telenor norway - network · pdf filetelenor norway - network magnus zetterberg, ... ran swap...
TRANSCRIPT
![Page 1: Telenor Norway - Network · PDF fileTelenor Norway - Network Magnus Zetterberg, ... RAN swap completed in 2010/2011 ... Phase-out 3G by 2020, 2G by 2025](https://reader031.vdocuments.net/reader031/viewer/2022022503/5aaf415b7f8b9a6b308d18ad/html5/thumbnails/1.jpg)
Telenor Norway - Network
Magnus Zetterberg, CTO, Telenor Norway
London 2 June 2015
![Page 2: Telenor Norway - Network · PDF fileTelenor Norway - Network Magnus Zetterberg, ... RAN swap completed in 2010/2011 ... Phase-out 3G by 2020, 2G by 2025](https://reader031.vdocuments.net/reader031/viewer/2022022503/5aaf415b7f8b9a6b308d18ad/html5/thumbnails/2.jpg)
Telenor Norway has invested more than NOK 4 bn per year
- building a great foundation for future growth
2010 2011 2012 2013 2014
Fixed Mobile
3.2 3.7
4.1 4.4
4.2
Capex (NOK bn)
2
![Page 3: Telenor Norway - Network · PDF fileTelenor Norway - Network Magnus Zetterberg, ... RAN swap completed in 2010/2011 ... Phase-out 3G by 2020, 2G by 2025](https://reader031.vdocuments.net/reader031/viewer/2022022503/5aaf415b7f8b9a6b308d18ad/html5/thumbnails/3.jpg)
xDSL
PSTN/
ISDN
2G/3G/4G
FTTH
Capacity
Core network
HFC
Optimise
development, plan,
rollout & operations
across access
technologies
Increase reach of
services
Enable transitions
ahead of customers’
needs
A future-proof all-play operator with unique synergy
and innovation potential
3
![Page 4: Telenor Norway - Network · PDF fileTelenor Norway - Network Magnus Zetterberg, ... RAN swap completed in 2010/2011 ... Phase-out 3G by 2020, 2G by 2025](https://reader031.vdocuments.net/reader031/viewer/2022022503/5aaf415b7f8b9a6b308d18ad/html5/thumbnails/4.jpg)
Investing in fixed and mobile networks to support
profitable growth and efficiency
4
Internet for all Loved by customers Efficient operations
![Page 5: Telenor Norway - Network · PDF fileTelenor Norway - Network Magnus Zetterberg, ... RAN swap completed in 2010/2011 ... Phase-out 3G by 2020, 2G by 2025](https://reader031.vdocuments.net/reader031/viewer/2022022503/5aaf415b7f8b9a6b308d18ad/html5/thumbnails/5.jpg)
Superior mobile network position
• A modern network
• RAN swap completed in 2010/2011
• High-capacity backhaul to 70% of all
base stations
• Leading 4G position
• 4G launched in 2012
• 1/3 of sites have 4G
• >60% of mobile data traffic now on 4G
• Preparing for VoLTE and Wifi Calling
• 4G+ launched in March 2015
• Mobile Business Network (MBN)
88
66
37
30
61
Q1 13 Q1 14 Q1 15
2G 3G 4G
Q1 13 Q1 14 Q1 15
2G/3G only 4G
Mobile data traffic (%)
Physical sites
6,850
7,250
7,500
5
![Page 6: Telenor Norway - Network · PDF fileTelenor Norway - Network Magnus Zetterberg, ... RAN swap completed in 2010/2011 ... Phase-out 3G by 2020, 2G by 2025](https://reader031.vdocuments.net/reader031/viewer/2022022503/5aaf415b7f8b9a6b308d18ad/html5/thumbnails/6.jpg)
Significant 4G network expansion 2015-2017
6
2015 2016
2017
95% of population
49% of area
98% of population
70% of area
99% of population
82% of area
![Page 7: Telenor Norway - Network · PDF fileTelenor Norway - Network Magnus Zetterberg, ... RAN swap completed in 2010/2011 ... Phase-out 3G by 2020, 2G by 2025](https://reader031.vdocuments.net/reader031/viewer/2022022503/5aaf415b7f8b9a6b308d18ad/html5/thumbnails/7.jpg)
Only 4G technology on all sites can efficiently cater for
the strong growth in data usage
7
Exploit 4G and IMS platforms
• Voice and business services on 4G
with VoLTE
• Improve indoor coverage with VoWiFi
• Complete transition from voice-centric
to data-centric
• 4G+ in more than 200 municipalities
before summer 2015
• Phase-out 3G by 2020, 2G by 2025
Maximise allocation of spectrum to 4G
2015 2025
![Page 8: Telenor Norway - Network · PDF fileTelenor Norway - Network Magnus Zetterberg, ... RAN swap completed in 2010/2011 ... Phase-out 3G by 2020, 2G by 2025](https://reader031.vdocuments.net/reader031/viewer/2022022503/5aaf415b7f8b9a6b308d18ad/html5/thumbnails/8.jpg)
Fixed broadband:
Optimise rollout by utilising all appropriate technologies
8
• Fibre rollout closer to customers to upgrade broadband access
• HFC upgrade to DOCSIS 3.1 and segmentation to increase capacity
• Major IT modernisation initiatives
DSL HFC
Fibre
![Page 9: Telenor Norway - Network · PDF fileTelenor Norway - Network Magnus Zetterberg, ... RAN swap completed in 2010/2011 ... Phase-out 3G by 2020, 2G by 2025](https://reader031.vdocuments.net/reader031/viewer/2022022503/5aaf415b7f8b9a6b308d18ad/html5/thumbnails/9.jpg)
Summary
All-play operator with unique synergy and innovation potential
Superior mobile network with 99% population coverage by end of 2017
Rolling fibre closer to the customer and implementing cluster strategy
9
![Page 10: Telenor Norway - Network · PDF fileTelenor Norway - Network Magnus Zetterberg, ... RAN swap completed in 2010/2011 ... Phase-out 3G by 2020, 2G by 2025](https://reader031.vdocuments.net/reader031/viewer/2022022503/5aaf415b7f8b9a6b308d18ad/html5/thumbnails/10.jpg)
Q&A