    Technical Report Marks Distribution

    Format (20%)

    Result and Analysis (25%)

    Discussion (25%)

    Conclusion (15%)

    References (15%)

    Total (100%)

  • 8/9/2019 Task 3 Lab

    3/16

    3

    TABLE OF CONTENT

    Contents

    1.0 INTRODUCTION 4

    2.0 OBJECTIVES 4

    3.0 APPARATUS 5

    4.0 PROCEDURE 5

    5.0 RESULT AND ANALYSIS 5

    6.0 CALCULATION 10

    7.0 DISCUSSION 14

    8.0 PROPOSED DESIGN 15

    9.0 CONCLUSION 16

    10.0 REFERENCES 16

  • 8/9/2019 Task 3 Lab

    4/16

  • 8/9/2019 Task 3 Lab

    5/16

    5

    3.0 APPARATUS

    Stopwatch, paper and pen (to record data), safety vest

    4.0 PROCEDURE

    1. The site location is identified and traffic movements for the identified intersection are

    sketched.

    2. The data collecting sheet is prepared before conducting the test.

    3. The numbers of vehicles turning left, right and go straight at selected approach is

    counted. Typical duration of interval is 15 minutes.

    4. The data is collected until time duration of one hour is achieved.

    5. The data collected is analyzed and level of service for all direction is determined.

    5.0 RESULT AND ANALYSIS

    A non-signalized T-junction in front UMS library is chosen as our assessment location to

    evaluate the suitability of traffic control and safety.

    From UMS library

    Traffic Flow in Morning Session

    Time

    To Left To Right

    Motorcycle CarHeavy

    VehicleMotorcycle Car

    HeavyVehicle

    0900-0915 0 4 1 0 0 0

    0915-0930 0 4 0 0 0 0

    0930-0945 0 2 0 0 0 0

    0945-1000 0 2 0 2 1 0

    Total

    13 3

    16

  • 8/9/2019 Task 3 Lab

    6/16

    6

    Traffic Flow in Afternoon Session

    Time

    To Left To Right

    Motorcycle Car

    Heavy

    Vehicle Motorcycle Car

    Heavy

    Vehicle

    1200-1215 0 2 0 0 3 0

    1215-1230 6 5 0 0 1 0

    1230-1245 3 1 0 3 3 0

    1245-1300 0 6 0 1 0 0

    Total

    23 11

    34

    Traffic Flow in Evening Session

    Time

    To Left To Right

    Motorcycle CarHeavy

    Vehicle

    Motorcycl

    eCar

    Heavy

    Vehicle

    1600-1615 11 7 0 3 0 0

    1615-1630 6 5 0 0 1 0

    1630-1645 5 13 0 0 0 0

    1645-1700 6 8 0 0 1 0

    Total

    61 5

    66

  • 8/9/2019 Task 3 Lab

    7/16

    7

    From DKP 1

    Traffic Flow in Morning Session

    Time

    To Left Straight

    Motorcycle CarHeavy

    VehicleMotorcycle Car

    Heavy

    Vehicle

    0900-0915 0 0 0 3 10 3

    0915-0930 0 0 0 0 8 0

    0930-0945 1 0 0 2 6 2

    0945-1000 0 0 0 2 8 3

    Total

    1 47

    48

    Traffic Flow in Afternoon Session

    Time

    To Left Straight

    Motorcycle CarHeavy

    VehicleMotorcycle Car

    Heavy

    Vehicle

    1200-1215 3 4 0 4 26 2

    1215-1230 2 6 0 6 31 1

    1230-1245 7 12 0 6 46 3

    1245-1300 1 8 0 6 36 3

    Total

    43 170

    213

  • 8/9/2019 Task 3 Lab

    8/16

    8

    Traffic Flow in Evening Session

    Time

    To Left Straight

    Motorcycle Car HeavyVehicle

    Motorcycle Car HeavyVehicle

    1600-1615 1 7 0 5 25 3

    1615-1630 0 1 0 10 28 2

    1630-1645 2 3 0 8 13 1

    1645-1700 4 4 0 6 9 3

    Total

    22 113

    135

    From UMS roundabout

    Traffic Flow in Morning Session

    Time

    Straight To Right

    Motorcycle CarHeavy

    VehicleMotorcycle Car

    Heavy

    Vehicle

    0900-0915 6 21 1 0 4 0

    0915-0930 5 13 4 4 5 0

    0930-0945 2 11 1 4 5 0

    0945-1000 2 5 1 3 4 0

    Total

    72 29

    101

  • 8/9/2019 Task 3 Lab

    9/16

    9

    Traffic Flow in Afternoon Session

    Time

    Straight To Right

    Motorcycle Car HeavyVehicle

    Motorcycle Car HeavyVehicle

    1200-1215 2 17 1 6 7 0

    1215-1230 3 15 2 3 2 0

    1230-1245 3 22 3 3 4 0

    1245-1300 7 13 2 7 8 0

    Total

    90 40

    130

    Traffic Flow in Evening Session

    Time

    Straight To Right

    Motorcycle Car

    Heavy

    Vehicle Motorcycle Car

    Heavy

    Vehicle

    1600-1615 5 9 2 1 4 0

    1615-1630 11 7 2 0 1 0

    1630-1645 3 16 5 2 0 0

    1645-1700 11 11 1 6 3 0

    Total

    83 17

    100

  • 8/9/2019 Task 3 Lab

    10/16

    10

    Table 1.1 Total Vehicle Volume of Each Session

    Session From Library From DKP 1 From

    Roundabout

    Total

    Morning 16 48 101 165

    Afternoon 34 213 130 377

    Evening 66 135 100 301

    From the table above, the total vehicle volume for afternoon session is the highest followedby evening session. The traffic flow is the lowest during morning session because the

    assessment is conducted on Sunday. Hence, peak session which is the afternoon session is

    chosen when analyzing the data collected.

    6.0 CALCULATION

    Assuming standard road condition:

    Lane width = 3.4 m

    Lateral clearance = 0.6 m

    Interchange per kilometer =

  • 8/9/2019 Task 3 Lab

    11/16

    11

    fN= adjustment for number of lanes (km/h)

    fID= adjustment for interchange density (km/h)

    Parameters Direction Reference

    From UMSlibrary

    From DKP 1 From UMSroundabout

    BFFS 120 km/h 120 km/h 120 km/h Rural Area

    fLw 2.1 2.1 2.1 Table 6.3

    fLC 0 0 0 Table 6.4

    fN 0 0 0 Table 6.5

    fID 0 0 0 Table 6.6

    FFS 117.9 km/h 117.9 km/h 117.9 km/h

    Peak Hour Factor (PHF)

    PHF =

    V = hourly volume for hour of analysis

    V15= maximum 15 min flow rate within hour of analysis

    4 = Number of 15 min period per hour

    Parameters Direction

    From UMS library From DKP 1 From UMS roundabout

    V 34 213 130

    V15 6 46 16

    PHF 1.42 1.16 2.03

  • 8/9/2019 Task 3 Lab

    12/16

    12

    Heavy Vehicle Adjustment Factor (fHV)

    fhv=

    fHV= heavy vehicle adjustment factor

    ET, ER= Passenger-car equivalents for trucks/ buses and RVs

    PT, PR= Proportion of trucks/buses and RVs in traffic stream

    Parameters Direction Reference

    From UMSlibrary

    From DKP 1 From UMSroundabout

    Heavy Vehicle 0 % 4.23 % 6.15 % %

    PT 0 0.0423 0.0615 %/100

    ET 2.5 2.5 2.5 Table 6.7

    Er 1 1 1 No RVs

    fhv 1.0 0.94 0.92

    Flow rate (vp)

    vp=

    vp= 15-minute passenger-car equivalent flow rate (pc/h/ln)

    V = hourly volume (veh/hr)

    PHF = peak hour factor

    N = number of lanes in one direction

  • 8/9/2019 Task 3 Lab

    13/16

    13

    fHV= heavy vehicle adjustment factor

    fp= driver population adjustment factor (Assume driver is commuter=1.0)

    Parameters Direction Reference

    From UMSlibrary

    From DKP 1 From UMSroundabout

    V 34 213 130

    PHF 1.42 1.16 2.03

    N 1 1 1 One lane

    fHV 1.0 0.94 0.92

    fp 1 1 1 Commuter

    vp 23.94pc/hr/ln

    195.34pc/hr/ln

    69.61pc/hr/ln

    Density (D)

    D =

    D = density (pc/km/ln)

    vp= flow rate (pc/hr/ln)

    s = average passenger car speed (km/hr)

    Parameters Direction Reference

    From UMSlibrary

    From DKP 1 From UMSroundabout

    vp 23.94 195.34 69.61

    s 117.9 117.9 117.9

    D 0.20 pc/km/ln 1.66 pc/km/ln 0.59 pc/km/ln

    Service A A A Figure 6.2

  • 8/9/2019 Task 3 Lab

    14/16

  • 8/9/2019 Task 3 Lab

    15/16

    15

    Figure 1: The Yield sign

    8.0 PROPOSED DESIGN

    Table 1 Guideline for type of crossing required, JKR

    Pedestrian Volume at

    peak hour

    Traffic Volume (1 way) at

    peak hour

    Type of Crossing

    < 50

  • 8/9/2019 Task 3 Lab

    16/16

    16

    9.0 CONCLUSION

    In a nut shell, all the level of service for this junction is classified as service A which

    indicates free flow traffic from all the direction.

    10.0 REFERENCES

    Arahan Teknik Jalan 8/86. A guide on Geometric Design of Roads.Kuala Lumpur: Public

    Work Department Malaysia.

    J. Garber, N., & A. Hoel, L. (2001). Traffic and Highway Engineering.US: The Wadsworth

    Group.