tap knitted assignment 2007-2003
TRANSCRIPT
DEPARMENT OF FASHION TECHNOLOGY
MASTERS OF FASHION TECHNOLOGY
ASSIGNMENT 1: “ OPERATION BREAKDOWN OF WOVEN AND KNITTED
GARMENT”
Subject: “Technology of apparel production”
Submission date: 9 sept, 2011
Submitted to- Submitted by-
Mr.Yoginder kumar.
Ms. Anupama gupta Mr. shreeshail k.kolekar. (12)
Assistant professor, Ms.Geetima singh.(25) Department of fashion technology, MFT-1(2011-2013)
Nift New delhi.
Contents:
• Description of the garment.
• Flat sketch
• Trims used.
• Part listing.
• Operation breakdown.
• Flow Diagram.
Seam types
Stitch types
M/c details.
Threads used
Needle details.
KNITTED
(1)Description of the garment.
(2)Trims used.
Buttons, threads, collar, labels, sleeve strip(rib)
(3) Flat sketch.
Garment Description Garment Polo ShirtBrand poloSize 40Fibre 100% CottonColour White and BlackPattern Horizontal StripsProcedure by which garment is made Knitting
Front view
Back view
(4)Parts listing.
Center front. Center back. Button placket. Buttonhole placket. Collar. Sleeves. Sleeve strip. Labels.
(5)Operation breakdown.
Sr. No. Operation Breakdown for Polo T Shirt1 Make center front buttonhole placket with interlining.2 Make button placket on front panel.3 Attach front & back panels at shoulder.4 Attach Sleeves.5 Attach sleeve strip.6 Attach collar.7 Stitch sleeves.8 Bottom hemming.9 Stitch side arm.
10 Stitching of small slit.11 Stitch buttons.12 Make buttonholes.13 Attach brand label at collar. And wash care label. 14 Make logo on front panel.
(6)Flow Diagram.
Preparatory1 Preparatory2
1).make button & buttonhole placket on center front
Assembly
3). Attach center front and center back on shoulder
4).Attach sleeves on armhole
7).Bottom hemming on front and back
8).Stitching of small slit
6).Side seam
10).Stitch button
5).Attach collar
9).Make button hole
11).Stitch tag at collar and make embroidery on front panel
2).Attach sleeve strips to right and left sleeves
(7) Stitch details.
op. No Stitch Details1 301 single needle lock stitch. 1 needle 2 thread2 301 single needle lock stitch. 1 needle 2 thread3 514 4 thread over lock. 2 needle 4 thread.4 514 4 thread over lock. 2 needle 4 thread.5 Combination of 514 & 401. 2 needle 4 thread & chain stitch6 Combination of 514 and 301. 2 needle 4 thread & 1 needle 2
thread.7 514 4 thread over lock. 2 needle 4 thread.8 406 1 needle top and bottom covering. 1 needle 3 thread.9 514 4 thread over lock. 2 needle 4 thread.
10 301 single needle lock stitch. 1 needle 2 thread.11 Single needle lock stitch button sewing m/c.12 1 needle 2 thread lock stitch m/c(single step zig zag)13 301 single needle lock stitch. 1 needle 2 thread.14 M/c embroidery for logo.
(8)M/c, Thread and needle details.
Op no m/c used Needle type
Thread used
Thread &needle details
Needle size
1 SNLS DBX1 3 ply 100% polyster
1 needle 2 thread
110/18
2 SNLS DBX1 3 ply 100% polyster
1 needle 2 thread
11,14
3 4 THREAD DCX1 3 ply 100% 2 needle 4 11,14
OVERLOCK polyster thread.
4 4 THREAD OVERLOCK
DCX1 3 ply 100% polyster
2 needle 4 thread
11,14
5 4 THREAD OVERLOCK & CHAIN STITCH M/C
DCX1 3 ply 100% polyster
2 needle 4 thread
11,14
6 4 THREAD OVERLOCK & SNLS M/C
DCX1 3 ply 100% polyster
2 needle 4 thread
11,14
7 4 THREAD OVERLOCK
DCX1 3 ply 100% polyster
2 needle 4 thread
11,14
8 1Needle top and bottom covering m/c
UY128 GAS 3 ply 100% polyster
1 needle 3 thread.
11,14
9 4 THREAD OVERLOCK
DCX1 3 ply 100% polyster
2 needle 4 thread
11,14
10 SNLS DBX1 3 ply 100% polyster
1 needle 2 thread.
11,14
11 BUTTON SEWING M/C
TQX1 3 ply 100% polyster
1 needle 2 thread.
11,14
12 SNLS DBX1 3 ply 100% polyster
1 needle 2 thread.
11,14
13 SNLS DBX1 3 ply 100% polyster
1 needle 2 thread.
11,14
14 EMBRIODERY M/C
DBX1 3 ply 100% polyster
2 THREAD 11,14