TEAM BUILDING ANALYSIS STRUCTURAL GRID AND COLUMNS

R.S

Page 3: TEAM BUILDING ANALYSIS R · 2017. 2. 8. · team building analysis current vs proposed floor to floors r.s. team building analysis mechanical systems vertical stock ww. team building

TEAM BUILDING ANALYSIS STRUCTURAL GRID AND COLUMNS

M.T

Page 4: TEAM BUILDING ANALYSIS R · 2017. 2. 8. · team building analysis current vs proposed floor to floors r.s. team building analysis mechanical systems vertical stock ww. team building

TEAM BUILDING ANALYSIS STRUCTURAL GRID AND COLUMNS

W.W

Page 5: TEAM BUILDING ANALYSIS R · 2017. 2. 8. · team building analysis current vs proposed floor to floors r.s. team building analysis mechanical systems vertical stock ww. team building

TEAM BUILDING ANALYSIS CURRENT VS PROPOSED FLOOR TO FLOORS

R.S

Page 6: TEAM BUILDING ANALYSIS R · 2017. 2. 8. · team building analysis current vs proposed floor to floors r.s. team building analysis mechanical systems vertical stock ww. team building

TEAM BUILDING ANALYSIS MECHANICAL SYSTEMS

Vertical Stock

WW

Page 7: TEAM BUILDING ANALYSIS R · 2017. 2. 8. · team building analysis current vs proposed floor to floors r.s. team building analysis mechanical systems vertical stock ww. team building

TEAM BUILDING ANALYSISMECHANICAL / VERTICAL CIRCULATION

R.S

STAIRCASES ADDED TO BE ABLE TO HOLD THE LOAD.

WE MUST FIGURE OUT WHERE TO ADD FIRE PROOF STAIRS

PROPOSED STAIR/ELEVATOR IN THE MIDDLE?

MECHANICAL ROOM?

Page 8: TEAM BUILDING ANALYSIS R · 2017. 2. 8. · team building analysis current vs proposed floor to floors r.s. team building analysis mechanical systems vertical stock ww. team building
Page 9: TEAM BUILDING ANALYSIS R · 2017. 2. 8. · team building analysis current vs proposed floor to floors r.s. team building analysis mechanical systems vertical stock ww. team building

TEAM BUILDING ANALYSIS R.S

Page 10: TEAM BUILDING ANALYSIS R · 2017. 2. 8. · team building analysis current vs proposed floor to floors r.s. team building analysis mechanical systems vertical stock ww. team building

TEAM BUILDING ANALYSISEGRESS pt2

R.S

Page 11: TEAM BUILDING ANALYSIS R · 2017. 2. 8. · team building analysis current vs proposed floor to floors r.s. team building analysis mechanical systems vertical stock ww. team building

SITE ANALYSIS/INVENTORY

M.T

Public Facility / InstitutionBlock: 97 Lot: 2

Property Characteristics:Lot Area: 38,565 sq ft (153.08' x 256')

# of Buildings: 1 Year built: 1971 Building frontage: 50'

# of floors: 1 Building Area: 187,894 sq ftTotal Units: 3 Residential Units: 0

Primary zoning: R7-2 Commercial Overlay:None

Floor Area Ratio: 4.87 Max. Allowable Residential FAR: 3.44

Max. Allowable Commercial FAR: 0 Max. Allowable Facility FAR: 6.5

Page 12: TEAM BUILDING ANALYSIS R · 2017. 2. 8. · team building analysis current vs proposed floor to floors r.s. team building analysis mechanical systems vertical stock ww. team building

SITE ANALYSIS/INVENTORY

M.T

Vibrations produced from elevated car traffic

Noise produced from surrounding residents and heavy car traffic

Shadings from the west

Site Shoot at 6:00 Am

Site Shoot at 1:00 pm

Site Shoot at 6:00 pm

Page 13: TEAM BUILDING ANALYSIS R · 2017. 2. 8. · team building analysis current vs proposed floor to floors r.s. team building analysis mechanical systems vertical stock ww. team building

SITE ANALYSIS/INVENTORY

M.T

Existing Project Inventory

❏ Auditorium (First Floor)❏ Ornamental Stair❏ Restrooms (First, Second Floor)❏ Information Desk ❏ One Egress Stair❏ Large exhibition area❏ Gallery Spaces❏ Double Height Spaces❏ Cafe (3rd Floor)

Page 14: TEAM BUILDING ANALYSIS R · 2017. 2. 8. · team building analysis current vs proposed floor to floors r.s. team building analysis mechanical systems vertical stock ww. team building

TEAM PROGRAM

OutdoorExhibit

Auditorium

OutdoorExhibit

SmallExhibit

MainExhibit

SmallExhibitSmall

Exhibit

SmallExhibit

ClassRoom

Page 15: TEAM BUILDING ANALYSIS R · 2017. 2. 8. · team building analysis current vs proposed floor to floors r.s. team building analysis mechanical systems vertical stock ww. team building
Page 16: TEAM BUILDING ANALYSIS R · 2017. 2. 8. · team building analysis current vs proposed floor to floors r.s. team building analysis mechanical systems vertical stock ww. team building

PRECEDENT CASE STUDYwarren

-Mechanical Distribution is always concealed-Lighting in the Exhibits are controlled light(natural and Artificial)-There is always natural light in the Classroom-Freight elevator is always the size of the truck-Coat Room is nearing the entrance -Entrance is the control point -Coat Room is always near the entrance-Vestibule is required-The stage for the auditorium is always located in the lowest point-Auditorium is at least 2 story hight-Information counter/ Ticketing is right after vestibule-Restaurant and food preparation facilities is in the opposite side of the exhibit-Staff room is always nearby the exhibits-Exhibits space are always double ceiling height

Page 17: TEAM BUILDING ANALYSIS R · 2017. 2. 8. · team building analysis current vs proposed floor to floors r.s. team building analysis mechanical systems vertical stock ww. team building

CHOSEN FACADEWARREN

Solid Panel

Spandrel Glass or stone Veneer

Vision glass

Curtain wall