Marana Cultural and Heritage Park Concessions Project Overview
Active rainwater harvesting for irrigation and fire suppression
• Industry/Sector: public
• Client: Town of Marana
• Location: Marana, Arizona
• Completion: 2013
• Description: This 163-acre municipal park includes a demo farm, equine facilities, water features and passive and active use park space. Adjacent to the Santa Cruz River, it also includes multiuse trails and public event space.
Marana Cultural and Heritage Park Concessions Design Data
• Water use: landscape irrigation, fire suppression
• Annual average rainfall: 14.9 in.
• Available roof area: 21' dia. X 10.9' h
• Roof material: stainless steel
• Hardscape material: concrete, soil
Marana Cultural and Heritage Park Concessions Rainwater System
• Storage: 27,000 gal.
• System: CorGal 2103-WT-ENC 0 degree high-rib roof plus enclosure kit; 23' dia. Concrete reinforced slab.
• Roof and surface conveyance: wet
• Irrigation: gravity
• Overflow: landscape
Marana Cultural and Heritage Park Concessions Average Annual Precipitation (in.)
Jan
Feb
Mar
ch
April
May
June
July
Aug
Sept
OctNov
Dec
0.00
1.00
2.00
3.00
Marana Cultural and Heritage Park Concessions Team
• Designer: TBK Environmental Design
• Installer: Skywater
• General Contractor: Durazo Construction
• Other Consultants: Technicians for Sustainability; SARG Water Solutions
SkywaterP.O. Box 2100Prescott, Arizona 86302928-445-3515