tel-aviv metropolitan mass transit network may 2017 2 il.pdf · tel aviv metropolitan area 47% of...
TRANSCRIPT
Tel-Aviv Metropolitan Mass Transit Network May 2017
2
Contents
• NTA
• Tel – Aviv metropolitan area
• The Red Line
• Future LRT lines
• Metro lines
3
NTA
4
NTA - Metropolitan Mass Transit System Ltd. , a government-owned company, appointed to promote the Tel Aviv
Metropolitan Area Mass Transit Network
NTA
August 2015
Construction begins on the Red Line project
2015
Red Line begins commercial operation
NTA – Time Line
2016
.
Governmental decision - implementation of the Green & Purple Lines
2021
.
5
6
Tel-Aviv metropolitan area
7
1,500 square kilometers
From Netanya in the north to Ashdod in the south
31 cities
22 local councils
12 regional councils
Tel Aviv Metropolitan Area
Approx. 3.4 million residents
44% of the population of the State of Israel
Tel Aviv Metropolitan Area
8
Tel Aviv Metropolitan Area
growth rate of Approx. 1% / year
4.4 million residents in the metropolitan area in 2030
5.1 million residents in the metropolitan area in 2040
9
Tel Aviv Metropolitan Area
47% of all people employed in Israel (approx. 1.0 million people) work within the metropolitan area
Every work day approx. 440,000 vehicles enter the metropolitan area.
An increase of 20,000 vehicles per year is expected
10
11
The Red Line
The Red Line - ID
Length: 24 KM; 12 KM U/G + 12 KM A/G
10 Underground stations24 At-Grade stations
‘Backbone’ of the Network: passes through the most congested regions of the
metropolitan area: Petah-Tikva, Bnei-Brak, Ramat-Gan, Tel-Aviv-Yafo and Bat-Yam
Frequency: 3 minutes in rush hour
Rolling Stock: Low Floor 90 Vehicles
Operation: October 2021
Expected Annual Ridership: 70 Million Passengers
12
The Red line Project management and design is carried out by international companies:
The project’s execution incorporates Israeli and international companies in JV’s:
Danya Sebus /CCECCSolel Boneh /CRTG CRC
Project Quality Assurance:
The Red Line
13
The Red Line Procurement Strategy
Red Line Project
S&TCTrack,
Power & Comm.
Main
Packag
es
Rolling Stock
Portals & TBM
O&MDepot
Under Procurement
At Grade Civil
Works
14
Completed / Ongoing Tenders
15
Future LRT lines
16
The Green Line - ID
Underground: 4.5 km, 4 stations
Estimated cost: 20 billion NIS
At-grade: 34.5 km, 59 stations
17
The Purple Line - ID
40 stations
Estimated cost: 8.6 billion NIS
At-grade: 30 km
18
The Brown Line - ID
45 stations
At-grade: 32 km
19
Mass Transit System - 2024
The Green and purple Lines Procurement Strategy
Design of INFRA 2
Design of INFRA 1
PMCSegments
PMC (construction)
Under ProcurementOngoing Tenders
20
21
Metro Lines
The Metro Lines
NTA is promoting preparation for detailed feasibility study report for the development of a high-capacity metro rail system in the Tel Aviv Metropolitan Area.
The purpose of the study is to initiate the development of three metro lines that will provide a safe, efficient and environmentally sustainable transport network as a complement to the existing one.
22
23
Full Mass Transit System
Thank you