tamilselvan 26.01

5
TAMILSELVAN GOVINDAN Testing and commissioning Engineer- Electrical Abu Dhabi, UAE [email protected] +971528836069 , +91 9715157791 Dubai,U.A.E. Summary 7+ years experience in Electrical Testing and commissioning engineering project management, coordination, inspection, testing,commissioing. Primary familiarity with protective relays and DC Protection schemes at Different Voltage level (132/33/11 kV , 132/11 kV ) 4 years Electrical Engineering experience of gulf market (UAE&QATAR) Effective communication, interpersonal, problem-solving, planning and coordination skills Always take pride in doing a job, willing to learn new skills, team player, confident and responsible Competency Approved by AADC for Backup Protection Relays and Bay control and Protection Unit Approved by Mott Macdonald (for Kharamaa Project) for Backup Protection Relays Testing and Bay control Unit Work Experience Commissioing Engineer- Electrical Zakher AADC 132/33/11kV Substation, Al ain Apr 2016 – till date Distribution systems 132kV/33/11 kV Back Up Protection Relays ABB REF 630,REF 615 final setting testing. Load shedding Relays final setting testing and its functional check DMS Signal check. Commissioing Engineer- Electrical Doha Festival City (DFC), kahramaa 132/11kV Substation,Qatar Sep 2015 – Mar 2016 Back up Protection Relays component and final setting Testing of SIEMENS 7SJ61, 7SJ62, 7SJ63, 7SJ64, 6MD66, 7SJ80, Solkor Relay 7PG21 Testing. Involved in 132kV/11 kV Back up Protection Relay Testing the and protection devices coordination work Commissioing Engineer- Electrical Zakher AADC 132/33/11kV Substation, Al ain Apr 2015 – Sep 2015 Distribution systems 132kV/33/11 kV Back Up Protection Relays ABB REF 630,REF 615 Testing Protection scheme check, Interlocking Test, SCMS signals. Participate in the coordination activities and concerns with the technical developments, scheduling and resolving engineering problems.

Upload: tamil-selvan

Post on 07-Feb-2017

23 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: TAMILSELVAN 26.01

TAMILSELVAN GOVINDAN Testing and commissioning Engineer- Electrical Abu Dhabi, UAE

[email protected]

+971528836069 , +91 9715157791

Dubai,U.A.E.

Summary 7+ years experience in Electrical Testing and commissioning engineering project management, coordination, inspection, testing,commissioing. Primary familiarity with protective relays and DC Protection schemes at Different Voltage level (132/33/11 kV , 132/11 kV )

4 years Electrical Engineering experience of gulf market (UAE&QATAR) Effective communication, interpersonal, problem-solving, planning and coordination skills Always take pride in doing a job, willing to learn new skills, team player, confident and responsible

Competency Approved by AADC for Backup Protection Relays and Bay control and Protection Unit Approved by Mott Macdonald (for Kharamaa Project) for Backup Protection Relays Testing

and Bay control Unit

Work Experience

Commissioing Engineer- Electrical Zakher AADC 132/33/11kV Substation, Al ain Apr 2016 – till date

Distribution systems 132kV/33/11 kV Back Up Protection Relays ABB REF 630,REF 615 final setting testing.

Load shedding Relays final setting testing and its functional check DMS Signal check.

Commissioing Engineer- Electrical Doha Festival City (DFC), kahramaa 132/11kV Substation,Qatar Sep 2015 – Mar 2016

Back up Protection Relays component and final setting Testing of SIEMENS 7SJ61, 7SJ62, 7SJ63, 7SJ64, 6MD66, 7SJ80,

Solkor Relay 7PG21 Testing. Involved in 132kV/11 kV Back up Protection Relay Testing the and protection devices

coordination work

Commissioing Engineer- Electrical Zakher AADC 132/33/11kV Substation, Al ain Apr 2015 – Sep 2015

Distribution systems 132kV/33/11 kV Back Up Protection Relays ABB REF 630,REF 615 Testing Protection scheme check, Interlocking Test, SCMS signals. Participate in the coordination activities and concerns with the technical developments, scheduling and resolving engineering problems.

Page 2: TAMILSELVAN 26.01

132kV, 11kV Busbar Protection stability Test, Cable/Transformer Differential stability Test. End to End Test Co ordination CBF Scheme check DMS Signal check Transformer and Cable Stability Test

Commissioing Engineer - Electrical Ain al Faydha AADC 132/33kV Substation, Al ain Jan 2015 – Mar 2015

Power distribution systems 132kV/33 kV Back Up Protection Relays ABB REF 630, REF 615 Testing. Protection Panel scheme check, Interlocking Test, SCMS signal check Involved in the protection devices coordination work Bus bar stability and sensitivity Test CBF Scheme check Load shedding Relay REF 630 Testing and Load shedding Functional check Participated in Energization and doing Load Test, Follewd up the Pending item/ snags.

Commissioing Engineer - Electrical Ai Qidfa Water Pumping station, Fujairah Oct 2014 – Dec 2014

LVAC 415V Back Up Protection Relays SIEMENS 7SJ61, 7SJ62, MICOM P921 Testing. CT, VT, ACB Testing Auxiliary Relay Testing, Primary and secondary Injection Testing Coordination with the clients to ensure that the system

Commissioing Engineer - Electrical ADDC E12 132/11 kV Substation, Abu dhabi Mar 2014 – Sep 2014

Involved in Protection Panel Scheme check,TCS Functional check, TCS current Measurement check, Trip Test LCC AC/DC Scheme check, Synchrocheck, Interlock Test. End to End Test Co ordination Participate in the coordination activities and concerns with the technical developments, scheduling and resolving engineering problems

Commissioing Engineer - Electrical ADDC Presidential Palace 132/11 kV Substation, Abu dhabi Mar 2013 – Feb 2014

Involved in Protection Panel Scheme check,TCS Functional check, TCS current Measurement check, Trip Test Auxiliary Relay Testing LCC AC/DC Scheme check, Synchrocheck, Interlock Test. AVR Parellel Operation Check 132kV, 11kV Busbar Protection stability Test, Cable/Transformer Differential stability Test. End to End Test Co ordination CBF Scheme check Participate in the coordination activities and concerns with the technical developments, scheduling and resolving engineering problems

Page 3: TAMILSELVAN 26.01

Commissioing Engineer - Electrical Emirates Aluminium (EMAL) 132/ 11kV Substation, Abu dhabi June 2012 – Feb 2013

Protection Relays Testing ABB REF 615, RED615, RET 615. Supporting In Main Realy Testing ABB RED 670, SIEMENS 7SD522 Auxiliary Relay Testing AC/DC Scheme check, Trip circuit functional check, Trip logic Test Bus bar stability, sensitivity Test Transformer Stability and sensitivity test Cable Feeder Stability and sensitivity test End to End Test co ordination Modifications and Red markup

Commissioing Engineer- Electrical Khuraityat (KHU), kahramaa 132/11kV Substation,Qatar Jan 2012 – May 2012

Back up Protection Relays Testing ABB REF 630, REF 615, RET615 Involved in 132kV/11 kV Protection panel Back up Protection Relay Testing the and protection devices coordination work Load shedding Relay SIEMENS 7SJ61Testing and its Functional check. 132/11 kV Protection Panel Scheme check, TCS current measurement check, Trip circuit Function check, Trip logic Test. 132kV, 11kV Busbar Protection stability Test, Cable/Transformer stability Test. End to End Test Co ordination CBF Scheme check Participated in Energization and doing Load Test, Follewd up the Pending item/ snags.

Work Experience In India Organization: Technosys Engineers & Consultants (Chennai) P (Ltd) – Chennai Commissioing Engineer- Electrical Bhushan Steel Limited 220/132 kV Substation, Odisha June 2010 – Dec 2011

Back up Protection Relays 7SJ61, 7SJ62, 7SJ64 Testing CT/VT Breaker Testing AC/DC Panel scheme scheck Primary/Secondary injection Test Power Transformers Testing MV Switchgear Bus Duct Lead a team of five electrical engineers in the successful execution of electrical Testing project within budget and on schedule. Ensure effective communication within the team and between project disciplines, and with client engineers. with the technical developments, scheduling and resolving engineering problems.

Page 4: TAMILSELVAN 26.01

Commissioing Engineer- Electrical Adani Power Plant , Gujarat Jan 2009 – June 2010

Protection Relays GE F650, T60 Testing AC/DC Scheme check/ ATS Scheme check HT/LT Motors Testing and commissioning CT/VT, Breaker Testing 40 MVATransformer Testing Transformer Mechanical Protection Cable Testing Transformer Stability and sensitivity test Busbar Stability and sensitivity test

Commissioing Engineer- Electrical TATA Steel Ltd, Jamshedpur Jul 2008 – Dec 2008

CT/VT, Breaker Testing Transformer Testing Cable Testing EOT Crane Troubleshooting, Preperation of control cable schedule HV Test for Busbar and cables Primary/Secondary injection Test DC Scheme check TCS/TSS Check Synchrocheck Interlock Test.

Relay Experience: ABB Relays

REF 615 - Over Current & Earth Fault Protection Relay. REF 630 - Bay Control and Protection Unit. REF 545 - Bay Control and Protection Unit. RET 615 - Transformer Protection Relay. RED615 - Cable Differential Protection

Siemens Relays

7SJ61,7SJ62,7SJ64 - Feeder Protection Relay. 7SJ62,7SJ80 - Feeder Protection Relay. 7SJ647 , 6MD66 - Bay Control Unit

Other Relays

GE F650 - Multifunctional Relay. GE T60 - Transformer Protection Relay MICOM P921 - Feeder Protection Relay.

TESTING INSTRUMETS HANDLED:

OMICRON CMC 356 FREJA 306 OMICRON CPC 100

Page 5: TAMILSELVAN 26.01

PROFPOSINAL QULIFICATION: B.E (Electrical & Electronics Engineering) Sudharsan Engineering College Anna University of engineering and Technology, Chennai-INDIA 2004 – 2008 PERSONAL DETAILS: Date of Birth : 30/07/1987

Sex : Male

Marital Status : Married

Nationality : Indian

Current Location : Dubai

Passport Number : H0080664

DECLARATION: I hereby declare that all the above information’s are true to the best of my knowledge and belief. Place : Dubai Date :26/01/2017 (TAMILSELVAN)