×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [beam commissioning]
New Particle Searches at the LHC SUSY - Inclusive search - Backgrounds - SUSY parameters Resonances in the Drell-Yan mass distribution Heavy long-lived
224 views
LHC Status and CERNs future plans Lyn Evans. L. Evans – EDMS document no. 859415 2 Machine layout
230 views
OUTLINE Introduction LHC Injector complex Conclusion R. Garoby
215 views
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015
219 views
J-PARC PAC ‘07 Imperial College/RAL Dave Wark Status of the T2K Experiment Dave Wark Imperial/RAL J-PARC PAC KEK July 6, 2007
225 views
Extended LTC 3-3-2008 CERNMassimiliano Ferro-Luzzi 1 Experiments during HWC, beam tests and initial commissioning What are the experiments going to do
218 views
Leon Mualem — NNN07 The NO A Experiment Status Leon Mualem California Institute of Technology (for the NO A collaboration) Workshop on Next Generation
214 views
Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans
[email protected]
June 16, 2008 1 LTU/Undulator Commissioning Plans Heinz-Dieter
221 views
July 7, 2008 SLAC Annual Program Review Page 1 Andrei Seryi, SLAC American Regional Team leader for BDS Deputy of ATF Spokesperson for ATF2 Global Design
215 views
Drift Tube Linac Andrea Pisent INFN Italy April 21, 2015
221 views
1 A Summary of CHEP 2007 Dmitry Emeliyanov, RAL PPD Victoria, BC, Canada, 2-7 Sept. 2007
215 views
Lina c4 connection Work to be done and draft planning
21 views
Next >