Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
Summary: Configuration Management Conference
July 3rd & 4th, 2007, AIRBUS, Hamburg
July, 2nd: Pre-Conference:Tutorial about the CMII Model
Organizers:AIRBUS CIMPA
Gesellschaft fr Konfigurations Management (GfKM)
Institute for Configuration Management (ICM)
DESY Participants:
Frank Lehner (ILC)
Riko Wichmann (XFEL)
-
7/27/2019 Technical Access
2/31
2
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
CMII Tutorial
given by Steve Easterbrook, ICM Vice-PresidentSummary of the CMII Certification Course
42 Participants with up to 15 (!) years of experience in CM
CMII Timeline:1977-1985: Development of basic CMII principles asBest Practice
1986: Start Training and Certification Program
1986-today: Continuous Improvement
CMII provides a business process infrastructure thatenables all activities to perform their tasks reliably andefficiently
-
7/27/2019 Technical Access
3/31
3
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
CMII Tutorial: A requirement is not a requirementunless it's documented, validated and released
-
7/27/2019 Technical Access
4/31
4
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
CMII Tutorial: Corrective Actions
Corrective Action:extra effort tocorrect something, which shouldnot have happened in the 1st place
primary cause: inadequaterequirements and/or conformance
to specification
most organizations spent 40-60%of their resources on interventions
Intervention Resources are spenton Corrective Actions
reduce corrective actions: clear,concise, valid requirements
CM: accommodate change andstay clear concise and valid
-
7/27/2019 Technical Access
5/31
5
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
CMII: Ingredients 1 Properly StructuredBaseline
CMII:verydocu
mentationcentric
Physical item hierarchies are used as a framework for enditem products, facilities and their associated requirements
Each item has its set ofsupporting documents/data
Documentation:
ClearConciseValid
XFEL
Buildings
Underground Buildings
XTL
Construction
-
7/27/2019 Technical Access
6/31
6
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
CMII: Ingredients 2 Closed Loop Change Process
Rules of the ultimate solution:
(1) Documents must be validatedprior to release.
(2) Documents must be releasedprior to use.
(3) Any detected deficiencies mustbe corrected prior to reuse
(4) Results must conform to require-ments in every case
Feedback about the executionof the change must reach theinitiator
applies to process themselves (e.g. CM) !
-
7/27/2019 Technical Access
7/317
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
CMII: Not all changes require full treatment!
75% - 85% of changes can be handled in a Fast-Track Process
-
7/27/2019 Technical Access
8/318
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
CMII: Ingredients 2 Closed Loop ChangeProcess with Fast Track
-
7/27/2019 Technical Access
9/319
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
CMC 2007 Main Conference: Company Reportson CMII Related Experience
142 Participants
Presentations by (non-selling) Organizations
NHIndustries (Eurocopter)
Embraer
NASA ISS
EADS Astrium Satellites
Delphi Automotive Systems
Airbus
EADS Defence Electronic
Microsoft
Dominated by Aviation and Space Industry
-
7/27/2019 Technical Access
10/3110
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
NHIndustries: Multi-national Cooperation
Christine-Anne Chevry,Senior Manager Configuration Management, NHIndustries
XFEL
-
7/27/2019 Technical Access
11/3111
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
NHIndustries: Eurocopter international project
XFEL
-
7/27/2019 Technical Access
12/3112
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
NHIndustries: Configuration Management Plan
defined in 2001 (?)
requirements
configuration identification
change process
production CM documents
Dec 2006: CM II training started for 20 employees
Feb 2007: Program Change Board established
long lead time for changes:
3 CB discussing costs, technical and business issues
XFEL
-
7/27/2019 Technical Access
13/3113
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
NHIndustries: Closed Loop Process w. Baseline
Closed Loop
XFEL
-
7/27/2019 Technical Access
14/3114
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
NHIndustries: Process => Key PerformanceIndicators => Tools
Th E XFEL
-
7/27/2019 Technical Access
15/3115
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
NASA: International Space Station
Ginny Stephenson,Change Management Lead, NASA Johnson Space Center
De
cember2006c
onfiguration
Th E XFEL
-
7/27/2019 Technical Access
16/3116
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
NASA: International Space Station
Partners from 15 countries participate in ISS the program
Th E XFEL
-
7/27/2019 Technical Access
17/3117
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
NASA: CM Process Improvement
Starting situation:
well defined CM process in place since years
strong CM group
Improvementsgap analysis by ICM in September 2004 (3 days)
implementation of recommendations
CM II briefing sessions with all departments
follow-up assessment August 2006
Th E XFEL
-
7/27/2019 Technical Access
18/3118
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
NASA: ICM findings/recommendations
fragmented baseline managementimplement closed-loop change management and coupleto baseline
find automated tool:
workflow, online change creation, distribution,disposition, task identification, scheduling & tracking
formal CMII training for ISSP CM group
CMII overview for ISSP personnel
avoid redline documents and drawings
define metric reporting for management
contractors to conform to NASA CM process
continuously improve CM process (committee)
The European XFEL
-
7/27/2019 Technical Access
19/3119
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
NASA: implementing CM improvements
within ~2 years
closed-loop in updated change request process withnew/updated forms
CMII certification and CMII briefings
updated metrics => regular meetings with seniormanagers
CMII also for new space vehicle !!
The European XFEL
-
7/27/2019 Technical Access
20/3120
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
NASA: Next Steps
integrate software tools
improve baseline databases
continuously improve process
reduce amount of signatures
The European XFEL
-
7/27/2019 Technical Access
21/3121
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
EADS Astrium Satellites
Jochen Hagenktter,Senior Advisor Configuration Management, EADS Astrium
The European XFEL
-
7/27/2019 Technical Access
22/3122
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
Astrium: Project Structure (similar to XFEL)
will be transferred into a product structure as the project progresses
The European XFEL
-
7/27/2019 Technical Access
23/31
23
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
Astrium: ESA CM Standards ECSS
Very similar to CMII standards
configuration baseline for approved status
baseline: all documentation that describe thecharacteristics of the product
evolution only by formal change procedure involving alldisciplines
change disposition via Change Control Board (CCB)
Change Boards on all levels:
ESA EADSEADS sub-contractor
sub-contractor vendor
The European XFEL
-
7/27/2019 Technical Access
24/31
24
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
Astrium: ECSS on the way to CMII
bring all CM related activities under one umbrella
currently ECSS is 85% CMII
standardized baselines, adapt CMII processes,harmonize forms, templates, etc for all spacecompanies
ECSS CMII
The European XFEL
-
7/27/2019 Technical Access
25/31
25
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
Embraer: Process Improvement in Aerospace
Manoel de Queiroz C. Santos,Configuration Engineer, Embraer
The European XFEL
-
7/27/2019 Technical Access
26/31
26
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
Embraer: Advices
get upper management to buy-in (ICM advice)
be visible (ICM advice)
implement CMII principles step-by-step
understand culture in your organization and identify whatis necessary to change that
think process first, tools should follow!!
The European XFEL
-
7/27/2019 Technical Access
27/31
27
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
The EuropeanX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
Commercial To-Sell Presentations
Airbus CIMPA, HH
consulting for product lifecycle management in aviationindustry
PTC
software for product lifecycle management (PLM)CMII certified
The European XFEL
-
7/27/2019 Technical Access
28/31
28
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
pX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
Siemens UGS: Product Lifecycle Management SW
The European XFEL
-
7/27/2019 Technical Access
29/31
29
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
pX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
UGS: Product Lifecycle Management SW
Most of this we have to do, too !
The European XFEL
-
7/27/2019 Technical Access
30/31
30
Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007
pX-Ray Laser Project XFEL
X-Ray Free-Electron Laser
Commercial To-Sell Presentations
Airbus CIMPA, HHconsulting for product lifecycle management in aviationindustry
PTC
software for product lifecycle managementCMII certified
Siemens UGS PLM Software
CMII conform
supply 90 % of the world PLM software (in aviation)
Teamcenter !
Think process first Tools should follow!
The European XFEL
-
7/27/2019 Technical Access
31/31
Riko Wichmann, XPO
X-Ray Laser Project XFELX-Ray Free-Electron Laser
Commercial To-Sell Presentations
Airbus CIMPA, HHconsulting for product lifecycle management in aviationindustry
PTC
software for product lifecycle managementCMII certified
Siemens UGS PLM Software
CMII conform
supply 90 % of the world PLM software (in aviation)
Teamcenter !
Think process first Tools should follow!