Welcome Everyone!
Building and Running a PMO
Tactical Guide for Building a PMO – How to Build & Implement a PMO
© Copyright 2012 – B Dow© Copyright 2017 – B Dow
Experienced
Bill Dow, PMP
Author Speaker/Presenter
• 1. Project Failures & Survey’s
• 2. Common Communication Problems
• 3. Project Communication Planning
• 4. Project Management & Social Media
• 5. Project Communications & Agile Projects
• 6. Project Management & Business Intelligence
Importance of Project Communications
Agenda
1.Building a PMO
2.Steps to Building
and Implementing a
PMO
3.Wrap-up & More
Information
© Copyright 2012 – B Dow© Copyright 2017 – B Dow
Building a PMO
© Copyright 2012 – B Dow© Copyright 2017 – B Dow
Start with a Plan
Obtain Executive Support
Create PMO Staples
Select 4 P’s of PMO (including Methodologies)
Select PMO Model
Create PMO Maturity Model (Categories and Measurement)
Obtain PMO Resources
Select PMO Training
Implement PMO Methodologies
Select PMO Reporting
Select PMO Tools and Processes
PMO Complete
(1)
Remember the 12 Steps to Building your PMO
Steps to Building a PMO
© Copyright 2012 – B Dow© Copyright 2017 – B Dow
Was that overwhelming?
Did you know there were 12 steps in building/enhancing a PMO?
© Copyright 2016 – B Dow
Start with a Plan
© Copyright 2012 – B Dow
Develop a WBS that outlines the components of your PMO. It does not have to be perfect, but develop the high-level groups to start we will tweak along the way. Get these into your favorite scheduling tool as soon as possible.
This schedule examples comes directly from “The Tactical Guide for Building a PMO” book.
Designing & Building a PMO
© Copyright 2012 – B Dow
Designing & Building a PMOUse a WBS tool to change the view
This schedule example comes directly from “The Tactical Guide for Building a PMO” book.
© Copyright 2016 – B Dow
Executive Support
© Copyright 2012 – B Dow© Copyright 2017 – B Dow
Executive Support – Stop Now!
Get Executive/Management Support Immediately
© Copyright 2012 – B Dow
Designing & Building a PMO
Understand the PMO Cycle, As a PMO Manager you are going to live and breathe this cycle.
Obtain Executive/Management Support
© Copyright 2016 – B Dow
Creating PMO Staples
© Copyright 2012 – B Dow
Designing & Building a PMOCreate PMO Staples – Starts with some Basics
✓Mission Statement
✓Vision Statement
✓PMO Value and KPIs
✓PMO Budget?
“PMO will provide customers with high quality, faster, cheaper projects, aligned with strategic goals of company
Drive excellence in management and delivery of projects”
© Copyright 2016 – B Dow
The 4 P’s of the PMO
© Copyright 2012 – B Dow
• One of the key components of building your PMO is understanding what are your 4 Ps of your PMO?
• Portfolio
• Program
• Project
• the 4th P is the PMO itself
Designing & Building a PMOThe 4 Ps of PMOs
Don’t forget the PMO!!
© Copyright 2012 – B Dow
Designing & Building a PMOThe 4 Ps of PMOs
© Copyright 2016 – B Dow
PMO Model / Methodology Matrix
© Copyright 2012 – B Dow
Designing & Building a PMO
When building the PMO, consider documenting the model with the process methodologies
PMO Model Type/ 4P’s Matrix
© Copyright 2016 – B Dow
PMO Maturity Model
© Copyright 2012 – B Dow© Copyright 2017 – B Dow
PMO Maturity Model
+
Measurement System Measurement Categories
=
PMO Maturity Model
PMO Maturity Models – Measurement System
© Copyright 2012 – B Dow
Measurement System Every PMO Maturity Model needs a measurement system and it is an industry best practice to use Dr. Kerzner’s Project Management Measurement model. It works perfectly for a measuring PMO Maturity as well as for Project Management.
PMO Maturity ModelPMO Maturity Models – Measurement System
© Copyright 2012 – B Dow
Measurement CategoriesEvery PMO will have their own sets of categories based on their industry, management needs, PMO needs…etc. Categories need to be very company specific as they are a critical component to measuring and showing how well your PMO is maturing.
PMO Maturity ModelPMO Maturity Models – Measurement System
© Copyright 2012 – B Dow© Copyright 2017 – B Dow
Tying it all together!
PMO Maturity ModelPMO Maturity Models – Measurement System
© Copyright 2016 – B Dow
PMO Staffing Model
© Copyright 2012 – B Dow© Copyright 2017 – B Dow
Hire PMO ResourcesPMO Roles and Responsibilities Staffing Model
© Copyright 2016 – B Dow
PMO Training & Mentoring
© Copyright 2012 – B Dow© Copyright 2017 – B Dow
PMO Training & Mentoring Programs
PMO Mentor Program
PMO Buddy System
Critical Hard & Soft Skills Training
© Copyright 2016 – B Dow
PMO Model & Process Methodology
© Copyright 2012 – B Dow© Copyright 2017 – B Dow
Implement your Different Methodologies (Portfolio/Program/Project)
Methodology Playbooks, Guides, Training, Tools…
When selecting you PMO Model, consider which methodology(s) you will use.
© Copyright 2016 – B Dow
PMO Reporting
© Copyright 2012 – B Dow© Copyright 2017 – B Dow
PMO Reporting
Dashboards
Portfolio Reports
• Past Reports
• Current Reports
• Future Reports
Program Reports
• Past Reports
• Current Reports
• Future Reports
Project Reports
•Past Reports
•Current Reports
•Future Reports
When setting up reports, there are 3 buckets to focus on in your PMO
© Copyright 2016 – B Dow
PMO Tools and Process
© Copyright 2012 – B Dow© Copyright 2017 – B Dow
PMO Tools & Processes
Portfolio Management Tools Program & Project Management Tools
There are hundreds of Portfolio and Program/Project Management software products to choose from for every PMO Manager….
• CA Clarity Project and Portfolio Management
• Compuware • UMT• Oracle Primavera• Microsoft Project Server 2013 & 2016
• and many others…..
• Microsoft Project 2013 & 2016• WBS ChartPro• Deltek Active Risk Manager• @Risk• and many others…..
PMO Tools & Processes
© Copyright 2012 – B Dow© Copyright 2017 – B Dow
• Program Status Reporting
• Program Risk Management
• Program Quality Management
• Etc.
• Project Schedule Management
• Project Performance Management
• Project Risk & Issue Management process
• Etc…
• Portfolio Initiation Process
• Portfolio Planning process
• Portfolio Status Process
• Etc…
• Governance process
• Escalation process
• Financial process
• Etc…
Generic PMO Processes
Portfolio Management
Processes
Program Management
Process
Project Management
Process
(1) (2)
(3)(4)
PMO Tools & Processes
There should be a minimum set of requirements you setup for each methodology!
© Copyright 2016 – B Dow
PMO Build Project Complete!
© Copyright 2012 – B Dow© Copyright 2017 – B Dow
PMO Complete
Check, Check, Check
© Copyright 2012 – B Dow© Copyright 2017 – B Dow
PMO Complete - Celebrate
Now the work begins..
© Copyright 2016 – B Dow
PMO Wrap-Up
© Copyright 2012 – B Dow© Copyright 2017 – B Dow
Final Take-Away• We covered 12 of the most important steps to building a sound and
lasting PMO for your organization.
• Don’t take short cuts, create these 12 different areas for your PMO and mature each of the areas as you run your PMO.
• Understand the value each of the 12 areas brings and ensure you can justify why you are taking the time and effort to build out these areas. Examples include:
• Why would you spend time to build a PMO Maturity Model?
• Why do you new a Project Manager Playbook?
• What value is there in a PMO Staffing Model?
© Copyright 2012 – B Dow© Copyright 2017 – B Dow
Questions??
© Copyright 2012 – B Dow© Copyright 2017 – B Dow
Thanks!