technical committee on mechanical systems (hea … committee on mechanical systems ... mazzetti...

20
Technical Committee on Mechanical Systems (HEA-MEC) M E M O R A N D U M DATE: July 20, 2015 TO: Principal and Alternate Members of the Technical Committee on Mechanical Systems (HEA-MEC) FROM: Jon Hart, Staff Liaison SUBJECT: AGENDA PACKAGENFPA 99 First Draft Meeting (A2017) ________________________________________________________________________ Enclosed is the agenda for the NFPA 99 First Draft meeting of the Technical Committee on Mechanical Systems, which will be held on Tuesday, August 4, 2015 at the Sheraton Inner Harbor Hotel, in Baltimore, MD. Please review the attached Public Inputs in advance, and if you have alternate suggestions, please come prepared with proposed language and respective substantiation. If you have any questions prior to the meeting, please do not hesitate to contact me at: Office: (617) 984-7470 Email: [email protected] For administrative questions, please contact Elena Carroll at (617) 984-7952. I look forward to working with everyone. 1

Upload: vuongtu

Post on 08-May-2018

229 views

Category:

Documents


4 download

TRANSCRIPT

Technical Committee on Mechanical Systems

(HEA-MEC)

M E M O R A N D U M

DATE: July 20, 2015

TO: Principal and Alternate Members of the Technical Committee on Mechanical

Systems (HEA-MEC)

FROM: Jon Hart, Staff Liaison

SUBJECT: AGENDA PACKAGE– NFPA 99 First Draft Meeting (A2017)

________________________________________________________________________

Enclosed is the agenda for the NFPA 99 First Draft meeting of the Technical Committee on

Mechanical Systems, which will be held on Tuesday, August 4, 2015 at the Sheraton Inner

Harbor Hotel, in Baltimore, MD. Please review the attached Public Inputs in advance, and if you

have alternate suggestions, please come prepared with proposed language and respective

substantiation.

If you have any questions prior to the meeting, please do not hesitate to contact me at:

Office: (617) 984-7470

Email: [email protected]

For administrative questions, please contact Elena Carroll at (617) 984-7952.

I look forward to working with everyone.

1

Table of Contents 

 Part 1 – Meeting Agenda 

Part 2 – Committee Roster 

Part 3 – Committee Distribution 

Part 4 – Previous Meeting Minutes 

Part 5 – Sample Meeting Motions 

Part 6 – Public Inputs 

2

Technical Committee on Mechanical Systems

(HEA-MEC) NFPA 99 First Draft Meeting (Annual 2017)

Tuesday, August 4, 2015

Sheraton Inner Harbor Hotel 300 S. Charles Street, Baltimore, MD 21201

AGENDA

Tuesday, August 4, 2015

1. Call to Order – 10:00 am

2. Introductions and Attendance

3. Chairman Comments

4. Approval of Previous Meeting Minutes

5. Staff Liaison Presentation on NFPA Revision Process and A2017 Cycle

6. Preparation of the First Draft

Review Public Inputs

Create First Revisions

7. New Business

8. Discuss dates for the TC Second Draft Meeting (Between 5/16 and 7/25, 2016)

9. Adjournment – No later than 4:00 pm

Please submit requests for additional agenda items to the chair and staff liaison at least

seven days prior to the meeting.

Please notify the chair and staff liaison as soon as possible if you plan to introduce any new

material not submitted through Public Input at the meeting.

3

Technical Committee on Mechanical Systems

(HEA-MEC) NFPA 99 First Draft Meeting (Annual 2017)

Tuesday, August 4, 2015

Sheraton Inner Harbor Hotel 300 S. Charles Street, Baltimore, MD 21201

Key Dates for the Annual 2017 Revision Cycle

Public Input Closing Date July 6, 2015

Final Date for First Draft Meeting September 14,

2015

Ballots Mailed to TC before October 26, 2015

Ballots Returned By November 16, 2015

Correlating Committee First Draft Meeting December 15, 2015

Final First Draft Posted March 7, 2016

Public Comment Closing Date May 16, 2016

Final Date for Second Draft Meeting July 25, 2016

Correlating Committee Second Draft Meeting by November 21, 2016

Final Second Draft Posted January 16, 2017

Closing Date for Notice of Intent to Make a Motion

(NITMAM) February 20, 2017

Issuance of Consent Document (No NITMAMs) May 12, 2017

NFPA Annual Meeting (Boston) June 2017

Issuance of Document with NITMAM August 10, 2017

Technical Committee deadlines are in bold.

4

 

 

 

 

Technical Committee Roster 

5

Address List No PhoneMechanical Systems HEA-MEC

Health Care Facilities

Jonathan Hart07/13/2015

HEA-MEC

Michael P. Sheerin

ChairTLC Engineering for Architecture255 South Orange Avenue, Suite 1600Orlando, FL 32801

SE 10/4/2007HEA-MEC

Chad E. Beebe

PrincipalASHE - AHAPO Box 5756Lacey, WA 98509-5756

U 10/29/2012

HEA-MEC

Christopher Bernecker

PrincipalH. T. Lyons, Inc.7165 Ambassador DriveAllentown, PA 18106

IM 1/25/2007HEA-MEC

Gordon D. Burrill

PrincipalTeegor Consulting Inc.316 Jewett StreetFredericton, NB E3A 5T2 CanadaCanadian Healthcare Engineering Society

U 1/25/2007

HEA-MEC

Luke Cummings

PrincipalMayo Clinic200 First Street SWRochester, MN 55901

U 04/08/2015HEA-MEC

Raj Daswani

PrincipalArup560 Mission Street, 7th FloorSan Francisco, CA 94105

SE 08/09/2012

HEA-MEC

Keith Ferrari

PrincipalPraxair, Inc.2807 Gresham Lake RoadRaleigh, NC 27615

M 1/25/2007HEA-MEC

Ronald E. Galloway

PrincipalMoses Cone Health System1200 North Elm StreetGreensboro, NC 27401-1004

U 8/2/2010

HEA-MEC

Phil Gioia

PrincipalMazzetti & Associates Inc.1600 Stout Street, Suite 450Denver, CO 80202

SE 1/25/2007HEA-MEC

Jonathan Hartsell

PrincipalRodgers5701 North Sharon Amity RoadCharlotte, NC 28215

SE 07/29/2013

HEA-MEC

Roger W. Lautz

PrincipalAffiliated Engineers, Inc.5802 Research Park BoulevardMadison, WI 53719

SE 1/25/2007HEA-MEC

Charles Seyffer

PrincipalCamfil Farr18 Camel Hill RoadTroy, NY 12180

M 10/4/2007

HEA-MEC

Alex Shair

PrincipalSiemens Building Technologies, Inc.1000 Deerfield ParkwayBuffalo Grove, IL 60089-4547

M 04/08/2015HEA-MEC

Allan D. Volz

PrincipalOSF HealthCare System800 NE Glen Oak AvenuePeoria, IL 61603-3200

U 8/2/2010

HEA-MEC

Jonathan Hart

Staff LiaisonNational Fire Protection Association1 Batterymarch ParkQuincy, MA 02169-7471

3/1/2012

16

 

 

 

 

Technical Committee 

Distribution 

7

Monday 7 13, Monday

Mechanical SystemsHEA-MECName Representation Class Office

Distribution by %

Company

Christopher Bernecker H. T. Lyons, Inc. IM Principal

1Voting Number Percent 7%

Keith Ferrari Praxair, Inc. M Principal

Charles Seyffer Camfil Farr M Principal

Alex Shair Siemens Building Technologies, Inc. M Principal

3Voting Number Percent 21%

Michael P. Sheerin TLC Engineering for Architecture SE Chair

Raj Daswani Arup SE Principal

Phil Gioia Mazzetti & Associates Inc. SE Principal

Jonathan Hartsell Rodgers SE Principal

Roger W. Lautz Affiliated Engineers, Inc. SE Principal

5Voting Number Percent 36%

Chad E. Beebe ASHE - AHA ASHE U Principal

Gordon D. Burrill Teegor Consulting Inc. CHES U Principal

Luke Cummings Mayo Clinic U Principal

Ronald E. Galloway Moses Cone Health System U Principal

Allan D. Volz OSF HealthCare System U Principal

5Voting Number Percent 36%

14Total Voting Number

8

 

 

 

 

Previous Meeting Minutes 

9

MINUTES NFPA Technical Committee on Mechanical Systems (HEA-MEC)

June 20, 2013

Second Draft Meeting

Adobe Connect / Conference Call

1. Call to Order. The meeting was called to order at 10:00 am Eastern on

Thursday June 20, 2013 by Committee Chair, Roger Lautz.

2. Attendance and Introductions: Attendance was taken and those present at

the meeting. Those who were present at the meeting are listed below:

Name Representing Lautz, Roger-Chair Affiliated Engineers, Inc.

Beebe, Chad – Principal ASHE

Daswani, Raj – Principal Arup Ferrari, Keith – Principal Praxair, Inc.

Olano, Gustavo – Principal Phoenix Controls Corporation Seyffer, Charles – Principal Camfil Farr

Sheerin, Michael – Principal TLC Engineering for Architecture

Volz, Allan – Principal OSF HealthCare System Hart, Jonathan-Staff Liaison NFPA

3. Chairman Comments: Roger Lautz reviewed where the current Chapters 8

and 9 stand today and provided some background on how the committee has

arrived at their current position.

4. Minutes Approval: The minutes of the HEA-MEC August 16, 2012 First

Draft Meeting were approved as distributed in the Agenda Package.

10

5. Staff Liaison Presentation: Jon Hart introduced himself as the Staff

Liaison for NFPA 99 and proceeded to give the staff presentation for the

meeting which included general meeting procedures and a review of the

Annual 2014 revision cycle.

6. Development of Second Draft: The committee reviewed all public

comments (PC) and resolved them by either providing a committee

statement or by creating a second revision (SR) based on the PC. Other

Second Revisions were also created. See the Second Draft and Second Draft

report for the official committee actions.

7. Old Business: There was no old business.

8. New Business: There was no new business.

9. Meeting Adjourned: The meeting was adjourned at 10:55 am on June 20,

2013.

11

Sample Motions for

First Draft Meeting

12

NEW PROCESS ACTIONS AND MOTIONS  

   Possible Action #1: Resolve PI (no change to section) 

   Action Required  Sample motion 

   Make a statement to resolve a PI I move to resolve PI # with the following 

statement . . . 

   Possible action #2: Create First Revision (make a change to a section) 

   Action Required  Sample motion 

Step 1 Create a First revision based one or more 

PIs I move to create a First Revision based on PI # 

Step 2 If the revision is related to multiple PIs, generate a statement to respond to all of 

them together   

        

Step 1  Create a First Revision  I move to create a First Revision as follows . . .  

Step 2  Generate a statement (substantiation)    

Possible Action 3: Create Committee input 

Step 1 Create proposed revision for solicitation 

of public comments I move to create  CI with a proposed revision to X 

as follows . . . 

Step 2 Generate a statement to explain the 

intent and why the Committee is seeking public comment 

  

 

13

 

 

 

 

Public Input 

14

Public Input No. 300-NFPA 99-2015 [ New Section after 3.3.21 ]

3.3.21 Capture Device (Plume). The hose, tube, funnel or other accessory that provides the inlet to the plume evacuation system at the site of plumegeneration.

Statement of Problem and Substantiation for Public Input

The term (used in 9.3.8) is not defined.

Submitter Information Verification

Submitter Full Name: MARK ALLENOrganization: BEACON MEDAESStreet Address:City:State:Zip:Submittal Date: Wed Jul 01 12:53:25 EDT 2015

National Fire Protection Association Report/submittals.nfpa.org/TerraViewWeb/FormLaunch?id=/TerraView/C...

1 of 1 7/8/2015 11:37 AM

15

ecarroll
Typewritten Text
ecarroll
Typewritten Text
ecarroll
Typewritten Text
ecarroll
Typewritten Text
ecarroll
Typewritten Text
ecarroll
Typewritten Text
ecarroll
Typewritten Text

Public Input No. 301-NFPA 99-2015 [ New Section after 3.3.135 ]

3.3.134 Plume. The noxious airborne contaminants generated as by-products of certain surgical, diagnostic, and therapeutic techniques. Plume iscommonly associated with procedures that include the cutting, ablation, cauterization, or mechanical manipulation of target tissue by energy-baseddevices such as lasers, electrosurgical generators, broadband light sources, ultrasonic instruments, etc. or mechanical surgical tools such as bonesaws, high speed drills and reamers.

Statement of Problem and Substantiation for Public Input

Term is used (9.3.4) but not defined. This definition follows the ISO version.

Submitter Information Verification

Submitter Full Name: MARK ALLENOrganization: BEACON MEDAESStreet Address:City:State:Zip:Submittal Date: Wed Jul 01 12:56:37 EDT 2015

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/FormLaunch?id=/TerraView/C...

1 of 1 7/8/2015 11:38 AM

16

ecarroll
Typewritten Text
ecarroll
Typewritten Text
ecarroll
Typewritten Text
ecarroll
Typewritten Text
ecarroll
Typewritten Text
ecarroll
Typewritten Text
ecarroll
Typewritten Text
ecarroll
Typewritten Text
ecarroll
Typewritten Text

Public Input No. 443-NFPA 99-2015 [ Section No. 9.3.6.5 ]

9.3.6.5 Indoor storage or manifold areas and storage or manifold buildings for medical gases and cryogenic fluids shall be provided with naturalventilation or mechanical exhaust ventilation in accordance with 9.3.6.5.1 through 9.3.6.8.9.3.6.5.1 *

For the purposes of this section the volume of fluid (gas and liquid) to be used in determining the ventilation requirements shall be the volume ofthe stored fluid when expanded to standard temperature and pressure (STP) of either the largest single vessel in the enclosed space or of theentire volume of the connected vessels that are on a common manifold in the enclosed space, whichever is larger.9.3.6.5.2 Natural Ventilation.9.3.6.5.2.1

Natural ventilation shall consist of two nonclosable louvered openings, each having an aggregate free opening area of at least 155 cm2/35 L (24

in.2/1000 ft3) of the fluid designed to be stored in the space and in no case less than 465 cm2 (72 in.2).9.3.6.5.2.2

One opening shall be located within 30 cm (1 ft) of the floor, and one shall be located within 30 cm (1 ft) of the ceiling.9.3.6.5.2.3

The openings shall be located to ensure cross ventilation.9.3.6.5.2.4

Natural ventilation openings shall be directly to the outside atmosphere without ductwork.9.3.6.5.2.5

Mechanical ventilation shall be provided if natural ventilation requirements cannot be met.9.3.6.5.3 Mechanical Ventilation.9.3.6.5.3.1

Mechanical exhaust to maintain a negative pressure in the space shall be provided continuously, unless an alternative design is approved by theauthority having jurisdiction.9.3.6.5.3.2

Mechanical exhaust shall be at a rate of 1 L/sec of airflow for each 300 L (1 cfm per 5 ft3 of fluid) designed to be stored in the space and not lessthan 24 L/sec (50 cfm) nor more than 235 L/sec (500 cfm).9.3.6.5.3.3

Mechanical exhaust inlets shall be unobstructed and shall draw air from within 300 mm (1 ft) of the floor and adjacent to the cylinder orcontainers.9.3.6.5.3.4

Mechanical exhaust air fans shall be supplied with electrical power from the essential electrical system.

Exception:

Buildings without essential electrical systems.

9.3.6.5.3.5 Dedicated exhaust systems shall not be required, provided that the system does not connect to spaces that contain combustible or flammablematerials.9.3.6.5.3.6

The exhaust duct material shall be noncombustible.9.3.6.5.3.7

A means of make-up air shall be provided according to one of the following:

(1) Air shall be permitted via noncombustible ductwork to be transferred from adjacent spaces, from outside the building, or from spaces thatdo not contain combustible or flammable materials.

(2) Air shall be permitted to be transferred from a corridor under the door up to the greater of 24 L/sec (50 cfm) or 15 percent of the roomexhaust in accordance with NFPA 90A, Standard for the Installation of Air-Conditioning and Ventilating Systems.

(3) Supply air shall be permitted to be provided from any building ventilation system that does not contain flammable or combustible vapors.

Statement of Problem and Substantiation for Public Input

Some buildings (outpatient facilities) fall under these requirements, however do not have essential electrical systems. It is reasonable to provide them an exception so they do not have to provide emergency power for an exhaust fan.

When mechanically ventilated the rooms operate at a negative pressure. Air transfer should be permitted from adjacent spaces without concern as to the amount transferred.

Submitter Information Verification

Submitter Full Name: MATTHEW T SCIARRETTIOrganization: HEAPY ENGINEERINGStreet Address:City:State:

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?xsl-RenderAs...

1 of 3 7/8/2015 10:37 AM

17

Public Input No. 303-NFPA 99-2015 [ Section No. 9.3.8 ]

9.3.8 Medical Plume Evacuation. Plumes from medical procedures,

including the use of lasers, shall be captured by one of the following methods : in 9.3.8.1 through 9.3.8.3 below.

9.3.8.1 Direct connection to an unfiltered dedicated piped or ducted exhaust system that discharges outside the building with the followingcharacteristics:

(1) The system shall be permitted to be filtered or unfiltered and use absorbers to remove noxious materials from the air stream.

(2) The system shall have dedicated producer(s) and shall not connect to HVAC, medical vacuum, WAGD or housekeeping vacuumproducers.

(3) Inlets shall be permitted to include automatic shutoff devices or to be open flow.

(4) Flow control for the inlets shall be as appropriate for the plume capture device in use.

(5) Inlets shall be permitted to be of any design suitable for the plume capture device in use, provided the design does not permitinterconnection to any medical vacuum, WAGD or housekeeping vacuum systems also installed in the room.

9.3.8.2 HEPA filtering and direct connection to a return or exhaust duct .

9.3.8.3 Chemical and thermal sterilization and return to the space .

9.3.8.4 The plume evacuation system shall have either:

(a) an indicator to demonstrate the system is operating within normal parameters or;

(b) an alarm to indicate the system is not usable.

Statement of Problem and Substantiation for Public Input

The requirements in chapter 9 are an ideal starting point for defining these systems. Two standards now in place internationally take these requirements further (ISO 16571 and CSA Z305.13) defining essential safety elements that NFPA can usefully incorporate as follows:1. some systems include not only filtration but absorbers to reduce objectionable odors. 2. Because plume is known to contain pathogens, viruses and other dangerous material, it is essential that the system not be mixed with other vacuum applications. The temptation will certainly arise as some are similar in pressure or flow, or may appear to offer "economies of scale" when combined. 3 and 4. Inlets for plume evacuation can resemble terminal outlets for medical vacuum, open tubes or inlets for housekeeping vacuum systems. However, their operation is not necessarily like any of these. Thus it makes sense to clarify that the terminal should be designed to mate with the intended capture device and to include such features as are appropriate. 5. The design freedom implied in the preceding clauses cannot be extended to inlet designs which can be inadvertently misconnected.

Submitter Information Verification

Submitter Full Name: MARK ALLENOrganization: BEACON MEDAESStreet Address:City:State:Zip:Submittal Date: Wed Jul 01 13:00:22 EDT 2015

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?xsl-RenderAs...

3 of 3 7/8/2015 10:37 AM

19

jhart
Text Box
See next page for corrected legislative text of this PI.

Public Input Number 303 (9.3.8)

9.3.8 Medical Plume Evacuation.

Plumes from medical procedures, including the use of lasers, shall be captured by one of the following

methods in 9.3.8.1 through 9.3.8.3 below:

9.3.8.1

(1) Direct connection to an unfiltered dedicated piped or ducted exhaust system that discharges outside

the building with the following characteristics:

(1) The system shall be permitted to be filtered or unfiltered and use absorbers to remove noxious

materials from the air stream.

(2) The system shall have dedicated producer(s) and shall not connect to HVAC, medical vacuum, WAGD

or housekeeping vacuum producers.

(3) Inlets shall be permitted to include automatic shutoff devices or to be open flow.

(4) Flow control for the inlets shall be as appropriate for the plume capture device in use.

(5) Inlets shall be permitted to be of any design suitable for the plume capture device in use, provided the

design does not permit interconnection to any medical vacuum, WAGD or housekeeping vacuum systems

also installed in the room.

9.3.8.2

(2) HEPA filtering and direct connection to a return or exhaust duct

9.3.8.3

(3) Chemical and thermal sterilization and return to the space

9.3.8.4

The plume evacuation system shall have either:

(a) An indicator to demonstrate the system is operating within normal parameters or;

(b) an alarm to indicate the system is not usable.

Submitter Substantiation:

The requirements in chapter 9 are an ideal starting point for defining these systems. Two standards now in place internationally take these requirements further (ISO 16571 and CSA Z305.13) defining essential safety elements that NFPA can usefully incorporate as follows:

1. some systems include not only filtration but absorbers to reduce objectionable odors.

2. Because plume is known to contain pathogens, viruses and other dangerous material, it is essential that the system not be mixed with other vacuum applications. The temptation will certainly arise as some are similar in pressure or flow, or may appear to offer "economies of scale" when combined.

3 and 4. Inlets for plume evacuation can resemble terminal outlets for medical vacuum, open tubes or inlets for housekeeping vacuum systems. However, their operation is not necessarily like any of these. Thus it makes sense to clarify that the terminal should be designed to mate with the intended capture device and to include such features as are appropriate.

5. The design freedom implied in the preceding clauses cannot be extended to inlet designs which can be inadvertently misconnected.