Page 1: Temporary Works – What Needs to be Done 17 th June 2015

Temporary Works – What Needs to be Done

17th June 2015

Page 2: Temporary Works – What Needs to be Done 17 th June 2015

Introduction

Page 3: Temporary Works – What Needs to be Done 17 th June 2015

3

Temporary Works in Tata Steel

HSE visit May 2012 identified areas of weakness with regard to the management of temporary work during the rebuild of Blast Furnace No. 4

Review conducted of the requirements of BS 5975:2008

Training given in the role of the Temporary Works Coordinator

System put in place to monitor temporary works from design stage to installation and use

Page 4: Temporary Works – What Needs to be Done 17 th June 2015

16 August 2012Temporary Works - BOS OG Replacement 4

Temporary Works - Introduction

• Defined in BS5975:2008 as :-

• “Those parts of the works that allow or enable construction of, protect, support or provide access to, the permanent works and which might or might not remain in place at the completion of the works”

Page 5: Temporary Works – What Needs to be Done 17 th June 2015

5

Temporary Works - Background

• Examples of Temporary Works:-

• Earthworks e.g. trenches, excavations, slopes and stockpiles;• Structures e.g. formwork, propping, shoring, scaffolding, temporary bridges,

site fencing;

Page 6: Temporary Works – What Needs to be Done 17 th June 2015

16 August 2012Temporary Works - BOS OG Replacement 6

Temporary Works - Background

• Examples of Temporary Works Cont.:-

• Equipment / Plant Foundations e.g. tower crane bases, supports, anchors and ties for construction hoists, mast climbing work platforms, grounds to provide suitable locations for plant erection;

Page 7: Temporary Works – What Needs to be Done 17 th June 2015

Management

Page 8: Temporary Works – What Needs to be Done 17 th June 2015

16 August 2012Temporary Works - BOS OG Replacement 8

Temporary Works - Management

• BS 5975:2008 provides recommendations and guidance on the procedural controls to be applied to all aspects of temporary works in the construction industry.

• You should be able to demonstrate that you have in place effective arrangements for controlling risks arising from the use of temporary works.

• These are captured in a temporary works procedure which will contain most or all of the following :-

• Appointment of a Temporary Works Co-Ordinator (TWC);

• Ensuring preparation of an adequate design brief;

• Preparation and maintenance of a temporary works register;

• Production of a temporary works design;

• Independent checking of temporary works design;

• Issue of a design / design check certificate;

• Pre-erection inspection of the temporary works materials and components.

• Supervision of erection of temporary works;

• Checking that temporary works has been erected in accordance with the relevant design;

• Confirm that permanent works have attained adequate strength, or no longer required to allow TW to be dismantled.

Page 9: Temporary Works – What Needs to be Done 17 th June 2015

16 August 2012Temporary Works - BOS OG Replacement 9

Temporary Works – Management

• Temporary Works Co-Ordinator (TWC)

• Formerly Appointed and has authority to carry out his/her tasks including stopping the work if not satisfactory;

• Hold professional qualifications (CE Status); formal TWC training; relevant experience;

• Coordinate all temporary work activities;

• Determine the temporary works for the project, compile a Temporary Works Register and keep all TW records including drawings and design calculations;

• Ensuring that the Contractors procedures for control of temporary works are implemented on site;

• Not normally the designer but ensures design is prepared, checked and implemented on site;

• Temporary Works Supervisor (TWS)

• Responsible to the TWC and assist the TWC in supervision of temporary works.

Page 10: Temporary Works – What Needs to be Done 17 th June 2015

Process Flow

Page 11: Temporary Works – What Needs to be Done 17 th June 2015

16 August 2012Temporary Works - BOS OG Replacement 11

Temporary Works – Process FlowStart

Initiator to complete ‘Temporary Works Request Briefing’ Form

Initiator to issue ‘Temporary Works Request Briefing’ (TWRB) Form to Temporary

Works Provider

Temporary Works Provider / Co-Ordinator determines category for Temporary Works

Category?

No design required.

Copy of TWRB form to be issued to Temporary Works Co-ordinator (TWC) for

record purposes under CDM

Proceed with installation of Temporary Works

Provider submits design drawings/calculations checked in accordance

with correct level of independence and confirms written confirmation to Initiator

Initiator submits TWRB Form and design drawings/calculations to TWC

TWC to sign and return TWRB Form to Initiator. TWC to record in TW Register. Proceed with installation of Temporary

Works

TWC to sign and return TWRB Form to Initiator. TWC to record in TW Register.

Proceed with use of Temporary Works

TWC/Supervisor to inspect TW installation. TWC to issue TW Design and Installation

Check Sheet and TW Permit.

0 1, 2 or 3

Page 12: Temporary Works – What Needs to be Done 17 th June 2015

12

Temporary Works – Documentation

• Temporary Works - Design Brief (By Initiator)

• A design brief should be prepared to serve as the starting point for subsequent decisions, design work, calculations and drawings;

• When the design brief is completed, the design check should be carried out

Page 13: Temporary Works – What Needs to be Done 17 th June 2015

16 August 2012Temporary Works - BOS OG Replacement 13

Temporary Works – Documentation

• Temporary Works – Design Check

• Before Starting the construction of the TW, the concept, adequacy, correctness and compliance with the design brief should be checked in accordance with the correct level of independence.

• Temporary Works Categories range from 0 to 3 depending on complexity

• Once the design check is complete and satisfactory a certificate or written confirmation should be issued to confirm the design complies with the design brief, standards and constraints or loading conditions.

Page 14: Temporary Works – What Needs to be Done 17 th June 2015

Category 0

14

Scope

Restricted to standard solutions only, to ensure the site conditions do not conflict with the scope of limitation of the chosen standard solution

Comment

This applies to the use of standard solutions and NOT an original design which will require both structural calculation and checking to cat 1, 2 or 3 as appropriate

Independence of checker

The design check may be carried out by another member of the site or design team

Scaffolding Context

This would be anything that constitutes a “ Basic Scaffold” as defined in TG20:08 which can be erected within the parameters of TG20:08 guidelines (or for a system scaffold that conforms to the requirements of a standard solution in the User Guide for that system.)

Page 15: Temporary Works – What Needs to be Done 17 th June 2015

Category 1

15

Scope

For simple designs. These may include formwork, falsework (where top restraint is not assumed) needling and propping to brickwork in openings in single storey construction

Comment

Such designs would be undertaken using simple methods of analysis and be in accordance with the relevant standards, suppliers technical literature or other relevant publications

Independence of checker

The check may be carried out by another member of the design team

Scaffolding Context

Examples that would fall into this category would be simple bridges with beams, simple loading bays founded on the ground (such as typical brickwork for new build), straightforward towers and birdcages.)

Page 16: Temporary Works – What Needs to be Done 17 th June 2015

Category 2

16

Scope

On more complex or involved designs. Designs for excavations, for foundations, for reinforced concrete

Comment

Category 2 checks would include designs where a considerable degree of interpretation of loads or soils’ information is required before the design of the foundation or excavation support or slope

Independence of checker

The check should be carried out by an individual not involved in design and not consulted by the designer.

Scaffolding Context

Public protection, complicated bridging arrangements, heavily loaded birdcages, truss outs, line crossings and scaffolds for vehicular access

Page 17: Temporary Works – What Needs to be Done 17 th June 2015

Category 3

17

Scope

For complex or innovative designs, which result in complex sequences of moving and / or construction of either the temporary or permanent works

Comment

These designs include unusual designs or where significant departures from the standards, novel methods of analysis, or considerable exercise of engineering judgement are involved

Independence of checker

The check should be carried out by another organisation

Scaffolding Context

The definition of a ‘complex’ or ‘innovative’ scaffold can be somewhat subjective. Such variations include unusual load paths (wind transferred through wires or beams on flat) or bridging/cantilever beams at several levels in different directions.

Page 18: Temporary Works – What Needs to be Done 17 th June 2015

18

Temporary Works – Permit

Issue of Temporary Works Permits

•On completion of the design, drawings and installation, a TW ‘Design and installation check sheet should be completed by the Temporary Works Supervisor, or nominated competent deputy.

•This is to confirm the Temporary Works design has been carried out and checked, the Temporary Works drawing is as per the Temporary Works design and the Temporary Works installation is as per the Temporary Works drawing.

•The completed Design and installation check sheet and all accompanying information is then presented to the Temporary Works Coordinator prior to the issue of a Temporary Works permit.

•The Temporary Works Permit to ‘Load, Lift, Use or Transport’ can then be issued by the Temporary Works Coordinator .

•The Temporary Works Coordinator will complete the ‘Design and installation check sheet’ along with the Temporary Works permits by the insertion of the ‘Temporary Works No.’ taken from the next sequential number from the Temporary Works Register.

Page 19: Temporary Works – What Needs to be Done 17 th June 2015

19

Temporary Works – Documentation

• Temporary Works – Design Check

Page 20: Temporary Works – What Needs to be Done 17 th June 2015

20

Temporary Works – Permit

Page 21: Temporary Works – What Needs to be Done 17 th June 2015

21

Temporary Works – Register

Example of Temporary Works Register

Page 22: Temporary Works – What Needs to be Done 17 th June 2015

Tata Steel Temporary Works Process

Page 23: Temporary Works – What Needs to be Done 17 th June 2015

Temporary Works Cat Flowcharts

23

Initiator of work prepares design brief

Scaffold company carries out design check

Scaffold design complies with TG20:13 copy of

design brief returned to TWC for inclusion on

TW Register

Scaffold erected, inspected and tagged

Scaffold use monitored to ensure continued

suitability

Cranes and Lifting Department carries out

design checks

Lifting point installed as per design and tested

Suitable design of lifting point identified copy of design brief returned to

TWC for inclusion on TW Register

Lifting point use monitored to ensure continued suitability

Structural beam used in accord with design brief

Suitability of beam confirmed and copy of design brief returned to TWC for inclusion on

TW Register

Structural beam use monitored to ensure continued suitability

Design Office carries out design checks

Mobile crane set up in accord with design brief

Suitability ground confirmed and copy of design brief returned to TWC for inclusion on

TW Register

Crane use monitored to ensure continued

compliance with design brief

Civil & Structural Department carries out

design checks

Scaffolding Lifting Points Use of Structural Beams Mobile Cranes

Page 24: Temporary Works – What Needs to be Done 17 th June 2015

24

QUESTIONS