×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [free running mode]
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development
220 views
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status
219 views
June 26 th, 2007 SPSC Yves Déclais 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of installation
215 views
October 18 th, 2007 LNGSC Yves Déclais 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1.Status of the installation of the electronic
214 views
Testing elements in a fast communication channel 100GB/s
33 views
Multiconn Srl BMW - iDRIVE Professional Navigation CCC (1-2 buttons) Installation and User Manual ver.1.0 [to integrate with the user manual
216 views
ID Quantique
60 views
< Prev