMPAC"ADO CON MA"ERIAL GRAZON POR%ENIEN"E DE LA CALERA.
RELLENO DE GRA%A DE 10 CMS ESPESOR, LADRILLO DE 14 CMS DE ESPESOR, ARENA DE 10 CMS ESPESOR Y %IRU"A, COMPAC"ADO CON PIZON AL 90 ?, SEGUN PRUEBA PROC"OR, PRE%IA LA INCORPORACION DEL AGUA NECESARIA, INCLUYESUMINIS"RO Y E$"ENDIDO DEL MA"ERIAL, MEDIDO COMPAC"ADO. !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
RELLENO DE MA"ERIAL PRODUC"O DE LA E$CA%ACION COMPAC"ADO CON E&UIPO MECANICO PARA ALCANZAR NI%ELES DE PROYEC"O, INCLUYE E&UIPO, "RASPALEOS, Y ACARREOS #UERA Y DEN"RO DE LA OBRA
RELLENO DE E$CA%ACIONES CON MA"ERIAL ME*ORADO'GRANZON(, PARA ES"RUC"URAS Y+O PARA ALCANZAR NI%ELES DE PROYEC"O, EN CAPAS DE 20 CMS DE ESPESOR, COMPAC"ADO CON PIZON AL 90 ?, SEGUN PRUEBA PROC"OR, PRE%IA LA INCORPORACION DEL AGUA NECESARIA, INCLUYESUMINIS"RO Y E$"ENDIDO DEL MA"ERIAL, MEDIDO COMPAC"ADO. !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
RELLENO DE E$CA%ACIONES A BASE DE PIEDRA &UEBRADA DE 2/ A 4/ DE DIAME"RO, PARA ES"RUC"URAS 'PARA #IL"RO( INCLUYE SUMINIS"RO Y E$"ENDIDO DEL MA"ERIAL, !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
SUMINIS"RO Y RELLENO DE PIEDRA &UEBRADA DE 2/ PARA #IL"RO EN MURO DE CON"ENSION, INCLUYE ACARREOS DEN"RO Y #UERA DE LA OBRA, !ERRAMIEN"A, MANO DE OBRA Y MA"ERIALES
DESPALME DE "ERRENO !AS"A 50 CMS.DE PRO#UNDIDAD PARA &UI"AR CAPA DE "IERRA %EGE"AL INCLUYE DESENRRAICE, !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y DEN"RO DE LA OBRA.
DESPALME DE "ERRENO DE 10CMS. DE ESP. DE PRO#UNDIDAD PARA &UI"AR CAPA DE "IERRA %EGE"AL, INCLUYE ACARREO !AS"A UNA DIS"ANCIA DE 20 M"S.
SUMINIS"RO Y RELLENO DE GRA%A GRADUADA, PARA #IL"RO EN DREN PLU%IAL, INCL. E$"ENDIDO DEL MA"ERIAL, ACARREOS #UERA Y DEN"RO DE LA OBRA, MANO DE OBRA, Y !ERRAMIEN"A.
#IL"RO DE GRA%A "RI"URADA DE 3+4/ PARA MURO DE CON"ENSION, INCLUYE MA"ERIALES, MANO DE OBRA Y ACARREOS DEN"RO Y #UERA DE LA OBRA.
SUMINIS"RO Y "ENDIDO DE GRA%A RO*A O COLORADA EN ESPESOR INDICADO POR EL PROYEC"O EN CAPAS DE 15 CMS., COMPAC"ADA CON RODILLO %IBRA"ORIO O E&UIPO SIMILAR AL 90 ? SEG>N PRUEBA PROC"OR, PRE%IA INCORPORACION DEL AGUA NECESARIA, INCLUYE E$"ENDIDO DEL MA"ERIAL MEDIDO COMPAC"ADO, !ERRAMIEN"A, MANO DE OBRA Y ACARREOS #UERA Y