tech interface in power distribution
TRANSCRIPT
-
7/30/2019 Tech Interface in Power Distribution
1/16
-
7/30/2019 Tech Interface in Power Distribution
2/16
2
Technology Interface in Power Distribution
1) Incoming Power Corridor/RoW issues:
High Ampacity conductors
- Double the MVA capacity with same towers
- Low sag
- Proper Ground clearance in spite of hutments below
the lines/towers
-Gap type conductors, Al Composite Core Conductors, INVAAR
conductors available
2) XLPE cables at 220/132/110/33 kV
- Light weight silicon terminations with possibility to terminate on tower cross
arm
3) Receiving Stations to handle bulk power
- High cost /Non-availability of land
- Hybrid Switchgear (Air-SF6) saves space by about 30%
- GIS at EHV/HV/MV saves space by about 90%
-
7/30/2019 Tech Interface in Power Distribution
3/16
3
Technology Interface in Power Distribution
4) Power Transformers:
Transformers with COPS
- No contact with contaminated air/moisture avoidingmajor maintenance, improving reliability and life
- Non breathing type transformers are recommended for all Power /
Distribution / Sub station transformers
- For old transformers Online filteration eqpt. & Low Freq. heating
methods
On line monitoring- Hot spots by fibre optic sensors
- Bushing Tan delta
- DGA
- Thermo-vision scanning
Integrated Numerical Controller- Temp indication
- Cooler control
- On line DGA monitors
- Thermal modeling
- OLTC control & Monitoring
-
7/30/2019 Tech Interface in Power Distribution
4/16
4
Technology Interface in Power Distribution
5) Distribution Transformers:
- OLTC for better voltage regulation- Dry type Transformers for safe operation
- Sealed Transformers for longer life & less maintenance
6) Sub-stations:
Package Substations- Spacing saving
- Dry type / Sealed transformers used
- Quick to install/commission
- Factory tested- Arc-proof
- Safe working
- Aesthetic appearance
-
7/30/2019 Tech Interface in Power Distribution
5/165
Technology Interface in Power Distribution
7) Network:
Use of SF6 filled RMUs (3 way / 4 way)
- space saving
- safe operation
- quick to install- factory tested
- fault passage indicators
Sectionalizers and Auto-reclosers
- with use of fault-passage indicators, faulty sections can
be quickly isolated and power can be restored
automatically
-
7/30/2019 Tech Interface in Power Distribution
6/166
Technology Interface in Power Distribution
8) Network Management:
Integrated SCADA for R/S and Distribution Automation System
(DAS) for S/S
- Quick / remote restoration in couple of minutes
by rearranging the feeder ring
- Restoration not affected by
traffic jams on roads
- Better utilization of man power for higher level work
- Alarms to Maint. Crew by SMS alerts,mobile vans
- Cable / Transformer load data archiving for future
studies, statistics and planning- Use of dedicated or public FOP / GSM / CDMA network
for communication and control make modern SCADA
and DAS systems effective
-
7/30/2019 Tech Interface in Power Distribution
7/16
7
Technology Interface in Power Distribution
9) Loss Reduction in Distribution:
High Voltage Distribution System (HVDS)- 11 kV / 415 V small pole-mounted transformers
- 25 kVA / 50 kVA transformers with metering for energy
accounting
Aerial Bunched Cable (ABC) Overhead System
- For better control and reliable
connections
- Cost saving
- Safe for public
-
7/30/2019 Tech Interface in Power Distribution
8/16
8
Technology Interface in Power Distribution
10) Electronic Meters:
- Tamper proof- AMR features- Built-in
PLCC,GSM,CDMA
- Pre-paid meters
- Time-of-Day feature for
Demand Side Management
through tariff structure
- 100% Electronic meters
-
7/30/2019 Tech Interface in Power Distribution
9/16
9
Technology Interface in Power Distribution
11) Geographical Information System (GIS):
Consumer Indexing through GIS networkmapping through GIS
Updating of records -Any change in theelectrical address can be updated as part of aprocess in GIS map which further gets updated
in the consumer Billing database.
Address formatting-consumer addresses canbe formatted to ensure easy retrieval andanalysis.
Network planning
new cable routes,transformer locations etc can be planned
effectively
Maintenance GIS maps can be used toidentify / rectify faulty sections
Illustrated GIS map
-
7/30/2019 Tech Interface in Power Distribution
10/16
10
Technology Interface in Power Distribution
12) Energy Accounting Un-accounted energy is the
single biggest problem of Distribution system in India- Energy Accounting by extensive use of IT
- Energy meter for each Distribution Transformer
- Feeder wise energy meters / accounting
- AMR for reduction in billing cycle time
- AMR by GSM / CDMA for major industrial customers
- AMR by RS 485 / Data concentrators for commercial
customers
- AMR for residential customers by use of PLCC
- Direct connectivity of AMR system to billing computersto eliminate human intervention
- Use of IT to connect these energy meters for central
monitoring and accounting
-
7/30/2019 Tech Interface in Power Distribution
11/16
11
53%
51.1%
44.86%
26.5%
23.7%
23%
28%
33%
38%
43%
48%
53%
J u l - 01 N ov- 01 M a r -0 2 J u l - 02 N o v- 02 M a r -03 J u l - 03 N o v- 03 M a r -04 J u l - 04 N o v- 04 M a r -0 5 J u l - 05 N o v- 05 M a r -0 6 J u l - 06 N o v- 06
33.79
Jul 02
(Privatisation)
FY 2002-03
FY 2003-04
AT&C Lossrising before
privatisation
Post
privatisation
reduction in
FY 2004-05
The Loss Reduction
FY 2005-06FY 2006-07
Cumulative Since Privatization
Committed Reduction -12.75%
Effective Reduction29%
Mar 07
Technology Interface in Power Distribution
-
7/30/2019 Tech Interface in Power Distribution
12/16
12
Technology Interface in Power Distribution
13) Use of Information Technology (IT):
For customer interaction, confidence, retention and delight
Call centers
- for better customer interaction
- complaint management
Web Based System
- Billing information
- On line bill payment
- Complaint management
SMS based complaint management
- maintenance crew informed through call center
immediately after receipt of complaint
Call Receivedat CallCentre
Consumerinformed &Call closed
Complaint
attended & CallCentre informed
SMS Sent toconcerned crew
K.R. Kalra32B Rohini
No Current
15mins
-
7/30/2019 Tech Interface in Power Distribution
13/16
13
CMG RRG RDGMRG RBG RCGMMG
RAG
Policy Regulatory Bench Data Revenue Infrastructure User& System
Advocacy Compliance Marking Analysis Protection Support Administration
Consumers
Call CenterCustomer care
Center Website E ailletters
Drop boxes
CCG
Integrated Commercial Package software- Industry First!!
Technology Interface in Power Distribution
-
7/30/2019 Tech Interface in Power Distribution
14/16
14
Technology Interface in Power Distribution
14) Power Quality:
- IT parks / DC devices generate more harmonics- Use of active and passive filters necessary to control the
harmonics
- UPS for maintaining the continuity of supply
- Use of fly wheels and magnetic field storage devices for
uninterrupted power supply for important loads like
huge data storage devices
- Use of shunt capacitors for riding over voltage dips
- Automatic Power Factor correction at the Distribution
Transformer
-
7/30/2019 Tech Interface in Power Distribution
15/16
15
Technology Interface in Power Distribution
15) Demand Side Management (DSM):
Energy efficient Appliances- T5 fluorescent tube lights
- Electronic chokes
- CFLs
- Efficient motors and compressors
- Street light control by GSM
Meter as Gateway using PLCC
- In addition to meter reading the PLCC technology canbe used for switching-off non-essential loads like
geysers, air conditioners etc during peak hours or
emergencies
-
7/30/2019 Tech Interface in Power Distribution
16/16
16
SCADA
Single Window Consumer
Grievance/ Service Centre
Remote Operation
of Substations
Area MISUp gradation
of network
Mobile Service
Stations 1
Industrial Units
Data
Local Area
Load Forecast
DTC Wise
ATC Losses
AMR of Selected
Consumers
Mobile Service
Stations 1
Mobile Service
Stations 1
ReliabilityReduction in
AT & C losses
Planning
Technology Interface in Power Distribution