team 3 - farm grid
DESCRIPTION
Team 3 final presentation from the Agritecture workshop NYCTRANSCRIPT
-
GRID FARM || PARK
-
Our Loca&on
-
500,000 sq ft!
-
Key Ac&vi&es
Educa&onPhytoremedia&onFood
Produc&onStormwater Management
-
Social Performance
Educa&onal Opportuni&es
Health & Well-Being
Local Jobs & Materials
Carbon Sequestra&ons 15 mTCO2e
Open/Green spaces Walking/biking trails Access to aordable/nutri9onal food Wednesdays Local Market Provide space for community events
LEED Innov. Design Incubator Urban
Agr. (Local Businesses)
-
Our Topology
-
Our Partners
Land & U&lity Educa&on Distributors
-
Human Resources
Key Resources
Farmers Educators Management Distributors
-
Key ResourcesLand
Phytoremedia&on Species
Tile Drain System
GuLer Connect Greenhouse
Geodesic Greenhouse
NFT Hydroponics System
LEED Warehouse Retrot & Green Washing Sta&on
Refrigerated Truck
Physical Resources
-
Our Produce
Cucumbers Tomatoes Leafy Greens Peppers HerbsZucchini
-
Customer Segments
Educators Private HospitalsStudentsNeighborhood Residents
-
The Breakdown
Exis%ng Structure (9,000 sq 4), parking, frontage, road access- 100,000 sq 4 9,000 sq Q footprint = 30,000 sq Q useable space $200 sq Q 2014 Florencia Costa
33%
8%
15%
29%
15%
Produc%on Greenhouse: 200,000 sq 4 $67 / sq Q for guYer connect GH structure $15 / sq Q for NFT hydroponic system = $16,400,000
Teaching greenhouse: 50,000 sq 4 $4,100,000
Intensive %le-drain phytoremedia%on: 100,000 sq 4 $3.02 sq Q 2011 Greenberg, Phytoremedia9on of petroleum and salt impacted soils
=$297,000
Constructed Wetland / Water Management Pond + Public Park 7.00 sq Q 2014 Greenvalues Stormwater Toolbox, Rain Garden and Bioswales
=$1,225,000
-
Revenue Streams
-
USDA loan- Direct Farm Ownership $300,000 New structures & renova&ng exis&ng ones
! NY State New Farmers Grant Fund $50,000 For new farmer ventures
!NY Farm Viability Group - $150,000 !NYC Oce of Environmental Remedia&on $25,000+ help with the phytoremedia&on
!Venture Capitalists
Financial Resources
-
Environmental Performance
Redevelop Browneld site
!Neighborhood
PaLern and Design
!Provide Community
Connec&on
Near public transit: 14 minutes walking distance to subway (Graham Ave L Train Sta&on) - 0.7 miles
!Bike paths/racks
!EV car sharing program
!Minimum parking lot
(zoning) !
!Reduce storm water runo
by porous pavement (&le drain)
!!
Cover parking lot and roofs (solar panels)
!Cool pavements
!Open-grid pavement
!
Prevent light pollu&on !
Landscaping Na&ve plants/remedia&on plants
!!
Smart Loca9on &
LinkageTransporta9on Stormwater Management
Heat Island Eect Site Management
-
Water Eciency
Harves9ng rainwater (barrels + 9le drain)
Stormwater/gray-water (Stormwater pond)
Outdoor Water Reduc9on Prac9ces (9le drain) !
Indoor StrategiesHigh-Eciency toiles
Waterless Urinals
Wastewater Treatment & Reuse (living machine)
Outdoor Strategies
-
Phytoremedia&on
-
Energy Eciency
Outdoor Strategies
Site Orienta9on (Passive Hea9ng/Cooling)
Hea9ng/Cooling: Geothermal
LED ligh9ng
ENERGY STAR appliances
Building automa9on system
Solar Panels (roof + Parking Lot)
Geothermal
Two wind towers
-
Resource Eciency
Reuse local construc&on materials
Use Cer&ed Wood
Zero Waste &
Compos&ng
-
!Increase ven&la&on in building
!
Dayligh&ng !
Temperature & light controls
Resource Eciency
-
Stormwater
Bookings / Catering
Education & outreach
Institutions & Partners
Retro,ed.Factory
Event.Space
Educa7onal.Space
Kitchen.and.Produc7on.Warehouse
Nursery
Seeds.&.Germina7on
Greenhouses
Commercial
Teaching
Phytoremedia7on.&.
Park.Space
HVAC
CO2
Na7onal.Grid.Gas
Systems Diagram
-
Thank You.