telecom 2002 - 2003. tuesday 12 november 2002group meeting - it/cs/tel/l.g.2 2002 - 2003 : losing or...

20
TELECOM 2002 - TELECOM 2002 - 2003 2003

Upload: mary-shepherd

Post on 22-Dec-2015

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: TELECOM 2002 - 2003. Tuesday 12 November 2002Group meeting - IT/CS/TEL/L.G.2 2002 - 2003 : losing or keeping time ? Topics Topics Radio Radio Video Video

TELECOM 2002 - 2003TELECOM 2002 - 2003

Page 2: TELECOM 2002 - 2003. Tuesday 12 November 2002Group meeting - IT/CS/TEL/L.G.2 2002 - 2003 : losing or keeping time ? Topics Topics Radio Radio Video Video

Tuesday 12 November 2002Tuesday 12 November 2002 Group meeting - IT/CS/TEL/L.G.Group meeting - IT/CS/TEL/L.G. 22

2002 - 2003 : losing or keeping time ?2002 - 2003 : losing or keeping time ?

TopicsTopics

RadioRadio VideoVideo AudioAudio TelephoneTelephone MS, IT, ContractsMS, IT, Contracts Under considerationUnder consideration

Page 3: TELECOM 2002 - 2003. Tuesday 12 November 2002Group meeting - IT/CS/TEL/L.G.2 2002 - 2003 : losing or keeping time ? Topics Topics Radio Radio Video Video

Tuesday 12 November 2002Tuesday 12 November 2002 Group meeting - IT/CS/TEL/L.G.Group meeting - IT/CS/TEL/L.G. 33

2002 : Radio and GSM2002 : Radio and GSM

Stopped the water-tower radio Stopped the water-tower radio system for the Fire Brigade, system for the Fire Brigade, replaced by the spare Motorolareplaced by the spare Motorola

Stopped the DECT pilot with PSStopped the DECT pilot with PS

Page 4: TELECOM 2002 - 2003. Tuesday 12 November 2002Group meeting - IT/CS/TEL/L.G.2 2002 - 2003 : losing or keeping time ? Topics Topics Radio Radio Video Video

Tuesday 12 November 2002Tuesday 12 November 2002 Group meeting - IT/CS/TEL/L.G.Group meeting - IT/CS/TEL/L.G. 44

2002 : Radio and GSM2002 : Radio and GSM

GSM surface coverage improvedGSM surface coverage improved

Studies for the coverage of the Studies for the coverage of the tunnel with GSM undertakentunnel with GSM undertaken

Leaky feeder installation started in Leaky feeder installation started in the LHC tunnel, sector 7-8the LHC tunnel, sector 7-8

Page 5: TELECOM 2002 - 2003. Tuesday 12 November 2002Group meeting - IT/CS/TEL/L.G.2 2002 - 2003 : losing or keeping time ? Topics Topics Radio Radio Video Video

Tuesday 12 November 2002Tuesday 12 November 2002 Group meeting - IT/CS/TEL/L.G.Group meeting - IT/CS/TEL/L.G. 55

2002 : Radio and GSM2002 : Radio and GSM

Review of all the CERN GSM Review of all the CERN GSM subscriptions according to Task subscriptions according to Task Force Nº 3 recommendation and Force Nº 3 recommendation and divisional decisionsdivisional decisions

GSM handset distribution through GSM handset distribution through CERN storesCERN stores

Telecom Lab reorganizationTelecom Lab reorganization

Page 6: TELECOM 2002 - 2003. Tuesday 12 November 2002Group meeting - IT/CS/TEL/L.G.2 2002 - 2003 : losing or keeping time ? Topics Topics Radio Radio Video Video

Tuesday 12 November 2002Tuesday 12 November 2002 Group meeting - IT/CS/TEL/L.G.Group meeting - IT/CS/TEL/L.G. 66

2002 : Video2002 : Video

Responsibility for the PS beam Responsibility for the PS beam observation video system has been observation video system has been returned to PSreturned to PS

A call for tenders concerning new A call for tenders concerning new video systems over IP has been video systems over IP has been issued for:issued for: Links between amphitheatersLinks between amphitheaters Low definition beam cameras (SL/BI)Low definition beam cameras (SL/BI)

Page 7: TELECOM 2002 - 2003. Tuesday 12 November 2002Group meeting - IT/CS/TEL/L.G.2 2002 - 2003 : losing or keeping time ? Topics Topics Radio Radio Video Video

Tuesday 12 November 2002Tuesday 12 November 2002 Group meeting - IT/CS/TEL/L.G.Group meeting - IT/CS/TEL/L.G. 77

2002 : Audio2002 : Audio

Public Address from building 58 closedPublic Address from building 58 closed

No more support for old audio systems No more support for old audio systems (Philips, Bouyer…), agreed by groups (Philips, Bouyer…), agreed by groups concernedconcerned

COMMEND system upgrade to digital, to COMMEND system upgrade to digital, to be finish in Decemberbe finish in December

Replacement of the TDM transmission Replacement of the TDM transmission system with an O.F. one, to be finish in system with an O.F. one, to be finish in DecemberDecember

Page 8: TELECOM 2002 - 2003. Tuesday 12 November 2002Group meeting - IT/CS/TEL/L.G.2 2002 - 2003 : losing or keeping time ? Topics Topics Radio Radio Video Video

Tuesday 12 November 2002Tuesday 12 November 2002 Group meeting - IT/CS/TEL/L.G.Group meeting - IT/CS/TEL/L.G. 88

2002 : Clocks2002 : Clocks

Stopped ? Stopped ?

No comment !No comment !

Page 9: TELECOM 2002 - 2003. Tuesday 12 November 2002Group meeting - IT/CS/TEL/L.G.2 2002 - 2003 : losing or keeping time ? Topics Topics Radio Radio Video Video

Tuesday 12 November 2002Tuesday 12 November 2002 Group meeting - IT/CS/TEL/L.G.Group meeting - IT/CS/TEL/L.G. 99

2002 :Telephone2002 :Telephone

FAX service to IT Printer FAX service to IT Printer SupportSupport

Crisis data up to the end of Crisis data up to the end of October:October: 350 phone transfers 350 phone transfers 200 new connections200 new connections

Page 10: TELECOM 2002 - 2003. Tuesday 12 November 2002Group meeting - IT/CS/TEL/L.G.2 2002 - 2003 : losing or keeping time ? Topics Topics Radio Radio Video Video

Tuesday 12 November 2002Tuesday 12 November 2002 Group meeting - IT/CS/TEL/L.G.Group meeting - IT/CS/TEL/L.G. 1010

2002 :Telephone2002 :Telephone

Official introduction of LCR :Official introduction of LCR : QualificationQualification ContractContract ImplementationImplementation Already 300 KCHF savedAlready 300 KCHF saved

Traffic statistics production, both Traffic statistics production, both fixed and GSM, for CERN fixed and GSM, for CERN management informationmanagement information

Page 11: TELECOM 2002 - 2003. Tuesday 12 November 2002Group meeting - IT/CS/TEL/L.G.2 2002 - 2003 : losing or keeping time ? Topics Topics Radio Radio Video Video

Tuesday 12 November 2002Tuesday 12 November 2002 Group meeting - IT/CS/TEL/L.G.Group meeting - IT/CS/TEL/L.G. 1111

2002 : MS, IT, Contracts2002 : MS, IT, Contracts

Audio, video : MS and orders issuedAudio, video : MS and orders issued

LCR : contract issuedLCR : contract issued

Upgrade of the PABXs : order issuedUpgrade of the PABXs : order issued

C-153 replacement : IT issued, C-153 replacement : IT issued, proposal to FCproposal to FC

Page 12: TELECOM 2002 - 2003. Tuesday 12 November 2002Group meeting - IT/CS/TEL/L.G.2 2002 - 2003 : losing or keeping time ? Topics Topics Radio Radio Video Video

Tuesday 12 November 2002

Group meeting - IT/CS/TEL/L.G. 12

Happy new year !

2003

Forget the clocks, it was a kid’s nightmare !

Page 13: TELECOM 2002 - 2003. Tuesday 12 November 2002Group meeting - IT/CS/TEL/L.G.2 2002 - 2003 : losing or keeping time ? Topics Topics Radio Radio Video Video

Tuesday 12 November 2002

Group meeting - IT/CS/TEL/L.G. 13

2003 : Radio

• Fire brigade and rescue :

• New Motorola station from the water tower

• Coverage uncertainties

Page 14: TELECOM 2002 - 2003. Tuesday 12 November 2002Group meeting - IT/CS/TEL/L.G.2 2002 - 2003 : losing or keeping time ? Topics Topics Radio Radio Video Video

Tuesday 12 November 2002

Group meeting - IT/CS/TEL/L.G. 14

2003 : Radio

• GSM + Leaky feeder

• Infrastructure for all underground communications

• More than 4 months delayed !

Page 15: TELECOM 2002 - 2003. Tuesday 12 November 2002Group meeting - IT/CS/TEL/L.G.2 2002 - 2003 : losing or keeping time ? Topics Topics Radio Radio Video Video

Tuesday 12 November 2002

Group meeting - IT/CS/TEL/L.G. 15

2003 : Video

• After the IT of 2002 :

• Migration to IP video for the access control of the site gates of LHC

• A pilot installation (with SL/BI) on IP video for beam observation

• A new transmission system based on M-JPEG 2000 will link the CERN amphitheaters

Page 16: TELECOM 2002 - 2003. Tuesday 12 November 2002Group meeting - IT/CS/TEL/L.G.2 2002 - 2003 : losing or keeping time ? Topics Topics Radio Radio Video Video

Tuesday 12 November 2002

Group meeting - IT/CS/TEL/L.G. 16

2003 : Telephone

• LCR will be eased by the new PABX OS, new operators will go through qualification

• A quarterly Telecom bulletin will be issued for CERN management

Page 17: TELECOM 2002 - 2003. Tuesday 12 November 2002Group meeting - IT/CS/TEL/L.G.2 2002 - 2003 : losing or keeping time ? Topics Topics Radio Radio Video Video

Tuesday 12 November 2002

Group meeting - IT/CS/TEL/L.G. 17

2003 : Telephone

• PABXs upgrade, a BIG step :• Replacement of the TDM by O.F. for

the meshed inter PABXs backbone• IP links for the edge PABXs• New topology for the network• Switchboard PCs move to W2K

Page 18: TELECOM 2002 - 2003. Tuesday 12 November 2002Group meeting - IT/CS/TEL/L.G.2 2002 - 2003 : losing or keeping time ? Topics Topics Radio Radio Video Video

Tuesday 12 November 2002

Group meeting - IT/CS/TEL/L.G. 18

2003 : Telephone

• PABXs upgrade, a BIG step :• New OS allowing :

• Simplified configuration management• Routing facilities• IP telephony• Avoid renumbering for France

• Introduction of soft phones based on W2K

Page 19: TELECOM 2002 - 2003. Tuesday 12 November 2002Group meeting - IT/CS/TEL/L.G.2 2002 - 2003 : losing or keeping time ? Topics Topics Radio Radio Video Video

Tuesday 12 November 2002

Group meeting - IT/CS/TEL/L.G. 19

Under consideration

• VoIP pilot :• In collaboration with Alcatel and IT/CS/CN we will set a

~100 connections IP telephone network.• 2nd half of 2003

• Polycom network (fire brigade) :• Depending on the result of discussions between the

Geneva Police and Fire Brigade, we may have to start a study for a complete replacement of the CERN Fire Brigade radio system based on TETRA or TETRAPOL standards

• GPRS services :• With the beginning of LHC installations we will have to

face new demands for GSM technologies. It’s time to think for new services.

Page 20: TELECOM 2002 - 2003. Tuesday 12 November 2002Group meeting - IT/CS/TEL/L.G.2 2002 - 2003 : losing or keeping time ? Topics Topics Radio Radio Video Video

Tuesday 12 November 2002

Group meeting - IT/CS/TEL/L.G. 20

Trombinoscope :

• We are very pleased to welcome a new member in the Telecom section : Frédéric Chapron

• For older members, please referred to photos on the Web pages of the group !