TAM Symposium Airport CDM to TAM Frank Brenner Director General EUROCONTROL 15 October 2013

Upload: lylien

Post on 29-Aug-2019

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TAM Symposium - dlr.de fileTAM Symposium - Frank Brenner, Director General of EUROCONTROL 3 Challenges of growth – major challenges Deliver planned airport capacity and bridge the

TAM Symposium Airport CDM to TAM

Frank Brenner Director General EUROCONTROL 15 October 2013

Page 2: TAM Symposium - dlr.de fileTAM Symposium - Frank Brenner, Director General of EUROCONTROL 3 Challenges of growth – major challenges Deliver planned airport capacity and bridge the

TAM Symposium - Frank Brenner, Director General of EUROCONTROL 2

Importance of the Network

Page 3: TAM Symposium - dlr.de fileTAM Symposium - Frank Brenner, Director General of EUROCONTROL 3 Challenges of growth – major challenges Deliver planned airport capacity and bridge the

TAM Symposium - Frank Brenner, Director General of EUROCONTROL 3

Challenges of growth – major challenges

Deliver planned airport capacity and bridge the 1.9m flight gap

Deliver network performance, with airport delays up by factor of 5

Ensure sustainability of that growth, e.g. emissions will continue to grow

Build resilience to climate change that will affect demand, infrastructure and day-to-day operations

airport capacity

sustainability

resilience to climate change

network performance

http://www.eurocontrol.int/articles/challenges-growth

Page 4: TAM Symposium - dlr.de fileTAM Symposium - Frank Brenner, Director General of EUROCONTROL 3 Challenges of growth – major challenges Deliver planned airport capacity and bridge the

TAM Symposium - Frank Brenner, Director General of EUROCONTROL 4

Source - IATA

Page 5: TAM Symposium - dlr.de fileTAM Symposium - Frank Brenner, Director General of EUROCONTROL 3 Challenges of growth – major challenges Deliver planned airport capacity and bridge the

TAM Symposium - Frank Brenner, Director General of EUROCONTROL 5

Challenges for the Network

Airports are the nodes of the Network Operations need to work closer

Airports are bottlenecks to the Network

New airports / expansion extremely difficult

SES achievement not possible without Airports Airports performance influences Network performance Network performance impacts Airports’ performance

Page 6: TAM Symposium - dlr.de fileTAM Symposium - Frank Brenner, Director General of EUROCONTROL 3 Challenges of growth – major challenges Deliver planned airport capacity and bridge the

TAM Symposium - Frank Brenner, Director General of EUROCONTROL 6

Airports with summer delay

2012 2035

Page 7: TAM Symposium - dlr.de fileTAM Symposium - Frank Brenner, Director General of EUROCONTROL 3 Challenges of growth – major challenges Deliver planned airport capacity and bridge the

TAM Symposium - Frank Brenner, Director General of EUROCONTROL 7

Airport CDM

The link between Airport Operations and Network Operations

Provides a two-way exchange of

information

Recognised as a way to integrate airports with the ATFM Network with benefits for both

Page 8: TAM Symposium - dlr.de fileTAM Symposium - Frank Brenner, Director General of EUROCONTROL 3 Challenges of growth – major challenges Deliver planned airport capacity and bridge the

TAM Symposium - Frank Brenner, Director General of EUROCONTROL 8

Airport Collaborative Decision Making

Improve predictability

Improve on-time performance

Reduce ground movement costs

Optimise use of infrastructure & reduce congestion

Reduce ATFM slot wastage

Flexible pre-departure planning

Reduce apron & taxiway congestion

Page 9: TAM Symposium - dlr.de fileTAM Symposium - Frank Brenner, Director General of EUROCONTROL 3 Challenges of growth – major challenges Deliver planned airport capacity and bridge the

TAM Symposium - Frank Brenner, Director General of EUROCONTROL 9

What if more airports implement?

Network perspective Network benefits evident with 8 currently implemented Airports 42 CDM airports

Potential 18 to 23% reduction of ATFM delay NM Target 20 A-CDM airports by 2014.

Importance Compounded – A-CDM regarded as baseline for;

SESAR developments (TAM/AOP/APOC etc.)

Implementation Accelerating Benefits evident Experience

Page 10: TAM Symposium - dlr.de fileTAM Symposium - Frank Brenner, Director General of EUROCONTROL 3 Challenges of growth – major challenges Deliver planned airport capacity and bridge the

TAM Symposium - Frank Brenner, Director General of EUROCONTROL 10

A-CDM Implementation Status

CDG

VIE BUD

Initial phase

Ongoing

A-CDM Airport

PRG

ZRH MXP

AMS

FCO

MUC

LYS

LIS

BRU

WAW

OSL

ATH

HER

BCN

SXF

GVA

IST MAD

PMI

LGW

DUS

FRA

RHO

TLS LIN VCE

MAN

BHX

DUB

CPH

LTN

A-CDM 2013

LJU

ORY

LHR

A-CDM 2014

STR

HAM KBP

HEL

ARN

SOF

Page 11: TAM Symposium - dlr.de fileTAM Symposium - Frank Brenner, Director General of EUROCONTROL 3 Challenges of growth – major challenges Deliver planned airport capacity and bridge the

TAM Symposium - Frank Brenner, Director General of EUROCONTROL 11

Airport CDM

Already providing a check of flight plan with airport slot for departing flights

Further enhancements with the introduction of Centralised Service 1

Already providing information to NMOC on departing flights

With TAM, enhanced information to feed Centralised Service 2

http://www.eurocontrol.int/centralised-services

Page 12: TAM Symposium - dlr.de fileTAM Symposium - Frank Brenner, Director General of EUROCONTROL 3 Challenges of growth – major challenges Deliver planned airport capacity and bridge the

TAM Symposium - Frank Brenner, Director General of EUROCONTROL 12

The Future - TAM

The SESAR Airport Operations Management concept enhances the principles of Airport CDM Extended information sharing supported by the Airport Operations Plan

(AOP) Extended time horizon: from long-term planning to post operations Enhanced collaborative decision making through the Airport Operations

Centre (APOC)

Source: EUROCONTROL ATM Lexicon

Page 13: TAM Symposium - dlr.de fileTAM Symposium - Frank Brenner, Director General of EUROCONTROL 3 Challenges of growth – major challenges Deliver planned airport capacity and bridge the

TAM Symposium - Frank Brenner, Director General of EUROCONTROL 13

The Future - TAM

Better integration of the airports in the ATM network through AOP / Network Operations Plan (NOP) integration

• Different airports: • Same shared data • Same quality of data • Different local complexity • Different support systems

• Airport demand / capacity changes automatically reflected in the NOP

• NOP changes communicated to ‘interested’ AOPs

Page 14: TAM Symposium - dlr.de fileTAM Symposium - Frank Brenner, Director General of EUROCONTROL 3 Challenges of growth – major challenges Deliver planned airport capacity and bridge the

TAM Symposium - Frank Brenner, Director General of EUROCONTROL 14

A-CDM – A stepping stone towards TAM

A-CDM is successful and demonstrating benefits

We fully support TAM, the next step

We are eager to contribute towards TAM development (with a view to eventual deployment)

Page 15: TAM Symposium - dlr.de fileTAM Symposium - Frank Brenner, Director General of EUROCONTROL 3 Challenges of growth – major challenges Deliver planned airport capacity and bridge the

TAM Symposium Airport CDM to TAM

Frank Brenner Director General EUROCONTROL 15 October 2013