×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [corrector circuits]
LHC Machine.pdf
277 views
Field Description of the LHC FiDeL - Status and Plan Presented by L. Bottura based on contributions of many MARIC 28.02.2007 and LHCCWG 28.02.2007
219 views
Fermilab’s Muon Collider Task Force: Status and Plans Vladimir Shiltsev Fermilab
31 views
Roberto Saban & Mirko Pojer
31 views
The FiDeL Project
39 views
18.01.07LSA/FiDeL1 Deliverables Commissioning:Commissioning: Transfer functions [MB, MQ, MQY, MQM, MQX etc…] DC components Decay prediction Snapback prediction
216 views
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems
216 views