    Table 1. The control and instrumentation in Copper Smelter Plant

    Process

    Equipment

    Controll

    ed

    Paramet

    er

    Controllin

    g

    Parameter

    Controller Alarm Function Control Procedure

    Valve ()

    Temper

    atur

    Outlet Flow O

    Temperatu

    r Control

    Controlling temperatur of

    smelting furnance to keep

    process running in optimum

    condition.

    When the outlet temperatur is undesired, the

    temperature transmiter will give a electric signal

    TIC, then, TIC will give a pneumatic signal for

    cooling air control valve. This valve will set the

    best opening to make the outlet reachesthe

    desired temperature.

    Belt

    Conveyor

    (C-202, C-

    203)

    Analit

    Outlet

    The

    weight of

    analit

    Analit

    Indikator

    Control v

    Contolling the analit of the

    solid raw materials is

    purposed to keep the

    process in smelting furnace

    is produced a certain desired

    capacity and reach the

    optimum condiion.

    When the amount of solid raw material is in

    undesired condition, transmiter will give a electric

    signal AIC, so the alarm will ring and give

    notification that the product doesnt suitable with

    our spec

    Electrolitic

    Cell (P-201,

    P-202)

    Flow on

    the

    valve in

    the

    stream

    before

    The level

    of

    electrolyt

    e liquid

    Level

    Control

    Controlling the amount of

    electrolite liquid to keep the

    optimum condition for the

    electrolysis so can be

    produced the product with

    our desired specs.

    When the level is in undesired condition, the

    temperature transmiter will give an electric signal

    LIC, then, LIC will give a pneumatic signal for

    electrolic cell control valve. This valve will set the

    best opening to make the outlet reachesthe

    desired level.

    Rolling

    Machine

    (PM-202)

    and Casting

    Machine (P-

    203)

    The

    amount

    of

    product

    outlet

    The rate

    of

    machine

    Analit

    control v

    Controlling the amount of

    product is related with the

    storage room or storage

    place that we have, this is

    also realted with schedulling.

    When the amount of solid raw material is in

    undesired condition, transmiter will give a electric

    signal AIC, so the alarm will ring and give

    notification that the product doesnt suitable with

    our spec.

    Electric

    Furnance

    Analit

    Outlet

    The

    weight of

    Analit

    Indikator

    Controlling the composition

    of the outlet product is

    When the amount of solid raw material is in

    undesired condition, transmiter will give a electric

  • 8/10/2019 Tabulasi Copper Smelter

    2/2

    (B-205) analit Control necessary to cover the

    operation condition of next

    stage process.

    signal AIC, so the alarm will ring and give

    notification that the product doesnt suitable with

    our spec.

    SlagCleaning

    Furnance

    (B-202)

    Thecomposi

    tion of

    matte

    Analit

    Indikator

    Control v

    Controlling the composition

    of the outlet product isnecessary to cover the

    operation condition of next

    stage process.

    When the composition of matte in the outletdoesn't reach17 %, the alarm will ring and give

    notification that the product doesnt suitable with

    our spec

    Converting

    Furnance,

    Anode

    Furnance(B-

    203 , B-204)

    Temper

    ature

    Inlet

    Temperat

    ure

    Temperatu

    r Indicator

    Control v

    Controlling temperatur of

    smelting furnance to keep

    process running in optimum

    condition.

    When the outlet temperatur is undesired, the

    temperature transmiter will give a electric signal

    TIC, then, TIC will give a pneumatic signal for

    cooling air control valve. This valve will set the

    best opening to make the outlet reachesthe