Talisman gets robust, weather-proof heli-portable drilling camp in remote Papua New Guinea rainforest RSHS delivered our drilling camp end-to-end with minimum glitches. Be it design, manufacture or logistics, their team handled situations exceptionally well, and addressed even the minutest detail, exceeding our expectations. Loved working with them! CLIENT SUCCESS STORY

Upload: tranliem

Post on 19-Jul-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Talisman gets robust, weather-proof heli-portable drilling ...redseahousing.com/sites/default/files/rsh-case-study-talisman... · Talisman gets robust, weather-proof heli-portable

Talisman gets robust,

weather-proof heli-portable

drilling camp in remote Papua

New Guinea rainforest

RSHS delivered our drilling camp end-to-end with minimum glitches. Be it design, manufacture or logistics,

their team handled situations exceptionally well, and addressed even the minutest detail, exceeding our

expectations. Loved working with them!

CLIENT SUCCESS STORY

Page 2: Talisman gets robust, weather-proof heli-portable drilling ...redseahousing.com/sites/default/files/rsh-case-study-talisman... · Talisman gets robust, weather-proof heli-portable

Talisman Energy Inc. is a global upstream oil and gas company, headquartered in Canada. Operating out

of the Americas and Asia-Pacific, Talisman is committed to conducting safe business, and is included in

the Dow Jones Sustainability (North America) Index.

About the client

Key Challenges

¤ Extreme remote location

in dense rainforest with

heavy rainfall

¤ Long complex logistics

route with multiple

offloads and lifts

¤ Camp unit design to

ensure weight capacity

compliance (9.5 metric

tonne)

¤ Tight project

commissioning deadline

¤ Tough living conditions for

RSHS personnel

Project 80-capacity helicopter-portable

drilling camp

Customer Talisman Energy

Industry Oil & Gas

Location Various locations in Western Province,

Papua New Guinea

Completion Date Mid 2011

Contract Value USD 2.5 million

Products Utilized Seaway Series

Project Units

Implemented

Accommodation units, Dining unit,

Kitchen area, Food storage modules,

First aid room, Office unit,

Recreation room

Project Snapshot

Page 3: Talisman gets robust, weather-proof heli-portable drilling ...redseahousing.com/sites/default/files/rsh-case-study-talisman... · Talisman gets robust, weather-proof heli-portable

The Need

As part of their exploratory activities in the dense, tropical rainforests of Papua New Guinea, Talisman

required a helicopter-portable drilling camp comprising of 80 single accommodation units with en-

suite, dining hall and kitchen, food storage modules, and first aid room. Moreover, their plan included

providing a drilling managers’ office complex installed in close proximity to the drilling rig platform.

Location map

Location of installation of 80 man

Drilling Camp for Talisman Energy

Page 4: Talisman gets robust, weather-proof heli-portable drilling ...redseahousing.com/sites/default/files/rsh-case-study-talisman... · Talisman gets robust, weather-proof heli-portable

The Project

The Red Sea Housing Services (RSHS) team of experts were able to design, manufacture, ship, and

commission the entire drilling camp within the limited timeframe, despite trying weather conditions

and logistical challenges. RSHS built comfortable living quarters for the Talisman drilling team, complete

with dining hall and kitchen, food storage modules, recreation room with games tables and lounge

chairs, first aid room, etc.

General location in Western

Province close to the Strickland River

Page 5: Talisman gets robust, weather-proof heli-portable drilling ...redseahousing.com/sites/default/files/rsh-case-study-talisman... · Talisman gets robust, weather-proof heli-portable

Drilling site where 80 man to be installed

Page 6: Talisman gets robust, weather-proof heli-portable drilling ...redseahousing.com/sites/default/files/rsh-case-study-talisman... · Talisman gets robust, weather-proof heli-portable

Chinook lifting RSHS modules

Page 7: Talisman gets robust, weather-proof heli-portable drilling ...redseahousing.com/sites/default/files/rsh-case-study-talisman... · Talisman gets robust, weather-proof heli-portable

Camp partially assembled

Page 8: Talisman gets robust, weather-proof heli-portable drilling ...redseahousing.com/sites/default/files/rsh-case-study-talisman... · Talisman gets robust, weather-proof heli-portable

Camp assembly in progress

Page 9: Talisman gets robust, weather-proof heli-portable drilling ...redseahousing.com/sites/default/files/rsh-case-study-talisman... · Talisman gets robust, weather-proof heli-portable

Camp assembly in progress

Page 10: Talisman gets robust, weather-proof heli-portable drilling ...redseahousing.com/sites/default/files/rsh-case-study-talisman... · Talisman gets robust, weather-proof heli-portable

Covered walkway between accommodation rooms

Page 11: Talisman gets robust, weather-proof heli-portable drilling ...redseahousing.com/sites/default/files/rsh-case-study-talisman... · Talisman gets robust, weather-proof heli-portable

Fuel Storage adjacent to generators

Page 12: Talisman gets robust, weather-proof heli-portable drilling ...redseahousing.com/sites/default/files/rsh-case-study-talisman... · Talisman gets robust, weather-proof heli-portable

Final commissioning

Page 13: Talisman gets robust, weather-proof heli-portable drilling ...redseahousing.com/sites/default/files/rsh-case-study-talisman... · Talisman gets robust, weather-proof heli-portable

Camp completed and commissioned

Page 14: Talisman gets robust, weather-proof heli-portable drilling ...redseahousing.com/sites/default/files/rsh-case-study-talisman... · Talisman gets robust, weather-proof heli-portable

Drilling Office complex in position. Note all RSHS modules

are white.

Page 15: Talisman gets robust, weather-proof heli-portable drilling ...redseahousing.com/sites/default/files/rsh-case-study-talisman... · Talisman gets robust, weather-proof heli-portable

Drilling offices

Page 16: Talisman gets robust, weather-proof heli-portable drilling ...redseahousing.com/sites/default/files/rsh-case-study-talisman... · Talisman gets robust, weather-proof heli-portable

REDSEA .COMHOUSING

Highlights of the project

¤ Minimal assembly onsite and rapid commissioning

¤ Crisp and functional design to avoid damage during helicopter sling transit

¤ Robust build quality to endure regular relocation

¤ Heavy rain-proof, internal condensation-resistant camp

¤ Aerial visibility in bad weather conditions