Technology Steering Committee 

2008‐2011 

Preston  Coppels  Director of Instructional Services,  Co‐Chair Lynn  McNally  Technology Resource Supervisor,  Co‐Chair 

Aizaz  Aslam  Computer Specialist, Personnel Dr. Clark   Bowers  Principal, Arcola ES Chris  Bugaj  Assistive Technology Trainer Ursula   Dixit  AIT Supervisor Nicholas  Edivan  AIT Information Security Specialist Dr. Nancy  Farrell  Staff Development Trainer Bent  Ferrell  Internet Content Manager Sherron   Gladden  Principal, Harmony IS Dr. Barbara  Gruber  Staff  Development Trainer Keith  Hicks  Technology Resource Teacher, Woodgrove HS Elizabeth  Jespersen  Library/Media Specialist Potomac Falls HS Rachel  Johnson  Student Information Supervisor Dr. Stephan  Knobloch  Research Director Michael  Larson  Instructional Technology Supervisor Sandra  Lenga  Systems Integration Coordinator Brian  Magurn  ITS Technology Coordinator Dr. Virginia  Minshew  Principal,  Park View HS  Mark  Nichols  Special Education Supervisor, Assistive Technology Adina  Popa  Technology Resource Teacher,  Steuart W. Weller ES Denver  Peschken  Internet Content and Video Production Assistant George   Rodriguez  Administrative Computer Specialist Dr. Michele  Schmidt‐Moore  English Supervisor Robert  Schneider  Community Representative Aaron   Smith  AIT Technology Coordinator Michael   Speidel  Staff  Development Trainer Kate  Stecher  Early Intervening Specialist Sandy  Sullivan  President, LEA Matthew  Thompson  Media Technology Specialist Michael  Turner  AIT Technology Coordinator Wendi  Walker  Technology Resource Teacher, Smart’s  Mill MS 

 

 

Page 3: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

Contents 

 Technology Steering Committee Members 

Introduction……………………………………………………………………..… Page  1 

Needs Assessment………………………………………………………………  Page 3 

Goal 1 ………………………………………………………………………………….. Page  4 

Goal 2 …………………………………………………………………………………  Page 10 

Goal 3…………………………………………………………………………………  Page 14 

Goal 4…………………………………………………………………………………  Page 19 

Goal 5…………………………………………………………………………………  Page 22 

Plan Evaluation…………………………………………………………………  Page 28 

Appendix ­ Technology Plan Budget Summary 

 

 

  

Page 4: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

 Introduction 

Preparing Students for a Global Society  

As Alvin Toffler stated, "The illiterate of the 21st century will not be those who cannot read and write, but those who cannot learn, unlearn, and relearn." And so in preparing our students to be life‐long,  independent  learners,  we  need  to  give  them  appropriate  technology  tools  and resources and teach them how to use them to  learn and grow. The global society  in which our students will live, work and compete demand those skills. 

We  also  know  that  technology,  as  it  has  evolved,  now  allows  us  to  teach with multimedia resources  (graphics,  audio,  video,  simulations)  so  that  both  visual  and  verbal  multimodal learning  can  come  together  in  a way  that  recent  research  in  neuroscience  shows  can  affect significant increases in learning. 

Our  students  have  already  embraced  digital  communication  and  collaboration  tools  in  their personal  lives.  They  need  to  learn  how  to  use  these  tools  to  learn  and work  in  school  and beyond. 

The  implementation  of  the  Technology  Plan  continues  to  expand  Loudoun  County  Public Schools’  (LCPS)  commitment  to  curriculum  integrated  through  technology  and  rigorous academic standards so that we can prepare our students for an ever‐evolving global society. 

Background  With  a  student  population  of more  than  63,000  students  that  reflects  a  growing  diversity, Loudoun  County  Public  Schools  continues  to  grow  annually,  welcoming  2,000‐3,000  new students each year. In the last 12 years the minority population has more than doubled to 42%. Hispanic and Asian students are  the county’s  two  largest minority groups making up 15% and 14% respectively of the population.  

As we  finish  the  first  decade  of  the  21st  century,  Loudoun  County  Public  Schools  face many educational challenges (diverse student populations some of whom struggle to meet academic standards, growing numbers of students, shrinking budgets  for professional development  (PD) opportunities, and high‐stakes test pressures) that digital resources and online learning can play a role in overcoming. And like other districts, we face the challenge of sustaining technology and PD programs beyond the current funding cycle. 

1  

Page 5: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

Technology has the ability to reach all students,  no matter where they live, what language they speak,  how wealthy  they  are  and whether  they  have  physical  or  cognitive  disabilities,    but technology  programs,  including  equipment,  applications,  professional  development  and  IT support, require sustained investment. 

Our  students by many measures achieve at a high  level.    In  the  last 3 years  the average SAT score has risen from 1560 to 1597 at a time when more students than ever are taking the SAT and planning  to attend  college.   But we know  that moving  forward with  technology will only enhance that achievement. 

Mission and Vision   In the last LCPS Technology Plan 2004‐2009, the district focused on integrating technology into the curriculum, but as Bill Rust in a 2009 Gartner Report points out, “that stops short of realizing the full potential of  instructional technology. The transformational power of technology  lies  in its ability to integrate the curriculum. This evolution,  curriculum integrated through technology,  reverses  the  burden  of  proof  for  technology  in  education.”  So  instead  of  asking  technology leaders  for  evidence  that  technology  has  been  integrated  into  the  curriculum,  it  challenges curriculum planners to take advantage of the unique transformational power of technology to bring together disparate resources that address the challenges of multidisciplinary studies in the same way that the world now learns, plays, and works together (Rust, 2009). 

In  an  effort  to  include  all  stakeholders,  the  School  Board  Technology  Steering  committee created and maintained the Tech Steering Committee Planning webpage. It provides resources, plans,  guides, whitepapers,  reports,  articles,  and  presentations  to  support  the  Tech  Steering Committee  in  planning  the  new  2010‐2015  Loudoun  County  Public  Schools Technology  Plan. This is also a place where committee members and others (staff, students, parents, public) can post thoughts regarding the new tech plan so as to be part of the dialogue, and it was through that dialogue, that the guiding vision statement for the new plan was crafted. 

Loudoun County Public Schools will enhance, expand, and support an “anytime, anywhere”  media‐rich  environment  that  leverages  technology  to  provide  a superior  education  system  to  prepare  all  stakeholders for  success in  a  global society. 

 

   

2  

Page 6: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

Needs Assessment The first step for the School Board Technology Steering Committee was to look at the status quo  with  regards  to  infrastructure,  hardware,  software  applications  (from  enterprise  to tilitarian,  productivity  to  communication),  support  staff,  and  professional  development. uThat detailed picture is available in the 2004‐2009 Tech Plan Report.  The committee then began one‐year of research – white papers, reports, speakers, industry tandards, etc. – that included much discussion and input from other stakeholders outside sof the committee.  As  the  Steering  Committee  built  on  this  vision,  the  various  departments  that  make  up oudoun County Public Schools began  to plan how they would bring  the LCPS  technology 

tLvision to frui ion, and a number of assessments were conducted.  Discussions,  focus  groups,  and  surveys  of  students,  principals,  teachers,  parents,  ITRT’s, librarians, and other support staff were conducted. The goals and objectives as articulated in this plan reflect those needs.    

3  

Page 7: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

 

Goal 1: Provide a safe, flexible, and effective learning environment for all students Objective 1.1: Deliver appropriate and challenging curricula through face­to­face, blended, and virtual learning environments.  

• Strategy 1.1.1: Expand course offerings for students through Virtual Virginia, The 

Online Academy, LCPS VISION and other designated providers.  

o Evaluation Strategy:  Analyze pre and post course frequency counts and 

enrollment statistics. 

 

• Strategy 1.1.2: Further develop and deploy digital curricular content through LCPS 

CLARITY and VISION and The Online Academy to promote greater flexibility and 

engagement for learners. 

o Evaluation Strategy: Document enhancements to LCPS VISION and The 

Online Academy. 

o Evaluation Strategy: Collect and analyze data of user assessments of 

flexibility and engagement. 

 

• Strategy 1.1.3: Provide division‐wide access to Web‐based content, tools, and 

collaborative spaces through VISION, subscription resources, LCPS‐developed 

curriculum, and public Web 2.0 tools. 

o Evaluation Strategy: Analyze use data to determine frequency of access to 

Web‐based content, tools, and collaborative spaces. 

 

 

 

4  

Page 8: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

• Strategy 1.1.4: Leverage higher education partnerships to assist schools in 

instructional design and media production e.g., George Mason University, North 

TIER, Shenandoah University, University of Virginia. 

o Evaluation Strategy: Document how the number and types of higher 

education partnerships differ from previous years. 

o Evaluation Strategy: Describe the types, quantity, and quality of 

instructional and technical assistance provided by higher education 

partnerships. 

o Evaluation Strategy: Describe the extent to which these partnerships are 

accessible and useful with regard to delivering appropriate and challenging 

curricula. 

 

Objective 1.1 

Completion Timeline  

FY 12 Budget 

FY 13 Budget 

FY 14 Budget 

FY 15 Budget 

Department(s) Responsible 

             Strategy 1.1.1 

Ongoing                

$20,000               

$20,000  $20,000  $20,000 

DOI

(Tech Resource, C  &I)

Strategy 1.1.2 

Ongoing  $1,897,995  $1,954,935  $2,013,583  $2,073,990 

DOI

(Tech Resource, C  &I)

Strategy 1.1.3  Ongoing  $50,000  $100,000  $140,000  $170,000 

DOI

(Tech Resource, C&I, Library Media, ITS 

Strategy 1.1.4  Ongoing  $240,000  $240,000  $240,000  $240,000 

DOI

(Tech Resource, C&I, Staff 

Development, Career & Tech and Adult Education) 

   

5  

Page 9: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

Objective 1.2: Provide the technical and human infrastructure necessary to support real, blended, and virtual learning environments.  

• Strategy 1.2.1: Provide resources and support for at least one instructional 

technology resource teacher (TRT) and one technology assistant (TA) per school to 

assist teachers in integrating technology into teaching and learning.  

o Evaluation Strategy: Document TRT and TA count as a ratio to schools. 

o Evaluation Strategy: Document TRT and TA teacher support as outlined in 

TRT Performance Standards. 

 

• Strategy 1.2.2: Provide resources and support for appropriate number of technical 

support positions to ensure that technology and infrastructure is operational, 

secure, and properly maintained. 

o Evaluation Strategy: Document support needs. 

o Evaluation Strategy: Benchmark the ratio of machines to tech support per 

ISTE Tech Support Standards 

 

• Strategy 1.2.3: Provide fiber and connectivity (Mbps to Gbps of Ethernet) to every 

school t . o support access to digital resources, and tools to support curriculum

o Evaluation Strategy: Document the connectivity (bandwidth) need in 

elementary, middle, and high school as other goals and objectives in this 

technology plan are implemented. 

o Evaluation Strategy: Describe the extent to which the required fiber and 

connectivity have been implemented in every school. 

 

• Strategy 1.2.4: Facilitate the implementation of scalable wireless access to the 

Internet in every school so as to support a device for every student. 

o Evaluation Strategy: Describe the implementation in every school. 

 

 

 

6  

Page 10: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

• Strategy 1.2.5: Rebuild and enhance support infrastructure to automate services so 

as to pr ort services. ovide greater scalability and efficiency of supp

o Evaluation Strategy: Describe infrastructure. 

 

Objective 1.1 

Completion Timeline  

FY 12 Budget 

FY 13 Budget 

FY 14  Budget 

FY 15             Budget 

Department(s) Responsible 

Strategy 1.2.1 

Ongoing  $11,484,159  $11,634,159  $11,940,159  $12,020,159 

DOI

Tech.  Resource Services 

Strategy 1.2.2 

Ongoing  $3,715,751  $4,135,751  $4,555,751  $4,615,751 

DOI

Instructional Technology Services (ITS) 

Strategy 1.2.3  Ongoing  $1,629,596  $2,117,996  $2,973,596  $3,055,196 

DOI

ITS 

Strategy 1.2.4  Ongoing  $0  $7,260,000  $7,057,700  $0 

DOI

ITS 

Strategy 1.2.5  Ongoing  $56,600  $67,000  $68,000  $140,000 

DOI

ITS 

   

7  

Page 11: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

Objective 1.3: Provide high­quality professional development to help educators create, maintain, and work in a variety of learner­centered environments.  

• Strategy 1.3.1: Identify, develop, disseminate, and maintain resources to support 

the effe eachers and other staff. ctive use of technology in all curricula by t

o Evaluation Strategy: Describe resources.  

o Evaluation Strategy: Identify benchmarks for use and measure annually. 

 

• Strategy 1.3.2: Leverage public/private/nonprofit partnerships to provide 

professional development focused on technology integration strategies and the 

development of teachers’ and administrators’ 21st century skills.  

o Evaluation Strategy: Describe the number and types of partnerships. 

o Evaluation Strategy: Describe the types, quantity, and quality of professional 

development provided by partnerships. 

o Evaluation Strategy: Describe the extent to which these partnerships focus 

on technology integration and 21st century skills. 

o Evaluation Strategy: Document the professional development program 

attendance. 

 

• Strategy 1.3.3: Support pilot programs of the goals and objectives in this tech plan 

as part of plan implementation.  

o Evaluation Strategy: Describe the number, types, locations, and scope/extent 

(breadth and depth) of pilot programs and how they relate to this tech plan’s 

implementation. 

o Evaluation Strategy: Document the new and emerging technologies and 

s. strategies for technology integration in school

   

8  

Page 12: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

 

 

 

   

Objective 1.3 

Completion Timeline  

FY 12 Budget 

FY 13 Budget 

FY 14 Budget 

FY 15 Budget 

Department(s) Responsible 

Strategy 1.3.1 

Ongoing  $0  $0  $0  $0 

DOI 

Staff Dev, C&I, Career & Tech and Adult Ed, Tech Resource 

Strategy 1.3.2  Ongoing  $20,000  $20,000  $20,000  $20,000 

DOI 

Staff Dev, C&I, Career & Tech and Adult Ed, Tech Resource 

Strategy 1.3.3 

Ongoing  $0  $30,000  $35,000  $40,000 

DOI 

Staff Dev, C&I, Career & Tech and Adult Ed, Tech Resource 

9  

Page 13: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

Goal 2: Engage students in meaningful curricular content through the purposeful and effective use of technology. 

Objective 2.1: Support innovative professional development practices that promote strategic growth for all educators and collaboration with other educators, content experts, and students.  

• Strategy 2.1.1: Provide ongoing district‐wide opportunities for face‐to‐face and 

online c  staff. ourses and workshops for instructional, administrative, and classified

o Evaluation Strategy: Describe annually the professional development 

opportunities and report on participation and engagement. 

 

Strategy 2.1.2: Provide opportunities for educators to participate in professional 

learning    communities to study and integrate digital content in the curriculum.

o Evaluation Strategy: Describe annually the experience of professional 

learning communities and report on participation, engagement, and 

integration of digital content into instruction. 

 

• Strategy 2.1.3: Provide ubiquitous (anytime, anywhere) access for teachers to 

digital curriculum and resources.  

o Evaluation Strategy:  Evaluate digital curriculum content and describe 

ment. opportunities for revision and further develop

   

10  

Page 14: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

Objective 2.1 

Completion Timeline 

FY 12 Budget 

FY13 Budget 

FY 14 Budget 

FY 15 Budget 

Department(s) Responsible 

Strategy 

2.1.1 & 

2.1.2 

Ongoing  $583,520  $601,026  $619,057  $637,629 

DOI 

C & I, Staff 

D t evelopmen

Principals 

Strategy 

2.1.3  FY15  $100,000  $200,000  $300,000  $400,000 DOI 

C & I, ITS, 

   

11  

Page 15: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

Objective 2.2: Actualize the ability of technology to individualize learning and provide equitable opportunities for all learners.  

• Strategy 2.2.1: Provide ubiquitous (anytime, anywhere) digital curriculum  and 

resourc  and elibrary resources   es for students, for example elearning opportunities,

o Evaluation Strategy:  Identify curriculum resources. 

o Evaluation Strategy: Evaluate digital curriculum and student use of 

opportunities for individualized student learning. 

 

• Strategy 2.2.2: Provide interactive digital content based on universal design to 

support specific curricular instruction. 

o Evaluation Strategy: Describe the use of interactive digital content as it 

elates to universal design fundamentals in instruction. r

 

• Strategy 2.2.3: Provide opportunities and resources for students to develop their 

six year personal learning plans to include educational opportunities beyond 

traditional face‐to face instruction.  

o Evaluation Strategy: Review opportunities, resources and usage patterns 

o Evaluation Strategy: Review representative personal learning plans to gauge 

success. 

Objective 

2.1 

Completion 

Timeline 

FY 12 

Budget 

FY13 

Budget 

FY 14 

Budget 

FY 15 

Budget 

Department(s) 

Responsible 

Strategy 

2.2.1 FY15  $600,000  $700,000  $800,000  $900,000  DOI 

Strategy 

2.2.2 Ongoing  $0  $0  $0  $0 

DOI 

Principals 

Strategy 

2.2.3 FY15  $30,000  $32,000  $34,000  $36,000 

DOI 

Pupil Services 

12  

   

Page 16: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

Objective 2.3 Facilitate the implementation of high­quality Internet safety programs in schools.  

• Strategy 2.3.1:  Provide and deliver an internet safety program for all stakeholders 

that add s. resses issues of cyberbullying, social networking, and Internet predator

o Evaluation Strategy:  Develop indicators for a successful internet safety 

program, e.g. reduction in cyberbullying and increased knowledge of safe 

social networking practices.  Evaluate current program against indicators 

and revise annually. 

 

Strategy 2.3.2: Provide an internet filter that promotes safe internet use. 

o Evaluation Strategy: Develop indicators of an effective internet filter.  

Evaluate current filter against indicators.  Upgrade internet filter as 

indicated. 

 

 

   

Objective 

2.2 

Completion Deadline 

FY12 Budget 

FY13 Budget 

FY14 Budget 

FY15 Budget 

Department(s) Responsible 

Strategy 2.3.1 

Ongoing  $20,000  $22,000  $24,000  $26,000 

DOI Librarians TRTs 

Classroom teachers Guidance 

Strategy 2.3.2 

FY13  $77,000  $85,000  $85,000  $350,000  ITS 

13  

Page 17: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

Goal 3: Afford students with opportunities to apply technology effectively to gain knowledge, develop skills, and create and distribute artifacts that reflect their understandings. 

Objective 3.1: Provide and support professional development that increases the capacity of teachers to design and facilitate meaningful learning experiences, thereby encouraging students to create, problem solve, communicate, collaborate, and use real­world skills by applying technology purposefully.  

• Strategy 3.1.1 – Provide ongoing district‐wide opportunities for face‐to‐face and online c nt office. 

ourses and workshops for instructional staff through Staff Developme

o Evaluation Strategy: Describe annually the professional development opportunities and report on participation and engagement.  

• Strategy 3.1.2 – Provide a variety of professional development opportunities to include face‐to‐face and online workshops, study groups, and conference attendance for Inst y Teacher

ructional Technology Resource Teachers (ITRT’s), Assistive Technologs (AT’s), and Technology Assistants (TA’s). 

o Evaluation Strategy: Describe annually the professional development opportunities and report on participation and engagement.  

• Strategy 3.1.3 – Provide professional development opportunities to include face‐to‐face and oun VITAL i

 online workshops and study groups for administrators through Loudn technology integration. 

o Evaluation Strategy: Describe annually the professional development opportunities and report on participation and engagement.  

• Strategy 3.1.4 – Provide a variety of ongoing professional development opportunities to include face‐to‐face and online workshops, study groups, newsletters, etc. for teachers and teacher assistants at the building level through the work of the building‐assigned ITRT’s. 

14  

Page 18: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

o Evaluation Strategy: Describe annually the professional development opportunities and report on participation and engagement.  

• Strategy 3.1.5 – Provide opportunities for students and teachers to engage in learning ss the glob

 activities that allow students to connect and collaborate with others acroe. 

o Evaluation: Strategy: Describe and report annually the global activities in which teachers and students engage. 

 

 

Objective  

3.1 

Completion 

Timeline  

FY 12 

Budget 

FY 13 

Budget 

FY 14 

Budget 

FY 15 

Budget 

Department(s) 

Responsible 

Strategy 

3.1.1 Ongoing  $325,2600  $341,523  $358,600  $376,530 

DOI 

Staff Development 

Strategy 

3.1.2 Ongoing  $32,700  $33,681  $34,691  $35,732 

DOI 

Technology Resource  

Strategy 

3.1.3 Ongoing  $10,000  $10,000  $10,000  $10,000 

 DOI 

Technology Resource 

Strategy 

3.1.4 Ongoing  $433,680  $448,690  $460,091  $473,894 

DOI 

Principals 

Strategy 

3.1.5 Ongoing  $0  $0  $0  $0 

DOI 

ITS 

   

15  

Page 19: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

Objective 3.2: Ensure that students, teachers, and administrators are Information and Communication Technology (ICT) literate.  

• Strategy 3.2.1 – Merge the leadership of  Technology  Resource Services and 

Library Media Services so as to evaluate job description and performance standards 

of school librarians and Technology Resource teachers to determine intersection of 

missions as relates to ICT literacy. 

o Evaluation Strategy: Describe job descriptions, performance standards and 

common missions and activities. 

 

• Strategy 3.2.2 ‐ Provide district‐wide and school‐based professional development 

opportunities for teachers to continue to build ICT literacy through district staff 

development (face‐to‐face and online), school‐based staff development facilitated by 

the building ITRT and librarian, and Loudoun VITAL (Loudoun’s administrative tech 

leadership program). 

o Evaluation: Describe annually the professional development opportunities 

and report on participation and engagement. 

 

• Strateg d staff. y 3.2.3 – Develop and deploy an assessment of ICT literacy of license

o Evaluation: Describe annually the compiled assessment results and 

implications for PD planning changes. 

 

• Strategy 3.2.4 – Continue to develop VISION infrastructure (to include Loudoun 

student email and portfolio tools) to support student‐created digital portfolios that 

promotes and facilitates students and teachers use of digital portfolios for  the 

following: 

1. Storing/Publishing ‐ Student develops/publishes on web to share 

with varying audiences 

2. Formative Assessment: Self‐reflecting ‐ Student reflects on the work 

1) as personal expression (inspiration) and 2) as a reflection of 

learned skills and knowledge through the lens of rubrics in order to 

form a learning plan. 

16  

Page 20: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

3. Formative Assessment: Critical Review – Student invites others to 

comment on the work and/or the student’s reflection. 

4. Summative Assessment – Teacher evaluates student work as a 

reflection of learned skills and knowledge through the lens of 

rubrics. 

 

o Evaluation Strategy: Describe annually the build out and use of the digital 

portfolio system and implication for digital portfolio tool design and 

professional development. 

 

• Strategy 3.2.5 – Design ICT Literacy rubric for student portfolio at the end of 5th 

and 8th grade. 

o Evaluation Strategy: Describe and publish rubric. Annually, sample student 

portfolios at 5th and 8th grades. 

 

 

Objective 3.2 

Completion Timeline 

FY 12 Budget 

FY 13 Budget 

FY 14 Budget 

FY 15 Budget 

Department(s) Responsible 

Strategy 3.2.1 

Ongoing  $0  $0  $0  $0  DOI 

Strategy 3.2.2 

Ongoing  $666,450  $6,806,450  $7,016,450  $7,226,450  Tech Resource 

Strategy 3.2.3 

FY15  $10,000  $15,000  $15,000  $15,000  Tech. Resource 

Strategy 3.2.4 

FY15  $15,000  $15,000  $15,000  $15,000  Tech. Resource 

Strategy 3.2.5 

FY15  $0  $2,000  $2,000  $2,000  Tech. Resource 

   

17  

Page 21: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

Objective 3.3: Implement technology­based formative assessments that produce further growth in content knowledge and skills development.  

• Strateg ort thought

y 3.3.1 – Develop an infrastructure (through LCPS CLARITY) to suppful assessment and evaluation of all students. 

o Evaluation Strategy: Sample CLARITY assessments and evaluations.  

• Strategy 3.3.2 – Develop professional development program to support staff thoughtfulness and ali(RAP). 

gnment of assessment practice – Refined Assessment Practice 

o Evaluation Strategy: Describe Refining Assessment Practice (RAP) activities. 

 

 

 

   

Objective 3.3 Completion Timeline 

FY 12 Budget 

FY 13 Budget 

FY 14 Budget 

FY 15 Budget 

Department(s) Responsible 

Strategy         3.3.1 

Ongoing  $0  $0  $0  $0  DOI 

Strategy         3.3.2 

FY14  $0  $0  $0  $0  DOI 

18  

Page 22: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

Goal 4: Provide students with access to authentic and appropriate tools to gain knowledge, develop skills, extend capabilities, and create and disseminate artifacts that demonstrate their understanding. 

Objective 4.1: Provide resources and support to ensure that every student has access to a personal computing device.   

• Strateg ed on current best pra nt.  

y 4.1.1:  Develop support model and implementation plan basctices and standards to support a mobile device for every stude

o Evaluation Strategy: LCPS mobile device implementation plan.  

• Strategy  4.1.2:  Provide  or  allow  student  access  to  a  mobile  device  to  support ubiquito  and Web 2.0 tools). 

us computing (anytime, anywhere access to digital curriculum

o Evaluation Strategy: LCPS mobile device implementation plan. 

 

Objective 

4.1 

Completion 

Timeline 

FY 12 

Budget 

FY13 

Budget 

FY 14 

Budget 

FY 15 

Budget 

Department(s) 

Responsible 

Strategy 

4.1.1 FY13  $35,000  $0  $0  $0  DOI 

Strategy 

4.1.2 Ongoing  $11,496,037  $6,244,000  $18,950,000  $6,656,000  DOI 

  

   

19  

Page 23: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

Objective 4.2:  Provide technical and pedagogical support to ensure that teachers, students and support staff can use technology tools.  

• Strateg  support for technology tools. 

y 4.2.1:  Continue to provide and grow technical

o Evaluation: Survey support of tools by end user.  

• Strategy  4.2.2:    Provide  professional  development  and  planning  support  for teacher nd VISION to include

s in using digital curriculum and resources in LCPS CLARITY a Web 2.0 tools.  

o Evaluation: Implementation of professional development plan.  

Objective 

4.2 

Completion 

Timeline 

FY 12 

Budget 

FY13 

Budget 

FY 14 

Budget 

FY 15 

Budget 

Department(s)

Responsible 

Strategy 

4.2.1 Ongoing  $0  $0  $0  $0  DOI 

 

   

20  

Page 24: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

Objective 4.3:  Identify and disseminate information and resources that assist educators in selecting authentic and appropriate tools for all grade levels and curricular areas.  

• Strateg d through the LCP es. 

y 4.3.1:   Ensure that appropriate tools are selected and purchase 1) software review and 2) curriculum textbook adoption process

o valuation  ocesses and published matrices.SE Strategy: Document pr   

• Strateg ional strategi

y  4.3.2:    Provide  professional  development  for  enhanced  instructes to teach 21st century skills at district and school level.  

o Evaluation Strategy: Implementation of professional development plan. 

 

Objective 

4.3 

Completion 

Timeline 

FY 12 

Budget 

FY13 

Budget 

FY 14 

Budget 

FY 15 

Budget 

Department(s)

Responsible 

Strategy 

4.3.1 Ongoing  $450,000  $525,000  $600,000  $650,000  DOI 

Strategy 

4.3.2 Ongoing  $0  $0  $0  $0  DOI 

 

   

21  

Page 25: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

Goal 5: Use technology to support an “enterprise‐wide” culture of data‐driven decision making that relies upon data to evaluate and improve teaching and learning. 

Objective 5.1 Use data to inform and adjust technical, pedagogical, and financial leadership and support.  

• Strategy 5.1.1: Develop needs assessment for central office, schools, students and 

community for dissemination and utilization of data (school profile, district profile, 

SIP, District strategic plan). 

o Evaluation Strategy: Measures the use of newly developed needs assessment tool.  

•  Strategy 5.1.2:  Evaluate LCPS technology management structure effectiveness. 

o Evaluatio ure.  

n Strategy: Map and access efficiencies in management struct

• Strategy 5.1.3:  Assess decision‐making practices related to resource supply. 

o Evaluation Strategy: Evidence of a documented, comprehensive decision‐making process for allocation of technology resources. 

 

 • Strategy 5.1.4: Identify costs associated technical support of applications/tools (i.e 

People Support, Help Tools [Altiris, Wonderdesk]), Computer Specialists, AIT, ITS, 

DIT, Effectiveness, Efficiency, Resource Allocations (i.e. TRT by subject areas 

secondary) 

o Evaluation 

 Strategy: Produce cost documentation 

• Strategy 5.1.5: Identify an efficient/effective support model for all of LCPS (i.e., ITIL 

methodology) (Trend analysis – 3 years) 

o Evaluation Strategy: Survey end users to determine the usefulness of technical support strategies  

 

22  

Page 26: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

• Strategy 5.1.6: Evaluate technology expenditures related to pedagogical 

support 

o Evaluation Strategy:  Assess the use of support methodology by offices 

(tools, times, methodology) 

Evaluation Strategy: Create a cost/benefit analysis of resource allocation of  

technology (ROI tools –CoSN) 

 

Objective 5.1 

Completion Timeline  

FY 12 Budget 

FY 13 Budget 

FY 14 Budget 

FY 15 Budget 

Department(s) Responsible 

Strategy 5.1.1 

FY12  $5,000  $0  $0  $0  DOI 

Strategy 5.1.2 

FY14  $10,000  $150,000  $50,000  $25,000 LCPS Technology S  teering Committee

Strategy 5.1.3  FY13  $50,000  $50,000  $50,000  $50,000 

LCPS Technology Stee tee ring Commit

Strategy 5.1.4 

FY15  $10,000  $15,000  $20,000  $50,000  AIT and ITS 

Strategy 5.1.5 

FY13  $10,000  $0  $0  $0 Staff Development (ITS, TRT, AIT) 

Strategy 5.1.6 

FY14  $10,000  $0  $0  $0 Bus nceiness and Fina

(AIT, ITS, SIS) 

 

   

23  

Page 27: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

Objective 5.2 Provide support to help teachers disaggregate, interpret, and use data to plan, improve, and differentiate instruction. 

Strategy 5.2.1:  Create system‐wide PD on the use and interpretation of data from data sysIntegrat

 

tems. 

ic ool Profiles e tools into day to day activities 

CLARITY, Distr t and Sch StarWeb (SIS Express),

School Improvement Planning Tool (SkoVision) LCPS Data Warehouse 

 Workshop, Self‐guided videos, self‐Face to face and online tools (VISION,help guides) 

Create video based instruction (tips)  

o valuation Strategy: Pre‐assessment, gap analysis, use of “data chats” and ultiple

Em  PD models within schools and central offices  

• Strateg  to interpret and make decisions (commo

y 5.2.2:  Develop and utilize protocols used

ation n report formats for consistency) 

tionable Inform  Tools ‐ 5 Whys Turning Data Into AcRoot Cause Analysis

Data Chat Protocols  

o valuation Strategy: Create criteria for usefulness of protocols and monitor mplemeEi ntation of protocols  

• Strategaccount

y 5.2.3: Establish regular basis (i.e. monthly) expectations and /reallocate resources. 

n ability to audit/evaluate/review/modify

Meet certification criteria exemplified in the Data Quality CampaigProgrammatic Data – RI, PBIS, AVID, etc. 

 

Reporting Data – Discipline, Remediation, Grades, Attendance etc.  

o Evaluation Strategy: Documentation of action items (PDSA) reported to oversight supervisors biannually  

• Strategy 5.2.4: Assess programs for alignment with best practices incorporating data use 

 ( i.e., SIP, AVID, Pathways, RI, PBIS). 

o Evaluation Strategy: Review program evaluations for use of APQC best practices benchmarking study  

24  

Page 28: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

  

Objective 5.2 

Completion Timeline  

FY 12 Budget 

FY 13 Budget 

FY 14 Budget 

FY 15 Budget 

Department(s) Responsible 

Strategy 5.2.1 

FY13  $5,000  $0  $0  $0  DOI 

Strategy 5.2.2 

FY14  $10,000 $10,000 $10,000  $10,000  LCPS Technology Ste e ering Committe

Strategy 5.2.3 

FY14  $1,000  $1,000  $1,000  $1,000 SIS Office and    Research Office 

Strategy 5.2.4 

FY14  $10,000 $15,000 $20,000  $0  AIT and ITS 

25  

Page 29: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

Objective 5.3 Promote the use of technology to inform the design and implementation of next generation standardized assessments. 

 

• Strategy 5.3.1: Review and incorporate the use of Marzano’s New Taxonomy of Objectithroug

ves and P21 Framework to plan the integration and evaluation of technology hout LCPS curricula.  

o Evaluation Strategy: Review content curricular documents for the use of P21 and Marzano taxonomy.  

• Strate rk current incorporation of objecti

gy: 5.3.2: Create assessment to benchmaves. 

o Evaluation Strategy: Publish the review.  

  

Objective 5.3 

Completion Timeline  

FY 12 Budget 

FY 13 Budget 

FY 14 Budget 

FY 15 Budget 

Department(s) Responsible 

Strategy 5.3.1  FY14  $20,000  $20,000 $20,000 $20,000  DOI 

Strategy 5.3.2 

FY13  $15,000  $0  $0  $0  Research Office 

26  

Page 30: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

Objective 5.4:  Promote the use of technology to streamline technology operations.  

• Strateg al skill requirements and tools by career/

y 5.4.1:  Define matrix of technologicosition. 

o valuation Strategy:  Publish matrix. pE 

Objective 

5.4 

Completion Timeline 

FY 12 Budget 

FY13 Budget 

FY 14 Budget 

FY 15 Budget 

Department(s)Responsible 

Strategy 

5.4.1 Ongoing  $0  $0  $0  $0  DOI 

 

 

   

27  

Page 31: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

Plan Evaluation Data collection and reporting (see evaluation strategies for each objective) will occur annually. Report will be provided by each Tech Steering committee Goal Manager to the committee. The committee will then adjust timeline and budget as appropriate for the coming school year. 

   

28  

Page 32: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

29  

 

 

 

 

 

 

 

 

 

 

APPENDIX

Page 33: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

2011‐2016 LCPS TECHNOLOGY PLAN BUDGET 

Broken Out by Objective 

Tech Plan Strategy 

FY12 Tech Plan Budget 

FY13 Tech Plan Budget 

FY14 Tech Plan Budget 

FY15 Tech Plan Budget 

Comments 

1.1.1   $20,000.00    $20,000.00    $20,000.00    $20,000.00   Cost of online course offerings 

1.1.2   $1,897,995.00    $1,954,935.00    $2,013,583.00    $2,073,990.00  

Cost of online curriculum resources (e.g. brain pop, nettreker, World Book, safari montage) and software for instruction (e.g. Arc GRS, Mathematica, pixie, Microsoft Office). 

1.1.3   $50,000.00    $100,000.00    $140,000.00    $170,000.00  

FY13 ‐ expand e‐pals to all high school students ,                      FY14 ‐ expand e‐palls to all middle school students                     FY15  ‐ expand e‐pals to all el. students                                          

1.1.4   $240,000.00    $240,000.00    $240,000.00    $240,000.00   Tech Cohorts (Inst. Tech, Library, Online Cert.)in SD Budget 

Total Obj. 1.1 

 $2,207,995.00    $ 2,314,935.00    $2,413,583.00    $2,503,990.00    

  

1.2.1   $11,484,159.00    $11,634,159.00    $11,940,159.00    $12,020,159.00  

Personnel Cost contained in Tech Resource/Library Services Budgets New School TRT                                                                    FY13 ‐ $150,000 ‐  2 EL.                                                                      FY14 ‐ $225,000  ‐  2 EL., 1 MS.                                                         FY15 ‐ $225,000 ‐ 1 MS., 2 MS. 

1.2.2   $3,715,751.00    $ 4,135,751.00    $ 4,555,751.00    $ 4,615,751.00  

Personnel cost contained in ITS budget                                          FY13 ‐ $420,000, 7 staff to support mobile devices for teaches.                                                                                              FY14 ‐ $240,000 ‐ 4 staff to support mobile devices at HS &  MS.                                                                                                         FY 15 ‐ $60,000 ‐ 1 staff to support mobile devices at EL.  

1.2.3   $1,629,596.00    $2,117,996.00    $2,973,596.00    $3,055,196.00  

FY13 ‐ increase bandwidth to 1GB at high school level and 100 mbs at the middle school level         FY 14 increase bandwidth to 100 mb at El. school level to corresponding to providing mobile devices to all students and staff                        FY15 ‐ increase bandwidth to new schools  

Page 34: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

 

2  

1.2.4   $0   $7,260,000.00    $7,057,700.00    $0 

FY13 ‐ build out WAN at all hi. &  mid. schools in preparation for providing mobile devices to students at that level to provide access                                                                                      FY14 ‐ build out WAN to all el. Schools.                                          

1.2.5   $56,600.00    $67,000.00    $68,000.00    $140,000.00   Network infrastructure support 

Total Obj. 1.2 

 $16,886,106.00    $25,214,906.00    $26,595,206.00    $19,831,106.00    

  

1.3.1   $0           $0 $0 $0  PD Funding contained in budget for TRT 1.2.1 

1.3.2   $20,000.00    $20,000.00    $20,000.00    $20,000.00   e.g. North Tier,  COSN, Learning Forward, ISTE 

1.3.3   $0   $30,000.00    $35,000.00    $40,000.00   Digital content pilot Total Obj. 

1.3  $20,000.00    $50,000.00    $55,000.00    $60,000.00  

  

  2.1.1 & 2.1.2 

 $583,520.00    $601,026.00    $619,057.00    $637,629.00   SD budget devoted to technology, VITAL, 

2.1.3   $100,000.00    $200,000.00    $300,000.00    $400,000.00   DOI Develop and revise digital content Total Obj. 

2.1  $583,520.00    $601,026.00    $619,057.00    $637,629.00  

  

  2.2.1   $600,000.00    $700,000.00    $800,000.00    $900,000.00   Purchase of digital content and e‐books  2.2.2  $0  $0  $0  $0  Digital content textbook funds 

2.2.3   $30,000.00    $32,000.00    $34,000.00    $36,000.00   Naviance Total Obj. 

2.2  $3,030,000.00    $3,332,000.00    $3,734,000.00    $4,036,000.00  

  

  2.3.1   $20,000.00    $22,000.00    $24,000.00    $26,000.00   Annual Funding to revise internet safety program 

2.3.2   $77,000.00    $85,000.00    $85,000.00    $350,000.00  FY 13‐14  ‐ maintenance cost,                                                           FY 15  ‐ purchase of new internet filter (current filter 8 yr. old, upgrade will be needed) 

Total Obj. 2.2 

 $97,000.00    $107,000.00    $109,000.00    $376,000.00    

  3.1.1   $325,260.00    $341,523.00    $358,600.00    $376,530.00   funding for tech contained in SD Budget 

3.1.2   $32,700.00    $33,681.00    $34,691.00    $35,732.00   Tech Resource  & library PD budgets 

Page 35: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

 

3  

3.1.3   $10,000.00    $10,000.00    $10,000.00    $10,000.00   Vital 

3.1.4   $433,680.00    $448,690.00    $460,091.00    $473,894.00   Staff Development allotments to schools 

3.1.5   $0    $0  $0  $0  e‐pals and Live at EDU budgeted through VISION Total Obj. 

3.1  $476,380.00    $833,894.00    $ 04,782.00    $519,626.00  

  

  3.2.1  $0  $0  $0  $0  No cost merger completed in FY12 

3.2.2   $6,666,450.00    $6,806,450.00    $7,016,450.00    $7,226,450.00   Salaries of Library/media Specialists.  Funding contained  

3.2.3   $10,000.00    $15,000.00    $15,000.00    $15,000.00   Cost to develop ICT Literacy assessment 

3.2.4   $15,000.00    $15,000.00    $15,000.00    $15,000.00  Develop portfolio system (Mahara Pilot) for student ICT Literacy  

3.2.5     $0  $2,000.00    $2,000.00    $2,000.00   Cost to design rubrics and Pull data  

Total Obj.  3.2 

 $6,691,450.00    $6,838,450.00    $7,048,450.00    $7,258,450.00    

  3.3.1             $0 $0 $0  $0  Cost  to develop assessment budgeted in C & I Personnel 

3.3.2     $0  $0  $0  $0  Funding  budgeted in SD and School SD allotment 

Total Obj.  3.3 

 $0  $0  $0  $0   

  4.1.1   $35,000.00   $0  $0  $0  Research and purchase devices to test 

4.1.2   $11,496,037.00    $6,244,000.00   $18,950,000   $6,656,000  

FY13 ‐ Mobile devices 5,500 instructional staff  and refresh for 31 el. K‐3                                                                                         FY 14 ‐ Mobile 19,306 HS students and  16,109 MS students  (35,500 students)  and refresh in K‐3 el. Schools.                         FY15 ‐ Mobile devices  11,900 grade 4‐5 students 

Total Obj.  4.1 

 $11,531,037.00    $6,244,000.00    $18,550,000.00    $6,056,000.00    

  

4.2.1  $0  $0  $0  $0 Funding to support staff PD in CLARITY contained in funding for TRT and SD Budget 

Total Obj.  4.2 

$0  $0  $0  $0   

  

Page 36: Technology - lcps.org€¦ · Edivan AIT Information Security Specialist Dr. Nancy Farrell Staff Development Trainer Bent Ferrell Internet Content Manager Sherron Gladden Principal,

 

4  

 4.3.1  $450,000.00    $525,000.00    $600,000.00    $650,000.00   Annual cost of CLARITY 

4.3.2  $0  $0  $0  $0  Funding source contained in 3.1.1, 3.1.2, 3.13, 3.1.4,  Total Obj. 

4.2  $450,000.00    $525,000.00    $600,000.00    $650,000.00  

  

  5.1.1       $5,000.00   $0  $0  $0

5.1.2   $10,000.00    $150,000.00    $50,000.00    $25,000.00    Consultant Fees 

5.1.3   $50,000.00    $50,000.00    $50,000.00    $50,000.00     

5.1.4   $10,000.00    $15,000.00    $20,000.00    $50,000.00     

5.1.5       $10,000.00   $0  $0  $0

5.1.6       $10,000.00   $0  $0  $0Total Obj. 

5.3  $95,000.00    $215,000.00    $220,000.00    $250,000.00  

  

  5.2.1       $ 5,000.00   $0  $0  $0

5.2.2   $10,000.00    $10,000.00    $10,000.00    $10,000.00     

5.2.3   $1,000.00    $1,000.00    $1,000.00    $1,000.00     

5.2.4   $10,000.00    $15,000.00    $20,000.00   $0    Total Obj. 

5.2  $26,000.00    $26,000.00    $31,000.00    $11,000.00  

  

  5.3.1   $20,000.00    $20,000.00    $20,000.00    $20,000.00     

5.3.2       $15,000.00   $0  $0  $0Total Obj. 

5.3  $35,000.00    $20,000.00     $20,000.00    $20,000.00  

  

5.4.1  $0  $0  $0  $0   

Grand Total 

 $39,129,488   $$43,022,211    $57,200,078    $38,809,801