Taking Control of Your Fuzzy
Front EndFront End
MassMedic Presentation
September 22, 2010
Sanjeev Wadhwani
Project Management Consultant
Integrated Project Management Company, Inc.
![Page 2: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/2.jpg)
Sanjeev Wadhwani
Project Manager
Integrated Project Management Company, Inc.
One Broadway, 14th floor
Cambridge, MA 02142
Phone: (617) 401-2325
E-mail: [email protected]
![Page 3: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/3.jpg)
Agenda
Measuring Success
IPM Case Study
Discussion
![Page 4: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/4.jpg)
What Defines a Successful
Product Launch?
Faster Time to Market
Meets Users Needs
Better than 3x VC ROI
Successful Launch
Increases Market Share %
No product recalls
Reduces Healthcare
Costs
Improves Patients’
Lives
Compliant Process
![Page 5: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/5.jpg)
Successful Launch
P r o d u c t D e v e l o p m e n t T i m e l i n e
Main efforts spent on
ensuring a successful
device product launch
P r o d u c t D e v e l o p m e n t T i m e l i n e
Idea Launch
Whether a device launch is
successful is determined much
earlier in the product development
timeline
![Page 6: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/6.jpg)
Top Six Reasons for Product Failure
Unrealistic schedule expectations
Product does not meet customer or
market requirements
Unclear or continually changing
product definitions
0% 10% 20% 30% 40% 50%
Unrealistic financial expectations
Unclear or continually changing
priorities
Projects not adequately staffed
Aberdeen Group, August 2006
![Page 7: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/7.jpg)
Marketing
R&D
Customers 88%
77%
75%
Main Sources for New Product Ideas
0% 20% 40% 60% 80% 100%
Other employees
Sales
Marketing 75%
52%
43%
Best Practices, LLC
![Page 8: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/8.jpg)
Uncovered
Timing of Activities
Balance of Activities
![Page 9: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/9.jpg)
IPM CASE STUDY
![Page 10: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/10.jpg)
Transforming Global Product
Development
Background
• Fortune 500 Medical Device /
Diagnostic Company
• R&D Centers and outsourced
Operations in US and EU
The Issue
• Products delayed to market
• Products did not meet all of the
user needs
• Strong need to increase R&D Operations in US and EU
• Quality, Sales / Marketing,
Regulatory primarily US based
• Portfolio of Class II and III Devices
• Strong need to increase R&D
throughput
The Objective Get more products to market faster which meet the requirements of the end user.
![Page 11: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/11.jpg)
Initial Assessment
� Products delayed
to market
� Products did not
Lack of Portfolio Governance
Over utilized R&D group
Development time for IVD’s >>> industry averages� Products did not
meet all of the
user needs
� Strong need to
increase R&D
throughput
Lack of disciplined approach to product development
Passive Voice of Customer (VOC) feedback process
Development effort >>> market research effort
Significant # of products in development
![Page 12: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/12.jpg)
Current Product Development Process
Development / Design Transfer Product Launch
IFA D E
B C
Idea
G H
Lack of control in critical
upfront processes
Product
Lack of Portfolio Governance
Over utilized R&D group
Development time for IVD’s >>> industry averages
Lack of disciplined approach to product development
Passive Voice of Customer (VOC) feedback process
Development effort >>> market research effort
![Page 13: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/13.jpg)
Welcome the Fuzzy Front End
Key activities between Idea Generation
and Formal DevelopmentFormal Development
(i.e. Design Control)
Fuzzy Front EndDevelopment / Design Transfer
1Cooper R.G., Edgett, S.J.(2008), Maximizing productivity in product innovation, in:
Research Technology Management, March 1, 2008
Idea
Provides key information to
facilitate Go / No-Go decisions(1)
Fuzzy Front End
![Page 14: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/14.jpg)
Consider / Re-consider the
Fuzzy Front End
• Products can fail due to
technical hurdles, but most
likely due to lack of true market
• New products have very high
failure rates
MythMoving Ideas straight into Development
reduces time to market
Reality• Average durations for Development can be
much longer due to Verification and
Validation (Formal Development) being an
experimental exercise
• Products are launched into non-existent
markets or not meeting all of the user needs
![Page 15: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/15.jpg)
Step 1
![Page 16: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/16.jpg)
Idea Screening
Idea B
Idea A
Idea C
Management
Go / No-go Approval
![Page 17: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/17.jpg)
Market Opportunity Assessment
What is the
application or
concept?
What is the
high-level value
proposition?
Who are the
main
competitors?
What initial
markets are we
targeting?
![Page 18: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/18.jpg)
Freedom to Operate (FTO)
Landscape Map™ of the "Starbucks Coffee Sleeve" Patent
![Page 19: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/19.jpg)
Freedom to Operate (FTO)
High-level patent landscape (lifecycle
document)
Determine best mix of outside
(IP expertise) / inside (product insights)
counselcounsel
Build a proactive, participatory
relationship throughout the lifecycle
![Page 20: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/20.jpg)
High-Level Regulatory Assessment
Preliminary regions forecasted to
understand regulatory pathways and hurdles
Regulatory Assessment
Closely tied with FTO and Market Opportunity Assessment
Build a proactive, participatory
relationship throughout the lifecycle
![Page 21: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/21.jpg)
Portfolio Assessment
• Portfolio mix
• R&D throughput
• Development priorityG
I
FA
H
D
E
B
C
Ris
k
C
Return
![Page 22: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/22.jpg)
Initial Wins
Development / Design Transfer Product Launch
A D E
B C
IdeaIF G H
B
One Customer
Data Point
Risk >>> Return
Market landscape had
significantly changed
since inceptionSkunkworks
Project
C
![Page 23: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/23.jpg)
Concept Stage (Idea Screening)
Idea C
Idea B
Idea A
Strategy
• Business Alignment
• High-Level Regulatory
Market Research
• What is the Application or Concept?
• What is the
Technology
• High-LevelTechnological Assessment
C Regulatory Assessment
• Preliminary Freedom to Operate (FTO) Assessment
• Portfolio priority
• What is the Value Proposition?
• Is there a clear market needs?
Management
Go / No-Go Approval
![Page 24: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/24.jpg)
Concept Stage Results
ConceptDevelopment / Design
TransferProduct Launch
Fuzzy Front End
Provide focus to the organization resulting in
the best chance of success in getting the right
ideas into development and
commercialization.
![Page 25: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/25.jpg)
Formal Development (V&V)
Move into Formal Development?
NO!NO!
Technical
Design Control
Proof of Concept
Commercial
What exactly are we
making ?
![Page 26: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/26.jpg)
A Delicate Balance
Commercial
Technical
Concept
![Page 27: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/27.jpg)
Market Research
Factors Variables Importance Rating* (Out of 100%)
Benchmark Performance
Safety Major Complication Rates
40%
Product X
Effectiveness Device Success Rate
Procedural Success Rates
25%
Ease of Use Deployment Time 15%
Patient Comfort Pain Level
Patient Request
15%
Price ASP Target 5%
Differentiation
![Page 28: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/28.jpg)
Reimbursement Strategy
“…a thorough reimbursement strategy has become as
important as the FDA strategy in the success of a new device.”
“Only 26% of the companies indicated that reimbursement
was part of the formal product lifecycle development process”
“How Medical Device Companies Deploy Reimbursement Resources, Report on the Compliance-Alliance
Reimbursement Benchmarking Survey,” Compliance- Alliance, LLC 2007
Challenges to Buy-in on Reimbursement Issues
Lake of awareness of potential consequences of reimbursement barriers 50%
Inadequate authority of the reimbursement function 26%
Inadequate support from senior executives 16%
Inadequate support from CEO 8%
![Page 29: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/29.jpg)
Coverage
Payment
Reimbursement Strategy
Classifies patient
Payment processes
and amounts
P ro d u c t D e ve l o p m e nt T i m e l i n e
CodingClassifies patient
conditions,
services and supplies
required
Determines eligibility for
payment for products &
services
Focus on demonstration of
enhanced outcomes and
cost effectiveness
Clinical StudiesReimbursement Research
& Strategy
Idea Launch
![Page 30: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/30.jpg)
Reimbursement
Strategy
The Global ImpactThe Global Impact
![Page 31: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/31.jpg)
Proof of Concept
Product
Concept
B
Product
Concept
C
Product
Concept
AProduct
Concept
A
Select
Partners
Concept
Clinical Study
Assessment
B CA
Device
AttributesPrototype
Testing
Concept
Selection
Market
Research / VOC
![Page 32: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/32.jpg)
Feasibility Stage
Strategy
• Clinical Strategy
• Pre-Submission Meetings
Market Research
• Detailed Market Assessments
• Key Opinion
Technology
• Prototype Development and evaluation
Requirements
• Product Requirements (Design Inputs)
Product
Concept
A
Meetings
• Supplier Assessments
• Continued FTO Evaluation
• Publication Strategy
• Key Opinion Leaders
• Medical / Scientific Boards
• Initial Reimbursement Data
• Health Economics
and evaluation
• Initial Manufacturing Assessments
(Design Inputs)
![Page 33: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/33.jpg)
Feasibility Stage Results
Concept FeasibilityDevelopment / Design
Transfer Product Launch
Fuzzy Front EndFuzzy Front End
Solidify the business case of the idea by
capturing more robust product requirements
and intended uses through detailed market
research and proof of concept evaluations.
![Page 34: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/34.jpg)
Formal Development (V&V)
Move into Formal Development?
NO!NO!
What we are building does not gurantee how we are
building it
![Page 35: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/35.jpg)
Planning
What
• Design and Development Plan
• Deliverables Matrix by Stage
• Design History File
Who
• Roles and Responsibility Matrix
• Decision Rights
When
• Detailed project schedule
• Critical path assessment
• Acceleration opportunities
How Much
• Detailed Budget Assessment
Any Risks?
• Risk Management Process
Feedback
• VOC
• IP
• Regulatory
• Stage Gate Reviews
• Design Reviews
![Page 36: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/36.jpg)
Planning Stage Results
Concept Feasibility PlanningDevelopment / Design
Transfer Product Launch
Fuzzy Front EndFuzzy Front End
Prior to entering formal development, ensure adequate
preparation has been completed to increase the
chances of developing and launching a successful
product.
![Page 37: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/37.jpg)
Refined Product Development Stage
Gate Process
Concept Feasibility Planning Development (V&V)Design
Transfer Product Launch
Formal
Development
Begins
Fuzzy Front End
Stage Gates
Design ReviewThe fuzzy front end can consume up to 50% of
development time and it is where the course for
the entire project and final end product are set
Source: Chapter 3 Smith, Preston G. and Reinertsen, Donald G. (1998) Developing
Products in Half the Time, 2nd Edition, John Wiley and Sons, New York, 1998
![Page 38: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/38.jpg)
Formal Development (V&V)
Move into Formal Development?
YES!YES!
![Page 39: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/39.jpg)
Client Impact
Faster Time to Market
Meets Users Needs
Better than 3x VC ROI
Client was not VC
funded; however,
was viewed as a
stronger partner in
Dx / Rx relationship
Successful Launch
Increases Market Share %
No product recalls /
complaintsReduces
Healthcare Costs
Improves Patient’s
Lives
Compliant Process
None identified
![Page 40: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/40.jpg)
Key Takeaways
• $$$$ and TTM are just a few factors determining
product launch success
• Investigate• Investigate
• Educate
![Page 41: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/41.jpg)
![Page 42: Taking Control of Your Fuzzy Front End · 2017. 3. 30. · Fuzzy Front End Stage Gates The fuzzy front end can consume up to 50% of Design Review development time and it is where](https://reader035.vdocuments.net/reader035/viewer/2022081616/6002d2a19d88db044035cc30/html5/thumbnails/42.jpg)
Sanjeev Wadhwani
Project Manager
Integrated Project Management Company, Inc.
One Broadway, 14th floor
Cambridge, MA 02142
Phone: (617) 401-2325
E-mail: [email protected]