technical specification for effluent treatment plant...
TRANSCRIPT
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – LPG TERMINAL
Doc No: 256324-500-RQ-MEC-013 Rev: B Page 1 of 26
P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-
Tech Specs for ETP.doc
TECHNICAL SPECIFICATION
FOR
EFFLUENT TREATMENT PLANT
(ETP)
Hindustan Petroleum Corporation Ltd
Viskaha Dispatch Station
VR-ATP Area, Naval Base Post
Visakhapatnam - 530 014
Andhra Pradesh
Mott MacDonald Consultants (India) Pvt. Ltd.
Kothari House, CTS No. 185
Off Andheri - Kurla Road
Andheri (East)
Mumbai 400 059
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – LPG TERMINAL
Doc No: 256324-500-RQ-MEC-013 Rev: B Page 2 of 26
P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-
Tech Specs for ETP.doc
TECHNICAL SPECIFICATION
FOR
EFFLUENT TREATMENT PLANT
(ETP)
Client HINDUSTAN PETROLEUM CORPORATION LTD.
MMCI Project No. 256324
Issue and Revision Record:
Rev Date Originator Checked Approved Description
A 30.07.09 SPW SVJ PJC Issued for Comments
B 15.02.10 ASA SM PJC Issued for Tender
C
Group Disclaimer
"This document has been prepared for the titled project or named part thereof and should not be relied upon or
used for any other project without an independent check being carried out as to its suitability and prior written
authority of Mott MacDonald being obtained. Mott MacDonald accepts no responsibility or liability for the
consequences of this document being used for a purpose other than the purposes for which it was commissioned.
Any person using or relying on the document for such other purpose agrees, and will by such use or reliance be
taken to confirm his agreement, to indemnify Mott MacDonald for all loss or damage resulting there from. Mott
MacDonald accepts no responsibility or liability for this document to any party other than the person by whom it
was commissioned.”
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – LPG TERMINAL
Doc No: 256324-500-RQ-MEC-013 Rev: B Page 3 of 26
P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-
Tech Specs for ETP.doc
List of Content Page No
1 Introduction 5
2 Location and Environmental Conditions 6
3 Scope of Supply 6
3.1 Process Description 6
3.2 Equipment and Materials 7
3.3 Engineering Services 9
3.4 Exclusions 10
4 Applicable Codes, Specifications and Standards 10
4.1 General 10
4.2 Codes and Standards 10
4.3 Other Specifications and Standards 11
4.4 Conflicting Requirements 11
5 Design Requirements 11
5.1 Mechanical Requirements 11
5.2 Civil Requirements 11
5.3 Instrumentation Requirements 11
5.4 Electrical Requirements 17
6 Quality Assurance 18
7 Inspection and Testing 18
7.1 Factory Inspection & Testing 18
7.2 Vendor Requirements 19
7.3 Performance Guarantee 19
7.4 Works Inspection and Notification 20
8 Vendor Documentation 20
8.1 Documents/ Information to be supplied with offer 20
8.2 Document/ Information to be supplied After Award of Contract 20
9 Manufacturing Schedule 21
10 Spares and Special Tools 21
10.1 Spares 21
10.2 Special Tools 21
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – LPG TERMINAL
Doc No: 256324-500-RQ-MEC-013 Rev: B Page 4 of 26
P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-
Tech Specs for ETP.doc
11 Packing and Shipping 21
12 Installation and Commissioning 21
Appendix A: Attachments 22
Appendix B: Water Quality 23
Appendix C: Requisition of Engineering Documents (Red Form) 24
Appendix D: Table of Compliance 25
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – LPG TERMINAL
Doc No: 256324-500-RQ-MEC-013 Rev: B Page 5 of 26
P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-
Tech Specs for ETP.doc
1 Introduction
1.1 This specification covers the minimum requirements for the design, engineering, material
procurement, civil construction, fabrication, painting, assembly, Inspection, supply, shipment,
erection and commissioning of Effluent Treatment Package (ETP) for “Re-sitement of
Integrated Marketing Facility at Vishakhapatnam – LPG Terminal.”
Definitions:
Company/End User/ Owner : Hindustan Petroleum Corporation Ltd (HPCL)
Purchaser : Hindustan Petroleum Corporation Ltd (HPCL)
Engineer / Consultant : Mott MacDonald Consultants (India) Pvt. Ltd.
Vendor : Supplier of Effluent Treatment Package (ETP).
Shall : This is to be understood as a mandatory in relation to the
requirements of this document.
Should : This is to be understood as a strong recommendation to
comply with the requirements of this document
The ETP is as follows:
Sr.
No. Tag No. Quantity Description
1 500ETP-001 ONE Effluent Treatment Plant – 10 m3/d (8 hours)
1.2 The Vendor shall be responsible for the design, engineering, construction, fabrication,
assembly, inspection, co-ordination, testing, delivery and proper performance of the ETP.
1.3 The Vendor shall ensure that the design complies with the requirements of this requisition and
its referenced specifications and standards. The data sheets, which form part of this
specification, shall be completed by the Vendor. The Vendor shall highlight any non-
compliance at the offer stage in the Table of Compliance, Appendix D. The Table of
Compliance and filled in data sheets shall form a part of the offer. Not providing completed
compliance table and data sheets can cause rejection of the offer. Failure to clearly identify
specific deviations shall be assumed by the Purchaser to be total compliance with the
requisition.
Only those deviations that are specifically agreed to, by the Purchaser prior to award of the
order will be incorporated into the purchase order. Deviations to the specification will not be
allowed after award of order. Unless referred to in the Table of Compliance (Appendix D), it
will be assumed that all specifications are adhered to and that they do not have implications
with respect to cost, delivery and integrity of the equipment.
1.4 The Vendor shall procure third party material from vendors listed in the approved Vendor List
only, unless the particular type of material is not covered by the list, and a special dispensation
to deviate from the list has been granted in writing by the Purchaser. Company will reject any
materials found at any stage to be out of the approved VENDOR or sub Vendor list.
1.5 Note that “lead times” will not be considered by the COMPANY as a justifiable reason for
using alternate VENDOR.
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – LPG TERMINAL
Doc No: 256324-500-RQ-MEC-013 Rev: B Page 6 of 26
P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-
Tech Specs for ETP.doc
1.6 This requisition shall in no way relieve the Vendor from final guarantee as to materials,
apparatus, workmanship and performance of the equipment and services supplied.
1.7 All correspondence and documentation shall be in English. All measurements and units shall
be in SI units.
Where necessary for a specific application, alternative units may be indicated in brackets
behind the SI units.
1.8 The VENDOR shall guarantee the equipment and all component parts against defective
workmanship and improper materials for the agreed period following the date of delivery of
the equipment or from commencement of operation as agreed. The VENDOR shall replace or
repair (the carrying out of all work including uncovering, removal, procurement and
reinstallation and construction as may be necessary) the components that are defective at their
own cost during the guarantee period at a suitable time to the COMPANY. Guarantee period
shall be as per the Contract and to be covered in commercial documentation.
2 Location and Environmental Conditions
For local conditions refer Document no. 256324-500-SP-GEN-001.
3 Scope of Supply
3.1 Process Description
The waste water effluent shall be subjected to physio-chemical treatment so that the treated
effluent shall meet the stipulations laid down by the Central Pollution Control Board.
The following steps shall form the process of treatment:
a) The untreated effluent from various locations like Cylinder washing, Water test bath,
Hydrotesting, soap water trays, etc of the LPG terminal shall reach the ETP through surface
drains by HDPE pipes, after passing through vapour seals. The effluent generated by these
streams shall be approx. 6 m3/day.
b) The caustic soda stream from the paint booth in the cylinder testing shed is neutralized with
10% Sulphuric acid in the Neutralization tank. The Transfer pumps shall also be used for
mixing acid in the caustic by recirculation. Once the pH in the range of 7.5 to 8.5 is sensed by
the pH meter, the recirculation will be stopped and effluent is pumped to main ETP through
Pressure Sand Filter (PSF).The quantity of effluent generated by this stream is 2000 litres/day.
Provision for backwash with service water shall be provided to the pressure sand filter.
c) The water requirement for the cylinder degassing is 50m3/day (1000 cylinders degassed per
day). At a time not more than 6 cylinders are degassed at a time i.e. the water requirement per
batch is approximately 300 liters. This water is pumped from the underground tank (5 m3
capacity) to the empty cylinder degassing via filter. After degassing the water is recycled back
to the underground tank and reused. The underground water is replenished by a continuous
supply of service water at the rate of 250 litres/ hour. The overflow from the underground tank
is taken to main ETP by surface drain, which is approximately 2 m3/day.
d) The main ETP shall be designed to treat 10 m3 of effluent generated in 8 hours shift from all
sources listed from (a) to (c) above.
(i) After passing through the bar screen, all free floating matters in the effluent stream
including the oil and grease shall be collected in the oil and grease trap. This collected
oil and grease is removed manually by hand-rack from time to time.
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – LPG TERMINAL
Doc No: 256324-500-RQ-MEC-013 Rev: B Page 7 of 26
P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-
Tech Specs for ETP.doc
(ii) The effluent, after passing through the Oil and grease trap, is collected in the
underground equalization tank after passing through the coarse and fine screens to arrest
the larger and smaller particles respectively.
(iii) The effluent is made homogeneous in the equalization tank. Homogeneous effluent
from the equalization tank is pumped to the reaction tank.
(iv) In the reaction tank, agitator shall be provided for mixing the dosing chemicals with the
effluent. The chemical dosing results in the precipitation, which entraps the colloidal
things thus results in the removal of dissolved matter. The conversion of micro flocs
into macro flocs is facilitated by the addition of poly-electrolyte dosing in the reaction
tank.
(v) From reaction tank, the effluent overflows to the settling tank. Here the macro flocs
settle down as the chemical sludge. The Backwash water of the Pressure Sand Filter
(Cylinder wash Area) and Dual Media Filter is also collected in the settling tank for
further treatment.
(vi) The effluent from the settling tank overflows to the buffer tank.
(vii) From the buffer tank, the effluent is pumped and discharged through a dual media filter.
The treated water shall be sent for horticulture purpose to the nearby green belt.
(viii) The sludge collected at the bottom of the settling tank is taken to the sludge drying beds
for drying. After drying, the dried sludge cake is removed manually from the sludge
drying beds. These filled bags are to be stored in the covered hazardous waste pit.
e) Effluent from cylinder washing and cylinder degassing shall be collected in main ETP located
as shown in attached part drawing (256324-500-PIP-A0-3000-1/2) and schematics (256324-
500-SKT-MEC-002).
f) The sequence of the above treatment process is indicated in the Treatment Scheme (256324-
500-SKT-MEC-002 (2 sheets)) is attached with this requisition. The equipments shall be
designed such that the entire effluent generated per day shall be treated in 8 hours shift.
g) Vendor can propose an alternate scheme to minimise total hardware required, if possible, as
an option to the basic scheme. The Vendor shall make every effort to optimise the scheme.
h) Vendor shall carry out the Hazardous Area Classification for the proposed ETP and shall
ensure the instruments and electrical components suitable for the Area Classification, as per
IS: 5572 (1994).
i) Vendor to note that the control panel shall be located in a safe area near the ETP. All the
signals required to monitor the operation of the plant shall be repeated and made available to
be connected by others, though a serial link (soft signals) to the central control panel.
Necessary interface to connect the above cables shall be provided by the control panel vendor.
3.2 Equipment and Materials
Scope of supply of Effluent Treatment Plant shall include but not necessarily be limited to
following. Any additional equipment required to achieve treated water quality shall be
included by the Vendor in their scope of supply and shall mention the details of the same in the
bid document.
A. Equipments and Materials for ETP section of Cylinder washing area.
• Dilution tank suitable for diluting H2SO4 to 10% from 98%. Preferable Material of
construction is CS tank with lead lining or PTFE lining. Diaphragm dosing Pumps
(1W+1S) with FLP motors, pulsation dampner, Piping and Valves for dosing 10% H2SO4
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – LPG TERMINAL
Doc No: 256324-500-RQ-MEC-013 Rev: B Page 8 of 26
P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-
Tech Specs for ETP.doc
in the neutralizing tank. The tank and Dosing Pumps shall be skid mounted with to
facilitate quick erection & interconnection at site.
• Neutralizing tank of 3 m3 capacity for collection of effluent with caustic soda.
• Pressure Sand filter complete with frontal Piping, Valves, Media, Interconnecting Piping
and Internals. Filter design shall be as per ASME Section VIII Div. I, latest edition.
• Filter feed/ Transfer Pumps with FLP Motors (1W+1S) mounted on common base plate
complete with flexible spacer type couplings, non-sparking coupling guards, suction and
discharge piping and valves. The head of this pump shall be sufficient to transfer
neutralised and filtered water to Main ETP.
• All Civil work (excluding Piling), Interconnecting Piping & Pipe supports, Ladders,
Crossovers, Power cabling, Control Cabling, Instrumentation, Earthing, etc. within this
ETP area and interconnection with main ETP.
B. Equipments and Materials for ETP Section of Degassing shed.
• Underground storage sump for water storage of 5 m3 capacity. With suitable overflow
arrangement for transfer of water to main ETP.
• Water transfer pumps of capacity 10 m3/hr with FLP Motors (1W+1S) mounted on
common base plate complete with flexible spacer type couplings, non-sparking coupling
guards, suction and discharge piping and valves. The head of this pump shall be sufficient
to transfer water from pit up to empty cylinder filling via filter.
• Filter (Basket type or Cartridge) to remove suspended particles from the water being filled
in empty cylinders for degassing.
• All Civil work (excluding Piling), Interconnecting Piping & Pipe supports, Ladders,
Crossovers, Power cabling, Control Cabling, Instrumentation, Earthing, etc. within this
ETP area and interconnection with main ETP.
• A Rotameter that will ensure continuous flow of 0.25 m3/hr to the underground storage
sump.
C. Equipments and Materials for Main ETP.
• Bar Screen at the inlet Oil and Grease trap.
• Design and Construction of Oil & Grease Trap, Equalisation tank, Reaction tank, Dosing
Tanks, Settling tank, Buffer tank, Treated water tank, Sludge drying beds and Hazardous
waste pit.
• Effluent transfer pumps with FLP motors (1W+1S) mounted on common base plate
complete with flexible spacer type couplings, non-sparking coupling guards, suction and
discharge piping with valves. These pumps are for transfer of equalised effluent from
equalisation tank to reaction tank. The Effluent flows by gravity from reaction tank to
Settling tank to Buffer tank.
• Filter Feed Pumps with FLP Motors (1W+1S) mounted on common base plate complete
with flexible spacer type couplings, non-sparking coupling guards, suction and discharge
piping and valves. Suction of these pumps shall be taken from Buffer tank.
• Dual Media filter complete with frontal Piping, Valves, Media, Interconnecting Piping and
Internals. Filter design shall be as per ASME Section VIII Div. I, latest edition.
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – LPG TERMINAL
Doc No: 256324-500-RQ-MEC-013 Rev: B Page 9 of 26
P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-
Tech Specs for ETP.doc
• Filter Backwash Pumps with FLP Motors (1W+1S) mounted on common base plate
complete with flexible spacer type couplings, non-sparking coupling guards, suction and
discharge piping and valves. Suction of backwash pump shall be taken from Treated water
tank.
• Treated Water Pumps for Gardening with FLP Motors (1W+1S) mounted on common base
plate complete with flexible spacer type couplings, non-sparking coupling guards, suction
and discharge piping and valves. The discharge pressure of the pump shall be 5 kg/cm2g.
• Complete Civil design and Construction of Sumps, Pits, Equipment foundations and
Control room. Piling for Pits & foundations, as required, by others.
• All necessary interconnecting piping/tubing and valves within the battery limit of the
package.
• Purchaser will provide one point Instrument air supply within battery limit. Vendor to
provide the estimated Instrument Air Supply requirement.
• Instrumentation as required complete with control panel for control and monitoring the
quality of treated water.
• Motor Control Centre (MCC), Local Control Panel, Supply of cables within the battery
limit and termination in the control panel/ MCC located in safe area near the ETP
Purchaser shall provide one point power supply in the MCC Incomer.
• Interfacing with the ETP of cylinder washing area & ETP of degassing shed including
required piping, cables, civil works etc.
D. Equipments and Materials Common for all ETP areas and Main ETP.
• Lifting & Earthing lugs for packaged unit, Vessels and Pump sets.
• Anchor bolts, fixing bolts, jack screw bolts, shims, etc.
• First fill of lubricants to be supplied separately along with the pump sets.
• Commissioning & Start-up Spares.
• Spares for two years trouble free operation. Vendor to furnish the list for the same.
• Inspection and testing as specified.
• Submission of documents as specified in this document.
• Painting, preservation, preparation for shipment and delivery at site.
• Special tools if required (Bidder to provide list in the bid).
• Construction, Installation & Commissioning.
3.3 Engineering Services
The Vendor shall provide engineering services, which shall include, but not necessarily be
limited to, the following:
• Providing/Coordinating detailed design of all equipment and components within the scope
of supply.
• Preparing Civil foundation design and drawings for construction at site.
• Resolving engineering queries related to the equipment and components within the scope
of supply.
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – LPG TERMINAL
Doc No: 256324-500-RQ-MEC-013 Rev: B
Page 10 of
26
P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-
Tech Specs for ETP.doc
• Performing and coordinating all aspects of design.
• Providing progress reports etc.
• Providing expediting services for all sub-vendors.
• Providing quality assurance including all sub-vendors with respect to ISO 9000 or
equivalent.
• Erection & Commissioning to be quoted separately.
• Attendance of kick-off meetings, coordination meetings, Design reviews meetings in the
Consultant’s/Purchaser’s office.
• Resolve/incorporate all action points from Design reviews, HAZOP, etc.
• Any technical document if required by Purchaser for statutory approval shall be furnished
by vendor.
3.4 Exclusions
The following are excluded from the Vendor's scope and will be provided by others:
• Piping/ trenches up to collection tank and beyond the outlet nozzle of last equipment in the
treatment scheme.
• Service water will be provided for Backwash of Pressure Sand Filters in the Cylinder
Washing Area at one point.
• Interconnecting power cabling and cable trays to vendor supplied MCC of ETP and
Purchaser’s PMCC.
• Instrument air connection piping up to battery limit.
• Cable between Vendor’s Control panel and Purchaser’s Control room.
• Piling required for Pits & Equipment foundations.
4 Applicable Codes, Specifications and Standards
4.1 General
The design, fabrication, assembly, inspection, testing, painting, packing and shipment of
equipment shall be in accordance with the latest edition of the codes, specifications and
standards (including standards / specifications mentioned therein) listed in this requisition.
The Vendor shall provide an itemized list of any comments or exceptions to the specification
and its attachments. Only those comments / exceptions that are accepted by Purchaser will be
incorporated into the requisition at the time of the order.
4.2 Codes and Standards
ASME Section VIII Div. I Rules for Construction of Unfired Pressure vessels
ASME B 16.5 (2003) Pipe Flanges and Flanged Fittings.
ISO 9000 (2005) Quality Management and Quality Assurance Standards.
ISO 10474 (1991) Inspection Documents
ISO 5199: 2002 Technical Specification for Centrifugal Pumps Class II
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – LPG TERMINAL
Doc No: 256324-500-RQ-MEC-013 Rev: B
Page 11 of
26
P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-
Tech Specs for ETP.doc
4.3 Other Specifications and Standards
Refer Appendix-A for other specifications & standards.
4.4 Conflicting Requirements
In case of conflict between documents relating to the enquiry or purchase order, the following
priority of documents shall apply:
First priority : Purchase order and variations thereto
Second priority : Data sheets and drawings
Third priority : This requisition
Fourth priority : Other Specifications
Fifth Priority : Referred Codes & Standards
Note: Should any conflict arise either before or after order placement of order, the
Vendor shall immediately inform the Purchaser for technical resolution of the conflict.
5 Design Requirements
5.1 Mechanical Requirements
5.1.1 Pumps shall be supplied as per the requirements of Specification for Non-API Centrifugal
Pumps (Doc. No. 256324-500-SP-MEC-004) Pump set (Pump and Motor) shall be mounted on
common base plate.
5.1.2 The internals of the Oil & Grease Trap, Reaction tank and settling tank unit shall be FRP for
corrosion protection.
5.1.3 Skid mounted Filter Vessels with internals, media, piping and valves. Material of construction
for vessels shall be suitable for the effluent characteristics specified.
5.1.4 Skid mounted Duel Filter Vessels with internals, piping and valves. Material of construction
for vessels shall be Carbon steel with suitable coating on the inside to avoid corrosion.
External surfaces shall be painted as per the specification for painting.
5.1.5 Auto valves, if required shall be pneumatically operated type only.
5.2 Civil Requirements
5.2.1 All RCC shall be of Grade M30.
5.2.2 The reinforcement shall be of Grade 500.
5.2.3 All foundations & Underground tanks shall rest on Pile foundation.
5.2.4 Slag cement shall be used for construction.
5.3 Instrumentation Requirements
5.3.1 The Instruments shall be supplied as mentioned in the scope of supply for effective control and
monitoring of the system.
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – LPG TERMINAL
Doc No: 256324-500-RQ-MEC-013 Rev: B
Page 12 of
26
P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-
Tech Specs for ETP.doc
5.3.2 All the Instruments shall be suitable for Zone 1, Gas Group IIA/IIB.
5.3.3 Instrument air supply if required, is available. The pressure range is 4.5 to 7.0 kg/cm2.
Purchaser will provide one point Instrument air supply within the battery limit of the bidder.
5.3.4 Controls shall be PLC based and all soft signals covering for dynamic graphic information of
ETP shall be made available for connection (By Others) to Owner’s control room.
5.3.5 Control Panel, if Electrical panel not combined with Automation with suitable partition, shall
be supplied by vendor. The Control Panel shall be fabricated from cold rolled MS sheets of
minimum 2mm thickness for load bearing members, 1.6mm for non load bearing members an
3mm for gland plates. Panel shall be rated for IP-55, weather protection.
5.3.6 All Instruments, Junction boxes, cables, control panels etc. shall be supplied and hooked up in
the skid. All on-skid cabling shall be terminated in skid mounted Local panels by the vendor.
5.3.7 All Instruments/PLC supplied in the package shall be from approved vendor list. Bidder shall
take the approval from MMCI for instruments not found in the approved list. Local panel shall
be provided with sunshade.
5.3.8 ETP shall be provided with its own PLC (if necessary) to control, monitor and safeguard the
system. The PLC’s shall be mounted in a local control panel (LCP) provided with necessary
indications.
5.3.9 Controls, sequencing logic and safe guarding of the complete ETP shall be bidder’s
responsibility. Vendor shall furnish the control and safeguarding logic of the package for
review and approval.
5.3.10 Clean & dirty earthing shall be made available inside LCP and separated accordingly
5.3.11 Vendor shall inform the total consumption of Instrument air.
5.3.12 All instruments to be visible from grade level otherwise platform shall be provided.
5.3.13 Vendor shall include in their offer, spares for Critical solenoids.
5.3.14 Instrument data sheets shall be completed by the vendor for all instruments supplied in the
format provided to the bidder.
5.3.15 The identifying tag number shall be neatly & clearly marked on each instrument.
5.3.16 Dial size of Pressure shall be 150 mm & Temperature Gauge shall be 100mm. Dial size of
Receiver Gauge shall be 50mm. The scale plates shall be aluminium or laminated plastic with
white face & black figures.
5.3.17 Pressure gauge & Temperature gauge range shall be within middle third of the instrument
range in normal operating condition. Pressure Gauge exposed to vacuum shall be capable of
withstanding full vacuum.
5.3.18 Instruments shall meet the minimum requirements of IP 65 for ingress protection in
accordance with IEC 60529.
5.3.19 All instruments shall be individually valved by block and bleed valve at the tap off to allow
depressurization, in-place testing and maintenance of the instrument without shutting down the
equipment/package unit.
5.3.20 Cable entry to all instruments shall be ½ inch NPT. Spare cable entries shall be suitably
plugged with stopping plugs.
5.3.21 Materials of construction for instrument equipment shall be compatible to the corrosion
resistance, pressure and temperature conditions of the process fluids handled. Generally, all
instrument wetted parts, in contact with the process fluid shall be SS316 (minimum), or of a
material equal to or better than that of the related vessel or line.
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – LPG TERMINAL
Doc No: 256324-500-RQ-MEC-013 Rev: B
Page 13 of
26
P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-
Tech Specs for ETP.doc
5.3.22 List of approved vendors
1. PROGRAMMABLE LOGIC CONTROLLER
SR.NO. NAME OF VENDOR
1. ALLEN BRADLEY (Rockwell Automation India Pvt Ltd)
2. GE FANUC SYSTEMS PVT LTD
3. SCHNEIDER MODICON
4. SIEMENS
5. HONEYWELL
2. ELECTRONIC TRANSMITTERS (PT, DPT, LT, TT)
SR.NO. NAME OF VENDOR
1. EMERSON PROCESS MANAGMENT
2. ENDRESS & HAUSER
3. YOKAGAWA
4. HONEYWELL
3. pH INSTRUMENT
SR.NO. NAME OF VENDOR
1. ZWELLEGER
2. FORBES POLYMETRON PVT LTD
3. ABB
4. EMERSON
4. ROTAMETER
SR.NO. NAME OF VENDOR
1. CHEMTROLS
2. EMERSON
3. KROHNE
5. PNEUMATIC VALVE ACTUATORS
SR.NO. NAME OF VENDOR
1. ADAMS
2. BETIS
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – LPG TERMINAL
Doc No: 256324-500-RQ-MEC-013 Rev: B
Page 14 of
26
P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-
Tech Specs for ETP.doc
3. VIRGO
4. VELAN
5. ORTON
6. TYCO –BIFI
7. ELOMATIC
6. CONTROL VALVE
SR.NO. NAME OF VENDOR
1. FISHER XOMOX
2. MASONEILAN
3. TYCO
4. FLOWSERVE INDIA
5. SAMSON CONTROLS
6. INSTRUMENTATION LTD.
7. METSO AUTOMATION
7. PRESSURE SAFETY/RELIEF, THERMAL SAFETY/RELIEF VALVE
SR.NO. NAME OF VENDOR
1. ANDERSON & GREENWOOD
2. L&T
3. TYCO
4. INSTRUMENTATION LTD.
5. FAINGER LASER
8. PRESSURE, TEMPERATURE GAUGE, D.P. GAUGE
SR.NO. NAME OF VENDOR
1. WIKA INSTRUMENTS
2. ASHCROFT
3. GENERAL INSTRUMENTS CONSORTIUM
9. LEVEL GAUGE
SR.NO. NAME OF VENDOR
1. JERGUSON
2. K-TEK
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – LPG TERMINAL
Doc No: 256324-500-RQ-MEC-013 Rev: B
Page 15 of
26
P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-
Tech Specs for ETP.doc
3. MAGNETROL
10. RTD
SR.NO. NAME OF VENDOR
1. GENERAL INSTRUMENTS CONSORTIUM
2. WAAREE INSTRUMENTS LTD.
3. ALTOP INDUSTRIES
4. PYRO ELECTRIC & ALLIED INSTRUMENTS PVT. LTD.
11. RELAY & RELAY BOARDS
SR.NO. NAME OF VENDOR
1. OMRON AUTOMATION PVT LTD
2. TELEMECHANIQUE
3. P&F
4. PHEONIX
5. HONEYWELL
6. SIEMENS
12. SOLENOID VALVE
SR.NO. NAME OF VENDOR
1. ASCO
2. HERION
3. NORGREN
13. PUSHBUTTONS
SR.NO. NAME OF VENDOR
1. TEKNIC
2. L&T
3. SIEMENS
4. MERLIN GERIN-TELEMECHANIQUE SCHNEIDER ELECTRIC
5. CONTROL & SWITCHGEAR-CANDS
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – LPG TERMINAL
Doc No: 256324-500-RQ-MEC-013 Rev: B
Page 16 of
26
P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-
Tech Specs for ETP.doc
14. MCB
SR.NO. NAME OF VENDOR
1. MDS
2. MERLIN GERIN-SCHNEIDER ELECTRIC
3. SIEMENS
4. L&T
15. CABLES
SR.NO. NAME OF VENDOR
1. ASSOCIATED CABLES PVT. LTD.
2. UNIVERSAL CABLES
3. ICON CABLES (KERPEN)
4. LAPP
5. CORDS CABLES
6. KEI INDUSTRIES LIMITED
16. RTD CABLES
SR.NO. NAME OF VENDOR
1. LAPP
2. DELTON
3. UNIVERSAL CABLES
4. UNIFLEX CABLES Ltd
5. ASSOCIATED CABLES PVT. LTD.
17. POWER CABLES
SR.NO. NAME OF VENDOR
1. CCI
2. ASSOCIATED CABLES PVT. LTD.
3. UNIVERSAL CABLES
4. FINOLEX
5. LAPP
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – LPG TERMINAL
Doc No: 256324-500-RQ-MEC-013 Rev: B
Page 17 of
26
P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-
Tech Specs for ETP.doc
18. TUBE AND TUBE FITTINGS
SR.NO. NAME OF VENDOR
1. SWAGELOK
2. PARKAR HANNIFEN INDIA PVT LTD
03. ASTEC INSTRUMENTS PVT. LTD
5.4 Electrical Requirements
5.4.1 Motors shall be supplied as per attached Motor specification no. 256324-500-SP-ELE-010.
5.4.2 Vendor shall submit the Motor Datasheet with all the data filled by the Motor Manufacturer.
5.4.3 Purchaser shall provide one point power supply within the battery limit of the package vendor.
Further distribution & control shall be in the scope of packaged vendor.
5.4.4 Local control panel shall have all necessary standard features viz.
• Motor ON/OFF push buttons
• Process interlocking provisions
• Auto / Manual selection position
• Motor ON/OFF indication
5.4.5 Local control panel shall be suitable for Safe location near ETP.
5.4.6 Normal 240 volts single phase (non UPS) power supply shall be derived from ETP MCC to
Local control panel.
5.4.7 Electrical Panel
Purchaser shall provide 415V, 3phase, 50Hz, power supply to ETP MCC and it shall be
located near ETP in safe area. Vendor shall decide exact location of ETP MCC panel suitably
in safe area. The auxiliary power requirements at various voltage levels (AC and/or DC) and
to the control panel shall be derived within the panel by providing necessary transformers,
rectifiers, fuses, etc. by the Vendor.
The Electrical Panel shall be fabricated from cold rolled MS sheets of minimum 2mm
thickness for load bearing members, 1.6mm for non load bearing members an 3mm for gland
plates. Panel shall be suitable for outdoor installation with IP-55 ingress protection.
The Electrical panel shall also house the starter and breaker units for the drive motors and
these feeders shall be fixed type. Motor starter feeder shall be chosen to provide Type-2 co-
ordination. Motors rated upto 15KW shall be started direct on line (DOL starter) and 15KW
and above shall have Star-Delta starter. Supply for Motor space heater shall be derived from
this panel. Suitable power feeders shall be provided for control panel.
Electrical Panel shall have Start, Stop Push buttons and Indication provision for all drives.
5.4.8 Local Control Station for each drive shall be provided near the drive.
5.4.9 LV Cables
All Power and Control cables shall be 1.1kv grade, XLPE insulated, multi standard conductor,
single/multi core, steel armoured, extruded PVC inner shealthed and extruded FRLS PVC
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – LPG TERMINAL
Doc No: 256324-500-RQ-MEC-013 Rev: B
Page 18 of
26
P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-
Tech Specs for ETP.doc
outer shealthed. Cable of size 6 sq.mm and below shall be of copper conductor. Cable of Size
10 sq.mm and above shall be aluminium conductor confirming to IS 7098 (Part-1).
6 Quality Assurance
The Vendor shall maintain and use a Quality System which is based on ISO 9000 to control
the work. If the Vendor elects to sub-contract part of the work he shall ensure that only those
sub-contractors or suppliers are used who can demonstrate that they operate Quality Systems
based on ISO 9001 or ISO 9002 as applicable.
The Vendor shall give his sub-contractors or suppliers assistance in attaining the required
standard, if necessary. This shall not relieve the Vendor of his responsibility for the quality of
the finished work. The Company / Consultant reserve the right to audit the Vendor’s Quality
System.
The Vendor shall assign sufficient full time personnel to the project to ensure the Quality
Assurance / Quality Control System, documented in a Quality Assurance / Control Manual, is
maintained and kept up-to-date throughout the duration of any purchase order. The Vendor’s
Quality Assurance / Control System shall become an integral part of any purchase order.
Vendor shall organize a prefabrication / inspection meeting with the Company / Consultant.
Vendor shall submit QA plan/Inspection test plan for Purchaser’s/Consultant’s review and
approval within 2 weeks from the date of Purchase Order/LOI/FOI.
7 Inspection and Testing
7.1 Factory Inspection & Testing
The responsibility for inspection, certification, etc. of all materials, parts lies with the Vendor.
The Vendor shall specify all of the inspection and testing requirements in the Quality
Assurance plan (QAP)/ Inspection Test plan (ITP) which shall identify the activities requiring
the Company / Consultant's approval, review, witnessing etc.
Inspection and testing requirements shall be in accordance with the applicable standards as
listed in this requisition and the data sheets and Vendor’s Quality Assurance Plan/ Inspection
test plan approved by Purchaser/ Consultant.
All equipment shall be inspected for compliance with:
• Requirements of the Company/Consultant’s specifications, data sheets and correspondence
thereafter.
• Applicable Codes, standards and specifications, which shall also include sub-referenced
standards therein.
• QAP/ ITPs produced by the Vendor duly approved by Purchaser/ Consultant.
Purchaser’s/ Consultant’s Inspectors have the right to request additional inspections or tests to
ensure that the equipment complies with this specification and all relevant codes and
standards.
All equipment shall be presented for inspection in an unpainted state except for the final
inspection. All instruments and other equipment necessary for testing shall be supplied by the
Vendor and the same shall be checked and certified by the Company / Consultant’s inspector.
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – LPG TERMINAL
Doc No: 256324-500-RQ-MEC-013 Rev: B
Page 19 of
26
P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-
Tech Specs for ETP.doc
Any defects found by the Company / Consultant’s appointed Inspector shall be rectified in his
presence. Where this is not possible or practical, check lists shall be prepared and signed by
the Inspector stating all “pending items”. Copies of these lists shall be sent to the
Company/Purchaser to enable their subsequent checking.
Mill and shop inspection shall not relieve the Vendor from his contractual responsibility for
replacing any defective material and for repairing any defective workmanship that may be
discovered in the field.
The Vendor shall be responsible for co-coordinating the inspection and testing of sub-vendor
supplied equipment, and for ensuring that the Company / Consultant’s representatives are
given the necessary access for inspection, and adequate warning of inspection and tests.
The Vendor (and all sub-Vendors) shall give the Company and its’ representatives, without
charge, all reasonable facilities and access for the purpose of inspecting the equipment to
ensure that it is manufactured in accordance with the Specification.
All spare parts shall be subjected to the same inspection standards and full material
certification as the main order.
The equipment shall not leave the Vendor’s factory before all discovered defects have been
rectified and without the written permission of the Company/Consultant.
Materials for all pressure retaining components & wetted components shall be certified in
accordance with ISO 10474 - 3.1B and that for non-pressure retaining components like
structural components, platforms, ladders, shall be certified in accordance with ISO 10474 -
2.2.
Final hydro test pressure shall be held for a minimum period of 30 minutes. Chloride contents
of water used for hydro test shall not exceed 20 ppm for stainless steel and chloride content
may be permitted up to 250 ppm for carbon steel.
7.2 Vendor Requirements
Any acceptance or release of equipment following an inspection or test activity shall in no way
relieve the Vendor of his responsibility to provide guarantees as to the suitability of the
materials, workmanship and performance of the equipment in accordance with this
Requisition.
7.3 Performance Guarantee
Unless otherwise agreed, all equipment shall be guaranteed as follows:
All equipment shall perform satisfactorily under the operating conditions and provide treated
water quality as per Appendix B of this requisition and shall be fit for the purpose intended.
The Vendor shall guarantee following as a minimum at site conditions:
• Sustained operation at the conditions outlined in this specification and relevant documents.
• Consumption of utilities like Water, Chemicals and Electrical power.
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – LPG TERMINAL
Doc No: 256324-500-RQ-MEC-013 Rev: B
Page 20 of
26
P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-
Tech Specs for ETP.doc
• The mechanical and structural integrity, workmanship and the materials of construction
used.
7.4 Works Inspection and Notification
The supplier shall send inspection notification at least 2 weeks in advance and shall send a
minimum of fifteen (15) working days notice prior to carrying out the Factory Acceptance Test
(FAT). The notification shall contain as a minimum the following information:
• Project Title, MMCI Project number.
• Manufacturer’s full address, contact name, telex / telefax / telephone numbers.
• Purchase Order reference
• Date of inspection
• Details of equipment to be tested / inspected and the status of the equipment (whether it is
complete).
8 Vendor Documentation
8.1 Documents/ Information to be supplied with offer
The Vendor shall provide the Consultant with the following information as a minimum along
with the offer. These documents shall include, but not be limited to the following:
a. The completed Table of Compliance (Appendix D).
b. Equipment Data sheets for Vessels and Pumps under scope of supply.
c. Piping and Instrumentation Diagram with description of Interlocks.
d. A detailed scope of supply that fully describes the equipments offered & treatment
scheme.
e. Pump performance curves.
f. General arrangement drawings with complete layout, dimensions, Termination details and
Load data for foundation design.
g. Commissioning Spare parts list.
h. 2-Years operation spare part list.
i. Complete list of special tools required, if any.
j. All utility consumptions such as power requirement, utility water requirement and
Chemical consumption.
k. Instrument Datasheets giving details of Manufacturer, Model number, Type of Instrument,
etc.
8.2 Document/ Information to be supplied After Award of Contract
Vendor shall provide Purchaser/Consultant with documents and drawings as described in the
'General Conditions of Contract'. However, document requirements as specified in the
'Requisition for Engineering Documents (RED)' attached with Appendix C shall be followed
as a minimum requirement.
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – LPG TERMINAL
Doc No: 256324-500-RQ-MEC-013 Rev: B
Page 21 of
26
P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-
Tech Specs for ETP.doc
9 Manufacturing Schedule
Within 2 weeks of the receipt of the Purchase Order/ LOI the manufacturer shall submit detail
bar chart schedule showing the dates for the following milestone activities, as minimum:
i) Issue of vendor drawings.
a. Issue for comments/approval
b. Issue of final drawings
c. Issue of O&M Manuals
ii) Equipment available for Testing.
iii) Completion of packing and readiness for dispatch.
10 Spares and Special Tools
10.1 Spares
As a minimum spares following shall be included:
• The supply of spares for start-up and commissioning
• Vendor to recommend two years operation spares and furnish separate price in the offer.
The Vendor shall also provide all consumables during erection up to commissioning and
reliability testing. In case of any additional spares if required during commissioning stage, the
same shall be supplied by Vendor free of cost.
The Vendor shall complete and submit SPIR forms 8 weeks after Vendor’s acceptance of the
Purchase Order. Spare parts for the normal operation shall be selected by the End User from
the electronic version of Spare Parts Lists and Interchange ability Record (SPIR).
10.2 Special Tools
The Vendor shall supply a set of any special tools, which are required for the installation,
commissioning, operation and maintenance of the equipment being supplied. A list of special
tools shall be supplied along with the offer.
11 Packing and Shipping
For Packaging, Shipping and delivery of equipment at site and unloading requirements,
'Agreed Conditions of Contract' shall be referred.
12 Installation and Commissioning
Vendor shall provide qualified personnel for the civil construction, installation, testing, pre-
commissioning and commissioning of the Effluent treatment plant.
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – LPG TERMINAL
Doc No: 256324-500-RQ-MEC-013 Rev: B
Page 22 of
26
P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-
Tech Specs for ETP.doc
Appendix A: Attachments
Document No. Rev. Description
256324-500-SP-ELE- 010 A Specification for Electric Motors (Electric
Motor Datasheet)
256324-500-SP-MEC-004 B Specification for Non-API Centrifugal pumps
for general services.
256324-500-SKT-MEC-002 B ETP Treatment Schematics
256324-500-PIP-A0-3000 (Sheet 1/2) 0 Part Drawing of Overall Plot Plan
256324-500-SP-GEN-001 B Local Conditions
Blank Instrument Datasheets
• Data sheet for Differential Pressure
Transmitter
• Data Sheet for Level Switch - High High /
Low Low(Displacer Type)
• Data Sheet For Pressure Safety Valve
(PSV)
• Data Sheet For Temperature Gauge
• Data Sheet For Pressure Gauge
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – LPG TERMINAL
Doc No: 256324-500-RQ-MEC-013 Rev: B
Page 23 of
26
P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-
Tech Specs for ETP.doc
Appendix B: Water Quality
Effluent Inlet Characteristics:
Temperature : 20- 40 oC
Colour : Muddy
pH : 5 to 8
Oil & Grease : 2 to 5 mg/l
TSS : 150-200 mg/l
TDS : 1000 – 1200 mg/l
BOD : 50-100 mg/l (3 days @ 27 oC)
COD : 150-250 mg/l
Detergent : 0.01 mg/l
Note: Oil shall be free oil, no emulsified oil to be considered.
Treated Effluent Characteristics:
The treated effluent characteristics shall be as per Ministry of Environment and Forest notification dated
18th March, 2008.
pH : 6.0 to 8.5
Oil & Grease : <5 mg/litre
BOD (3 days, 27° C) : <15 mg/litre
COD : <125 mg/litre
Suspended Solids : <20 mg/litre
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – LPG TERMINAL
Doc No: 256324-500-RQ-MEC-013 Rev: B
Page 24 of
26
P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-
Tech Specs for ETP.doc
Appendix C: Requisition of Engineering Documents (Red Form)
Owner/Purchaser’s Office Consultant’s Office
HINDUSTAN PETROLEUM CORPORATION LTD.
Krishna Shree, 2nd Floor, Gandhi Nagar, 1st Main Road-Adyar,
Chennai – 600 020
Mott MacDonald Consultants (India) Pvt. Ltd
Kothari House, CTS No. 185 Off Andheri – Kurla Road, Andheri (East)
Mumbai 400 059, India ; Tel 09122 3083 5000
DRAWINGS Required number for TIMING FOR SUBMITTAL
Approval Final issue - for approval 2 weeks after order date
Approval drawings / Final drawings to be submitted
under cover of an ADS form / FDS form respectively
Transpa
rencies
Prints Disk Prints - final issue 2 weeks after approval date
Documents shall be submitted to:
Vendor Doc. Schedule 4 1 3
General arrangement 4 1 3
Piping & Instrumentation Diagram 4 1 3
Piping Layout with Termination details 4 1 3
Civil design, Civil drawings, Foundation loading and
bolt location plan
4 1 3
Cross section drawing with BOM and MOC 4 1 3
Completed Pump, Motor data sheets 4 1 3
Performance curves for Pumps and motors 4 1 3
Motor Datasheet,GA drawing & Terminal Box
Drawing
4 1 3
GA and Control Schematic drawings for Local Control Panel, Instrument hook-up diagram, loop diagram,
layout, Termination details, MTO, etc. MCC in
vendor’s scope.
4 1 3
Production Schedule 4
Progress Report 4 Monthly Once.
Performance Test Procedure including FAT, NDT
Procedures
4 1 3
Quality plan satisfying ISO 9000 requirements 4 1 3
Manufacturing, Inspection & testing sequence plan/
QAP
4
SPARE PARTS DOCUMENTS 1 3
ESPIR forms including 1 transparency 1 3
Lubrication schedules 1 3
TEST AND INSPECTION DOCUMENTS Prints Documents to be submitted under transmittal Documents shall be submitted to:
Manufacturing report 1 3
Material certificates to: ISO 10474 - 3.1B 1 3
Electrical certificates to Cenelec / Baseefa/ATEX Compliance/CMRI 1 3
Static / dynamic balancing certificates 1 3 Purchasing Office via courier service within 4 weeks
Performance test Report & Performance Curves 1 3 of relevant test / inspection.
Heat treatment graphs
Calibration certificates of Instruments 1 3
OPERATING DOCUMENTS Purchasing Office via courier service not later than
time of dispatch of equipment.
Installation instructions 1 3
Operating instructions 1 3 Combine into one manual
Maintenance instructions 1 3
ADDITIONAL REQUIREMENTS:
1. Referenced standards / codes shall be the latest issue unless otherwise stated.
Invoice must certify that the drawings and engineering documents specified
above have been dispatched to all parties concerned. Any deviation from the timing for submittal of documents shall be notified to
the Approval / Distribution Offices by fax or E mail.
Shop fabrication shall not be started before the required approval drawings
have been released for construction by the party concerned, unless otherwise
stated on the "Approval Drawing Specification".
Each document shall bear the item / tag and order reference number and be
dispatched by air mail, unless other instructions are stated on the RED.
Units / dimensions to be used on Engineering documents shall be SI.
The documents shall be in English. Description on drawings and similar documents may be in other languages provided English translations are
also given.
Drawings and documents shall be suitable for microfilming and comply
with accepted national or international standards for the preparation of
technical drawings. Only the following standard sizes should be used: A4,
A3, A2, A1.
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – LPG TERMINAL
Doc No: 256324-500-RQ-MEC-013 Rev: B
Page 25 of
26
P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-
Tech Specs for ETP.doc
Appendix D: Table of Compliance
The Vendor shall confirm below their acceptance of all the clauses contained in the specification or
otherwise make clarifications or exceptions that shall be noted below:-
CLIENT: HINDUSTAN PETROLEUM
CORPORATION LTD.
VENDOR REF. NO.
REF. NO.: 256324-500-RQ-MEC-013 Rev. B
CLAUSE
NO.
CONFORMS
Y/N
ALTERNATIVE
Y/N
CLARIFICATION
1.0
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
2.0
3.0
3.1
3.2
3.3
3.4
4.0
4.1
4.2
4.3
4.4
5.0
5.1
5.2
5.3
5.4
6.0
7.0
7.1
7.2
7.3
7.4
8.0
VISAKH MARKETING INSTALLATION RESITEMENT
PROJECT – LPG TERMINAL
Doc No: 256324-500-RQ-MEC-013 Rev: B
Page 26 of
26
P:\Andheri\IndiaProject\256324 HPCL- LPG\10 Procurement\TENDER\17 ETP\Final\Editable\Technical Attachments\2.1-
Tech Specs for ETP.doc
CLIENT: HINDUSTAN PETROLEUM
CORPORATION LTD.
VENDOR REF. NO.
REF. NO.: 256324-500-RQ-MEC-013 Rev. B
CLAUSE
NO.
CONFORMS
Y/N
ALTERNATIVE
Y/N
CLARIFICATION
8.1
8.2
9.0
10.0
10.1
10.2
11.0
12.0
Appendix A
Appendix B
Appendix C
Appendix D