X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19, 2020 Chandra Yadav TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, Texas 78711 Re: Diamond Back Solid Waste Facility & Recycling Center TCEQ MSW Permit No. 2404 Technical NOD4 submittal Tracking No. 24409148 (2515939) Mr. Yadav The revisions made to the Diamond Back Solid Waste Facility & Recycling Center, TCEQ MSW Permit No. 2404 Technical NOD5 submittal are enclosed with this letter. In response to the email dated June 10, 2020, we have included our responses to your comments by adding a separate column to the unique deficiency identifier and the location in the permit for which it was corrected. We believe the newly updated deficiency identifier sheet addresses all comments. Sincerely, PARKHILL, SMITH & COOPER, INC. By Todd E. Stiggins Team Leader | Associate TES/ss cc: Mr. Mike Valenzuela, Managing Partner

Upload: others

Post on 26-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm

June 19, 2020 Chandra Yadav TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, Texas 78711 Re: Diamond Back Solid Waste Facility & Recycling Center TCEQ MSW Permit No. 2404 Technical NOD4 submittal Tracking No. 24409148 (2515939) Mr. Yadav The revisions made to the Diamond Back Solid Waste Facility & Recycling Center, TCEQ MSW Permit No. 2404 Technical NOD5 submittal are enclosed with this letter. In response to the email dated June 10, 2020, we have included our responses to your comments by adding a separate column to the unique deficiency identifier and the location in the permit for which it was corrected. We believe the newly updated deficiency identifier sheet addresses all comments.

Sincerely, PARKHILL, SMITH & COOPER, INC. By

Todd E. Stiggins Team Leader | Associate

TES/ss

cc: Mr. Mike Valenzuela, Managing Partner

Page 2: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

NOD

IDMRI ID App. Part Citation Location Additional NOD Type NOD Description NOD Response

T1 143 Part II 330.61(i)(4) Part II, II.C-1 Incomplete

(a) Address TxDOT concerns

indicated in the letter dated

January 22, 2020 and update the

application accordingly. (b) Revise

TCEQ Form 20179 to include

complete information.

a) TxDOT letter dated June 10, 2020 and PSC's

response to that letter are included in Appendix

II.C. Any further correspondance with TxDOT

will be submitted as supplemental information to

TCEQ.

(b) Revised TCEQ form 20179 is included with

this submittal.

T2 167 Part II 330.61(n)(1) Part II, II-20 Incompletea) Include USFWS response in the

application. a) No response is received from USFWS.

T3 349 Part III 330.63(d)(4)(A) Part III, III.D-2 Incomplete

Indicate legend information for

interior access roads, including for

the type of surfacing.

Legend has been added for interior access road

including type of surfacing for Figure II.A.9.

Figures III.B1 and III.D1.1 have also been

revised to include type of surfacing on interior

access road.

T4 687 Part III 330.457(a)

Part III,

Attachment H,

III.H2-2

Incomplete

Provide statement in the

application that the construction of

an alternative cover will be

subjected to an approval of a

permit modification to include a

complete design of the water

balance cover.

Statement has been included in the application to

indicate that the construction of an alternative

cover shall be subjected to an approval of a

permit modification to include a complete design

of the water balance cover.

Page 3: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

NOD

IDMRI ID App. Part Citation Location Additional NOD Type NOD Description NOD Response

T5 691 Part III 330.457(c)

Part III,

Attachment H,

III.H2

Incomplete

Revise Final Cover Quality

Control Plan for addressing the

testing requirements for the

prescriptive cover, including for

the coefficient of permeability and

its frequency in accordance with

Guidance for Liner Construction

and Testing for a Municipal Solid

Waste Landfill (RG-534).

Final Cover Quality Control Plan has been

revised for the prescriptive cover testing

requirements in accordance with Guidance for

Liner Construction and Testing for a Municipal

Solid Waste Landfill (RG-534).

T6 738 Part III 330.503(a)Part III,

Attachment HIncomplete

a) Revise the closure cost

estimates by including the cost of

geo-composite. b) Correct the form

TCEQ-20270 to indicate 40-mil in

the column “Final Cover System

Components Descriptions.”

a) Closure cost has been revised to include the

cost of geo-composite.

b) TCEQ form 20720 has been revied to indicate

40 mil.

Page 4: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

June 2020 – Rev 06

April 2020 – Rev 05

March 2020 – Rev 04

January 2020 – Rev 03

November 2019 - Rev 02

August 2019 – Rev 01

May 2019 - Rev 00

PSC Project # 01080118

Prepared for:

Diamond Back Recycling and Sanitary Landfill, LP

PO Box 2283

Odessa Texas 79760

Prepared By:

Parkhill, Smith & Cooper Inc. (PSC)

4222 85th Street

Lubbock Texas 79423

TBPE F-560

Diamond Back Solid Waste Facility

& Recycling Center

Ector County, Texas

TCEQ MSW Permit No. 2404

Permit Application

Page 5: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

June 2020 – Rev 06

April 2020 – Rev 05

March 2020 – Rev 04

January 2020 – Rev 03

November 2019 - Rev 02

August 2019 – Rev 01

May 2019 - Rev 00

PSC Project # 01080118

Prepared for:

Diamond Back Recycling and Sanitary Landfill, LP

PO Box 2283

Odessa Texas 79760

Prepared By:

Parkhill, Smith & Cooper Inc. (PSC)

4222 85th Street

Lubbock Texas 79423

TBPE F-560

Diamond Back Solid Waste Facility

& Recycling Center

Ector County, Texas

TCEQ MSW Permit No. 2404

Permit Application

06/19/2020

/19/2020

Page 6: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Master Table of Contents

PARKHILL, SMITH & COOPER INC. TOC - i 01080118 Rev 00 – 05.31.19; Rev 01 – 08.21.19; Rev 02 – 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020 Rev 06 – 06.19.2020

X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\0-MasterTOC-sealed_tes.doc

TABLE OF CONTENTS

PART I – GENERAL INFORMATION

1.0 GENERAL – 30 TAC §330.59(a)(1) ............................................................................................. I-1

1.1 Site Description and History ............................................................................................ I-1

1.2 Supplementary Technical Report – 30 TAC §305.45 ...................................................... I-2

2.0 LOCATION - 30 TAC §330.59(b) ................................................................................................ I-7

3.0 MAPS - 30 TAC §305.45, §330.59(c) ........................................................................................... I-8

3.1 General Location Maps .................................................................................................... I-8

3.2 Land Ownership Map and Land Owners List .................................................................. I-8

3.3 Mineral Interest ................................................................................................................ I-8

4.0 PROPERTY OWNER INFORMATION – 30 TAC §330.59(d) ................................................... I-9

4.1 Legal Description ............................................................................................................. I-9

4.2 Easements ........................................................................................................................ I-9

4.3 Property Owner Affidavit ................................................................................................ I-9

5.0 LEGAL AUTHORITY - 30 TAC §330.59(e).............................................................................. I-10

6.0 EVIDENCE OF COMPETENCY - 30 TAC §330.59(f) ............................................................. I-11

7.0 APPOINTMENTS - 30 TAC §330.59(g) .................................................................................... I-12

8.0 APPLICATION FEE - 30 TAC §330.59(h) ................................................................................ I-13

APPENDICES

APPENDIX I.A – GENERAL LOCATION MAPS

APPENDIX I.B – LAND OWNERSHIP MAP AND LAND OWNERS

LIST

APPENDIX I.C – LEGAL DESCRIPTION AND FACILITY

BOUNDARY MAP

APPENDIX I.D - LEGAL AUTHORITY

APPENDIX I.E – APPOINTMENTS

APPENDIX I.F – DOCUMENTATION OF APPLICATION FEE

PAYMENT

06/19/2020

Page 7: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Master Table of Contents

PARKHILL, SMITH & COOPER INC. TOC - ii 01080118

Rev. 00 – 05.31.19; Rev 01 – 08.21.19; Rev 02 – 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020 X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\0-MasterTOC-sealed_tes.doc

06/19/2020

PART II – EXISTING CONDITIONS AND CHARACTER OF FACILITY

AND SURROUNDING AREA

1.0 INTRODUCTION ........................................................................................................................ II-1

2.0 EXITING CONDITIONS SUMMARY ....................................................................................... II-2

3.0 WASTE ACCEPTANCE PLAN- 30 TAC §330.61(b) ................................................................ II-3

3.1 Properties and Characteristics of Waste - 30 TAC §330.61(b)(1)&30 and §330.201(a) II-3

3.2 Volume and Rate of Disposal – 30 TAC §330.61(b)(1)(A)-(C) ................................... II-5

4.0 GENERAL LOCATION MAPS - 30 TAC §330.61(c) ................................................................ II-8

5.0 FACILITY LAYOUT MAPS- 30 TAC §330.61(d) ..................................................................... II-9

6.0 GENERAL TOPOGRAPHIC MAPS - 30 TAC §330.61(e) ...................................................... II-10

7.0 AERIAL PHOTOGRAPH - 30 TAC §330.61(f) ........................................................................ II-11

8.0 LAND-USE MAP - 30 TAC §330.61(g) .................................................................................... II-12

9.0 IMPACT ON SURROUNDING AREA- 30 TAC §330.61(h) ................................................... II-13

9.1 Local Zoning ................................................................................................................. II-13

9.2 Character of Surrounding Lands ................................................................................... II-13

9.3 Growth Trends .............................................................................................................. II-13

9.4 Proximity to Residences ............................................................................................... II-13

9.5 Proximity to Commercial Establishments .................................................................... II-13

9.6 Nearby Wells ................................................................................................................ II-13

10.0 TRANSPORTATION ................................................................................................................. II-14

10.1 General .......................................................................................................................... II-14

10.2 Airport Safety ............................................................................................................... II-14

11.0 GENERAL GEOLOGY AND SOILS - 30 TAC §330.61(j) ...................................................... II-15

11.1 Geologic Investigation...................................................................................................II-15

11.2 Stratigraphy....................................................................................................................II-15

11.3 Faults and Subsidence....................................................................................................II-15

11.4 Erosion...........................................................................................................................II-15

11.5 Unstable Areas...............................................................................................................II-15

11.6 Subsurface Investigation ............................................................................................... II-16

Page 8: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Master Table of Contents

PARKHILL, SMITH & COOPER INC. TOC - iii 01080118

Rev. 00 – 05.31.19; Rev 01 – 08.21.19; Rev 02 – 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020 X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\0-MasterTOC-sealed_tes.doc

06/19/2020

12.0 GROUNDWATER AND SURFACE WATER - 30 TAC §330.61(k) ....................................... II-17

12.1 Major Aquifers .............................................................................................................. II-17

12.2 Minor Aquifers ............................................................................................................. II-17

12.3 Surface Water – 30 TAC §330.61(k)(2) ....................................................................... II-18

12.4 Stormwater Permitting – 30 TAC §330.61(k)(3) ......................................................... II-18

13.0 ABANDONED OIL AND WATER WELLS - 30 TAC §330.61(l)........................................... II-19

13.1 Water Wells .................................................................................................................. II-19

13.2 Oil Wells ....................................................................................................................... II-19

14.0 FLOODPLAINS AND WETLANDS - 30 TAC §330.61(m) ..................................................... II-20

15.0 ENDANGERED OR THREATENED SPECIES – 30 TAC §330.61(n) ................................... II-21

16.0 TEXAS HISTORICAL COMMISSION REVIEW – 30 TAC §330.61(o) ................................ II-23

17.0 COUNCIL OF GOVERNMENTS AND LOCAL GOVERNMENT REVIEW - 30 TAC

§330.61(p) .................................................................................................................................. II-24

APPENDICES

APPENDIX II.A – MAPS AND DRAWINGS

APPENDIX II.B – LAND USE ANALYSIS

APPENDIX II.C – TxDOT CORRESPONDENCE

APPENDIX II.D - WETLANDS DOCUMENTATION

APPENDIX II.E – ENDANGERED AND THREATENED SPECIES DOCUMENTATION

APPENDIX II.F – ARCHAEOLOGICAL SURVEY

APPENDIX II.G – TPDES PERMIT

APPENDIX II.H - FAA DOCUMENTATION

APPENDIX II.I - COUNCIL OF GOVERNMENTS DOCUMENTATION

APPENDIX II.J – LOCATION RESTRICTION CERTIFICATIONS

APPENDIX II.K – AIR AUTHORIZATION CORRESPONDENCE

Page 9: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Master Table of Contents

PARKHILL, SMITH & COOPER INC. TOC - iv 01080118

Rev. 00 – 05.31.19; Rev 01 – 08.21.19; Rev 02 – 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020 X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\0-MasterTOC-sealed_tes.doc

06/19/2020

PART III – FACILITY INVESTIGATION AND DESIGN

ATTACHMENT A – SITE DEVELOPMENT PLAN

1.0 GENERAL .............................................................................................................................. III.A-1

2.0 INTRODUCTION - 30 TAC §330.63(a) ................................................................................ III.A-2

2.1 General Facility Description ........................................................................................ III.A-2

2.2 Land Use and Zoning .................................................................................................. III.A-4

2.3 Adequacy of Access Roads and Highways ................................................................. III.A-4

3.0 GENERAL FACILITY DESIGN - 30 TAC §330.63(b) ........................................................ III.A-5

4.0 FACILITY SURFACE WATER DRAINAGE REPORT - 30 TAC §330.63(c) ................... III.A-6

5.0 WASTE MANAGEMENT UNIT DESIGN - 30 TAC §330.63(d) ........................................ III.A-7

6.0 GEOLOGY REPORT - 30 TAC §330.63(e) .......................................................................... III.A-8

7.0 GROUNDWATER SAMPLING AND ANALYSIS PLAN .................................................. III.A-9

8.0 LANDFILL GAS MANAGEMENT PLAN – 30 TAC §330.63(g) ..................................... III.A-10

9.0 CLOSURE PLAN - 30 TAC §330.63(h) .............................................................................. III.A-11

10.0 POST-CLOSURE PLAN - 30 TAC §330.63(i) .................................................................... III.A-12

11.0 COST ESTIMATES FOR CLOSURE AND POST-CLOSURE CARE - 30 TAC §330.63(j)III.A-13

ATTACHMENT B – GENERAL FACILITY DESIGN

1.0 FACILITY ACCESS – 30 TAC §330.63(b)(1) ...................................................................... III.B-1

2.0 WASTE MOVEMENT – 30 TAC §330.63(b)(2) .................................................................. III.B-2

3.0 VENTILATION AND ODOR CONTROL – 30 TAC §330.63(b)(2)(C) .............................. III.B-4

3.1 Sources of Odor ......................................................................................................... III.B.4

3.2 Odor Control .............................................................................................................. III.B.4

3.3 Working Face ............................................................................................................. III.B.4

3.4 Ponded Water ............................................................................................................. III.B.4

4.0 WATER POLLUTION CONTROL – 30 TAC §330.63(b)(4) ................................................ III.B.5

5.0 ENDANGERED SPECIES PROTECTION – 30 TAC §330.63(b)(5) .................................... III.B.6

APPENDICES

APPENDIX III.B.1 – DRAWINGS

Page 10: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Master Table of Contents

PARKHILL, SMITH & COOPER INC. TOC - v 01080118

Rev. 00 – 05.31.19; Rev 01 – 08.21.19; Rev 02 – 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020 X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\0-MasterTOC-sealed_tes.doc

06/19/2020

ATTACHMENT C – FACILITY SURFACE WATER DRAINAGE REPORT

1.0 INTRODUCTION .................................................................................................................. III.C-1

2.0 DRAINAGE AND ANALYSIS AND DESIGN .................................................................... III.C-2

2.1 Methodology ............................................................................................................... III.C-2

2.2 Existing Condition Hydrology .................................................................................... III.C-6

2.3 Proposed Condition Hydrology ................................................................................... III.C-7

2.4 Detention Pond Design ................................................................................................ III.C-8

2.5 Weir Design ................................................................................................................. III.C-9

2.6 Hydrology Comparison ............................................................................................. III.C-10

3.0 FLOOD CONTROL AND ANALYSIS ............................................................................... III.C-12

4.0 DRAINAGE SYSTEM PLANS AND DETAILS ................................................................ III.C-13

4.1 Final cover System Drainage Design ........................................................................ III.C-13

4.2 Developed Hydrologic Modeling .............................................................................. III.C-13

5.0 EROSION CONTROL PLAN .............................................................................................. III.C-14

5.1 Interim Controls for Phased Development ................................................................ III.C-14

5.2 Fully-Developed Erosion Control ............................................................................. III.C-14

6.0 CONCLUSIONS .................................................................................................................. III.C-15

ATTACHMENTS

ATTACHMENT III.C.1 – EXISTING HYDROLOGY

ATTACHMENT III.C.2 – PROPOSED HYDROLOGY

ATTACHMENT III.C.3 – FINAL COVER, INTERIM COVER, AND PERIMETER DRAINAGE PLANS

AND CALCULATIONS

Page 11: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Master Table of Contents

PARKHILL, SMITH & COOPER INC. TOC - vi 01080118

Rev. 00 – 05.31.19; Rev 01 – 08.21.19; Rev 02 – 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020 X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\0-MasterTOC-sealed_tes.doc

06/19/2020

ATTACHMENT D – WASTE MANAGEMENT UNIT DESIGN

1.0 INTRODUCTION .................................................................................................................. III.D-1

2.0 STORAGE AND TRANSFER UNITS - 30 TAC §330.63(d)(1) ........................................... III.D-2

2.1 Large Item Storage ...................................................................................................... III.D-2

3.0 LANDFILL DESIGN ............................................................................................................. III.D-3

3.1 All-Weather Operation ................................................................................................ III.D-3

3.2 Landfilling Methods .................................................................................................... III.D-3

3.3 Landfill Design Parameters ......................................................................................... III.D-3

3.4 Landfill Life Projection ............................................................................................... III.D-3

3.5 Landfill Cross Sections................................................................................................ III.D-4

3.6 Leachate and Contaminated Water Management ........................................................ III.D-4

4.0 SITE LIFE CALCULATIONS ............................................................................................... III.D-6

ATTACHMENTS

ATTACHMENT III.D1 – SITE LAYOUT PLANS

ATTACHMENT III.D2 – CROSS SECTIONS

ATTACHMENT III.D3 – CONSTRUCTION DESIGN DETAILS

ATTACHMENT III.D4 – SITE LIFE

ATTACHMENT III.D5 – GEOTECHNICAL DESIGN

ATTACHMENT III.D6 – LEACHATE AND CONTAMINATED WATER MANAGEMENT PLAN

ATTACHMENT III.D7 – LINER QUALITY CONTROL PLAN

ATTACHMENT E – GEOLOGY REPORT

1.0 REGIONAL GEOLOGIC/HYDROGEOLOGIC INFORMATION ...................................... III.E-1

1.1 Regional Physiography and Topography .................................................................... III.E-1

1.2 Regional Stratigraphy, Lithology, and Structural Setting ........................................... III.E-1

2.0 GEOLOGIC PROCESSES - 30 TAC § 330.63(e)(2), 330.61(J)(2) ....................................... III.E-3

2.1 Fault Areas .................................................................................................................. III.E-3

2.2 Seismic Impact Zones.................................................................................................. III-E-4

2.3 Unstable Areas ............................................................................................................ III-E-5

Page 12: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Master Table of Contents

PARKHILL, SMITH & COOPER INC. TOC - vii 01080118

Rev. 00 – 05.31.19; Rev 01 – 08.21.19; Rev 02 – 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020 X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\0-MasterTOC-sealed_tes.doc

06/19/2020

3.0 REGIONAL AQUIFERS - 30 TAC § 330.63(E)(3) ............................................................... III.E-5

3.1 Regional Hydrogeology ............................................................................................... III.E-5

3.2 Edwards-Trinity Aquifer ............................................................................................. III.E-5

3.3 Dockum Aquifer .......................................................................................................... III.E-6

3.4 Area Water Wells ........................................................................................................ III.E-7

4.0 SUBSURFACE INVESTIGATION REPORT – 30 TAC §330.63(E)(4)(A)-(H)12 .............. III.E-7

4.1 Drilling Activities ........................................................................................................ III.E-8

4.2 Site Stratigraphy .......................................................................................................... III.E-9

4.3 Groundwater Occurrence ........................................................................................... III.E-11

4.4 Groundwater Analytical Data .................................................................................... III.E-11

4.5 Site Hydrogeology ..................................................................................................... III.E-12

5.0 REFERENCES ..................................................................................................................... III.E-14

ATTACHMENTS

ATTACHMENT III.E1 – REGIONAL GEOLOGIC/HYDROLOGIC INFORMATION

ATTACHMENT III.E2 – SITE EXPLORATION DATA

ATTACHMENT III.E3 – SITE GEOLOGIC DATA

ATTACHMENT III.E4 – FAULT AND SEISMIC DATA

ATTACHMENT III.E5 – LABORATORY TESTS

ATTACHMENT III.E6 - TWDB WELL RECORDS AND WELL DRILLERS REPORT

ATTACHMENT III.E7 - OIL WELL PLUGGING RECORDS

ATTACHMENT F – GROUNDWATER SAMPLING AND ANALYSIS PLAN

GROUNDWATER MONITORING SYSTEM DESIGN CERTIFICATION ........................ III.F-1

1.0 GROUNDWATER MONITORING PROGRAM ................................................................... III.F-2

1.1 Site Hydrogeology ........................................................................................................ III.F-2

1.2 Groundwater Flow Direction and Rate ......................................................................... III.F-2

2.0 OPERATIONAL CONSIDERATIONS FOR GROUNDWATER SYSTEM DESIGN ......... III.F-4

2.1 Critical Receptors ......................................................................................................... III.F-4

2.2 Relations of Excavation Bottom-to-Uppermost Aquifer .............................................. III.F-4

Page 13: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Master Table of Contents

PARKHILL, SMITH & COOPER INC. TOC - viii 01080118

Rev. 00 – 05.31.19; Rev 01 – 08.21.19; Rev 02 – 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020 X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\0-MasterTOC-sealed_tes.doc

06/19/2020

2.3 Leachate Sump Design ................................................................................................. III.F-4

2.4 Contaminant Pathway Analysis .................................................................................... III.F-4

3.0 SUBTITLE D GROUNDWATER MONITORING SYSTEM ............................................... III.F-5

3.1 Monitoring Well Locations .......................................................................................... III.F-5

3.2 Sampling and Analysis Procedures .............................................................................. III.F-5

3.3 Monitor Well Design and Construction........................................................................ III.F-5

ATTACHMENTS

ATTACHMENT III.F1 – FIGURES

ATTACHMENT III.F2 – GROUNDWATER SAMPLING AND ANALYSIS PLAN (GWSAP)

ATTACHMENT G – LANDFILL GAS MANAGEMENT PLAN

1.0 INTRODUCTION - 30 TAC §330.63(g) and §330.371 ......................................................... III.G-1

2.0 SITE CHARACTERISTICS - 30 TAC §330.371(b)(1)(A)-(C) ............................................. III.G-2

2.1 Facility Structures ........................................................................................................ III.G-2

2.2 Underground Utilities .................................................................................................. III.G-2

3.0 MONITORING - 30 TAC §330.371(h)-(k) ............................................................................ III.G-3

3.1 Perimeter Monitoring .................................................................................................. III.G-3

3.2 Landfill Gas-Monitoring Probes .................................................................................. III.G-3

3.3 Utility Easements......................................................................................................... III.G-3

3.4 Procedures ................................................................................................................... III.G-4

3.5 Maintenance Procedures .............................................................................................. III.G-4

3.6 Facility Monitoring ...................................................................................................... III.G-5

3.7 Maintenance Procedures .............................................................................................. III.G-5

3.8 Monitoring Frequency and Recordkeeping/Reporting ................................................ III.G-5

3.9 Contingency Monitoring Plan - 30 TAC §330.371(g)(3) ............................................ III.G-5

4.0 ACTION PLAN - 30 TAC §330.371(c)(1)-(2) ....................................................................... III.G-7

4.1 Emergency Action ....................................................................................................... III.G-7

4.2 Notification Procedures ............................................................................................... III.G-9

Page 14: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Master Table of Contents

PARKHILL, SMITH & COOPER INC. TOC - ix 01080118

Rev. 00 – 05.31.19; Rev 01 – 08.21.19; Rev 02 – 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020 X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\0-MasterTOC-sealed_tes.doc

06/19/2020

5.0 REMEDIATION PLAN - 30 TAC §330.371(c)(3) ................................................................ III.G-9

6.0 LFG CONTROL SYSTEM - 30 TAC §330.371(g) ............................................................. III.G-10

6.1 Passive Gas-Control System ...................................................................................... III.G-10

7.0 SAFETY ............................................................................................................................... III.G-11

ATTACHMENTS

ATTACHMENT III.G1 – LANDFILL GAS MONITORING PROBE PLAN

ATTACHMENT III.G2 – REPORTING AND RECORDING FORMS

ATTACHMENT H – CLOSURE PLAN

1.0 FINAL CLOSURE ACTIVITIES – 30 TAC §330.457 .......................................................... III.H-1

2.0 FINAL COVER DESIGN - 30 TAC §330.457(a)(1-(3) and (d) ............................................ III.H-2

3.0 SEQUENCE OF FINAL COVER INSTALLATION - 30 TAC §330.457(e)(1)-(3) ............. III.H-4

3.1 Closure Sequence ....................................................................................................... III.H-4

3.2 Closure During Active Life ....................................................................................... III.H-4

3.3 Estimate of Largest Area Requiring Final Cover....................................................... III.H-5

3.4 Estimate of Maximum Inventory of Waste On Site ................................................... III.H-5

4.0 FINAL CLOSURE ACTIVITY SCHEDULE - 30 TAC §330.457(e)(4), (f)(1)-(6), (g), and

§330.461(a)-(b) ....................................................................................................................... III.H-6

5.0 CLOSURE COST ESTIMATE – 30 TAC §330.503.(a) ........................................................ III.H-7

ATTACHMENTS

ATTACHMENT III.H1 – TCEQ RG-494 GUIDANCE FOR REQUESTING A WATER BALANCE

(WB) ALTERNATIVE FINAL COVER FOR A MUNICIPAL SOLID

WASTE LANDFILL

ATTACHMENT III.H2 – FINAL COVER QUALITY CONTROL PLAN

ATTACHMENT III.H3 – FINAL COVER FIGURES AND DETAILS

ATTACHMENT I – POST-CLOSURE PLAN

1.0 GENERAL ................................................................................................................................ III.I-1

2.0 MONITORING AND MAINTENANCE ACTIVITIES .......................................................... III.I-2

3.0 LENGTH OF POST-CLOSURE CARE .................................................................................. III.I-3

4.0 COMPLETION OF POST-CLOSURE CARE ......................................................................... III.I-4

Page 15: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Master Table of Contents

PARKHILL, SMITH & COOPER INC. TOC - x 01080118

Rev. 00 – 05.31.19; Rev 01 – 08.21.19; Rev 02 – 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020 X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\0-MasterTOC-sealed_tes.doc

06/19/2020

5.0 LANDFILL CONTACT FOR POST-CLOSURE ACTIVITIES ............................................. III.I-5

6.0 PROPOSED USE OF FACILITY FOLLOWING CLOSURE ................................................ III.I-6

7.0 POST-CLOSURE COSTS ........................................................................................................ III.I-7

ATTACHMENT J – CLOSURE AND POST-CLOSURE COST ESTIMATES

1.0 INTRODUCTION – 30 TAC §330.63(j) ................................................................................ III.J-1

2.0 CLOSURE COST ESTIMATE – 30 TAC §330.503 ............................................................. III.J-1

3.0 POST-CLOSURE CARE COST ESTIMATE – 30 TAC §330.507 ....................................... III.J-1

4.0 COST ESTIMATE ADJUSTMENT – 30 TAC §330.503, 507.............................................. III.J-1

5.0 FINANCIAL ASSURANCE – 30 TAC §330.503, 507 ......................................................... III.J-2

ATTACHMENTS

ATTACHMENT III.J1 - CLOSURE COST ESTIMATE CALCULATIONS

ATTACHMENT III.J2 - POST-CLOSURE CARE COST ESTIMATE CALCULATIONS

Page 16: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Master Table of Contents

PARKHILL, SMITH & COOPER INC. TOC - xi 01080118

Rev. 00 – 05.31.19; Rev 01 – 08.21.19; Rev 02 – 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020 X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\0-MasterTOC-sealed_tes.doc

06/19/2020

PART IV – SITE OPERATING PLAN

1.0 INTRODUCTION - 30 TAC §330.121 and 123 .................................................................... IV-1

2.0 RECORDKEEPING REQUIREMENTS - 30 TAC §330.125 ............................................... IV-2

3.0 SITE OPERATING PLAN - 30 TAC §330.127 ..................................................................... IV-4

4.0 LANDFILL PERSONNEL - 30 TAC §330.127(1) ................................................................ IV-5

5.0 EQUIPMENT - 30 TAC §330.127(2) .................................................................................... IV-6

6.0 OPERATIONAL REQUIREMENTS - 30 TAC §330.127(3) ................................................ IV-7

7.0 TRAINING - 30 TAC §330.127(4) ........................................................................................ IV-8

7.1 Requirements ............................................................................................................. IV-8

8.0 DETECT AND PREVENT DISPOSING PROHIBITED WASTES - 30 TAC §330.127(5) IV-10

8.1 Measures for Controlling Prohibited Wastes ............................................................. IV-11

8.2 Random Inspections ................................................................................................... IV-12

9.0 FIRE PROTECTION - 30 TAC §330.129 .............................................................................. IV-14

9.1 Fire Protection Plan ................................................................................................... IV-14

9.2 Procedures in Case of a Fire ...................................................................................... IV-14

9.3 Firefighting Methods ................................................................................................. IV-15

9.4 Earthen Material Coverage ........................................................................................ IV-15

9.5 Earthen Material Distance from Working Face ......................................................... IV-16

9.6 Fire Equipment .......................................................................................................... IV-16

9.7 Fire Protection Training ............................................................................................. IV-16

9.8 TCEQ Notification ..................................................................................................... IV-16

10.0 ACCESS CONTROL - 30 TAC §330.131 ............................................................................. IV-17

10.1 Site Security ............................................................................................................... IV-17

10.2 Vehicle Access ........................................................................................................... IV-17

11.0 UNLOADING WASTE - 30 TAC §330.133.......................................................................... IV-18

12.0 FACILITY OPERATING HOURS - 30 TAC §330.135 ........................................................ IV-20

13.0 SITE SIGN - 30 TAC §330.137 ............................................................................................. IV-21

14.0 CONTROL OF WINDBLOWN SOLID WASTE AND LITTER - 30 TAC §330.139 ......... IV-22

15.0 EASEMENTS AND BUFFER ZONES - 30 TAC §330.141 ................................................. IV-23

Page 17: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Master Table of Contents

PARKHILL, SMITH & COOPER INC. TOC - xii 01080118

Rev. 00 – 05.31.19; Rev 01 – 08.21.19; Rev 02 – 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020 X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\0-MasterTOC-sealed_tes.doc

06/19/2020

16.0 LANDFILL MARKERS AND BENCHMARK - 30 TAC §330.143 .................................... IV-24

17.0 MATERIALS ALONG ROUTE TO SITE - 30 TAC §330.145 ............................................ IV-26

18.0 DISPOSAL OF LARGE ITEMS - 30 TAC §330.147 ............................................................ IV-27

19.0 ODOR MANAGEMENT PLAN - 30 TAC §330.149 ............................................................ IV-28

20.0 DISEASE VECTOR CONTROL - 30 TAC §330.151 ........................................................... IV-29

21.0 SITE ACCESS ROADS - 30 TAC §330.153 ......................................................................... IV-30

22.0 SALVAGING AND SCAVENGING - 30 TAC §330.155 .................................................... IV-31

23.0 ENDANGERED SPECIES PROTECTION - 30 TAC §330.157 ........................................... IV-32

24.0 LANDFILL GAS CONTROL - 30 TAC §330.159 ................................................................ IV-33

25.0 OIL, GAS, AND WATER WELLS - 30 TAC §330.161 ....................................................... IV-34

26.0 COMPACTION - 30 TAC §330.163 ...................................................................................... IV-35

27.0 LANDFILL COVER - 30 TAC §330.165 .............................................................................. IV-36

28.0 PONDED WATER - 30 TAC §330.167 ................................................................................. IV-38

29.0 DISPOSAL OF SPECIAL WASTES - 30 TAC §330.171 ..................................................... IV-39

30.0 DISPOSAL OF INDUSTRIAL WASTE - 30 TAC §330.173 ............................................... IV-41

31.0 VISUALLY SCREEN DEPOSITED WASTE - 30 TAC §330.175 ....................................... IV-42

32.0 LEACHATE AND GAS CONDENSATE RECIRCULATION - 30 TAC §330.177 ............ IV-43

APPENDICES

APPENDIX IV.A – LOAD INSPECTION REPORT

TABLES

Table IV.4 - SITE INSPECTION AND MAINTENANCE LIST:

OPERATIONAL

Table IV.1 - SITE OPERATING RECORD

Table IV.2 - PERSONNEL TYPES AND DESCRIPTIONS

Table IV.3 - LANDFILL FACILITY EQUIPMENT LIST

REQUIREMENTS

Table IV.5 - JOB POSITIONS, DESCRIPTIONS, AND

TRAINING REQUIREMENTS

Table IV.6 - EXAMPLE CALCULATIONS

Table IV.7 - ACCESS BREACH SCHEDULE AND

NOTIFICATION

Table IV.8 - MARKER GUIDELINES

Page 18: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

TCEQ-0650, Part I Application (rev. 08-17-2017) Page 1

Facility Name: Diamond Back Solid Waste Facility and Recycling Center

Permittee/Registrant Name: Diamond Back Recycling and Sanitary Landfill, LP

MSW Authorization #:2404

Initial Submittal Date: 5/31/2019

Revision Date: 6/19/2020

Texas Commission on Environmental Quality

Part I Form for New Permit/Registration and Amendment Applications for an MSW Facility

1. Reason for Submittal

Initial Submittal Notice of Deficiency (NOD) Response

2. Authorization Type

Permit Registration

3. Application Type

New Major Amendment

Major Amendment (Limited Scope)

4. Application Fees

Pay by Check Online Payment

If paid online, e-Pay Confirmation Number: 582EA000352001

5. Application URL

Is the application submitted for Type I Arid Exempt (AE) and/or Type IV AE facility?

Yes No

If the answer is “No”, provide the URL address of a publicly accessible internet web site where the application and all revisions to that application will be posted.

http://www.team-psc.com/engineering-sector/solid-waste/tceq-permits/

6. Application Publishing

Party Responsible for Publishing Notice:

Applicant Agent in Service Consultant

Contact Name: Todd E. Stiggins, P.E. Title: Team Leader

Page 19: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Facility Name: Diamond Back Solid Waste Facility and Recycling Center Initial Submittal Date: 5/31/2019

MSW Authorization #: 2404 Revision Date: 6/19/2020

TCEQ-0650, Part I Application (rev. 08-17-2017) Form - Page 2 of 11

7. Alternative Language Notice

Is an alternative language notice required for this application? (For determination refer

to Alternative Language Checklist on the Public Notice Verification Form TCEQ-20244-Waste)

Yes No

8. Public Place Location of Application

Name of the Public Place: Ector County Library

Physical Address: 321 W 5th St

City: Odessa County: Ector State: TX Zip Code: 79761

(Area code) Telephone Number: (432) 332-0633

9. Consolidated Permit Processing

Is this submittal part of a consolidated permit processing request, in accordance with 30

TAC Chapter 33?

Yes No Not Applicable

If “Yes”, state the other TCEQ program authorizations requested:

10. Confidential Documents

Does the application contain confidential documents?

Yes No

If “Yes”, cross-reference the confidential documents throughout the application and submit as a separate attachment in a binder clearly marked “CONFIDENTIAL.”

11. Permits and Construction Approvals

Permit or Approval Received Pending Not

Applicable

Hazardous Waste Management Program under the

Texas Solid Waste Disposal Act

Underground Injection Control Program under the Texas Injection Well Act

National Pollutant Discharge Elimination System Program under the Clean Water Act and Waste Discharge Program under Texas Water Code,

Chapter 26

Prevention of Significant Deterioration Program under the Federal Clean Air Act (FCAA).

Nonattainment Program under the FCAA

National Emission Standards for Hazardous Air Pollutants Preconstruction Approval under the FCAA

Ocean Dumping Permits under the Marine Protection Research and Sanctuaries Act

Page 20: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Facility Name: Diamond Back Solid Waste Facility and Recycling Center Initial Submittal Date: 5/31/2019

MSW Authorization #: 2404 Revision Date: 6/19/2020

TCEQ-0650, Part I Application (rev. 08-17-2017) Form - Page 3 of 11

Permit or Approval Received Pending Not

Applicable

Dredge or Fill Permits under the CWA

Licenses under the Texas Radiation Control Act

Other (describe)

Other (describe)

Other (describe)

Other (describe)

12. General Facility Information

Facility Name: Diamond Back Solid Waste Facility and Recycling Center

Contact Name: Michael G. Valenzuela Title: Managing

Partner

MSW Authorization No. (if available): 2404

Regulated Entity Reference No. (if issued)*: RN109839597

Physical or Street Address (if available): 2301 South FM 866

City: Odessa County: Ector State: TX Zip Code: 79763

(Area Code) Telephone Number: (432)264-2400

Latitude (Degrees, Minutes Seconds): N 31°47'21.03"

Longitude (Degrees, Minutes Seconds): W 102°33'00.31"

Benchmark Elevation (above mean sea level): 3094.73 (NAVD 88) ft.

Provide a description of the location of the facility with respect to known or easily

identifiable landmarks: Diamond Back Solid Waste Facility and Recycling Center

is located approximately 22 miles south west from Midland International Air &

Space Port. It is located in central Ector County, on the north side of US

Highway 20, approximately 2.0 miles northwest of the intersection of FM 866

and US highway 20.

Detail access routes from the nearest United States or state highway to the facility: The

front access for the facility is located along FM 866. The facility is located

approximately 2 miles northwest of the intersection of FM 866 and Interstate

20.

*If this number has not been issued for the facility, complete a TCEQ Core Data Form (TCEQ-10400) and submit it with this application. List the Facility as the Regulated Entity.

13. Facility Type(s)

Type I Type IV Type V

Type I AE Type IV AE Type VI

Page 21: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Facility Name: Diamond Back Solid Waste Facility and Recycling Center Initial Submittal Date: 5/31/2019

MSW Authorization #: 2404 Revision Date: 6/19/2020

TCEQ-0650, Part I Application (rev. 08-17-2017) Form - Page 4 of 11

14. Activities Conducted at the Facility

Storage Processing Disposal

15. Facility Waste Management Unit(s)

Landfill Unit(s) Incinerator(s)

Class 1 Landfill Unit(s) Autoclave(s)

Process Tank(s) Refrigeration Unit(s)

Storage Tank(s) Mobile Processing Unit(s)

Tipping Floor Type VI Demonstration Unit

Storage Area Compost Pile(s) and/or Vessel(s)

Container(s) Other (Specify)

Roll-off Boxes Other (Specify)

Surface Impoundment Other (Specify)

16. Description of Proposed Facility or Changes to Existing Facility

Provide a brief description of the proposed activities if application is for a new facility, or

the proposed changes to an existing facility or permit conditions if the application is for

an amendment.

The facility is a Type I municipal solid waste landfill with separate Type I and

Type IV units. The facility will accept residential and commercial municipal

solid waste from residents and businesses in Ector and surrounding counties.

The waste stream will be typical of what is generated by minicipalities. A

Recycling Center (MSW#100494) is located on the west side of the property

within the permit boundary, owned and operated by Diamond Back Recycling

and Sanitary Landfill, LP. As authorized, the Recycling Center will only collect

and process non-putrescible source separated recyclable material. Any

materials that cannot be recycled will be disposed at the Municipal Solid Waste

Facility at the site.

17. Facility Contact Information

Site Operator (Permittee/Registrant) Name: Diamond Back Recycling and

Sanitary Landfill, LP

Customer Reference No. (if issued)*: CN605388230

Contact Name: Michael G. Valenzuela Title: Managing

Partner

Page 22: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Facility Name: Diamond Back Solid Waste Facility and Recycling Center Initial Submittal Date: 5/31/2019

MSW Authorization #: 2404 Revision Date: 6/19/2020

TCEQ-0650, Part I Application (rev. 08-17-2017) Form - Page 5 of 11

Mailing Address: P.O. Box 2283

City: Odessa County: Ector State: TX Zip Code: 79760

(Area Code) Telephone Number: (432)332-3866

Email Address: [email protected]

TX Secretary of State (SOS) Filing Number: 0802446676

*If the Site Operator (Permittee/Registrant) does not have this number, complete a TCEQ Core Data Form (TCEQ-10400) and submit it with this application. List the Site Operator (Permittee/Registrant) as the Customer.

Page 23: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Facility Name: Diamond Back Solid Waste Facility and Recycling Center Initial Submittal Date: 5/31/2019

MSW Authorization #: 2404 Revision Date: 6/19/2020

TCEQ-0650, Part I Application (rev. 08-17-2017) Form - Page 6 of 11

Operator Name1: Diamond Back Recycling and Sanitary Landfill, LP

Customer Reference No. (if issued)*: 605388230

Contact Name: Michael G. Valenzuela Title: Managing Partner

Mailing Address: P.O. Box 2283

City: Odessa County: Ector State: TX Zip Code: 79760

(Area Code) Telephone Number: (432)332-3866

Email Address: [email protected]

TX SOS Filing Number: 0802446676

1If the Operator is the same as Site Operator/Permittee type “Same as “Site Operator (Permittee/Registrant)”. *If the Operator does not have this number, complete a TCEQ Core Data Form (TCEQ-10400) and submit it with this application. List the Operator as the customer.

Consultant Name (if applicable): Parkhill, Smith and Cooper, Inc.

Texas Board of Professional Engineers Firm Registration Number:

Contact Name: Todd E. Stiggins Title: Associate

Mailing Address: 4222 85th St

City: Lubbock County: Lubbock State: TX Zip Code: 79423

(Area Code) Telephone Number: (806) 473-3683

E-Mail Address: [email protected]

Agent in Service Name (required only for out-of-state):

Mailing Address:

City: County: State: Zip Code:

(Area Code) Telephone Number:

E-Mail Address:

18. Facility Supervisor’s License

Select the Type of License that the Solid Waste Facility Supervisor, as defined in 30 TAC

Chapter 30, Occupational Licenses and Registrations, will obtain prior to commencing facility operations.

Class A Class B

19. Ownership Status of the Facility

Corporation Limited Partnership Federal Government

Individual City Government Other Government

Sole Proprietorship County Government Military

General Partnership State Government Other (Specify):

Page 24: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Facility Name: Diamond Back Solid Waste Facility and Recycling Center Initial Submittal Date: 5/31/2019

MSW Authorization #: 2404 Revision Date: 6/19/2020

TCEQ-0650, Part I Application (rev. 08-17-2017) Form - Page 7 of 11

Does the Site Operator (Permittee/Registrant) own all the facility units and all the facility property?

Yes No

If “No”, provide the information requested below for any additional ownership.

Owner Name:

Street or P.O. Box:

City: County: State: Zip Code:

(Area Code) Telephone Number:

Email Address (optional):

20. Other Governmental Entities Information

Texas Department of Transportation District: Odessa District

District Engineer’s Name: John R. Speed, P.E.

Street Address or P.O. Box: 3901 E. Highway 80

City: Odessa County: Ector State: TX Zip Code: 79761

(Area Code) Telephone Number: (432) 332-0501

E-Mail Address (optional):

The Local Governmental Authority Responsible for Road Maintenance (if

applicable):

Contact Person’s Name:

Street Address or P.O. Box:

City: County: State: Zip Code:

(Area Code) Telephone Number:

E-Mail Address (optional):

City Mayor Information

City Mayor’s Name: David R. Turner

Office Address: P.O. Box 4398

City: Odessa County: Ector State: TX Zip Code: 79760

(Area Code) Telephone Number: (432) 335-4104

E-Mail Address (optional): [email protected]

City Health Authority: Not Applicable

Contact Person’s Name:

Street Address or P.O. Box:

City: County: State: Zip Code:

(Area Code) Telephone Number:

E-Mail Address (optional):

Page 25: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Facility Name: Diamond Back Solid Waste Facility and Recycling Center Initial Submittal Date: 5/31/2019

MSW Authorization #: 2404 Revision Date: 6/19/2020

TCEQ-0650, Part I Application (rev. 08-17-2017) Form - Page 8 of 11

County Judge Information

County Judge’s Name: Judge Debi Hays

Street Address or P.O. Box: 300 North Grant, Room 227

City: Odessa County: Ector State: TX Zip Code: 79761

(Area Code) Telephone Number: (432)498-4101

E-Mail Address (optional):

County Health Authority: Ector County Health Department

Contact Person’s Name: Gino Solla, R.S. - Director

Street Address or P.O. Box: 221 North Texas

City: Odessa County: Ector State: TX Zip Code: 79761

(Area Code) Telephone Number: (432)498-4141

E-Mail Address (optional):

State Representative Information

District Number: 81

State Representative’s Name: Brooks Landgraf

District Office Address: P.O. Box 2910

City: Austin County: Hays State: TX Zip Code: 78768

(Area Code) Telephone Number: (432)332-0937

E-Mail Address (optional):

State Senator Information

District Number: 31

State Senator’s Name: Kel Seliger

District Office Address: P.O. Box 9155

City: Amarillo County: Potter State: TX Zip Code: 79105

(Area Code) Telephone Number: (806) 374-8994

E-Mail Address (optional):

Council of Government (COG) Name: Permian Basin Regional Planning

Commission

COG Representative’s Name: Ms. Terri Moore

COG Representative’s Title: Executive Director

Street Address or P.O. Box: P.O. Box 60660

City: Midland County: Midland State: TX Zip Code: 79711

(Area Code) Telephone Number: (432)563-1061 or (432)563-1728

E-Mail Address (optional):

Page 26: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Facility Name: Diamond Back Solid Waste Facility and Recycling Center Initial Submittal Date: 5/31/2019

MSW Authorization #: 2404 Revision Date: 6/19/2020

TCEQ-0650, Part I Application (rev. 08-17-2017) Form - Page 9 of 11

River Basin Authority Name: Upper Colorado River Authority

Contact Person’s Name: Chuck Brown

Watershed Sub-Basin Name: Western High Plains

Street Address or P.O. Box: 512 Orient

City: San Angelo County: Tom Green State: TX Zip Code: 76903

(Area Code) Telephone Number: (325)655-0565

E-Mail Address (optional):

Coastal Management Program

Is the facility within the Coastal Management Program boundary?

Yes No

U.S. Army Corps of Engineers

The facility is located in the following District of the U.S. Army Corps of Engineers:

Albuquerque, NM Galveston, TX

Ft. Worth, TX Tulsa, OK

Local Government Jurisdiction

Within City Limits of: Not within Any City Limit

Within Extraterritorial Jurisdiction of: Not within any extraterritorial jurisdiction

Is the facility located in an area in which the governing body of the municipality or

county has prohibited the storage, processing or disposal of municipal or industrial solid waste?

Yes No

(If “Yes”, provide a copy of the ordinance or order as an attachment):

Page 27: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,
Page 28: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Facility Name: Diamond Back Solid Waste Facility and Recycling Center Initial Submittal Date: 5/31/2019

MSW Authorization #: 2404 Revision Date: 6/19/2020

TCEQ-0650, Part I Application (rev. 08-17-2017) Form - Page 11 of 11

Part I Attachments

(See Instructions for P.E. seal requirements.)

Required Attachments Attachment No.

Supplementary Technical Report Part I Section 1.2

Property Legal Description Part I Section 4.1

Property Metes and Bounds Description Part I Appendix I.C

Facility Legal Description Part I Appendix I.C

Facility Metes and Bounds Description Part I Appendix I.C

Metes and Bounds Drawings Part I Appendix I.C

On-Site Easements Drawing Part I Appendix I.C

Land Ownership Map Part I Appendix I.B

Land Ownership List Part I Appendix I.B

Electronic List or Mailing Labels Part I Appendix I.B

Texas Department of Transportation (TxDOT) County Map Part I Appendix I.A

General Location Map Part I Appendix I.A

General Topographic Map Part I Appendix I.A

Verification of Legal Status Part I Section 5.0

Property Owner Affidavit Part I Section 4.3

Evidence of Competency Part I Section 6.0

Additional Attachments as Applicable- Select all those apply and add as necessary

TCEQ Core Data Form(s) Front of the Application

Signatory Authority Delegation

Fee Payment Receipt Part I Appendix I.F

Confidential Documents

Waste Storage, Processing and Disposal Ordinances

Final Plat Record of Property

Certificate of Fact (Certificate of Incorporation)

Assumed Name Certificate

Page 29: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

June 2020 – Rev 06

April 2020 – Rev 05

March 2020 – Rev 04

January 2020 – Rev 03

November 2019 - Rev 02

August 2019 – Rev 01

May 2019 - Rev 00

PSC Project # 01080118

Prepared for:

Diamond Back Recycling and Sanitary Landfill, LP

PO Box 2283

Odessa Texas 79760

Prepared By:

Parkhill, Smith & Cooper Inc. (PSC)

4222 85th Street

Lubbock Texas 79423

TBPE F-560

Diamond Back Solid Waste Facility

& Recycling Center

Ector County, Texas

TCEQ MSW Permit No. 2404

Permit Application

Page 30: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

June 2020 – Rev 06

April 2020 – Rev 05

March 2020 – Rev 04

January 2020 – Rev 03

November 2019 - Rev 02

August 2019 – Rev 01

May 2019 - Rev 00

PSC Project # 01080118

Prepared for:

Diamond Back Recycling and Sanitary Landfill, LP

PO Box 2283

Odessa Texas 79760

Prepared By:

Parkhill, Smith & Cooper Inc. (PSC)

4222 85th Street

Lubbock Texas 79423

TBPE F-560

Diamond Back Solid Waste Facility

& Recycling Center

Ector County, Texas

TCEQ MSW Permit No. 2404

Permit Application

06/19/2020

/19/2020

Page 31: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Table of Contents - Volume 1

PARKHILL, SMITH & COOPER INC. VOL1 - i 01080118 Rev 00 – 05.31.19; Rev 01 – 08.21.19; Rev 02 – 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\0-MasterTOC-Volume1-sealed_tes.doc

VOLUME 1

TABLE OF CONTENTS

PART I – GENERAL INFORMATION

1.0 GENERAL – 30 TAC §330.59(a)(1) ................................................................................. I-1

1.1 Site Description and History ............................................................................................ I-1

1.2 Supplementary Technical Report – 30 TAC §305.45 ...................................................... I-2

2.0 LOCATION - 30 TAC §330.59(b) .................................................................................... I-7

3.0 MAPS - 30 TAC §305.45, §330.59(c) ............................................................................... I-8

3.1 General Location Maps .................................................................................................... I-8

3.2 Land Ownership Map and Land Owners List .................................................................. I-8

3.3 Mineral Interest ................................................................................................................ I-8

4.0 PROPERTY OWNER INFORMATION – 30 TAC §330.59(d) ....................................... I-9

4.1 Legal Description ............................................................................................................. I-9

4.2 Easements ........................................................................................................................ I-9

4.3 Property Owner Affidavit ................................................................................................ I-9

5.0 LEGAL AUTHORITY - 30 TAC §330.59(e) ................................................................. I-10

6.0 EVIDENCE OF COMPETENCY - 30 TAC §330.59(f) ................................................. I-11

7.0 APPOINTMENTS - 30 TAC §330.59(g) ........................................................................ I-12

8.0 APPLICATION FEE - 30 TAC §330.59(h) .................................................................... I-13

APPENDICES

APPENDIX I.A – GENERAL LOCATION MAPS

APPENDIX I.B – LAND OWNERSHIP MAP AND LAND OWNERS

LIST

APPENDIX I.C – LEGAL DESCRIPTION AND FACILITY

BOUNDARY MAP

APPENDIX I.D - LEGAL AUTHORITY

APPENDIX I.E – APPOINTMENTS

APPENDIX I.F – DOCUMENTATION OF APPLICATION FEE

PAYMENT

06/19/2020

Page 32: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Master Table of Contents

PARKHILL, SMITH & COOPER INC. TOC III - 2 01080118

Rev. 00 – 05.31.19; Rev 01 – 08.21.19; Rev 02 – 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020 X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\0-MasterTOC-Volume1-sealed_tes.doc

06/19/2020

PART II – EXISTING CONDITIONS AND CHARACTER OF FACILITY

AND SURROUNDING AREA

1.0 INTRODUCTION ........................................................................................................... II-1

2.0 EXITING CONDITIONS SUMMARY .......................................................................... II-2

3.0 WASTE ACCEPTANCE PLAN- 30 TAC §330.61(b) ................................................... II-3

3.1 Properties and Characteristics of Waste - 30 TAC §330.61(b)(1)&30 and §330.201(a) II-3

3.2 Volume and Rate of Disposal – 30 TAC §330.61(b)(1)(A)-(C) ................................... II-5

4.0 GENERAL LOCATION MAPS - 30 TAC §330.61(c) ................................................... II-8

5.0 FACILITY LAYOUT MAPS- 30 TAC §330.61(d) ........................................................ II-9

6.0 GENERAL TOPOGRAPHIC MAPS - 30 TAC §330.61(e) ......................................... II-10

7.0 AERIAL PHOTOGRAPH - 30 TAC §330.61(f) ........................................................... II-11

8.0 LAND-USE MAP - 30 TAC §330.61(g) ....................................................................... II-12

9.0 IMPACT ON SURROUNDING AREA- 30 TAC §330.61(h) ...................................... II-13

9.1 Local Zoning ................................................................................................................. II-13

9.2 Character of Surrounding Lands ................................................................................... II-13

9.3 Growth Trends .............................................................................................................. II-13

9.4 Proximity to Residences ............................................................................................... II-13

9.5 Proximity to Commercial Establishments .................................................................... II-13

9.6 Nearby Wells ................................................................................................................ II-13

10.0 TRANSPORTATION .................................................................................................... II-14

10.1 General .......................................................................................................................... II-14

10.2 Airport Safety ............................................................................................................... II-14

11.0 GENERAL GEOLOGY AND SOILS - 30 TAC §330.61(j) ......................................... II-15

11.1 Geologic Investigation...................................................................................................II-15

11.2 Stratigraphy....................................................................................................................II-15

11.3 Faults and Subsidence....................................................................................................II-15

11.4 Erosion...........................................................................................................................II-15

11.5 Unstable Areas...............................................................................................................II-15

11.6 Subsurface Investigation ............................................................................................... II-16

Page 33: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Master Table of Contents

PARKHILL, SMITH & COOPER INC. TOC III - 3 01080118

Rev. 00 – 05.31.19; Rev 01 – 08.21.19; Rev 02 – 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020 X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\0-MasterTOC-Volume1-sealed_tes.doc

06/19/2020

12.0 GROUNDWATER AND SURFACE WATER - 30 TAC §330.61(k) ......................... II-17

12.1 Major Aquifers .............................................................................................................. II-17

12.2 Minor Aquifers ............................................................................................................. II-17

12.3 Surface Water – 30 TAC §330.61(k)(2) ....................................................................... II-18

12.4 Stormwater Permitting – 30 TAC §330.61(k)(3) ......................................................... II-18

13.0 ABANDONED OIL AND WATER WELLS - 30 TAC §330.61(l) ............................. II-19

13.1 Water Wells .................................................................................................................. II-19

13.2 Oil Wells ....................................................................................................................... II-19

14.0 FLOODPLAINS AND WETLANDS - 30 TAC §330.61(m) ....................................... II-20

15.0 ENDANGERED OR THREATENED SPECIES – 30 TAC §330.61(n) ...................... II-21

16.0 TEXAS HISTORICAL COMMISSION REVIEW – 30 TAC §330.61(o) ................... II-23

17.0 COUNCIL OF GOVERNMENTS AND LOCAL GOVERNMENT REVIEW - 30 TAC

§330.61(p) ..................................................................................................................... II-24

APPENDICES

APPENDIX II.A – MAPS AND DRAWINGS

APPENDIX II.B – LAND USE ANALYSIS

APPENDIX II.C – TxDOT CORRESPONDENCE

APPENDIX II.D - WETLANDS DOCUMENTATION

APPENDIX II.E – ENDANGERED AND THREATENED SPECIES DOCUMENTATION

APPENDIX II.F – ARCHAEOLOGICAL SURVEY

APPENDIX II.G – TPDES PERMIT

APPENDIX II.H - FAA DOCUMENTATION

APPENDIX II.I - COUNCIL OF GOVERNMENTS DOCUMENTATION

APPENDIX II.J – LOCATION RESTRICTION CERTIFICATIONS

Page 34: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Master Table of Contents

PARKHILL, SMITH & COOPER INC. TOC III - 4 01080118

Rev. 00 – 05.31.19; Rev 01 – 08.21.19; Rev 02 – 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020 X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\0-MasterTOC-Volume1-sealed_tes.doc

06/19/2020

PART IV – SITE OPERATING PLAN

1.0 INTRODUCTION - 30 TAC §330.121 and 123 .................................................................... IV-1

2.0 RECORDKEEPING REQUIREMENTS - 30 TAC §330.125 ............................................... IV-2

3.0 SITE OPERATING PLAN - 30 TAC §330.127 ..................................................................... IV-4

4.0 LANDFILL PERSONNEL - 30 TAC §330.127(1) ................................................................ IV-5

5.0 EQUIPMENT - 30 TAC §330.127(2) .................................................................................... IV-6

6.0 OPERATIONAL REQUIREMENTS - 30 TAC §330.127(3) ................................................ IV-7

7.0 TRAINING - 30 TAC §330.127(4) ........................................................................................ IV-8

7.1 Requirements ............................................................................................................. IV-8

8.0 DETECT AND PREVENT DISPOSING PROHIBITED WASTES - 30 TAC §330.127(5) IV-10

8.1 Measures for Controlling Prohibited Wastes .............................................................. IV-11

8.2 Random Inspections .................................................................................................... IV-12

9.0 FIRE PROTECTION - 30 TAC §330.129 ............................................................................... IV-14

9.1 Fire Protection Plan .................................................................................................... IV-14

9.2 Procedures in Case of a Fire ....................................................................................... IV-14

9.3 Firefighting Methods .................................................................................................. IV-15

9.4 Earthen Material Coverage ......................................................................................... IV-15

9.5 Earthen Material Distance from Working Face .......................................................... IV-16

9.6 Fire Equipment ........................................................................................................... IV-16

9.7 Fire Protection Training .............................................................................................. IV-16

9.8 TCEQ Notification ...................................................................................................... IV-16

10.0 ACCESS CONTROL - 30 TAC §330.131 ............................................................................. IV-17

10.1 Site Security ................................................................................................................ IV-17

10.2 Vehicle Access ............................................................................................................ IV-17

11.0 UNLOADING WASTE - 30 TAC §330.133.......................................................................... IV-18

12.0 FACILITY OPERATING HOURS - 30 TAC §330.135 ........................................................ IV-20

13.0 SITE SIGN - 30 TAC §330.137 ............................................................................................. IV-21

14.0 CONTROL OF WINDBLOWN SOLID WASTE AND LITTER - 30 TAC §330.139 ......... IV-22

15.0 EASEMENTS AND BUFFER ZONES - 30 TAC §330.141 ................................................. IV-23

Page 35: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Master Table of Contents

PARKHILL, SMITH & COOPER INC. TOC III - 5 01080118

Rev. 00 – 05.31.19; Rev 01 – 08.21.19; Rev 02 – 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020 X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\0-MasterTOC-Volume1-sealed_tes.doc

06/19/2020

16.0 LANDFILL MARKERS AND BENCHMARK - 30 TAC §330.143 .................................... IV-24

MATERIALS ALONG ROUTE TO SITE - 30 TAC §330.145 ............................................ IV-26

17.0 DISPOSAL OF LARGE ITEMS - 30 TAC §330.147 ............................................................ IV-27

18.0 ODOR MANAGEMENT PLAN - 30 TAC §330.149 ............................................................ IV-28

19.0 DISEASE VECTOR CONTROL - 30 TAC §330.151 ........................................................... IV-29

20.0 SITE ACCESS ROADS - 30 TAC §330.153 ......................................................................... IV-30

21.0 SALVAGING AND SCAVENGING - 30 TAC §330.155 .................................................... IV-31

22.0 ENDANGERED SPECIES PROTECTION - 30 TAC §330.157 ........................................... IV-32

23.0 LANDFILL GAS CONTROL - 30 TAC §330.159 ................................................................ IV-33

24.0 OIL, GAS, AND WATER WELLS - 30 TAC §330.161 ....................................................... IV-34

25.0 COMPACTION - 30 TAC §330.163 ...................................................................................... IV-35

26.0 LANDFILL COVER - 30 TAC §330.165 .............................................................................. IV-36

27.0 PONDED WATER - 30 TAC §330.167 ................................................................................. IV-38

28.0 DISPOSAL OF SPECIAL WASTES - 30 TAC §330.171 ..................................................... IV-39

29.0 DISPOSAL OF INDUSTRIAL WASTE - 30 TAC §330.173 ............................................... IV-41

30.0 VISUALLY SCREEN DEPOSITED WASTE - 30 TAC §330.175 ....................................... IV-42

31.0 LEACHATE AND GAS CONDENSATE RECIRCULATION - 30 TAC §330.177 ............ IV-43

APPENDICES

APPENDIX IV.A – LOAD INSPECTION REPORT

TABLES

Table IV.1 - SITE OPERATING RECORD

Table IV.2 - PERSONNEL TYPES AND DESCRIPTIONS

Table IV.3 - LANDFILL FACILITY EQUIPMENT LIST

Table IV.4 – SITE INSPECTION AND MAINTENANCE LIST: OPERATIONAL

REQUIREMENTS

Table IV.5 - JOB POSITIONS, DESCRIPTIONS, AND TRAINING REQUIREMENTS

Table IV.6 - EXAMPLE CALCULATIONS

Table IV.7 – ACCESS BREACH SCHEDULE AND

NOTIFICATION

Table IV.8 – MARKER GUIDELINES

Page 36: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

June 2020 – Rev 06

April 2020 – Rev 05

March 2020 – Rev 04

January 2020 – Rev 03

November 2019 - Rev 02

August 2019 – Rev 01

May 2019 - Rev 00

PSC Project # 01080118

Prepared for:

Diamond Back Recycling and Sanitary Landfill, LP

PO Box 2283

Odessa Texas 79760

Prepared By:

Parkhill, Smith & Cooper Inc. (PSC)

4222 85th Street

Lubbock Texas 79423

TBPE F-560

Diamond Back Solid Waste Facility

& Recycling Center

Ector County, Texas

TCEQ MSW Permit No. 2404

PART II – EXISTING CONDITIONS AND

CHARACTER OF FACILITY

AND SURROUNDING AREA

Permit Application

Page 37: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

June 2020 – Rev 06

April 2020 – Rev 05

March 2020 – Rev 04

January 2020 – Rev 03

November 2019 - Rev 02

August 2019 – Rev 01

May 2019 - Rev 00

PSC Project # 01080118

Prepared for:

Diamond Back Recycling and Sanitary Landfill, LP

PO Box 2283

Odessa Texas 79760

Prepared By:

Parkhill, Smith & Cooper Inc. (PSC)

4222 85th Street

Lubbock Texas 79423

TBPE F-560

Diamond Back Solid Waste Facility

& Recycling Center

Ector County, Texas

TCEQ MSW Permit No. 2404

PART II – EXISTING CONDITIONS AND

CHARACTER OF FACILITY AND

SURROUNDING AREA

04/29/2020

Permit Application

06/19/2020

Page 38: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part II – Existing Conditions and Character of Facility and Surrounding Area

PARKHILL, SMITH & COOPER INC. 01080118 Rev 00 – 05.31.19; Rev 01 – 08.21.19; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\II.3-TOC_tes.docx

06/19/2020

TABLE OF CONTENTS

1.0 INTRODUCTION ........................................................................................................... II-1

2.0 EXITING CONDITIONS SUMMARY .......................................................................... II-2

3.0 WASTE ACCEPTANCE PLAN- 30 TAC §330.61(b) ................................................... II-3

3.1 Properties and Characteristics of Waste - 30 TAC §330.61(b)(1)&30 and §330.201(a)

...................................................................................................................................... II-3

3.2 Volume and Rate of Disposal – 30 TAC §330.61(b)(1)(A)-(C) ................................. II-5

4.0 GENERAL LOCATION MAPS - 30 TAC §330.61(c) ................................................... II-8

5.0 FACILITY LAYOUT MAPS- 30 TAC §330.61(d) ........................................................ II-9

6.0 GENERAL TOPOGRAPHIC MAPS - 30 TAC §330.61(e) ......................................... II-10

7.0 AERIAL PHOTOGRAPH - 30 TAC §330.61(f) ........................................................... II-11

8.0 LAND-USE MAP - 30 TAC §330.61(g) ....................................................................... II-12

9.0 IMPACT ON SURROUNDING AREA- 30 TAC §330.61(h) ...................................... II-13

9.1 Local Zoning ................................................................................................................. II-13

9.2 Character of Surrounding Lands ................................................................................... II-13

9.3 Growth Trends .............................................................................................................. II-13

9.4 Proximity to Residences ............................................................................................... II-13

9.5 Proximity to Commercial Establishments .................................................................... II-13

9.6 Nearby Wells ................................................................................................................ II-13

10.0 TRANSPORTATION .................................................................................................... II-14

10.1 General .......................................................................................................................... II-14

10.2 Airport Safety ............................................................................................................... II-14

11.0 GENERAL GEOLOGY AND SOILS - 30 TAC §330.61(j) ......................................... II-15

11.1 Geologic Investigation .................................................................................................. II-15

11.2 Stratigraphy ................................................................................................................... II-15

11.3 Faults and Subsidence ................................................................................................... II-15

Page 39: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part II – Existing Conditions and Character of Facility and Surrounding Area

PARKHILL, SMITH & COOPER INC. 01080118 Rev 00 – 05.31.19; Rev 01 – 08.21.19; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\II.3-TOC_tes.docx

06/19/2020

11.4 Erosion .......................................................................................................................... II-15

11.5 Unstable Areas .............................................................................................................. II-15

11.6 Subsurface Investigation ............................................................................................... II-16

12.0 GROUNDWATER AND SURFACE WATER - 30 TAC §330.61(k) ......................... II-17

12.1 Major Aquifers .............................................................................................................. II-17

12.2 Minor Aquifers ............................................................................................................. II-17

12.3 Surface Water – 30 TAC §330.61(k)(2) ....................................................................... II-18

12.4 Stormwater Permitting – 30 TAC §330.61(k)(3) ......................................................... II-18

13.0 ABANDONED OIL AND WATER WELLS - 30 TAC §330.61(l) ............................. II-19

13.1 Water Wells .................................................................................................................. II-19

13.2 Oil Wells ....................................................................................................................... II-19

14.0 FLOODPLAINS AND WETLANDS - 30 TAC §330.61(m) ....................................... II-20

15.0 ENDANGERED OR THREATENED SPECIES – 30 TAC §330.61(n) ...................... II-21

16.0 TEXAS HISTORICAL COMMISSION REVIEW – 30 TAC §330.61(o) ................... II-23

17.0 COUNCIL OF GOVERNMENTS AND LOCAL GOVERNMENT REVIEW - 30 TAC

§330.61(p) ..................................................................................................................... II-24

APPENDICES

APPENDIX II.A – MAPS AND DRAWINGS

APPENDIX II.B – LAND USE ANALYSIS

APPENDIX II.C – TxDOT CORRESPONDENCE

APPENDIX II.D – WETLANDS DOCUMENTATION

APPENDIX II.E – ENDANGERED AND THREATENED SPECIES DOCUMENTATION

APPENDIX II.F – ARCHAEOLOGICAL SURVEY

APPENDIX II.G – TPDES PERMIT

APPENDIX II.H – FAA DOCUMENTATION

APPENDIX II.I – COUNCIL OF GOVERNMENTS DOCUMENTATION

APPENDIX II.J – LOCATION RESTRICTION CERTIFICATIONS

APPENDIX II. K – AIR AUTHORIZATION

CORRESPONDENCE

TABLES

Table II.3.1 – PERMIT CONDITIONS SUMMARY

Table II.3.2 – ESTIMATED MAXIMUM ANNUAL WASTE

ACCEPTANCE RATE

Table II.3.3 – ESTIMATED TYPE I MAXIMUM ANNUAL

WASTE ACCEPTANCE RATE

Table II.3.4 – ESTIMATED TYPE IV MAXIMUM ANNUAL

WASTE ACCEPTANCE RATE

Page 40: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part II – Existing Conditions and Character of Facility and Surrounding Area

PARKHILL, SMITH & COOPER INC. 01080118 Rev 00 – 05.31.19; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

APPENDIX II.A

MAPS AND DRAWINGS

Page 41: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,
Page 42: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part II – Existing Conditions and Character of Facility and Surrounding Area

PARKHILL, SMITH & COOPER INC. 01080118 Rev 00 – 05.31.19; Rev 01 – 08.21.19; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

APPENDIX II.C

TxDOT CORRESPONDENCE

Page 43: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

June 19, 2020 Chad Windham, P.E. Director of Operations Texas Department of Transportation 3901 E Highway 80 Odessa, TX 79761 RE: Diamond Back Solid Waste Facility & Recycling Center

Permit Application Dear Mr. Windham,

In response to the letter dated June 10, 2020, Parkhill, Smith & Cooper (PSC) offers the following to address your comments. PSC proposes a new driveway for the facility. The proposed driveway will be constructed to meet the current Access Management Standards of TxDOT and uses guidance from the Odessa District IAC Technical Memorandum concerning access management. The new driveway will be constructed of concrete and will include a 34-ft wide throat and 60-ft radii. A traversable apron with 70-ft radii will be constructed of caliche base. This design will allow trucks to enter the drive even while a vehicle is waiting to exit, without having to slow excessively on FM 866. Additionally, the shoulder will be widened 10 feet from the white edge line 250 feet either side of the driveway. This will allow traffic to use the shoulder to either slow as it approaches the drive or accelerate as it exits the drive with less impact on FM 866 through traffic. The proposed plan view of the driveway can be seen in Attachment 1. An application for a new driveway permit will be submitted upon issuance of the municipal solid waste permit. The driveway permit will be submitted prior to, but within 6 months of driveway construction. An updated traffic analysis will be available upon a formal request from TxDOT after facility is fully operational. Updates to the driveway for additional turn lanes or similar features shall be constructed if evaluation indicates sufficient disparity. We request TxDOT concur with our recommendation. If you need any further information, please do not hesitate to contact me at 469.200.7363.

Sincerely,

PARKHILL, SMITH & COOPER, INC.

By

Todd Stiggins, PE

Civil Project Manager

TES/ss X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\Response Letter-TxDOT.doc

cc: Kyle Jackson, PSC

John Speed, Odessa District Engineer Mike Valenzuela

Enclosures: 1. Driveway Plan

Page 44: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,
Page 45: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

3901 East Hwy 80, Odessa, TEXAS 79761 | 432-332-0501 | WWW.TXDOT.GOV

OUR VALUES: People • Accountability • Trust • Honesty OUR MISSION: Connecting You With Texas

An Equal Opportunity Employer

June 10, 2020 Mr. Todd Stiggins Parkhill Smith & Cooper (PSC) 4222 85th Street Lubbock, Texas 79423 RE: Diamond Back Solid Waste Facility & Recycling Center Dear Mr. Stiggins, TxDOT Odessa District has reviewed the traffic analysis that was performed for the above-mentioned site located on FM 866 approximately 2 miles north of IH 20 in Ector County and we offer the following comments.

• TxDOT has concerns about the traffic modeling methodology and projections utilized in the analysis and their applicability to the site conditions. However, we understand the difficulty in obtaining accurate traffic projections utilizing currently available information and standard procedures.

• Because the modeling should use nonstandard procedures, , TxDOT may request a re-evaluation of the traffic analysis and projections against actual traffic volumes and patterns once the site is made fully operational. We reserve the right to require additional turn lanes or similar features if the comparative evaluation indicates sufficient disparity.

• What are the details and location of the new driveway into the facility? This will require application for and issuance of a new driveway permit. TxDOT will need to evaluate and determine if the driveway can be accommodated with the additional development that has occurred near this site.

• Speed reductions would require an engineering study and would need to look at the entire FM 866 corridor. Speed reductions for a specific access or development are not usually recommended.

• The existing driveway was approved in 2017 and was submitted as a temporary or Phase 1 access based on 1 or 2 vehicles per hour. The driveway permit called for a 30’ throat width with 75’ radii, but the current driveway was not constructed in accordance with this permit. It must be reconstructed to meet current Access Management Standards. We do not recommend placement of 2 exit lanes as these movements will conflict with each other, increase conflict points, and potentially cause safety concerns.

• As the traffic analysis shows there is added safety value in the inclusion of turn bays on FM 866, but as discussed above, additional and accurate traffic data will be needed. The driveway should be designed to accommodate the turning movements for the anticipated vehicle usage along with a shoulder widening 250’ each side of the driveway to obtain a minimum 10’ shoulder. The shoulder widening is required to mitigate the edge drop-off issues that are typically seen with truck traffic entering and exiting the facility. Attached is our current standards for commercial and industrial driveways.

Page 46: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Mr. Todd Stiggins 2 June 3, 2020

OUR VALUES: People • Accountability • Trust • Honesty OUR MISSION: Connecting You With Texas

An Equal Opportunity Employer

I am also including the recommended driveway details for designing improved driveways within the Permian Basin energy production zones. FM 866 is considered a Secondary Energy Sector Highway. Please use this design guidance as the basis for your subsequent driveway permit application.

Sincerely,

Chad Windham Odessa District – Director of Operations Cc: John Speed, Odessa District Engineer Kyle Jackson, PSC Eduardo Hernandez, PSC

Mike Valenzuela

Page 47: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Transportation Data and Coordination Report Form for MSW Type I Landfills (TCEQ-20719, 8/13/15) Page 1 of 9

Texas Commission on Environmental Quality

Transportation Data and Coordination Report Form for

Municipal Solid Waste Type I/IV Landfills

This form is for use by applicants or site operators of Municipal Solid Waste (MSW) Type

I/IV landfills to provide data and information to address the availability and adequacy of access roads to a landfill site, the volume of vehicular traffic on and generated by the facility on area roadways, and to provide coordination information as required under 30

TAC §330.61(i). Roadways that provide primary access to a landfill facility must be adequate and possess appropriate design capacity to safely accommodate the additional

volumes and weights of traffic generated or expected to be generated by this landfill facility during its active life. Data provided in this form should correspond with data contained in the coordination documents submitted to the Texas Department of

Transportation or other agency that has jurisdiction over affected area roads.

If you need assistance in completing this form, please contact the Municipal Solid Waste

Permits Section of the Waste Permits Division at (512) 239-2335.

General Information

Facility Name: Diamond Back Solid Waste Facility & Recycling Center

MSW Permit No.: 2404

Site Operator/Permittee Name and Mailing Address: 2301 South FM 866, Odessa, TX 79763

Documentation of Coordination with the Texas Department of Transportation (TXDOT) for Traffic and Location Restrictions

1. A traffic study document and cover letter was submitted to TXDOT as Coordination

for traffic and location restrictions for the subject facility and a copy of the documents submitted to TXDOT is attached herein: Yes No

If you checked “No” , provide explanation:

2. Date of submission of the coordination documents to TXDOT: 05/30/2019

3. TXDOT’s response received? Yes No

4. If “No” is checked in response to Item I.3 above, complete Items I.4 and I.5 below only after TxDOT’s response is received.

5. Did TxDOT’s response include recommendation of improvements to any of the

roadways or intersections that lead to the site? Yes No

6. If you checked “Yes” in Item I.5 above, proceed to Section III., TxDOT’s

Recommended Roadway or Intersection Improvements (as applicable).

Page 48: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Transportation Data and Coordination Report for MSW Type I Landfills

Facility Name: Diamond Back Solid Waste Facility & Recycling Center Revision No.: 06

Permit No: 2404 Date: 06/19/2020

Transportation Data and Coordination Report Form for MSW Type I Landfills (TCEQ-20719, 8/13/15) Page 2 of 9

7. If you checked “No” in Item I.5 above, provide TxDOT’s response to the traffic and location restrictions compliance coordination for the subject site: (Enter TxDOT’s

response to coordination correspondence) N/A

TxDOT Recommended Roadway or Intersection Improvements (as applicable)

Enter TxDOT’s recommendations for improvement of roadways or intersections that lead

to the site:

1. TxDOT has concerns about the traffic modeling methodology and projections

utilized in the analysis and their applicability to the site conditions. However, we understand the difficulty in obtaining accurate traffic projections utilizing currently

available information and standard procedures. Because the modeling should use nonstandard procedures, TxDOT may request a re-evaluation of the traffic analysis and projections against actual traffic volumes and patterns once the site is made

fully operational. We reserve the right to require additional turn lanes or similar features if the comparative evaluation indicates sufficient disparity.

2. Speed reductions would require an engineering study and would need to look at the entire FM 866 corridor. Speed reductions for a specific access or development are not usually recommended.

Documentation of Coordination of Improvement Designs of Public Roadways (e.g., Turning Lanes, Storage Lanes, Acceleration/Deceleration Lanes, etc.) at and Near the Site Entrances with Agencies that Exercise Maintenance

Responsibility

1. Complete Table 1 with information regarding documentation of coordination of

improvement designs for existing and proposed roads.

Table 1: Public Roadway Improvements Coordination

Existing and

Proposed

Roads

Associated

with the Site

Entrance(s)

Agency

Exercising

Maintenance

Responsibility

Date of

Coordination

Correspondence

from the

Applicant or Site

Operator to the

Agency

Responsible

Date of the

Coordination

Response

Letter from

the Agency

Responsible

Did the Agency

Responsible

Require

Improvements to

the Roadway(s)

Associated with

the Site

Entrance(s)

(check Yes or No

as applicable)

FM 866 TXDOT 05/30/2019 06/10/2020 Yes No

Page 49: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Transportation Data and Coordination Report for MSW Type I Landfills

Facility Name: Diamond Back Solid Waste Facility & Recycling Center Revision No.: 06

Permit No: 2404 Date: 06/19/2020

Transportation Data and Coordination Report Form for MSW Type I Landfills (TCEQ-20719, 8/13/15) Page 3 of 9

Existing and

Proposed

Roads

Associated

with the Site

Entrance(s)

Agency

Exercising

Maintenance

Responsibility

Date of

Coordination

Correspondence

from the

Applicant or Site

Operator to the

Agency

Responsible

Date of the

Coordination

Response

Letter from

the Agency

Responsible

Did the Agency

Responsible

Require

Improvements to

the Roadway(s)

Associated with

the Site

Entrance(s)

(check Yes or No

as applicable)

Yes No

Yes No

Yes No

2. If you checked “Yes” in the last column of Table 1, indicating that improvements

are required, address the following:

(a) Briefly describe the improvements proposed for the public roadway(s)

associated with the site entrance(s):

1. What are the details and location of the new driveway into the facility? This will require application for and issuance of a new driveway permit.

TxDOT will need to evaluate and determine if the driveway can be accommodated with the additional development that has occurred near

this site.

2. The existing driveway was approved in 2017 and was submitted as a temporary or Phase 1 access based on 1 or 2 vehicles per hour. The

driveway permit called for a 30’ throat width with 75’ radii, but the current driveway was not constructed in accordance with this permit.

It must be reconstructed to meet current Access Management Standards. We do not recommend placement of 2 exit lanes as these movements will conflict with each other, increase conflict points, and

potentially cause safety concerns.

3. As the traffic analysis shows there is added safety value in the

inclusion of turn bays on FM 866, but as discussed above, additional and accurate traffic data will be needed. The driveway should be

designed to accommodate the turning movements for the anticipated vehicle usage along with a shoulder widening 250’ each side of the driveway to obtain a minimum 10’ shoulder. The shoulder widening is

required to mitigate the edge drop-off issues that are typically seen with truck traffic entering and exiting the facility. Attached is our

current standards for commercial and industrial driveways.

Page 50: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Transportation Data and Coordination Report for MSW Type I Landfills

Facility Name: Diamond Back Solid Waste Facility & Recycling Center Revision No.: 06

Permit No: 2404 Date: 06/19/2020

Transportation Data and Coordination Report Form for MSW Type I Landfills (TCEQ-20719, 8/13/15) Page 4 of 9

(b) A copy of the proposed improvement design submitted to the agency exercising maintenance responsibility over the roadway is attached herein:

Yes No. If you checked “No” please explain: The Agreement will require the developer to provide a professionally engineered design meeting the Odessa District’s requirements prior to construction.

(c) A copy of the response letter from the agency exercising maintenance responsibility over the roadway(s) associated with the site entrance(s)

approving the improvement design is attached herein: Yes No. If you checked “No” please explain: The Agreement will require the developer to provide a professionally engineered design meeting the Odessa District’s

requirements prior to construction.

Facility Location and Operation Information Used in Estimating Transportation Data

1. Facility Location Information

The facility is located in central Ector County, on FM 866 approximately 2.0 miles

northwest of the intersection of FM 866 and US Highway 20.

2. Waste Acceptance Rates

(a) Initial Waste Acceptance Rate: 200 tons/day

(b) Estimated Maximum Waste Acceptance Rate at any Time During Facility Life:

523 tons/day

3. Hours of Operation and Site Life

(a) a. Operating Hours: 5:00 A.M. to 9:00 P.M.

(b) b. Waste Acceptance Hours: 7:00 P.M. to 7:00 P.M.

(c) c. Estimated Site Life: 62 years

4. Other Information Used or Assumed in Estimating Transportation Data: N/A

Page 51: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Transportation Data and Coordination Report for MSW Type I Landfills

Facility Name: Diamond Back Solid Waste Facility & Recycling Center Revision No.: 06

Permit No: 2404 Date: 06/19/2020

Transportation Data and Coordination Report Form for MSW Type I Landfills (TCEQ-20719, 8/13/15) Page 5 of 9

Facility Daily Traffic Volume Data

1. Complete Table 2 with estimated existing daily volume of traffic generated by the facility.

Table 2: Estimated Existing Daily Volume of Traffic Generated

Vehicle Type

Traffic Volume to

Facility (vehicles per

day, vpd)

Traffic Volume from

Facility (vpd)

Trucks N/A N/A

Employee Vehicles N/A N/A

Visitors Vehicles N/A N/A

Other Vehicles N/A N/A

Summation of Daily Volume of Traffic to and from the Facility

Total Daily Volume of Traffic N/A N/A

(a) Describe the source(s) of or method(s) used to obtain the existing daily volume of traffic generated by the facility: N/A

(b) Location(s) of traffic counts (if applicable): N/A

2. Complete Table 3 with estimated future daily volume of traffic generated by the

facility.

Table 3: Estimated Future Daily Volume of Traffic Generated

Vehicle Type Traffic Volume to

Facility (vpd)

Traffic Volume from

Facility (vpd)

Trucks 92 92

Employee Vehicles 8 8

Visitors Vehicles 2 2

Other Vehicles N/A N/A

Summation of Daily Volume of Traffic to and from the Facility

Total Daily Volume of Traffic 102 102

3. Describe the method(s) used to obtain the estimated future daily volume of traffic generated by the facility, including dates, traffic growth rates, and sources of the growth rates: The expected tonnage rate of 200 tons/day. The number of trucks

was calculated assuming 70% of the vehicles are 5 tons trucks, 15% of to be 1/2 ton pickups and 15% to be 8 ton roll-offs.

Page 52: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Transportation Data and Coordination Report for MSW Type I Landfills

Facility Name: Diamond Back Solid Waste Facility & Recycling Center Revision No.: 06

Permit No: 2404 Date: 06/19/2020

Transportation Data and Coordination Report Form for MSW Type I Landfills (TCEQ-20719, 8/13/15) Page 6 of 9

4. Maps showing the facility boundary and roads within 1 mile of the facility that provide access to the site are attached herein. Yes No . If you checked “No”

please explain: N/A

Page 53: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Transportation Data and Coordination Report for MSW Type I Landfills

Facility Name: Diamond Back Solid Waste Facility & Recycling Center Revision No.: 06

Permit No: 2404 Date: 06/19/2020

Transportation Data and Coordination Report Form for MSW Type I Landfills (TCEQ-20719, 8/13/15) Page 7 of 9

Availability and Adequacy of Roads

1. Complete Table 4 with information regarding the primary access roadways.

Table 4: Roadway Characteristics of the Primary Access Roadways

List the roads that the owner or operator will use as primary access to the

site

Existing Annual Average

Daily Traffic on Roadway

(vpd)

Expected Annual Average

Daily Traffic on Roadway

(vpd)

Existing Roadway Capacity

Expected Roadway Capacity

Max Gross Weight Allowed

(lbs)

Max/Min Posted Speed Limit (mph)

Min Vertical Clearance (ft)

Surface Type

and No. of Lanes

Level of Service

Existing Traffic

Generated by the

Facility on Each Roadwa

y

Expected Traffic

Generated by the

Facility on Each

Roadway

FM 866 4842 4944 1200 vph 1200 vph 80,000 75 NA Asphalt & 2

C NA 102

2. Complete Table 5 with information regarding other access roadways within one

mile.

Table 5: Roadway Characteristics of Other Access Roadways within One Mile of the Facility

Boundary

List other

access

roadways

within 1 mile

of the facility

Existing Annual Average

Daily Traffic on Roadway

Expected Annual Average

Daily Traffic on Roadway

Existing Roadway Capacity

Expected Roadway Capacity

Max Gross Weight Allowed

(lbs)

Max/Min Posted Speed Limit (mph)

Min Vertical

Clearance (ft)

Surface Type

and No. of Lanes

Level of Service

Existing Traffic

Generated by the

Facility on Each

Roadway

Expected Traffic

Generated by the

Facility on Each

Roadway

3. Complete Table 6 with information regarding access roadway intersections within

one mile.

Table 6: Roadway Intersection Characteristics

Please list major (signalized) roadway

intersections for access roads within

1 mile of facility

Existing Capacity Existing Level of Service

NA NA NA

Page 54: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Transportation Data and Coordination Report for MSW Type I Landfills

Facility Name: Diamond Back Solid Waste Facility & Recycling Center Revision No.: 06

Permit No: 2404 Date: 06/19/2020

Transportation Data and Coordination Report Form for MSW Type I Landfills (TCEQ-20719, 8/13/15) Page 8 of 9

4. (For applicants that conducted traffic counts) Peak period traffic counts were conducted at critical intersections and roadways in the area: Yes No

If “No” is checked, please explain:

Conclusions on the availability and adequacy of roads to be used for accessing the facility

Enter conclusions regarding the availability and adequacy of roads to be used for

accessing the facility using information obtained from access roadway data; data on the volume of existing and expected vehicular traffic on the access roads within one mile of

the facility; and the projection of the volume of traffic expected to be generated by the facility on the access roads:

Traffic generated by the facility will not create any adverse impacts on the level of service of roadways providing access to the facility. No roadway improvements are recommended to facilitate traffic flow in the vicinity of the facility.

Highway Beautification

Enter facility distance from interstate or primary highways and screening information as required by 30 TAC 330.23(a).

1. Distance of Facility from Interstate or Primary Highway: 1.9 miles

2. Type of Facility Screening Provided, if applicable: NA

Analysis of the Impact of the Facility upon Airports

Enter the Part, Appendix, Attachment, Section, and Page Number of the application where

analysis of the impact of the facility upon airports is provided: Part II Appendix II.H – FAA Documentation

Documentation of Coordination with the Federal Aviation Administration for Compliance with Airport Location Restrictions

1. Applicant has submitted written information to FAA describing the facility location,

maximum height of waste units, type of waste accepted at the facility, and other facility-relevant data and information as required: Yes No

(a) Enter Date of Coordination Letter to FAA: May 15, 2019

(b) Enter Date of FAA Response: July 30, 2019

2. Indicate FAA Response and Final Action:

FAA Acknowledged No Adverse Impact.

Page 55: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Transportation Data and Coordination Report for MSW Type I Landfills

Facility Name: Diamond Back Solid Waste Facility & Recycling Center Revision No.: 06

Permit No: 2404 Date: 06/19/2020

Transportation Data and Coordination Report Form for MSW Type I Landfills (TCEQ-20719, 8/13/15) Page 9 of 9

FAA Recommended Safety Improvements. (Complete Section XII if you check this item.)

3. A copy of the Documentation of Coordination with FAA for compliance with airport location restrictions is attached herein. Yes No. If you checked “No” please explain:

NA

FAA Recommended Changes or Improvements for Airport Safety, (as applicable)

Enter FAA’s recommended changes or improvements to the facility for airport safety or for compliance with airport location restrictions.

NA

Attachments

● Maps showing the facility boundary and roads within 1 mile of the facility.

● Documentation of coordination of all designs of proposed public roadway

improvements associated with site entrances with the agency exercising maintenance responsibility of the public roadway involved; and the response letter

received from the agency, as applicable.

● Documentation of coordination with the Texas Department of Transportation (TxDOT) for traffic and location restrictions, including any traffic study report; and

the response letter received from TxDOT.

● Documentation of coordination with the Federal Aviation Administration for

compliance with airport location restrictions; and the response letter received from FAA.

● Other documents attached: NA

Page 56: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

June 2020 – Rev 06

April 2020 – Rev 05

March 2020 – Rev 04

January 2020 – Rev 03

November 2019 - Rev 02

August 2019 – Rev 01

May 2019 - Rev 00

PSC Project # 01080118

Prepared for:

Diamond Back Recycling and Sanitary Landfill, LP

PO Box 2283

Odessa Texas 79760

Prepared By:

Parkhill, Smith & Cooper Inc. (PSC)

4222 85th Street

Lubbock Texas 79423

TBPE F-560

Diamond Back Solid Waste Facility

& Recycling Center

Ector County, Texas

TCEQ MSW Permit No. 2404

Permit Application

Page 57: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

June 2020 – Rev 06

April 2020 – Rev 05

March 2020 – Rev 04

January 2020 – Rev 03

November 2019 - Rev 02

August 2019 – Rev 01

May 2019 - Rev 00

PSC Project # 01080118

Prepared for:

Diamond Back Recycling and Sanitary Landfill, LP

PO Box 2283

Odessa Texas 79760

Prepared By:

Parkhill, Smith & Cooper Inc. (PSC)

4222 85th Street

Lubbock Texas 79423

TBPE F-560

Diamond Back Solid Waste Facility

& Recycling Center

Ector County, Texas

TCEQ MSW Permit No. 2404

Permit Application

06/19/2020

/19/2020

Page 58: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Table of Contents – Volume 2

PARKHILL, SMITH & COOPER INC. VOL2 - i 01080118

Rev. 00 – 05.31.19; Rev. 01 – 08.21.19; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020 X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\0-MasterTOC-Volume2-sealed_tes.doc

06/19/2020

VOLUME 2

TABLE OF CONTENTS

PART III – FACILITY INVESTIGATION AND DESIGN

ATTACHMENT A – SITE DEVELOPMENT PLAN

1.0 GENERAL .............................................................................................................................. III.A-1

2.0 INTRODUCTION - 30 TAC §330.63(a) ................................................................................ III.A-2

2.1 General Facility Description ........................................................................................ III.A-2

2.2 Land Use and Zoning .................................................................................................. III.A-4

2.3 Adequacy of Access Roads and Highways ................................................................. III.A-4

3.0 GENERAL FACILITY DESIGN - 30 TAC §330.63(b) ........................................................ III.A-5

4.0 FACILITY SURFACE WATER DRAINAGE REPORT - 30 TAC §330.63(c) ................... III.A-6

5.0 WASTE MANAGEMENT UNIT DESIGN - 30 TAC §330.63(d) ........................................ III.A-7

6.0 GEOLOGY REPORT - 30 TAC §330.63(e) .......................................................................... III.A-8

7.0 GROUNDWATER SAMPLING AND ANALYSIS PLAN .................................................. III.A-9

8.0 LANDFILL GAS MANAGEMENT PLAN – 30 TAC §330.63(g) ..................................... III.A-10

9.0 CLOSURE PLAN - 30 TAC §330.63(h) .............................................................................. III.A-11

10.0 POST-CLOSURE PLAN - 30 TAC §330.63(i) .................................................................... III.A-12

11.0 COST ESTIMATES FOR CLOSURE AND POST-CLOSURE CARE - 30 TAC §330.63(j)III.A-13

Page 59: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Table of Contents – Volume 2

PARKHILL, SMITH & COOPER INC. VOL2 - ii 01080118

Rev. 00 – 05.31.19; Rev. 01 – 08.21.19; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020 X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\0-MasterTOC-Volume2-sealed_tes.doc

06/19/2020

ATTACHMENT B – GENERAL FACILITY DESIGN

1.0 FACILITY ACCESS – 30 TAC §330.63(b)(1) ...................................................................... III.B-1

2.0 WASTE MOVEMENT – 30 TAC §330.63(b)(2) .................................................................. III.B-2

3.0 VENTILATION AND ODOR CONTROL – 30 TAC §330.63(b)(2)(C) .............................. III.B-4

3.1 Sources of Odor ......................................................................................................... III.B.4

3.2 Odor Control .............................................................................................................. III.B.4

3.3 Working Face ............................................................................................................. III.B.4

3.4 Ponded Water ............................................................................................................. III.B.4

4.0 WATER POLLUTION CONTROL – 30 TAC §330.63(b)(4) ................................................ III.B.5

5.0 ENDANGERED SPECIES PROTECTION – 30 TAC §330.63(b)(5) .................................... III.B.6

APPENDICES

APPENDIX III.B.1 – DRAWINGS

ATTACHMENT C – FACILITY SURFACE WATER DRAINAGE REPORT

1.0 INTRODUCTION .................................................................................................................. III.C-1

2.0 DRAINAGE AND ANALYSIS AND DESIGN .................................................................... III.C-2

2.1 Methodology ............................................................................................................... III.C-2

2.2 Existing Condition Hydrology .................................................................................... III.C-6

2.3 Proposed Condition Hydrology ................................................................................... III.C-7

2.4 Detention Pond Design ................................................................................................ III.C-8

2.5 Weir Design ................................................................................................................. III.C-9

2.6 Hydrology Comparison ............................................................................................. III.C-10

3.0 FLOOD CONTROL AND ANALYSIS ............................................................................... III.C-11

4.0 DRAINAGE SYSTEM PLANS AND DETAILS ................................................................ III.C-12

4.1 Final cover System Drainage Design ........................................................................ III.C-12

4.2 Developed Hydrologic Modeling .............................................................................. III.C-12

5.0 EROSION CONTROL PLAN .............................................................................................. III.C-13

5.1 Interim Controls for Phased Development ................................................................ III.C-13

5.2 Fully-Developed Erosion Control ............................................................................. III.C-13

6.0 CONCLUSIONS .................................................................................................................. III.C-14

ATTACHMENTS

ATTACHMENT III.C.1 – EXISTING HYDROLOGY

ATTACHMENT III.C.2 – PROPOSED HYDROLOGY

ATTACHMENT III.C.3 – FINAL COVER AND PERIMETER

DRAINAGE PLANS AND

CALCULATIONS

Page 60: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Table of Contents – Volume 2

PARKHILL, SMITH & COOPER INC. VOL2 - iii 01080118

Rev. 00 – 05.31.19; Rev. 01 – 08.21.19; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020 X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\0-MasterTOC-Volume2-sealed_tes.doc

06/19/2020

ATTACHMENT D – WASTE MANAGEMENT UNIT DESIGN

1.0 INTRODUCTION .................................................................................................................. III.D-1

2.0 STORAGE AND TRANSFER UNITS - 30 TAC §330.63(d)(1) ........................................... III.D-2

2.1 Large Item Storage ...................................................................................................... III.D-2

3.0 LANDFILL DESIGN ............................................................................................................. III.D-3

3.1 All-Weather Operation ................................................................................................ III.D-3

3.2 Landfilling Methods .................................................................................................... III.D-3

3.3 Landfill Design Parameters ......................................................................................... III.D-3

3.4 Landfill Life Projection ............................................................................................... III.D-3

3.5 Landfill Cross Sections................................................................................................ III.D-4

3.6 Leachate and Contaminated Water Management ........................................................ III.D-4

4.0 SITE LIFE CALCULATIONS ............................................................................................... III.D-6

ATTACHMENTS

ATTACHMENT III.D1 – SITE LAYOUT PLANS

ATTACHMENT III.D2 – CROSS SECTIONS

ATTACHMENT III.D3 – CONSTRUCTION DESIGN DETAILS

ATTACHMENT III.D4 – SITE LIFE

ATTACHMENT III.D5 – GEOTECHNICAL DESIGN

ATTACHMENT III.D6 – LEACHATE AND CONTAMINATED WATER MANAGEMENT PLAN

ATTACHMENT III.D7 – LINER QUALITY CONTROL PLAN

ATTACHMENT E – GEOLOGY REPORT

1.0 REGIONAL GEOLOGIC/HYDROGEOLOGIC INFORMATION ...................................... III.E-1

1.1 Regional Physiography and Topography .................................................................... III.E-1

1.2 Regional Stratigraphy, Lithology, and Structural Setting ........................................... III.E-1

2.0 GEOLOGIC PROCESSES - 30 TAC § 330.63(e)(2), 330.61(J)(2) ....................................... III.E-3

2.1 Fault Areas .................................................................................................................. III.E-3

2.2 Seismic Impact Zones.................................................................................................. III-E-4

2.3 Unstable Areas ............................................................................................................ III-E-5

Page 61: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Table of Contents – Volume 2

PARKHILL, SMITH & COOPER INC. VOL2 - iv 01080118

Rev. 00 – 05.31.19; Rev. 01 – 08.21.19; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020 X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\0-MasterTOC-Volume2-sealed_tes.doc

06/19/2020

3.0 REGIONAL AQUIFERS - 30 TAC § 330.63(E)(3) ............................................................... III.E-5

3.1 Regional Hydrogeology ............................................................................................... III.E-5

3.2 Edwards-Trinity Aquifer ............................................................................................. III.E-5

3.3 Dockum Aquifer .......................................................................................................... III.E-6

3.4 Area Water Wells ........................................................................................................ III.E-7

4.1 Drilling Activities ........................................................................................................ III.E-8

4.2 Site Stratigraphy .......................................................................................................... III.E-9

4.3 Groundwater Occurrence ........................................................................................... III.E-11

4.4 Groundwater Analytical Data .................................................................................... III.E-11

4.5 Site Hydrogeology ..................................................................................................... III.E-12

5.0 REFERENCES ..................................................................................................................... III.E-14

ATTACHMENTS

ATTACHMENT III.E1 – REGIONAL GEOLOGIC/HYDROLOGIC INFORMATION

ATTACHMENT III.E2 – SITE EXPLORATION DATA

ATTACHMENT III.E3 – SITE GEOLOGIC DATA

ATTACHMENT III.E4 – FAULT AND SEISMIC DATA

ATTACHMENT III.E5 – LABORATORY TESTS

Page 62: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

June 2020 – Rev 06

April 2020 – Rev 05

March 2020 – Rev 04

January 2020 – Rev 03

November 2019 - Rev 02

August 2019 – Rev 01

May 2019 - Rev 00

PSC Project # 01080118

Prepared for:

Diamond Back Recycling and Sanitary Landfill, LP

PO Box 2283

Odessa Texas 79760

Prepared By:

Parkhill, Smith & Cooper Inc. (PSC)

4222 85th Street

Lubbock Texas 79423

TBPE F-560

Diamond Back Solid Waste Facility

& Recycling Center

Ector County, Texas

TCEQ MSW Permit No. 2404

PART III – FACILITY INVESTIGATION AND DESIGN

Permit Application

Page 63: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

June 2020 – Rev 06

April 2020 – Rev 05

March 2020 – Rev 04

January 2020 – Rev 03

November 2019 - Rev 02

August 2019 – Rev 01

May 2019 - Rev 00

PSC Project # 01080118

Prepared for:

Diamond Back Recycling and Sanitary Landfill, LP

PO Box 2283

Odessa Texas 79760

Prepared By:

Parkhill, Smith & Cooper Inc. (PSC)

4222 85th Street

Lubbock Texas 79423

TBPE F-560

Diamond Back Solid Waste Facility

& Recycling Center

Ector County, Texas

TCEQ MSW Permit No. 2404

PART III – FACILITY INVESTIGATION AND DESIGN

Permit Application

06/19/2020

Page 64: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III – Facility Investigation and Design

PARKHILL, SMITH & COOPER INC. TOC III - 1 01080118

Rev. 00 – 05.31.19; Rev. 01 – 08.21.19; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\III.0-TOC-sealed_tes.doc

06/19/2020

TABLE OF CONTENTS

ATTACHMENT A – SITE DEVELOPMENT PLAN

1.0 GENERAL .............................................................................................................................. III.A-1

2.0 INTRODUCTION - 30 TAC §330.63(a) ................................................................................ III.A-2

2.1 General Facility Description ........................................................................................ III.A-2

2.2 Land Use and Zoning .................................................................................................. III.A-4

2.3 Adequacy of Access Roads and Highways ................................................................. III.A-4

3.0 GENERAL FACILITY DESIGN - 30 TAC §330.63(b) ........................................................ III.A-5

4.0 FACILITY SURFACE WATER DRAINAGE REPORT - 30 TAC §330.63(c) ................... III.A-6

5.0 WASTE MANAGEMENT UNIT DESIGN - 30 TAC §330.63(d) ........................................ III.A-7

6.0 GEOLOGY REPORT - 30 TAC §330.63(e) .......................................................................... III.A-8

7.0 GROUNDWATER SAMPLING AND ANALYSIS PLAN .................................................. III.A-9

8.0 LANDFILL GAS MANAGEMENT PLAN – 30 TAC §330.63(g) ..................................... III.A-10

9.0 CLOSURE PLAN - 30 TAC §330.63(h) .............................................................................. III.A-11

10.0 POST-CLOSURE PLAN - 30 TAC §330.63(i) .................................................................... III.A-12

11.0 COST ESTIMATES FOR CLOSURE AND POST-CLOSURE CARE - 30 TAC §330.63(j)III.A-13

ATTACHMENT B – GENERAL FACILITY DESIGN

1.0 FACILITY ACCESS – 30 TAC §330.63(b)(1) ...................................................................... III.B-1

2.0 WASTE MOVEMENT – 30 TAC §330.63(b)(2) .................................................................. III.B-2

3.0 VENTILATION AND ODOR CONTROL – 30 TAC §330.63(b)(2)(C) .............................. III.B-4

3.1 Sources of Odor ......................................................................................................... III.B.4

3.2 Odor Control .............................................................................................................. III.B.4

3.3 Working Face ............................................................................................................. III.B.4

3.4 Ponded Water ............................................................................................................. III.B.4

4.0 WATER POLLUTION CONTROL – 30 TAC §330.63(b)(4) ................................................ III.B.5

5.0 ENDANGERED SPECIES PROTECTION – 30 TAC §330.63(b)(5) .................................... III.B.6

APPENDICES

APPENDIX III.B.1 – DRAWINGS

Page 65: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III – Facility Investigation and Design

PARKHILL, SMITH & COOPER INC. TOC III - 2 01080118

Rev. 00 – 05.31.19; Rev. 01 – 08.21.19; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\III.0-TOC-sealed_tes.doc

06/19/2020

ATTACHMENT C – FACILITY SURFACE WATER DRAINAGE REPORT

1.0 INTRODUCTION .................................................................................................................. III.C-1

2.0 DRAINAGE AND ANALYSIS AND DESIGN .................................................................... III.C-2

2.1 Methodology ............................................................................................................... III.C-2

2.2 Existing Condition Hydrology .................................................................................... III.C-6

2.3 Proposed Condition Hydrology ................................................................................... III.C-7

2.4 Detention Pond Design ................................................................................................ III.C-8

2.5 Weir Design ................................................................................................................. III.C-9

2.6 Hydrology Comparison ............................................................................................. III.C-10

3.0 FLOOD CONTROL AND ANALYSIS ............................................................................... III.C-11

4.0 DRAINAGE SYSTEM PLANS AND DETAILS ................................................................ III.C-12

4.1 Final cover System Drainage Design ........................................................................ III.C-12

4.2 Developed Hydrologic Modeling .............................................................................. III.C-12

5.0 EROSION CONTROL PLAN .............................................................................................. III.C-13

5.1 Interim Controls for Phased Development ................................................................ III.C-13

5.2 Fully-Developed Erosion Control ............................................................................. III.C-13

6.0 CONCLUSIONS .................................................................................................................. III.C-14

ATTACHMENTS

ATTACHMENT III.C.1 – EXISTING HYDROLOGY

ATTACHMENT III.C.2 – PROPOSED HYDROLOGY

ATTACHMENT III.C.3 – FINAL COVER, INTERIM COVER, AND PERIMETER DRAINAGE PLANS

AND CALCULATIONS

Page 66: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III – Facility Investigation and Design

PARKHILL, SMITH & COOPER INC. TOC III - 3 01080118

Rev. 00 – 05.31.19; Rev. 01 – 08.21.19; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\III.0-TOC-sealed_tes.doc

06/19/2020

ATTACHMENT D – WASTE MANAGEMENT UNIT DESIGN

1.0 INTRODUCTION .................................................................................................................. III.D-1

2.0 STORAGE AND TRANSFER UNITS - 30 TAC §330.63(d)(1) ........................................... III.D-2

2.1 Large Item Storage ...................................................................................................... III.D-2

3.0 LANDFILL DESIGN ............................................................................................................. III.D-3

3.1 All-Weather Operation ................................................................................................ III.D-3

3.2 Landfilling Methods .................................................................................................... III.D-3

3.3 Landfill Design Parameters ......................................................................................... III.D-3

3.4 Landfill Life Projection ............................................................................................... III.D-3

3.5 Landfill Cross Sections................................................................................................ III.D-4

3.6 Leachate and Contaminated Water Management ........................................................ III.D-4

4.0 SITE LIFE CALCULATIONS ............................................................................................... III.D-6

ATTACHMENTS

ATTACHMENT III.D1 – SITE LAYOUT PLANS

ATTACHMENT III.D2 – CROSS SECTIONS

ATTACHMENT III.D3 – CONSTRUCTION DESIGN DETAILS

ATTACHMENT III.D4 – SITE LIFE

ATTACHMENT III.D5 – GEOTECHNICAL DESIGN

ATTACHMENT III.D6 – LEACHATE AND CONTAMINATED WATER MANAGEMENT PLAN

ATTACHMENT III.D7 – LINER QUALITY CONTROL PLAN

ATTACHMENT E – GEOLOGY REPORT

1.0 REGIONAL GEOLOGIC/HYDROGEOLOGIC INFORMATION ...................................... III.E-1

1.1 Regional Physiography and Topography .................................................................... III.E-1

1.2 Regional Stratigraphy, Lithology, and Structural Setting ........................................... III.E-1

2.0 GEOLOGIC PROCESSES - 30 TAC § 330.63(e)(2), 330.61(J)(2) ....................................... III.E-3

2.1 Fault Areas .................................................................................................................. III.E-3

2.2 Seismic Impact Zones.................................................................................................. III-E-4

2.3 Unstable Areas ............................................................................................................ III-E-5

Page 67: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III – Facility Investigation and Design

PARKHILL, SMITH & COOPER INC. TOC III - 4 01080118

Rev. 00 – 05.31.19; Rev. 01 – 08.21.19; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\III.0-TOC-sealed_tes.doc

06/19/2020

3.0 REGIONAL AQUIFERS - 30 TAC § 330.63(E)(3) ............................................................... III.E-5

3.1 Regional Hydrogeology ............................................................................................... III.E-5

3.2 Edwards-Trinity Aquifer ............................................................................................. III.E-5

3.3 Dockum Aquifer .......................................................................................................... III.E-6

3.4 Area Water Wells ........................................................................................................ III.E-7

4.0 SUBSURFACE INVESTIGATION REPORT – 30 TAC §330.63(E)(4)(A)-(H)12 .............. III.E-7

4.1 Drilling Activities ........................................................................................................ III.E-8

4.2 Site Stratigraphy .......................................................................................................... III.E-9

4.3 Groundwater Occurrence ........................................................................................... III.E-11

4.4 Groundwater Analytical Data .................................................................................... III.E-11

4.5 Site Hydrogeology ..................................................................................................... III.E-12

5.0 REFERENCES ..................................................................................................................... III.E-14

ATTACHMENTS

ATTACHMENT III.E1 – REGIONAL GEOLOGIC/HYDROLOGIC INFORMATION

ATTACHMENT III.E2 – SITE EXPLORATION DATA

ATTACHMENT III.E3 – SITE GEOLOGIC DATA

ATTACHMENT III.E4 – FAULT AND SEISMIC DATA

ATTACHMENT III.E5 – LABORATORY TESTS

ATTACHMENT III.E6 - SITE HYDROGEOLOGIC DATA

ATTACHMENT III.E3 – SITE GEOLOGIC DATA

ATTACHMENT III.E4 – FAULT AND SEISMIC DATA

ATTACHMENT III.E5 – LABORATORY TESTS

ATTACHMENT III.E6 - TWDB WELL RECORDS AND WELL DRILLERS REPORT

ATTACHMENT III.E7 - OIL WELL PLUGGING RECORDS

ATTACHMENT F – GROUNDWATER SAMPLING AND ANALYSIS PLAN

GROUNDWATER MONITORING SYSTEM DESIGN CERTIFICATION ........................ III.F-1

1.0 GROUNDWATER MONITORING PROGRAM ................................................................... III.F-2

1.1 Site Hydrogeology ........................................................................................................ III.F-2

1.2 Groundwater Flow Direction and Rate ......................................................................... III.F-2

Page 68: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III – Facility Investigation and Design

PARKHILL, SMITH & COOPER INC. TOC III - 5 01080118

Rev. 00 – 05.31.19; Rev. 01 – 08.21.19; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\III.0-TOC-sealed_tes.doc

06/19/2020

2.0 OPERATIONAL CONSIDERATIONS FOR GROUNDWATER SYSTEM DESIGN ......... III.F-4

2.1 Critical Receptors ......................................................................................................... III.F-4

2.2 Relations of Excavation Bottom-to-Uppermost Aquifer .............................................. III.F-4

2.3 Leachate Sump Design ................................................................................................. III.F-4

2.4 Contaminant Pathway Analysis .................................................................................... III.F-4

3.0 SUBTITLE D GROUNDWATER MONITORING SYSTEM ............................................... III.F-5

3.1 Monitoring Well Locations .......................................................................................... III.F-5

3.2 Sampling and Analysis Procedures .............................................................................. III.F-5

3.3 Monitor Well Design and Construction........................................................................ III.F-5

ATTACHMENTS

ATTACHMENT III.F1 – FIGURES

ATTACHMENT III.F2 – GROUNDWATER SAMPLING AND ANALYSIS PLAN (GWSAP)

ATTACHMENT G – LANDFILL GAS MANAGEMENT PLAN

1.0 INTRODUCTION - 30 TAC §330.63(g) and §330.371 ......................................................... III.G-1

2.0 SITE CHARACTERISTICS - 30 TAC §330.371(b)(1)(A)-(C) ............................................. III.G-2

2.1 Facility Structures ........................................................................................................ III.G-2

2.2 Underground Utilities .................................................................................................. III.G-2

3.0 MONITORING - 30 TAC §330.371(h)-(k) ............................................................................ III.G-3

3.1 Perimeter Monitoring .................................................................................................. III.G-3

3.2 Landfill Gas-Monitoring Probes .................................................................................. III.G-3

3.3 Utility Easements......................................................................................................... III.G-3

3.4 Procedures ................................................................................................................... III.G-4

3.5 Maintenance Procedures .............................................................................................. III.G-4

3.6 Facility Monitoring ...................................................................................................... III.G-5

3.7 Maintenance Procedures .............................................................................................. III.G-5

3.8 Monitoring Frequency and Recordkeeping/Reporting ................................................ III.G-5

3.9 Contingency Monitoring Plan - 30 TAC §330.371(g)(3) ............................................ III.G-5

Page 69: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III – Facility Investigation and Design

PARKHILL, SMITH & COOPER INC. TOC III - 6 01080118

Rev. 00 – 05.31.19; Rev. 01 – 08.21.19; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\III.0-TOC-sealed_tes.doc

06/19/2020

4.0 ACTION PLAN - 30 TAC §330.371(c)(1)-(2) ....................................................................... III.G-7

4.1 Emergency Action ....................................................................................................... III.G-7

4.2 Notification Procedures ............................................................................................... III.G-9

5.0 REMEDIATION PLAN - 30 TAC §330.371(c)(3) ................................................................ III.G-9

6.0 LFG CONTROL SYSTEM - 30 TAC §330.371(g) ............................................................. III.G-10

6.1 Passive Gas-Control System ...................................................................................... III.G-10

7.0 SAFETY ............................................................................................................................... III.G-11

ATTACHMENTS

ATTACHMENT III.G1 – LANDFILL GAS MONITORING PROBE PLAN

ATTACHMENT III.G2 – REPORTING AND RECORDING FORMS

ATTACHMENT H – CLOSURE PLAN

1.0 FINAL CLOSURE ACTIVITIES – 30 TAC §330.457 .......................................................... III.H-1

2.0 FINAL COVER DESIGN - 30 TAC §330.457(a)(1-(3) and (d) ............................................ III.H-2

3.0 SEQUENCE OF FINAL COVER INSTALLATION - 30 TAC §330.457(e)(1)-(3) ............. III.H-4

3.1 Closure Sequence ....................................................................................................... III.H-4

3.2 Closure During Active Life ....................................................................................... III.H-4

3.3 Estimate of Largest Area Requiring Final Cover....................................................... III.H-5

3.4 Estimate of Maximum Inventory of Waste On Site ................................................... III.H-5

4.0 FINAL CLOSURE ACTIVITY SCHEDULE - 30 TAC §330.457(e)(4), (f)(1)-(6), (g), and

§330.461(a)-(b) ....................................................................................................................... III.H-6

5.0 CLOSURE COST ESTIMATE – 30 TAC §330.503.(a) ........................................................ III.H-7

ATTACHMENTS

ATTACHMENT III.H1 – TCEQ RG-494 GUIDANCE FOR REQUESTING A WATER BALANCE (WB)

ALTERNATIVE FINAL COVER FOR A MUNICIPAL SOLID WASTE LANDFILL

ATTACHMENT III.H2 – FINAL COVER QUALITY CONTROL PLAN

ATTACHMENT III.H3 – FINAL COVER FIGURES AND DETAILS

Page 70: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III – Facility Investigation and Design

PARKHILL, SMITH & COOPER INC. TOC III - 7 01080118

Rev. 00 – 05.31.19; Rev. 01 – 08.21.19; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\III.0-TOC-sealed_tes.doc

06/19/2020

ATTACHMENT I – POST-CLOSURE PLAN

1.0 GENERAL ................................................................................................................................ III.I-1

2.0 MONITORING AND MAINTENANCE ACTIVITIES .......................................................... III.I-2

3.0 LENGTH OF POST-CLOSURE CARE .................................................................................. III.I-3

4.0 COMPLETION OF POST-CLOSURE CARE ......................................................................... III.I-4

5.0 LANDFILL CONTACT FOR POST-CLOSURE ACTIVITIES ............................................. III.I-5

6.0 PROPOSED USE OF FACILITY FOLLOWING CLOSURE ................................................ III.I-6

7.0 POST-CLOSURE COSTS ........................................................................................................ III.I-7

ATTACHMENT J – CLOSURE AND POST-CLOSURE COST ESTIMATES

1.0 INTRODUCTION – 30 TAC §330.63(j) ................................................................................ III.J-1

2.0 CLOSURE COST ESTIMATE – 30 TAC §330.503 ............................................................. III.J-1

3.0 POST-CLOSURE CARE COST ESTIMATE – 30 TAC §330.507 ....................................... III.J-1

4.0 COST ESTIMATE ADJUSTMENT – 30 TAC §330.503, 507.............................................. III.J-1

5.0 FINANCIAL ASSURANCE – 30 TAC §330.503, 507 ......................................................... III.J-2

ATTACHMENTS

ATTACHMENT III.J1 - CLOSURE COST ESTIMATE CALCULATIONS

ATTACHMENT III.J2 - POST-CLOSURE CARE COST ESTIMATE CALCULATIONS

ATTACHMENT III.J3 - EVIDENCE OF FINANCIAL ASSURANCE

Page 71: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

June 2020 – Rev 06

April 2020 – Rev 05

March 2020 – Rev 04

November 2019 – Rev 02

August 2019 – Rev 01

May 2019 - Rev 00

PSC Project # 01080118

Prepared for:

Diamond Back Recycling and Sanitary Landfill, LP

PO Box 2283

Odessa Texas 79760

Prepared By:

Parkhill, Smith & Cooper, Inc. (PSC)

4222 85th Street

Lubbock, Texas 79423

TBPE F-560

Diamond Back Solid Waste Facility

& Recycling Center

Ector County, Texas

TCEQ MSW Permit No. 2404

PART III – FACILITY INVESTIGATION AND DESIGN Attachment B – GENERAL FACILITY DESIGN

Permit Application

Page 72: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

June 2020 – Rev 06

April 2020 – Rev 05

March 2020 – Rev 04

November 2019 - Rev 02

August 2019 – Rev 01

May 2019 - Rev 00

PSC Project # 01080118

Prepared for:

Diamond Back Recycling and Sanitary Landfill, LP

PO Box 2283

Odessa Texas 79760

Prepared By:

Parkhill, Smith & Cooper Inc. (PSC)

4222 85th Street

Lubbock, Texas 79423

TBPE F-560

Diamond Back Solid Waste Facility

& Recycling Center

Ector County, Texas

TCEQ MSW Permit No. 2404

PART III – FACILITY INVESTIGATION AND DESIGN Attachment B – GENERAL FACILITY DESIGN

Permit Application

06/19/2020

Page 73: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment B – General Facility Design

PARKHILL, SMITH & COOPER INC. TOC III.B-i 01080118

Rev 00 – 05.31.19; Rev 01 – 08.21.19; Rev 02 - 11.11.19; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\III.B-TOCbodyDivider_tes.docx

06/19/2020

TABLE OF CONTENTS PART III, ATTACHMENT B – GENERAL FACILITY DESIGN

1.0 FACILITY ACCESS – 30 TAC §330.63(b)(1) .......................................................... III.B-1

2.0 WASTE MOVEMENT – 30 TAC §330.63(b)(2) ...................................................... III.B-2

3.0 VENTILATION AND ODOR CONTROL – 30 TAC §330.63(b)(2)(C) .................. III.B-4

3.1 Sources of Odor ......................................................................................................... III.B.4

3.2 Odor Control .............................................................................................................. III.B.4

3.3 Working Face ............................................................................................................. III.B.4

3.4 Ponded Water ............................................................................................................. III.B.4

4.0 WATER POLLUTION CONTROL – 30 TAC §330.63(b)(4) .................................... III.B.5

5.0 ENDANGERED SPECIES PROTECTION – 30 TAC §330.63(b)(5) ....................... III.B.6

APPENDICES

APPENDIX III.B1 – DRAWINGS

Page 74: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment B – General Facility Design

PARKHILL, SMITH & COOPER INC. 01080118 Rev 00 – 05.31.19; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

APPENDIX III.B1

DRAWINGS

Page 75: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,
Page 76: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

June 2020 – Rev 06

April 2020 – Rec 05

March 2020 – Rev 04

January 2020 – Rev 03

November 2019 - Rev 02

August 2019 – Rev 01

May 2019 - Rev 00

PSC Project # 01080118

Prepared for:

Diamond Back Recycling and Sanitary Landfill, LP

PO Box 2283

Odessa Texas 79760

Prepared By:

Parkhill, Smith & Cooper, Inc. (PSC)

4222 85th Street

Lubbock, Texas 79423

TBPE F-560

Diamond Back Solid Waste Facility

& Recycling Center

Ector County, Texas

TCEQ MSW Permit No. 2404

PART III – FACILITY INVESTIGATION AND DESIGN Attachment D – WASTE MANAGEMENT UNIT DESIGN

Permit Application

Page 77: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

June 2020 – Rev 06

April 2020 – Rev 05

March 2020 – Rev 04

January 2020 – Rev 03

November 2019 - Rev 02

August 2019 – Rev 01

May 2019 - Rev 00

PSC Project # 01080118

Prepared for:

Diamond Back Recycling and Sanitary Landfill, LP

PO Box 2283

Odessa Texas 79760

Prepared By:

Parkhill, Smith & Cooper Inc. (PSC)

4222 85th Street

Lubbock, Texas 79423

TBPE F-560

Diamond Back Solid Waste Facility

& Recycling Center

Ector County, Texas

TCEQ MSW Permit No. 2404

PART III – FACILITY INVESTIGATION AND DESIGN Attachment D – WASTE MANAGEMENT UNIT DESIGN

Permit Application

06/19/2020

Page 78: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment D – Waste Management Unit Design

PARKHILL, SMITH & COOPER INC. TOC III.D-i 01080118

Rev 00 – 05.31.19; Rev 01 – 08.21.19; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\III.D0-TOCbodyDividers_tes.docx

06/19/2020

TABLE OF CONTENTS

1.0 INTRODUCTION ...................................................................................................... III.D-1

2.0 STORAGE AND TRANSFER UNITS – 30 TAC §330.63(d)(1) .............................. III.D-2

2.1 Large Item Storage ..................................................................................................... III.D-2

3.0 LANDFILL DESIGN ................................................................................................. III.D.3

3.1 All-weather operation ................................................................................................ III.D.3

3.2 Landfilling Methods ................................................................................................... III.D.3

3.3 Landfill Design Parameters ........................................................................................ III.D.3

3.4 Landfill Life Projection .............................................................................................. III.D.3

3.5 Landfill Cross Sections .............................................................................................. III.D.4

3.6 Leachate and Contaminated Water Management....................................................... III.D.4

4.0 SITE LIFE CALCULATIONS ................................................................................... III.D.6

ATTACHMENTS

ATTACHMENT III.D1 – SITE LAYOUT PLANS

ATTACHMENT III.D2 – CROSS SECTIONS

ATTACHMENT III.D3 – CONSTRUCTION DESIGN DETAILS

ATTACHMENT III.D4 – SITE LIFE

ATTACHMENT III.D5 – GEOTECHNICAL DESIGN

ATTACHMENT III.D6 – LEACHATE AND CONTAMINATED WATER MANAGEMENT PLAN

ATTACHMENT III.D7 – LINER QUALITY CONTROL PLAN

TABLES

Table III.D.1 - LANDFILL CONDITIONS

Table III.D.2 – SITE LIFE CALCULATIONS

Page 79: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment D – Waste Management Unit Design

PARKHILL, SMITH & COOPER INC. 01080118 Rev 00 – 05.31.19; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

ATTACHMENT III.D1

SITE LAYOUT PLANS

Page 80: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,
Page 81: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

June 2020 – Rev 06

April 2020 – Rev 05

March 2020 – Rev 04

January 2020 – Rev 03

November 2019 - Rev 02

August 2019 – Rev 01

May 2019 - Rev 00

PSC Project # 01080118

Prepared for:

Diamond Back Recycling and Sanitary Landfill, LP

PO Box 2283

Odessa Texas 79760

Prepared By:

Parkhill, Smith & Cooper Inc. (PSC)

4222 85th Street

Lubbock Texas 79423

TBPE F-560

Diamond Back Solid Waste Facility

& Recycling Center

Ector County, Texas

TCEQ MSW Permit No. 2404

Permit Application

Page 82: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

June 2020 – Rev 06

April 2020 – Rev 05

March 2020 – Rev 04

January 2020 – Rev 03

November 2019 - Rev 02

August 2019 – Rev 01

May 2019 - Rev 00

PSC Project # 01080118

Prepared for:

Diamond Back Recycling and Sanitary Landfill, LP

PO Box 2283

Odessa Texas 79760

Prepared By:

Parkhill, Smith & Cooper Inc. (PSC)

4222 85th Street

Lubbock Texas 79423

TBPE F-560

Diamond Back Solid Waste Facility

& Recycling Center

Ector County, Texas

TCEQ MSW Permit No. 2404

Permit Application

06/19/2020

/19/2020

Page 83: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Table of Contents – Volume 4

PARKHILL, SMITH & COOPER INC. VOL4 - i 01080118

Rev. 00 – 05.31.19; Rev. 01 – 08.21.19; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020 X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\0-MasterTOC-Volume4-sealed_tes.doc

06/19/2020

VOLUME 4

TABLE OF CONTENTS

PART III – FACILITY INVESTIGATION AND DESIGN

ATTACHMENT E – GEOLOGY REPORT

ATTACHMENTS

ATTACHMENT III.E6 - TWDB WELL RECORDS AND WELL DRILLERS REPORT (pages III.E6-783

to III.E6-1416)

ATTACHMENT III.E7 - OIL WELL PLUGGING RECORDS

ATTACHMENT F – GROUNDWATER SAMPLING AND ANALYSIS PLAN

GROUNDWATER MONITORING SYSTEM DESIGN CERTIFICATION ........................ III.F-1

1.0 GROUNDWATER MONITORING PROGRAM ................................................................... III.F-2

1.1 Site Hydrogeology ........................................................................................................ III.F-2

1.2 Groundwater Flow Direction and Rate ......................................................................... III.F-2

2.0 OPERATIONAL CONSIDERATIONS FOR GROUNDWATER SYSTEM DESIGN ......... III.F-4

2.1 Critical Receptors ......................................................................................................... III.F-4

2.2 Relations of Excavation Bottom-to-Uppermost Aquifer .............................................. III.F-4

2.3 Leachate Sump Design ................................................................................................. III.F-4

2.4 Contaminant Pathway Analysis .................................................................................... III.F-4

3.0 SUBTITLE D GROUNDWATER MONITORING SYSTEM ............................................... III.F-5

3.1 Monitoring Well Locations .......................................................................................... III.F-5

3.2 Sampling and Analysis Procedures .............................................................................. III.F-5

3.3 Monitor Well Design and Construction........................................................................ III.F-5

ATTACHMENTS

ATTACHMENT III.F1 – FIGURES

ATTACHMENT III.F2 – GROUNDWATER SAMPLING AND

ANALYSIS PLAN (GWSAP)

Page 84: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Table of Contents – Volume 4

PARKHILL, SMITH & COOPER INC. VOL4 - ii 01080118

Rev. 00 – 05.31.19; Rev. 01 – 08.21.19; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020 X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\0-MasterTOC-Volume4-sealed_tes.doc

06/19/2020

ATTACHMENT G – LANDFILL GAS MANAGEMENT PLAN

1.0 INTRODUCTION - 30 TAC §330.63(g) and §330.371 ......................................................... III.G-1

2.0 SITE CHARACTERISTICS - 30 TAC §330.371(b)(1)(A)-(C) ............................................. III.G-2

2.1 Facility Structures ........................................................................................................ III.G-2

2.2 Underground Utilities .................................................................................................. III.G-2

3.0 MONITORING - 30 TAC §330.371(h)-(k) ............................................................................ III.G-3

3.1 Perimeter Monitoring .................................................................................................. III.G-3

3.2 Landfill Gas-Monitoring Probes .................................................................................. III.G-3

3.3 Utility Easements......................................................................................................... III.G-3

3.4 Procedures ................................................................................................................... III.G-4

3.5 Maintenance Procedures .............................................................................................. III.G-4

3.6 Facility Monitoring ...................................................................................................... III.G-5

3.7 Maintenance Procedures .............................................................................................. III.G-5

3.8 Monitoring Frequency and Recordkeeping/Reporting ................................................ III.G-5

3.9 Contingency Monitoring Plan - 30 TAC §330.371(g)(3) ............................................ III.G-5

4.0 ACTION PLAN - 30 TAC §330.371(c)(1)-(2) ....................................................................... III.G-7

4.1 Emergency Action ....................................................................................................... III.G-7

4.2 Notification Procedures ............................................................................................... III.G-9

5.0 REMEDIATION PLAN - 30 TAC §330.371(c)(3) ................................................................ III.G-9

6.0 LFG CONTROL SYSTEM - 30 TAC §330.371(g) ............................................................. III.G-10

6.1 Passive Gas-Control System ...................................................................................... III.G-10

7.0 SAFETY ............................................................................................................................... III.G-11

ATTACHMENTS

ATTACHMENT III.G1 – LANDFILL GAS MONITORING PROBE PLAN

ATTACHMENT III.G2 – REPORTING AND RECORDING FORMS

Page 85: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Table of Contents – Volume 4

PARKHILL, SMITH & COOPER INC. VOL4 - iii 01080118

Rev. 00 – 05.31.19; Rev. 01 – 08.21.19; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020 X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\0-MasterTOC-Volume4-sealed_tes.doc

06/19/2020

ATTACHMENT H – CLOSURE PLAN

1.0 FINAL CLOSURE ACTIVITIES – 30 TAC §330.457 .......................................................... III.H-1

2.0 FINAL COVER DESIGN - 30 TAC §330.457(a)(1-(3) and (d) ............................................ III.H-2

3.0 SEQUENCE OF FINAL COVER INSTALLATION - 30 TAC §330.457(e)(1)-(3) ............. III.H-4

3.1 Closure Sequence ....................................................................................................... III.H-4

3.2 Closure During Active Life ....................................................................................... III.H-4

3.3 Estimate of Largest Area Requiring Final Cover....................................................... III.H-5

3.4 Estimate of Maximum Inventory of Waste On Site ................................................... III.H-5

4.0 FINAL CLOSURE ACTIVITY SCHEDULE - 30 TAC §330.457(e)(4), (f)(1)-(6), (g), and

§330.461(a)-(b) ....................................................................................................................... III.H-6

5.0 CLOSURE COST ESTIMATE – 30 TAC §330.503.(a) ........................................................ III.H-7

ATTACHMENTS

ATTACHMENT III.H1 – TCEQ RG-494 GUIDANCE FOR REQUESTING A WATER BALANCE (WB)

ALTERNATIVE FINAL COVER FOR A MUNICIPAL SOLID WASTE LANDFILL

ATTACHMENT III.H2 – FINAL COVER QUALITY CONTROL PLAN

ATTACHMENT III.H3 – FINAL COVER FIGURES AND DETAILS

ATTACHMENT I – POST-CLOSURE PLAN

1.0 GENERAL ................................................................................................................................ III.I-1

2.0 MONITORING AND MAINTENANCE ACTIVITIES .......................................................... III.I-2

3.0 LENGTH OF POST-CLOSURE CARE .................................................................................. III.I-3

4.0 COMPLETION OF POST-CLOSURE CARE ......................................................................... III.I-4

5.0 LANDFILL CONTACT FOR POST-CLOSURE ACTIVITIES ............................................. III.I-5

6.0 PROPOSED USE OF FACILITY FOLLOWING CLOSURE ................................................ III.I-6

7.0 POST-CLOSURE COSTS ........................................................................................................ III.I-7

Page 86: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Table of Contents – Volume 4

PARKHILL, SMITH & COOPER INC. VOL4 - iv 01080118

Rev. 00 – 05.31.19; Rev. 01 – 08.21.19; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020 X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\0-MasterTOC-Volume4-sealed_tes.doc

06/19/2020

ATTACHMENT J – CLOSURE AND POST-CLOSURE COST ESTIMATES

1.0 INTRODUCTION – 30 TAC §330.63(j) ................................................................................ III.J-1

2.0 CLOSURE COST ESTIMATE – 30 TAC §330.503 ............................................................. III.J-1

3.0 POST-CLOSURE CARE COST ESTIMATE – 30 TAC §330.507 ....................................... III.J-1

4.0 COST ESTIMATE ADJUSTMENT – 30 TAC §330.503, 507.............................................. III.J-1

5.0 FINANCIAL ASSURANCE – 30 TAC §330.503, 507 ......................................................... III.J-2

ATTACHMENTS

ATTACHMENT III.J1 - CLOSURE COST ESTIMATE CALCULATIONS

ATTACHMENT III.J2 - POST-CLOSURE CARE COST ESTIMATE CALCULATIONS

Page 87: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

June 2020 – Rev 06

April 2020 – Rev 05

March 2020 – Rev 04

January 2020 – Rev 03

November 2019 - Rev 02

August 2019 - Rev 01

May 2019 - Rev 00

PSC Project # 01080118

Prepared for:

Diamond Back Recycling and Sanitary Landfill, LP

PO Box 2283

Odessa Texas 79760

Prepared By:

Parkhill, Smith & Cooper, Inc. (PSC)

4222 85th Street

Lubbock, Texas 79423

TBPE F-560

Diamond Back Solid Waste Facility

& Recycling Center

Ector County, Texas

TCEQ MSW Permit No. TBD

PART III – FACILITY AND INVESTIGATION DESIGN Attachment H – CLOSURE PLAN

Permit Application

Page 88: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

June 2020 – Rev 06

April 2020 – Rev 05

March 2020 – Rev 04

January 2020 – Rev 03

November 2019 - Rev 02

August 2019 - Rev 01

May 2019 - Rev 00

PSC Project # 01080118

Prepared for:

Diamond Back Recycling and Sanitary Landfill, LP

PO Box 2283

Odessa Texas 79760

Prepared By:

Parkhill, Smith & Cooper Inc. (PSC)

4222 85th Street

Lubbock, Texas 79423

TBPE F-560

Diamond Back Solid Waste Facility

& Recycling Center

Ector County, Texas

TCEQ MSW Permit No. TBD

PART III – FACILITY AND INVESTIGATION DESIGN Attachment H – CLOSURE PLAN

Permit Application

06/19/2020

Page 89: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment H – Closure Plan

PARKHILL, SMITH & COOPER INC. TOC III.H-i 01080118 Rev 00 – 05.31.19; Rev 01 – 08.21.19; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 04 – 03.25.2020;

Rev 05 – 04.29.2020; Rev 06 – 06.19.2020 X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\III.H0-TOC_tes.doc

TABLE OF CONTENTS

1.0 FINAL CLOSURE ACTIVITIES – 30 TAC §330.457 .......................................................... III.H-1

2.0 FINAL COVER DESIGN - 30 TAC §330.457(a)(1-(3) and (d) ............................................ III.H-2

3.0 SEQUENCE OF FINAL COVER INSTALLATION - 30 TAC §330.457(e)(1)-(3) ............. III.H-4

3.1 Closure Sequence ....................................................................................................... III.H-4

3.2 Closure During Active Life ....................................................................................... III.H-4

3.3 Estimate of Largest Area Requiring Final Cover....................................................... III.H-5

3.4 Estimate of Maximum Inventory of Waste On Site ................................................... III.H-5

4.0 FINAL CLOSURE ACTIVITY SCHEDULE - 30 TAC §330.457(e)(4), (f)(1)-(6), (g), and

§330.461(a)-(b) ....................................................................................................................... III.H-6

5.0 CLOSURE COST ESTIMATE – 30 TAC §330.503.(a) ........................................................ III.H-7

ATTACHMENTS

ATTACHMENT III.H1 – TCEQ RG-494 GUIDANCE FOR REQUESTING A WATER

BALANCE (WB) ALTERNATIVE FINAL COVER FOR A MUNICIPAL

SOLID WASTE LANDFILL

ATTACHMENT III.H2 – FINAL COVER QUALITY CONTROL PLAN

ATTACHMENT III.H3 – FINAL COVER FIGURES AND DETAILS

06/19/2020

Page 90: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment H – Closure Plan

PARKHILL, SMITH & COOPER INC. 01080118 Rev 00 – 05.31.19; Rev 02 - 11.11.19; Rev 03 - 01.20.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

ATTACHMENT III.H2

FINAL COVER QUALITY CONTROL PLAN

Page 91: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment H – Closure Plan

PARKHILL, SMITH & COOPER INC. III.H-3 01080118 Rev 00 – 05.31.19; Rev 02 - 11.11.19: Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

Water Balance Final Cover construction shall be subjected to an approval of a permit

modification from TCEQ to include complete design of the final cover. Pre-construction testing

will be conducted on the borrow soil material. Thickness of Water Balance Final Cover will be

determined from hydraulic conductivity of the borrow soil. Tests will be conducted during

construction, to verify that final cover geometric mean hydraulic conductivity is not greater than

the borrow soil test results.

As provided for in TCEQ RG-494, no vegetation is required for the water balance final cover to

function as designed. Vegetation will be established within the erosion layer to provide for

additional protection from erosion. Native grasses will be established immediately following

construction of the water balance final cover. Refer to Appendix III.H.2 - Final Cover Quality

Control Plan for construction requirements.

The final cover system will be maintained consistent with Part III, Attachment I – Post-Closure

Plan. Following facility closure, final cover will be maintained as described in Attachment I -

Post-Closure Plan. Final cover soil layer will be constructed in accordance with construction

details shown in Part III, Appendix III.H3 –Final Cover Figures and Details, Figure III.H2.

Testing 5 feet of compacted clay-rich cover soil for coefficient of permeability will occur no less

than one test per acre of final cover.

Revised Universal Soil Loss Equation (RUSLE) calculations predict rate of soil loss for final

cover to be within TCEQ guidelines. RUSLE calculations are included in Appendix III.C.3.

Page 92: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment H – Closure Plan

PARKHILL, SMITH & COOPER INC. 01080118 Rev 00 – May 2019; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

ATTACHMENT III.H2

FINAL COVER QUALITY CONTROL PLAN

Page 93: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment H2 – Final Cover Quality Control Plan

PARKHILL, SMITH & COOPER INC. TOC III.H2-i 01080118 Rev 00 – 05.31.19; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\III.H2-TOCbodyDivider_tes.docx

06/19/2020

TABLE OF CONTENTS

1.0 INTRODUCTION .................................................................................................... III.H2-1

1.1 Definitions ................................................................................................................ III.H2-1

2.0 FINAL COVER SYSTEM ....................................................................................... III.H2-2

2.1 Final Cover ............................................................................................................... III.H2-2

2.2 Construction Monitoring .......................................................................................... III.H2-3

3.0 INTERMEDIATE COVER AND GRADING ......................................................... III.H2-3

3.1. General ..................................................................................................................... III.H2-3

3.2. Materials .................................................................................................................. III.H2-3

3.3. Slopes ....................................................................................................................... III.H2-3

3.4. Testing and Verification ........................................................................................... III.H2-4

4.0 INFILTRATION/STORAGE LAYER ..................................................................... III.H2-4

4.1. General ..................................................................................................................... III.H2-4

4.2. Subgrade Preparation ............................................................................................... III.H2-5

4.3. Placement and Processing ........................................................................................ III.H2-5

4.4. Compaction .............................................................................................................. III.H2-6

4.5 Protection ................................................................................................................. III.H2-6

4.6 Tie In to Existing Covers ......................................................................................... III.H2-6

4.7 Testing and Verification ........................................................................................... III.H2-6

5.0 FLEXIBLE MEMBRANE LAYER ......................................................................... III.H2-9

5.1 General ..................................................................................................................... III.H2-9

5.2 Materials .................................................................................................................. III.H2-9

5.3 Preparation ............................................................................................................. III.H2-10

5.4 Installation .............................................................................................................. III.H2-10

5.5 Testing and Verification ......................................................................................... III.H2-12

6.0 DRAINAGE LAYER ............................................................................................. III.H2-13

6.1 General ................................................................................................................... III.H2-13

6.2 Materials ................................................................................................................ III.H2-14

6.3 Delivery and Storage .............................................................................................. III.H2-14

6.4 Installation .............................................................................................................. III.H2-14

6.5 Testing and Verification ......................................................................................... III.H2-15

Page 94: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment H2 – Final Cover Quality Control Plan

PARKHILL, SMITH & COOPER INC. TOC III.H2-ii 01080118 Rev 00 – 05.31.19; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\III.H2-TOCbodyDivider_tes.docx

06/19/2020

7.0 EROSION LAYER ................................................................................................. III.H2-16

7.1 General ................................................................................................................... III.H2-16

7.2 Materials ................................................................................................................ III.H2-16

7.3 Preparation ............................................................................................................. III.H2-16

7.4 Placement ............................................................................................................... III.H2-16

7.5 Testing and Verification ......................................................................................... III.H2-16

7.6 Erosion Protection .................................................................................................. III.H2-16

7.7 Vegetation .............................................................................................................. III.H2-17

8.0 DOCUMENTATION ............................................................................................. III.H2-17

TABLES

Table 1 – MINIMUM STORAGE LAYER THICKNESS

Table 2(a) - INFILTRATION LAYER (FOR PRESCRIPTIVE COVER) MATERIAL

PRECONSTRUCTION TESTS

Table 2(b) – STORAGE LAYER (FOR WATER BALANCE COVER) MATERIAL

PRECONTRUCTION TESTS

Table 3(a) - INFILTRATION LAYER (FOR PRESCRIPTIVE COVER) MATERIAL

CONSTRUCTION TESTS

Table 3(b) - STORAGE LAYER (FOR WATER BALANCE COVER) MATERIAL CONSTRUCTION

TESTS

Table 4 – GEOMEMBRANE CONFORMANCE TESTS

Table 5 – GEOMEMBRANE SEAM PROPERTIES

Table 6 – GEOCOMPOSITE PROPERTIES

Table 7 – MANUFACTURER TESTING AND FREQUENCY

Page 95: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment H2 – Final Cover Quality Control Plan

PARKHILL, SMITH & COOPER INC. III.H2 - 2 01080118 Rev 00 – 12.15.18; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

2.0 FINAL COVER SYSTEM

2.1 FINAL COVER

2.1.1 Prescriptive Final Cover

The prescriptive final cover system will consist of an infiltration layer, a flexible

geomembrane, drainage geocomposite and erosion control layer on top. The infiltration

layer will 18 inches of compacted soil with a coefficient of permeability less than or equal

to 1x10-5 cm/sec. The flexible geomembrane will be a 40 mil LLLDPE geomembrane

placed over the infiltration layer. The drainage layer will be double sided geocomposite

and the erosion layer will be 6 inches of soil. Erosion layer will be placed over the drainage

layer and be capable of sustaining native plant growth. The final cover will be seeded with

native grasses and plants immediately following soil placement to minimize erosion. Final

cover system will be maintained consistent with those defined in Part III, Attachment C -

Facility Surface Water Drainage Report.

2.1.2 Alternative/Water Balance Final Cover

In accordance with 30 TAC $330.457(d), Diamond Back Solid Waste Facility & Recycling

Center will install an alternate final cover over both Type I and Type IV disposal areas.

The alternate final cover will consist of a water balance final cover designed in accordance

with TCEQ Regulatory Guidance RG-494 Guidance for Requesting a Water Balance (WB)

Final Cover for a Municipal Solid Waste Landfill. TCEQ RG-494 is included in

Appendix III.H.1. TCEQ RG-494 provides for four options for water balance final cover.

Diamond Back Solid Waste Facility & Recycling Center will utilize Option 1 - Statewide

Design Table for construction water balance final covers at the facility.

In accordance with TCEQ RG-494, the water balance cover will consist of a minimum

18-inch-thick storage layer overlain by a minimum 6-inch thick erosion layer. The

thickness of each final cover layer may vary depending upon the hydraulic conductivity of

the borrow soil material. Water Balance Final Cover construction shall be subjected to an

approval of a permit modification from TCEQ to include a complete design of the final

cover.

As provided for in TCEQ RG-494, no vegetation is required for the water balance final

cover to function as designed. Vegetation will be established within the erosion layer to

provide for additional protection from erosion. Native grasses will be established

immediately following construction of the water balance final cover.

The Final Cover System will be constructed from onsite soil and seeded with native grasses

and plants immediately following soil placement to minimize erosion. Final cover system

will be maintained consistent with those defined in Part III, Attachment C - Facility Surface

Water Drainage Report. Following facility closure, the final cover will be maintained as

described in Part III, Attachment I – Post-Closure Plan.

Page 96: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment H2 – Final Cover Quality Control Plan

PARKHILL, SMITH & COOPER INC. III.H2 - 3 01080118 Rev 00 – 12.15.18; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

The final cover system will be constructed in accordance with construction details shown

in Appendix III.H.3 - Final Cover Figures and Details and specifications provided herein.

2.2 CONSTRUCTION MONITORING

Continuous on-site monitoring is necessary to assure components of final cover system

are constructed in accordance with this FCQCP. CQA monitor shall provide continuous

on-site observation during the following activities:

• Infiltration/Storage layer placement, processing, compaction, and testing;

• Flexible membrane layer deployment, trial welds, seaming, testing, and repairing (for

prescriptive cover only);

• Drainage layer deployment and seaming (for prescriptive cover only);

• Erosion layer placement; and

• Any work that could damage installed components of final cover system.

GP or POR will document and certify the final cover system was constructed in accordance

with this FCQCP. GP or POR shall make sufficient site visits to observe critical

construction activities and verify construction and QA activities are performed in

accordance with this FCQCP.

3.0 INTERMEDIATE COVER AND GRADING

3.1 GENERAL

Landfill completion plan provides for the landfill cover to slope to the perimeter 4H:1V

side slopes. Final lift of waste will be covered by intermediate cover placed in accordance

with the Part IV - Site Operating Plan.

3.2 MATERIALS

Intermediate cover will consist of general fill that has not previously come into contact

with waste.

3.3 SLOPES

Slope stability analyses are provided in Attachment D5 – Geotechnical Design,

Appendix D5.B, and are only valid for conditions that were analyzed. Any changes to final

Page 97: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment H2 – Final Cover Quality Control Plan

PARKHILL, SMITH & COOPER INC. III.H2 - 4 01080118 Rev 00 – 12.15.18; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

cover system or landfill completion plan will necessitate slope stability analyses be revised

to reflect actual conditions. Further, slope stability analyses represent end-of-construction

conditions and may not represent temporary conditions during construction. Temporary

construction slopes shall not be steeper than final slopes and concentrated loadings, such

as heavy equipment and soil stockpiles, and not placed near the crest of slopes unless

additional slope stability analyses are performed.

3.4 TESTING AND VERIFICATION

Intermediate cover placement and grading will be observed and documented by landfill

staff in accordance with the Site Operating Plan.

4.0 INFILTRATION/STORAGE LAYER

4.1. GENERAL

The infiltration/storage layer will consist of compacted, relatively homogeneous material.

Infiltration layer shall consist of soil that is free from debris, foreign objects and organic

material. The soil properties for the infiltration layer shall meet the following: plasticity

index (ASTM D 4318) 15 or greater; liquid limit (ASTM D 4318) 30 or greater; percent

passing 200 sieve (ASTM D 1140) 30 or greater; and coefficient of permeability (ASTM

D 5084 or COE EM 1110-2-1906 Appendix VII) 1x10-5 cm/sec or less.

The minimum required thickness of the storage layer is derived from Option 1 - Statewide

Design Table of TCEQ Regulatory Guidance RG-494 Guidance for Requesting a Water

Balance (WB) Final Cover for a Municipal Solid Waste Landfill. TCEQ RG-494 is

included in Appendix III.H.1. CQA monitor shall provide continuous on-site observation

during storage layer placement, processing, compaction, and testing. GP shall make

sufficient site visits during storage layer construction to document construction activities,

testing, and thickness verification in the Final Cover FCER Report, in accordance with

Section 6.0.

Through normal operation, soils will be stored in stockpiles and borrow areas and shall be

used in preconstruction testing for use in the development of the water balance final cover.

Preconstruction testing procedures and frequencies for storage layer materials are listed in

Section 4.7.1 Table 2.

Page 98: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment H2 – Final Cover Quality Control Plan

PARKHILL, SMITH & COOPER INC. III.H2 - 5 01080118 Rev 00 – 12.15.18; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

4.2 SUBGRADE PREPARATION

Before placing infiltration/storage layer material, subgrade should be proof rolled with

heavy, rubber-tired construction equipment to detect soft areas. POR or CQA monitor must

observe proof-rolling operation. Soft areas should be compacted then proof rolled again.

Subgrade elevations shall be verified in accordance with requirements of Section 4.7.3

before placing storage layer.

4.3 PLACEMENT AND PROCESSING

The infiltration layer/storage layer subgrade and surface of each lift should be scarified to

a 6-inch minimum depth before placing next lift of storage layer. Storage layer material

should be placed in 8-inch maximum loose lifts to produce a compacted lift thickness of

approximately 6 inches. Material should be processed to a maximum particle size of 1 inch

or less before water is added. Rocks and clods less than 1 inch in diameter should not total

more than about 10 percent by weight. Surface of top lift shall contain no material larger

than 3/8 inch.

If additional water is necessary to adjust moisture content, apply after initial processing but

before compaction. Water should be applied evenly across the lift and worked in the

material. Waste or any objectionable material must not contaminate compaction water.

In accordance with TCEQ RG-494, the minimum thickness of the storage layer is 18

inches. The required thickness of the storage layer shall be determined before constructing

the final cover. During preconstruction, on-site soils from stockpiles or borrow areas will

be assessed for hydraulic conductivity to thickness values in Table 1. To maintain

permitted final cover grades, the final top of waste heights will be adjusted based on storage

layer thickness requirements. Table 1 is excerpted from Table 3 in Section 10 of TCEQ

RG-494, which shows the relationship of hydraulic conductivity to storage layer thickness.

Table 1 - MINIMUM STORAGE LAYER THICKNESS

KAS-BUILT (cm/sec) Minimum Storage Layer Thickness (ft-in)

1.00E-08 1 ft 0 in*

5.00E-08 1 ft 3 in*

1.00E-07 1 ft 7 in

4.50E-07 1 ft 10 in

5.40E-05 6 ft 2 in

*Although Table 3 of Section 10 of TCEQ RG-494 allows for minimum storage layer thickness less than 18 inches, minimum storage layer thickness shall be at least 18 inches in accordance with Table 2 of Section 9 of TCEQ RG-494.

Page 99: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment H2 – Final Cover Quality Control Plan

PARKHILL, SMITH & COOPER INC. III.H2 - 6 01080118 Rev 00 – 12.15.18; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

4.4 COMPACTION

Infiltration/Storage layer shall be compacted with a pad/tamping-foot or prong-foot roller.

A footed roller is necessary to bond lifts, distribute water, and blend soil matrix through

kneading action. Storage layer shall not be compacted with bulldozer, rubber-tired or flat-

wheeled roller, scrapers, or any track equipment unless used to pull a footed roller.

Compactor should weight at least 40,000 pounds. Lift thickness shall be controlled to

achieve total penetration in the top of the previously-compacted lift; therefore, lift thickness

must not be greater than pad or prong length. Cleaning devices on the roller must be in

place and maintained to prevent prongs or pad feet from becoming clogged to the point

they cannot achieve full penetration.

Compactor shall make at least four passes across area being compacted. A pass is defined

as the front and rear drums of the compactor making one pass. Material should be

compacted to a minimum 95-percent of the maximum dry density determined by Standard

Proctor (ASTM D698) at a moisture content dry of optimum moisture. Areas with failing

tests shall be reworked, recompacted, then retested with passing tests before another lift is

added.

4.5 PROTECTION

Completed infiltration/storage layer must be protected from desiccation, rutting, erosion,

and ponded water until erosion layer is placed. Areas that undergo excessive desiccation

or damage shall be reworked, recompacted, and retested as directed by GP or POR.

4.6 TIE IN TO EXISTING COVERS

Edge of existing storage layers shall be cut back on either a slope or step to prevent

formation of a vertical joint.

4.7 TESTING AND VERIFICATION

4.7.1 Preconstruction Testing

Table 2 lists minimum testing required for material proposed for use as

infiltration/storage layer.

Page 100: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment H2 – Final Cover Quality Control Plan

PARKHILL, SMITH & COOPER INC. III.H2 - 7 01080118 Rev 00 – 12.15.18; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

TABLE 2(a) - INFILTRATION LAYER (FOR PRESCRIPTIVE COVER)

MATERIAL PRECONSTRUCTION TESTS

Test Standard Frequency

Plasticity Index ASTM D4318

1 per Material Type

Liquid Limit ASTM D4318

Percent Passing No. 200 Mesh Sieve ASTM D1140

Percent Passing 1-inch Sieve ASTM D422

Standard Proctor Test ASTM D698

Coefficient of Permeability

ASTM D5084 or COE EM 1110-

2-1906 Appendix VII

1 per Moisture/Density

Relationship

TABLE 2(b) - STORAGE LAYER (FOR WATER BALANCE COVER)

MATERIAL PRECONSTRUCTION TESTS

Test Standard Frequency

Soil Classification ASTM D2487

1 per 20,000 CY

Plasticity Index ASTM D4318

Atterberg Limits ASTM D4318

Standard Proctor Test ASTM D698

6-inch Diameter Remolded Hydraulic Conductivity ASTM D5084

Field moisture contents of constructed soil cover should be in the dry of optimum

region.

After the moisture density relationship is determined for a material type, a soil

sample should be remolded to about 95-percent maximum dry density at the

optimum moisture content. The preconstruction testing of borrow soils will be used

to determine hydraulic conductivity and minimum storage layer thickness of final

cover by using Table 1, in accordance with TCEQ Regulatory Guidance RG-494

Guidance for Requesting a Water Balance Final Cover for a Municipal Solid Waste

Landfill.

Undisturbed constructed soil cover samples should be collected in 3-inch or greater

diameter thin-wall tubes at a frequency of at least one test per 2.5 acres per lift and

tested in the laboratory for moisture content, dry unit weight, and saturated

hydraulic conductivity. Water balance construction methods must ensure as-built

soil density is adequate for sufficient vegetation growth, maintaining design values

for unsaturated hydraulic conductivity, and minimizing developments of cracks,

macro features, and differential settlement.

Page 101: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment H2 – Final Cover Quality Control Plan

PARKHILL, SMITH & COOPER INC. III.H2 - 8 01080118 Rev 00 – 12.15.18; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

4.7.2 Construction Testing

Table 3 lists minimum testing required for material used for use as the storage layer:

Atterberg limits of in-place infiltration/storage layer must be continually compared

to Atterberg limits of the Proctor curve sample to assure Proctor curve accurately

represents in-place material. Any variance of more than 10 points between liquid

limit or plasticity index of in-place soil and those of the Proctor curve sample, will

require a new Proctor curve be developed.

4.7.3 Thickness Verification

As-built thickness of infiltration/storage layer shall be determined by standard

survey methods. Before placing infiltration/storage layer material, subgrade

elevations will be determined at a minimum rate of one survey point per 5,000

square feet of lined area. After infiltration/storage layer is completed, top of

Table 3(a) – INFILTRATION LAYER (FOR PRESCRIPTIVE COVER) MATERIAL CONSTRUCTION TESTS

Test Standard Frequency

Field Density ASTM D1556,

D2167, or D6938

1/8,000 sq ft per 6-inch parallel lift; 1/100 lineal ft

per 12-inch sidewall horizontal lift

Plasticity Index ASTM D4318 1 per 100,000 sq. ft per 6-inch parallel lift; 1 per 2,000 lineal ft per 12-inch sidewall

horizontal lift

Liquid Limit ASTM D4318

Sieve (gradation) ASTM D422 or

D1140

Standard Proctor Test ASTM D698 1 per material type

Coefficient of Permeability

ASTM D5084 or COE EM

1110-2-1906 Appendix VII

1 per 100,000 sq. ft per 6-inch parallel lift; 1 per 2,000 lineal ft per 12-inch sidewall

horizontal lift

Thickness

Registered Surveyor or Professional

Engineer

1 per 5,000 sq ft (parallel lifts); 50-ft cross sections

(horizontal-lift sidewall liners)

Table 3(b) - STORAGE LAYER (FOR WATER BALANCE COVER) MATERIAL CONSTRUCTION TESTS

Test Standard Frequency

Field Moisture/Density Test ASTM D6938 2 per acre per 6-inch lift

Plasticity Index ASTM D4318 1 per acre

Atterberg Limits ASTM D4318

6-inch Diameter Remolded Hydraulic Conductivity ASTM D5084 1 per 2.5 acres per 6-inch lift

Page 102: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment H2 – Final Cover Quality Control Plan

PARKHILL, SMITH & COOPER INC. III.H2 - 9 01080118 Rev 00 – 12.15.18; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

infiltration/storage layer elevations will be determined at same locations as

subgrade elevations.

During construction, storage layer soil samples will be assessed for as-built

hydraulic conductivity to verify minimum storage thickness determined from

preconstruction. Areas with hydraulic conductivity higher than determined during

preconstruction will be further compacted and retested. The thickness of the storage

layer may be adjusted based on the results of construction testing of hydraulic

conductivity and comparison to Table 1, in accordance with TCEQ Regulatory

Guidance RG-494 Guidance for Requesting a Water Balance Final Cover for a

Municipal Solid Waste Landfill. To maintain permitted final cover grades, the final

top of waste heights will be adjusted based on storage layer thickness requirements.

5.0 FLEXIBLE MEMBRANE LAYER

5.1. GENERAL

The flexible membrane layer component of the final cover system consists of a 40 mil thick

linear low density polyethylene (LLDPE) placed over the infiltration layer. The CQA

monitor shall provide continuous on-site observation during geomembrane deployment,

trial welds, seaming, testing and repairing. The POR shall make sufficient site visits during

the geomembrane installation to document the installation and testing in the final cover

evaluation report.

5.2. MATERIALS

5.2.1 Properties

Flexible membrane layer shall consist of textured LLDPE produced from virgin

raw materials. Recycled materials are not acceptable. Manufacturer quality control

testing procedures and frequencies for geomembrane are listed in Section 5.5. Third

party conformance testing procedures and frequencies are listed in Section 5.5.2.

5.2.2 Delivery and Storage

Geomembrane shall be shipped in rolls labeled with the manufacturer's name, roll

number, and lot or batch number. The CQA monitor shall inspect the rolls for

shipping damage and complete a receipt log for all materials delivered to the site.

Damaged rolls shall be rejected.

Geomembrane shall be unloaded and handled with equipment that does not damage

the rolls. Rolls should not be pushed or dragged to the storage location. The

geomembrane shall not be stored on a stable subgrade. Geomembrane must not be

stacked more than five rolls high to avoid crushing the roll cores. The stored

geomembrane must be protected from puncture, grease, dirt, excessive heat, or any

other damage.

Page 103: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment H2 – Final Cover Quality Control Plan

PARKHILL, SMITH & COOPER INC. III.H2 - 10 01080118 Rev 00 – 12.15.18; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

5.3. PREPARATION

Prior to installation of the geomembrane the infiltration layer shall be tested and verified.

The CQA or POR shall monitor geomembrane installation and shall inspect the surface of

the infiltration layer to verify that:

• The infiltration layer surface has been smooth drum rolled;

• The infiltration layer surface is free from irregularities, soft areas, or loose soil; and

• The infiltration layer surface is free of stones, or other objects that could damage the

geomembrane.

The geomembrane installer must accept the condition of the infiltration layer and sign a

subgrade acceptance form prior to installation of the geomembrane layer.

5.4. INSTALLATION

5.4.1 Deployment and Placement

Geomembrane installer shall submit a drawing showing the proposed panel layout.

Geomembrane shall be deployed by equipment that will unroll the geomembrane

without damaging the infiltration layer or the geomembrane. Geomembrane shall

not be deployed on frozen subgrade or during rain or high winds. The installer must

deploy the amount of geomembrane that can be seamed on the same day.

The CQA monitor must:

• Provide full time observation;

• A minimum of five thickness verification tests for each panel. A minimum of

one thickness verification test shall be performed per 5 feet along the edge of

the panel. No measurement may be less than 90 percent of the nominal panel

thickness;

• Record panel numbers, dimensions, and roll numbers on the panel layout

drawing;

• Record weather conditions;

• Note any deficiencies on subgrade that shall be repaired and approved by CQA

monitor. Note any defects of the geomembrane. All defects must be repaired in

accordance with Section 5.4.4.;

Page 104: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment H2 – Final Cover Quality Control Plan

PARKHILL, SMITH & COOPER INC. III.H2 - 11 01080118 Rev 00 – 12.15.18; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

• Observe that people working on the geomembrane do not smoke, wear shoes

that could damage the geomembrane; and

• Observe that there are no horizontal seams on side slopes.

5.4.2 Seaming

Only welding apparatus and operators that have completed approved trial welds

shall be allowed to weld panel seams. Each seam shall be assigned a unique

number, which is preferably consistent with panel numbering system. Side slope

seams shall be oriented downslope. Prior to welding, the proper panel overlap shall

be provided. Dirt, grease and free moisture shall be cleaned from the panel contact

area. Seaming operations shall not be allowed when the ambient temperature is

below 40 deg F or above 104 deg F unless trial welds have been demonstrated that

adequate welds can be achieved outside these limits.

5.4.3 Anchor Trenches

Anchor trenches shall be left open until the seaming is completed. Expansion and

contraction of the geomembrane shall be accounted for during deployment. The

bottom of the anchor trenches shall be backfilled with compacted general fill that

is free of particles larger than 1-inch diameter. Anchor trenches shall be backfilled

in a way that does not damage or induce stress to the geomembrane.

5.4.4 Repairs

Defects in geomembrane, defects in seam, failing destructive tests, failing non-

destructive tests, holes from non-destructive tests, and destructive test sample

locations shall be repaired by one of the following repair techniques.

• Patching - used to repair large holes, tears, large defects and destructive test

locations.

• Extrusion - used to repair small defects, cuts, holes from non-destructive tests

and seam defects less than 1/2 inch long.

• Capping - used to repair failed seams or seams where non-destructive tests

cannot be performed.

• Removal - used to replace areas with large defects where other repair techniques

are not appropriate.

Page 105: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment H2 – Final Cover Quality Control Plan

PARKHILL, SMITH & COOPER INC. III.H2 - 12 01080118 Rev 00 – 12.15.18; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

5.5. TESTING AND VERIFICATION

5.5.1 Manufacturer’s Quality Control Testing and Conformance Testing

The manufacturer shall test the geomembrane and raw materials in accordance with

GRI standard GM17 to assure the quality of geomembrane. Samples shall be cut

across the full width of selected rolls or may be taken at the manufacturing plant or

at the project site and will be forwarded to a third-party testing laboratory.

5.5.2 Trial Welds

Each operator and welding apparatus must be tested to verify that seam welds

meeting the specifications can be achieved under the site conditions. Trial welds

must be performed at the beginning and midpoint of each day for each operator and

apparatus used that day. If welding continues past 6:00 pm, additional trial welds

may be required.

The CQA monitor must observe the trial welding operations and document the

operator’s initials, apparatus number, time, date, air temperature and peel and shear

test results.

5.5.2 Construction Testing

Non-destructive seam tests include vacuum pressure tests and air pressure tests.

Vacuum testing shall be used to test extrusion welded seams and fusion welded

seams that cannot be tested by air pressure methods. During the non-destructive

testing the CQA monitor must:

• Observe that equipment and operators perform the tests properly;

• Observe that the entire length of each seam is tested and recorded;

Table 4 – GEOMEMBRANE CONFORMANCE TESTS

Test Standard Frequency

Sheet Thickness ASTM D5199; 1593; or 5994

1 per 50,000 sq. ft. and every resin lot

Specific Gravity ASTM D1505

1 per 100,000 sq. ft. and every resin lot

Carbon Black Content ASTM D1603

Carbon Black Dispersion ASTM D3015

or 5596

Tensile Properties ASTM D638

Direct Shear1 ASTM D5321 1 per GM/adjoining material

type 1 Direct Shear Test (ASTM D5321) will be performed at strain rates, confining pressures and other parameters that simulate the field conditions.

Page 106: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment H2 – Final Cover Quality Control Plan

PARKHILL, SMITH & COOPER INC. III.H2 - 13 01080118 Rev 00 – 12.15.18; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

• Identify failed seams and inform the installer of any required repairs; and

• Record all completed and tested for repairs.

Destructive testing shall be performed at a frequency of one stratified test location

per 500 linear feet of seam. During destructive seam testing, the CQA monitor

must:

• Select sample locations and observe sample cutting;

• Assign sample numbers and label samples;

• Observe installer performed tests; and

• Record sample locations, sample number, sample purpose, and field test results.

6.0 DRAINAGE LAYER

6.1 GENERAL

The drainage layer on sideslopes consists of a double sided geocomposite. The POR shall

make sufficient site visits during the geocomposite installation to document the installation

for the final cover evaluation report.

Table 5 – GEOMEMBRANE SEAM PROPERTIES

Test Standard Frequency Minimum Criteria

Shear ASTM D4437 1 sample per 500

feet of seam

Four of five specimens from each sample must have a shear strength greater than or equal to 95% of sheet strength but not less than 40 ppi.

The average shear strength value of all five specimens must be greater than or equal to 95% of sheet strength but not less than 40 ppi.

Peel ASTM D4437 1 sample per 500

feet of seam

Four of five specimens from each sample must have a peel strength greater than or equal to 62% of sheet strength but not less than 36 ppi.

The average peel strength value of all five specimens must be greater than or equal to 62% of sheet strength but not less than 36 ppi.

Both sides of dual track seams shall meet the minimum criteria. Each track is considered a separate sample.

All specimens shall exhibit Film Tear Bond.

Page 107: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment H2 – Final Cover Quality Control Plan

PARKHILL, SMITH & COOPER INC. III.H2 - 14 01080118 Rev 00 – 12.15.18; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

6.2 MATERIALS

The double sided geocomposite will have nonwoven geotextile bonded to the top and

bottom of geonet. Geocomposite shall have the minimum properties as listed in Table 6.

Table 6 – GEOCOMPOSITE PROPERTIES

Material Test Standard Required Property

Geotextile Material Apparent

Opening Size ASTM D4751

Nonwoven polypropylene or polyester 70 sieve

HDPE Drainage Net

Specific Gravity Thickness

Carbon Black

ASTM D1505 ASTM D5199 ASTM D1603

.093 g/cm3 0.2 inch

Minimum 2%, Maximum 3%

Geocomposite Transmissivity ASTM D4716 2.4 x 10-4m2/sec

6.3 DELIVERY AND STORAGE

Geocomposite shall be shipped in rolls labeled with the manufacturer’s name, roll number,

and lot or batch number. The CQA monitor shall inspect the rolls for shipping damage and

complete a receipt log for all the materials delivered to the site. Damaged rolls shall be

rejected.

The material shall remain undamaged during unloading and handling. Rolls should not be

pushed or dragged to the storage locations. Geocomposite shall not be stored on a stable

subgrade. Geocomposite must not be stacked more than five rolls high to avoid crushing

the roll cores. The stored materials must be protected from puncture, grease, dirt, excessive

heat and other damage.

6.4 INSTALLATION

Prior to installation, geomembrane shall be tested and verified. The CQA monitor shall

observe that the surface to receive the geocomposite is free of debris, stones and dirt, and

verify that the conformance documentation was submitted and approved.

Geocomposite shall be deployed by equipment that will unroll the material without

damaging the underlying layers. All panels must be anchored to prevent uplift from wind.

Smoking and wearing shoes that may damage the materials or underlying geomembrane

shall not be permitted and only low ground pressure supporting equipment shall be allowed

on materials. Adjacent rolls of geocomposite shall be securely tied with plastic fasteners.

The CQA monitor must:

• Provide full time observation;

• Record weather conditions;

Page 108: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment H2 – Final Cover Quality Control Plan

PARKHILL, SMITH & COOPER INC. III.H2 - 15 01080118 Rev 00 – 12.15.18; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

• Observe the condition of the geocomposite and note any defects. All defects must be

repaired or replaced;

• Observe that people working on the geocomposite do not smoke or wear shoes that

could damage the materials or underlying geomembrane;

• Observe that the deployment method minimizes wrinkles in the materials or underlying

geomembrane; and

• Observe that the geocomposite panels have been properly tied.

6.5 TESTING AND VERIFICATION

The manufacturer shall test the geocomposite to assure the quality of the drainage

materials. Table 7 provides manufacturer testing lists and frequency. Manufacturer's testing

shall be performed at a minimum frequency of one test per 100,000 sf.

TABLE 7 - MANUFACTURER TESTING AND FREQUENCY1 Test Category Product Testa Test Methodb Testing Frequency

Manufacturer Resin (geonet) Density ASTM D792 or D1505

1 test per 100,00 sq. ft. and every resin lot Melt Flow Index ASTM D1238

Manufacturer Geonet Density ASTM D792 OR D1505

1 test per 100,000 sq. ft. and every resin lot

Mass/Area ASTM D5261

Thickness ASTM D5199

Compression ASTM D1621

Transmissivity ASTM D4716

Manufacturer Geotextile Mass/Area ASTM D5261

1 test per 100,000 sq. ft. and every resin lot

Grab Tensile Strength

ASTM D4632

Trapezoidal Tear Strength

ASTM D4533

Burst Strength ASTM D3786

Puncture Strength ASTM D4833

Thickness ASTM D5199

Apparent Opening Size

ASTM D4751

Permittivity ASTM D4491

Independent Laboratory

Geocomposite Product

Transmissivity ASTM D4761

1 test per product type

Interface Shear or Ply Adhesion

ASTM D5321 or D413

1 test per project

a Adapted for EPA/600/R-93/182, September 1993, and Designing with Geosynthetics, 6th ed. b The POR may propose equivalent or better tests.

Page 109: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment H2 – Final Cover Quality Control Plan

PARKHILL, SMITH & COOPER INC. III.H2 - 16 01080118 Rev 00 – 12.15.18; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

7.0 EROSION LAYER

7.1. GENERAL

Erosion layer consists of 6 inches of soil capable of sustaining native plant growth. Erosion

layer shall be minimum 12 inches thick if storage layer is comprised of high-plasticity clay.

CQA monitor shall provide continuous on-site observation during erosion layer placement

to assure erosion layer placement does not damage underlying storage layer. GP or POR

shall make sufficient site visits during erosion layer placement to document construction

activities and thickness verification in the Final Cover Evaluation Report.

7.2. MATERIALS

Erosion layer materials shall consist of soil free from debris, rubbish, frozen materials,

foreign objects, and organic material. The erosion layer shall consist of on-site soils capable

of sustaining native plant growth.

7.3. PREPARATION

Before placing erosion layer material, storage layer elevations shall be verified in

accordance with requirements of Section 4.7.3.

7.4. PLACEMENT

Erosion layer shall be dumped from the haul road and spread by low ground pressure

equipment. On side slopes, erosion layer shall be placed from bottom to top, not across or

down.

As provided in TCEQ RG-494, no vegetation is required for the water balance final cover

to function as designed. Vegetation will be established within the erosion layer to provide

for additional protection from erosion. Native grasses will be established immediately

following construction of the water balance final cover.

7.5. TESTING AND VERIFICATION

As-built thickness of erosion layer shall be determined by standard survey methods. Before

placing erosion layer, top of storage layer elevations will be determined at a minimum rate

of one survey point per 5,000 square feet of lined area. Top of storage layer will be

considered as bottom of erosion layer.

7.6. Erosion Protection

As required by §330.457(d)(2), water balance final cover must provide equivalent

protection from wind and water. Water balance final cover has identical erosion controls

as prescriptive cover, structural and non-structural. Attachment III.C shows maximum final

cover soil erosion is 2.77 tons per acre-year, less than standard 3 tons per acre-year.

Page 110: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment H2 – Final Cover Quality Control Plan

PARKHILL, SMITH & COOPER INC. III.H2 - 17 01080118 Rev 00 – 12.15.18; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 05 – 04.29.2020; Rev 06 – 06.19.2020

7.7. Vegetation

Water balance final cover for the facility is designed without reliance on vegetation for

moisture transportation. Native grasses will be established immediately after construction

of final cover by seeding or sodding to provide additional protection from erosion. A

semi-annual vegetation establishment report will be submitted until vegetation is

established. The report shall include type and quantity of vegetation established.

8.0 DOCUMENTATION

After construction of final cover system, POR will submit a Final Cover Evaluation Report to

TCEQ on behalf of Owner. The purpose of the Final Cover Evaluation Report is to document

construction methods and test procedures are consistent with this FCQCP. At minimum, the Final

Cover Evaluation Report will contain:

• Summary of all construction activities.

• Summary of all laboratory and field test results.

• Description of significant construction problems and resolution of the problems.

• Record Drawings.

• Statement of compliance with FCQCP.

• Completed report forms required by TCEQ.

• Drawings showing sample and test locations.

• Instructions to limit equipment weight and traffic on the cover and procedures for

identifying and correcting out-of-specification compaction and other situations or

damage.

• Vegetation details for erosion control purposes, plants proposed for erosion control, and

target percent coverage.

• Seal and signature of POR in accordance with the Texas Engineering Practice Act.

Page 111: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

June 2020 – Rev 06

April 2020 – Rev 05

January 2020 – Rev 03

November 2019 - Rev 02

August 2019 – Rev 01

May 2019 – Rev 00

PSC Project # 01080118

Prepared for:

Diamond Back Recycling and Sanitary Landfill, LP

PO Box 2283

Odessa Texas 79760

Prepared By:

Parkhill, Smith & Cooper, Inc. (PSC)

4222 85th Street

Lubbock, Texas 79423

TBPE F-560

Diamond Back Solid Waste Facility

& Recycling Center

Ector County, Texas

TCEQ MSW Permit No. 2404

PART III – FACILITY INVESTIGATIN AND DESIGN Attachment J – CLOSURE AND POST-CLOSURE CARE

COST ESTIMATES

Permit Application

Page 112: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

June 2020 – Rev 06

April 2020 – Rev 05

January 2020 – Rev 03

November 2019 - Rev 02

August 2019 – Rev 01

May 2019 - Rev 00

PSC Project # 01080118

Prepared for:

Diamond Back Recycling and Sanitary Landfill, LP

PO Box 2283

Odessa Texas 79760

Prepared By:

Parkhill, Smith & Cooper Inc. (PSC)

4222 85th Street

Lubbock, Texas 79423

TBPE F-560

Diamond Back Solid Waste Facility

& Recycling Center

Ector County, Texas

TCEQ MSW Permit No. 2404

PART III – FACILITY INVESTIGATIN AND DESIGN Attachment J – CLOSURE AND POST-CLOSURE CARE

COST ESTIMATES

Permit Application

06/19/2020

Page 113: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment J – Closure and Post-Closure Care Cost Estimates

PARKHILL, SMITH & COOPER INC. TOC III.J-i 01080118 Rev 00 – 05.31.19; Rev 01 – 08.21.19; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 05 – 04.29.2020;

Rev 06 – 06.19.2020 X:\2018\0801.18\03_DSGN\03_REPT\00_CLERICAL\PERMIT\NOD\NO.6\MARKED\III.J0-TOC_tes.doc

06/19/2020

TABLE OF CONTENTS

1.0 INTRODUCTION – 30 TAC §330.63(j) ................................................................................ III.J-1

2.0 CLOSURE COST ESTIMATE – 30 TAC §330.503 ............................................................. III.J-1

3.0 POST-CLOSURE CARE COST ESTIMATE – 30 TAC §330.507 ....................................... III.J-1

4.0 COST ESTIMATE ADJUSTMENT – 30 TAC §330.503, 507.............................................. III.J-1

5.0 FINANCIAL ASSURANCE – 30 TAC §330.503, 507 ......................................................... III.J-2

ATTACHMENTS

ATTACHMENT III.J1 - CLOSURE COST ESTIMATE CALCULATIONS

ATTACHMENT III.J2 - POST-CLOSURE CARE COST ESTIMATE CALCULATIONS

TABLES

Table 1 – SIMPLE CLOSURE COSTS

Table 2 – SIMPLE POST-CLOSURE COSTS

Page 114: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment J – Closure and Post-Closure Care Cost Estimates

PARKHILL, SMITH & COOPER INC. III.J-3 01080118 Rev 00 – 05.31.19, Rev 01 – 08.21.19; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 06 – 06.19.20

Table 1 – SIMPLE CLOSURE COSTS

No. ITEM COST ESTIMATE

1.0 Engineering Costs

1.1 Topographic Survey $ 15,150.00

1.2 Boundary Survey $ 8,080.00

1.3 Site Evaluation $ 12,120.00

1.4 Development of Plans $ 102,200.00

1.5 Administration $ 15,000.00

1.6 Inspection and Testing $ 408,800.00

1.7 Groundwater Consultant $ -

1.8 Permit Compliance Package $ 12,000.00 Engineering Total $ 573,350.00

2.0 Construction Costs

2.1 Type I Final Cover System (27.5 acres) $ 1,619,383.33

2.2 Type IV Final Cover System (23.6 acres) $ 818,605.33

2.3 Vegetation $ 153,300.00

2.4 LFG Control System $ 962,500.00

2.5 Site Grading and Drainage $ 255,500.00

2.6 Site Fencing and Security $ -

2.7 Leachate Collection System $ -

2.8 Monitoring Wells $ -

2.9 Gas Probes $ 24,000.00

2.10 Storage Units $ 8,500.00 Construction Total $4,412,908.67 Engineering and Construction Total $3,749,638.67 Contingency $498,626.00

3.0 Administrative Costs

3.1 Contract Performance Bond $99,726.00

3.2 TCEQ Contract Admin/Legal Fees $124,657.00

Total $5,709,267.67 * This closure cost estimate was developed in 2020 dollars.

Page 115: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Diamond Back Solid Waste Facility & Recycling Center

Part III, Attachment J – Closure and Post-Closure Care Cost Estimates

PARKHILL, SMITH & COOPER INC. 01080118 Rev 00 – 05.31.19, Rev 01 – 08.21.19; Rev 02 - 11.11.19; Rev 03 – 01.20.2020; Rev 05 - 04.29.2020; Rev 06-06.19.2020

ATTACHMENT III.J1

CLOSURE COST ESTIMATE CALCULATIONS

Page 116: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Required: Estimate the cost to hire a third party to conduct final closure activities.

In accordance with §330.503(a) the following landfill closure cost estimate shows the cost of hiring a third party, in

current dollars, to close the largest waste fill area that could potentially be open and have not received final cover

in accordance to the final closure plan.

Solution: Final closure will require construction of Type I final cover 27.5 acres

Final closure will require construction of Type IV final cover 23.6 acres

Final closure will require administrative closure of 202 acres

Final closure will require the installation of 0 monitor wells

Final closure will require the installation of 6 gas probes

Final closure will require the installation of 28 acres of LFG Control System

No Item Qty Unit Unit Cost Total Cost

1.0 Engineering Costs

1.1 Topographic Survey 202 AC 75.00$ 15,150.00$

1.2 Boundary Survey 202 AC 40.00$ 8,080.00$

1.3 Site Evaluation 202 AC 60.00$ 12,120.00$

1.4 Development of Plans 51 AC 2,000.00$ 102,200.00$

1.5 Administration 1.00 LS 15,000.00$ 15,000.00$

1.6 Inspection and Testing 51 AC 8,000.00$ 408,800.00$

1.7 Groundwater Consulant 0.00 LS -$ -$

1.8 Permit Compliance Package 1.00 LS 12,000.00$ 12,000.00$

Engineering Total 573,350.00$

2.0 Construction Costs

2.1 Type I Final Cover System (27.5 acres)

2.1.1 Topsoil - 6" 22,183 CY 4.00$ 88,733.33$

2.1.2 Clay Rich Layer - 18" 66,550 CY 4.00$ 266,200.00$

2.1.3 Geomembrane 133,100 SY 4.50$ 598,950.00$

2.1.4 Geocomposite 133,100 SY 5.00$ 665,500.00$

2.2 Type IV Final Cover System (23.6 acres)

2.2.1 Topsoil - 6" 19,037 CY 4.00$ 76,149.33$

2.2.2 Clay Rich Layer - 18" 57,112 CY 4.00$ 228,448.00$

2.2.3 Geomembrane 114,224 SY 4.50$ 514,008.00$

2.2.4 Geocomposite 114,224 SY 5.00$ 571,120.00$

2.3 Vegetation 51 AC 3,000.00$ 153,300.00$

2.4 LFG Control System 28 AC 35,000.00$ 962,500.00$

2.5 Site Grading and Drainage 51 AC 5,000.00$ 255,500.00$

2.6 Site Fencing and Security 0.00 AC -$ -$

2.7 Leachate Collection System 0.00 LF -$ -$

2.8 Monitoring Wells 0.00 EA -$ -$

2.9 Gas Probes 6.00 EA 4,000.00$ 24,000.00$

2.10 Storage Units 1.00 LS 8,500.00$ 8,500.00$

Construction Total 4,412,908.67$

4,986,258.67$

10.00 % 498,626.00$

3.0 Administrative Costs

3.1 Contract Performance Bond 2.00 % 99,726.00$

3.2 TCEQ Contract Admin / Legal Fees 2.50 % 124,657.00$

Total Type I / Type IV Closure Cost 5,709,267.67$

Engineering and Construction Total

Contingency

* This closure cost estimate was developed in 2020 dollars.

Diamond Back Solid Waste Facility & Recycling Center

Closure Cost Estimate

Page 117: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

TCEQ-20720, Closure Plan for Municipal Solid Waste Type I Landfill and Facility (06/08/15) Page 1 of 15

Texas Commission on Environmental Quality

Closure Plan for Municipal Solid Waste Type I

Landfill Units and Final Facility Closure

This form is for use by applicants or site operators of Municipal Solid Waste (MSW) Type I

landfills to detail the plan for closure of a landfill unit, closure of associated storage or processing units, and final closure of the facility to meet the requirements in 30 TAC Chapter 330, §330.63(h) and 30 TAC Chapter 330 Subchapter K for a MSW Type I facility.

If you need assistance in completing this form, please contact the MSW Permits Section in the Waste Permits Division at (512) 239-2335.

General Information

Facility Name: Diamond Back Solid Waste Facility & Recycling Center

MSW Permit No.: 2404

Site Operator/Permittee Name: Diamond Back Recycling and Sanitary Landfill, LP

Landfill and Other Waste Management Units and Operations Requiring Closure at the Facility

A. Facility Units

Table 1. Description of Landfill Units.

Name or

Descriptor

of Unit

Operating

Status of

Unit

Type of

Liner

System

Under

Unit

Above

Grade

Class 1

Disposal

Cells in

this Unit

Below

Grade

Class 1

Disposal

Cells in

this Unit

Other

Class 1

Disposal

Cells in

this Unit

(describe)

Size of

Unit’s

Waste

Footprint

(acres)

Maximum

Inventory of

Waste Ever

in Unit

(yd3)

Other

Necessary

Information

that Pertains

to the Unit

Type I Cell

1

Active Alternate

Liner

27.5 3,800,000

Type I Cell

2

Active Alternate

Liner

27.7 2,450,000

Type I Cell

3

Active Alternate

Liner

18.5 1,250,000

Type IV

Cell 1

Active Alternate

Liner

5.6 170,000

Type IV

Cell 2

Active Alternate

Liner

23.6 2,100,000

Type IV

Cell 4

Active Alternate

Liner

21.7 1,330,000

Totals 124.6 11,100,000

Page 118: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Closure Plan for Type I Landfill Unit and Facility

Facility Name: Diamond Back Solid Waste Facility & Recycling Center Revision No.: 03

Permit No: 2404 Date: 06/19/2020

TCEQ-20720, Closure Plan for Municipal Solid Waste Type I Landfill Unit and Facility (06/08/15) Page 2 of 15

Table 2. Description of Waste Storage or Processing Units or Operations Associated with

this Permit.

Type of Storage

or Processing

Unit or Operation

(individual units

may be closed at

any time prior to

or during the

final facility

closure as

described in this

plan)

Operational

Status of

Unit

Size of the

Area Used

for the

Storage or

Processing

Unit or

Operation

(Acres)

Maximum Inventory of

Waste Ever in Storage

or Processing Unit or

Operation

(indicate cubic yards

or tons)

Other Information

(enter other

necessary information

that pertains to the

unit)

Large Item

Storage

Active 1.6 100

cubic yards tons

Leachate Storage

Area

Active .0054 130

cubic yards tons

cubic yards tons

cubic yards tons

Totals 1.6054 100 tons and 130 cubic

yards

B. Waste Inventory Summary

Table 3. Maximum Inventory of Wastes Ever On Site.

Item Quantity (indicate cubic yards or tons)

Maximum inventory of waste in landfill units

(total from Table 1)

11,100,000 cubic yards or tons

Maximum inventory of waste in storage or

processing units or operations (total from

Table 2)

100 cubic yards or tons

130 cubic yards or tons

Total Maximum Inventory of Wastes ever on

site over the active life of the MSW facility

(sum of totals from Tables 1 and 2)

11,100,130 cubic yards or tons

130 cubic yards or tons

C. Drawings Showing Details of the Waste Management Units at Closure

Table 4. Location of the Drawings showing Details of the Waste Management Units at

Closure (outlines, dimensions, maximum elevations of waste and final cover of

Page 119: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Closure Plan for Type I Landfill Unit and Facility

Facility Name: Diamond Back Solid Waste Facility & Recycling Center Revision No.: 03

Permit No: 2404 Date: 06/19/2020

TCEQ-20720, Closure Plan for Municipal Solid Waste Type I Landfill Unit and Facility (06/08/15) Page 3 of 15

landfill units, and waste storage or processing units or operations at closure of

the facility).

Drawing

Location in

the SDP

Drawing

Figure

Number

Drawing Title Waste Management Units Details

Shown

Attachment

H3

FIG.III.H1 Landfill Final Contour Plan e.g., outlines , waste footprints,

and dimensions of the landfill

unit(s)

Attachment

H3

FIG.III.H1 Landfill Final Contour Plan e.g., maximum elevations of waste

and final cover of the landfill unit(s)

Attachment

D3

FIG.III.H1 &

FIG.III.D35

Landfill Final Contour Plan

& Leachate Storage Tanks

Details

e.g., outlines and dimensions of the

storage and processing unit(s)

Description of the Final Cover System Design

A. Types and Descriptions of the Final Cover Systems

Table 5. Types and Descriptions of the Final Cover Systems Permitted or Proposed for

Closure of the Landfill Units.

Landfill

Unit Name

or

Descriptor

Type of

Final Cover

System

Final Cover System Components Description

Other

Information

(Enter other

information

as

applicable)

Type I Cell

1

Composite 6” erosion control layer, 18” earthen storage layer,

40mil geomembrane, geocomposite

Type I Cell

2

Composite 6” erosion control layer, 18” earthen storage layer,

40mil geomembrane, geocomposite

Type I Cell

3

Composite 6” erosion control layer, 18” earthen storage layer,

40mil geomembrane, geocomposite

Type IV

Cell 1

Composite 6” erosion control layer, 18” earthen storage layer,

40mil geomembrane, geocomposite

Page 120: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Closure Plan for Type I Landfill Unit and Facility

Facility Name: Diamond Back Solid Waste Facility & Recycling Center Revision No.: 03

Permit No: 2404 Date: 06/19/2020

TCEQ-20720, Closure Plan for Municipal Solid Waste Type I Landfill Unit and Facility (06/08/15) Page 4 of 15

Landfill

Unit Name

or

Descriptor

Type of

Final Cover

System

Final Cover System Components Description

Other

Information

(Enter other

information

as

applicable)

Type IV

Cell 2

Composite 6” erosion control layer, 18” earthen storage layer,

40mil geomembrane, geocomposite

Type IV

Cell 4

Composite 6” erosion control layer, 18” earthen storage layer,

40mil geomembrane, geocomposite

B. Design Details

Table 6. Design Details of the Final Cover Top and Side Slopes for the Landfill Units.

Landfill Unit

Name or

Descriptor

Maximum

Final Elevation

of Waste (feet

above mean

sea level

[ft-msl])

Maximum

Elevation of

Top of Final

Cover (ft-msl)

Minimum

Grade of

the Final

Cover Top

Slope (%)

Maximum

Grade of the

Final Cover

Side Slope

(%)

Other

Information

(enter other

information as

applicable,

e.g. above-

grade Class 1

Cell Dikes)

Type I Cell 1 3,167.50 3165.5 3 3

Type I Cell 2 3,107.47 3105.47 3 3

Type I Cell 3 3,091.01 3089.01 3 3.38

Type IV Cell 1 3,103.60 3101.6 3 3

Type IV Cell 2 3,121.02 3119.02 3 3

Type IV Cell 4 3,097.92 3095.92 3 3

C. Final Cover Drainage Features

Storm water drainage and erosion and sediment control features incorporated on the final cover of the landfill units to protect the integrity and effectiveness of the final

cover system include (please list and describe the drainage features to be installed on the final cover at or prior to closure for each landfill unit, or list the drainage features

and provide cross references on the location(s) of the descriptive and details (drawing) information in other parts of the SDP):

Topslope swales, sideslope swales, and chutes (FIG.III.C.2.3) will be installed as

shown in Attachment C Appendix III.C3.

Page 121: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Closure Plan for Type I Landfill Unit and Facility

Facility Name: Diamond Back Solid Waste Facility & Recycling Center Revision No.: 03

Permit No: 2404 Date: 06/19/2020

TCEQ-20720, Closure Plan for Municipal Solid Waste Type I Landfill Unit and Facility (06/08/15) Page 5 of 15

D. Final Cover Vegetation or Other Ground Cover Material

The final cover will be seeded and/or sodded with native plants immediately following

the application of the final cover in order to minimize erosion. Other materials, including NA, may be incorporated over the final cover soil surface to ensure sufficient

coverage of the ground surface to minimize erosion. The estimated percent ground cover to minimize soil loss and maintain long-term erosional stability of the final cover top and side slopes is: 60%. The minimum material specifications for other ground

cover materials are summarized in the table below.

For a landfill with water balance final cover design, the percentage vegetation cover

(excluding other ground cover types) will not be less than that assumed in the water balance final cover model.

Table 7. Minimum Specification for Ground Cover Materials Other Than Vegetation, if

Applicable.

Other Ground

Cover Material

Maximum

Particle Size

(inches)

Minimum

Particle

Size

(inches)

Material

Placement

Method

Thickness

of Layer

(inches)

Percentage

Coverage

(%)

Other

(specify)

E. Final Contour Map

Figure FIG.III.H1, a facility final contour map is attached. The map shows the final contours of the landfill units and the entire facility at closure.

Figures FIG.III.D2.1 through FIG.III.D2.10 showing the cross–sections of the landfill units at closure are also provided.

The facility final contour and cross-section maps/drawings depict the following

information:

(1) Final constructed contours of the landfill at closure.

(2) Top slopes and side slopes of the landfill units.

(3) Surface drainage features (FIG.III.C.2.3).

(4) 100-year floodplain, as applicable (NOT APPLICABLE).

(5) Constructed features providing protection of/from the 100-year floodplain(NOT APPLICABLE).

(6) Other (specify):

Page 122: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Closure Plan for Type I Landfill Unit and Facility

Facility Name: Diamond Back Solid Waste Facility & Recycling Center Revision No.: 03

Permit No: 2404 Date: 06/19/2020

TCEQ-20720, Closure Plan for Municipal Solid Waste Type I Landfill Unit and Facility (06/08/15) Page 6 of 15

Description of the Final Cover System Installation Procedure

A. Mode of Installation

Table 8. Mode of Final Cover Installation on the Landfill Units.

Landfill Unit Name

or Descriptor

Largest Area

of Unit Ever

Requiring

Final Cover

(Acres)

Check this Column if

Final Cover will be

Placed in

Installments as

Permitted Elevation

is Reached

Check this Column

if Final Cover will be

Placed when Entire

Unit Area Reaches

Permitted Elevation

Final Cover

Installation

Status

Type I Cell 1 27.5 Yet to be

installed

Type I Cell 2 27.7 Yet to be

installed

Type I Cell 3 18.5 Yet to be

installed

Type IV Cell 1 5.6 Yet to be

installed

Type IV Cell 2 23.6 Yet to be

installed

Type IV Cell 4 21.7 Yet to be

installed

B. Installation Drawings for Final Cover and Drainage Features

The following attached plan and cross-section drawings show the final cover design

details, the largest area requiring final cover, details of the sequence of installation of the final cover system, and all drainage features.

Table 9. List of Attached Installation Drawings for Final Cover and Drainage Features.

Drawing No. Drawing Title Description of Information Contained in Drawing

FIG.III.D2.1

Cross Section Plan (e.g., final cover cross section details with references to

base drawings)

FIG.III.H1

Landfill Final Contour

Plan

(e.g., the largest area ever requiring final cover)

FIG.III.C2.3

Final Drainage Plan (e.g., details of all drainage features on the final cover)

Page 123: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Closure Plan for Type I Landfill Unit and Facility

Facility Name: Diamond Back Solid Waste Facility & Recycling Center Revision No.: 03

Permit No: 2404 Date: 06/19/2020

TCEQ-20720, Closure Plan for Municipal Solid Waste Type I Landfill Unit and Facility (06/08/15) Page 7 of 15

C. Final Cover Quality Control Plan

A final cover quality control plan (FCQCP), Attachment III.H2, is attached. The FCQCP describes the final cover system design, construction, and evaluation protocol and processes, including the personnel, materials, methods, sampling and testing

standards, procedures, and practices to be used in procuring, handling, installing, and evaluating all elements of the final cover system. It establishes the material

requirements; personnel qualifications and roles; installation requirements; quality control and quality assurance monitoring, testing, documentation, and reporting programs to be used during construction of each component of the final cover system

to assure and to verify that the final cover system is constructed as designed and in accordance with applicable rules and technical standards.

D. Documentation and Reporting of Final Cover System Construction and Testing

The professional of record will document all aspects and stages of the final cover

installation, including materials used, equipment and construction methods, and the type and rate of sampling and quality control testing performed. Following completion of construction of the final cover, the site operator/permittee will submit to the TCEQ

executive director, a Final Cover System Evaluation Report (FCSER) for each landfill unit.

Closure Activities and Completion Schedules for Each Landfill Unit and for the Final Facility Closure

A. Closure of a Landfill Unit

The following activities will be conducted to satisfy the closure criteria for a landfill

unit:

Closure Notification to the TCEQ Executive Director:

The site operator will inform the executive director of the TCEQ, in writing, of the intent to close the unit no later than 45 days prior to the initiation of closure activities and place this notice of intent in the operating record.

Stoppage of Waste Acceptance and Commencement of Other Closure Activities for the Unit:

The site operator will stop accepting waste upon receiving the known final receipt of waste. The site operator will ensure that the permitted top elevations of the in-place waste, as depicted in/derived from the unit’s final contour map

Other: describe as applicable

Page 124: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Closure Plan for Type I Landfill Unit and Facility

Facility Name: Diamond Back Solid Waste Facility & Recycling Center Revision No.: 03

Permit No: 2404 Date: 06/19/2020

TCEQ-20720, Closure Plan for Municipal Solid Waste Type I Landfill Unit and Facility (06/08/15) Page 8 of 15

approved by the TCEQ executive director, are not exceeded at any section or part of the landfill unit. The site operator will begin closure activities for the unit

no later than:

● Thirty days after the date on which the unit receives the known final receipt

of wastes; or

● One year after the most recent receipt of wastes if the unit has remaining capacity and there is a reasonable likelihood that the unit will receive

additional wastes.

Request for Extension Beyond the 1-Year Deadline for Commencing

Closure Activities for a Unit:

The site operator may submit a written request to the executive director of the TCEQ for review and approval for an extension beyond the one-year deadline for

the initiation of closure. The request will include the following:

(a) All applicable documentation necessary to demonstrate that the unit has

the capacity to receive additional waste; and

(b) All documentation necessary to demonstrate that the site operator has taken and will continue to take all steps necessary to prevent threats to

human health and the environment from the MSW landfill unit.

Construction of Final Cover:

The site operator will construct the permitted final cover over the waste mass utilizing methods, procedures, and specifications described in the FCQCP. The final constructed contours, elevations, and slopes of the installed final cover will

match the permitted final cover contours, elevations, and slopes shown in

closure drawings contained in this closure plan.

Construction of Drainage Features:

The site operator will construct the drainage structures shown in drawings

referenced or contained in this closure plan or in the facility surface water drainage report.

Completion of Outstanding or Replacement of Damaged Groundwater or

Landfill Gas Monitoring Components:

The site operator will complete installation of any outstanding or replacement of

any damaged groundwater or landfill gas monitoring system components and landfill gas control systems as needed to maintain current and effective groundwater or landfill gas monitoring and control systems.

Submittal of Final Cover System Evaluation Report (FCSER) to the TCEQ Executive Director:

Following completion of construction of the final cover for the subject landfill unit, the site operator will submit to the TCEQ executive director for review and acceptance, a FCSER for the unit.

Page 125: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Closure Plan for Type I Landfill Unit and Facility

Facility Name: Diamond Back Solid Waste Facility & Recycling Center Revision No.: 03

Permit No: 2404 Date: 06/19/2020

TCEQ-20720, Closure Plan for Municipal Solid Waste Type I Landfill Unit and Facility (06/08/15) Page 9 of 15

Completion of Closure Activities for the Landfill Unit:

The site operator will complete closure activities for the unit within 180 days

following the start of closure activities, unless the executive director of the TCEQ grants an extension as described in Item V.A.8(a) below.

The site operator may submit a written request for an extension for the

completion of closure activities to the TCEQ for review and approval. The extension request will include:

● All applicable documentation necessary to demonstrate that closure will, of necessity, take longer than 180 days; and

● All applicable documentation necessary to document that all steps have been taken and will continue to be taken to prevent threats to

human health and the environment from the unclosed MSW landfill

unit.

Submittal of Engineer’s Certification of Closure to the TCEQ Executive Director and Request of Closure Inspection to TCEQ Regional Office:

Following completion of all closure activities for the landfill unit, the site operator

will submit:

A written request to the local TCEQ regional office for a closure inspection of the unit.

A certification, signed by an independent licensed professional engineer, to the executive director of the TCEQ for review and approval verifying

that closure has been completed in accordance with this closure plan. The site operator will submit the certification via registered mail, and the submittal will contain all applicable documentation necessary for

certification of closure of the unit, including:

● A final cover system evaluation report (FCSER) documenting the

installation of the final cover. The FCSER may be submitted as a separate document for review and approval following the completion of the final cover installation. In that case, the certification of closure will

be submitted subsequently;

● A final contour map as described under Section III.E that includes the

relevant unit; and

● Copy of the letter to the TCEQ regional office requesting a closure inspection of the relevant unit.

Page 126: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Closure Plan for Type I Landfill Unit and Facility

Facility Name: Diamond Back Solid Waste Facility & Recycling Center Revision No.: 03

Permit No: 2404 Date: 06/19/2020

TCEQ-20720, Closure Plan for Municipal Solid Waste Type I Landfill Unit and Facility (06/08/15) Page 10 of 15

TCEQ’s Acknowledgement of Termination of Operation and Closure of a Unit:

Upon receipt, the TCEQ executive director will review the closure documents for completeness and accuracy; and following receipt of the closure inspection

report from the agency’s regional office verifying proper closure of the MSW landfill unit according to this closure plan, the executive director will, in writing, acknowledge the termination of operation and closure of the unit and deem it

properly closed. Thereafter, the site operator will comply with the post-closure care requirements described in the post-closure care plan for the unit.

Deed Recordation for Disposed Regulated Asbestos Containing Materials (RACM):

Upon closure of the unit that accepted RACM, the site operator will place a

specific notation that the unit accepted RACM in the deed records for the facility with a diagram identifying the RACM disposal areas. Concurrently, the site

operator will submit to the TCEQ executive director, a notice of the deed recordation and a copy of the diagram identifying the asbestos disposal areas.

Placement of all Closure Documentation in the Site Operating Record:

Once approved, the closure certification and all other documentation of closure will be placed in the site operating record.

Closure Schedule for the Landfill Unit:

A closure schedule is included in Part III Attachment H. The schedule shows all the closure activities listed within Section V.A and the timelines for commencing

and completing each activity. Also, the schedule shows that closure activities for the landfill unit will be completed within 180 days following the initiation of

closure activities as required, unless an extension is granted by the TCEQ executive director.

Other: (enter as applicable).

Page 127: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Closure Plan for Type I Landfill Unit and Facility

Facility Name: Diamond Back Solid Waste Facility & Recycling Center Revision No.: 03

Permit No: 2404 Date: 06/19/2020

TCEQ-20720, Closure Plan for Municipal Solid Waste Type I Landfill Unit and Facility (06/08/15) Page 11 of 15

B. Closure of the Waste Storage or Processing Units or Operations

Closure of the waste storage or processing units or operations authorized under this

permit will include removal of all waste, waste residues, and any recovered materials. The facility units and operations will either be dismantled and removed off-site or

decontaminated. The site operator will dispose at the landfill or evacuate all materials (including feedstock, in process, and processed) to an authorized facility and disinfect all leachate handling units, tipping areas, processing areas, and post-processing areas.

If there is evidence of a release from a unit or operation, the site operator will conduct an investigation, as approved by the TCEQ executive director, into the nature and

extent of the release and an assessment of measures necessary to correct an impact to groundwater.

C. Final Closure of the Facility

In addition to the closure activities listed in Section V.A above for closing a landfill unit, the site operator will conduct the following activities for the closure of the entire

facility:

Publish Final Closure Notice and Place the closure Plan in a Public Place:

No later than 90 days prior to the initiation of the final facility closure, the site

operator will:

The site operator will publish notice in the newspaper(s) of largest circulation in the vicinity of the facility to inform the public of the final closure of the facility. This notice will include:

● The name of the facility;

● The address, and physical location of the facility;

● The facility’s permit number; and

● The last date of intended receipt of waste.

The site operator will also make available an adequate number of copies of the approved final closure and post-closure plans for public access and

review at the Ector County Public Library (state public place within the area, including address, where the plan will be available for public access and review).

Submit Written Notice of “Intent to Close the Facility” to the TCEQ Executive Director:

The site operator will provide written notification to the TCEQ executive director of the intent to close the facility. This notice will be provided to the executive

director no later than 90 days prior to the initiation of the final facility closure, and thereafter be placed in the site operating record.

Page 128: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Closure Plan for Type I Landfill Unit and Facility

Facility Name: Diamond Back Solid Waste Facility & Recycling Center Revision No.: 03

Permit No: 2404 Date: 06/19/2020

TCEQ-20720, Closure Plan for Municipal Solid Waste Type I Landfill Unit and Facility (06/08/15) Page 12 of 15

Post Signs and Install Barriers:

Upon notifying the executive director of the intent to close the facility and no

later than 90 days prior to the initiation of final facility closure, the site operator will:

The site operator will post a minimum of one sign at the main entrance and all other frequently used points of access for the facility notifying all

persons who may utilize the facility of the date of closing for the entire facility and the prohibition against further receipt of waste materials after

the stated date.

Also, the site/operator will install suitable barriers at all gates or access

points to adequately prevent the unauthorized dumping of solid waste at the closed facility.

Filling of “Affidavit to the Public” and Performance of the Final Deed Recording:

Upon closure of all the landfill units or upon final closure of the facility, the site

operator will:

File with the county deed records an "Affidavit to the Public" in a form provided by the TCEQ executive director that includes an updated metes and bounds description of the extent of the disposal areas at the facility

and the restrictions to future use of the land in accordance with applicable provisions under 30 TAC Chapter 330, Subchapter T.

Record a certified notation on the deed to the facility property, or on some other instrument that is normally examined during title search, that

will in perpetuity notify any potential purchaser of the property that the land has been used as a landfill facility and use of the land is restricted

according to the provisions under 30 TAC Chapter 330, Subchapter T.

Place a copy of the “Affidavit to the Public” and a copy of the modified

deed in the site operating record.

Page 129: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Closure Plan for Type I Landfill Unit and Facility

Facility Name: Diamond Back Solid Waste Facility & Recycling Center Revision No.: 03

Permit No: 2404 Date: 06/19/2020

TCEQ-20720, Closure Plan for Municipal Solid Waste Type I Landfill Unit and Facility (06/08/15) Page 13 of 15

Submittal of a Copy of the “Affidavit to the Public” and the “Modified Deed” to the TCEQ Executive Director:

Within ten days after completion of final closure activities of the facility, the site operator will submit the following to the TCEQ executive director by registered

mail:

(a) A certified copy of the "Affidavit to the Public";

(b) A certified copy of the modified deed to the facility property; and

(c) A certification, signed by an independent licensed professional engineer, verifying that final facility closure has been completed in accordance with

the approved closure plan. The submittal will contain all applicable documentation necessary for certification of final facility closure, including:

● Final Cover System Evaluation Report (FCSER) documenting the installation of the final cover. The FCSER may be submitted earlier as

a separate document for review and approval following the completion of the final cover installation. In that case, the certification of closure will be submitted subsequently;

● A final contour map as described under Item III.G above;

● Copy of a letter to the TCEQ regional office requesting a final closure

inspection of the facility; and

● Copies of documents verifying newspaper publication of the notice of the final facility closure.

Other

Additional items relating to the schedule for final facility closure, and additional

closure activities specific to the final closure of this facility include:

Page 130: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Closure Plan for Type I Landfill Unit and Facility

Facility Name: Diamond Back Solid Waste Facility & Recycling Center Revision No.: 03

Permit No: 2404 Date: 06/19/2020

TCEQ-20720, Closure Plan for Municipal Solid Waste Type I Landfill Unit and Facility (06/08/15) Page 14 of 15

TCEQ’s Acceptance of Termination of Operation and Closure of a Landfill Facility:

Following the TCEQ executive director’s receipt and completion of the review of the professional engineer’s certification of the completion of facility closure and

the final closure documents, and receipt of the inspection report from the agency’s regional office verifying proper closure of the facility according to this closure plan, the executive director will, in writing, accept the termination of

operation and closure of the facility and deem it properly closed. Thereafter, the site operator will comply with the post closure care requirements described in

the post closure plan for the facility.

Final Closure Schedule for the Facility:

Attachment H, Final Closure Schedule, provides the closure schedule for the final

facility closure. It incorporates the schedule for closure of a unit as discussed in Section V.A and also shows the commencement and completion timelines for the

final closure activities listed within this Section.

Summary of Attachments

A. Drawings and Maps

The following Drawings and Maps are attached as part of this plan.

● Figure FIG.III.H2, Final Contour Map.

● Figures FIG.III.D2.1, Cross-Section Drawings of the Landfill Units at Closure.

● Figures FIG.III.C.2.3, Final Cover and Drainage Features Installation Drawings.

● Other Drawings/Maps: Figures

B. Documents

● Attachment H2, Final Cover Quality Control Plan (FCQCP).

● Attachment H, Landfill Unit Closure Schedule Chart.

● Attachment H, Final Closure Schedule Chart.

● Other: Attachment

C. Additional Items Attached (enter as applicable)

Page 131: TCEQ MSW Permits, MC-124 12100 Park 35 Circle, Bldg F Austin, … · 2020-07-22 · X:\2018\0801.18\03_DSGN\03_REPT\02_Permitting\01_Working\06_REV-06\__Cover_Letter.docm June 19,

Closure Plan for Type I Landfill Unit and Facility

Facility Name: Diamond Back Solid Waste Facility & Recycling Center Revision No.: 03

Permit No: 2404 Date: 06/19/2020

TCEQ-20720, Closure Plan for Municipal Solid Waste Type I Landfill Unit and Facility (06/08/15) Page 15 of 15

Professional Engineer’s Statement, Seal, and Signature

Name: Todd E. Stiggins Title: Environmental Team Leader|Associate

Date: 06/19/2020

Company Name: Parkhill, Smith & Cooper, Inc. Firm Registration Number: F-560

Professional Engineer’s Seal

Signature