×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [beam tubes]
X5/GIF Test Beam: High Rate Analysis Manuela Cirilli
215 views
Zentralabteilung Forschungsreaktoren Contents - The German FRJ-2 Research Reactor - Operation and Decommissioning - Distribution of Neutronflux and activity
217 views
F October 4, 2001David Finley to FARDOG at FermilabSlide 1 Status of X-Band Structures Fabrication Our First X-Band Structure Progress of RF Factory at
222 views
Presented by: Matthew Schantz Travis Heffernan Physics 43, SRJC 5/12/08 Younes Ataiiyan
215 views
E. Kako (KEK) Webex Meeting in May 24th, 2011 1 Status and Disassembly Plan of S1-G Cryomodule
216 views
LOS Absorption Presentation for TCS Group Rupal S. Amin Tuesday, August 26, 2008 LIGO-G080428-00-L
217 views
Searching for gravitational waves with lasers Rick Savage Caltech LIGO Hanford Observatory - Richland, WA
219 views
The Heavy Ion Fusion Virtual National Laboratory UC Berkeley Christophe S. Debonnel 1,2 (1) Thermal Hydraulics Laboratory Department of Nuclear Engineering
228 views
LIGO-G000193-00-M Status of LIGO Barry Barish PAC Meeting - LHO December 12, 2000
220 views
KAGRA Vacuum System Items of vacuum sub-group 1 1. Overview 120203 VAC (YS) Required Pressure “uhv (ultra-high-vacuum)” in the order of 10 -7 Pa, or lower
221 views
Low Energy RHIC e - Cooling Meeting Notes 1 –LF Solenoids & HF (Matching) Solenoids: Out for bid??? –20 o Dipole Magnet gap is 4 inches/transport lines
221 views
The LHC Machine
41 views
Next >