technology department (te)€¦ · a. vidal n. zelko engineering & insulation vacuum section...
TRANSCRIPT
LS1 Days
Report from Vacuum, Surfaces and Coatings (VSC) group
Technology Department (TE)
José Miguel JIMENEZ
J.M. Jimenez, 12 June’12 TE-VSC 1
Main topics
• LS1 coordination
• TE-VSC Plan Items • Implications for TE-VSC
• Impacts to other Groups
• TE-VSC Group contributions
• Resource status
• Closing remarks
TE-VSC 2 J.M. Jimenez, 12 June’12
LS1 Coordination
TE-VSC Structure (June’12)
Vacuum, Surfaces and Coatings
José Miguel JIMENEZ Group Leader
Paolo CHIGGIATO Deputy Group Leader
Injectors & Vacuum Measurement Section
[IVM]
Section Leader Paolo CHIGGIATO
Engineers & Physicists
G. VANDONI J.A. FERREIRA R. KERSEVAN
Technical Engineers J. HANSEN
B. JENNINGER S. MEUNIER I. WEVERS
Technicians A. BRUTON
J. CAVE C. COLLOMB PATTON
P. DEMAREST A. HARRISON
J. KORTESMAA P. LANCON A. MICHET
A. MONGELLUZZO A. SINTUREL
N. THAUS
LHC Beam Vacuum Section
[LBV]
Section Leader Vincent BAGLIN
Engineers & Physicists
G. BREGLIOZZI G. LANZA
Technical Engineers G. CATTENOZ B. HENRIST
E. PAGE G. SCHNEIDER
Technicians D. CALEGARI
J. FINELLE J. GALLAGHER A. MARRAFFA
A. VIDAL N. ZELKO
Engineering & Insulation Vacuum Section
[EIV]
Section Leader Paul CRUIKSHANK
Engineers & Physicists
M. GALLILEE C. GARION
N. KOS CP E TE-VSC-EIV-2011-277
Technical Engineers P. LEPEULE
W. MAAN
Technicians J. CHAURE
P. COLY H. KOS
L. MOURIER E. PAJU
H. RAMBEAU
Interlocks, Controls & Monitoring Section
[ICM]
Section Leader Paulo GOMES
Engineers & Physicists
G. PIGNY
Technical Engineers F. ANTONIOTTI S. BLANCHARD
H. VESTERGARD
Technicians D. ANDEREGG F. BELLORINI G. GIRARDOT
B. RIO
Surfaces, Chemistry & Coatings
[SCC]
Section Leader Mauro TABORELLI
Engineers & Physicists L. ANTUNES FERREIRA
S. CALATRONI P. COSTA PINTO
S. ILIE A. SUBLET
Technical Engineers
C. CHARVET M. MALABAILA
H. NEUPERT W. VOLLENBERG
Technicians J. CAROSONE
D. LETANT-DELRIEUX S. FOREL
P. GARRITTY L. LEGGIERO
B. TEISSANDIER M. THIEBERT
CP C TE-VSC-SCC-2011-278 CP C Surface treatments [Sep'12] CP C Surface treatments [Sep'12]
LS1 Coordination
Name of Contact Persons in TE-VSC
Vacuum, Surfaces and Coatings (VSC)
Technology Department (TE)
José Miguel JIMENEZ (GL) [16 0763]
Paolo CHIGGIATO (DGL) [16 3689]
Injectors & Associated
Experimental Areas
All activities related
to maintenance, consolidations and
upgrades
José ANTONIO FERREIRA [16 9183]
Paolo CHIGGIATO (SL)
[16 3689]
LHC
Beam and Insulation Vacuum
Beam Vacuum
Consolidation and upgrade of beam
vacuum systems and support to
equipment owners
Vincent BAGLIN (SL)
[16 4287]
Giuseppe BREGLIOZZI
[16 2517]
Insulation Vacuum
Warm-ups, leak
detections & pump downs
Paul CRUIKSHANK (SL)
[16 0756]
(Fellow) [16 XXYY]
Insulation Vacuum
Consolidations
following 3-4, PIMs and Splices train
Cédric GARION [16 5257]
(Staff position) [16 XXYY]
Experimental Areas
Consolidation and
upgrade of experimental
beampipes
Mark GALILLEE [16 9509]
Cédric GARION [16 5257]
Surfaces, Chemistry &
Coatings Supports
All activities of
support to surface treatments, coatings
and chemistry analysis
Mauro TABORELLI
(SL) [16 3890]
Coatings
Sergio CALATRONI [16 3613]
Chemistry
Benoit TESSANDIER [7 8822 ]
Surfaces treatments
Marina MALABAILA [16 4814]
Vacuum Controls
Industrial Controls and Supervision
tools
Paulo GOMES (SL) [16 3982]
Hardware and Cables Gregory PIGNY
[16 9526]
TE-VSC 4 J.M. Jimenez, 12 June’12
TE-VSC Plan items
Implications for TE-VSC (1/2)
• 161 Plan Items entered (2012-06-09 @ 21:54)
– 17 need ECRs
#Items %
• P0 14 8.7
• P1 61 37.9
• P2 40 24.8
• P3 42 26.1
• P4 4 2.5
P0+P1+P2 represent 71%
of the requests
LHC represents 50% of the
requests
• Status in plan.cern.ch
– 91 involve only TE-VSC
– 70 require support from other
groups
TE-VSC 5 J.M. Jimenez, 12 June’12
Count of Status
Accelerator Priority Total
AD P2 2
P3 3
AD Total 5
HIE-ISOLDE P3 5
HIE-ISOLDE Total 5
LEIR P2 2
LEIR Total 2
LHC P0 10
P1 42
P2 17
P3 15
LHC Total 84
LINAC P1 4
P2 2
P3 5
LINAC Total 11
PS P1 5
P2 5
P3 4
P4 1
PS Total 15
PSB P2 4
P3 1
P4 1
PSB Total 6
SPS P0 4
P1 10
P2 8
P3 9
P4 2
SPS Total 33
Grand Total 161
Count of Status
Priority Accelerator Total
P0 LHC 10
SPS 4
P0 Total 14
P1 LHC 42
LINAC 4
PS 5
SPS 10
P1 Total 61
P2 AD 2
LEIR 2
LHC 17
LINAC 2
PS 5
PSB 4
SPS 8
P2 Total 40
P3 AD 3
HIE-ISOLDE 5
LHC 15
LINAC 5
PS 4
PSB 1
SPS 9
P3 Total 42
P4 PS 1
PSB 1
SPS 2
P4 Total 4
Grand Total 161
TE-VSC Plan items
Implications for TE-VSC (2/2)
• Manpower
– 50 FTEs required (TE-VSC) #FTE %
• P0 8.7 17.9
• P1 22.2 45.5
• P2 8.0 16.5
• P3 9.1 18.8
• P4 0.6 1.3
P0+P1+P2 represent 80% of the
TE-VSC Manpower
LHC represent 40% of the
TE-VSC Manpower
TE-VSC 6 J.M. Jimenez, 12 June’12
Sum of FTE
Accelerator Priority Total
AD P2 1.8
P3 0.2
AD Total 1.9
HIE-ISOLDE P3 0.0
HIE-ISOLDE Total 0.0
LEIR P2 0.2
LEIR Total 0.2
LHC P0 8.3
P1 19.3
P2 4.4
P3 6.6
LHC Total 38.6
LINAC P1 0.4
P2 0.2
P3 0.3
LINAC Total 0.9
PS P1 0.8
P2 0.4
P3 1.1
P4 0.3
PS Total 2.6
PSB P2 0.3
P3 0.0
P4 0.3
PSB Total 0.5
SPS P0 0.4
P1 1.7
P2 0.8
P3 1.0
P4 0.1
SPS Total 4.0
Grand Total 48.7
Sum of FTE
Priority Accelerator Total
P0 LHC 8.3
SPS 0.4
P0 Total 8.7
P1 LHC 19.3
LINAC 0.4
PS 0.8
SPS 1.7
P1 Total 22.2
P2 AD 1.8
LEIR 0.2
LHC 4.4
LINAC 0.2
PS 0.4
PSB 0.3
SPS 0.8
P2 Total 8.0
P3 AD 0.2
HIE-ISOLDE 0.0
LHC 6.6
LINAC 0.3
PS 1.1
PSB 0.0
SPS 1.0
P3 Total 9.1
P4 PS 0.3
PSB 0.3
SPS 0.1
P4 Total 0.6
Grand Total 48.7
TE-VSC Plan items
Impact to other groups
• 161 Plan Items entered (2012-06-09 @ 21:54)
– 70 need support from other groups
#Items %
• P0 Total 4 5.7
• P1 Total 31 44.3
• P2 Total 17 24.3
• P3 Total 16 22.9
• P4 Total 2 2.9
– 10 Groups are asked to support TE-VSC
#Items %
• EN-EL 40 42.6
• BE-ABP 13 13.8
• EN-MME 13 13.8
• EN-HE 12 12.8
• TE-MSC 4 4.3
• DGS-RP 4 4.3
• EN-MEF 3 3.2
• TE-CRG 2 2.1
• EN-CV 2 2.1
• BE-BI 1 1.1
• Status in plan.cern.ch
– 3 “Yes” completed
– 5 “pending”
– 62 “Not filled”
TE-VSC 7 J.M. Jimenez, 12 June’12
Count of Status
Accelerator Priority Total
AD P2 1
P3 1
AD Total 2
HIE-ISOLDE P3 3
HIE-ISOLDE Total 3
LHC P0 2
P1 21
P2 7
P3 4
LHC Total 34
LINAC P1 2
P2 1
P3 2
LINAC Total 5
PS P1 3
P2 3
P3 2
PS Total 8
PSB P2 2
PSB Total 2
SPS P0 2
P1 5
P2 3
P3 4
P4 2
SPS Total 16
Grand Total 70
Count of Status
Priority Accelerator Total
P0 LHC 2
SPS 2
P0 Total 4
P1 LHC 21
LINAC 2
PS 3
SPS 5
P1 Total 31
P2 AD 1
LHC 7
LINAC 1
PS 3
PSB 2
SPS 3
P2 Total 17
P3 AD 1
HIE-ISOLDE 3
LHC 4
LINAC 2
PS 2
SPS 4
P3 Total 16
P4 SPS 2
P4 Total 2
Grand Total 70
TE-VSC Plan items
Impact to other groups: EN-EL case
• 20% (614 cables) correspond
to the needs for new
projects
• 16% correspond to P3
34% if cumulated
• Replacement of electrical
“reglettes” are counted as
cables
TE-VSC 8 J.M. Jimenez, 12 June’12
Accelerator Cable Qty
LINAC 61
PSB 200
PS 345
SPS 788
LHC BV 1053
LHC IV 27
L4 108
AD 164
HIE-ISOLDE 342
3088
Sum of Cables Qty
Priority Accelerator Total
P0 LHC BV 577
SPS 144
P0 Total 721
P1 LHC BV 189
LINAC 56
PS 279
PSB 110
SPS 196
P1 Total 830
P2 AD 132
HIE-ISOLDE 342
L4 108
LHC BV 14
LHC IV 19
PS 33
PSB 43
SPS 370
P2 Total 1061
P3 AD 32
LHC BV 273
LHC IV 8
LINAC 5
PS 33
PSB 47
SPS 78
P3 Total 476
Grand Total 3088
Sum of Cables Qty
Accelerator Priority Total
AD P2 132
P3 32
AD Total 164
HIE-ISOLDE P2 342
HIE-ISOLDE Total 342
L4 P2 108
L4 Total 108
LHC BV P0 577
P1 189
P2 14
P3 273
LHC BV Total 1053
LHC IV P2 19
P3 8
LHC IV Total 27
LINAC P1 56
P3 5
LINAC Total 61
PS P1 279
P2 33
P3 33
PS Total 345
PSB P1 110
P2 43
P3 47
PSB Total 200
SPS P0 144
P1 196
P2 370
P3 78
SPS Total 788
Grand Total 3088
Summary by Accelerators
Summary by Accelerators
TE-VSC Group contributions
• 145 Group contributions received (2012-06-09 @ 21:54)
– Ratio by priorities could not be extracted from the tool (important)
– 8 Groups are requesting TE-VSC Support
#Items % FTE • TE-ABT 36 25 3.5
• BE-RF 34 23 4.1
• BE-BI 28 19 3.2
• EN-STI 26 18 2.8
• BE-ABP 10 7 1.5
• BE-CO 5 3 0.2
• TE-MSC 5 3 0.6
• TE-CRG 1 1 0.2
• Status in plan.cern.ch – 13 “Not filled” checking with requesters
– 32 “pending” more detailed needed to complete the filling
– 100 “Yes” completed
• Resources involved – Manpower: 16 FTEs (excluding support at the surface: vacuum acceptance tests)
– Material budget required: 0.5 MCHF (outside the current agreements)
TE-VSC 9 J.M. Jimenez, 12 June’12
Accelerator Total
AD 0.4
CTF3 0.0
LEIR 0.2
LHC 6.0
LINAC 4.8
PS 0.8
PSB 0.6
SPS 2.6
SURF 0.5
Grand Total 16.0
Sum of FTEs
TE-VSC Resource status
Manpower availabilities: CERN Staffs & Fellows
• 59 VSC Staff deployed in all accelerators from Jan’13 to end March’14 – 15 in the Injectors
– 30 in the LHC
– 14 for the Surface treatments & Coatings support
Then Injector’s Staff partly redeployed in the LHC activities as from Feb’14
Engineers Technical Technicians & Physicists Engineers
– IVM: 2 1 8
– LBV 3 4 6
– EIV 4 2 6
– ICM 2 3 4
– SCC 2 2 10
• 5 Fellows – 1 in the Injectors
– 4 in the LHC
2013 2014
– Controls 1 1
– LHC BV 2 2
– LHC Exp. Areas 1 1
– LHC IV 1 1
TE-VSC 10 J.M. Jimenez, 12 June’12
Values
ISFSUPJAS Priority Sum of 2012 Sum of 2013 Sum of 2014
FELL P2 120 120
FELL Total 120 120
FSU P0 35
P1 68 979 490
P2 180 150
P3 180 120
FSU Total 68 1,374 760
IS P0 15 172 213
P1 456 1,329 797
P2 340 519 259
P3 53
IS Total 811 2,073 1,269
Mat P0 855 1,525
P1 2,972 2,302 488
P2 1,877 1,325 530
P3 1,466 1,977 750
Mat Total 7,170 7,128 1,768
PJAS P0 75 60
P1 151 598 290
PJAS Total 151 673 350
Staff P1
P3
Staff Total
Grand Total 8,200 11,368 4,267
TE-VSC Resource status
Manpower availabilities: IS & Collaborations
• 57 External Support is based on: – 23 AL40-30 mainly for LHC activities:
mechanics, venting/pump-downs and bake-out installations
2013 2014
• LHC BV 11 11
• LHC IV 10 10
• Injectors 2 2
– 18 FSUs for all activities: mechanics, controls, surface treatments, logistics and bake-out installations
2013 2014
• LHC BV 4 4
• LHC PIMs/Exp 2 2
• Controls 8 4.5
• Surface treat. 3.5+2? 3.5+2?
– 12 Collaboration: vacuum consolidation related to PIMs and Controls
2013 2014
• LHC BV 6 (PL) 6 (PL) 1+1? (ES) 1+1? (ES)
• Controls 5 (PL) 5 (PL)
– 4 USAS 2013 2014
• Portugal 2 1
• Spain 2 2
TE-VSC 11 J.M. Jimenez, 12 June’12
Summary by IS/FSU/PJAS
Values
Accel. Sum of 2012 Sum of 2013 Sum of 2014
AD 695 510 265
LHC BV 3,223 5,503 1,696
LHC IV 1,393 2,522 1,263
LINAC 325 363 160
PS 638 402 155
PSB 258 235 204
SPS 1,670 1,834 524
Grand Total 8,200 11,368 4,267
Values
Accel. Priority Sum of 2012 Sum of 2013 Sum of 2014
AD P2 695 435 265
P3 75
AD Total 695 510 265
LHC BV P0 518 1,528 266
P1 1,556 2,196 786
P2 260 100 24
P3 888 1,679 620
LHC BV Total 3,223 5,503 1,696
LHC IV P0 12 77 6
P1 717 1,541 860
P2 532 839 397
P3 132 66
LHC IV Total 1,393 2,522 1,263
LINAC P1 293 353 150
P3 32 10 10
LINAC Total 325 363 160
PS P1 410 167
P2 83 140 65
P3 145 95 90
PS Total 638 402 155
PSB P2 115 95 54
P3 143 140 150
PSB Total 258 235 204
SPS P0 340 202
P1 671 952 270
P2 533 535 254
P3 126 145
SPS Total 1,670 1,834 524
Grand Total 8,200 11,368 4,267
TE-VSC Resource status
Material
J.M. Jimenez, 12 June’12 TE-VSC 12
Summary by Accelerators Values
Priority Accel. Sum of 2012 Sum of 2013 Sum of 2014
P0 LHC BV 518 1,528 266
LHC IV 12 77 6
SPS 340 202
P0 Total 870 1,807 273
P1 LHC BV 1,556 2,196 786
LHC IV 717 1,541 860
LINAC 293 353 150
PS 410 167
SPS 671 952 270
P1 Total 3,647 5,208 2,065
P2 AD 695 435 265
LHC BV 260 100 24
LHC IV 532 839 397
PS 83 140 65
PSB 115 95 54
SPS 533 535 254
P2 Total 2,217 2,143 1,059
P3 AD 75
LHC BV 888 1,679 620
LHC IV 132 66
LINAC 32 10 10
PS 145 95 90
PSB 143 140 150
SPS 126 145
P3 Total 1,466 2,210 870
Grand Total 8,200 11,368 4,267
Summary by priorities
Material cost 23.8 MCHF (procurements…) LHC represent 66% P3 represent 19%
Closing remarks (1/3)
• The ideal sequence would be:
– For the arcs
• Pre-installation of mobile pumps (sub-sectors with leaks)
• Venting to speed up the warming-up
• Leak detections
• Follow-up of the trains for PIMs & relief valves installation
• “independent” schedule for RF ball & rupture disk installations
– For the LSS
• Venting and removal of equipment belonging to other groups
• TE-VSC consolidations
• Installation of equipment (coming back or new)
• Pump downs and bake-out installations
• Bake-out and NEG activations
• Removal of vacuum bake-out and cleaning
TE-VSC 13 J.M. Jimenez, 12 June’12
Closing remarks (2/3)
Optimisation of TE-VSC activities…
J.M. Jimenez, 12 June’12 TE-VSC 14
Venting LHC IV
Removing equipment
TE-VSC consolidations
Equipment back
Pump down & bake-out inst.
Bake-out & NEC activ.
Closing remarks (3/3)
• TE-VSC was aware of all most relevant activities
– Contacts taken since months with Groups so no big surprises
seen in Plan.cern.ch
121 people (59 Staffs + 5 Fellows + 57 External Support) are
required to execute all activities
• Schedule issues in LSS5, 6, 7 and 8
– Need a careful preparation with Katy
– Material (mobile pumps, bake-out) & co-activities to be analyzed
• Budget issues for P3 activities
– TE-VSC to revise the impact of LS1 day decisions
– Feedback to EN-EL on impact to the communicated DICs
• Decrease of the number of cables requested
TE-VSC 15 J.M. Jimenez, 12 June’12