technical note - tn 086: 2015 - transport for nsw · technical note - tn 086: 2015 . ... 6.2.4...

64
Technical Note - TN 086: 2015 © State of NSW through Transport for NSW Page 1 of 1 Technical Note - TN 086: 2015 Subject: Withdrawal of TMD 0001 CAD Manual- All sections (except Section 5 – Electrical Operating Diagrams) Issued date: 01 March 2016 Effective date: 01 March 2016 This technical note is issued by the Asset Standards Authority as a notification to remove from use the RailCorp standard TMD 0001 CAD Manual- All sections, Version 2.3 (except section 5 – Electrical operating diagrams). TMD 0001 CAD Manual- All sections (except section 5 – Electrical operating diagrams) are legacy documents and shall be used for reference purposes only. ASA standard T MU MD 00006 ST Engineering Drawings and CAD Requirements, Version 1.0 supersedes this document from 01 March 2016. Authorisation: Technical content prepared by Checked and approved by Interdisciplinary coordination checked by Authorised for release Signature Date Name Harpreet Singh Jagath Peiris John Paff Graham Bradshaw Position CAD Specialist Manager Network Standards A/Chief Engineer Rail Director Network Standards and Services For queries regarding this document [email protected] www.asa.transport.nsw.gov.au

Upload: lyanh

Post on 20-May-2018

222 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

Technical Note - TN 086: 2015

© State of NSW through Transport for NSW Page 1 of 1

Technical Note - TN 086: 2015

Subject: Withdrawal of TMD 0001 CAD Manual- All sections (except Section 5 – Electrical Operating Diagrams)

Issued date: 01 March 2016

Effective date: 01 March 2016

This technical note is issued by the Asset Standards Authority as a notification to remove from

use the RailCorp standard TMD 0001 CAD Manual- All sections, Version 2.3 (except section 5 –

Electrical operating diagrams).

TMD 0001 CAD Manual- All sections (except section 5 – Electrical operating diagrams) are

legacy documents and shall be used for reference purposes only. ASA standard

T MU MD 00006 ST Engineering Drawings and CAD Requirements, Version 1.0 supersedes this

document from 01 March 2016.

Authorisation:

Technical content prepared by

Checked and approved by

Interdisciplinary coordination checked by

Authorised for release

Signature

Date

Name Harpreet Singh Jagath Peiris John Paff Graham Bradshaw

Position CAD Specialist Manager Network Standards

A/Chief Engineer Rail Director Network Standards and Services

For queries regarding this document [email protected]

www.asa.transport.nsw.gov.au

Page 2: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

Engineering Manual DesignSignal

TMD 0001

CAD AND DRAFTING MANUAL – SIGNAL – SECTION 6

Version 1.6

Issued September 2010

Owner: Applications Manager – RailCAD

Approved by:

Brent Mallam Applications Manager RailCAD

Authorised by:

Mike Hogan General Manager Professional Services

Disclaimer This document was prepared for use on the RailCorp Network only. RailCorp makes no warranties, express or implied, that compliance with the contents of this document shall be sufficient to ensure safe systems or work or operation. It is the document user’s sole responsibility to ensure that thecopy of the document it is viewing is the current version of the document as in use by RailCorp. RailCorp accepts no liability whatsoever in relation to the use of this document by any party, and RailCorp excludes any liability which arises in any manner by the use of this document. Copyright The information in this document is protected by Copyright and no part of this document may be reproduced, altered,stored or transmitted by any person without the prior consent of RailCorp.

Engi

neer

ing

Man

ual

UNCONTROLLED WHEN PRINTED Page 1 of 63 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 3: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

Document control

Version Date Summary of change

1.6 September 2010 Application of TMA 400 format.

NOTE TO USER CURRENTLY UNDER REVIEW.

NEW RELEASE TO BE PUBLISHED SHORTLY.

© RailCorp Page 2 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 4: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

6

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

Contents

Signal Design Standards........................................................................................................5

6.1 Introduction ................................................................................................................5

6.1.1 Scope .........................................................................................................5

6.1.2 Signal Design File Structure.......................................................................5

6.1.2.1 Version 1.3..................................................................................5

6.1.3 Definitions...................................................................................................6

6.1.3.1 Documents and Drawings...........................................................6

6.1.4 Reference Documents................................................................................6

6.2 Documentation and Drawings ...................................................................................7

6.2.1 General.......................................................................................................7

6.2.2 Labelling of Compact Disks........................................................................7

6.2.3 Code Identification......................................................................................8

6.2.4 Symbols for Plans and Drawings ...............................................................9

6.2.5 MicroStation Title Block..............................................................................9

6.2.6 MicroStation Cell Libraries .......................................................................10

6.2.7 Levels, Level Symbology Overrides and Symbology By Level .........................................................................................................10

6.3 Signalling Plans .......................................................................................................10

6.3.1 General.....................................................................................................10

6.3.2 Overlapping ..............................................................................................10

6.3.3 Drawing Scales ........................................................................................10

6.3.4 Centreline .................................................................................................11

6.3.5 Format For Signalling Plans.....................................................................11

6.4 Signalling Circuits ....................................................................................................14

6.4.1 General.....................................................................................................14

6.4.2 Circuit Book Layout ..................................................................................14

6.4.3 Signal Circuit Drawing Format .................................................................17

6.4.4 Drawing Layers ........................................................................................18

6.4.5 Linework ...................................................................................................18

6.4.6 Text...........................................................................................................19

6.4.7 Master Sheet Blocks ................................................................................19

6.4.8 Signalling Circuit Symbols........................................................................19

6.4.9 Plotting Of Circuit Drawings .....................................................................19

6.4.10 Filenames For Drawing Files ...................................................................20

6.5 Detailed Site Survey Drawings ................................................................................22

6.5.1 General.....................................................................................................22

6.5.2 Detailed Site Survey Drawing Format ......................................................23

6.6 Drivers Diagrams And Weekly Notice Insertions.....................................................23

6.6.1 Format ......................................................................................................23

6.6.2 Size...........................................................................................................24

6.6.3 Reduction .................................................................................................24

6.6.4 Title Block.................................................................................................24

6.7 Track Insulation Plans .............................................................................................24

6.7.1 Scale.........................................................................................................24

© RailCorp Page 3 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6

Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 5: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

6.7.2 Per-way Plans ..........................................................................................24

6.7.3 Format For Track Insulation Plans ...........................................................24

6.8 Other Drawings........................................................................................................25

6.8.1 Equipment Housing ..................................................................................25

6.8.2 Level Crossings........................................................................................25

6.8.3 Mechanical Drawings ...............................................................................25

6.8.4 Structures and Drawings..........................................................................25

6.8.5 Clearance Diagrams.................................................................................25

Appendix A Signal Design MicroStation Cell Libraries ..........................................................26

Appendix B Signal Design MicroStation Level Structure.......................................................31

Appendix C Signal Design AutoCAD Circuit Element Block List ..........................................33

Key To X,Y Scale And Rotation Angle ....................................................................33

Block Name Insertion & Definition Table .................................................................33

Special Blocks For New & Removed Circuit Work ..................................................40

Special Blocks For Extended Sheets ......................................................................40

Appendix D Symbols For Plans And Drawings .......................................................................41

© RailCorp Page 4 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6

Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 6: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

6 Signal Design Standards

6.1 Introduction

6.1.1 Scope This section of the CADD Manual is intended to address the production of CAD drawings associated with signalling works and assist to:

• Standardise the preparation of drawings • Simplify various aspects of the work • Provide guidance on detailing • Secure consistency in quality and appearance

If, in special cases or for particular clients, it becomes necessary to deviate from these practices, then the Signal Design Manager must first give approval. Any proposed permanent change or alternative to these procedures must be circulated to Signal Design Section staff for their comment and subsequent agreement. Changes shall be incorporated in this Manual.

This section of the Manual also contains information and advice on the detailing of drawings. The use of this information should lead to the best and most economic solution of drafting problems, (resulting in savings in time and effort) even when the drafting officer is not fully familiar with the particular work.

Corporation-wide standards are to be found in Section 1 of this manual, or in the Australian Standard AS1100, parts 101 & 501. This section defines the standards to be applied to drawings specific to the Signal Design discipline. Generally, all drawings shall comply with Australian Standards and any project specific special requirements.

All references to Australian Standards refer to the latest edition.

6.1.2 Signal Design File Structure

6.1.2.1 Version 1.3 All drawings, whether they are AutoCAD (dwg), MicroStation (dgn), PDF or TIF files MUST ONLY BE STORED AND WORKED ON IN THE SPECIFIED AREAS IN R:/U: DRIVE. No one is to use his or her H: drive for any reason other than the storage of PERSONAL FILES ONLY, this also applies to your C: drive.

This policy will be strictly enforced. The CAD Team will be going around to each individual to explain the structure and help sort out files in their H: Drive.

Specified Areas

Only the R: drive will be used. There are specific folders for each type of document. These are:

• Circuit Books (existing) • Control Tables (existing, but will be changed to fit new structure) • Drivers Diagrams (existing, but will be changed to fit new structure) • Indicator/Control Panels • Locking Tables/Diagrams (this will probably cover nameplates and pulling lists as

well)

© RailCorp Page 5 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 7: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

• Signalling/Track Plans • Track Insulation Plans • Train Order Working (not everyone will need to use this) • Proposals and Misc. (used for work which doesn’t fall into any other specific folder)

The full path is R:Sig_des\common\ then the appropriate folder.

Within these folders there will be a folder for that specific area eg> Signalling Plans\Sutherland – Cronulla or Drivers Diagrams\Dubbo. This system is the same as used for Circuit Books.

Then with each folder there is a sub-folder specific to each type of task:

Designer - This folder is used to do any work for the design process and can contain any number of other folders. It will be electronically secured for the user, so he/she will be the only one who can alter the drawing and has total control of how this area is used. Once the design is done, it can be used to store the drawings until the updates are ready to commence. No work shall be done to this folder without consulting the original owner. The CAD controller will always notify the designer about any changes via e-mail.

Maint_Update – This folder is used when updating the drawings to COC’s for maintenance updating.

Originals – Used to store original files for safekeeping.

When all files have been updated, issued, new CDs burnt and masters returned to the planroom, all files should be removed except any outstanding design work (and PDF/TIF files). The updating team will have to liaise with the designer to ensure that all parties know that this is happening.

Please be patient. We want this system to be flexible and as user friendly as possible, it is being set up to aid everyone. I know there will be problems, if you have any, please do not hesitate to contact any of us.

CAD Control Committee:

Paul Surridge 9782 1770

Julie Jenkins 9782 1582

6.1.3 Definitions

6.1.3.1 Documents and Drawings Document and drawings shall be defined in the context of this manual as technical documents and technical drawings relating to the infrastructure asset and its life cycle (specification, design, manufacture, construction, test and commission, operation, maintenance, modification, disposal) and shall not include documents or drawings relating to correspondence, administration, finance, marketing, human resource management, project management, contract management and the like.

6.1.4 Reference Documents This Manual shall be read in conjunction with the Particular Specification, any general conditions attached thereto and other specifications and documents comprising the Contract.

In particular this Manual shall be read in conjunction with RailCorp publications;

© RailCorp Page 6 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 8: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

• Signalling Design Principles ESG 100.0, • Signalling Control Systems SPG 0713, • Signalling Circuit Design Standards SDG 0001, • Signalling Operator Interface, and • Procedures.

6.2 Documentation and Drawings

6.2.1 General • All documentation and drawings including those submitted for review, shall be laid

out in a clear and logical fashion and shall be such as to facilitate understanding, checking, construction and maintenance.

• Current digitised Signalling Plans, Track Insulation Plans are in MicroStation software and Circuit Diagrams in AutoCAD software. New and amended plans, including Signalling Plans, Track Insulation Plans, Detailed Site Survey Drawings, Drivers Diagrams, Weekly Notice Insertions, Equipment Housing Plans, Level Crossing Plans plus other plans and drawings associated with signalling projects shall be prepared using MicroStation v8.1 or higher. New and amended circuit diagrams shall be prepared using AutoCAD LT2000 or AutoCAD 2000 or later version.

• Final digitised drawings shall be provided on write once Compact Discs. • Documentation and drawings shall be prepared for A4 or A3 size paper and roll

plans. Roll plans shall be divided into manageable and logical lengths and with height of 450mm wide (max.). A2 and A1 size paper may be allowed for detailed mechanical and structural drawings.

• Geographically oriented drawings shall have the Sydney direction at the left hand side.

• Each design drawing including amended drawings shall be distinctively and uniquely identified as shall each controlled copy of a drawing.

• Each drawing shall include the names of the designer, checker and approver. Details shall be provided for each amendment/issue of the drawing.

6.2.2 Labelling of Compact Disks Compact disks shall be labelled to allow easy identification of the contents. Where a number of CDs are provided for a particular circuit book, each compact disc shall be labelled. The CD label shall include the following details:

• Copy Purpose: eg Review Copy, Construction Copy, Test Copy, Commissioning Copy, Maintenance Copy

• Copy Name/No: eg Master Copy, Master Back Up Copy, Copy No. 1 • Copy Holder: Name person issued to – responsible for • Drawing Type: eg Signalling Plan, Track Insulation Plan, Circuit Book, etc. • Drawing Name: eg Geographic location/area • Job Name: as applicable or not • Drawing Book/No: eg CB…. or xxxxx • Sheets No …… To …… (as applicable) • Version No: • Version Date: • Disc No …… of …… • Drawing Software: eg AutoCAD.REL14 • File No: (as applicable) • Job No: (as applicable)

© RailCorp Page 7 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 9: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

Where several CDs are required for a circuit book the CDs shall be numbered as part of the set. By way of example, where 10 CDs are required for a circuit book the Compact Disc number shall be in the following form:

• COMPACT DISC NO. 1 OF 10 etc

All CDs shall be supported by file lists.

In addition to the original copy a Backup copy of each drawing compact disc shall be provided. These backup copy CDs shall have detailed labels as provided on the original copy drawing compact discs. Additionally, the Backup copy shall carry the name "BACKUP COPY DRAWINGS".

6.2.3 Code Identification Drawings shall include the following Code Identification:

Circuit Book Sheet: C Circuit Book Nos: 0 or 1 Coded Sheet

000 - 999 0 = As Built Numbering System 1 = Work in Progress Three Digits

e.g. C0750A25.DWG

Signalling Plan/Track Plan: D Circuit Book Nos. 0 or 1 Three Digits

000 - 999 0 = As Built 1st Digit: 1 = Work in Progress 0 = Drawing in One

Part 1,2 = Drawing in More than One Part 2nd/3rd Digit: 10 = 1:1000 Scale 11 = Multi-scale

e.g. D0450010.DGN

Track Insulation Plan: E Circuit Book Nos. 0 or 1 Three Digits

000 - 999 0 = As Built 1st Digit: 1 = Work in Progress 0 = Drawing in One

Part 1,2 = Drawing in More than One Part 2nd/3rd Digit: 10 = 1:1000 Scale 11 = Multi-scale

e.g. E0450010.DGN

Indicator Diagram: F Circuit Book Nos. 0 or 1 010

000 - 999 0 = As Built Fixed 1 = Work in Progress

e.g. F0610010.DGN

© RailCorp Page 8 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 10: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

Drivers Diagram:

G Area Name in 7 Characters eg. GHORNSBY.DGN

Mechanical Drawing:

M Five Digits According to “Numbering for Mechanical Drawings” code:

6.2.4 Symbols for Plans and Drawings Symbols for plans and drawings shall be in accordance with Appendix D.

6.2.5 MicroStation Title Block Drawings shall include a title block. The title block shall be vertical (as shown below) or horizontal, where the two halves are placed side-by-side. Internally, the title block information is filled in indirectly via a dialog box, opened from the bar menu. The information in the right margin is automatically filled in at the time of plot/printout.

Figure 1

Figure 2 - Typical Vertical Title Block

Drawings shall include a template incorporating the following details:

RailCorp name:

Drawing Type: (eg Signalling Plan, Track Insulation Plan, Circuit Diagram,Signalling Arrangements)

Title of Drawing: (eg Project Name, Location/Area Name, Equipment/StructureName, Process Name, Purpose Description)

Purpose of Drawing: (Proposal, Construction, As-built)

Drawing Number:

Sheet/Part Number (where applicable):

Version Date:

© RailCorp Page 9 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 11: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

Scale (where applicable):

Legend (where applicable):

Name of Organisation responsible for Drawing content

For each amendment to the drawing the following details shall be included;

Brief description of amendment:

Version Number (Amendment):

Version Date (Amendment):

Name of Organisation responsible for the Amendment content.

6.2.6 MicroStation Cell Libraries For a full listing of cell libraries and their contents for use in drawings produced by or for the RailCorp Signal Design area (See Appendix A). For internal use, all signal design cell libraries are located on the network at:

M:\Rail\ustn_wsV8\RC_Modules\Signals\cell

6.2.7 Levels, Level Symbology Overrides and Symbology By Level All levels, symbology and text shall be in accordance with this manual, (see Appendix B) and with MicroStation requirements. This level structure can be imported from:

M:\Rail\ustn_wsV8\RC_Modules\Signals\dgnlib\SD_Level.dgnlib.

Different levels shall be used to indicate and separate various features.

6.3 Signalling Plans

6.3.1 General Signalling Plans shall include details in accordance with Specification SPG 0703 and cover the whole of the Works including interface details at the Contract limits. Plans shall extend sufficiently at Contract limits to detail approach locking points and overlap clearance points for all signals included in the Works.

6.3.2 Overlapping Overlapping of Signalling Plans shall be kept to a minimum. However individual plans shall extend sufficiently to detail clearance points for all controlled signals included in the plan. Each end of the plan shall include the name and drawing number of the adjoining plan.

6.3.3 Drawing Scales Metric scales shall be used from the range 1:1000, 1:2000, 1:5000 and 1:10,000 and shall be submitted for consideration prior to use. The minimum scale for interlocking areas shall be 1:2000 subject to full details being clearly and legibly shown. Changes of scale shall only take place at kilometre points or at one tenth kilometre points.

© RailCorp Page 10 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 12: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

6.3.4 Centreline The centreline of all symbols for equipment and structures shall be as longitudinally correct to scale as feasible and laterally correct relative to the track centre lines and laterally spaced for legibility.

6.3.5 Format For Signalling Plans Generally existing signalling plans are in MicroStation software. New and amended drawings shall be prepared using MicroStation v8 software.

Signalling Plans shall include the following:-

a) The scale for all plans on screen shall be 1:1000, multi-scaling for plotted drawings may be presented for approval.

b) Text shall be made up as follows :-

i) Station names and title = 5mm high text

ii) Track names = 2.5mm high text

iii) Any other text shall be 1.75mm high

c) A Signalling Plan shows the track layout for the area involved on a single line basis ie. each pair of rails shown as a single line. The Signalling Plans are drawn such that Sydney is on the left of the plan, the lines are drawn straight. Curve and gradient details are drawn above the track layout. The curve diagram illustrates where they occur in the track, the curve radius shown in metres and the gradient details shown relative to the track and illustrate the differing gradients by the ratio of the rise or fall. Eg. 1 in 50 etc.

Symbols used to represent the various details on the Signalling Plan shall be in accordance with the symbols included in Appendix D.

d) Graphic grouping shall be used at each location area. To facilitate movement of selected elements as one unit in ratio to movement of track whilst scaling, all items shall be grouped are as follows:

i) Text and symbols only are grouped.

ii) Do not group red and purple items.

e) The area between 12cm and 14cm (or the Co-ordinate y = 0.012 and y = 0.014) above the coordinate where y = 0 shall be kept clear for use others for scaling purposes.

f) Storage of completed drawings shall be on write once Compact Discs.

Examples of typical layouts of Signalling Plan details are shown below.

© RailCorp Page 11 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 13: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

© RailCorp Page 12 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6

Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 14: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

© RailCorp Page 13 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6

Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 15: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

6.4 Signalling Circuits

6.4.1 General Signalling circuits shall include details in accordance with Specification SPG 0703.

6.4.2 Circuit Book Layout Circuit Books shall be prepared in accordance with the following:

Section Circuits Page

Frontis- Title Sheet A00 pieces

Index (alphabetical) A01 - 9

Control Page CP1 - 9

Record of Amendment Sheet AS1 - 9

Automatic Automatic Signals (Standard sheet to include signal B1 - 99 control, signal operating, trainstop, VCSR, to be in numerical order. Track circuits to be in latter section with other track circuits.

© RailCorp Page 14 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 16: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

Section Circuits Page

Section YR, SCR, DSR, FDM, 1/2 Pilot C01 - 19 Controls Staffs

Level Crossing Controls C20 - 99 Crossing Lights Circuits

Boom Mechanisms

Panel Push Button Relays (F)R, (FM)R, (N)R, D01 - 19 (R)R.

Controls Lever Relays NR, CR, RR D20 - 39

Remote Control (if applicable) TDM D40 - 59

Ring Circuit (R)PR D60 - 69

Commence Relays CeR D70 - 79

Finish Relays FnR D80 - 89

Machine in Use MuR D90 - 94

Finish Repeat Relays FnPR, FnJR, D95 - 99 FnJP2R

Normalising Relays (N)R E01 - 19

Track Special Relays TZR E20 - 39

Interlock- Route Lock Relays ing & Controls/ Road Closing Local/ Signals

Lever Sticks

Auto Re Clearing

Route Control

Signal Control

Signal Operating

Trainstop Operating

Trainstop

Trainstop Checking

Trainstop Suppression

Signal Normal/Reverse

Approach Sticks

RUR/NLR F01 - 99

RLR/NLR/LCR/RC G01 - 09 R

SR G10 - 29

(A) SR/Shelf G30 - 39 Switch Relays UCR G40 - 69

HR, HDR, DR, G70 -LSpR H29 E, 'A' Lights, H30 - I29 Guards' Indicators VR/V I30 - I49

NOR/REV I50 - I79 VNR/VRR VCSR I80 - J09

VsnR/VsnJR J10 - J19

NGPR/RGKR, J20 - J49 DGNR, RGPR ALSR/ALSJR J50 - J99

© RailCorp Page 15 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 17: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

Section Circuits Page

Route Sticks USR K01 - 49

Track Timers JR K50 - 79

/ Points Point Setting Relays NZR, RZR, (C)PR L01 -L99

Point Lock Relays NLR/RLR L01 - 00

Point Contactors NWR/RWR M01 - 49

Isolating Relays IR M50 - 79

Point Cutout Timers M80 - 99

Point Time Limit

Point Motor Operating N01 - 59

Local Detectors NKR/RKR N60 - 99

Detectors NWKR/RWKR P01 - 39

/ Releasing Switch Lock Relays (RLR/NLR,NR) Q20 - 39 Releasing Switches Releasing Switch Circuit/Detectors Q20 - 39

Vital Misc Indicating Relays PR Q40 - 59

Track Circuits (include Track Q60 - 99 sticks)

Diagram Signal Repeater NGKR/RGKR, R01 - 19 ALSKR, FNGKR/FRGKR

Signal Repeater Lights RKE/DKE R20 - 39

Point Indicating Relays NWKR/RWKR/WZ R40 - 59 KR

Point Lever Lights NKR, RKE, WZKE, R60 - 79 TKE

Spare R80 - 99

Push Button Indications FEKR, FEK2R S01 - 29

Push Button Lights PBE S30 - 59

Diagram Indicator Relays KR S60 - 99

Diagram Route Relays UR, USKR T01 - 29

Diagram Track Route Relays TUR T30 - 39

Diagram Track Indications T40 - 89

Diagram Layout T90 - 99

© RailCorp Page 16 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 18: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

Section Circuits Page

Power Power Supplies U01 - 99

Indicators Power Supply Indicators V01 - 29 & Alarms Filament/Lamp Indicators V30 - 49

Alarms V50 - 59

Other Non-Vital Misc Circuits (specify eg. V60 - 99 Warning Lights Train Train Approach Bells)

Telephones/Communications W1 - W9

Spare W10 - 99

Analysis Relay Room/Hut Layouts X01 - 09

Relay Racks X10 - 49

Cable List/Runs X50 - 99

Fuse and Terminal Lists Y01 - 99

Contact Allocation Z01 - 99

Notes:

• Repeat relays to follow the appropriate section. • All circuits within a section to be in numerical order. • The index is to show the range of page numbers for each section. • Page numbers start with a letter followed by up to 2 numbers. (0 must never be

used).

Where multiple level crossings are within the same circuit book circuits are to be grouped by crossings.

6.4.3 Signal Circuit Drawing Format Current digitised circuit drawings are in AutoCAD 2000. Unless approved otherwise, new and amended circuit diagrams shall be prepared using AutoCAD LT2000 or AutoCAD 2000 or later.

Drawings shall be stored on write once Compact Discs.

© RailCorp Page 17 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 19: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

The circuit drawing filename shall be ACAD.DWG.

a) One(1) Circuit drawing per file

b) File name shall be in the following order (8 characters long)

3 characters 4 characters 3 characters Circuit Book number Sheet Number File Type

(leading zeros required) (leading zeros required)

e.g. Circuit book - CB15 Page 9

File name would be C0150009.DWG

c) Drawings shall be A3 size :

i) Overall sheet size: 420mmx297mm

ii) Drawing area size: 396mmx273mm

d) Drawing Symbols - In accordance with Appendix D. Definition and sizes to be approved

Circuit drawings shall include layers, linework, text, plus system variables and support operating variables preset to values listed in the tables below.

6.4.4 Drawing Layers The signalling circuit and analysis drawings utilise various layers, colours and linestyles to indicate NEW, REMOVED and MAINTENANCE information. The following list shows the allowable layers, colours and linestyles that may be used in the drawings.

If other layers, colours and/or linestyles for temporary use are utilised, then they shall be removed from the drawing before the final discs are submitted.

Layer Name

State Colour Linetype Purpose

0 ON ( 1)Red Continuous Reserved (do not use) 1 ON ( 7)White Continuous Borders sheet/analysis etc) 2 ON ( 2)Yellow Continuous Maintenance - Text 3 ON ( 4)Cyan Continuous Maintenance - Circuit 4 ON ( 3)Green Continuous Removals - Text 5 ON ( 5)Blue Hidden Removals - Circuit 6 ON ( 6)Magenta Hidden Dashed linework 7 ON (10)Brown Continuous New Work - Text 8 ON ( 1)Red Continuous New Work - Circuit 9 ON ( 6)Magenta Continuous New/Removed work arrows

6.4.5 Linework PLINE shall be used for line-work.

0mm and 0.5mm are the only allowable widths.

LINE command SHALL NOT BE USED - use PLINE 0mm width.

PLINE-ARC or CIRCLE shall be used to for curved linework.

TRACE command SHALL NOT BE USED - use PLINE 0.5mm width.

© RailCorp Page 18 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 20: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

POINT command SHALL NOT BE USED.

6.4.6 Text Text can be placed in the drawing using either the TEXT or DTEXT command using the necessary justification.

Text sizes are restricted to the following list.

Text Size Purpose 1.75 mm Detail (eg. relay contact numbers) 2.5 mm Element (eg. relay and contact names) 3.0 mm Page headings 4.0 mm Circuit headings

NB: Cover sheets will have an additional text size allowed

15 mm Circuit book name and the use of a bold font.

6.4.7 Master Sheet Blocks Circuit and analysis drawings shall be created using the standard prototype drawing as a template. (See Appendix C)

The A3 border block is a master sheet block. A library of standard master sheet blocks already exists. eg. 'Q' type relay analysis sheet, cable analysis sheet, fuse and terminal list sheets, etc...

Master sheet blocks shall be inserted in the drawing at (0,0), X scale factor = 1, Y scale factor = 1 and rotation angle = 0 degrees.

NB: Master sheet blocks listed are the only acceptable blocks that may be placed in any circuit drawing for the purpose of a MASTER SHEET.

Where a master sheet that is not listed needs to be created then full details of the sheet shall be referred for approval.

6.4.8 Signalling Circuit Symbols Signalling circuit symbols shall be in accordance with Appendix D and shall be placed in the circuit drawing in the form of BLOCKS.

BLOCKS shall be placed on a 5mm GRID in the circuit drawing and connected to other BLOCKS using PLINES.

Where a circuit element that is not listed needs to be created then full details of the element shall be referred for approval.

6.4.9 Plotting Of Circuit Drawings Hard copies of the circuit drawings shall be produced on 80 gsm, (420mm x 297mm) A3 Media

Linework for the plotted drawings shall be as follows.

Maintenance New/Removed Drawing Drawing ---- Pen ---- ---- Pen ----

© RailCorp Page 19 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 21: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

Layer Colour Function Size Colour Size Colour 1 (7) White Border 0.3mm Black 0.3mm Black 2 (2) Yellow Maintenance - text 0.3mm Black 0.3mm Black 3 (4) Cyan Maintenance - 0.7mm Black 0.7mm Black

circuit 4 (3) Green Removal - text ----- ----- 0.3mm Black 5 (5) Blue Removal - circuit ----- 0.3mm Black 6 (6) Magenta Dashed line 0.3mm Black 0.3mm Black 7 (10) Brown New - text ----- ----- 0.3mm Black 8 (1) Red New - circuit ----- ----- 0.7mm Black 9 (6) Magenta New/Removed ----- ----- 0.3mm Black

arrows

Each sheet or part of an extended sheet shall be plotted on 80 gsm (420mm x 297mm) A3 media.

6.4.10 Filenames For Drawing Files Filenames for drawing files shall be in accordance with the following:

{FILE} this is the document that contains a copy of the CIRCUIT DRAWING.

{SHEET} is the CIRCUIT DRAWING sheet number. one (1) only per FILE. more than one SHEET only permitted for extended sheets.

{CB} Circuit book number. {FILENAME} identifies the file to allow a particular SHEET to be quickly

located for editing. - the FILENAME is made up of 12 characters

consisting of FILENAME plus DRAWING EXTENSION

{FILE NAME} is made of the 1st 8 characters. These 8 characters are to allow quick

{WITHOUT} visual identification. The filename for circuit drawing files shall be 8

{DRAWING} Characters

© RailCorp Page 20 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 22: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

<CATEGORY> - 1 character Identifies the type of information stored in the file. CIRCUIT DRAWINGS are represented by the letter "C".

<CB NUMBER> - 3 character Identifies the CIRCUIT BOOK by circuit book number. SHALL BE 3 characters. ie:CB:1 = 001

<SIGNALLING STANDARD - Standard book identified by : STD ie:CSTD DRAWING> DRAWING>

<SHEET NUMBER> - 4 characters Identifies the SHEET whose data is stored in the file. SHALL BE 4 characters. ie:sheet A26 = A026

[FILE SEPARATER] - is always the 9th character. This character is always a "." (period). Its purpose is to separate the FILE NAME from the FILENAME EXTENSION

[FILENAME EXTENSION] - is made of the last 3 characters. These 3 characters are set to a standard suffix so as to follow the drawing editor to recognise the file. The suffix for DRAWING SHEET files is "DWG" or "DGN". "DWG" means drawing file format for AutoCAD. "DGN" means drawing file format for MicroStation. “XLS” means drawing file format for EXCEL

EXAMPLE: Create a maintenance drawing sheet 27 for circuit book CB:15

C = circuit drawing files

015 = CB number

A027 = sheet number

© RailCorp Page 21 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 23: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

DWG = file type

FILENAME FORMAT

C015A027.DWG

Labelling of all CDs shall be as follows:

White Label:Maintenance Copy

MASTER and BACK-UP

Green Label:Construction Copy

MASTER and BACK-UP

Pink Label:Test Copy

MASTER and BACK-UP

Yellow Label: Commissioning Copy

MASTER and BACK-UP

Version Number

Each circuit drawing shall be given a date (date approved).

The Circuit book name shall be in upper case characters.

The Circuit book number shall be in the form - CB No: 27, CB No: 143, etc.

6.5 Detailed Site Survey Drawings

6.5.1 General a) Detailed Site Survey Drawings shall include details in accordance with

Specification SPG 0703. The content of Detailed Site Survey Drawings (DSS Drawings) shall be kept to manageable areas and shall be numbered to form a logical pattern. An overall index shall be provided.

b) The software version of the detailed site survey drawings shall be drawn at 1:1 scale and plotted to the required scale on A3 paper. All text and symbols are to be legible when plotted on A4 paper. In very complex areas, the vertical scale may be abandoned but all vertical dimensions must be shown to the relevant trackside equipment. One hundred-metre sections plotted to a scale of 1:250 is preferred in most cases but scales of 1:200 and 1:500 are permissible.

c) Where mapping files are available these are to be used as a basis for detailed site surveys.

d) The cable route shall be drawn continuous in manageable proportions with borders abutting to facilitate the insertion in a master drawing held by RailCorp.

e) DSS drawings shall be fully dimensioned to show the location of every kilometre and half kilometre post, the final cable routes, underline crossings (ULX's), station buildings, signal boxes, relay rooms, housings, location cases and lineside equipment with reference to the running face of the nearest railway line and, where applicable, existing buildings which are to remain and/or overhead wiring structures.

© RailCorp Page 22 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 24: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

f) Detailed Site Survey Drawings shall also show those existing items which affect the construction of the new works, and which are subsequently to be removed. After removal they shall be deleted from the as built drawings.

6.5.2 Detailed Site Survey Drawing Format a) Unless otherwise approved, detailed site survey drawings shall be prepared

using AutoCAD LT2000 or AutoCAD 2000 or later.

b) Drawings should be produced on the layers identified by a number, a name, and a different colour for every layer as follows:

Layer Colour NameL0 White Page Set Set of the border, Title Lines and the Legend L1 Yellow Km Ref References in kilometres L2 Cyan Cable Rt Cable Route with all the trackside equipment L3 Blue Environ Environment: buildings, roads, stairways,

pathways L4 Red Deminsio Dimensions L5 Green Text Labels and descriptions L5 Green Text Labels and descriptions L6 Brown Others L7 Magenta Existing trackside equipment, buildings and cable routes etc.

that become redundant

c) Drawing sheet sizes shall be A3 with a border layout as per the Signalling Circuit Design Standards SC 00140000 SP. The sheet (MBORDA4) shall be 396mm (X direction) and 273mm (Y direction).

d) Hard copies of the drawings shall be produced on 80 gsm A3 paper or where applicable A4 Laser plots will be accepted.

e) Storage of drawings shall be on write once Compact Discs.

f) Cover sheets to be supplied as agreed.

6.6 Drivers Diagrams And Weekly Notice Insertions

6.6.1 Format Current drawings are in MicroStation and AutoCAD 2000. Unless otherwise approved new and amended drawings shall be prepared using AutoCAD LT2000 or AutoCAD 2000 or later.

Layers incorporated into the drawings shall be as follows:

Layer Name Colour Line Type Purpose Weights (MicroStation)

1 Red Continuous Track 5 3 Yellow Continuous Signalling Symbols

Power Supply CCTS, Xings

0

5 Purple Continuous Structural Symbols Bridges, Platforms (RTC)

2

© RailCorp Page 23 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 25: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

7 Green Continuous Text 1.75mm = 2.5mm = 5.0mm =

0 * 1 * 2 *

Note: * Weights not applicable if True Type text fonts, such as Arial, are used.

6.6.2 Size Shall conform to suitable reduction for publication in Weekly Notice. Standard sized sheets are available and shall be used. CAD generated diagrams shall be programmed to conform to these sizes. All drawing content shall be drawn as size permitted in proportion to drawing.

6.6.3 Reduction Signal symbols, lettering size, line thickness and gaps between lines (particularly in congested areas) shall be large enough to be clearly legible when reduced for publication. (Diagram may be photocopy-reduced to appropriate size for verification).

6.6.4 Title Block The Title Block shall refer to the drawing as SIGNALLING ARRANGEMENT and shall include the applicable location/area, extent of work, W.N. (Weekly Notice) number, job number, Drawing Office identity, eg.

RAC of N.S.W.

WYONG

SIGNALLING ARRANGEMENT

WN33/95 RAIL SERVICES AUSTRALIA SIGNAL DESIGN OFFICE 92294

6.7 Track Insulation Plans

6.7.1 Scale Track Insulation Plans shall be straight line plans drawn to longitudinal scales of 1:500 for interlocking areas and 1:1000 for other areas.

6.7.2 Per-way Plans Prints of the RailCorp’s permanent way layout plans, which will be to various scales and may not be fully up to date, shall normally be available as an aid but shall require confirmation of actual site conditions and details for inclusion in the Track Insulation Plans.

6.7.3 Format For Track Insulation Plans Track Insulation Plans shall be produced in the same format as specified for signalling Plans as detailed under Section 6.3 above.

© RailCorp Page 24 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 26: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

6.8 Other Drawings

6.8.1 Equipment Housing Layout plans for equipment housings including huts, relay rooms, signal boxes and control centres etc. shall be to scale and shall detail precise floor, wall and ceiling positions for all items.

6.8.2 Level Crossings Level Crossing Layout Plans shall show, to a scale of 1:50, the physical arrangements at road/rail or controlled pedestrian crossings.

6.8.3 Mechanical Drawings Drawings showing mechanical arrangements for equipment and systems shall be fully detailed scale drawings and shall include all fixtures and fittings and manufacturing, fabrication and finishing details.

6.8.4 Structures and Drawings Working drawings for structures and buildings shall be fully detailed and shall include architectural and structural details, specifications, computations, arrangements for services etc. together with assembly, mounting and erection details where appropriate.

6.8.5 Clearance Diagrams Trackside structures such as signals and signal gantries which have been expressly approved in writing to protrude into the area of the RailCorp’s Standard Structure Gauge, shall be detailed on Clearance Diagrams. Such diagrams shall detail the precise location of structures, including associated ladders, stays and fittings, in relation to the RailCorp’s Standard Structure Gauge including distances from rail level, running edge and overhead traction wires and equipment. Track curvature and superelevation shall also be shown on these diagrams.

© RailCorp Page 25 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 27: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

Appendix A Signal Design MicroStation Cell Libraries Below is a full listing of cell libraries and their contents for use in drawings produced by or for the RailCorp Signal Design area. For internal use, all files are located on the network at:

N:\Groups\Sig_des\COMMON\GRAPHICS.

SD_mstplan.cel

CELL NAME CELL DESCRIPTION

LINE 2LGHT2 SIG6.. NTCBRD CUPBRD FRAME1 XSIGN. TRNSFM POINTS CLMLCK CHOKE. MUTXRX MLTCRS SGLPT. DBLPTS ISJNT4 ISJNT1 ISJNT2 CIRCLE XOVER2 SCLBAR XOVER4 BOLTLK S250 S500 S1000 S2000 S5000 S10000 S20000 XOVER5 SYMB15 LNMARK RELSW2 POST.. INDR13 INDR15 INDR14 INDR9. POST1. SIGBOX ISJNT5 CTTRK1 PLUS BALVER

© RailCorp Page 26 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 28: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

CELL NAME CELL DESCRIPTION

CONTAC SCSYM SIG3.. SIG4.. SIG5.. SOLAR REYRL ISJNT6 PWRFD3 PWRFD4 BCROSS SMCRSS BANNER CUTTRK CLRPST XOVER1 TUMURX EARTH1 EARTH2 ISLBND STPBRD DSTBRD STDFRM FLAG XOVRIS ST87 NOLGHT TRSFM2 CB1... TRSFM1 EOC1.. EOC... MTRMGR VARSB1 IDCTBD MAINBD VARSBD VARBD. IDPBD. CBBD.. IVAPBD THYRS1 THYRS2 SPDBRD MAKER1 SHUNT1 INDR16 INDR12 CLSUP1 RELSW3 PHONE2 MARKE0 1LGHT1 2LGHT1 3LGHT1

© RailCorp Page 27 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 29: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

CELL NAME CELL DESCRIPTION

2LGHT3 3LGHT2 3LIGHT 5LIGHT POINT2 GNSIG1 GNSIG2 GNSIG3 GNSIG4 GNSIG5 GNSIG6 GNSIG7 4LIGHT 5LGHT1 SIG82. SIG444 SIG1.. SIG7 SIG2.. SIG8.. SIG81. 1LGHT2 RABSIG WRNGRD BELL.. XING1. XING2. XING3. PHONE1 RELSW1 TSTOP. LOCK.. DERAIL REYRL1 ARESTR INDR11 DCFEED 1LGHT3 JOIN BLOCK JOIN FOR TIP BOND1 BOND FOR TIP DOT01 DOT01 FOR TIP TEXT04 TEXT04 FOR TIP TEXT05 TEXT05 FOR TIP CONN CONNECT FOR TIP TU001 TU001 FOR TIP TU002 TU002 FOR TIP TU004 TU004 FOR TIP ARR01 ARR01 FOR TIP TU005 TU005 FOR TIP ARR02 ARR02 FOR TIP TEXT06 TEXT06 FOR TIP TEXT07 TEXT07 FOR TIP TEXT08 TEXT08 FOR TIP ACFD01 ACFEED FOR TIP FUSE01 FUSE01 FOR TIP

© RailCorp Page 28 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 30: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

CELL NAME CELL DESCRIPTION

EBOND1 ELEC BOND FOR TIP BUNG01 BUNGALOW FOR TIP TEXT01 TEXT01 FOR TIP TEXT02 TEXT02 FOR TIP TEXT03 TEXT03 FOR TIP TEXT10 TEXT10 FOR TIP TEXT11 TEXT11 FOR TIP LINK01 LINK01 FOR TIP RELAY RELAY FOR TIP DFEED1 DC FEED 1 FOR TIP SIG01 SIGNAL01 FOR TIP TEXT12 TEXT12 FOR TIP BBAR01 BUSBAR01 FOR TIP KM01 HALF KM FOR TIP KM02 KM FOR TIP TIPTEX JOB DESC TEXT FOR TIP LINK02 LINK02 FOR TIP TTIEIN TIE IN CIRCUIT FOR TIP TI21 TI21 FOR TIP SRTI21 SINGLE RAIL TI21 FOR TIP CSEE CSEE TUNING FOR TIP TU006 TU006 FOR TIP TEXT09 TEXT09 FOR TIP LEGEND LEGEND FOR TIP PID... PLOT ID FOR TIP IMPB01 IMPEDANCE BOND1 FOR TIP IMPB02 IMPEDANCE BOND2 FOR TIP DNAM DNAM FOR TIP RELAY1 RELAYS FOR TIP TEXT13 TEXT13 FOR TIP SCALE SCALE RULER FOR TIP WDPOLE WOODEN POLE FOR TIP XBOND CROSS BONDS FOR TIP PBOND PARALLEL BONDS FOR TIP IMPB03 IMPEDANCE BOND3 FOR TIP TU003 TU003 FOR TIP TLBLC TITLE BLOCK FOR TIP TEXT19 TEXT19 FOR TIP TEXT14 TEXT14 FOR TIP DTI21 DTI21 FOR TIP SDTI21 SDTI21 FOR TIP DRTI21 DRTI21 FOR TIP POINT1 POINT1 FOR TIP SGC01 SPARK CONNECTION FOR TIP SGC02 SGC02 FOR TIP EBOND2 EBOND2 FOR TIP TERM1 TERM1 FOR TIP TERM2 TERM2 FOR TIP BUFFER BUFFER FOR TIP BSTOP BUFFER STOP FOR TIP XING01 CROSSING 1 FOR TIP XING02 CROSSING 2 FOR TIP CONN01 CONN01 FOR TIP ADDARWF ADD FILLED ARROW FOR TIP T001 T001 FOR TIP

© RailCorp Page 29 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 31: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

CELL NAME CELL DESCRIPTION

T002 T002 FOR TIP T003 T003 FOR TIP T004 T004 FOR TIP T005 T005 FOR TIP T006 T006 FOR TIP NOTE.. NOTE FOR TIP LEGEND SBOND SERIES BOND FOR TIP BUNGLW BUNGLOW FOR TIP POWER POWER SUPPLY EQUIP TIP T007 T007 FOR TIP T008 T008 FOR TIP ADDARWO ADD OPEN ARROW FOR TIP FRAME2 FRAME3

title.cel

CELL NAME CELL DESCRIPTION

Cell Library Name: title.cel Date of Output: 20/08/04 Cell Name Cell Description Default NOTE SEXTUP NOTE NOTE1 LEGEND SEXTUP LEGEND RCLOGO RAIL CAD LOGO LOGO CITYRAIL LOGO TD TRANSITION DETAILS LEG COMMON LEGEND CD CURVE DETAILS BNOTES SCALE 1 200 CT CURVE TEMPLET BOTX RSADIS RSA DISCLAIMER TBA0A1 STD TITLE BLOCK A0A1 TBA2A3 STD TITLE BLOCK A2A3 TBA0 A0 TITLE BLOCK TBA1 A1 TITLE BLOCK TBA2 A2 TITLE BLOCK TBA3 A3 TITLE BLOCK

© RailCorp Page 30 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 32: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

Appendix B Signal Design MicroStation Level Structure The MicroStation v8 levels for placement of various types of elements, Level Symbology Overrides and Symbology ByLevel shall be in accordance with the table on this and the following pages.

Nam

e

Num

ber

Des

crip

tion

Ove

rrid

eCol

orO

verr

ideS

tyle

Ove

rrid

eWei

ght

ByL

evel

Col

or

ByL

evel

Styl

eB

yLev

elW

eigh

t G

loba

lDis

play

El

emen

tAcc

ess

Plot

C-TRAK-NORM 4000 Track Normal Linework 0 0 0 6 0 2 C-TRAK-RDNT 4001 Track Linework New 0 0 0 3 0 1 C-TRAK-DASH 4002 Track Linework Removed

(Dashed) 0 0 0 3 0 0

C-TRAK-CURV 4003 Track Curve 0 0 0 3 0 0 C-TRAK-GRAD 4004 Track Gradient 0 0 0 3 0 0 C-TRAK-NOTE 4005 Track Name 0 0 0 3 0 0 C-TRAK-LABL 4006 Track Length 0 0 0 3 0 0 C-TRAK-CELL-SGNL

4007 Track Signal Symbology 0 0 0 4 0 0

C-TRAK-CELL-STRU

4008 Track Structural Symbology 0 0 0 5 0 1

C-TRAK-ROUT 4009 Track Route Information 0 0 0 5 0 2 C-STRU-GANT 4010 Structures Gantries 0 0 0 3 0 0 C-STRU-PLAT 4011 Structures Platform Linework 0 0 0 3 0 0 C-STRU-BRIG 4012 Structures Bridge Linework 0 0 0 3 0 0 C-STRU-STRT 4013 Structures Street Linework 0 0 0 3 0 0 C-SGNL-CELL-SYMB

4014 Signal Symbol 0 0 0 3 0 0

C-SGNL-TEXT 4015 Signal Text 0 0 0 0 0 0 C-SGNL-AREA 4016 Signal Location Boundary 0 0 0 3 0 0 C-POWR-CELL 4017 Power Supply Diagram Cells 0 0 0 5 0 1 C-POWR-LINE-PSTV

4018 Power Supply Diagram Positive 0 0 0 5 0 1

C-POWR-LINE-NGTV

4019 Power Supply Diagram Negative

0 0 0 5 0 1

C-POWR-TEXT 4020 Power Supply Diagram General Text

0 0 0 5 0 1

C-POWR-LABL 4021 Power Supply Diagram Labelling

0 0 0 5 0 1

C-SIGN-CELL 4022 Sign Speed Posting 0 0 0 3 0 0 C-PANL-TRAK 4023 Panel Track Linework 0 0 0 3 0 2 C-PANL-GRID 4024 Panel Grid 0 0 0 2 0 0 C-PANL-LGHT 4025 Panel Lights 0 0 0 2 0 0 C-PANL-CTRL-BTTN

4026 Panel Controls Buttons 0 0 0 2 0 0

C-PANL-CTRL-LGHT

4027 Panel Controls Lights 0 0 0 2 0 0

C-PANL-LMRK 4028 Panel Frames and Platforms 0 0 0 2 0 0 C-PANL-TEXT 4029 Panel Text 0 0 0 2 0 0 C-INSU-BOND 4030 Insulation Bonding 0 0 0 2 0 0 C-INSU-DOTT 4031 Insulation Positive 0 0 0 2 0 0 C-INSU-FILL 4032 Insulation Negative 0 0 0 2 0 0 C-INSU-BLKJ 4033 Insulation Blockjoints 0 0 0 2 0 0 C-INSU-STAN 4034 Insulation Stanchions and

Spark Gaps 0 0 0 2 0 0

C-INSU-SIGS 4035 Insulation Cell and Text 0 0 0 2 0 0 C-INSU-FEED 4036 Insulation Feed and Relay

Information 0 0 0 2 0 0

© RailCorp Page 31 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 33: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

Nam

e

Num

ber

Des

crip

tion

Ove

rrid

eCol

orO

verr

ideS

tyle

Ove

rrid

eWei

ght

ByL

evel

Col

or

ByL

evel

Styl

eB

yLev

elW

eigh

t G

loba

lDis

play

El

emen

tAcc

ess

Plot

C-WORK-NEW 4037 New Work 0 0 0 4 0 0 C-WORK-RMOV 4038 Work to be Removed 0 0 0 2 0 0 C-LOCK-DPLX 4039 Duplex Locks 0 0 0 2 0 0 C-LOCK-BARS 4040 Locking Bars and Rods 0 0 0 2 0 0 C-LOCK-ELEC 4041 Electric Locks 0 0 0 2 0 0 C-LOCK-CTCH 4042 Catch Rods and Lights 0 0 0 2 0 0 C-LOCK-KEYS 4043 Locking Keys 0 0 0 2 0 0 C-KLMG 4044 Kilometrage Cells and Text 0 0 0 3 0 0 C-DIMS-PRIM 4045 Dimensions Primary 0 0 0 2 0 0 C-DIMS-SECD 4046 Dimensions Secondary 0 0 0 2 0 0 C-DIMS-GNRL 4047 Dimensions General 0 0 0 2 0 0 C-DIMS-MISC 4048 Dimensions Miscellaneous 0 0 0 2 0 0 C-HIDD-LINE-OVER 4049 Hidden Lines Over 0 3 0 3 3 0 C-HIDD-LINE-UNDR 4050 Hidden Lines Underneath 0 2 0 3 2 0 C-TEXT-LABL-MINR 4051 Minor Labelling 0 0 0 2 0 2 C-TEXT-LABL-MAJR 4052 Major Labelling 0 0 0 2 0 3 C-TEXT-TABL 4053 All Drawing Tables 0 0 0 2 0 1 C-TEXT-SCHD 4054 All Drawing Schedules 0 0 0 2 0 1 C-TEXT-175 4055 General Text 1.75 0 0 0 2 0 0 C-TEXT-25 4056 General Text 2.5 0 0 0 2 0 0 C-TEXT-35 4057 General Text 3.5 0 0 0 2 0 1 C-TEXT-50 4058 General Text 5.0 0 0 0 2 0 1 C-TEXT-70 4059 General Text 7.0 0 0 0 2 0 1

© RailCorp Page 32 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 34: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

Appendix C Signal Design AutoCAD Circuit Element Block List

Key To X,Y Scale And Rotation Angle * - any value acceptable X - condition not allowed 1 - condition allowed, scale factor = 1

Block Name Insertion & Definition Table Scale Rotation Angle

Block Name

Fig No.

X + -

Y + -

-90

0 + 90 Description

ZZARROW 13O 1 1 1 X 1 1 1 ARROW (used for tap-off points in circuits)

ZZBELLB 19A 1 1 1 X X 1 X BELL Block (single stroke)

ZZBELLT 19B 1 1 1 X X 1 X BELL Trembling ZZBICNC 19N 1 1 1 X X 1 X Block Instrument

stick Relay Normally closed

ZZBIR 19M 1 1 1 X X 1 X Block Instrument stick Relay

ZZBMC 13H 1 1 1 X X 1 1 Battery Multiple Cell

ZZBSC 13G 1 1 1 X X 1 1 Battery Single Cell ZZBSIGC 6G 1 1 1 X X 1 X Banner Signal

Contact ZZBUSPS 13I 1 1 1 X X 1 X Bus Power Supply ZZBUSTS1 13E 1 X 1 X X 1 1 BUS Terminal

Supply 1 only ZZBUSTS2 13F 1 X 1 X X 1 1 BUS Terminal

Supply 2 only ZZCAC 4L 1 1 1 X X 1 X Contactor A.C. ZZCACMI 4J 1 1 1 X X 1 X Contactor A.C.

Mechanically Interlocked

ZZCAP 20A 1 1 1 X X 1 1 CAPacitor ZCAPE 20B 1 1 1 X X 1 1 CAPacitor

Electrytic ZCAPVSP 20C 1 1 1 X X 1 1 CAPacitor Voltage

Surge Protection ZCBCC 2E 1 1 1 X X 1 X Contactor Back

Contact Closed ZCBCO 2D 1 1 1 X X 1 X Contactor Back

ContactOpened ZCCLUT 100 1 1 1 X X 1 X Contact CLUTch ZCCRK1 10R 1 1 1 X X 1 X Contact CRanK

type 1 (points machine)

ZCDC 4K 1 1 1 X X 1 X Contactor D.C. ZCDLNO 10Q 1 1 1 X X 1 X Contact Duplex

Lock Normally Open

ZCFCC 2A 1 1 1 X X 1 X Contactor Front ContactClosed

ZCFCO 2B 1 1 1 X X 1 X Contactor Front Contact Open

ZCOIL 12A 1 X 1 1 1 1 1 COIL (air core)

© RailCorp Page 33 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 35: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

Scale Rotation Angle

Block Name

Fig No.

X + -

Y + -

-90

0 + 90 Description

ZCOILC1 3L 1 1 1 X X 1 X X COIL Clutch type 1

ZCOILH1 3R 1 1 1 X X 1 X X COIL pick-up & Holdclear type 1

ZCOILIC 12B 1 X 1 1 1 1 1 COIL (Iron Core) ZCOILT 12C 1 X 1 X X 1 1 COIL Transformer ZCOM 13B 1 1 1 X X 1 X COMmon terminal ZDIMCOIL 12G 1 1 1 X X 1 X DIMming COIL ZDIODE 20P 1 1 1 X X 1 1 DIODE ZDIODER 20R 1 1 1 X X 1 X DIODE bridge

Rectifier ZDIODEZ 20Q 1 1 1 X X 1 1 DIODE Zener ZEARTH 20O 1 1 1 X 1 1 1 EARTH

connection ZEDCSCO 8C 1 1 1 X X 1 X Electrical Detector

Contact Sw.only Change Over

ZEDCSN 8A 1 1 1 X X 1 X Electrical Detector Contact Sw only Normal

ZEDCSPN 8E 1 1 1 X X 1 X Electrical Detector Contact Sw. & Plunger Normal

ZEDCSPR 8F 1 1 1 X X 1 X Electrical Detector Contact Sw. & Plunger Reverse

ZEDCSR 8B 1 1 1 X X 1 X Electrical Detector Contact Sw. only Reverse

ZEDESC 8D 1 1 1 X X 1 X Electrical Detector ESCapement slide contact

ZEDPLCN 8G 1 1 1 X X 1 X Electrical Detector PLunger Lock Contact Normal

ZEDPLCR 8H 1 1 1 X X 1 X Electrical Detector PLunger Lock Contact Reverse

ZELL 9A 1 1 1 X X 1 X Electric Lock Lever ZELLCC 9B 1 1 1 X X 1 X Electric Lock Lever

Contact Closed ZELCO 9C 1 1 1 X X 1 X Electric Lock Lever

Contact Open ZELP 9G 1 1 1 X X 1 X Electric Lock

Plunger ZELRS 9D 1 1 1 X X 1 X Electric Lock

Releasing Switch ZELRSCC 9E 1 1 1 X X 1 X Electric Lock

Releasing Switch Contact Closed

ZELRSCO 9F 1 1 1 X X 1 X Electric Lock Releasing Switch Contact Open

ZEREV 6P 1 1 1 X X 1 X Electrical REVerser

ZESMCCON 10F 1 1 1 x x 1 x Electrical Sw. Mach. Contact Change-Over (Nippon)

© RailCorp Page 34 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 36: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

Scale Rotation Angle

Block Name

Fig No.

X + -

Y + -

-90

0 + 90 Description

ZESMCN 10A 1 1 1 1 X 1 X Electrical Sw. Mach. Contact Normal

ZESMCNN 10D 1 1 1 1 X 1 X Electrical Sw. Mach Contact Normal (Nippon)

ZESMCR 10B 1 1 1 1 X 1 X Electrical Sw. Mach. Contact Reverse

ZESMCCL 10C 1 1 1 1 X 1 X Electrical Sw. Mach Contact Clamp Lock

ZESMCRN 10E 1 1 1 1 X 1 X Electrical Sw. Mach. Contact Reverse (Nippon)

ZESML 10P 1 1 1 1 X 1 X Electrical Sw. Mach. Lock

ZFL1 11M 1 1 1 X X 1 X FLasher unit type 1 (thermal type)

ZFL2 11N 1 1 1 X X 1 X FLasher unit type 2 (email type)

ZRFC 2R 1 1 1 X X 1 X FLashing Relay Contact

ZFUSE 13A 1 1 1 X X 1 X FUSE ZFUSE1 13B 1 1 1 X X 1 1 FUSE type 1

(without wire tags) ZGPO 13D 1 1 1 X X 1 X General Purpose

Outlet (ie. 240V) ZHDCB 2I 1 1 1 X X 1 X Heavy Duty

Contactor Busbar ZHDCFCC 2G 1 1 1 X X 1 X Heavy Duty

Contactor Front Contact Closed

ZHDCFCO 2H 1 1 1 X X 1 X Heavy Duty Contactor Front Contact Open

ZIEC 18A 1 1 1 X X 1 X Indicator Eyeball inseparate Case

ZIED 18B 1 1 1 X X 1 X Indicator Eyeball in Diagram

ZIL 18D 1 1 1 X X 1 X Indicator Lamp ZILC 18E 1 1 1 X X 1 X Indicator Lamp in

sep. case ZILEV 18G 1 1 1 X X 1 X Indicator LEVer

light ZILMI1 21M 1 1 1 X X 1 X Indicator Lamp

Module Incandescent type 1

ZILML1 21A 1 1 1 X X 1 X Indicator Lamp Module LED type 1 (3mm LED)

ZILML2 21B 1 1 1 1 X 1 X Indicator Lamp Module LED type 2 (3mm LED)

ZILML3 21D 1 1 1 X X 1 X Indicator Lamp LED type 3 (3mm LED)

ZILML4 21E 1 1 1 X X 1 X Indicator Lamp Module LED type 4 (3mm LED)

© RailCorp Page 35 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 37: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

Scale Rotation Angle

Block Name

Fig No.

X + -

Y + -

-90

0 + 90 Description

ZILML5 21F 1 1 1 X X 1 X Indicator Lamp Module LED type 5 (3mm LED)

ZILML6 21C 1 1 1 X X 1 X Indicator Lamp Module LED type 6 (3mm LED)

ZILSI 18H 1 1 1 X X 1 X Indicator Lamp with Store no.1 transformer

ZIRNT 18C 1 1 1 X X 1 X Indicator Repeater Needle Type

ZIRST 18F 1 X 1 X X 1 X Indicator Repeater Semaphore Type

ZLA 13P 1 1 1 X X 1 X Lighting Arrestor ZLA2 13Q 1 1 1 X X 1 X Lighting Arrestor

type 2 ZLCCRNC 17G 1 1 1 X X 1 X Lever Contact

CatchRodNormally Closed

ZLCCRNO 17H 1 1 1 X X 1 X Lever Contact CatchRodNormally Open

ZLCE 17B 1 1 1 1 X 1 X Lever Contact Electric switch

ZLCMCO 17L 1 1 1 1 X 1 X Lever Contact Minature type Change Over

ZLCMNC 17J 1 1 1 X X 1 X Lever Contact Minature type Normally Closed

ZLCMNO 17K 1 1 1 X X 1 X Lever Contact Minature type Normally Opened

ZLCR 17A 1 1 1 X X 1 X Lever Contact Rotary

ZLCS 17C 1 1 1 X X 1 X Lever Contact route Setting switch

ZLINK1 13K 1 1 1 X X 1 X LINK type 1 ZLOC 13M 1 X 1 X X 1 X LOCation terminal

single ZLOC1 13N 1 X 1 X X 1 1 LOCation terminal

double (type 1) ZLQSC 6J 1 1 1 1 X 1 X Lower Quadrant

Signal Contact ZMETER 13R 1 1 1 X X 1 1 METER (eg.

voltage, current, etc)

ZMOTOR 7A 1 1 1 X X 1 X MOTOR (eg. banner signal)

ZMOTOR2 7C 1 X 1 X X 1 X MOTOR type 2 (western railroad boom gates)

ZMOTOR3 7D 1 X 1 X X 1 X MOTOR type 3 (western railroad boom gates type B)

ZMOTOR4 7B 1 1 1 X X 1 X MOTOR type 4 (eg. nippon points motor)

© RailCorp Page 36 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 38: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

Scale Rotation Angle

Block Name

Fig No.

X + -

Y + -

-90

0 + 90 Description

ZMOTOR5 7E 1 X 1 X X 1 X MOTOR type 5 (eg. pedestrian barriers)

ZNVRAC 3K 1 1 1 X X 1 X Non Vital Relay A.C (ie. HH23 type)

ZNVRBCC 1N 1 1 1 X X 1 X Non Vital Relay Back Contact Closed

ZNVRBCO 1M 1 1 1 X X 1 X Non Vital Relay Back Contact Open

ZNVRDC 3N 1 1 1 X X 1 X Non Vital Relay D.C. (ie. HH23 type)

ZNVRDCP 3Q 1 1 1 X X 1 X Non Vital Relay D.C. (PC board type)

ZNVRDFCC 1P 1 1 1 X X 1 X Non Vital Relay Dependant Front Contact Closed

ZNVRDFCO 1Q 1 1 1 X X 1 X Non Vital Relay Dependant Front Contact Open

ZNVRFCC 1J 1 1 1 X X 1 X Non Vital Relay Front Contact Closed

ZNVRFCO 1K 1 1 1 X X 1 X Non Vital Relay Front Contact Open

ZPB3F 16A 1 1 1 X X 1 X Push Button 3 position (push to make)

ZPB3FM 16C 1 1 1 X X 1 X Push Button 3 position (pull to break)

ZPB3T 16B 1 1 1 X X 1 X Push Button 3 position (pull to make)

ZPBBBCO 16R 1 1 1 X X 1 X Push Button Block Bell Change Over type

ZPBNC 16G 1 1 1 X X 1 X Push Button Normally Closed

ZPBNO 16H 1 1 1 X X 1 X Push Button Normally Open

ZPBRSNO 16Q 1 1 1 X X 1 X Push Button Release Switch Normally Open

ZPBTF 16J 1 1 1 X X 1 X Push Button (push to break/push to make)

ZPC 13J 1 1 1 X X 1 1 Plug Coupler ZPSM1 11A 1 1 1 X X 1 X Power Supply

Module type 1 ZR3P 3H 1 1 1 X X 1 X Relay a.c.3

Position ZRAC 3B 1 1 1 X X 1 X Relay A.C. ZRACDE 3E 1 1 1 X X 1 X Relay A.C. Double

Element

© RailCorp Page 37 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 39: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

Scale Rotation Angle

Block Name

Fig No.

X + -

Y + -

-90

0 + 90 Description

ZRACSR 3I 1 1 1 X X 1 X Relay A.C. Slow Release

ZRACTS 4E 1 1 1 X X 1 X Relay A.C. Track relay Shelf

ZRBCC 1E 1 1 1 X X 1 X Relay Back Contact Closed

ZRBCO 1D 1 1 1 X X 1 X Relay Back Contact Open

ZRDC 3A 1 1 1 X X 1 X Relay D.C. ZRDCB 3D 1 1 1 X X 1 X Relay D.C. Biased ZRDCL 3P 1 1 1 X X 1 X Relay D.C.

Latched ZRDQ1 4C 1 1 1 X X 1 X Relay D.C. QTR1

type ZRDCSP 3G 1 1 1 X X 1 X Relay D.C. Slow

Pick ZRDCSPR 3M 1 1 1 X X 1 X Relay D.C. Slow

Pick andRelease ZRDCSR 3J 1 1 1 X X 1 X Relay D.C. Slow

Release ZRDCT 4A 1 1 1 X X 1 X Relay D.C. Timer ZRDCTQ3 4B 1 1 1 X X 1 X Relay D.C.Timer

QTD3 type ZRDFCC 1G 1 1 1 X X 1 X Relay Dependant

Front Contact Closed

ZRDFCO 1H 1 1 1 X X 1 X Relay Dependant Front Contact Open

ZRES 20G 1 1 1 X X 1 X RESistor fixed ZRESV 20H 1 1 1 X X 1 X RESistor Variable ZRESV2 20I 1 1 1 X X 1 X RESistor Variable

type 2 ZRESV3 20J 1 1 1 1 1 1 X RESistor Variable

type 3 ZRFCC 1A 1 1 1 X X 1 X Relay Front

Contact Closed ZRFCO 1B 1 1 1 X X 1 X Relay Front

Contact Open ZRTJS 4I 1 1 1 X X 1 X Relay Rack

Jeumont Schneider

ZSAC 4N 1 1 1 X X 1 X Solenoid A.C. ZSCNC 15G 1 1 1 X X 1 X Switch Contact

Normally Closed ZSCNO 15H 1 1 1 X X 1 X Switch Contact

Normally Open ZSDC 4M 1 1 1 X X 1 X Solenoid D.C. ZSDP 15D 1 1 1 X X 1 X Switch Double

Pole ZSDPS 15F 1 1 1 X X 1 X Switch Double

Pole Snap action ZSLC 6A 1 1 1 X X 1 X Search Light

signal Contact ZSLCN 6B 1 1 1 X X 1 X Search Light

signal Contact Normal

ZSLINDN 6C 1 1 1 X X 1 X Search Light signal INDicatioN (signal operating)

© RailCorp Page 38 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 40: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

Scale Rotation Angle

Block Name

Fig No.

X + -

Y + -

-90

0 + 90 Description

ZSSHELF 15P 1 1 1 X X 1 X Switch SHELF type (used with mechanical levers)

ZSSHELF1 15Q 1 1 1 X X 1 X Switch SHELF type 2 (used with mechanical levers)

ZSSPNC 15A 1 1 1 X X 1 X Switch Single Pole Normally Closed

ZSSPNO 15B 1 1 1 X X 1 X Switch Single Pole Normally Open

ZSSPNOD 15N 1 1 1 X X 1 X Switch Single Pole Normally Open for Dimming

ZSSPS 15C 1 1 1 X X 1 X Switch Single Pole Snap action

ZSTP1 14M 1 1 1 X X 1 X STraP type 1 (for timer relays - ZRDCT)

ZSTP2 14N 1 1 1 X X 1 X STraP type 2 (for timer relays - ZRDCT)

ZSTP3 14O 1 1 1 X X 1 X STraP type 3 (for timer relays - ZRDCT)

ZRTP4 14P 1 1 1 X X 1 X STraP type 4 (for timer relays - ZRDCT)

ZTSCN 14B 1 1 1 X X 1 X Train Stop Contact Normal

ZTSCNR 14F 1 1 1 X X 1 X Train Stop Contact made Normal to almost Reverse

ZTSCR 14C 1 1 1 X X 1 X Train Stop Contact Reverse

ZTSM 14A 1 1 1 X X 1 X Train Stop Motor ZUQC 5A 1 1 1 X X 1 X Upper Quadrant

Contact (0 degrees)

ZUQC0010 5B 1 1 1 X X 1 X Upper Quadrant Contact (0 to 10 degrees)

ZUQC0045 5C 1 1 1 X X 1 X Upper Quadrant Contact (0 to 45 degrees)

ZUQC0088 5D 1 1 1 X X 1 X Upper Quadrant Contact (0 to 88 degrees)

ZUQC45 5E 1 1 1 X X 1 X Upper Quadrant Contact (45 degrees)

ZUQC0690 5F 1 1 1 X X 1 X Upper Quadrant Contact (6 to 90 degrees)

ZUQC4590 5G 1 1 1 X X 1 X Upper Quadrant Contact (45 to 90 degrees)

ZUQC8890 5H 1 1 1 X X 1 X Upper Quadrant Contact (88 to 90 degrees)

ZVARES 20K 1 1 1 X X 1 X VAREStor

© RailCorp Page 39 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 41: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

Special Blocks For New & Removed Circuit Work Scale Rotation Angle

Block Name

Fig No.

X + -

Y + -

-90

0 + 90 Description

ZNWAR 19G 1 X 1 X * * * New Work ARrow

ZRWAR 19H 1 X 1 X * * * Removal Work ARrow

Special Blocks For Extended Sheets Scale Rotation Angle

Block Name

Fig No.

X + -

Y + -

-90

0 + 90 Description

ZLABEL 19I 1 X 1 X X X X Label for extended sheets

© RailCorp Page 40 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 42: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

Appendix D Symbols For Plans And Drawings

© RailCorp Page 41 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6 Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 43: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

© RailCorp Page 42 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6

Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 44: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

© RailCorp Page 43 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6

Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 45: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

© RailCorp Page 44 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6

Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 46: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

© RailCorp Page 45 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6

Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 47: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

© RailCorp Page 46 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6

Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 48: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

© RailCorp Page 47 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6

Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 49: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

© RailCorp Page 48 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6

Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 50: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

© RailCorp Page 49 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6

Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 51: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

© RailCorp Page 50 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6

Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 52: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

© RailCorp Page 51 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6

Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 53: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

© RailCorp Page 52 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6

Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 54: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

© RailCorp Page 53 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6

Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 55: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

© RailCorp Page 54 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6

Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 56: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

© RailCorp Page 55 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6

Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 57: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

© RailCorp Page 56 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6

Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 58: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

© RailCorp Page 57 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6

Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 59: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

© RailCorp Page 58 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6

Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 60: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

© RailCorp Page 59 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6

Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 61: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

© RailCorp Page 60 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6

Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 62: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

© RailCorp Page 61 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6

Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 63: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

© RailCorp Page 62 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6

Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0

Page 64: Technical Note - TN 086: 2015 - Transport for NSW · Technical Note - TN 086: 2015 . ... 6.2.4 Symbols for Plans and Drawings ... Special Blocks For New & Removed Circuit Work

RailCorp Engineering Manual — Design — Signal CAD and Drafting Manual – Signal – Section 6 TMD 0001

© RailCorp Page 63 of 63 Issued September 2010 UNCONTROLLED WHEN PRINTED Version 1.6

Sup

erse

ded

by T

MU

MD

000

06 S

T v1

.0