technical overview: electrical, civil and … · • laying of power cables (mv) ... competency as...

116
TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND COMMISSIONING June 2017

Upload: vonhi

Post on 27-Apr-2018

219 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND

COMMISSIONING

June 2017

Page 2: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

2

DISCIPLINE STREAMS

• The following technical discipline streams are defined for this Panel:

• Electrical Plant

• General Building and Civil Engineering Work

• Commissioning

• Protection

• Metering

• Telecontrol

• DC

Page 3: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

DISCIPLINE STREAMS - SCOPES

• ELECTRICAL PLANT:

(High level only! Refer to NEC document for detail)

• Delivery, storage and installation of electrical equipment for new substations or during refurbishment of substations.

• Substation earthing

• Stringing of busbars and jumpers

• Cable work (MV and LV)

• Yard lighting, plug boxes, junction boxes

• Substation labels

• Installation of panels

3

Page 4: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

DISCIPLINE STREAMS - SCOPES

• GENERAL BUILDING AND CIVIL ENGINEERING WORK:

(High level only! Refer to NEC document for detail)

• Geology and Soils

• Excavation

• Survey

• Water Services

• Earthworks and Subgrade treatment

• Drainage

• Embankments

• Access Roads

• Fencing and Gates

• Foundations

• Control Building

• Main Substation Earthing

• Steelwork

4

Page 5: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

DISCIPLINE STREAMS - SCOPES

• COMMISSIONING:

(High level only! Refer to NEC document for detail)

Pre-commissioning and Energization phase of commissioning

• PROTECTION: schemes e.g. transformer and OLTC diff scheme, HV

feeder diff and impedance schemes, Bus zone protection, rural feeder

schemes (refer to NEC for more)

• METERING: tariff metering, statistical metering

• DC: batteries, battery charger, AC/DC board

• TELECTRONTROL: Reclosers (Any 2 of the following: Tavrida,

Schneider, Nulec, 4c, Form 5), D20 RTU, D400 RTU

5

Page 6: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

TECHNICAL TENDER SUBMISSIONS

• Technical Criteria for each stream is unique, and only relevant to the specific stream.

• Technical Submissions Files can be submitted for any or all of the defined streams.

• A minimum of one stream must be submitted for further consideration on the Panel.

• If no technical submission is received then overall submission will not be considered further.

• The submission will only be considered for the discipline stream it is submitted against. No benefit will be given for other streams.

• That is! Example: If a submission is for Electrical Plant, that submission will not be used to assess compliance to the Civils or Commissioning criteria. It will strictly be used for evaluation against the Electrical Plant criteria.

6

Page 7: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

SCORING AND RANKING

• There are 15 slots available in each Discipline Stream

• Electrical Plant: 15

• General Building and Civil Engineering Work: 15

• Commissioning: 15

• What does this mean?

• For each stream, after the technical evaluations are concluded, only 15 submissions will be considered successful and will be processed further.

• The 15 successful submissions will be selected by scoring and ranking all submissions that meet the minimum requirements, and thereafter selecting the TOP 15 highest ranked submissions.

7

Page 8: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

SCORING AND RANKING

• Minimum Thresholds have been established for each Discipline Stream.

• If a submission has achieved a score above the minimum threshold, it will be included in the ranking process.

• Scores will be normalized to percentages for the ranking process.

• The Top 15 will be selected from the submissions scoring above the minimum threshold.

8

Page 9: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

SUBSTATION PANEL – HOW IT WORKS

9

SUBSTATION PANEL

ELECTRICAL PLANT

TOP 15

1. A

2. B

3. Springbok

4. D

5. E

6. F

7. G

8. H

9. I

10. J

11. Rhino

12. L

13. M

14. N

15. O

CIVIL WORKS

TOP 15

1. Zebra

2. Giraffe

3. Rhino

4. Elephant

5. A

6. Duiker

7. Springbok

8. N

9. Lion

10. Leopard

11. Cheetah

12. Hyena

13. Dragon

14. Godzilla

15. T-Rex

COMMISSIONING

TOP 15

1. Mountain

2. Valley

3. H

4. Grass

5. Sand

6. Water

7. River

8. A

9. Road

10. …

11. …

12. Rhino

13. …

14. …

15. …

Page 10: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

ACHIEVING TOP 15

• How to maximize the chance of being in the Top 15 for any Discipline (Electrical Plant, Civil, Commissioning)?

• Follow the Evidence Guidelines – e.g. certify, method statements, CVs etc.

• Use the Submission Packs and organize the evidence correctly per discipline

• Don’t just attempt to meet the minimum score – try to meet the maximum score

10

Page 11: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

ELECTRICAL PLANT

TECHNICAL CRITERIA, SCORING, THRESHOLD etc.

11

Page 12: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

ELECTRICAL PLANT

• Electrical Plant Criteria has two MAIN Sections:

• GATEKEEPER SECTION

• MANDATORY EVIDENCE SECTION

• Training and Skills

• Tools and Equipment

• Vehicles

• All elements in the criteria have a score allocation. Negative marking applies for non-compliant/not submitted evidence.

• The minimum score for the gatekeeper has to be achieved for the submission to be considered further.

• The minimum score for the mandatory evidence has to be achieved for the submission to achieve the minimum threshold for Ranking.

12

Page 13: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

ELECTRICAL PLANT: GATEKEEPER

Evidence of previous experience & associated method statements

• List of Completed Jobs related to Substation Construction and Refurbishment (not older than 7 years, specifically demonstrating the required competencies).

• Competencies (New Build or Refurb):

• Installation of Substation Equipment: Isolators

• Installation of Substation Equipment: Breakers

• Installation of Substation Equipment: Power Transformers

• Stringing of jumpers and busbars

• Laying of Power Cables (MV) and Terminating

• Substation Dismantling

• Installation of substation equipment such as CTs, VTs, Insulators

• Installation of PTM and DC Panels And Junction Boxes

13

Page 14: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

ELECTRICAL PLANT: GATEKEEPER

• Gatekeeper Evidence to be submitted:

• General Information required per Completed Job:

• Project Name

• Name Of Customer

• References (Name And Contact Information)

• Project Value

• Project Duration (Start And End Dates)

• Brief scope of work

• Method statements to be included per Competency, with content relevant to the task such as risks, working in live chambers, supervision, tools and equipment, task steps etc

• Can be from 1 or more jobs – if 1 job shows required number of competencies, then 1 is fine… or as many as you need.

14

Page 15: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

ELECTRICAL PLANT: GATEKEEPER

• How to successfully submit the Gatekeeper information:

1. Use the Electrical Plant - Tender Submission pack loaded on the tender portal.

2. Use the Gatekeeper Section of the Submission Pack to prepare your submission.

3. Successful evidence will included details of the job completed, confirmation of the tasks that align to the competencies we require and the Method Statements for those competencies.

15

Page 16: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

ELECTRICAL PLANT: GATEKEEPER

• How to successfully PASS the Gatekeeper:

• Total / Max Gatekeeper Score = 40 (8 Competencies demonstrated)

• Pass Mark = 20 (4 Competencies demonstrated)

• Points deducted per Competency not demonstrated = 5

• Points deducted if evidence does note demonstrate Project Details, a Competency as stated in the criteria and the associated method statement for that competency!

• Pass with 4 competencies – will allow the submission to be considered further

• GATEKEEPER SCORES ARE INCLUDED IN THE FINAL SCORING.

HIGHER GATEKEEPER SCORES COULD RESULT IN HIGHER FINAL

SCORES AND IMPROVE THE CHANCES OF BEING INCLUDED IN

THE TOP 15!

16

Page 17: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

ELECTRICAL PLANT: MANDATORY EVIDENCE

• MANDATORY TRAINING AND SKILLS

17

Criteria Quantity Evidence Evidence requirements Scoring

BASIC

RIGGING

1 Basic Rigging

Training Certificate

1. Copies of the training certificates must be certified by a

commissioner of Oaths, with a signature and date not

older than three months from the issue date of this

tender.

2. Training certificates are to be valid on the date of tender

close. Certificates that have expired prior to this date will

not be accepted as valid evidence.

10

TRUCK

MOUNTED

CRANE

OPERATOR

1 Truck Mounted

Crane Certificate

1. Copies of the training certificates must be certified by a

commissioner of Oaths, with a signature and date not

older than three months from the issue date of this

tender.

2. Training certificates are to be valid on the date of tender

close. Certificates that have expired prior to this date will

not be accepted as valid evidence

10

ORHVS 1 ORHVS Training

Certificates

(Responsible

Person/HVO2

Minimum)

Or Valid

Authorizations

1. Copies of the training certificates/authorizations must be

certified by a commissioner of Oaths, with a signature

and date not older than three months from the issue date

of this tender.

2. Training certificates are to be valid on the date of tender

close. Certificates that have expired prior to this date will

not be accepted as valid evidence

10

Page 18: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

ELECTRICAL PLANT: MANDATORY EVIDENCE

• MADATORY TRAINING AND SKILLS

18

Criteria Quantity Evidence Evidence requirements Scoring

MV CABLE JOINTING

AND TERMINATION

1 Training

certificate

1. Copies of the training certificates must be

certified by a commissioner of Oaths, with a

signature and date not older than three

months from the open date of this tender.

10

CONSTRUCTION

TEAM EXPERIENCE:

SITE

SUPERVISOR

CONSTRUCTION

MANAGER

FOREMAN

ELECTRICIAN

1 CV and

related

qualificati

ons

1. CV to demonstrate previous experience in

this specific role for substation related tasks.

1. Proof of registration as a candidate or

confirmation letter from SACPCMP of

registration for the Construction Manager.

(2.5 marks per skill)

10

Page 19: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

ELECTRICAL PLANT: MANDATORY EVIDENCE

• TRAINING AND SKILLS – SCORING

• Total / Max Points = 50

• Each Training and Skill criteria is worth 10 points

• Negative Marking Applies

• 10 points deducted if evidence not submitted as per requirements stated

19

Page 20: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

ELECTRICAL PLANT: MANDATORY EVIDENCE

• MANDATORY TOOLS/EQUIPMENT

20

No Tool/Equipment 1 Slings (steel, chain and canvas)

2 Conductor grip (steel)

3 Conductor grips (al)

4 Tirfor (winch)

5 Lever hoists

6 D-shackles (containing swl)

7 Snatch block

8 Stringing wheels / conductor pulleys

9 Guide / pilot rope

10 Galvanizing tester

11 Tool boxes – electrical and mechanical

12 Insulation tester

13 Earth resistance tester

14 Continuity tester for ringing out cable

cores

No Tool/Equipment 15 Suitable drills (power)

16 Hole alignment wedge

17 Hand lines or skip rope

18 Hydraulic conductor cutter

19 Cable/conductor drum trestle (braked)

20 Conductor wire brush (al)

21 Gas welding sets

22 Jacks & props

23 Generator

24 Thermometer

25 Crimping (100 ton press + suitable dies)

26 LV Crimper

27 Torque wrench

28 Dynamometer (or sagging tools)

29 Mechanical Compactor

30 Angle Grinder

Page 21: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

ELECTRICAL PLANT: MANDATORY EVIDENCE

• MANDATORY TOOLS/EQUIPMENT

• Refer to the Electrical Plant - Tender Submission pack loaded on the tender portal.

• Use the tool list included in the pack for your evidence submission. This is preferred.

• HOW TO SUBMIT THE REQUIRED EVIDENCE:

• Use the Tool List in the tender pack.

• Indicate if the tool is currently OWNED by the Company or being HIRED

• If the tool is owned, indicate the quantity available and if the tools are available for inspection if needed.

• If the tools are being hired, include a letter from the Bona Fide Hiring Company proving the ability to hire the tools. If this letter is not included, points will be deducted for the relevant tools.

21

Page 22: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

ELECTRICAL PLANT: MANDATORY EVIDENCE

• MANDATORY TOOLS/EQUIPMENT - SCORING

• Total / Max Points = 30

• Each Tool/Equipment criteria is worth 1 point

• Negative Marking Applies

• 1 point deducted if evidence not submitted as per requirements stated

• A penalty of 2 points will be deducted if 50% (15) or more of tools/equipment is hired.

22

Page 23: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

ELECTRICAL PLANT: MANDATORY EVIDENCE

• MANDATORY VEHICLES

23

Criteria Quantit

y

Evidence Evidence requirements Scoring

Bakkie/LDV 1 Proof of

Ownership

Or

Hiring Letter

In order to demonstrate ownership, license documents are to be

submitted, clearly showing the type of vehicle and the owner’s name.

If the vehicle is not in the Company name then submit an affidavit

clarifying the vehicle ownership for consideration.

If the evidence does not adequately demonstrate ownership then the

vehicle will be noted as non-responsive.

Hiring of the Vehicle will be accepted. A hiring letter from a Bona Fide

hiring company will be required as evidence. Hiring from

Electrical/Construction/Other Contractors will not be accepted. If the hiring

letter is not provided or accepted then the vehicle will be noted as non-

responsive.

1

Staff

Transport

Vehicle

1 Proof of

Ownership

Or

Hiring Letter

In order to demonstrate ownership, license documents are to be

submitted, clearly showing the type of vehicle and the owner’s name.

Additional bakkies/ldvs, micro/minibus buses, or similar passenger

vehicles will be accepted.

If the vehicle is not in the Company name then submit an affidavit

clarifying the vehicle ownership for consideration.

If the evidence does not adequately demonstrate ownership then the

vehicle will be noted as non-responsive.

Hiring of the Transport Vehicle will be accepted. A hiring letter from a

Bona Fide hiring company will be required as evidence. Hiring from

Electrical/Construction/Other Contractors will not be accepted. If the hiring

letter is not provided or accepted then the vehicle will be noted as non-

responsive.

1

Page 24: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

ELECTRICAL PLANT: MANDATORY EVIDENCE

• MANDATORY VEHICLES

24

Criteria Quantity Evidence Evidence requirements Scoring

5 Ton

Truck with

Crane

1 Proof of

Ownership

with Crane

Load Test

Or

Hiring Letter

In order to demonstrate ownership, license documents are to be submitted, clearly

showing the type of vehicle and the owner’s name.

If the vehicle is not in the Company name then submit an affidavit clarifying the

vehicle ownership for consideration.

The Crane Load test for the crane on the truck must be submitted.

If the evidence does not adequately demonstrate ownership or of the load test is not

accepted/submitted then the vehicle will be noted as non-responsive.

Hiring of the Vehicle will be accepted. A hiring letter from a Bona Fide hiring

company will be required as evidence. Hiring from Electrical/Construction/Other

Contractors will not be accepted. If the hiring letter is not provided or accepted then

the vehicle will be noted as non-responsive.

1

Bucket/

Hydraulic

Lift

1 Proof of

Ownership

Or

Hiring Letter

In order to demonstrate ownership, license documents are to be submitted, clearly

showing the type of vehicle and the owner’s name.

If the vehicle is not in the Company name then submit an affidavit clarifying the

vehicle ownership for consideration.

The Crane Load test for the crane on the truck must be submitted.

If the evidence does not adequately demonstrate ownership or of the load test is not

accepted/submitted then the vehicle will be noted as non-responsive.

Hiring of the Vehicle will be accepted. A hiring letter from a Bona Fide hiring

company will be required as evidence. Hiring from Electrical/Construction/Other

Contractors will not be accepted. If the hiring letter is not provided or accepted then

the vehicle will be noted as non-responsive.

1

Page 25: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

ELECTRICAL PLANT: MANDATORY EVIDENCE

• MANDATORY VEHICLES

• HOW TO SUBMIT THE REQUIRED EVIDENCE:

• The Vehicles listed can be OWNED by the Company or HIRED.

• If OWNED:

• Evidence of ownership is needed. Submit evidence such as a Logbook or license documents that show the vehicle type (e.g. bakkie, LDV, micro-bus, dropside etc) and the owners name.

• If the vehicle is not in the companies name, include an affidavit explaining the ownership of the vehicle. The vehicle ownership must be related to the company in a significant way e.g. Company Owner’s name, Shareholders Name etc

• The CRANE TRUCK EVIDENCE must include the evidence above and proof of the crane e.g. installation certificate, load test certificate etc.

• If HIRED: include a letter from the Bona Fide Hiring Company proving the ability to the vehicles. If this letter is not included, points will be deducted for the relevant vehicles.

25

Page 26: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

ELECTRICAL PLANT: MANDATORY EVIDENCE

• MANDATORY VEHICLES

• Total / Max Points = 4

• Each Vehicle criteria is worth 1 point

• Negative Marking Applies

• 1 point deducted if evidence not submitted as per requirements stated

26

Page 27: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

ELECTRICAL PLANT: FINAL SCORING AND RANKING

• Only applicable if the Gatekeeper pass mark is achieved AND the minimum score for the Mandatory Evidence is achieved:

• Gatekeeper Pass = 20

• Mandatory Evidence Pass = 38***

• ***Mandatory evidence score is determined by combining the scores for Training and Skills, Tools/Equipment and Vehicles. Submitting evidence as per the requirements and minimizing the scores that will be deducted by negative marking will increase the points achieved for the Mandatory Evidence.

• Submissions not achieving these scores will not be processed further.

• Gatekeeper score and Mandatory evidence score will be added together. This will be the final score for the submission. The final score will be converted to a percentage.

• The % scores will be ordered from highest to lowest, thereby ranking them.

27

Page 28: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

ELECTRICAL PLANT: FINAL SCORING AND RANKING

• Threshold for Ranking:

• The TOP 15 submissions achieving a % score of 59% or more will be processed further

• If there are less than 15 submissions with scores greater than or equal to 59%, then the shortfall will be made up from submissions with scores between 58% and 46% (inclusive). The selected submissions will be processed further.

• These submissions will be allocated for Development to resolve the shortfalls related to the Mandatory evidence which resulted in the score achieved.

• Submissions not selected in the Top 15 will not be processed further.

28

Page 29: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

GENERAL BUILDING AND CIVIL ENGINEERING WORK

TECHNICAL CRITERIA, SCORING, THRESHOLD etc.

29

Page 30: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

GENERAL BUILDING AND CIVIL ENGINEERING WORK

• General Building And Civil Engineering Work Criteria has two MAIN Sections:

• GATEKEEPER SECTION

• MANDATORY EVIDENCE SECTION

• Training and Skills

• Tools and Equipment

• Vehicles

• All elements in the criteria have a score allocation. Negative marking applies for non-compliant/not submitted evidence.

• The minimum score for the gatekeeper has to be achieved for the submission to be considered further.

• The minimum score for the mandatory evidence has to be achieved for the submission to achieve the minimum threshold for Ranking.

30

Page 31: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

GENERAL BUILDING AND CIVIL ENGINEERING WORK: GATEKEEPER

Evidence of previous experience & associated method statements

• List of Completed Jobs related to Substation Construction and Refurbishment (not older than 7 years, specifically demonstrating the required competencies).

• Competencies (New Build or Refurb):

• Survey

• Bulk earthworks and layerworks

• Control Room/ Switchroom Building works

• CONTINUED NEXT SLIDE

31

Page 32: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

GENERAL BUILDING AND CIVIL ENGINEERING WORK: GATEKEEPER

• Competencies (New Build or Refurb):

• Concrete works:

• If Batching – the contractor needs to provide the following:

Concrete Mix design;

Aggregate to be used;

Location/supplier of aggregate; and

Mixing and testing need to be included in the method statement.

• If Ready mix – the contractor needs to provide the following:

The supplier of Ready mix and the distance from site;

How results will be obtained from the supplier; and

How concrete will be tested on site.

• CONTINUED NEXT SLIDE

32

Page 33: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

GENERAL BUILDING AND CIVIL ENGINEERING WORK: GATEKEEPER

• Competencies (New Build or Refurb):

• Surface and Subsurface Drainage

• Steelwork

• Earthmat trenching, installation and backfilling

• Fencing and Gates

• Yardstone and kerbing

• Installation of Control/Switch Room Electrical (Air-conditioner units, 400V

AC DB, 110V DC DB, emergency lighting

• Retaining structures

• Rehabilitation

• Total of 12 competencies listed.

33

Page 34: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

GENERAL BUILDING AND CIVIL ENGINEERING WORK: GATEKEEPER

• Gatekeeper Evidence to be submitted:

• General Information required per Completed Job:

• Project Name

• Name Of Customer

• References (Name And Contact Information)

• Project Value

• Project Duration (Start And End Dates)

• Brief scope of work

• Method statements to be included per Competency, with content relevant to the task such as risks, working in live chambers, supervision, tools and equipment, task steps etc.

• Can be from 1 or more jobs – if 1 job shows required number of competencies, then 1 is fine… or as many as you need.

34

Page 35: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

GENERAL BUILDING AND CIVIL ENGINEERING WORK: GATEKEEPER

• How to successfully submit the Gatekeeper information:

1. Use the General Building and Civil Engineering Work - Tender Submission pack loaded on the tender portal.

2. Use the Gatekeeper Section of the Submission Pack to prepare your submission.

3. Successful evidence will included details of the job completed, confirmation of the tasks that align to the competencies we require and the Method Statements for those competencies.

35

Page 36: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

GENERAL BUILDING AND CIVIL ENGINEERING WORK: GATEKEEPER

• How to successfully PASS the Gatekeeper:

• Total / Max Gatekeeper Score = 60 (12 Competencies demonstrated)

• Pass Mark = 40 (8 Competencies demonstrated)

• Points deducted per Competency not demonstrated = 5

• Points deducted if evidence does note demonstrate Project Details, a Competency as stated in the criteria and the associated method statement for that competency!

• Pass with 8 competencies – will allow the submission to be considered further

• GATEKEEPER SCORES ARE INCLUDED IN THE FINAL SCORING.

HIGHER GATEKEEPER SCORES COULD RESULT IN HIGHER FINAL

SCORES AND IMPROVE THE CHANCES OF BEING INCLUDED IN

THE TOP 15!

36

Page 37: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

GENERAL BUILDING AND CIVIL ENGINEERING WORK: MANDATORY EVIDENCE

• MANDATORY TRAINING AND SKILLS

37

Criteria Quantity Evidence Evidence requirements Scoring

BASIC

RIGGING

1 Basic Rigging

Training

Certificate

1. Copies of the training certificates must be certified by a

commissioner of Oaths, with a signature and date not

older than three months from the open date of this tender.

2. Training certificates are to be valid on the date of tender

close. Certificates that have expired prior to this date will

not be accepted as valid evidence.

10

TRUCK

MOUNTED

CRANE

OPERATOR

1 Truck Mounted

Crane Certificate

1. Copies of the training certificates must be certified by a

commissioner of Oaths, with a signature and date not

older than three months from the open date of this tender.

2. Training certificates are to be valid on the date of tender

close. Certificates that have expired prior to this date will

not be accepted as valid evidence

10

ORHVS 1 ORHVS Training

Certificates

(Responsible

Person/HVO2

Minimum)

Or Valid

Authorizations

1. Copies of the training certificates/authorizations must be

certified by a commissioner of Oaths, with a signature and

date not older than three months from the open date of this

tender.

2. Training certificates are to be valid on the date of tender

close. Certificates that have expired prior to this date will

not be accepted as valid evidence

10

Page 38: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

GENERAL BUILDING AND CIVIL ENGINEERING WORK: MANDATORY EVIDENCE

• MANDATORY TRAINING AND SKILLS

38

Criteria Quantity Evidence Evidence requirements Scoring

SURVEYOR 1 CV and related

qualifications

1. Site Surveyor CV to demonstrate previous experience in

this role.

2. Qualifications such as a Registered Land Surveyor with

PLATO to be included, and must be in the name of the

identified site Surveyor as per the CV

10

SITE

SUPERVISOR

1 CV and related

qualifications

1. Site Supervisor CV to demonstrate previous experience in

this role.

2. Qualifications such as 4 years’ experience : NQF5- Civil

Engineering Diploma to be included, and must be in the

name of the identified site supervisor as per the CV,

experience in civil projects, contactable references.

10

SITE

SUPERVISOR

1 CV and related

qualifications

1. Site Supervisor CV to demonstrate previous experience in

this role.

2. Qualifications such as 10 years’ experience to be

included, and must be in the name of the identified site

supervisor as per the CV, experience in civil projects,

contactable references.

10

Page 39: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

GENERAL BUILDING AND CIVIL ENGINEERING WORK: MANDATORY EVIDENCE

• MANDATORY TRAINING AND SKILLS

39

Criteria Quantity Evidence Evidence requirements Scoring

CONSTRUCTION

MANAGER

1 CV and related

qualifications

1. Construction Manager CV to demonstrate previous

experience in this role.

2. Qualifications such as 5 years’ experience: NQF5- Civil

Engineering Diploma or BSc in Construction Management

or BSc in Civil Engineering) to be included, and must be in

the name of the identified Construction Manager as per the

CV, experience in civil projects, contactable references.

3. Must be registered at least as a candidate with the

SACPCMP.

10

FOREMAN FOR

CIVIL

ENGINEERING

AND BUILDING

ACTIVITIES

1 CV and related

qualifications

1. Grade 10, 10 years of practical experience as a General

Foreman in building, relevant occupational experience to

be included, and must be in the name of the identified site

foreman as per the CV.

2. Trade qualification in concreting/ building or construction.

10

Page 40: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

GENERAL BUILDING AND CIVIL ENGINEERING WORK: MANDATORY EVIDENCE

• TRAINING AND SKILLS – SCORING

• Total / Max Points = 80

• Each Training and Skill criteria is worth 10 points

• Negative Marking Applies

• 10 points deducted if evidence not submitted as per requirements stated

40

Page 41: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

GENERAL BUILDING AND CIVIL ENGINEERING WORK: MANDATORY EVIDENCE

• MANDATORY TOOLS/EQUIPMENT

41

No Tool/Equipment 1 Galvanizing tester

2 Concrete vibrator

3 Suitable drills including pneumatic drills

4 Excavator

5 TLB

6 Dump truck/ tipper truck

7 Vibratory rollers/ Compactors

8 Water bowser/ tanker

9 Survey equipment

10 Concrete test equipment

11 Troxler tester

12 DCP

13 Scaffolding

14 Shuttering/ Formwork

15 Approved FAS

16 Concrete mixer

Page 42: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

GENERAL BUILDING AND CIVIL ENGINEERING WORK: MANDATORY EVIDENCE

• MANDATORY TOOLS/EQUIPMENT

• Refer to the General Building and Civil Engineering Work - Tender Submission pack loaded on the tender portal.

• Use the tool list included in the pack for your evidence submission. This is preferred.

• HOW TO SUBMIT THE REQUIRED EVIDENCE:

• Use the Tool List in the tender pack.

• Indicate if the tool is currently OWNED by the Company or being HIRED

• If the tool is owned, indicate the quantity available and if the tools are available for inspection if needed.

• If the tools are being hired, include a letter from the Bona Fide Hiring Company proving the ability to hire the tools. If this letter is not included, points will be deducted for the relevant tools.

42

Page 43: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

GENERAL BUILDING AND CIVIL ENGINEERING WORK: MANDATORY EVIDENCE

• MANDATORY TOOLS/EQUIPMENT - SCORING

• Total / Max Points = 16

• Each Tool/Equipment criteria is worth 1 point

• Negative Marking Applies

• 1 point deducted if evidence not submitted as per requirements stated

• A penalty of 1 points will be deducted if 50% (8) or more of tools/equipment is hired.

43

Page 44: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

GENERAL BUILDING AND CIVIL ENGINEERING WORK: MANDATORY EVIDENCE

• MANDATORY VEHICLES

44

Criteria Quantity Evidence Evidence requirements Scoring

Bakkie/LD

V

1 Proof of

Ownership

Or

Hiring Letter

In order to demonstrate ownership, license documents are to be

submitted, clearly showing the type of vehicle and the owner’s name.

If the vehicle is not in the Company name then submit an affidavit

clarifying the vehicle ownership for consideration.

If the evidence does not adequately demonstrate ownership then the

vehicle will be noted as non-responsive.

Hiring of the Vehicle will be accepted. A hiring letter from a Bona Fide

hiring company will be required as evidence. Hiring from

Electrical/Construction/Other Contractors will not be accepted. If the hiring

letter is not provided or accepted then the vehicle will be noted as non-

responsive.

1

Staff

Transport

Vehicle

1 Proof of

Ownership

Or

Hiring Letter

In order to demonstrate ownership, license documents are to be

submitted, clearly showing the type of vehicle and the owner’s name.

Additional bakkies/ldvs, micro/minibus buses, or similar passenger

vehicles will be accepted.

If the vehicle is not in the Company name then submit an affidavit

clarifying the vehicle ownership for consideration.

If the evidence does not adequately demonstrate ownership then the

vehicle will be noted as non-responsive.

Hiring of the Transport Vehicle will be accepted. A hiring letter from a

Bona Fide hiring company will be required as evidence. Hiring from

Electrical/Construction/Other Contractors will not be accepted. If the hiring

letter is not provided or accepted then the vehicle will be noted as non-

responsive.

1

Page 45: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

GENERAL BUILDING AND CIVIL ENGINEERING WORK: MANDATORY EVIDENCE

• MANDATORY VEHICLES

45

Criteria Quantity Evidence Evidence requirements Scoring

5 Ton

Truck with

Crane

1 Proof of

Ownership

with Crane

Load Test

Or

Hiring Letter

In order to demonstrate ownership, license documents are to be submitted, clearly

showing the type of vehicle and the owner’s name.

If the vehicle is not in the Company name then submit an affidavit clarifying the

vehicle ownership for consideration.

The Crane Load test for the crane on the truck must be submitted.

If the evidence does not adequately demonstrate ownership or of the load test is not

accepted/submitted then the vehicle will be noted as non-responsive.

Hiring of the Vehicle will be accepted. A hiring letter from a Bona Fide hiring

company will be required as evidence. Hiring from Electrical/Construction/Other

Contractors will not be accepted. If the hiring letter is not provided or accepted then

the vehicle will be noted as non-responsive.

1

Bucket/

Hydraulic

Lift

1 Proof of

Ownership

Or

Hiring Letter

In order to demonstrate ownership, license documents are to be submitted, clearly

showing the type of vehicle and the owner’s name.

If the vehicle is not in the Company name then submit an affidavit clarifying the

vehicle ownership for consideration.

The Crane Load test for the crane on the truck must be submitted.

If the evidence does not adequately demonstrate ownership or of the load test is not

accepted/submitted then the vehicle will be noted as non-responsive.

Hiring of the Vehicle will be accepted. A hiring letter from a Bona Fide hiring

company will be required as evidence. Hiring from Electrical/Construction/Other

Contractors will not be accepted. If the hiring letter is not provided or accepted then

the vehicle will be noted as non-responsive.

1

Page 46: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

GENERAL BUILDING AND CIVIL ENGINEERING WORK: MANDATORY EVIDENCE

• MANDATORY VEHICLES

• HOW TO SUBMIT THE REQUIRED EVIDENCE:

• The Vehicles listed can be OWNED by the Company or HIRED.

• If OWNED:

• Evidence of ownership is needed. Submit evidence such as a Logbook or license documents that show the vehicle type (e.g. bakkie, LDV, micro-bus, dropside etc) and the owners name.

• If the vehicle is not in the companies name, include an affidavit explaining the ownership of the vehicle. The vehicle ownership must be related to the company in a significant way e.g. Company Owner’s name, Shareholders Name etc

• The CRANE TRUCK EVIDENCE must include the evidence above and proof of the crane e.g. installation certificate, load test certificate etc.

• If HIRED: include a letter from the Bona Fide Hiring Company proving the ability to the vehicles. If this letter is not included, points will be deducted for the relevant vehicles.

46

Page 47: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

GENERAL BUILDING AND CIVIL ENGINEERING WORK: MANDATORY EVIDENCE

• MANDATORY VEHICLES

• Total / Max Points = 4

• Each Vehicle criteria is worth 1 point

• Negative Marking Applies

• 1 point deducted if evidence not submitted as per requirements stated

47

Page 48: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

GENERAL BUILDING AND CIVIL ENGINEERING WORK: MANDATORY EVIDENCE

• Only applicable if the Gatekeeper pass mark is achieved AND the minimum score for the Mandatory Evidence is achieved:

• Gatekeeper Pass = 40

• Mandatory Evidence Pass = 40***

• ***Mandatory evidence score is determined by combining the scores for Training and Skills, Tools/Equipment and Vehicles. Submitting evidence as per the requirements and minimizing the scores that will be deducted by negative marking will increase the points achieved for the Mandatory Evidence.

• Submissions not achieving these scores will not be processed further.

• Gatekeeper score and Mandatory evidence score will be added together. This will be the final score for the submission. The final score will be converted to a percentage.

• The % scores will be ordered from highest to lowest, thereby ranking them.

48

Page 49: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

GENERAL BUILDING AND CIVIL ENGINEERING WORK: FINAL SCORING AND RANKING

• Threshold for Ranking:

• The TOP 15 submissions achieving a % score of 58% or more will be processed further

• If there are less than 15 submissions with scores greater than or equal to 58%, then the shortfall will be made up from submissions with scores between 57% and 50% (inclusive). The selected submissions will be processed further.

• These submissions will be allocated for Development to resolve the shortfalls related to the Mandatory evidence which resulted in the score achieved.

• Submissions not selected in the Top 15 will not be processed further.

49

Page 50: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

COMMISSIONING

TECHNICAL CRITERIA, SCORING, THRESHOLD etc.

50

Page 51: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

COMMISSIONING

• Commissioning has ONE MAIN Section made up of 4 subsections:

• MANDATORY EVIDENCE SECTION

• Experience

• Skills

• Tools/ Test Equipment

• Vehicles

• All elements in the criteria have a score allocation. Negative marking applies for non-compliant/not submitted evidence.

• THERE IS NO GATEKEEPER!

• The minimum score for the mandatory evidence for Experience and Tools/ Test Equipment has to be achieved for the submission to processed further.

51

Page 52: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

COMMISSIONING

• How it works for Commissioning:

• The Technical Tender Criteria is unique for each discipline – Protection, Metering, Telecontrol, DC.

• To be consider for Commissioning, a technical file must be submitted for at least 1 of the 4 commissioning disciplines.

• The same company can apply for any or all of the Commissioning disciplines.

• Minimum Thresholds have been established for each Discipline of Commissioning.

• If a submission achieved a score above the minimum threshold for that Commissioning Discipline, it will be included in the ranking process FOR THAT DISCIPLINE.

• The Top 15 will be selected from the submissions scoring above the minimum threshold FOR THAT DISCIPLINE.

52

Page 53: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

COMMISSIONING – DETERMINING THE TOP 15

• To reiterate, scoring and ranking will be applied for each submission under each discipline. The top 15 as per the defined Ranking rules will be determined for each discipline.

• All submissions achieving a top 15 ranking under any discipline will be processed further to determine a Top15 ranking for Commissioning.

53

Protection

Top 15

Metering

Top 15

Telecontrol

Top 15

DC

Top 15

COMMISSIONING

FINAL TOP 15

Page 54: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

COMMISSIONING – DETERMINING THE TOP 15

• The maximum score achievable for Commissioning is 100%.

• If a Tenderer was ranked in the top 15 for only one discipline then the score achieved will be utilized with no normalization applied.

• If a Tenderer was ranked in the top 15 for any two disciplines then the two scores achieved will be combined and divided by 2 in order to determine a score out of 100%.

• If a Tenderer was ranked in the top 15 for any three disciplines then the three scores achieved will be combined and divided by 3 in order to determine a score out of 100%.

• If a Tenderer was ranked in the top 15 for all four disciplines then the four scores achieved will be combined and divided by 4 in order to determine a score out of 100%.

• All normalized scores will be ranked and the top 15 highest scores will be processed further.

54

Page 55: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

PROTECTION

TECHNICAL CRITERIA, SCORING, THRESHOLD etc.

55

Page 56: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

PROTECTION: MANDATORY CRITERIA

• MANDATORY EXPERIENCE

• Commissioning Records/Portfolio of Evidence/Training Certificates demonstrating experience for the following:

• Transformer + OLTC - diff scheme

• Sub transmission (66kV upwards) Feeder Bay - diff scheme

• Sub transmission (66kV upwards) Feeder Bay - impedance, no comms

• Sub transmission (66kV upwards) Feeder Bay - impedance, with comms

• Sub transmission (66kV upwards) Feeder Bay - combined diff + impedance

• Under Frequency load shedding SchemeHV Bus Zone Protection

• MV Buszone Protection

• Rural Feeder - O/H Line

• Rural Feeder - Cable Feeder (RMS Relay)

• Rural Feeder - Cable Feeder with Diff

• Busbar Arc Protection -

• HV Cap Bank (132 or 88kV or 66kV)

• MV Cap Bank (11 or 22kV or 33kV)

• Buscoupler Protection

• Section Breaker incl Telecontrol

56

Page 57: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

PROTECTION: MANDATORY CRITERIA

• MANDATORY EXPERIENCE

• Evidence is:

• Commissioning Records/Portfolio of Evidence/Training Certificates demonstrating experience for the following:

• Refer to the Protection Commissioning - Tender Submission pack loaded on the tender portal.

• Use the Commissioning Experience Interleaf to indicate which Mandatory Experience is available.

• Then include the evidence to support this.

• DO NOT SUBMIT THE RESOURCE’S ENTIRE PORTFOLIO OF EVIDENCE – ONLY THE SHEETS RELEVANT THAT DEMONSTRATE THE EXPERIENCE LISTED.

• Copies of training certificates are to be certified (certification must be signed and dated, no older than 3 months)

57

Page 58: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

PROTECTION: MANDATORY CRITERIA

• MANDATORY EXPERIENCE - SCORING

• Total / Max Points = 75

• Each Experience criteria is worth 5 points

• Negative Marking Applies

• 5 point deducted if evidence not submitted as per requirements stated

• A minimum score of 35 must be achieved for Mandatory Experience for the submission to be processed further.

58

Page 59: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

PROTECTION: MANDATORY CRITERIA

• MANDATORY SKILLS

59

MANDATORY SKILLS

CRITERIA EVIDENCE EVIDENCE REQUIREMENTS Scorin

g

ECSA

Registered

Resource

ECSA Registration -

Pr Eng / Pr Tech

Professional

Registration

Copy of registration certificate - certified by a

commissioner of Oaths, with a signature and date not

older than three months from the issue date of this

tender.

1

Page 60: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

PROTECTION: MANDATORY CRITERIA

• MANDATORY SKILLS – SCORING

• Total / Max Points = 1

• The Skill criteria is worth 1 point

• Negative Marking Applies

• 1 point deducted if evidence not submitted as per requirements stated

60

Page 61: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

PROTECTION: MANDATORY CRITERIA

• MANDATORY TOOLS/EQUIPMENT

61

No Tool/Equipment

1 AC Current clamp: 0-5A

2 AC Current clamp: 0-1000A

3 Current injection test set

4 Single Phase variac

5 Digital multi-meter 4 ½ Digit true

RMS

6 Digital multi-meter 3 ½ Digit true

RMS

7 Insulation tester 500V

8 Insulation tester 5kV

9 Laptop with 3G capability

10 Relay communication cables

No Tool/Equipment

11 Secondary Injection test set

12 Primary Injection test set

13 Universal panel keys

14 GPS unit for End to end

15 Clamp meter with a high resolution

16 Three phase generator.

17 Test Blocks

18 RS232 to RS485 convertors eg.

MOXA Convertor

19 Phase Rotation Meter

20 Insulated hand tools rated 1000v

Page 62: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

PROTECTION: MANDATORY CRITERIA

• MANDATORY TOOLS/EQUIPMENT

• Refer to the Protection Commissioning - Tender Submission pack loaded on the tender portal.

• Use the tool list included in the pack for your evidence submission. This is preferred.

• HOW TO SUBMIT THE REQUIRED EVIDENCE:

• Use the Tool List in the tender pack.

• Indicate if the tool is currently OWNED by the Company or being HIRED

• If the tool is owned, indicate the quantity available and if the tools are available for inspection if needed.

• If the tools are being hired, include a letter from the Bona Fide Hiring Company proving the ability to hire the tools. If this letter is not included, points will be deducted for the relevant tools.

62

Page 63: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

PROTECTION: MANDATORY CRITERIA

• MANDATORY TOOLS/EQUIPMENT - SCORING

• Total / Max Points = 20

• Each Tool/Equipment criteria is worth 1 point

• Negative Marking Applies

• 1 point deducted if evidence not submitted as per requirements stated

• A minimum score of 10 must be achieved for Mandatory Tools/Equipment for the submission to be processed further.

63

Page 64: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

PROTECTION: MANDATORY CRITERIA

• MANDATORY VEHICLES

64

Criteria Quantity Evidence Evidence requirements Scoring

Bakkie/

LDV

1 Proof of

Ownership

Or

Hiring Letter

In order to demonstrate ownership, license documents are to be

submitted, clearly showing the type of vehicle and the owner’s

name.

If the vehicle is not in the Company name then submit an affidavit

clarifying the vehicle ownership for consideration.

If the evidence does not adequately demonstrate ownership then the

vehicle will be noted as non-responsive.

Hiring of the Vehicle will be accepted. A hiring letter from a Bona

Fide hiring company will be required as evidence. Hiring from

Electrical/Construction/Other Contractors will not be accepted. If the

hiring letter is not provided or accepted then the vehicle will be noted

as non-responsive.

1

Page 65: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

PROTECTION: MANDATORY CRITERIA

• MANDATORY VEHICLES

• HOW TO SUBMIT THE REQUIRED EVIDENCE:

• The Vehicles listed can be OWNED by the Company or HIRED.

• If OWNED:

• Evidence of ownership is needed. Submit evidence such as a Logbook or license documents that show the vehicle type (e.g. bakkie, LDV, micro-bus, dropside etc) and the owners name.

• If the vehicle is not in the companies name, include an affidavit explaining the ownership of the vehicle. The vehicle ownership must be related to the company in a significant way e.g. Company Owner’s name, Shareholders Name etc

• The CRANE TRUCK EVIDENCE must include the evidence above and proof of the crane e.g. installation certificate, load test certificate etc.

• If HIRED: include a letter from the Bona Fide Hiring Company proving the ability to the vehicles. If this letter is not included, points will be deducted for the relevant vehicles.

65

Page 66: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

PROTECTION: MANDATORY CRITERIA

• MANDATORY VEHICLES

• Total / Max Points = 1

• Vehicle criteria is worth 1 point

• Negative Marking Applies

• 1 point deducted if evidence not submitted as per requirements stated

66

Page 67: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

PROTECTION: MANDATORY CRITERIA

• Only applicable if the minimum score for the Mandatory Evidence is achieved as follows:

• Mandatory Experience = 35

• Mandatory Tools/Equipment = 10

• Submitting evidence as per the requirements and minimizing the scores that will be deducted by negative marking will increase the points achieved for the Mandatory Evidence.

• If these scores are not achieved the submission will not be processed further.

• This will be the final score for the submission in this Discipline of commissioning. The final score will be converted to a percentage.

• The % scores will be ordered from highest to lowest, thereby ranking them.

67

Page 68: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

PROTECTION: MANDATORY CRITERIA

• Threshold for Ranking:

• The TOP 15 submissions achieving a % score of 69% or more will be processed further

• If there are less than 15 submissions with scores greater than or equal to 69%, then the shortfall will be made up from submissions with scores between 68% and 46% (inclusive). The selected submissions will be processed further.

• These submissions will be allocated for Development to resolve the shortfalls related to the Mandatory evidence which resulted in the score achieved.

• Submissions not selected in the Top 15 will not be processed further to determine the COMMISSIONING Top 15.

68

Page 69: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

METERING

TECHNICAL CRITERIA, SCORING, THRESHOLD etc.

69

Page 70: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

METERING: MANDATORY CRITERIA

• MANDATORY EXPERIENCE

• Commissioning Records/Portfolio of Evidence/Training Certificates demonstrating experience for the following:

• Tariff Metering

• Statistical Metering

• Modems

70

Page 71: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

METERING: MANDATORY CRITERIA

• MANDATORY EXPERIENCE

• Evidence is:

• Commissioning Records/Portfolio of Evidence/Training Certificates demonstrating experience for the following:

• Refer to the Metering Commissioning - Tender Submission pack loaded on the tender portal.

• Use the Commissioning Experience Interleaf to indicate which Mandatory Experience is available.

• Then include the evidence to support this.

• DO NOT SUBMIT THE RESOURCE’S ENTIRE PORTFOLIO OF EVIDENCE – ONLY THE SHEETS RELEVANT THAT DEMONSTRATE THE EXPERIENCE LISTED.

• Copies of training certificates are to be certified (certification must be signed and dated, no older than 3 months)

71

Page 72: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

METERING: MANDATORY CRITERIA

• MANDATORY EXPERIENCE - SCORING

• Total / Max Points = 45

• Each Experience criteria is worth 15 points

• Negative Marking Applies

• 15 point deducted if evidence not submitted as per requirements stated

• A minimum score of 15 must be achieved for Mandatory Experience for the submission to be processed further.

72

Page 73: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

METERING: MANDATORY CRITERIA

• MANDATORY SKILLS

73

MANDATORY SKILLS

CRITERIA EVIDENCE EVIDENCE REQUIREMENTS Scoring

ECSA

Registered

Resource

ECSA Registration -

Pr Eng / Pr Tech

Professional

Registration

Copy of registration certificate - certified by a

commissioner of Oaths, with a signature and date not

older than three months from the issue date of this

tender.

1

Page 74: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

METERING: MANDATORY CRITERIA

• MANDATORY SKILLS – SCORING

• Total / Max Points = 1

• The Skill criteria is worth 1 point

• Negative Marking Applies

• 1 point deducted if evidence not submitted as per requirements stated

74

Page 75: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

METERING: MANDATORY CRITERIA

• MANDATORY TOOLS/EQUIPMENT

75

No Tool/Equipment

1 AC Current clamp: 0-5A

2 AC Current clamp: 0-1000A

3 Current injection test set

4 Digital multi-meter

5 Insulation tester 500V

6 Insulation tester 5kV

7 Laptop

8 Capacitive Load box

9 CT accuracy test set

10 Meter test set

11 Optical eye: Universal type

12 Injection set and reference meter

13 PK 2 4 way test handles.

14 Insulated tools

Page 76: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

METERING: MANDATORY CRITERIA

• MANDATORY TOOLS/EQUIPMENT

• Refer to the Metering Commissioning - Tender Submission pack loaded on the tender portal.

• Use the tool list included in the pack for your evidence submission. This is preferred.

• HOW TO SUBMIT THE REQUIRED EVIDENCE:

• Use the Tool List in the tender pack.

• Indicate if the tool is currently OWNED by the Company or being HIRED

• If the tool is owned, indicate the quantity available and if the tools are available for inspection if needed.

• If the tools are being hired, include a letter from the Bona Fide Hiring Company proving the ability to hire the tools. If this letter is not included, points will be deducted for the relevant tools.

76

Page 77: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

METERING: MANDATORY CRITERIA

• MANDATORY TOOLS/EQUIPMENT - SCORING

• Total / Max Points = 14

• Each Tool/Equipment criteria is worth 1 point

• Negative Marking Applies

• 1 point deducted if evidence not submitted as per requirements stated

• A minimum score of 7 must be achieved for Mandatory Tools/Equipment for the submission to be processed further.

77

Page 78: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

METERING: MANDATORY CRITERIA

• MANDATORY VEHICLES

78

Criteria Quantity Evidence Evidence requirements Scoring

Bakkie/

LDV

1 Proof of

Ownership

Or

Hiring Letter

In order to demonstrate ownership, license documents are to be

submitted, clearly showing the type of vehicle and the owner’s

name.

If the vehicle is not in the Company name then submit an affidavit

clarifying the vehicle ownership for consideration.

If the evidence does not adequately demonstrate ownership then the

vehicle will be noted as non-responsive.

Hiring of the Vehicle will be accepted. A hiring letter from a Bona

Fide hiring company will be required as evidence. Hiring from

Electrical/Construction/Other Contractors will not be accepted. If the

hiring letter is not provided or accepted then the vehicle will be noted

as non-responsive.

1

Page 79: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

METERING: MANDATORY CRITERIA

• MANDATORY VEHICLES

• HOW TO SUBMIT THE REQUIRED EVIDENCE:

• The Vehicles listed can be OWNED by the Company or HIRED.

• If OWNED:

• Evidence of ownership is needed. Submit evidence such as a Logbook or license documents that show the vehicle type (e.g. bakkie, LDV, micro-bus, dropside etc) and the owners name.

• If the vehicle is not in the companies name, include an affidavit explaining the ownership of the vehicle. The vehicle ownership must be related to the company in a significant way e.g. Company Owner’s name, Shareholders Name etc

• The CRANE TRUCK EVIDENCE must include the evidence above and proof of the crane e.g. installation certificate, load test certificate etc.

• If HIRED: include a letter from the Bona Fide Hiring Company proving the ability to the vehicles. If this letter is not included, points will be deducted for the relevant vehicles.

79

Page 80: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

METERING: MANDATORY CRITERIA

• MANDATORY VEHICLES

• Total / Max Points = 1

• Vehicle criteria is worth 1 point

• Negative Marking Applies

• 1 point deducted if evidence not submitted as per requirements stated

80

Page 81: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

METERING: MANDATORY CRITERIA

• Only applicable if the minimum score for the Mandatory Evidence is achieved as follows:

• Mandatory Experience = 15

• Mandatory Tools/Equipment = 7

• Submitting evidence as per the requirements and minimizing the scores that will be deducted by negative marking will increase the points achieved for the Mandatory Evidence.

• If these scores are not achieved the submission will not be processed further.

• This will be the final score for the submission in this Discipline of commissioning. The final score will be converted to a percentage.

• The % scores will be ordered from highest to lowest, thereby ranking them.

81

Page 82: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

METERING: MANDATORY CRITERIA

• Threshold for Ranking:

• The TOP 15 submissions achieving a % score of 67% or more will be processed further

• If there are less than 15 submissions with scores greater than or equal to 67%, then the shortfall will be made up from submissions with scores between 66% and 36% (inclusive). The selected submissions will be processed further.

• These submissions will be allocated for Development to resolve the shortfalls related to the Mandatory evidence which resulted in the score achieved.

• Submissions not selected in the Top 15 will not be processed further to determine the COMMISSIONING Top 15.

82

Page 83: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

TELECONTROL

TECHNICAL CRITERIA, SCORING, THRESHOLD etc.

83

Page 84: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

TELECONTROL: MANDATORY CRITERIA

• MANDATORY EXPERIENCE

• Commissioning Records/Portfolio of Evidence/Training Certificates demonstrating experience for the following:

• Reclosers (Any 2 of the following: Tavrida, Schneider, Nulec, 4c, Form 5)

• D20 RTU

• D400 RTU

84

Page 85: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

TELECONTROL: MANDATORY CRITERIA

• MANDATORY EXPERIENCE

• Evidence is:

• Commissioning Records/Portfolio of Evidence/Training Certificates demonstrating experience for the following:

• Refer to the Telecontrol Commissioning - Tender Submission pack loaded on the tender portal.

• Use the Commissioning Experience Interleaf to indicate which Mandatory Experience is available.

• Then include the evidence to support this.

• DO NOT SUBMIT THE RESOURCE’S ENTIRE PORTFOLIO OF EVIDENCE – ONLY THE SHEETS RELEVANT THAT DEMONSTRATE THE EXPERIENCE LISTED.

• Copies of training certificates are to be certified (certification must be signed and dated, no older than 3 months)

85

Page 86: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

TELECONTROL: MANDATORY CRITERIA

• MANDATORY EXPERIENCE - SCORING

• Total / Max Points = 45

• Each Experience criteria is worth 15 points

• Negative Marking Applies

• 15 point deducted if evidence not submitted as per requirements stated

• A minimum score of 15 must be achieved for Mandatory Experience for the submission to be processed further.

86

Page 87: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

TELECONTROL: MANDATORY CRITERIA

• MANDATORY SKILLS

87

MANDATORY SKILLS

CRITERIA EVIDENCE EVIDENCE REQUIREMENTS Scoring

ECSA

Registered

Resource

ECSA Registration -

Pr Eng / Pr Tech

Professional

Registration

Copy of registration certificate - certified by a

commissioner of Oaths, with a signature and date not

older than three months from the issue date of this

tender.

1

Page 88: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

TELECONTROL: MANDATORY CRITERIA

• MANDATORY SKILLS – SCORING

• Total / Max Points = 1

• The Skill criteria is worth 1 point

• Negative Marking Applies

• 1 point deducted if evidence not submitted as per requirements stated

88

Page 89: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

TELECONTROL: MANDATORY CRITERIA

• MANDATORY TOOLS/EQUIPMENT

89

No Tool/Equipment 1 Laptop PC with Serial port and USB

ports

2 Electrical or DC Drill

3 GSM Installer's friend

4 Digital Multi meter

5 Milli Amp Injector

6 Megger Earth Resistance tester

7 Tool Box with wire strippers, Crimpers

etc all insulated tools 1000V

8 Soldering and De-Soldering Station

9 Relevant test boxes and test

equipment for Section Breakers

(Schnieder and Tavrida)

Page 90: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

TELECONTROL: MANDATORY CRITERIA

• MANDATORY TOOLS/EQUIPMENT

• Refer to the Telecontrol Commissioning - Tender Submission pack loaded on the tender portal.

• Use the tool list included in the pack for your evidence submission. This is preferred.

• HOW TO SUBMIT THE REQUIRED EVIDENCE:

• Use the Tool List in the tender pack.

• Indicate if the tool is currently OWNED by the Company or being HIRED

• If the tool is owned, indicate the quantity available and if the tools are available for inspection if needed.

• If the tools are being hired, include a letter from the Bona Fide Hiring Company proving the ability to hire the tools. If this letter is not included, points will be deducted for the relevant tools.

90

Page 91: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

TELECONTROL: MANDATORY CRITERIA

• MANDATORY TOOLS/EQUIPMENT - SCORING

• Total / Max Points = 9

• Each Tool/Equipment criteria is worth 1 point

• Negative Marking Applies

• 1 point deducted if evidence not submitted as per requirements stated

• A minimum score of 5 must be achieved for Mandatory Tools/Equipment for the submission to be processed further.

91

Page 92: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

TELECONTROL: MANDATORY CRITERIA

• MANDATORY VEHICLES

92

Criteria Quantity Evidence Evidence requirements Scoring

Bakkie/

LDV

1 Proof of

Ownership

Or

Hiring Letter

In order to demonstrate ownership, license documents are to be

submitted, clearly showing the type of vehicle and the owner’s

name.

If the vehicle is not in the Company name then submit an affidavit

clarifying the vehicle ownership for consideration.

If the evidence does not adequately demonstrate ownership then the

vehicle will be noted as non-responsive.

Hiring of the Vehicle will be accepted. A hiring letter from a Bona

Fide hiring company will be required as evidence. Hiring from

Electrical/Construction/Other Contractors will not be accepted. If the

hiring letter is not provided or accepted then the vehicle will be noted

as non-responsive.

1

Page 93: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

TELECONTROL: MANDATORY CRITERIA

• MANDATORY VEHICLES

• HOW TO SUBMIT THE REQUIRED EVIDENCE:

• The Vehicles listed can be OWNED by the Company or HIRED.

• If OWNED:

• Evidence of ownership is needed. Submit evidence such as a Logbook or license documents that show the vehicle type (e.g. bakkie, LDV, micro-bus, dropside etc) and the owners name.

• If the vehicle is not in the companies name, include an affidavit explaining the ownership of the vehicle. The vehicle ownership must be related to the company in a significant way e.g. Company Owner’s name, Shareholders Name etc

• The CRANE TRUCK EVIDENCE must include the evidence above and proof of the crane e.g. installation certificate, load test certificate etc.

• If HIRED: include a letter from the Bona Fide Hiring Company proving the ability to the vehicles. If this letter is not included, points will be deducted for the relevant vehicles.

93

Page 94: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

TELECONTROL: MANDATORY CRITERIA

• MANDATORY VEHICLES

• Total / Max Points = 1

• Vehicle criteria is worth 1 point

• Negative Marking Applies

• 1 point deducted if evidence not submitted as per requirements stated

94

Page 95: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

TELECONTROL: MANDATORY CRITERIA

• Only applicable if the minimum score for the Mandatory Evidence is achieved as follows:

• Mandatory Experience = 15

• Mandatory Tools/Equipment = 5

• Submitting evidence as per the requirements and minimizing the scores that will be deducted by negative marking will increase the points achieved for the Mandatory Evidence.

• If these scores are not achieved the submission will not be processed further.

• This will be the final score for the submission in this Discipline of commissioning. The final score will be converted to a percentage.

• The % scores will be ordered from highest to lowest, thereby ranking them.

95

Page 96: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

TELECONTROL: MANDATORY CRITERIA

• Threshold for Ranking:

• The TOP 15 submissions achieving a % score of 67% or more will be processed further

• If there are less than 15 submissions with scores greater than or equal to 67%, then the shortfall will be made up from submissions with scores between 66% and 35% (inclusive). The selected submissions will be processed further.

• These submissions will be allocated for Development to resolve the shortfalls related to the Mandatory evidence which resulted in the score achieved.

• Submissions not selected in the Top 15 will not be processed further to determine the COMMISSIONING Top 15.

96

Page 97: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

DC

TECHNICAL CRITERIA, SCORING, THRESHOLD etc.

97

Page 98: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

DC: MANDATORY CRITERIA

• MANDATORY EXPERIENCE

• Commissioning Records/Portfolio of Evidence/Training Certificates demonstrating experience for the following:

• Batteries

• Battery Chargers

• AC/DC Distribution Boards

98

Page 99: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

DC: MANDATORY CRITERIA

• MANDATORY EXPERIENCE

• Evidence is:

• Commissioning Records/Portfolio of Evidence/Training Certificates demonstrating experience for the following:

• Refer to the DC Commissioning - Tender Submission pack loaded on the tender portal.

• Use the Commissioning Experience Interleaf to indicate which Mandatory Experience is available.

• Then include the evidence to support this.

• DO NOT SUBMIT THE RESOURCE’S ENTIRE PORTFOLIO OF EVIDENCE – ONLY THE SHEETS RELEVANT THAT DEMONSTRATE THE EXPERIENCE LISTED.

• Copies of training certificates are to be certified (certification must be signed and dated, no older than 3 months)

99

Page 100: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

DC: MANDATORY CRITERIA

• MANDATORY EXPERIENCE - SCORING

• Total / Max Points = 55

• Battery and Battery Charger Experience criteria is worth 20 points

• AC/DC Board Experience criteria is worth 15 points

• Negative Marking Applies

• Relevant point deducted if evidence not submitted as per requirements stated

• A minimum score of 20 must be achieved for Mandatory Experience for the submission to be processed further.

100

Page 101: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

DC: MANDATORY CRITERIA

• MANDATORY SKILLS

101

MANDATORY SKILLS

CRITERIA EVIDENCE EVIDENCE REQUIREMENTS Scoring

ECSA

Registered

Resource

ECSA Registration -

Pr Eng / Pr Tech

Professional

Registration

Copy of registration certificate - certified by a

commissioner of Oaths, with a signature and date not

older than three months from the issue date of this

tender.

1

Page 102: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

DC: MANDATORY CRITERIA

• MANDATORY SKILLS – SCORING

• Total / Max Points = 1

• The Skill criteria is worth 1 point

• Negative Marking Applies

• 1 point deducted if evidence not submitted as per requirements stated

102

Page 103: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

DC: MANDATORY CRITERIA

• MANDATORY TOOLS/EQUIPMENT

103

No Tool/Equipment

1 Mini Clamp Meter

2 Digital Multimeter Basic

3 Digital Multimeter Advanced

4 Digital Clamp On Current Meter

5 Temperature gun

6 Hydrometer

7 Thermometer

8 Conductivity meter

9 AC/DC mini clamp meter

10 Discharge Unit

No Tool/Equipment

11 Voltage Unit

12 Digital hydrometer

13 State-of-Health tester: Impedance or

conductance tester

14 Scopemeter

15 Cadmium stick

16 Earth leakage tester

17 Safety gloves

18 Laptop

19 Portable Earth Leakage Unit

20 Portable variable power supply

21 Portable 5kVA generator

Page 104: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

DC: MANDATORY CRITERIA

• MANDATORY TOOLS/EQUIPMENT

• Refer to the DC Commissioning - Tender Submission pack loaded on the tender portal.

• Use the tool list included in the pack for your evidence submission. This is preferred.

• HOW TO SUBMIT THE REQUIRED EVIDENCE:

• Use the Tool List in the tender pack.

• Indicate if the tool is currently OWNED by the Company or being HIRED

• If the tool is owned, indicate the quantity available and if the tools are available for inspection if needed.

• If the tools are being hired, include a letter from the Bona Fide Hiring Company proving the ability to hire the tools. If this letter is not included, points will be deducted for the relevant tools.

104

Page 105: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

DC: MANDATORY CRITERIA

• MANDATORY TOOLS/EQUIPMENT - SCORING

• Total / Max Points = 21

• Each Tool/Equipment criteria is worth 1 point

• Negative Marking Applies

• 1 point deducted if evidence not submitted as per requirements stated

• A minimum score of 12 must be achieved for Mandatory Tools/Equipment for the submission to be processed further.

105

Page 106: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

DC: MANDATORY CRITERIA

• MANDATORY VEHICLES

106

Criteria Quantity Evidence Evidence requirements Scoring

Bakkie/

LDV

1 Proof of

Ownership

Or

Hiring Letter

In order to demonstrate ownership, license documents are to be

submitted, clearly showing the type of vehicle and the owner’s

name.

If the vehicle is not in the Company name then submit an affidavit

clarifying the vehicle ownership for consideration.

If the evidence does not adequately demonstrate ownership then the

vehicle will be noted as non-responsive.

Hiring of the Vehicle will be accepted. A hiring letter from a Bona

Fide hiring company will be required as evidence. Hiring from

Electrical/Construction/Other Contractors will not be accepted. If the

hiring letter is not provided or accepted then the vehicle will be noted

as non-responsive.

1

Page 107: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

DC: MANDATORY CRITERIA

• MANDATORY VEHICLES

• HOW TO SUBMIT THE REQUIRED EVIDENCE:

• The Vehicles listed can be OWNED by the Company or HIRED.

• If OWNED:

• Evidence of ownership is needed. Submit evidence such as a Logbook or license documents that show the vehicle type (e.g. bakkie, LDV, micro-bus, dropside etc) and the owners name.

• If the vehicle is not in the companies name, include an affidavit explaining the ownership of the vehicle. The vehicle ownership must be related to the company in a significant way e.g. Company Owner’s name, Shareholders Name etc

• The CRANE TRUCK EVIDENCE must include the evidence above and proof of the crane e.g. installation certificate, load test certificate etc.

• If HIRED: include a letter from the Bona Fide Hiring Company proving the ability to the vehicles. If this letter is not included, points will be deducted for the relevant vehicles.

107

Page 108: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

DC: MANDATORY CRITERIA

• MANDATORY VEHICLES

• Total / Max Points = 1

• Vehicle criteria is worth 1 point

• Negative Marking Applies

• 1 point deducted if evidence not submitted as per requirements stated

108

Page 109: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

DC: MANDATORY CRITERIA

• Only applicable if the minimum score for the Mandatory Evidence is achieved as follows:

• Mandatory Experience = 20

• Mandatory Tools/Equipment = 12

• Submitting evidence as per the requirements and minimizing the scores that will be deducted by negative marking will increase the points achieved for the Mandatory Evidence.

• If these scores are not achieved the submission will not be processed further.

• This will be the final score for the submission in this Discipline of commissioning. The final score will be converted to a percentage.

• The % scores will be ordered from highest to lowest, thereby ranking them.

109

Page 110: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

DC: MANDATORY CRITERIA

• Threshold for Ranking:

• The TOP 15 submissions achieving a % score of 66% or more will be processed further

• If there are less than 15 submissions with scores greater than or equal to 66%, then the shortfall will be made up from submissions with scores between 65% and 41% (inclusive). The selected submissions will be processed further.

• These submissions will be allocated for Development to resolve the shortfalls related to the Mandatory evidence which resulted in the score achieved.

• Submissions not selected in the Top 15 will not be processed further to determine the COMMISSIONING Top 15.

110

Page 111: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

COMMISSIONING FINAL RANKING

111

Protection

Top 15

Metering

Top 15

Telecontrol

Top 15

DC

Top 15

COMMISSIONING

FINAL TOP 15

Page 112: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

ACHIEVING TOP 15

• How to maximize the chance of being in the Top 15 for any Discipline (Electrical Plant, Civil, Commissioning)?

• Follow the Evidence Guidelines – e.g. certify, method statements, CVs etc.

• Use the Submission Packs and organize the evidence correctly per discipline

• Don’t just attempt to meet the minimum score – try to meet the maximum score

112

Page 113: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

SUBMISSION PACKS

• Examples of the submission packs will now be demonstrated

• Tender Discipline Selection

• Example 1: Electrical Plant

• Example 2: Protection Commissioning

113

Page 114: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

AT CONTRACT AWARD

• Electrical Plant:

• Department of Labour Registration as an Electrical Contractor – in the name of the tendering company and valid at the time of contract award.

• Proof of registration as a candidate or confirmation letter from SACPCMP of registration for the Construction Manager.

• Assessments may be carried out by Eskom prior to Contract Award. This will include resource verification, project assessments and referee interviews. The outcome of the assessment will be the final result, and supersede all previous results.

• General Building and Civil Engineering Work

• Department of Labour Registration as a Civil and Building Contractor – in the name of the tendering company and valid at the time of contract award.

• Proof of registration as a candidate or confirmation letter from SACPCMP of registration for the Construction Manager.

• Assessments may be carried out by Eskom prior to Contract Award. This will include resource verification, project assessments and referee interviews. The outcome of the assessment will be the final result, and supersede all previous results.

114

Page 115: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

AT CONTRACT AWARD

• Commissioning:

• Assessments may be carried out by Eskom prior to Contract Award. This will include resource verification, project assessments and referee interviews. The outcome of the assessment will be the final result, and supersede all previous results.

115

Page 116: TECHNICAL OVERVIEW: ELECTRICAL, CIVIL AND … · • Laying of Power Cables (MV) ... Competency as stated in the criteria and the associated method statement for that competency!

Thank you