Recycling of Effluent for Reuse
in Process through the BOOT Model
Tata Motors Ltd. – CVBU Pimpri Pune Mr V V Joshi
Mr B B Patil
Mr A T Gaikwad
33
Water Policy and Implementatio3
2 of 15
Flow of Presentation
1. Tata Motors CUBU Pimpri Pune – Layout .
2 Tata Motors CUBU Pimpri Pune Manufacturing Process.
3. Project Uniqueness - Selection of System - Cost , Quality – Sustainability
4.Project Uniqueness in Nature of Agreement , Technical & Quality Aspects=
5. Major Trigger – Need & Details of the Project
6.Plant Constituents and Key Advantage
7. Project – Financial Perspective
8. RO BOOT Project Tangible Benefits
9. RO BOOT Project Non - Tangible Benefits – Plant Performance
10. Replication Potential – Progress - Status and Steps taken
11. Replication Potential – Within Sector – Propagation of Concept
12. Challenges – Bottlenecks during Projects Implementation
13. Achieving National Benchmark / Standard – Environmental Performance
6/17/2017
2
v
� Multi-location manufacturing facilities in India. CVBU – Commercial Vehicle Business Unitcomprises 5 Plants – Jamshedpur, Pune , Lucknow, Pantnagar and Dharwad. PVBU-Passenger vehicle Business Unit comprises of Pune and Sanand Plant
CVBU Pune plant – Manufacturing of Commercial vehicles.
1. Tata Motors CUBU Pimpri Pune – Layout
Resi Area 393 Acr
Lake & Pond 85 Acr.
Plantation 183 Acr
Plot Area 380 Acr.
Green Area 55 Acr
3 of 15
CII – ‘Excellence in Energy
Management -2015Srishti Good Green Governance Award
CII – CII-GreenCo ‘GOLD’ ratingCII-GBC Green Co Best Practices
Award-2015
CII National Water Award and FICCI National Water Award.
v
2. Tata Motors CUBU Pimpri Pune – Manufacturing Process.
Resi Area 393 Acr
Lake & Pond 85 Acr.
Plantation 183 Acr
Plot Area 380 Acr.
Green Area 55 Acr
4 of 15
6/17/2017
3
v
Plot Area 380 Acr.
Green Area 55 Acr
5 of 15
Technology Available in
Market
But at what Cost ?
That Is Important
In normal circumstances with our own investment cost would have been
Running + Capital for 10 years - Rs 1369 Lakh
With innovative approach by selecting the Unique model DBOO ( Design, Built,
Own & Operate) we are now saving Rs 782 Lakh in next 10 Years
Take or pay Agreement
No Investment
No LiabilityPerformance Guarantee
Projects: 1000 KLD BOOT
Basis RO plant
Installed with
Investment from
OEM while TML
reimburses party
on the basis of RO
Water Received
3. Project Uniqueness - Selection of System considering Cost , Quality – Sustainability
Sustainable Model
6 of 15
4.Project Uniqueness in Nature of Agreement , Technical & Quality Aspects
Technical Aspect
Mobile Plant
Spares by Party
Shared Operation
Supply/Dispose filters by Party
PTRO Membrane
Isolation of membrane
for maintenance
No Ultrafiltration
Low maintenance and break
downs
Reject is less hazardous
Less use of Chemical
Less Hazardous process
Quality Aspect
75 % Recovery
Input Quality acceptable
limit for SDI is 15 as against
3 to 5
Inlet TDS 800
Inlet TSS < 5 ppm
Inlet COD < 56 ppm
Inlet Hardness 300 ppm
Outlet TDS - 75 PPM
Outlet TSS - NIL
Outlet COD - NIL
Hardness < 50 ppm
Agreement
Minimum Intake
Minimum Generation
Penalty for less Intake or
Generation
Defined Quantity
Ten Year Agreement
Free Power Supply – linked
with quality feed
Ten Year Agreement
Metering – Water - Power
Early exist clause
6/17/2017
4
� Plumber available in both shift.
� On receipt of complaint, complaint number is given to complainer
� Plumber immediately reaches to the location based on no. & location & stops/attend the
leakages.
� In case of major leakages stop the water & call for additional help.
� Daily review of complaint status.
� Proactive actions on the basis of
7 of 15
5. Major Trigger – Need & Details of the Project
Aspiration – Water Positive
Water Foot Print
Hot Spot Identifica
tion
ZLD – Zero Liquid
Discharge Conditions
by SPCB
Drought Situation –
Supply restrictions-Scarcity of
water
Green and Climate change
initiatives
Recycling of
treated Effluent
� Plumber available in both shift.
� On receipt of complaint, complaint number is given to complainer
� Plumber immediately reaches to the location based on no. & location & stops/attend the
leakages.
� In case of major leakages stop the water & call for additional help.
� Daily review of complaint status.
� Proactive actions on the basis of
8 of 15
6. Plant Constituent – Key Advantages
Plant Constituents
• Low Pressure / High
pressure pump
• Anti-Scalant , Acid and CIP
System
• First stage RO 32 No SW
membrane
• Bag filter 20 micron ,
• Cartridge filter 10 micron
• Second stage 80 Nos PTRO
membrane
Advantage of RO plant Advantage of RO plant
over other DM Plant • Physical Separation
• Less Hazardous process
• Less Chemicals
• Low maintenance and
breake downs
• Easy for maintenance
• Reject is less hazardous
• Isolation of poor
performance membranes
• Isolation for membrane
for maintenance
• Better Automation
6/17/2017
5
� Plumber available in both shift.
� On receipt of complaint, complaint number is given to complainer
� Plumber immediately reaches to the location based on no. & location & stops/attend the
leakages.
� In case of major leakages stop the water & call for additional help.
� Daily review of complaint status.
� Proactive actions on the basis of
9 of 15
7. Project – Financial Perspective
• Plant Capacity 1000 KLD
• Minimum generation 270000 Cum
• Reimbursement Rs 8/Cum
• Escalation Rs 0.25/Cum
• Max -Power 1.4 Kwh/Cum
• For less Lift Rs 4.05/Cum
• Penalty For less Generation Rs 6/Cum
• Excess Power-Penalty-Prevailing power tariff
• Special provision for long term shutdowns
Financial
Perspective
� Plumber available in both shift.
� On receipt of complaint, complaint number is given to complainer
� Plumber immediately reaches to the location based on no. & location & stops/attend the
leakages.
� In case of major leakages stop the water & call for additional help.
� Daily review of complaint status.
� Proactive actions on the basis of
10 of 15
8. RO BOOT Project - Tangible Benefits
Tangible - Benefits
• 550 Lacs 300 Mechanical + 250
Civil investment eliminated
• RO Water Generation cost Rs 16
to 17 /KL less than MIDC
• Daily water saving of 1000 KLD
• 305800 KL Effluent Recycling
during 16-17
• ZLD – Achievements
• No maintenance burden and No
conflict with OEM – key in RO
operation
• Maintenance issues eliminated
• Backwash / reject disposal issue
addressed
222414
100762
305800
50000
150000
250000
350000
14-15 15-16 16-17
48.26
16.11
23
0
20
40
14-15 15-16 16-17
Effluent Recycling for Process Use In KL
Saving In Rs Lacs
6/17/2017
6
� Plumber available in both shift.
� On receipt of complaint, complaint number is given to complainer
� Plumber immediately reaches to the location based on no. & location & stops/attend the
leakages.
� In case of major leakages stop the water & call for additional help.
� Daily review of complaint status.
� Proactive actions on the basis of
11 of 15
9. RO BOOT Project Non - Tangible Benefits – Sustenance of Plant performance
Non - Tangible - Benefits Non - Tangible - Benefits
• Moving towards Water positive
• Reduction in water foot print
• Environment protection
• Improved Safety Status
• Maximizing the reuse
• Quality of treated effluent
improved – with enhance control
• Reduction in chemical usage
• House keeping improved
• Branding of plant
• Reduction of water extraction
• Automation - Better Quality
control
Plant Performance• Recovery Satisfactory
• Quality Ok
• Feed TDS s 450 ppm
• Acceptance Variable
feed quality
• Power 1.1 Kwh/Cum
• One Breakdown
• ORP Increase
• Strainer Introduced
• Reject Recycled
• Cost Rs 16 -17 /Cum
• MIDC Water cost Rs
32.25- 21.50/ Cum
� Plumber available in both shift.
� On receipt of complaint, complaint number is given to complainer
� Plumber immediately reaches to the location based on no. & location & stops/attend the
leakages.
� In case of major leakages stop the water & call for additional help.
� Daily review of complaint status.
� Proactive actions on the basis of
12 of 15
10. Replication Potential – Progress - Status and Steps taken
• Can be replicated across all Automobile
Manufacturing Industries
• Replicated at Pune – added capacity 500 KLD.
• Replicated – at TML Lucknow – 500 KLD -
commissioned Dev 16
• Proposed 500 KLD Pimpri – expected to start by
Oct 17
• Under consideration for Dharwad - which will
also account for borewell water and higher TDS
Level up to 1200
• Future - Under consideration – Jamshedpur
Plant
• Shared the case study through group level inno-
vista competition
Replicability
TML - Cross
Location /
Within
Group
6/17/2017
7
� Plumber available in both shift.
� On receipt of complaint, complaint number is given to complainer
� Plumber immediately reaches to the location based on no. & location & stops/attend the
leakages.
� In case of major leakages stop the water & call for additional help.
� Daily review of complaint status.
� Proactive actions on the basis of
13 of 15
11. Replication Potential – Within Sector – Propagation of Concept
•• OEM- is branding the concept under
RO-SERVE Brand
• Presented a case study as a party of CII
– National Water award presentation
• The rental concept is developed by
party
• Leasing concept – where in party is
providing finance is also developed
• Mutually agreed Taylor made solutions
are being provided
• Outright purchase option is also
available
FICCI
2 nd India Industry Water Conclave on
“ Sustainable Water Management”
Session
Water Use Efficiency in Industries -
Best Practices
� Plumber available in both shift.
� On receipt of complaint, complaint number is given to complainer
� Plumber immediately reaches to the location based on no. & location & stops/attend the
leakages.
� In case of major leakages stop the water & call for additional help.
� Daily review of complaint status.
� Proactive actions on the basis of
14 of 15
12 Challenges – Bottlenecks during Projects Implementation
• Analysis of Earlier data
• Finalization Design Range
• Joint operation
responsibility
• Segregation of
streams
• Minimum Power fixed
• Power Consumption Linked
with TDS level
• Penalty for excess power / KL
RO Generation
• Recovery as per
prevailing power tariff
• Combination of RO membranes• Combination of RO membranes
• Sharing of O & M responsibility
• Both way penalty
• Minimum in take and
generation criteria
• Separate work out
for less intake
• Escalation over minimum rate
• Separate work out for less
generate
• Chemicals by party
• Disposal of waste material by
party
• Use of reject water
Project
Cost
Economics
Variable
Feed
Quality
Power
Cost
6/17/2017
8
� Plumber available in both shift.
� On receipt of complaint, complaint number is given to complainer
� Plumber immediately reaches to the location based on no. & location & stops/attend the
leakages.
� In case of major leakages stop the water & call for additional help.
� Daily review of complaint status.
� Proactive actions on the basis of
15 of 15
DBOO – Basis
RO PLANT
Easy
Replicate
No Capital
Investment
Taylor
Made Design
Acceptance
of High SDI
Address
ZLD
Easy to
install and Maintain
Best –Option For Recycling of
Treated Effluent
New installation coat of
1000 KLD – 550 Lacs No specific National
Benchmark
13 Achieving National Benchmark / Standard – Environmental Performance
Water Generated
6.27 Lac Cum –
Saving Rs 90 Lacs
Use of Existing
Infrastructure
Load on Environment
Reduced –
No reject Disposal –