Page 1: TE040 System Test Script

AIM

TE.040 SYSTEM TEST SCRIPT

Mock Telecom Ltd

Cash Management

Author: Team 4

Creation Date: Jun 05,2011

Last Updated: June 5, 2011

Document Ref: MTL/CM/TE040/01

Version: 1.0

Approvals:

<Approver 1> ORACLE TEAM

<Approver 2>

Page 2: TE040 System Test Script

TE.040 System Test Script

Document Control

Change Record

4

Date Author Version

Change Reference

05-JUN-11

TEAM4 1.0 No Previous Document

Reviewers

Name Position

Distribution

Copy No.

Name Location

1 Library Master Project Library2 Project Manager34

Note To Holders:

If you receive an electronic copy of this document and print it out, please write your name on the equivalent of the cover page, for document control purposes.

If you receive a hard copy of this document, please write your name on the front cover, for document control purposes.

Error: Reference source not foundFile Ref: document.doc (v. Error: Reference source not found )

Company Confidential - For internal use only

Document Control iii

Doc Ref: Error: Reference source not foundJune 5, 2011

Page 3: TE040 System Test Script

TE.040 System Test Script

Contents

Document Control.........................................................................................iii

Overview........................................................................................................1

Century Date Compliance........................................................................1

System Test Sequences................................................................................3

System Test Specifications - <Scenario Number>.......................................4

Test Specification-Pre requisite steps

Data Profile - <Scenario Number>...............................................................5

Defect Log......................................................................................................6

Open And Closed Issues For This Deliverable..............................................7

Open Issues..............................................................................................7Closed Issues...........................................................................................7

Error: Reference source not foundFile Ref: document.doc (v. Error: Reference source not found )

Company Confidential - For internal use only

Document Control iii

Doc Ref: Error: Reference source not foundJune 5, 2011

Page 4: TE040 System Test Script

Overview

This System Test Script documents the steps needed to test the integration of application extensions with the target application system with respect to the <Process> process.

System testing measures the quality of the entire application system, using system test sequences and scripts. You must create scripts for all business processes based on the Mapped Business Requirements (BR.030). You should be able to reuse the test scripts you created during Test Business Solutions (BR.080); however, the focus of business solution testing is confirming individual business processes, while business system testing focuses on confirming the collective application system. For more information, refer to Business Mapping Test Results (BR.080) as a basis for business system test specifications.

This system test will include the following types of testing:

Integrated Business Processes

Manual Procedures

Support Procedures

Security Testing

Initial System Documentation Inspection

Manual Data Inspection

Database Journaling

Converted Data Load Testing

Converted Data Inspection

Interface Testing (limited to processing data as input from another system, or creating data for use by another system)

Data/Transaction Reconciliation to the legacy system

Job Stream Testing (if there is a batch component)

Back-Up and Recovery Testing

Data Archival Testing

Lock Testing Simulating User Load (executing identical scenarios)

Batch Window Test (on full converted data volumes)

Century Date Compliance

In the past, two character date coding was an acceptable convention due to perceived costs associated with the additional disk and memory storage requirements of full four character date encoding. As the year 2000 approached, it became evident that a full four character coding scheme was more appropriate.

In the context of the Application Implementation Method (AIM), the convention Century Date or C/Date support rather than Year2000 or Y2K support is used. It is felt that coding for any future Century Date is now the modern business and technical convention.

File Ref: document.doc (v. )Company Confidential - For internal use only

Document Control iii

Doc Ref:

Page 5: TE040 System Test Script

Every applications implementation team needs to consider the impact of the Century Date on their implementation project. As part of the implementation effort, all customizations, legacy data conversions, and custom interfaces need to be reviewed for Century Date compliance.

Testing activities need to make sure that all interfaces and application extensions are coded for Century Date compliance. System test scripts should include steps for testing Century Date compliance.

File Ref: document.doc (v. )Company Confidential - For internal use only

Document Control iii

Doc Ref:

Page 6: TE040 System Test Script

System Test Sequences

Sequence #

Date Time <Test Type> Test Name Description Tester Test Status

Pass/Fail Notes

1 01-01-00

Customer Order to Invoicing Test the flow of order entry to customer invoicing

B. Schmitzheim

Active Pass Test completed successfully

File Ref: document.doc (v. )Company Confidential - For internal use only

Document Control iii

Doc Ref:

Page 7: TE040 System Test Script

System Test Specifications - <Scenario Number>

ScenarioStep

TestStep Role

Actionor Path Expected Results Actual Results

ExpectedCycle Time

ActualCycle Time Status

1 OFA 130.1

OE Supervisor Enter Orders Customer order entered Customer order entered > 1 min. > 1 min. Active

File Ref: document.doc (v. )Company Confidential - For internal use only

Document Control iii

Doc Ref:

Page 8: TE040 System Test Script

Data Profile - <Scenario Number>

ScenarioStep

BusinessObject

DataCondition

BusinessRule Type Status

1 Customer Order Order Item 34456 Book new order from customer

Customer Order

Active

File Ref: document.doc (v. )Company Confidential - For internal use only

Document Control iii

Doc Ref:

Page 9: TE040 System Test Script

Defect Log

Defect ID Number

Test Step Reference

Module Name Defect Description

Resolution Re-Test By Re-Test Date Pass/Fail Status (open, closed,

in process)

1 OFA 130.1 Order entry Order could not be booked as customer credit profile not complete

Customer credit profile completed

F.J. Southpark 01/20/00 Pass Closed

File Ref: document.doc (v. )Company Confidential - For internal use only

Document Control iii

Doc Ref:

Page 10: TE040 System Test Script

Open And Closed Issues For This Deliverable

Open Issues

ID Issue Resolution Responsibility Target Date

Impact Date

Closed Issues

ID Issue Resolution Responsibility Target Date

Impact Date

File Ref: document.doc (v. )Company Confidential - For internal use only