Summary 7+ years experience in Electrical Testing and commissioning engineering project management, coordination, inspection, testing,commissioing. Primary familiarity with protective relays and DC Protection schemes & FR at Different Voltage level (400/132 kV , 132/11 kV )
4 years Electrical Engineering experience of gulf market (UAE&QATAR) Effective communication, interpersonal, problem-solving, planning and coordination skills Always take pride in doing a job, willing to learn new skills, team player, confident and responsible
Competency Approved by AADC for Backup Protection Relays and Bay control and Protection Unit Approved by Kahramaa for Backup Protection Relays Testing and Bay control Unit
Work Experience In GULF Market Organization: BORGE General contracting and Electromechanical – Abu dhabi Commissioing Engineer- Electrical Doha Festival City (DFC), kahramaa 132/11kV Substation,Qatar Sep 2015 – Till date
Back up Protection Relays Testing SIEMENS 7SJ61, 7SJ62, 7SJ63, 7SJ64, 6MD66, 7SJ80 Involved in 132kV/11 kV Back up Protection Relay Testing the and protection devices
coordination work Automatic Voltage Regulator (AVR) Relay testing, and AVR functional Check. Load shedding Relay SIEMENS 7SJ61Testing and its Functional check. 132/11 kV Protection Panel Scheme check, TCS current measurement check, Trip circuit
Function check, Trip logic Test. 132kV, 11kV Busbar Protection stability Test, Cable/Transformer Differential stability Test. End to End Test Co ordination End Fault Protection Test CBF Scheme check Participated in Energization and doing Load Test, Follewd up the Pending item/ snags.
Commissioing Engineering - Electrical Zakher AADC 132/33/11kV Substation, Al ain Mar 2015 – Sep 2015
Distribution systems 132kV/33/11 kV Back Up Protection Relays ABB REF 630,REF 615 Testing DC and Fault Recorder carried out, Protection scheme check, Interlocking Test, SCMS signals. Participate in the coordination activities and concerns with the technical developments,
scheduling and resolving engineering problems. 132kV, 11kV Busbar Protection stability Test, Cable/Transformer Differential stability Test. End to End Test Co ordination CBF Scheme check
Commissioing Engineering - Electrical Ain al Faydha AADC 132/33kV Substation, Al ain Dec 2014 – Mar 2015
Power distribution systems 132kV/33 kV Back Up Protection Relays ABB REF 630, REF 615 Testing.
Protection Panel scheme check, Interlocking Test, SCMS signal check Involved in the protection devices coordination work Bus bar stability and sensitivity Test CBF Scheme check Load shedding Relay REF 630 Testing and Load shedding Functional check Participated in Energization and doing Load Test, Follewd up the Pending item/ snags.
Commissioing Engineering - Electrical Ai Qidfa Water Pumping station, Fujairah Sep 2014 – Dec 2014
LVAC 415V Back Up Protection Relays SIEMENS 7SJ61, 7SJ62, MICOM P921 Testing. 11 kV REF 545 Relay Testing CT, VT, ACB Testing Auxiliary Relay Testing, Primary and secondary Injection Testing Coordination with the clients to ensure that the system
Commissioing Engineering - Electrical ADDC E12 132/11 kV Substation, Abu dhabi Feb 2014 – Sep 2014
Involved in Protection Panel Scheme check,TCS Functional check, TCS current Measurement check, Trip Test
LCC AC/DC Scheme check, Synchrocheck, Interlock Test. End to End Test Co ordination Participate in the coordination activities and concerns with the technical developments,
scheduling and resolving engineering problems
Commissioing Engineering - Electrical ADDC Presidential Palace 132/11 kV Substation, Abu dhabi Mar 2013 – Feb 2014
Involved in Protection Panel Scheme check,TCS Functional check, TCS current Measurement check, Trip Test
Auxiliary Relay Testing LCC AC/DC Scheme check, Synchrocheck, Interlock Test. AVR Parellel Operation Check 132kV, 11kV Busbar Protection stability Test, Cable/Transformer Differential stability Test. End to End Test Co ordination CBF Scheme check Participated in Energization and doing Load Test, Follewd up the Pending item/ snags. Participate in the coordination activities and concerns with the technical developments,
scheduling and resolving engineering problems
Commissioing Engineering - Electrical Emirates Aluminium (EMAL) 132/ 11kV Substation, Abu dhabi June 2012 – Feb 2013
Protection Relays Testing ABB REF 615, RED615, RET 615. Supporting In Main Realy Testing ABB RED 670, SIEMENS 7SD522 Auxiliary Relay Testing AC/DC Scheme check, Trip circuit functional check, Trip logic Test Bus bar stability, sensitivity Test Transformer Stability and sensitivity test Cable Feeder Stability and sensitivity test End to End Test co ordination Modifications and Red markup
Commissioing Engineer- Electrical Khuraityat (KHU), kahramaa 132/11kV Substation,Qatar Jan 2012 – May 2012
Back up Protection Relays Testing ABB REF 630, REF 615, RET615 Supporting in Main Relay Tesing ABB RED 670, SIEMENS 7SD522 Involved in 132kV/11 kV Protection panel Back up Protection Relay Testing the and protection
devices coordination work Load shedding Relay SIEMENS 7SJ61Testing and its Functional check. 132/11 kV Protection Panel Scheme check, TCS current measurement check, Trip circuit
Function check, Trip logic Test. 132kV, 11kV Busbar Protection stability Test, Cable/Transformer stability Test. End to End Test Co ordination End Fault Protection Test CBF Scheme check Participated in Energization and doing Load Test, Follewd up the Pending item/ snags.
Work Experience In India Organization: Technosys Engineers & Consultants (Chennai) P (Ltd) – Chennai Commissioing Engineer- Electrical Bhushan Steel Limited 220/132 kV Substation, Odisha June 2010 – Dec 2011
Back up Protection Relays 7SJ61, 7SJ62, 7SJ64 Testing Main Protection Relays RED 670 Testing CT/VT Breaker Testing AC/DC Panel scheme scheck Primary/Secondary injection Test Power Transformers Testing MV Switchgear Bus Duct Lead a team of five electrical engineers in the successful execution of electrical Testing project
within budget and on schedule. Ensure effective communication within the team and between project disciplines, and with client
engineers. with the technical developments, scheduling and resolving engineering problems.
Commissioing Engineer- Electrical Adani Power Plant , Gujarat Jan 2009 – June 2010
Protection Relays GE F650, T60 Testing AC/DC Scheme check/ ATS Scheme check HT/LT Motors Testing and commissioning CT/VT, Breaker Testing 40 MVATransformer Testing Transformer Mechanical Protection Cable Testing Transformer Stability and sensitivity test Busbar Stability and sensitivity test
Commissioing Engineer- Electrical TATA Steel Ltd, Jamshedpur Jul 2008 – Dec 2008
CT/VT, Breaker Testing Transformer Testing Cable Testing EOT Crane Troubleshooting, Preperation of control cable schedule HV Test for Busbar and cables Primary/Secondary injection Test DC Scheme check TCS/TSS Check Synchrocheck Interlock Test.
Relay Experience: ABB Relays
REF 615 - Over Current & Earth Fault Protection Relay. REF 630 - Bay Control and Protection Unit. REF 545 - Bay Control and Protection Unit. RET 615 - Transformer Protection Relay. RED670 - Cable Differential Protection RED615 - Cable Differential Protection
Siemens Relays
7SJ61,7SJ62,7SJ64 - Feeder Protection Relay. 7SJ62,7SJ80 - Feeder Protection Relay. 7SD522 - Cable Differential Protection 7SJ647 , 6MD66 - Bay Control Unit
Other Relays
GE F650 - Multifunctional Relay. GE T60 - Transformer Protection Relay MICOM P921 - Feeder Protection Relay.
SOFTWARE USED:
ABB PCM SIEMENS DIGSI Schneider Electric S1 Studio GE Multilin
PROFPOSINAL QULIFICATION:
B.E (Electrical & Electronics Engineering) Sudharsan Engineering College Anna University of engineering and Technology, Chennai-INDIA 2004 – 2008
PERSONAL DETAILS:
Date of Birth : 30/07/1987
Sex : Male
Marital Status : Single
Nationality : Indian
Current Location : Dubai
Passport Number : H0080664
DECLARATION:
I hereby declare that all the above information’s are true to the best of my knowledge and belief.
Place : Dubai
Date :07/02/2016 (TAMILSELVAN)