taking up challenges in the construction industry
DESCRIPTION
Planning for success: applying lean principles to project planning so that the whole supply chain is involved.TRANSCRIPT
Planning for success:applying lean principles to project planning so that the whole supply chain is involved
*
Taking up Challenges in the Construction Industry using the Lean Philosophy
IQPC Process Excellence Benelux
Brussels 26 October 2010
Rudy Gort MSc. MBA
Manager Lean Construction
Confident about quality results?
World wide annoyances about contractors...
delays
cost overruns
quality issues
World wide public area annoyances...
obstructions
trash
noise
Challenges within the contracting industry
Causes of failure
Communication losses
Each barrier cost
Remedy
teamwork
war roomapproach
get attuned
Who is Heembouw?
5S - workplace organisation: a change of attitude
Pull-planning: tackling the construction process together
plan
plan
planfor commitment!
Weekly work meetings: check and fine-tune the pull-planning
do
check
act
van producten die invloed hebben op het ontwerp
Influence curve
Pull-planning
Dedicated
Getting right things done (effective) Getting things done right (efficient)
Hard-bidBouwteam
Turn-key
• Quality • Cost• Safety• Sustainability
Dedicated design & engineering: the war room approach
Heembouw results
Quality Defects-list: 46% ⇩ Complaints: 44% ⇩
Cost Cost due to defects: 84% ⇩ Cost due to complaints: 40% ⇩
Delivery On time: >95% Construction time: 10-40% ⇩
Safety Injuries (IF): 13% ⇩ Safety issues: 10% ⇧
Satisfaction Customer satisfaction: 7,9 (5 years average) Employee satisfaction: 7,8 (5 years average)