×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [stable beams]
Thursday 12 th April - morning Machine in access for a problem on the injection kickers… MKI2 problem – fuse - PFNs were properly charged but pulses were
214 views
News da LHC… *** Discussion title: CMS Commissioning Notes from 09:00 meeting 100627 Current fill (1182) has now been in stable beams for >12 hours. Delivered
212 views
DA-JPL-final
28 views
LHC machine status
220 views
Wolfram KORTEN 1 Euroschool Leuven – Septemberi 2009 Coulomb excitation with radioactive ion beams Motivation and introductionMotivation and introduction
220 views
B-tagging, leptons and missing energy in ATLAS after first data Ivo van Vulpen (Nikhef) on behalf of the ATLAS collaboration
215 views
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 15 March 2011
221 views
Monday 21.3. 06h00: End of fill #1640: 3.7 pb -1. 06h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost
216 views
AGATA AGATA Advanced Gamma-Ray Tracking Array Next-generation spectrometer based on -ray tracking Radioactive and stable beams, high recoil velocities
230 views
Polarisation monitoring Sabine Riemann, Andreas Schälicke, Andriy Ushakov (DESY) Positron Source Group Meeting, 28-30 October, 2009 University of Durham
217 views
LHC Beam Operation CommitteeJune, 14 th 20111 UFOs in the LHC Tobias Baer LBOC June, 14 th 2011 Acknowledgements: N. Garrel, B. Goddard, E.B. Holzer, S
219 views
Beam commissioning strategy 09-12-09 Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning
230 views
Next >