te 506 planning & assesment in teaching

13
TE 506 Planning & Assesment In Teaching Student Information Database Fatih Dağtekin Öznur Altıntaş Onur Önür Tuğba Buldu

Upload: apria

Post on 22-Jan-2016

29 views

Category:

Documents


0 download

DESCRIPTION

TE 506 Planning & Assesment In Teaching. Student Information Database Fatih Dağtekin Öznur Altıntaş Onur Önür Tuğba Buldu. Outline. General Information about BLIS Dan Keller’s Requests Tasks Done Difficulties Faced Comments & Contributions. General Information about BLIS. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: TE 506 Planning & Assesment  In Teaching

TE 506Planning & Assesment In Teaching

Student Information Database

Fatih DağtekinÖznur Altıntaş

Onur ÖnürTuğba Buldu

Page 2: TE 506 Planning & Assesment  In Teaching

Outline

General Information about BLIS

Dan Keller’s Requests

Tasks Done

Difficulties Faced

Comments & Contributions

Page 3: TE 506 Planning & Assesment  In Teaching

General Information about BLIS

• Primary School

• Approximately 400 students

• MicrosoftOffice & OpenOffice

&

Page 4: TE 506 Planning & Assesment  In Teaching

Dan Keller’s Requests

• MicrosoftOffice OpenOffice

• Students’ Reports

• Revise the Database

• Class Reports

Page 5: TE 506 Planning & Assesment  In Teaching

Tasks Done

First Task

Second Task

Page 6: TE 506 Planning & Assesment  In Teaching

First Task

Letter Merge (1st Step)

– Conversion from spreadsheet to database

– Changing the field names in to more meaningful names

(nearly 2 weeks)

MS Excel OO Base

Page 7: TE 506 Planning & Assesment  In Teaching

– Learning mail merge task with a sample mail list

– Designing the Student Information Report

– Fetching data from Base document

(Nearly 3 weeks)

OO Base OO Writer

First Task

Letter Merge (2nd Step)

Page 8: TE 506 Planning & Assesment  In Teaching

• Writing query for 7x3 classes

Second Task

Creating Query (1st Step)

Page 9: TE 506 Planning & Assesment  In Teaching

• Writing query for 7x3 classes

Second Task

Creating Query (1st Step Cont.)

Page 10: TE 506 Planning & Assesment  In Teaching

Second Task

Creating Report (2nd Step)

• Learning report task with a small query

• Designing the Class Information Report for 3x7 classes(1 weeks)

Page 11: TE 506 Planning & Assesment  In Teaching

Difficulties Faced

× Arranging the meetings was difficult.

× Dan Keller was busy most of the times.

× Connection with Dan Keller was difficult.

× Little misunderstandings about tasks.

× Unstability of Open Office.

× Lack of Open Office maintenance.

Page 12: TE 506 Planning & Assesment  In Teaching

Comments & Contributions

Project enviroment was relaxing and it was enjoyable for us.

Working with an ‘’important’’ person was stressful but

beneficial for future referance.

Satisfaction of doing something beneficial to a great school.

Learned a lot about Open Office and it’s features.

We always had encouraging feedback from our supervisors.

Dan Keller was a great person and was motivating and

helping us always.

Page 13: TE 506 Planning & Assesment  In Teaching

Thanks for Listening