technical evolution of optical networks towards new ... · technical evolution of optical networks...
TRANSCRIPT
Technical Evolution of Optical Networks Towards New Revenue-Generating Applications
Wireless & Optical Communication Conference in Taipei on March 9th 2004
X_ppt—2 All rights reserved © 2003, Alcatel
Asian Operators – Healthy and Growing in 2003
Increased revenue and profitability …
9.6%7.7%2.8%254 BE0.5%Total
16.0%
11.5%
6.0%
2003E2002Growth 03/02 E
2002Growth 02/01
17.3%2.2%30 BE7.6%Fixed & Mobile
8.3%4.4%111 BE4.9%Mobile
4.5%1.4%113 BE-5.1%Fixed
Profit MarginRevenue
Estimated CY2003Source: MSDW, Company data
X_ppt—3 All rights reserved © 2003, Alcatel
Operators expect Revenues up, Costs down, Profits up
7.8%4.8%Data Rev/Total Rev
34.4%66.3%Capex/sales
20.3%24.0%Capex/sales
418385Lines/employee
$26.1$26.2ARPU
Mobile
Fixed Line
2,2732,111Subs/employee
$20.8$21.3ARPU
48.8%45.5%Overall Penetration
29.8%29.7%Overall Penetration
2003E2002Indicator
Stable Top line
Productivity up
Subscriber growth offsets ARPU decline
Data ARPU important
Cost Reductions
Source: Goldman Sachs. Figures are arithmetic averages, not weighted averages.
X_ppt—4 All rights reserved © 2003, Alcatel
Strategic aspects in APAC: revenues and users growth
Number of Suscribers
0
200000
400000
600000
800000
[000] [000] [000]
Na rrowba nd S ubsc ribe rLine s
Broa dba nd S ubsc ribe rLine s
Tot a l P riva t e Circ uitConne c t ions
Type of use rs
1998A
1999A
2000A
2001A
2002E
2003E
2004E
2005E
2006E
2007E
Source: Pyramid Research
#Narrow band CAGR: 15%#Broadband CAGR: 167%#Leased Lines CAGR: 12%
Revenues
0
50000
100000
150000
200000
[US $m] [US $m] [US $m]
Voic e Broa dba nd P riva t e Circ uit
Re ve nue s pe r t ype
$Total CAGR: 3%$Broadband CAGR: 115%$Leased Lines CAGR: 9.7%
All rights reserved © 2002, Alcatel
X_ppt—5 All rights reserved © 2003, Alcatel
Do the ABC: Opex improvements becoming as important as Capex improvements
> Network costs• Operations• Maintenance• Provisioning
> Access charges• Fees paid to use another
network> SG&A
• Sales & Marketing• Finance• Corporate Overhead
> Depreciation and amortization• Allocation of tangible and
intangible fixed assets
2002 Opex: $161 billion forNA ILECs and IXCs
Depreciation and amort.
23%
Network costs28%
Access charges
17%
SG&A32%
Source: RHK Inc. 2003
X_ppt—6 All rights reserved © 2003, Alcatel
Revenues Opportunities: Growing demand for metro services
+35%407Content distribution/ Caching (wholesale)
8.
+41%673Web-hosting (ISP)6.+40%875Web-hosting (carrier)5.+20%1,126Native ATM4.+28%1,721VoIP (wholesale)3.+27%3,239IP-VPN2.+59%5,657Ethernet access1.
+63%246Unified Messaging10.+72%267IP multi-cast (wholesale)9.
+115%450IP multi-cast (retail)7.
5-year CAGR2007 Revenues($Millions USD)
Service
Source: Gartner Dataquest Apr03
X_ppt—7 All rights reserved © 2003, Alcatel
Worldwide Revenues
Service/Year 2003 2007 Frame Relay $16.7B $16.7B Leased Lines $23.2B $24.2B Ethernet $1.2B $8.3B
Source: Infonetics Research
X_ppt—8 All rights reserved © 2003, Alcatel
Services Price and Quality Positioning
Leased Lines 100 No Overbooking Frame Relay 70 CIR + BE nx64Kb/s Ethernet (Objective) 70 CIR + BE Network based IP VPN 45 No QoS CPE IP VPN 15 No guarantees
Source: Internal studies
X_ppt—9 All rights reserved © 2003, Alcatel
The strategic aspects of the Metro network
The metro network has been up to recently built in overlaying networks, one per type of service.The current pressure for financial performance and cost efficiency, is leading operators to built metro networks with the following characteristics: Migrating services and protecting revenues Simplifying and collapsing the network reducing the number of overlaying networks.OPEX reduction through centralized OAMP
X_ppt—10 All rights reserved © 2003, Alcatel
Yield management:One metro network or many?
How to achieve economies of scale?
Corporate services:Existing leased lines services and frame relayNew emerging Ethernet servicesFuture GPRS/EDGE/3G cellular services
Residential services:Existing ADSL servicesFuture VDSL servicesFuture GPRS/EDGE/3G cellular servicesEmerging Ethernet services
X_ppt—11 All rights reserved © 2003, Alcatel
Yield management:One metro network or many?
CPN
CPN
CPN
POTS/ISDN
xDSL
PON
Cable
LMDSCPN
DS1/DS3
SONET/SDH
Class-5
ATM-switch
IP router
(N)BAS
Server Farms
PoPPoP
PoP
PoPPoP
PoP
COPoPPSTN core
ATM core
IP core
CorporateIntranetExtranetInternet
Head End
ethernet
Aggregation router
PoPMG
CO
2G / 3GMobile
BaseStation
Campusbusiness park
downtown subtending rings
Metro accessMetro core rings
X_ppt—12 All rights reserved © 2003, Alcatel
Yield Management:One metro network or many?
QoS allows one network to better use complementary traffic matrixes on the same infrastructure.
SSoouurrccee:: AATT&&TT
X_ppt—13 All rights reserved © 2003, Alcatel
Yield management:One metro aggregation system or many?
MediaGateways
MediaMediaGatewaysGateways
Voice ServicesVoice ServicesVoice Services
DSLAMsDSLAMsDSLAMs
FR NodesFR NodesFR Nodes
BSTs
Nodes B
BSTsBSTs
Nodes BNodes B
BB ServicesBB ServicesBB Services
NB ServicesNB ServicesNB Services
MobileServicesMobileMobile
ServicesServices
LL ServicesLL ServicesLL Services
1640FOX1642EM
1650SMC1660SM
1662SMC1670SM
1692MSE1696MS1641SX
OMSNCWDMWDM
MultiserviceAggregation
Device
16401640FOXFOX1642EM1642EM
1650SMC1650SMC1660SM1660SM
1662SMC1662SMC1670SM1670SM
1692MSE1692MSE1696MS1696MS1641SX1641SX
OMSNOMSNCWDMCWDMWDMWDM
MultiserviceMultiserviceAggregationAggregation
DeviceDevice ETH ServicesSAN servicesETH ServicesETH ServicesSAN servicesSAN servicesFTTBFTTBFTTB
FTTBFTTBFTTB
ATMEthernet
ATMATMEthernetEthernet
CONSOLIDATEDBACKBONE
IP/MPLSSDHWDM
CONSOLIDATEDCONSOLIDATEDBACKBONEBACKBONE
IP/MPLSIP/MPLSSDHSDHWDMWDM
ATMEthernet
ATMATMEthernetEthernet
ATMATMATM
ATMATMATM
PDH/SDHPDH/SDHPDH/SDHEthernetEthernetEthernet
X_ppt—14 All rights reserved © 2003, Alcatel
Connectivity requiredin the WAN
Connectivity between large hubsConsolidated trafficQoS managed in the enterprisePoint to point leased lines type of services
sufficeVCX, LCA, GFP are the solutions adoptedVCX, LCA, GFP are the solutions adopted
Connectivity between small branches and large hubs and LAN to LAN connectivity
Volatile trafficQoS managed by the service providerPoint to multipoint services welcomeMPLS switching is the solution adoptedMPLS switching is the solution adopted
X_ppt—15 All rights reserved © 2003, Alcatel
Initiating Ethernet Point to Pointwith ISA Ethernet boards
GFPLCAS ( V.Cat )
OMSN
OMSN
OMSN
OMSN
OMSN
STM-16
Note: - Node #1 is equipped with 1 x FE port (100 M), where its traffic is multicasted into towards two directions (two head ends) with STP protocol activated at the client side
- FE mapped in N x VC3/VC12
Node # 3
Node # 1
Node # 2
63 x 2M 3 x 45 M
GbE#1 (200 M)1 x FE (100 M)
GbE#1 (200 M)4 x STM-1o
4 x STM-1o
Build # 1
ISA-ETH V2 ISA-GBE
X_ppt—16 All rights reserved © 2003, Alcatel
Note: - Node #1 is equipped with 1 x FE port (100 M), where its traffic is multicasted towards two directions (two head ends) with STP protocol activated at the client side.
-Node #3 is equipped with 1 x FE port (100 M) with 100 BaseFL interface to reach the remote node which is equipped with FE extender. The FE traffic is also multicasted towards two direction (two head ends) with STP protocol activated at the client side.
GbE#1
GbE#1
GbE#2
GbE#2
GFPLCAS ( V.Cat )
RemoteEthernetExtension
Build # 2
63 x 2M 3 x 45 M
4 x STM-1o
1 x FE (100 M)
4 x STM-1o
STM-16
OMSN
OMSN
OMSN
Node # 3
Node # 1
Node # 2
1 x FE (100 M)
OMSN
OMSN
Continuing Ethernet Point to Pointwith ISA Ethernet
ISA-ETH V2 ISA-GBE FE Extender
X_ppt—17 All rights reserved © 2003, Alcatel
GbE#1
GbE#2
GbE#2
L2
L2
GFPLCAS ( V.Cat )
L2 = Layer 2 Aggregation
4 x STM-1o
4 x STM-1o
1 x FE (100 M)OMSN
OMSN
OMSN
OMSN
OMSN
STM-16
Node # 3
Node # 1
Node # 2
Extending Ethernet Point to Multi-Pointwith ISA Ethernet
63 x 2M 3 x 45 M
GbE#11 x FE (100 M)
RemoteEthernetExtension
1 x FE (100 M)
Build # 3
FE Extender
Note: - Node #1 is equipped with 1 x FE port (100 M), where its traffic is multicasted towards two directions (two head ends) with STP protocol activated at the client side.
-Node #3 is equipped with 1 x FE port (100 M) with 100 BaseFL interface to reach the remote node which is equipped with FE extender. The FE traffic is also multicasted towards two direction (two head ends) with STP protocol activated at the client side.
ISA-ETH V2
ISA-GBE
ISA-PR-EA
X_ppt—18 All rights reserved © 2003, Alcatel
L2
L2
GFPLCAS ( V.Cat )
L2 = Layer 2 Aggregation
L2
L2
STM-16
OMSN
OMSN
OMSN
OMSN
OMSN
Node # 3
Node # 1
Node # 2
Extending Ethernet Multi –Pointto Multi-Point
with ISA Ethernet 63 x 2M 3 x 45 M
GbE#11 x FE (100 M)
4 x STM-1oGbE#2
GbE#3GbE#1
4 x STM-1o
GbE#2RemoteEthernetExtension
Build # 4GbE#3
Note: - Node #1 is equipped with 1 x FE port (100 M), where its traffic is multicasted towards two directions (two head ends) with STP protocol activated at the client side.
-Node #3 is equipped with 1 x FE port (100 M) with 100 BaseFL interface to reach the remote node which is equipped with FE extender. The FE traffic is also multicasted towards two direction (two head ends) with STP protocol activated at the client side.
GBE Extender
ISA-ETH V2
ISA-GBE
ISA-PR-EA
X_ppt—19 All rights reserved © 2003, Alcatel
Conclusions
The metro network holds the key to revenues generation and operator’s profitability.It is also the most capital intensive piece of infrastructure.Tight financial controls will be applied to metro investments strongly focusing on risk management and ROI.
The only way to achieve these objectives is to have a single convergent multi-service transmission metro network.
www.alcatel.com