Page 1: Technical Aspects in LIS with Special Focus on Production

LO275 Technical Aspects in LIS with Special Focus on Production

LO275LO275

Technical Aspects in LIS with Special Focus on ProductionTechnical Aspects in LIS with Special Focus on Production SAP AG

Page 2: Technical Aspects in LIS with Special Focus on Production

Copyright 2001 SAP AG. All rights reserved.

Neither this training manual nor any part thereof maybe copied or reproduced in any form or by any means,or translated into another language, without the priorconsent of SAP AG. The information contained in thisdocument is subject to change and supplement without prior notice.

All rights reserved.

Copyright

Page 3: Technical Aspects in LIS with Special Focus on Production

Information Systems

Processes in Salesand Distribution

Processes in Salesand Distribution

LO150 5 days

Logistics InformationSystem (LIS) Reporting

Logistics InformationSystem (LIS) Reporting

LO930 2 days

Level 2 Level 3

Processes in Procurement

Processes in Procurement

LO020 5 days

Manufacturing Planning & Execution for Discrete & Repetitive

Manufacturing Planning & Execution for Discrete & Repetitive

LO050 5 days

Executive Information System (EIS) 2 - Setting up the System

Executive Information System (EIS) 2 - Setting up the System

AC620 2 days

Advanced Functionsof the Report Writer

Advanced Functionsof the Report Writer

CA710 3 days

Advanced LISConfiguration

Advanced LISConfiguration

LO940 2 days

Technical Aspects in LIS with Special Focus on PURCHIS/INVCO

Technical Aspects in LIS with Special Focus on PURCHIS/INVCO

LO555 2 days

Technical Aspects in LIS with Special Focus on PPIS

Technical Aspects in LIS with Special Focus on PPIS

LO275 2 days

Technical Aspects in LIS with Special Focus on SIS

Technical Aspects in LIS with Special Focus on SIS

LO630 2 days

Executive Information System (EIS) 1 - Reporting

Executive Information System (EIS) 1 - Reporting

AC615 2 days

Basics of the Report Painter/Report Writer

Basics of the Report Painter/Report Writer

CA705 2 days

Flexible PlanningFlexible Planning

LO935 2 days

Page 4: Technical Aspects in LIS with Special Focus on Production

Course Prerequisites Recommended:

Basic Knowledge of the Data Dictionary is useful but not mandatory

Required:

Course LO930 - Logistics Information Systems (LIS) Reporting

Detailed knowledge of the contents of the courses LO050 - Manufacturing Planning & Execution for Discrete and Repetitive Manufacturingor LO060 - Process Manufacturing

Page 5: Technical Aspects in LIS with Special Focus on Production

Target Group Participants:

Project team members responsible for configuring the Shop Floor Information System

Duration: 2 days

Page 6: Technical Aspects in LIS with Special Focus on Production

SP AG S

Course Overview Overview

The LIS System and its Components

The Shop Floor Information System

Contents:

Page 7: Technical Aspects in LIS with Special Focus on Production

Course GoalThis course will prepare you to:

Outline how LIS information structures form the basis for standard analyses

Detail the function of communication structures

Use the options for finely tuning statistics updates in LIS

Name the PP processes that are statistically relevant in LIS

Create your own field catalogs for characteristics and key figures

Create your own information structures with self-defined characteristics and key figures

Use formulas and conditions for finely tuning the statistics update in LIS

Page 8: Technical Aspects in LIS with Special Focus on Production

Unit 6 Extended Updating Control

Unit 7 Rebuilding Statistics Data

Unit 8 Special Topics

Unit 9 Conclusion

Unit10 Outlook - Business Information Warehouse

Unit 1 Course Overview

Unit 2 Information Structures

Unit 3 Update Rules

Unit 4 Application-specificCustomizing

Unit 5 Individual Information Structures

Preface

Course Content

Page 9: Technical Aspects in LIS with Special Focus on Production

Main Business Scenario You are a member of your company's implementation

team for reporting. You have to define an evaluation structure that enables your company to analyze production data for each plant.

These analyses must include the following information: plant, MRP controller, material, order, and work center. Subprocesses relevant for the analyses must include production orders, confirmations, goods receipts and goods issued. These statistics are to include quantities and times.

Standard structures may suffice for most of your requirements, but there may also be special situations where you will have to create your own structures to provide the information needed.

Page 10: Technical Aspects in LIS with Special Focus on Production

Onlinetransactionprocessing

DATAWARE-HOUSE

OLTP

OLAP

Analysis tools

Onlineanalytical

processing

Aggregated information

Integrated Application ModulesIntegrated Application Modules

SalesSales FinanceFinance

Production planning

Production planning

Materialsmanagement

Materialsmanagement

Externaldata

Externaldata

Data Warehouse Concepts

Page 11: Technical Aspects in LIS with Special Focus on Production

OrdersInventoriesCapacitiesSeasons

R1::R4

1988------------------------

1994------------------------

ROIOpen items

Profit/costs

EmployeesQualifications

Time

100

0 100

CISCISCISCISLISLISLISLIS FISFISFISFIS HISHISHISHIS

EISEISEISEIS

Production orders

Purchase

orders

Sales orders Invoices

ProjectsMaintenance

ordersProduco

Purchase

orders

Sales orders Invoices

jectsMaintenance

orders

SAP Open Information Warehouse

Page 12: Technical Aspects in LIS with Special Focus on Production

LISLISLISLIS

PPISPPISPPISPPISSISSISSISSIS PURCHISPURCHISPURCHISPURCHIS INVCOINVCOINVCOINVCO

RISRISRISRISQMISQMISQMISQMIS PHISPHISPHISPHIS WMISWMISWMISWMIS

R1:R4

1988------------------

1994------------------

MM-PURMM-PURSDSD

QMQM PMPM

PPPPMM-IM

MM-IM

WMWM R/3

SAP Logistics Information System

Page 13: Technical Aspects in LIS with Special Focus on Production

CentralUpdateCentralUpdate

Online/Background

Online/Background

External DataExternal DataInternal Data

(R/2 - R/3)Internal Data

(R/2 - R/3)

StandardAnalysesStandardAnalyses

FlexibleAnalysesFlexible

Analyses

CopyManagement

CopyManagementLogistics Data

WarehouseLogistics Data

WarehousePlanningPlanning

Logistics Information System

Page 14: Technical Aspects in LIS with Special Focus on Production

S...S... S021S021 S6nnS6nn

AFPOAFPOAFKOAFKO

Order

AFPOAFKO

MCAFPOMCAFKO

S6nn/XYZS021/SAPQuant.Time

...

...No.Quant.

...

...

Production

Course Overview Diagram - Data Flow in LIS

SP AG S

Standardanalysis

Standardanalysis

LIS interfaceLIS interface

ApplicationApplication

Updaterules

Updaterules

Information structureInformation structure

Analysis program Analysis program

Page 15: Technical Aspects in LIS with Special Focus on Production

OperationalEfficiency

LowStocks

OptimumCapacity LoadUtilization

ShortLead Time

Faithfulness toDeadlines

1

2 3 4

5 6 7

8 9 10 11 1213 14

15 16 17 18 19 20 21

22 23 24 25 26 27 28

29 30 31

May 4

PPIS - Objectives and Key Figures

Page 16: Technical Aspects in LIS with Special Focus on Production

Shop Floor Information System

Shop Floor Information System

PlannedPlannedPlannedPlanned

Production PlanningProduction Planning

Production ControlProduction Control

ProductionProduction

TargetTargetTargetTarget

ActualActualActualActual

Planned/Actual Comparison

Page 17: Technical Aspects in LIS with Special Focus on Production

Unit Summary In the area of production, LIS provides the Shop

Floor Information System which can be used to permanently monitor the target criteria for shop floor control.

Page 18: Technical Aspects in LIS with Special Focus on Production

Information Structures

SAP AG 1999

Basic Features

Shop Floor Information Structures

Field Catalogs in LIS

User-Defined Information Structures

Contents:

Page 19: Technical Aspects in LIS with Special Focus on Production

Information Structures: Unit Objectives

Outline how LIS information structures form the database for standard analyses

Describe how the standard information structures are organized in the Shop Floor Information system

Create your own information structures with any combination of characteristics and self-defined key figures

At the conclusion of this unit, you will be able to:

Page 20: Technical Aspects in LIS with Special Focus on Production

S...S... S021S021 S6nnS6nn

AFPOAFPOAFKOAFKO

Order

AFPOAFKO

MCAFPOMCAFKO

S6nn/XYZS021/SAPQuant.Time

...

...No.Quant.

...

...

Production

Information Structures: Course Overview Diagram

SAP AG 1999

Standardanalysis

Standardanalysis

LIS interfaceLIS interface

ApplicationApplication

Updaterules

Updaterules

Information structure

Information structure

Analysis program Analysis program

Page 21: Technical Aspects in LIS with Special Focus on Production

Information Structures: Business Scenario Management wants an online analysis tool that will allow them to

see monthly production figures based on Plant and MRP controller data.

An existing system is currently being used for reporting, and the users do not want to lose this functionality. You have been asked to analyze the existing reporting structures within R/3 to see if any of them will meet the needs stated in the above business scenario.

After working with PPIS for a short time, Management has requested a report that includes only the plant and work center data. The areas to be measured include quantities and times.

Management has noticed that key figure updates are not period-specific and wants this to be corrected.

In addition, Management requests that a key figure be developed that reflects the efficiency of a work center.

Page 22: Technical Aspects in LIS with Special Focus on Production

Plant MaterialTarget

lead timeActual

lead timeScrap Costs ....

Week

March 11March 11Mo Tu We Th Fr Sa Su

157 005

398Time base

Characteristics Key Figures

S...S...

Content of Information Structures

Page 23: Technical Aspects in LIS with Special Focus on Production

• Schedule deviation input• Schedule deviation output• Lead time• Execution time• Wait time• Quantity• Scrap• Capacity utilization load

• Schedule deviation• Lead time• Execution time• Wait time• Quantity• Scrap

10 20 50 60

30

10 403020

2010

30 40

Work center view

Order View

Key Figure Views

Page 24: Technical Aspects in LIS with Special Focus on Production

Target lead time Target execution time Planned order quantity

Target lead time Target execution time Planned order quantity

Actual lead time Scrap quantity Actual waiting time

Actual lead time Scrap quantity Actual waiting time

Goods receipt quantity Schedule deviation

Goods receipt quantity Schedule deviation

EventEventEventEvent Key FiguresKey FiguresKey FiguresKey Figures

GoodsIssue

Order

Quantity issued Value issued

Confirmation

GoodsReceipt

Events and Key Figures

Page 25: Technical Aspects in LIS with Special Focus on Production

DayActual

lead timePlant Work center Material Order...

Plant DayMaterial OrderActual

lead timeScrap

Target lead time

Rel. schedule deviance

157 005398

Time base

Characteristics Key Figures

S021 Production orderS021 Production orderS021 Production orderS021 Production order

S022 OperationS022 OperationS022 OperationS022 Operation

Plant MonthMRP controller Material Lead time devianceNo.

purch. ord.

S023 MaterialS023 MaterialS023 MaterialS023 Material

Plant MonthPlanner group Work center Capacity utilization load

S024 Work centerS024 Work centerS024 Work centerS024 Work center

Wait time

Info Structures for Production/Process Orders

Page 26: Technical Aspects in LIS with Special Focus on Production

– Planned lead time:– Target lead time:– Actual lead time:

– Exact lead time:

Thur23.5.Thur23.5.

Fri24.5.Fri

24.5.Sun26.5.

Sat25.5.

Mon27.5.Mon27.5.

Tues28.5.Tues28.5.

Wed.29.5.Wed.29.5.

Thur30.5.

Fri31.5.Fri

31.5.Sat1.6.

Sun2.6.

Mon3.6.Mon3.6.

11 22 33 44 55 66 77

Weekday

Factory calendar day

PS PE

Delivery date in plan. order - start date in plan. order + 1

Scheduled finish date - scheduled finish date + 1

Actual delivery/finish date - actual start date + 1

lead times operation

Material-Based Key Figure: Lead Time

Page 27: Technical Aspects in LIS with Special Focus on Production

Operation MillingMilling

DeburringDeburring

Drilling

DrillingDrilling

Time

Wait time ofpredecessor

Movetime

Waittime

Setup/processingtear down

10

20

30

40

Confirmation predecessorStart calculation of lead time

ConfirmationFinish calculation

of lead time

Start dateOrder header

Lead time:Finish operation - input - wait time predecessor (+ 1)

Work-Center-Related Key Figure: Lead Time

Page 28: Technical Aspects in LIS with Special Focus on Production

Work center 123 Monday Tuesday Wednesday Thursday Friday

Capacity LoadAvailable cap. (h)

6 8 8 8 6

Capacity rqmntsFA 1012, Op. 30 10

4 4 4

Capacity rqmntsFA 1014, Op. 30 30

5 5 5 5

Capacity LoadUtilization

67% 113% 113% 63% 83%

Load Utilization forMon. - Fri.

(4 + 9 + 9 + 5 + 5) / (6 + 8 + 8 + 8 + 6) = 32 / 36 = 89%

Load Utilization forMon. - Wed.

(4 + 9 + 9) / (6 + 8 + 8) = 22 / 22 = 100%

Capacity Key Figures in PPIS (1)

Page 29: Technical Aspects in LIS with Special Focus on Production

Work center 123 Monday Tuesday Wednesday Thursday Friday

Capacity LoadAvailable cap. (h)

6 8 8 8 6

Capacity rqmntsFA 1012, Op. 30 10

4 4 412

Capacity rqmntsFA 1014, Op. 30 30

5 5 5 520

Capacity LoadUtilization

67%0%

113%0%

113%150%

63%0%

83%333%

Load Utilization forMon. - Fri.

(4 + 9 + 9 + 5 + 5) / (6 + 8 + 8 + 8 + 6) = 32 / 36 = 89%(12 + 20) / (6 + 8 + 8 + 8 + 6) = 32 / 36 = 89%

Load Utilization forMon. - Wed.

(4 + 9 + 9) / (6 + 8 + 8) = 22 / 22 = 100%12 / (6 + 8 + 8) = 12 / 22 = 55%

Capacity Key Figures in PPIS (2)

Page 30: Technical Aspects in LIS with Special Focus on Production

Plant DayMRP

controllerMaterial... ScrapGoods receipt quantity

157 005398

Time base

Characteristics Key Figures

S025 Run schedule headerS025 Run schedule headerS025 Run schedule headerS025 Run schedule header

Plant DayMRP

controllerMaterial... ScrapConfirmed quantity

S028 Rep.point statisticsS028 Rep.point statisticsS028 Rep.point statisticsS028 Rep.point statistics

Information Structures for Run Schedule Headers

Page 31: Technical Aspects in LIS with Special Focus on Production

Plant DayMaterial Component... Quantity issuedReq.qty

157 005398

Time base

Characteristics Key Figures

S026 Material consumptionS026 Material consumptionS026 Material consumptionS026 Material consumption

Plant DayMaterial Activity type... Variable act. costsFix.planned costs

S027 Product costsS027 Product costsS027 Product costsS027 Product costs

Information Structures for All Orders

Page 32: Technical Aspects in LIS with Special Focus on Production

Plant DayMRP controller Material... ScrapGoods receipt quantity

157 005398

Time base

Characteristics Key Figures

S225 Goods receipt for rep. man.S225 Goods receipt for rep. man.S225 Goods receipt for rep. man.S225 Goods receipt for rep. man.

Plant DayMaterial Component... Quantity issuedReq.qty

S226 Material cons. - rep. man.S226 Material cons. - rep. man.S226 Material cons. - rep. man.S226 Material cons. - rep. man.

Plant DayMaterial Activity type... Variable actual costsFixed actual costs

S227 Product costs - rep. man.S227 Product costs - rep. man.S227 Product costs - rep. man.S227 Product costs - rep. man.

Information Structures for Repetitive Manufacturing

Page 33: Technical Aspects in LIS with Special Focus on Production

Plant DaySupply area ... Wait timeContainer

157 005398

Time base

Characteristics Key Figures

S029 KanbanS029 KanbanS029 KanbanS029 Kanban

Actual qty

Information Structure for Kanban

Page 34: Technical Aspects in LIS with Special Focus on Production

Characteristics:S6nn-MATNR...

Key Figures:S5nn-WEMNG

S5nn-ZZMNG

S5nn/XYZ

Number

ø value

...

...

Finalconfirmation

Order 4711Material Pump

Quantity

2 1 9 0

9 9 9 9 8 0

01 0 7 2 1 7 0

S6nnS6nn

Update Rule S6nn/XYZ

Key figure

Goods receipt

Source/Requirement

MCAFPO-WEMNG /..

FIELD CATALOGS

Field

Material

Incoming orders

Incoming orders

...

Source Field

MCAFPO-MATNR

MCAFPO-WEMNG

MCAFPO-WEMNG

...

Technicalfeatures

Technicalfeatures

Reference Field

MCAFPO-MATNR

MCAFPO-WEMNG

MCFKENNZ-ZZMNG

...

7 0

Field Catalogs: Source and Reference Fields

Page 35: Technical Aspects in LIS with Special Focus on Production

Characteristics

Info structure

Application

Plant

MRP controller

Material

Goods receipt quantity

Lead Time

Actual scrap quantity

Key Figures

S6nn

04

Transp. table S6nnTransp. table S6nn

... WERKS... WERKS DISPODISPO MATNR ...MATNR ...DDICDDIC Generation

Pick up

FIELD CATALOGS

Field

Plant

Goods receipt quantity

Actual scrap quantity

Source Field

MCAFKO-WERKS

MCAFPO-WEMNG

MCAFPO-IAMNG

Reference Field

MCAFKO-WERKS

MCAFPO-WEMNG

MCAFPO-IAMNG

Creating Information Structures

Page 36: Technical Aspects in LIS with Special Focus on Production

Characteristics

Info structure

Application

Plant

MRP controller

Material

Goods receipt quantity

Lead Time

Actual scrap quantity

Key Figures

S6nn

04

Evaluation structure

Planning screens

DDIC Structure: S6nn

KundeMaterial

CustomerMaterial

PlantMaterial

DISPO MATNR WEMNG ...

DISPO MATNR WEMNG

Standardanalyses

S6nn

Databasetable

Generation

Automatic Environment Generation

Page 37: Technical Aspects in LIS with Special Focus on Production

Information Structures: Unit Summary Information structures in LIS are database tables

containing characteristics, time-related characteristics, and key figures with the associated units.

Within the SAP System, various information structures are provided for each application including a number of standard key figures.

In addition, you can use field catalogs and the LIS tools to create your own individual information structures.

Page 38: Technical Aspects in LIS with Special Focus on Production

SAP AG 1999

Update Rules Information Flow in LIS

Communication Structures in LIS

Defining Update Rules

Update Events

Activating Updates

Update Log

Contents:

Page 39: Technical Aspects in LIS with Special Focus on Production

Update Rules: Unit Objectives

Describe an overview of the data flow in LIS

Detail the function of communication structures

Master the techniques for finely tuning the statistical update in LIS

Test the updating of self-defined info structures in the system

At the conclusion of this unit, you will be able to:

Page 40: Technical Aspects in LIS with Special Focus on Production

S...S... S021S021 S6nnS6nn

AFPOAFPOAFKOAFKO

Order

AFPOAFKO

MCAFPOMCAFKO

S6nn/XYZS021/SAPQuant.Time

...

...No.Quant.

...

...

Production

Update Rules: Course Overview Diagram

SAP AG 1999

Standardanalysis

Standardanalysis

LIS interfaceLIS interface

ApplicationApplication

Update rulesUpdate rules

Information structureInformation structure

Analysis program Analysis program

Page 41: Technical Aspects in LIS with Special Focus on Production

Update Rules: Business scenario The date for the goods receipt quantity in your new

structure will have to be changed so that it will be updated in the correct period. A reliable planned/actual comparison is not needed in this case.

Management wants to track production activities on a monthly basis. Although online updating is needed for current data, they are concerned about system performance.

Management requires some interim testing of the new information structure.

Page 42: Technical Aspects in LIS with Special Focus on Production

S023S023Plant

1000

MRP controller

100

Material

T-F100

No. oforders

2

Goodsreceiptquantity

71 pcs

Period

10/98S021S021

Goodsreceiptquantity

30 pcs

41 pcs

Actualleadtime

3 days

4 days

Plant

1000

1000

Material

T-F100

T-F100

Order

12345

12346

Period

4/10/98

4/10/98

Posting date 4/10/98

Quantity

30 pcs 41 pcs

Material

T-F100T-F100

Order

1234512346

Item

12

MvT

101101

Data Retrieval in LIS - Detail

Page 43: Technical Aspects in LIS with Special Focus on Production

Info structureUpdate group

Key Figures............

....

....

Rules forKey figureRules for

Key figure

Rules for Key Figure QuantityRules for Key Figure QuantityRules for Key Figure QuantityRules for Key Figure Quantity

S6nnS6nn

CopyCopy

S6nn10

QuantityCumulative

Goods receipt

Final del. date

WEMNG-...

...

...

Type of updating

Event

Date field

Source Field

Requirements

Key figure formula

Update Rules - Key Figures

Page 44: Technical Aspects in LIS with Special Focus on Production

Info structureUpdate group

Key Figures............

....

....

S6nn10

QuantityCharacteristics for Key Figure QuantityCharacteristics for Key Figure QuantityCharacteristics for Key Figure QuantityCharacteristics for Key Figure Quantity

...

Copy Copy

Characteristics

Order

MRP controller

Plant

RulesChar.RulesChar.

Source Table

MCAFKO

MCAFKO

MCAFPO

MC...

Source Field

AUFNR

DISPO

WERKS

...

Update Rules - Characteristics

Page 45: Technical Aspects in LIS with Special Focus on Production

Jan. 2000

Feb. 2000

Order 4711

Order 4711

700 pcs.

Order entry

Order release

Target quantity

1/00 2/00 3/00 4/00

1/00 2/00 3/00 4/00

System dateSystem date

Entry dateEntry date

1000 pcs.

Post

Post

Adjust

Adjust

Determining Periods

Page 46: Technical Aspects in LIS with Special Focus on Production

Target/Actual quantity

Jan. 2000 Order 47111000 pcs.

Order entry

1/00 2/00 3/00 4/00

1/00 2/00 3/00 4/00

System dateSystem date

Final delivery dateFinal delivery date

Post

Post

Adjust

Adjust

Target/Actual Versus Period-Specific (1)

Page 47: Technical Aspects in LIS with Special Focus on Production

Target/Actual quantity

Jan. 2000 Order 4711

Order entry

Feb. 2000Order 4711 700 pcs.

Goods receipt

1/00 2/00 3/00 4/00

1/00 2/00 3/00 4/00

System dateSystem date

Final delivery dateFinal delivery date

1000 pcs.

Post

Post

Adjust

Adjust

Target/Actual Versus Period-Specific (2)

Page 48: Technical Aspects in LIS with Special Focus on Production

Target/Actual quantity

Jan. 2000 Order 4711

Order entry

Feb. 2000Order 4711 700 pcs.

Goods receipt

March 2000Order 4711

300 pcs.

Goods receipt

1/00 2/00 3/00 4/00

1/00 2/00 3/00 4/00

System dateSystem date

Final delivery dateFinal delivery date

1000 pcs.

Post

Post

Adjust

Adjust

Target/Actual Versus Period-Specific (3)

Page 49: Technical Aspects in LIS with Special Focus on Production

Update Parameters

Info Str. DescriptionS021 production orderS022 OperationS023 Material...

S023 Material

Period unit

Posting period

Month

Week

Day

Update

No updating

Synchronous update (1)

Asynchronous update (2)

Asynchronous update (3)

S021S021

S022S022

S023S023

Document

Document

Document

Activating Updates

Page 50: Technical Aspects in LIS with Special Focus on Production

Check list

Was the update program generated without errors?

Is updating activated for this info structure?

Has the update flag been set for the order type?

Debugging Tools

Update Log

Check list

Was the update program generated without errors?

Is updating activated for this info structure?

Has the update flag been set for the order type?

Debugging Tools

Update Log

S021S021

S022S022

S023S023

Document

Document

Document

Problems During Updating

Page 51: Technical Aspects in LIS with Special Focus on Production

Update Rules: Unit Summary Use update rules to define for each information

structure how individual key figures should be updated.Fine-tune date, event, and source field references for each key figure.The characteristics combination to be updated can also be set for each key figure.

Easily monitor update processes using logs.

You are now able to:

Page 52: Technical Aspects in LIS with Special Focus on Production

SAP AG

Application-Specific Customizing

Selection of Process and Production Orders

Release Versions

Performance Settings

Contents:

Page 53: Technical Aspects in LIS with Special Focus on Production

Application-Specific Customizing: Unit Objectives

Tailor the update function to suit your specific needs

At the conclusion of this unit, you will be able to:

Page 54: Technical Aspects in LIS with Special Focus on Production

S...S... S021S021 S6nnS6nn

AFPOAFPOAFKOAFKO

Order

AFPOAFKO

MCAFPOMCAFKO

S6nn/XYZS021/SAPQuant.Time

...

...No.Quant.

...

...

Analysis program Analysis program

ApplicationProduction

Application-Specific Customizing: Overview

SAP AG

Standardanalysis

Standardanalysis

LIS interfaceLIS interface

ApplicationApplication

Update rulesUpdate rules

Information structure

Information structure

Page 55: Technical Aspects in LIS with Special Focus on Production

Reschedule

S6nnS6nn

Order 4711

1000 pcs.

HeaderHeader

S6zzS6zzS6yyS6yy

S6xxS6xx

Release

Up

dat

e

ItemItem OperationOperation

Release versions

• Process and production orders– Depending on order type– Release versions

Activating the Statistics Update

Page 56: Technical Aspects in LIS with Special Focus on Production

• Deactivate communication structures– Costs– Goods issues– Operations

• Settings at operation level– Capacity– Execution time

• Other settingsGoods issue

Performance Customizing

Page 57: Technical Aspects in LIS with Special Focus on Production

Application-Specific Customizing: Unit Summary Application-specific customizing has a significant

influence on the data to be updated.

You are now able to

Identify which order types are statistically relevant

Use release versions to obtain better target data

Define settings to improve performance of updates and standard analyses

Page 58: Technical Aspects in LIS with Special Focus on Production

SAP AG

User-Defined Information Structures

Implementing User-Defined Characteristics and Key Figures

Enhancing Communication Structures

Characteristics as Key Figures

Contents:

Page 59: Technical Aspects in LIS with Special Focus on Production

User-Defined Information Structures Unit Objectives

Implement user-defined key figures and characteristics for your own updating purposes

Specify the steps required to enhance communication structures

Outline the problems involved with limiting the number of characteristics to 9 per information structure, and provide solutions to these

At the conclusion of this unit, you will be able to:

Page 60: Technical Aspects in LIS with Special Focus on Production

S...S... S021S021 S6nnS6nn

AFPOAFPOAFKOAFKO

Order

AFPOAFKO

MCAFPOMCAFKO

S6nn/XYZS021/SAPQuant.Time

...

...No.Quant.

...

...

Production

User-Defined Information Structures: Course Overview

Diagram

SAP AG

Standardanalysis

Standardanalysis

LIS interfaceLIS interface

ApplicationApplication

Update rulesUpdate rules

Information structure

Information structure

Analysis program Analysis program

Page 61: Technical Aspects in LIS with Special Focus on Production

User-Defined Information Structures: Business Scenario Management requires a new monthly efficiency

evaluation for the individual work centers. This evaluation should be based on the total of all activity types.

Since your company uses special work centers where the first three characters have a particular significance, Management wants another evaluation level based on these three characters.

Page 62: Technical Aspects in LIS with Special Focus on Production

Characteristics:S6nn-ARBPL...

Key Figures:S6nn-ZZEFF

...S6nn-ZZLST

23.5 hrs

S5nn/XYZ

Number

ø value

...

...

Confirmation

Order 4711Operation 0010

Setup time 30 minMachine 10 hrsPersonnel 11 hrs

S6nnS6nn

Update Rule S6nn/XYZ

Key figure

W.cntr efficiencyTotal activity

Source/formula

Formula 950Formula 951

FIELD CATALOGS

Field

Work center

W.cntr efficiency

Total activity

...

Source Field

MCAFVG-ARBPL

...

Technicalfeatures

Technicalfeatures

Reference Field

MCAFVG-ARBPL

MCFKENNZ-ZZEFF

MCFKENNZ-ZZLST

...

Field Catalogs: Source and Reference Fields

Page 63: Technical Aspects in LIS with Special Focus on Production

Info structure (DDIC table)Info structure (DDIC table)Info structure (DDIC table)Info structure (DDIC table)

Field catalogField catalogField catalogField catalog

Reference structure MCFKENNZReference structure MCFKENNZ

..DDIC Append structure ZAMCFKENNZ..DDIC Append structure ZAMCFKENNZ

Reference structure MCFKENNZReference structure MCFKENNZ

..DDIC Append structure ZAMCFKENNZ..DDIC Append structure ZAMCFKENNZ

DDIC Data elementDDIC Data elementDDIC Data elementDDIC Data element

DDIC DomainDDIC DomainDDIC DomainDDIC Domain

DDICDDIC

Field name ZZEFF

NameMENG15

NameZZEFF

NameZZ_EFFTextWork center efficienc

NameWork center efficiency

Data elementZZ_EFF

TextWork center efficiency

Source Field Reference FieldMCFKENNZ-ZZEFF

Data element ZZ_EFF

Text Work center efficiency

DomainMENG15

TypeQUAN

Length15

User-Defined Key Figures: New Reference Fields

Page 64: Technical Aspects in LIS with Special Focus on Production

Info Structure S6nnInfo Structure S6nnInfo Structure S6nnInfo Structure S6nn

Field CatalogsField CatalogsField CatalogsField Catalogs

....

....

....

DDIC Structure MCAFKODDIC Structure MCAFKODDIC Structure MCAFKODDIC Structure MCAFKO

Structure ZAMCAFKOStructure ZAMCAFKOStructure ZAMCAFKOStructure ZAMCAFKO

DDICDDIC

Name

MAUFNR

PeriodsCharacteristicsKey figuresAppend ZAMCAFKO

NameMAUFNR

NameMaufnr

Data element

MAUFNR

Type

...

Text

Higher-lev.ord.

Source FieldMCAFKO-MAUFNR

Reference TableMCAFKO-MAUFNR

Data element. ... ...MAUFNR

Enhancing Communication Structures

Page 65: Technical Aspects in LIS with Special Focus on Production

Field

Order type

MRP controller

Key Figure Catalog (New)

Create Information StructureCreate Information StructureCreate Information StructureCreate Information Structure

Char.1

...

Char. 8

Order type

04

S6nnInfo structure

Application

Standard

Production

Characteristics

Type of info str.

MRP controller

Order

Quantity

Time

Key Figures

Source Field

MCAFKO-AUART

MCAFKO-DISPO

Reference Field

MCAFKO-AUART

MCAFKO-DISPO

CharacteristicsCharacteristics (Key) (Key)VersionPeriodCharacteristic 1......Characteristic 8Production orderKey figures (data part)Key figures (data part)Order typeMRP controllerQuantityTime

S6nnS6nn

Info Structures with Characteristic-Based Key Figures

Page 66: Technical Aspects in LIS with Special Focus on Production

Standard Analysis:Standard Analysis: Selection ScreenSelection ScreenStandard Analysis:Standard Analysis: Selection ScreenSelection Screen

Characteristics

Char.1...Order

Period to Analyze

Month

Selections Using Key Figures

Order typeMRP contr.

Analysis

Plant Quantity Time

100,000

200,000

10.5

15.3

Hamburg

Berlin

Order type Quantity Time

60,000

40,000

10.0

11.0

Production ord.Process order

Plant

Drill Down by

Hamburg

OrderOrder type

Char.1MRP controller

... Char. 8PlantMonth

Characteristic-Based Key Figures in Standard Analyses

Page 67: Technical Aspects in LIS with Special Focus on Production

Carry out the preparations in the Data Dictionary that are necessary to add new fields to the systemIn doing so, you define the technical and text attributes of the key figures.

This information is then transferred to user-defined field catalogs, which form the basis for creating information structures.

You are now able to:

User-Defined Information Structures: Unit Summary

Page 68: Technical Aspects in LIS with Special Focus on Production

SAP AG

Formulas and Conditions

Cross-Application Updating

Contents:Extended Updating Control

Page 69: Technical Aspects in LIS with Special Focus on Production

Extended Updating Control: Unit Objectives

Finely tune the statistics update function in LIS

Use information structures across applications

At the conclusion of this unit, you will be able to:

Page 70: Technical Aspects in LIS with Special Focus on Production

Order

AFPOAFKO

MCAFPOMCAFKO

S6nn/XYZS021/SAPQuant.Time

...

...No.Quant.

...

...

Production

S...S... S021S021 S6nnS6nn

AFPOAFPOAFKOAFKO

Extended Updating Control: Overview

SAP AG

StandardAnalysis

StandardAnalysis

LIS interfaceLIS interface

ApplicationApplication

Update rulesUpdate rules

Info structureInfo structure

Analysis program Analysis program

Page 71: Technical Aspects in LIS with Special Focus on Production

Extended Updating Control: Business scenario The new fields created in the new information

structure are not updated automatically. Updating by appropriate business transactions must be defined in the system.

Page 72: Technical Aspects in LIS with Special Focus on Production

....

Quantity

....

Update RulesUpdate RulesUpdate RulesUpdate Rules

Rules for Key Figure QuantityRules for Key Figure QuantityRules for Key Figure QuantityRules for Key Figure Quantity

CopyCopy

Type of updating

Event

Date reference

Source field

Condition

Key figure formula

Info structureUpdate group

Key figure

S6nn10

Rules forKey figureRules for

Key figure Formula EditorFormula EditorFormula EditorFormula Editor

Cumulative

Order

Doc.date

947

........................................................

... Formula 947 FORMULA_VALUE =... MCAFKO-.......

........................................................

... Formula 947 FORMULA_VALUE =... MCAFKO-.......

Double-click

Formula-Driven Key Figure Valuation

Page 73: Technical Aspects in LIS with Special Focus on Production

....

Quantity

....

Update RulesUpdate RulesUpdate RulesUpdate Rules

Info structureUpdate group

Key figure

S6nn10

Rules forChar.

Rules forChar.

Characteristics for Key Figure QuantityCharacteristics for Key Figure QuantityCharacteristics for Key Figure QuantityCharacteristics for Key Figure Quantity

MCAFKOMaterial MATNR

MCAFPOPlant WERKS

MC... ...

MRP controller

Char.

Double-click

ContinueContinue

Srce fld. Srce tab. O L Formula

...Formula EditorFormula EditorFormula EditorFormula Editor

....................................................................

... Formula 901 FORMULA_VALUE_OBJECT =... MCAFKO-.......

....................................................................

... Formula 901 FORMULA_VALUE_OBJECT =... MCAFKO-.......

901

Formula-Driven Characteristic Valuation

Page 74: Technical Aspects in LIS with Special Focus on Production

Customizing LIS:Customizing LIS: Formulas and ConditionsFormulas and ConditionsCustomizing LIS:Customizing LIS: Formulas and ConditionsFormulas and Conditions

No sub-operations

Work center efficiency...

900...

...900...

ProductionKey figure formulas:

Requirements:

EditorEditorEditorEditor.................................................................... FORMULA_VALUE =

MCAFVG-LSTEFF1 +MCAFVG-LSTEFF2 +MCAFVG-LSTEFF3 +MCAFVG-LSTEFF4...

.................................................................... FORMULA_VALUE =

MCAFVG-LSTEFF1 +MCAFVG-LSTEFF2 +MCAFVG-LSTEFF3 +MCAFVG-LSTEFF4...

EditorEditorEditorEditor.................................................................... CLEAR RETURNCODE.

IF NOT MCAFVG-UVORNR IS INITIAL.

... RETURNCODE = 4.

... ENDIF.

.................................................................... CLEAR RETURNCODE.

IF NOT MCAFVG-UVORNR IS INITIAL.

... RETURNCODE = 4.

... ENDIF.

Special Updating Control

Page 75: Technical Aspects in LIS with Special Focus on Production

Info structure

Application

Attributes

Production/Inventory ControllingProduction/Inventory ControllingProduction/Inventory ControllingProduction/Inventory Controlling99999999

ProductionProductionProductionProduction StocksStocksStocksStocks

Update group

Updateprogram

00090009000900090010001000100010

S999S999S999S999

Chars. PPIS Key figures BCO Key figuresChars. PPIS Key figures BCO Key figuresChars. PPIS Key figures BCO Key figuresChars. PPIS Key figures BCO Key figures

RMCX 4712RMCX 4712RMCX 4712RMCX 4712RMCX 4711RMCX 4711RMCX 4711RMCX 4711

Cross-Application Updating

Page 76: Technical Aspects in LIS with Special Focus on Production

Extended Updating Control: Unit Summary Use formulas and conditions in ABAP to finely tune

the update control for each key figure and to evaluate characteristics and the key figures themselves.This enables you to describe more complex update operations in detail.

The problem of cross-application updates can also be solved in LIS. For this purposes, you can define your own applications with combined application attributes.

Page 77: Technical Aspects in LIS with Special Focus on Production

SAP AG

Setting up Statistical Data General Problem

Setting up Statistical Data in Production

Contents:

Page 78: Technical Aspects in LIS with Special Focus on Production

Setting up Statistical Data: Unit Objectives

Identify situations where statistics have to be set up and use the techniques designed to do so

At the conclusion of this unit, you will be able to:

Page 79: Technical Aspects in LIS with Special Focus on Production

S... S021 S6nn

AFPOAFKO

Order

AFPOAFKO

MCAFPOMCAFKO

S6nn/XYZS021/SAPQuant.Time

...

...No.Quant.

...

...

Setup of Statistical Data: Course Overview Diagram

Production

SAP AG

StandardAnalysis

StandardAnalysis

LIS interfaceLIS interface

ApplicationApplication

Update rulesUpdate rules

Info structureInfo structure

Analysis program Analysis program

Page 80: Technical Aspects in LIS with Special Focus on Production

The project team has finished creating and testing the new information structures. Management wants to start using the analyses as soon as possible. Before they can do so, the data from the last 6 months has to be set up in the new info structures. Because the update rules have changed, the data cannot simply be copied from the standard information structures.

Setting up Statistical Data: Business scenario

Page 81: Technical Aspects in LIS with Special Focus on Production

S022S022

Doc.

S021S021

Version...

000..

000

&(.&(.&(.

Version...

000..

000

&(.&(.&(.

Info structures

Production orders

TMCW3TMCW3TMCW3TMCW3Control table

Run name ...Last document ...

Control table

Run name ...Last document ...

CopyManagement

CopyManagement

Actualdata

SetupData

Actualdata

SetupData

Setup programsSetup programs

Overview: Setting up Statistical Data

Page 82: Technical Aspects in LIS with Special Focus on Production

Selection ScreenSelection ScreenSelection ScreenSelection Screen

Tgt structuresInfo structureVersion

Orders

PlantMRP controller Production order

ControlRun name

New run?

Termination time

Check for S021? Extended setup?

PPIS Setup: Control Parameters

Page 83: Technical Aspects in LIS with Special Focus on Production

Selection ScreenSelection ScreenSelection ScreenSelection Screen

Tgt structuresInfo StructureVersion

Documents

PlantRun schedule header Posting date

ControlRun name

New run?

Termination date

Termination time

Setup scrap?

PPIS Setup: Repetitive Manufacturing

Page 84: Technical Aspects in LIS with Special Focus on Production

Plan/act. comparison in standard analysis: Order value

Vendor Planned(&(1) Actual(000) Difference %

..

Vendor 1Vendor 2

46.000 USD 80.500 USD

40.000 USD 70,000 USD

- 6,000 USD -10,500 USD

15 %15 %

--

Checking Analysis Results

Page 85: Technical Aspects in LIS with Special Focus on Production

Selection ScreenSelection ScreenSelection ScreenSelection Screen

Data sourceSource info structureSource version

RestrictionsPlantMaterialOrderDay

Data targetTarget info structureTarget version

TransformationNo copy method X

Copying Versions

Page 86: Technical Aspects in LIS with Special Focus on Production

Doc.

S021S021

...Version...

000000

&(1&(1&(1

&(2&(2&(2

...Version...

000000

&(1&(1&(1

&(2&(2&(2

Info structureProduction orders

Setup programsSetup programs

Actual dataPlant 1000 and 2000

Setup IPlant 1000

Setup IIPlant 2000

Actual dataPlant 1000 and 2000

Setup IPlant 1000

Setup IIPlant 2000

CopyManagement

CopyManagement

Copying Statistical Data in Parallel

Page 87: Technical Aspects in LIS with Special Focus on Production

Selection ScreenSelection ScreenSelection ScreenSelection Screen

Data sourceSource info structureSource version

RestrictionsPlantMaterialOrderDay

Processing Delete selected dataX

&(1

Deleting Versions

Page 88: Technical Aspects in LIS with Special Focus on Production

Setting up Statistical Data: Unit Summary

The statistical data is first set up from the application

The data is then checked

Finally, the setup versions are copied and deleted

Statistical data is set up in three steps:

Page 89: Technical Aspects in LIS with Special Focus on Production

SAP AG

Special Topics

Input/Output Diagram

Gantt Chart

Contents:

Page 90: Technical Aspects in LIS with Special Focus on Production

Special Topics: Unit Objectives

Identify the additional graphical evaluation functions in the Shop Floor Information System

At the conclusion of this unit, you will be able to:

Page 91: Technical Aspects in LIS with Special Focus on Production

S...S... S021S021 S6nnS6nn

AFPOAFPOAFKOAFKO

Order

AFPOAFKO

MCAFPOMCAFKO

S6nn/XYZS021/SAPQuant.Time

...

...No.Quant.

...

...

Production

Special Topics: Course Overview Diagram

SAP AG

StandardAnalysis

StandardAnalysis

LIS interfaceLIS interface

ApplicationApplication

Update rulesUpdate rules

Info structureInfo structure

Analysis program Analysis program

Page 92: Technical Aspects in LIS with Special Focus on Production

Hrs

Date

Incomingorders

Outgoingorders

Work center 5610

Lead time

Pool of orders/operations

Input/output diagram Actual and

target curves

Key figure comparison

Leadtimes

Capacityloadutilization

Stocksituation

Page 93: Technical Aspects in LIS with Special Focus on Production

Plant Hamburg Date

000100015326

000100015328

000100015365

000100015468

Deadlines

Tgt

Actl

Gantt Chart Target and actual

lead times

Target and actual deadlines

Earliest and latest dates

Schedule deviation

Page 94: Technical Aspects in LIS with Special Focus on Production

Special Topics: Unit Summary The input/output diagram and the Gantt charge

clearly show the effectiveness of work center control.

Page 95: Technical Aspects in LIS with Special Focus on Production

SAP AG

Unit Summary Course recap

Recap of the course objectives

Overview of the data flow in LIS

Topics discussed in follow-up course

Recommended follow-up activities

Page 96: Technical Aspects in LIS with Special Focus on Production

Course ObjectivesYou are now able to

Explain the extent to which LIS Information Structures form the database for standard analyses.

Detail the function of communication structures

Use the options for finely tuning statistics updates in LIS

Name the PP processes that are statistically relevant in LIS

Create your own field catalogs for characteristics and key figures

Create your own information structures with user-defined characteristics and key figures

Use formulas and conditions for finely tuning the statistics update in LIS

Page 97: Technical Aspects in LIS with Special Focus on Production

You now have detailed LIS knowledge in the Shop Floor controlling area. On the basis on this knowledge, you should be able to use LIS in other areas (for example, QM Info System, PM Info System).

You can gain further in-depth knowledge by attending the course LO940, for which this course is a prerequisite.

Course Goals

Page 98: Technical Aspects in LIS with Special Focus on Production

S...S... S021S021 S6nnS6nn

AFPOAFPOAFKOAFKO

Order

AFPOAFKO

MCAFPOMCAFKO

S6nn/XYZS021/SAPQuant.Time

...

...No.Quant.

...

...

Production

Course Overview Diagram - Data Flow in LIS

SP AG S

Standardanalysis

Standardanalysis

LIS interfaceLIS interface

ApplicationApplication

Updaterules

Updaterules

Information structureInformation structure

Analysis program Analysis program

Page 99: Technical Aspects in LIS with Special Focus on Production

LO275 Overview: Business scenario You are a member of your company's implementation

team for reporting. You have to define an evaluation structure that enables your company to analyze production data for each plant.

These analyses must include the following information: plant, MRP controller, material, order, and work center. The sub-processes relevant to the analyses are production orders, confirmations, goods receipts, and goods issues. These statistics are to include quantities and times.

Standard structures may suffice for most of your requirements, but there may also be special situations where you will have to create your own structures to provide the necessary data.

Page 100: Technical Aspects in LIS with Special Focus on Production

LO275 Summary and Conclusion In your company, you are responsible for providing statistical

information in the respective Logistics application areas. You have to meet a large variety of information requirements.

You first need to decide whether the LIS standard covers the requirement in question. For requirements not covered by the standard system, LIS provides various tools to meet individual information needs.

LIS often provides more than one method of approaching individual solutions. The solution you opt for in each case will be dictated by performance criteria during the update and analysis procedures, and by the required "up-to-dateness" of the information.These solutions range from online updating and batch processing on one hand, and between the static and dynamic provision of information on the other.

Page 101: Technical Aspects in LIS with Special Focus on Production

Recommended Follow-up Courses I LO940 Advanced LIS Configuration

Copy Management

LIS Inbound Interface

Flexible Analyses: Complex

Data & List Enhancements

Functional Enhancements in LIS

Page 102: Technical Aspects in LIS with Special Focus on Production

Recommended Follow-up Courses II LO935 Flexible Planning

Planning in the Logistics Information System

Sales and Operations Planning

Flexible Planning Methods

Planning Hierarchies and Proportional Factors

Planning Types and Macros

Using the Planning Table

Interface Between CO-PA and LIS

Page 103: Technical Aspects in LIS with Special Focus on Production

Recommended Follow-up Activities Repeat the exercises

using IDES data or your own data

Read the online documentation

Read the IMG documentation

Read the release notes

Page 104: Technical Aspects in LIS with Special Focus on Production

Outlook: Business Information Warehouse

SAP AG

Course Recap

Recap of the Course Objectives

Overview of the LIS Data Flow

Topics Discussed in the Follow-up Course

Recommended Follow-up Activities

Contents:

Page 105: Technical Aspects in LIS with Special Focus on Production

SAP Business Information Warehouse Objectives Standardized structuring and representation of all

company information

Easy access to company information via a single point of entry

Highly-developed reporting functionality for self-service analysis at all levels

Fast and cost-effective implementation

High-performance environment

Data provided from one environment

Load reduction for the OLTP systems and IT organization

Page 106: Technical Aspects in LIS with Special Focus on Production

Business Information Warehouse Architecture

BusinessInformationWarehouseServer

Administrator Workbench

BAPIBAPI

OLAP ProcessorOLAP Processor

Staging EngineStaging Engine

InfoCubesInfoCubesMeta DataRepositoryMeta DataRepository

ODSODS

BusinessExplorer

client

BAPIBAPI

Page 107: Technical Aspects in LIS with Special Focus on Production

Update Information Structures in BW InfoCubes

Transfer rules

Update Rules

BW System

Communication structureCommunication structure

Transfer structureTransfer structure Transfer structureTransfer structure

Transfer structureTransfer structure

OLTP 1 LIS Info Structure OLTP 1 LIS Info Structure

Extraction source structureExtraction source structure

S5nn S5nnBIW1 S5nnBIW2

Transfer structureTransfer structure

OLTP 2 LIS Info Structure OLTP 2 LIS Info Structure

Extraction source structureExtraction source structure

S5nn S5nnBIW1 S5nnBIW2

R/3 OLTP

Page 108: Technical Aspects in LIS with Special Focus on Production

BW Link for LIS Info StructuresBW Link for LIS Info StructuresBW Link for LIS Info Structures

Information structure

Display settings

Set up LIS environment

Generate InfoSource

Delete environment/info source

Delta update in LIS

Activate/deactivate

Generate update

S5nn