×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [rf structures]
Introduction to CLIC and breakdown in rf structures W. Wuensch Breakdown physics workshop 6-5-2010
236 views
L-Band Test Stands in ESB Carsten Hast Test Facilities Department Helps to develop and test near-term solutions for accelerator systems including RF structures
214 views
Structure Preparation Techniques and New Materials DC breakdown testing –Test of new materials –Test of in situ and ex-situ heating, plasma treatments,
240 views
H. MAINAUD DURAND CLIC ACTIVE PRE-ALIGNMENT SYSTEM: PROPOSAL FOR CDR AND PROGRAM FOR TDR
218 views
Influence of the Gravity, Vacuum and RF on CLIC Module T0 Behavior 21.11.2011 R. Raatikainen
220 views
Summary of Collaboration “EOI’s” for the CLIC technical developments 2012-2016 HS for CTC
219 views
5 th CLIC X-band collaboration meetingWalter Wuensch16 May 2011 CLIC rf structure program
221 views
Status of X-band program at RadiaBeam Luigi Faillace RadiaBeam Technologies, LLC. Santa Monica, CA 5th Collaboration Meeting on X-band Accelerator Structure
216 views
Fifth International Linear Collider SchoolW. Wuensch 30 October 2010 Room Temperature rf High Gradients: Physics, rf design and Technology When Maxwell’s
216 views
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team CLIC ACTIVE PRE-ALIGNMENT STUDIES: STATUS FOR CDR AND PROSPECTS FOR TDR PHASE
220 views
CLIC ACTIVE PRE-ALIGNMENT STUDIES: STATUS FOR CDR AND PROSPECTS FOR TDR PHASE
30 views
OUTLINE Two beam acceleration feasibility issue
28 views
Next >