Page 1: TEMPORARY POWER FOR PERMANENT GROWTH · 2014-11-02 · TEMPORARY POWER PLANTS KEY PROJECT COMPONENTS MAIN FUEL TANKS, FUEL SYSTEM The fuel system includes the connection to the main

International electricity rental

TEMPORARY POWER FOR

PERMANENT GROWTH

Page 2: TEMPORARY POWER FOR PERMANENT GROWTH · 2014-11-02 · TEMPORARY POWER PLANTS KEY PROJECT COMPONENTS MAIN FUEL TANKS, FUEL SYSTEM The fuel system includes the connection to the main

GenRent – International Electricity Rental is a leading global

provider of temporary power solutions including development,

planning, rental, installation and operation of temporary

power plants, based on gas turbines, diesel and gas gensets

and containerized HFO, and rental and sale of diesel and

gas generators, generators installation and installation of

standalone substations.

Our advanced software management tools, global real-time

performance monitoring abilities, together with high quality

maintenance and our approach of support services assures

our clients a fast and seamless operation at all times.

140MW 69KV Power Station, in Maua, BrazilWithin 3 months, GenRent succeeded in establishing this

140MW diesel power plant rented to Amazonas Energia and

constituting 110 diesel generators. The teams performed all

construction works, including hydraulics, electromechanical,

assembly of fuel tanks with a capacity for 5000m³, and

connecting a 69 KV transmission line from the substation to

the Industrial District.

TEMPORARY POWER SOLUTIONS

40MW 69KV Power Station, in Manaus, BrazilWithin 30 days, GenRent succeeded in establishing this 40MW

diesel power plant rented to Amazonas Energia.

The teams handled all project aspects including hydraulic

installations, electromechanical, assembly of fuel tanks with

a capacity for 900m³, and transmission line setup at 13.8KV

from the power plant to Substation at Industrial District.

140MW within 3 months 40MWwithin 30 day

140MW within 3 months

40MWwithin 30 day

International electricity rental

Page 3: TEMPORARY POWER FOR PERMANENT GROWTH · 2014-11-02 · TEMPORARY POWER PLANTS KEY PROJECT COMPONENTS MAIN FUEL TANKS, FUEL SYSTEM The fuel system includes the connection to the main

International electricity rental

With more than 20 years of experience in providing

comprehensive power solutions, 500 employees, a global

fleet of more than 750MW and a worldwide presence,

GenRent is your global partner for quick and effective

implementation of temporary power solutions.

ABOUT GENRENTWE HAVE THE POWER SOLUTIONS FOR YOU!

WE UNDERSTAND POWERWith more than 20 years in the business of supplying power, we

have a deep understanding of your requirements as well as the

answers on how to provide.

WE ARE FAST Combining dedication and flexibility with excellent logistic and

project management skills, we provide our clients with the

industry’s shortest response time. If your requirement can be met,

we will be the ones to provide.

OUR COMPREHENSIVE APPROACH Together with our affiliates, we provide the client with a full

solution, addressing all his demand for power, whether temporary

or long term.

WE ARE RELIABLEUsing Diesel and Gas generators, containerized HFO engines

and movable Gas turbines, we always provide our clients with

equipment at excellent condition. Based on our knowledge and

experience we know how to reduce the gensets’ sensitivity to

site temperature and weather conditions. Our knowledge and

equipment combined, provide our clients with increased reliability

and assurance for seamless operation and power supply.

OUR COST-EFFECTIVE SOLUTIONOur highly efficient operation teamed with our knowledge and

experience, allow us to offer our clients highly competitive

product. Our gensets’ fuel consumption is significantly lower than

industry standard, which ensures our clients pay less.

Page 4: TEMPORARY POWER FOR PERMANENT GROWTH · 2014-11-02 · TEMPORARY POWER PLANTS KEY PROJECT COMPONENTS MAIN FUEL TANKS, FUEL SYSTEM The fuel system includes the connection to the main

International electricity rental

SCADA SYSTEMEach of our projects includes an advanced

real time control and monitoring system,

which is a cornerstone in our approach to

site operation and maintenance

TEMPORARY POWER PLANTS KEY PROJECT COMPONENTSMAIN FUEL TANKS, FUEL SYSTEMThe fuel system includes the connection to

the main tank, which is already installed on

site for the entire plant, which in turn feeds

buffer tanks – the daily tanks for each 6

generator units

GENERATOR SETSWe use a unique light modular building

structure, specially designed and developed

by us, which enables easier and faster time

for the installation of the power plant as well

greater efficiency and cost saving during the

Operation and Maintenance period

DAILY FUEL TANK

TRANSFORMERSPower plant transformers are responsible

for the adjustment between high voltage

levels and low distribution voltage levels

or between two different transmission

voltages.

Our step-up transformers increase the

voltage in order to transmit electric current

a long distance through the power grid.

CONTROL CENTER

Page 5: TEMPORARY POWER FOR PERMANENT GROWTH · 2014-11-02 · TEMPORARY POWER PLANTS KEY PROJECT COMPONENTS MAIN FUEL TANKS, FUEL SYSTEM The fuel system includes the connection to the main

Planning and EngineeringAfter so many years in the business of providing power, we know how

important it is to meticulously learn the specific site and project requirements.

Our planning and engineering group will design the site to meet both the

technical requirements as well as any applicable standards and regulations.

1

International electricity rental

OUR WORKING PROCESS At GenRent, we know that the requirement for a temporary power solution is nearly always

immediate and in many cases even urgent. Our working process is efficient and well structured.

Mobilization and Procurement

Our outstanding project management & logistic

skills, supported by GenRent’s world renowned

development and project implementation

capabilities, begin to work as soon as the contract

is signed. Utilizing both our existing fleet and

equipment, as well as our excellent relationships

with leading suppliers, the procurement &

mobilization of the required equipment is focused

on delivering our commitment to you.

2

3

4

5 AC and Grid Connection WorksSimultaneously with electro-mechanical works, AC and grid connection works

commence in order to ensure the connection to the local grid as soon as installation

works are completed. Each grid has its own unique specifications and our team works

hard to make the perfect connection between the power plant and the local grid.

56

7

Operation and Maintenance

Once the power plant is up and running, we ensure the

seamless operation of the plant by using our advanced

controlling and management systems. Our team present

on site, together with local employees trained by us, will

be constantly monitoring the power plant’s operation and

power produced. Throughout the contract duration, we

will ensure that the team on site is always both skilled and

equipped with the required spare parts and resources.

7

8

DecommissioningAt the end of the contract, in the same way we built

our modular plant, we will decommission it, and

fully clear and clean the site, keeping environmental

preservation in mind.

8

CommissioningCommissioning is executed once the installation

works as well as the AC and grid connection

works are completed. At the commissioning

stage we run rigorous tests to ensure that all the

pieces are in place and that the plant is ready to

generate the power required.

6

Electro – Mechanical Installation Works

Upon arrival of the equipment on site, the electro-

mechanical installation works begin. Our team will

work around-the-clock to ensure a flawless installation

of our modular power plants and to complete all the

related mechanical and electrical works.

4

Civil WorksAs soon as the planning and engineering is complete,

the site preparation and civil works begin. In many

cases, we leverage our experience as a truly global

company to partner with local companies who

are familiar with each sites unique characteristics

and conditions. Not only are we able to ensure a

seamless working process, we are also happy to

support the local employees and economy.

3

1 2

Page 6: TEMPORARY POWER FOR PERMANENT GROWTH · 2014-11-02 · TEMPORARY POWER PLANTS KEY PROJECT COMPONENTS MAIN FUEL TANKS, FUEL SYSTEM The fuel system includes the connection to the main

International electricity rental

g e n r e n t - i n t e r n a t i o n a l . c o m

South-West [email protected]

East [email protected]

Latin [email protected]

[email protected]

CONTACT US

[email protected]