technical access

Upload: serbanel

Post on 14-Apr-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/27/2019 Technical Access

    1/31

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    Summary: Configuration Management Conference

    July 3rd & 4th, 2007, AIRBUS, Hamburg

    July, 2nd: Pre-Conference:Tutorial about the CMII Model

    Organizers:AIRBUS CIMPA

    Gesellschaft fr Konfigurations Management (GfKM)

    Institute for Configuration Management (ICM)

    DESY Participants:

    Frank Lehner (ILC)

    Riko Wichmann (XFEL)

  • 7/27/2019 Technical Access

    2/31

    2

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    CMII Tutorial

    given by Steve Easterbrook, ICM Vice-PresidentSummary of the CMII Certification Course

    42 Participants with up to 15 (!) years of experience in CM

    CMII Timeline:1977-1985: Development of basic CMII principles asBest Practice

    1986: Start Training and Certification Program

    1986-today: Continuous Improvement

    CMII provides a business process infrastructure thatenables all activities to perform their tasks reliably andefficiently

  • 7/27/2019 Technical Access

    3/31

    3

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    CMII Tutorial: A requirement is not a requirementunless it's documented, validated and released

  • 7/27/2019 Technical Access

    4/31

    4

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    CMII Tutorial: Corrective Actions

    Corrective Action:extra effort tocorrect something, which shouldnot have happened in the 1st place

    primary cause: inadequaterequirements and/or conformance

    to specification

    most organizations spent 40-60%of their resources on interventions

    Intervention Resources are spenton Corrective Actions

    reduce corrective actions: clear,concise, valid requirements

    CM: accommodate change andstay clear concise and valid

  • 7/27/2019 Technical Access

    5/31

    5

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    CMII: Ingredients 1 Properly StructuredBaseline

    CMII:verydocu

    mentationcentric

    Physical item hierarchies are used as a framework for enditem products, facilities and their associated requirements

    Each item has its set ofsupporting documents/data

    Documentation:

    ClearConciseValid

    XFEL

    Buildings

    Underground Buildings

    XTL

    Construction

  • 7/27/2019 Technical Access

    6/31

    6

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    CMII: Ingredients 2 Closed Loop Change Process

    Rules of the ultimate solution:

    (1) Documents must be validatedprior to release.

    (2) Documents must be releasedprior to use.

    (3) Any detected deficiencies mustbe corrected prior to reuse

    (4) Results must conform to require-ments in every case

    Feedback about the executionof the change must reach theinitiator

    applies to process themselves (e.g. CM) !

  • 7/27/2019 Technical Access

    7/317

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    CMII: Not all changes require full treatment!

    75% - 85% of changes can be handled in a Fast-Track Process

  • 7/27/2019 Technical Access

    8/318

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    CMII: Ingredients 2 Closed Loop ChangeProcess with Fast Track

  • 7/27/2019 Technical Access

    9/319

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    CMC 2007 Main Conference: Company Reportson CMII Related Experience

    142 Participants

    Presentations by (non-selling) Organizations

    NHIndustries (Eurocopter)

    Embraer

    NASA ISS

    EADS Astrium Satellites

    Delphi Automotive Systems

    Airbus

    EADS Defence Electronic

    Microsoft

    Dominated by Aviation and Space Industry

  • 7/27/2019 Technical Access

    10/3110

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    NHIndustries: Multi-national Cooperation

    Christine-Anne Chevry,Senior Manager Configuration Management, NHIndustries

    XFEL

  • 7/27/2019 Technical Access

    11/3111

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    NHIndustries: Eurocopter international project

    XFEL

  • 7/27/2019 Technical Access

    12/3112

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    NHIndustries: Configuration Management Plan

    defined in 2001 (?)

    requirements

    configuration identification

    change process

    production CM documents

    Dec 2006: CM II training started for 20 employees

    Feb 2007: Program Change Board established

    long lead time for changes:

    3 CB discussing costs, technical and business issues

    XFEL

  • 7/27/2019 Technical Access

    13/3113

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    NHIndustries: Closed Loop Process w. Baseline

    Closed Loop

    XFEL

  • 7/27/2019 Technical Access

    14/3114

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    NHIndustries: Process => Key PerformanceIndicators => Tools

    Th E XFEL

  • 7/27/2019 Technical Access

    15/3115

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    NASA: International Space Station

    Ginny Stephenson,Change Management Lead, NASA Johnson Space Center

    De

    cember2006c

    onfiguration

    Th E XFEL

  • 7/27/2019 Technical Access

    16/3116

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    NASA: International Space Station

    Partners from 15 countries participate in ISS the program

    Th E XFEL

  • 7/27/2019 Technical Access

    17/3117

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    NASA: CM Process Improvement

    Starting situation:

    well defined CM process in place since years

    strong CM group

    Improvementsgap analysis by ICM in September 2004 (3 days)

    implementation of recommendations

    CM II briefing sessions with all departments

    follow-up assessment August 2006

    Th E XFEL

  • 7/27/2019 Technical Access

    18/3118

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    NASA: ICM findings/recommendations

    fragmented baseline managementimplement closed-loop change management and coupleto baseline

    find automated tool:

    workflow, online change creation, distribution,disposition, task identification, scheduling & tracking

    formal CMII training for ISSP CM group

    CMII overview for ISSP personnel

    avoid redline documents and drawings

    define metric reporting for management

    contractors to conform to NASA CM process

    continuously improve CM process (committee)

    The European XFEL

  • 7/27/2019 Technical Access

    19/3119

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    NASA: implementing CM improvements

    within ~2 years

    closed-loop in updated change request process withnew/updated forms

    CMII certification and CMII briefings

    updated metrics => regular meetings with seniormanagers

    CMII also for new space vehicle !!

    The European XFEL

  • 7/27/2019 Technical Access

    20/3120

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    NASA: Next Steps

    integrate software tools

    improve baseline databases

    continuously improve process

    reduce amount of signatures

    The European XFEL

  • 7/27/2019 Technical Access

    21/3121

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    EADS Astrium Satellites

    Jochen Hagenktter,Senior Advisor Configuration Management, EADS Astrium

    The European XFEL

  • 7/27/2019 Technical Access

    22/3122

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    Astrium: Project Structure (similar to XFEL)

    will be transferred into a product structure as the project progresses

    The European XFEL

  • 7/27/2019 Technical Access

    23/31

    23

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    Astrium: ESA CM Standards ECSS

    Very similar to CMII standards

    configuration baseline for approved status

    baseline: all documentation that describe thecharacteristics of the product

    evolution only by formal change procedure involving alldisciplines

    change disposition via Change Control Board (CCB)

    Change Boards on all levels:

    ESA EADSEADS sub-contractor

    sub-contractor vendor

    The European XFEL

  • 7/27/2019 Technical Access

    24/31

    24

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    Astrium: ECSS on the way to CMII

    bring all CM related activities under one umbrella

    currently ECSS is 85% CMII

    standardized baselines, adapt CMII processes,harmonize forms, templates, etc for all spacecompanies

    ECSS CMII

    The European XFEL

  • 7/27/2019 Technical Access

    25/31

    25

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    Embraer: Process Improvement in Aerospace

    Manoel de Queiroz C. Santos,Configuration Engineer, Embraer

    The European XFEL

  • 7/27/2019 Technical Access

    26/31

    26

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    Embraer: Advices

    get upper management to buy-in (ICM advice)

    be visible (ICM advice)

    implement CMII principles step-by-step

    understand culture in your organization and identify whatis necessary to change that

    think process first, tools should follow!!

    The European XFEL

  • 7/27/2019 Technical Access

    27/31

    27

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    The EuropeanX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    Commercial To-Sell Presentations

    Airbus CIMPA, HH

    consulting for product lifecycle management in aviationindustry

    PTC

    software for product lifecycle management (PLM)CMII certified

    The European XFEL

  • 7/27/2019 Technical Access

    28/31

    28

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    pX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    Siemens UGS: Product Lifecycle Management SW

    The European XFEL

  • 7/27/2019 Technical Access

    29/31

    29

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    pX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    UGS: Product Lifecycle Management SW

    Most of this we have to do, too !

    The European XFEL

  • 7/27/2019 Technical Access

    30/31

    30

    Riko Wichmann, XPOJoint ILC-XFEL Meeting, 24. Aug. 2007

    pX-Ray Laser Project XFEL

    X-Ray Free-Electron Laser

    Commercial To-Sell Presentations

    Airbus CIMPA, HHconsulting for product lifecycle management in aviationindustry

    PTC

    software for product lifecycle managementCMII certified

    Siemens UGS PLM Software

    CMII conform

    supply 90 % of the world PLM software (in aviation)

    Teamcenter !

    Think process first Tools should follow!

    The European XFEL

  • 7/27/2019 Technical Access

    31/31

    Riko Wichmann, XPO

    X-Ray Laser Project XFELX-Ray Free-Electron Laser

    Commercial To-Sell Presentations

    Airbus CIMPA, HHconsulting for product lifecycle management in aviationindustry

    PTC

    software for product lifecycle managementCMII certified

    Siemens UGS PLM Software

    CMII conform

    supply 90 % of the world PLM software (in aviation)

    Teamcenter !

    Think process first Tools should follow!